Loading...
HomeMy WebLinkAboutRES.1440.03-01-1999 BILL N0. 99-60 RESOLUTION N0. f���v A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTR.ACT FOR ENGINEERING SERVICES WITH KOEHLER ENGINEERING AND LAND SURVEYING, FOR THE DESIGN OF SIGNALIZATION AT SPRIGG STREET AND NORMAL AVENUE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS : ARTICLE 1 . The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute a Contract for Engineering Services with Koehler Engineering and Land Surveying, for the design of signalization at Sprigg Street and Normal Avenue. A copy of said Contract is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS �_ DAY OF { 7 ; , 19�. . �✓1�'" A. . Spradling, III, a or ATTEST: -��.:�� . �A.�.F �.'� � �i �� i';� f-N� ��'.�i��. %' � / �✓l� .�f / / / �� /C:.�iL _�t� �� ' (. Cl�(S:i. a 'r�; 1� Gayle << Conrad �'� � �"` Deputy City Clerk �4�,;�.�� v � �i�'1 �, , `�" ��f;i ��� , �,�,,��= p ^ * a�� SIGNALIZATION OF SPRIGG STREET �i NORMAL AVENUE CONTRACT FOR ENGINEERING SERVICES CITY OF CAPE GIRARDEAU,MISSOURI THIS CONTRACT is between City of Cape Girardeau, hereinafter referred to as the "City" and Koehler Engineering and Land Surveying, hereinafter referred to as the"Engineer". The City of Cape Girardeau desires to have a traff"ic signal designed and constructed at the existing intersection of Sprigg Street and Normal Avenue. This signal is to be constructed to relieve frequent traffic congestion at this intersection. This contract is for engineering services to prepare detailed plans, speci�cations, and contract documents, in every way sufficient for the advertising and letting of a construction contract. In the event the City desires to use the Engineer for construction inspection, construction staking, and certain testing services, this Contract provides hourly rates for such services. The Engineer will provide the Ciry with basic design services, and those additional services, if requested, as hereinafter detailed. It is mutually agreed as follows: ARTICLE I— SCOPE OF SERVICES A. DESIGN PHASE —The Engineer will: 1. Determine the project design requirements and the specific goals of the City with , regards to the intersection of Sprigg Street and Normal Avenue. 2. Conduct topographic, property, and utility surveys, to establish the existing design conditions at the intersection. 3. Design required geometric changes to accommodate the signalized intersection, including modification of existing sidewalks as required. 4. Evaluate the need for and placement of advance signage for the Signalized Intersection. 5. Evaluate existing storm sewer facilities, and propose modi�cations to the facilities to accommodate the geometric and sidewalk modifications. 6. Work with City staff and equipment to obtain traffic counts at the intersection of Sprigg Street and Normal Avenue, including directional time / movement patterns. 7. Coordinate with Ciry staff to specify and design signal hardware and PLC's compatible with existing and proposed City system components. 8. Submit copies of the preliminary plans, estimates and other studies for review by the City. Participate in the discussion and review of the preliminary plans, to determine the final signal geometry other pertinent design decisions. 9. Based on approvals of preliminary plans, prepare detailed construction plans, cost estimates, specifications and related documents as necessary for the purpose of soliciting bids for constructing the project. Actual soliciting of bids is to be conducted by the City. 10. Secure adequate properties title information, determine right-of-way plans, and assist the City in preparing the right-of-way deeds and plats for the project. 11. Provide the City five sets of completed plans, specifications and cost estimates for the purpose of obtaining construction contracts. Provide the City with a complete set of reproducible drawings. r � B. BIDDING PHASE—The Engineer will: 1. Upon receipt of construction authorization from the City, make final corrections resulting from reviews by the City and all other agencies that may be involved. 2. Assist the City in evaluating bids and awarding of the Contract. C. CONSTRUCTION PHASE — The Engineer, if requested by the City, will serve as the City's representative for administeri.ng the terms of the construction contract between City and their Contractor. Engineer will advise the City of defects in workmanship and materials. However,the furnishing of such project representation will not make Engineer responsible for the construction methods and procedures used by the Contractor or for the Contractor's failure to perform work in accordance with the contract documents. The Engineer's services, more specifically, will include the following: 1. Assist the City with a pre-construction conference to discuss project details with the Contractor. 2. Make periodic site visits to observe the Contractor's progress and quality of work, and determine if the work conforms to the contract documents. If construction staking and layout is to be accomplished by the Ciry or Contractor, the Engineer shall establish control points and benchmarks suf�cient for layout. 3. Check shop drawings,review construction schedules and pay estimates submitted by the Contractor. 4. Reject work not conforming to the project documents. 5. Prepare necessary change orders for issuance by the City, and assure that proper approvals are obtained. 6. Review wage rates, equal employment opportunity guidelines, contractual obligations, and all related contractual items specifically set forth in the contract documents. 7. Inspect materials, review material certifications, and workmanship of the Contractor; sample concrete and other materials as required, and arrange or perform laboratory testing. 8. Maintain a construction progress diary and other project records; measure and document quantities, and review monthly pay requests due the Contractor. 9. During critical construction operations, the Engineer shall be on the job to observe and approve contractors operations, speci�cally the Engineer shall observe the following: a. Layout of the Intersection b. Excavation and backfilling c. Checking of reinforcing steel prior to concrete placement d. Concrete batching and pouring e. Placement of surfacing materials 10. Perform soil compaction testing,prepare and test concrete cylinders, and prepaze reports summarizing all test results. 11. Participate in final inspection, and provide City with project documentation (diaries, test results, certi�cations, etc.); provide as-built plans for the City's records. ARTICLE II—ADDITIONAL SERVICES The City reserves the right to request additional work, if changed or unforeseen conditions occur beyond the scope of this contract. In this event, a supplement to this agreement shall be executed and submitted for the approval prior to performing additional work or incurring any additional cost therefor. Any change in compensation will be covered in the supplemental agreement. ARTICLE III—RESPONSIBILITIES OF CITY The City will cooperate fully with the Engineer in the dev,elopment of the project, including the following: A. Make available all information pertaining to the project which may be in the possession of the City. B. Provide the Engineer with the City's requirements for the project. C. Assist in securing arrangements for the Engineer to enter upon properties at the project site for the performance of his duties. D. Assist in obtaining traftic counts for the intersection of Sprigg Street and Normal Avenue, in the form of instructing City Staff to place and monitor a traffic counter to gather data on all sides of the proposed intersection. E. Examine all studies and layouts developed by the Engineer, and submit a summary of the review comments. The Ciry shall render decisions thereon in a prompt manner so as not to delay the Engineer. F. Designate a person in the City's employ to act as City's representative under this contract. Said person shall have the authority to transmit instructions, interpret the City's policies and render decisions with respect to matters covered by this agreement. G. The City will perform appraisals and appraisal review, negotiate with the properiy owners and otherwise provide all services in connection with acquiring all right-of- way needed to construct this project. ARTICLE IV—PERIOD OF SERVICE The Engineer will commence work within one week after receiving notice to proceed from the City. The general phases of work will be completed in accordance with the following schedule: A. Preliminary design phase — Within 30 calendar days after receipt of notice to proceed. B. Final design phase — Within 15 calendar days after completion of review of preliminary plans by City. C. Construction Phase — The Engineer shall perform all construction inspection and staking on a schedule that will not delay the Contractor. The above times are exclusive of review time by other agencies and exclusive of time needed to acquire right-of-way. The Ciry will gant time extensions for unavoidable delays beyond the control of the Engineer. Requests for extensions of time shall be requested in writing by the Engineer, stating fully the reasons for the request. ARTICLE V—STANDARDS For services provided under this contract, the Ciry will compensate the Engineer as follows: A. For design services, including work through the construction contract award the City will reimburse the Engineer for the hours expended and at the hourly rates set previously set forth in Attachment"A"to the original Agreement for Services. For the basic design services set forth herein, reimbursement to the Engineershall not exceed $ 14,500 which sum includes the design services for of the Signalized Intersection to be installed at Sprigg Street and Normal Avenue. B. If construction inspection services or construction staking services are desired by the City the Engineer shall be reimbursed for the hours expended based on the hourly rates set forth in Attachment"A"to the original Ageement for Services. C. Any major changes in work, or extra work, which exceeds the contract ceiling will require a supplement to this contract, as covered in Article II — ADDITIONAL SERVICES. D. The hourly rates for survey crews and testing personnel include the cost of all survey equipment, measuring devices, and testing apparatus while employed on the site. The hourly rates for personnel include the cost of overhead, payroll taxes, and employee insurance. 1. Other possible Project Costs, incurred on a subcontract basis, will be passed through the Engineer to the City on the basis of actual cost as invoiced. These costs could include a subsurface investigation, or specialized services such as archaeological surveys, etc. No subcontractor costs will be incurred without prior written consent of the Ciry. E. METHOD OF PAYMENT— Partial payments for work satisfactorily completed will be made to Engineer upon receiptof itemized invoices by the City, Invoices will be submitted on a monthly basis. F. PROPERTY ACCOUNTABILITY — If it becomes necessary to acquire any specialized equipment for the performance of this contract, appropriate credit will be given for any residual value of said equipment after completion of usage of the equipment. ARTICLE VII—COVENANT AGAINST CONTINGENT FEES The Engineer warrants that he has not employed or retained any company or person, other than a bona fide employee working for the Engineer, to solicit or secure this agreement, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award of this contract. For breach or violation this warranty, the City shall have the right to annul this agreement without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage,brokerage fee, gift,or contingent fee,plus reasonable attorney's fees. ARTICLE VIII— SUBLETTING,ASSIGNMENT OR TRANSFER No portion of the work covered by this contract, except as provided herein, shall be sublet or transfened without the written consent of the City. The subletting of the work shall in no way relive the Engineer of his primary responsibility for the qualiry and performance of the work. It is the intention of the Engineer to engage subcontractors for the purposes of: Foundation borings and tests, abstracts of title, aerial topography, and archaeological studies, if required. ARTICLE IX—PROFESSIONAL ENDORSEMENT All plans, specifications and other documents shall be endorsed by the Engineer and shall reflect the name and seal of the Professional Engineer endorsing the work. ARTICLE X—RETENTION OF RECORDS The Engineer shall maintain all records, survey notes, design documents, cost and accounting records, construction records and other records pertaining to this project, for a period not less than three years following final payment. Said records shall be made available for inspection by authorized representatives of the City. ARTICLE XI —OWNERSHIP OF DOCUMENTS Plans, tracings, maps and specifications prepared under this contract shall be delivered to and become the property of the City upon termination or completion of work. Basic survey notes, design computations and other data prepared under this contract shall be made available to the City upon request. All such information produced under this contract shall be available for use by the Ciry without restriction or limitation on its use. If the City incorporates any portion of the work into a project other than that which it was performed, the Ciry shall save the Engineer harmless from any claims and liabilities resulting from such use. ARTICLE XII—TERMINATION The City may terminate the contract at any time by giving written notice. If the contract is terminated because the project is abandoned or postponed by the Ciry, the Engineer will be paid for actual expenses incurred at the time of termination. If the contract is tertninated due to unsatisfactory services I the judgement of the City, or if the Engineer fails to prosecute the work with due diligence, the City may procure completion of the work in such manner as it deems to be in the best interest of the City. The Engineer will be responsible for any excess cost in addition to that provided for in this contract or any damages the City may sustain by reason of the termination of this contract due to unsatisfactory performances or prosecution. ARTICLE XIII—DECISIONS UNDER THIS CONTRACT The City will determine the acceptability of work performed under this contract, and will decide all questions which may arise concerning the project. The City's decision shall be final and conclusive. J � ARTICLE XIV— SUCCESSORS AND ASSIGNS The City and the Engineer agree that this contract and all contracts entered into under the provisions of this contract shall be binding upon the parties hereto and their successors and assigns. ARTICLE XV—COMPLIANCE WITH LAWS The Engineer shall comply with all federal, state, and local laws, ordinances, and regulations applicable to the work, including Title VI of the Civil Rights Act of 1964 and non-discrimination clauses incorporated herein by reference. ARTICLE XVI—RESPONSIBILITY FOR CLAIMS AND LIABILITY The Engineer agrees to save harmless the City, from all claims and liability due to his negligent acts or the negligent acts of his employees, agents,or subcontractors. ARTICLE XVII—NONDISCRIlVIINATION The Engineer, with regard to the work performed, will not discriminate on the grounds of race, color or national origin in the selection and retention of subcontractors. ARTTCLE XVIII—INSURANCE During the performance of the Services under this Agreement, Engineer shall maintain the following insurance: (1) General Liability Insurance, with a combined single limit of $1,000,000 for each occurrence and$1,000,000 in the aggregate. (2) Automobile Liability Insurance, with a combined single limit of $1,000,000 for each person and$1,000,000 for each accident. (3) Workers' Compensation Insurance in accordance with statutory requirements and Employers' Liability Insurance,with a limit of$500,000 for each occurrence. (4) Professional Liability Insurance with a limit of$1,000,000 annual aggregate. Engineer shall, upon written request, fwnish Owner certificates of insurance,which shall include a provision that such insurance shall not be canceled without at least thirty days' written notice to Owner. All Project contractors shall be required to include Owner and Engineer as additional insured on their General Liabiliry insurance policies, and shall be required to indemnify Owner and Engineer to the same extent. Engineer and Owner waive all rights against each other and their directors, officers, partners, commissioners, officials, agents, and employees for damages covered by properiy insurance during and after the completion of the Services. If the Services result in a construction phase of the project, a similaz provision shall be incoiporated into all construction phase contracts entered into by Owner and shall protect Owner and Engineer to the same extent. ARTICLE XIX T'his contract is made and entered into subject to the approval of the City of Cape Girardeau. ARTICLE XX—ATTACHMENTS The following exhibits are attached hereto and are hereby made part of this contract: Attachment A—Estimate of Cost IN WITNESS WHEREOF, Owner and Engineer have executed this Agreement. OWNE ENGINEER Cit of Cape Girardeau, Missouri Koehler Engineering an and Surveying � i i. �/_ .:BY �" Mike Mi er C is oehler f City Manager Partner Date: � ;� � `j j Date: 3 - Z - �!'� ATTAC��VIEENT `A' SIGNALIZATION OF SPRIGG STREET & NORMAL AVENUE Each Phase of the proposed project has been estimated to contribute the following amounts toward the total project estimated design cost. Initial Property and Topographical Data Acq.: 16.0 Hours x $80/hr=$ 1,280.00 4.0 Hours x$50/hr= $ 200.00 20.0 Hours x $45/hr= $ 900.00 Preliminary Design Phase: 8.0 Hours x $67/hr=$ 536.00 20.0 Hours x $60/hr=$ 1,200.00 20.0 Hours x $45/hr=$ 900.00 Full Design Phase: 24.0 Hours x $ 67/hr= $ 1,608.00 40.0 Hours x $60/hr=$ 2,400.00 40.0 Hours x$45/hr=$ 1,800.00 Production of Construction Documents: 8.0 Hours x $ 67/hr= $ 536.00 24.0 Hours x $ 60/hr= $ 1,440.00 8.0 Hours x $45/hr= $ 360.00 Right of Way Deeds & Plats: 8.0 Hours x $50/hr=$ 400.00 8.0 Hours x $45 /hr=$ 360.00 Materials,Media, Postage, Reproduction, Etc $ 100.00 Total Estimated Cost: $ 14,020.00 The project is to be charged on an hourly basis,with total cost not to exceed the above stated: Fourteen Thousand Twenty Dollars: ($14,020.00) Rates for all categories of work, to be used for this contract, and for additional work as required by extensions or options of this contract, aze as originally indicated on the original Agreement for Services: