HomeMy WebLinkAboutRES.2704.07-16-2012 BILL N0. 12-97 RESOLUTION N0. t�/��
A RESOLUTION AUTHORIZING THE MAYOR TO
EXECUTE AN AGREEMENT WITH KCI
CONSTRUCTION COMPANY INC. , FOR THE
WASTEWATER TREATMENT FACILITY, IN THE
CITY OF CAPE GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS :
ARTICLE l . The Mayor, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to
execute an Agreement with KCI Construction Company in the
amount of Fifty-five Million Six Hundred Seventy-four
Thousand Dollars ($55, 674 , 000 . 00) , for the Wastewater
Treatment Facility in the City of Cape Girardeau, Missouri,
pending final approval by the Missouri Department of
Natural Resources . A copy of said Agreement is attached to
this Resolution and made a part hereof.
PASSED AND ADOPTED THIS /�� DAY OF , 2012 .
Harry E. ediger, Mayor
ATTEST : 4���T�'`'' ���,
-�,��j�-_— ����f�� \
f�". �/. \(��j.
� �J A �E�
' / _�1 � ry � � �
U u Ui;Ww �� �;�\\ �E'
Gayl�e L. Conrad, City C1erk t�`, ;�i`'� �
, ,>� �1p ��
.��� `�.._F..4 ti
�� Sl�
,\ a � ��
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
DOCUMENT 005200 -AGREEMENT
This Agreement is by and between the City of Cape Girardeau, Missouri (hereinafter called Owner) and
KCI Construction Company, Inc. (hereinafter called Contractor).
Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 -WORK
1.01 Contractor shall complete all work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
The work to be done generally consists of constructing the new wastewater treatment facility
that includes influent pumping, screens and screening compactors, grit removal systein, a
sequencing batch reactor activated sludge system, ultraviolet disinfection, sludge storage and
processing system, administration building; installing approximately 4,200 lineal feet of
42-inch and 60-inch diameter sanitary sewer, and approximately 4,900 lineal feet of 54-inch
and 60-inch diameter plant effluent line; decommissioning and partial demolition of the
existing wastewater treatment facility; and the associated site work, mechanical and electrical
work.
ARTICLE 2 -T�IE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows: Wastewater Treatment Facility.
ARTICLE 3 - ENGINEER
3.01 The Project has been desibned by Jacobs Engineering Group Inc.,who is hereinafter called Engineer
and who is to act as Owner's representative,assume all duties and responsibilities,and have the rights
and authority assigned to Engineer in the Contract Documents in connection with the completion of
the Work in accordance with the Contract Documents.
ARTICLE 4 -CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestoi7es, if any, Substantial Completion,and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion and Final Payment
A. The Work will be substantially completed within 700 days after the date when the Contract
Times commence to run as provided in paragraph 2.03 of the General Conditions, and
completed and ready for final payment in accordance with paragraph 14.07 of the General
Conditions within 730 days after the date when the Contract Times commence to run.
CSX65101 005200-1 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner
will suffer financial loss if the Work is not completed within the times specified in paragraph
4.02 above,plus any extensions thereof allowed in accordance with Article 12 of the General
Conditions. The parties also recognize the delays, expense, and difficulties involved in
proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is
not completed on time. Accordingly, instead of requiring any such proof, Owner and
Contractor agree that as liquidated damages for delay(but not as a penalty)Contractor shall
pay Owner $600.00 for each of the first 30 days that expires after the time specified in
paragraph 4.02 for completion and readiness for final payment until the Work is completed
and ready for tinal payment. Thereafter,the Contractor shall pay Owner$1,200.00 for each
of the next 60 days that expires until the Work is completed and ready for final payment. If
the Work is not completed and ready for final payment after 90 days from the time specified
in paragraph 4.02, the Contractor shall pay Owner$2,000.00 for each day that expires until
the Work is completed and ready for final payment.
ARTICLE 5 -CONTRACT PRICE.
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents
an amount in current funds equal to the price or prices in the Bid Fonn;
UNIT PRICE SCHEDULE
Estimated Unit Total
Item uantit Price Price
A. MOBILIZATION Lump Sum ......................... $ 550,000.00
B. MANHOLES IN 60" SANITARY SEWER
1. Depth 25' —30' (4' dia FRP) I EA $ 30,000.00/EA $ 30,000.00
2. Depth >35'—40' (4' dia FRP) 1 EA $ 35,000.00/EA $ 35,000.00
3. Depth >50'—SS (8' dia Conc—MH 1) 1 EA $ 40,000.00/EA $ 40,000.00
4. Cast-in-Place MH (MH 4) 1 EA $ 25,000.00/EA $ 25,000.00
C. MANHOLES IN 42" SANITARY SEWER
1. Depth 20'—25' (8' dia Conc—MH 5) 1 EA $ 35,000.00/EA $ 35,000.00
2. Depth 10'—15' (6' dia Conc) 2 EA $ 20,000.00/EA $ 40,000.00
3. Depth >15' —20' (6' dia Conc) 3 EA $ 20,000.00/EA $ 60,000.00
4. Depth >20'—25' (6' dia Conc) 1 EA $ 20,000.00/EA $ 20,000.00
5. Depth 10'— 15' (6' dia Conc—MH 12) 1 EA $ 20,000.00/EA $ 20,000.00
D. MANHOLES IN 60"EFFLUENT PIPE
1. Depth 5'— 10' (4' dia FRP) 4 EA $ 35,000.00/EA $ 140,000.00
2. Depth >10'— 15' (4' dia FRP) 4 EA $ 25,000.00/EA $ 100,000.00
3. Depth >15'—20' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
4. Depth >20'—25' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
5. Depth >25'—30' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
6. Cast-in-Place MH(EF-JC 1) 1 EA $ 25,000.00/EA $ 25,000.00
CSX65101 005200-2 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
E. SANITARY SEWER
1. 60" Pipe
a. Station 0+00 to MH 3 598 LF $ 600.00/LF S 358,800.00
b.MH 3 to MH 4(Includes concrete
encasement and rip rap at creek crossing) 415 LF $ 500.00/LF S 207,500.00
2. 42"Pipe
a.MH 4 to MH 7 1,022 LF $ 200.00/LF $ 204,400.00
b. MH 7 to Station 33+00 1,267 LF $ 130.00/LF $ 164,710.00
c. Starion 33+00 to Station 34+00 100 LF $ 350.00/LF $ 35,000.00
d. Starion 34+00 to Station 36+95 295 LF $ 150.00/LF $ 44,250.00
e. Station 38+95 to MH 12 333 LF $ 150.00/LF $ 49,950.00
3. Jacked 42" Pipe Under Railroad 200 LF $ 850.00/LF $ 170,000.00
4. Abandon Manholes 11 EA $ 1,500.00/EA $ 16,500.00
F. EFFLUENT PIPE
1. 60" Pipe
a. Station 0+00 to MH 2 671 LF $ 425.00/LF $ 285,175.00
b. MH 2 to MH 3 (Includes concrete
encasement and rip rap at creek crossing) 408 LF $ 450.00/LF $ 183,600.00
c. MH 3 to Station 33+50 2,272 LF $ 300.00/LF $ 681,600.00
d. Station 33+50 to Station 34+50 100 LF $ 450.00/LF $ 45,000.00
e. Station 34+50 to Station 37+66 316 LF $ 320.00/LF $ 101,120.00
f. Station 39+66 to JC 1 345 LF $ 320.00/LF $ 110,400.00
2. Jacked 60"Pipe Under Railroad 200 LF $ 950.00/LF $ 190,000.00
3. 54" Pipe(from JC 2 to Outfall) 619 LF $ 600.00/LF $ 371,400.00
4. Concrete Outfall and Rip Rap at
Mississippi River Lump Surn ......................... $ 20,000.00
5. 21" Sewer and Manhole Removal 2,680 LF $ 5.00/LF $ 13,400.00
G. FORCE MAIN FROM EXISTING FACILITY
1. 4"Pipe 707 LF $ 70.00/LF $ 49,490.00
2. Jacked Casing Pipe(10"min,Two Places) 87 LF $ 180.00/LF $ 15,660.00
H. ROCK EXCAVATION
1 For Sanitary Sewer and Effluent Pipe 1,000 CY $ 250.00/CY $ 250,000.00
2. For Structural Excavation and
in Pipe Trenches) 2,200 CY $ 40.00/CY $ 88,000.00
I. PIPE PILES
l. Steel Pipe Pile Shoes 2,800 EA $ 95.00/EA $ 266,000.00
2. Steel Pipe Piles 97,000 LF $ 34.00/LF $ 3,298,000.00
J. EQUIPMENT AT WWTF
1. Screw Conveyors
(Section 411213.36)
Base Bid-SPIRAC (USA) Lump Sum ......................... $ 190,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
CSX65101 005200-3 AGREEMENT
RO-4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
2. High-Speed Turbo Blowers
(Section 431125)
Base Bid—HSI Lump Sum ......................... $ 800,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
3. Recessed Impeller Pumps
(Section 432114)
Base Bid—Wemco Lump Sum ......................... $ 90,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
4. Rotary Lobe Pumps and Grinders
(Section 432137)
Base Bid—Vogelsang Lump Sum ......................... $ 80,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
5. Progressing Cavity Pumps
(Section 432138)
Base Bid—Seepex Lump Sum ......................... $ 30,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
6. Submersible Pumps and Mixers
(Section 432130)
Base Bid—Flygt Lump Sum ......................... � 1,080,000.00
Alternate Bid:
Name of Manufacturer:
Bid Ainotult: $
7. Submersible Pre-Rotation Basin and Pumps
(Section 432143)
Base Bid—Wemco Lump Suin ......................... $ 57,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
8. Automatic Backwash Strainer
(Section 432734)
Base Bid—Atniad Luinp Sum ......................... $ 49,000.00
Altenzate Bid:
Name of Manufacturer:
Bid Amount: $
9. Mechanical Screens and Compactors
(Section 462100)
Base Bid—Parkson Aquaguard Lurnp Sum ......................... $ 460,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
CSX65101 005200-4 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
10. Grit Removal Equipment
(Section 462300)
Base Bid—Hydro International Lump Sum ......................... $ 745,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
ll. SBR Equipment(Section 465353)
Base Bid—Sanitaire Lump Sum ......................... $ 2,650,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
12. UV Disinfection Equipment(Section 446300)
Base Bid—Trojan Lump Sum ......................... $ 895,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
13. Dewatering Centrifuges(Section 467633)
Base Bid— Andritz or Alfa Laval Lump Sum ......................... $ 570,000.00
(Circle one)
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
K. Sludge Drying Equipment
(Section 467653.01)
Allowance for Pre-Procured Equipment Lump Sum ......................... $ 3,800,000.00
L. EXISTING WWTF
Decommissioning,Partial Demolition
And All Improvements at Facility Lump Sum ......................... $ 250,000.00
M. SYSTEM INTEGRATION
Instrumentation and Supervisory Control
System Integration
Base Bid—Cogent Inc. Lump Sum ......................... $ 1,750,000.00
Aiternate Bid:
Name of Integrator:
Bid Amount: $
N. NEW WWTF
All Work at Facility Lump Sum .......................... $33,748,045.00
TOTAL BASE BID(Total of A through N) $ 55,674,000.00
Fift�five million six hundred seventv-four thousand dollars and 0/00.
(Total Base Bid in Words)
If Owner accepts any of the alternate equipment or system integration Bid prices,total Bid price will be based
on the Owner-accepted alternate Bid prices. Bidder acknowledges that the quantities are not guaranteed and
final payment will be based on actual quantities determined as provided in the Contract Documents.
CSX65101 005200-5 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
ARTICLE 6 -PAYMENT PROCEDURES.
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accardance with Article 14 of the
General Conditions. Applications for Pa}nnent will be processed by Engineer as provided in
the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments in accordance with Section 34.057,RSMo,on account
of the Contract Price on the basis of Contractor's Applications for Payment during
performance of the Work as provided in paragraphs 6.02.A.1 and 6.02.A.2 below. All such
payznents will be measured by the schedule of values established in paragraph 2.07.A of the
General Conditions (and in the case of Unit Price Work based on the number of units
completed) or, in the event there is no schedule of values, as provided in the General
Requirements:
1. Prior to Substantial Completion,progress payments will be made in an amount equal to
the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as Engineer shall determine or Owner may
withhold, in accordance with paragraph 14.02 of the General Conditions.
a. 90% of Work completed (with the balance being retainage). If Work has been
50% completed as determined by Engineer, and if the character and progress of the
Work have been satisfactory to Owner and Engineer, Owner, on recommendation
of Engineer, may determine that as long as the character and progress of the Work
remain satisfactory to them, there will be no retainage on account of Work
subsequently completed, in which case the retnaining progress payinents prior to
Substantial Completion will be in an amount equal to 100%of the Work completed
less the aggregate of payments previously made; and
b. 90% of cost of materials and equipment not incorporated in the Work(with the balance
being retainage).
2. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total
payinents to Contractor to 100%of the Work completed,less such amounts as Engineer shall
determine in accordance with paragraph 14.02.B.5 of the General Conditions and less 100%
of Engineer's estimate of the value of Work to be completed or corrected as shown on the
tentative list of items to be completed or corrected attached to the certificate of Substantial
Completion.
6.03 Final Payinent
A. Upon final completion and acceptance of the Wark in accordance with paragraph 14.07 of
the General Conditions, Owner shall pay the remainder of the Contract Price as
recommended by Engineer as provided in said paragraph 14.07.
CSX65101 005200-6 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
ARTICLE 7 -INTEREST
7.01 All monies not paid when due as provided in Article 14 of the General Conditions shall bear interest
at the rate specified in Section 34.057, RSMo.
ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following
representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related
data identified in the Bidding Documents.
B. Contractor has visited the site and become familiar with and is satisfied as to the general,
local, and Site conditions that may affect cost, progress, and perfonnance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that inay affect cost, progress, and perfonnance of the Work.
D. Contractar has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the site (except Underground
Facilities) wluch have been identified in the Supplementary Conditions as provided in
paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous
Environmental Condition,if any, at the Site which has been identified in the Supplementary
Conditions as provided in paragraph 4.06 of the General Conditions.
E. Contractor has obtained and carefully studied(or assumes responsibility for having done so)
all such additional or supplementary examinations,investigations,explorations,tests,studies,
and data concerning conditions (surface, subsurface and Underground Facilities) at or
contiguous to the Site which may affect cost,progress,or performance of the Work or which
relate to any aspect of the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor,including applying the specific means,methods,
techniques, sequences, and procedures of construction expressly required by the Contract
Documents to be einployed by Contractor, and safety precautions and programs incident
thereto.
F. Contractor does not consider that any additional examinations,investigations, explorations,
tests, studies or data are necessary for the perfonnance of the Work at the Contract Price,
within the Contract Times, and in accordance with the other terms and conditions of the
Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has correlated the infonnation known to Contractor,information and observations
obtained from visits to the Site, reports and drawings identified in the Contract Documents,
and all additional examinations,investigations,explorations,tests, studies,and data with the
Contract Documents.
CSX65101 005200-7 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
I. Contractor has given Engineer written notice of all conflicts, errors, ainbiguities or
discrepancies that Contractor has discovered in the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Contractor.
J. The Contract Documents are generally sufficient to indicate and convey understanding of all
terms and conditions for performance of the Work.
ARTICLE 9 - CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement
2. Perfonnance Bond
3. Payment Bond
4. General Conditions
5. Supplementary Conditions
6. Specifications as listed in the table of contents of the Project Manual
7. Drawings with each sheet bearing the following general title: Wastewater Treatment
Facility, City of Cape Girardeau, Missouri
8. Addenda(numbers 1 to 3, inclusive)
9. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed
b. Contractar's Bid
c. Documentation submitted by Contractor prior to Notice of Award
10. The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto:
a. Written Amendments
b. Work Change Directives
c. Chanbe Orders
B. The docuinents listed in parabraph 9.O 1.A are attached to this Agreement(except as expressly
noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in
paragraph 3.04 of the General Conditions.
CSX65101 005200-8 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
ARTICLE 10 -MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings indicated in the General Conditions.
10.02 Assignmei7t of Contract
A. No assignment by a party hereto of any ri�hts under ar interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound;
and,specifically but without limitation,moneys that may become due and moneys that are due
may not be assigned without such consent (except to the extent that the effect of this
restriction may be limited by law),and unless specifically stated to the contrary in any written
consent to an assignment,no assignment will release or discharge the assignor from any duty
or responsibility under the Contract Documents.
10.03 Successors and Assign
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions
shall continue to be valid and binding upon Owner and Contractor, who agree that the
Contract Documents shall be reformed to replace such stricken provision or part
thereof with a valid and enforceable provision that comes as close as possible to
expressing the intention of the stricken provision.
ARTICLE 11 -NON-DISCRIMINATION IN EMPLOYMENT
11.01 Contractar will not discriminate against any employee or applicant far employment because of race,
creed,color,or national origin.The Contractor will take affirmative action to ensure that applicants are
employed, and that employees are treated during employment, without regard to their
race, creed, color ar national origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection for training, including
apprenticeship.
11.02 Contractor will post in conspicuous places, available to employees and applicants for
employment,notices setting forth the provisions of this non-discrimination clause.
A. Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, creed,color, or national origin.
CSX65101 005200-9 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
B. Contractor will send to each labor union or representative of workers with which he
has a collective bargaining agreement or other contract or understandin�, a notice, to be
provided by the agency contracting officer,advising the labor union or workers'representative
of the Contractar's commitments under Section 202 of Executive Order No. ll246 of
September 24, 1965, and shall post copies of the notice in conspicuous places available to
employees and applicants for employment.
C. Contractor will comply with all provisions of Executive Order No. ll246 of
September 24, 1965,and of the rules,regulations,and relevant orders of the Secretary of Labor.
D. Contractor will furnish all information and reports required by Executive Order No. 11246 of
September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto,and will pennit access to his books,records, and accounts by the contracting
agency and the Secretary of Labor for purposes of investigation to ascertain compliance with
such rules, regulations, and arders.
E. In the event of the Contractor's non-compliance with the non-discrimination clauses of this
Contract ar with any of such rules, regulations, or orders, this Contract may be cancelled,
terminated or suspended in whole or in part and the Contractor may be declared ineligible for
further Governtnent contracts in accordance with procedures authorized in Executive Order No.
11246 of September 24, 1965,and such other sanctions may be imposed and remedies involved
as provided in Executive Order No. ll 246 of September 24, 1965, or by rule, regulation, or
order of the Secretary of Labor, or as otherwise provided by law.
F. Contractor will include the provisions of Article 11 in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order No. 11246 of September 24, 1965,so that such provisions will
be binding upon each subcontractor or vendor. The Contractor will take such action with
respect to any subcontract or purchase order as the contracting agency inay direct as a means of
enforcing such provisions including sanctions for non-compliance: Provided,however,that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the contracting agency,the Contractor
may request the United States to enter into such litigation to protect the interests of the United
States.
CSX65101 005200-10 AGREEMENT
RO—4/16/2012
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
IN WITNESS WHEREOF,Owner and Contractor have signed this Agreement in duplicate. One counterpart
each has been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or
identified by Owner and Contractor or on their behalf.
This Agreement will be effective on , 20�(which is the Effective Date of the Agreement).
CITY OF CAPE GIRARDEAU CONTRACTOR KCI Construction Company
Scott Meyer, City Manager
By: Douglas Jones, President
Attest [CORPORATE SEAL]
Gayle L. Conrad, City Clerk
APPROVED AS TO FORM:
City Counselor
Address for giving notices:
401 Independence Street Attest
Cape Girardeau, MO 63703
Carrol Tauser, Secretary
Address for giving notices:
10315 Lake Bluff Drive
If Owner is a corporation, attacli evidence of St. Louis, MO 63123
authority to sign. If Owner is a public body,attach
evidence of authority to sign and resolution or
other documents authorizing execution of Owner-
Contractor Agreement. License No. 110432
Agent for service of process:
Designated Representative: Douglas Jones
Name: Scott Meyer
Title: City Mana�er (If Contractor is a corporation or a partnership,
Address: 401 Independence Street attach evidence of authority to sign).
Cape Girardeau, MO 63703
Phone: (573) 339-6320 Designated Representative:
Facsimile: (573) 339-6302 Name: Brent Krue�er
Title: Project Manager
Address: 10315 Lake Bluff Drive
St. Louis, MO 63123
Phone: (314) 894-8888
Facsimile: (314) 894-7418
CSX65101 005200-11 AGREEMENT
RO—4/16/2012
�
. �
WASTEWATER 1�RE�ITM�NT FACILI"I'Y
CITY OF CAPE GIRARDEAi1, MISSOIJRI
DOCUMEN"I�005200 -AGKEEMEN`I'
This Agreement is by and between the City of Cape Girardeau, Missouri (hereinafter called Owner) and
KC1 Construction Company,Inc. (hereinafter called Contractor).
Owner and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 -WORK
1.01 Contraetor shall complete al] work as specitied or indicated in the Contract Documents. The
Work is generally described as follows:
The work to be done generally consists of constructing the ne�v �vastewater treatmei�t facility
that includes influent pumping, screens and screening compactors, grit removal system, a
sequencing batch reactor�ctivated sludge system, ultraviolet disinfection, sludge storage and
processing system, administration building; installing approximately 4,200 lineal feet of
42-inch and 60-inch diameter sanitary sewer, and approximately 4,900 lineal feet of 54-inch
and 60-inch diameter plant effluent line; decommissioning and partial demolition of the
existing wastewater treatment facility; and the associated site�vork, mechanical and electrical
work.
ARTICLE 2 -THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or oniy a part is
generally described as follows: Wastewater Treatment Facility.
ARTICLE 3 -ENGINEER
3.01 The Project has been designed by Jacobs Engineering Group Inc.,who is hereinafter called Engineer
and who is to act as Owner's representative,assume all duties and responsibilities,and have the rights
and authority assigned to Engineer in the Contract Documents in connection with the completion of
the Work in accordance with the Contract Documents.
ARTICLE 4 -CONTRACT TIMES
4.01 Time ofthe Essence
A. All time limits for Milestones,if any,Substantial Completion,and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion and Final Payment
A. The Work will be substantially completed within 700 days after the date when the Contract
Times commence to run as provided in paragraph 2.03 of the General Conditions, and
completed and ready for final payment in accordance with paragraph 14.07 of the General
Conditions within 730 days after the date when the Contract Times commence to run.
CSX65101 005200-1 AGREEMENT
RO—4/16/2012
r �
Vb'ASTEVI%A"I�ER TREATMENT FACILITY
CITY OF CAPE GIRARDFAtJ. MtSSOURI
4.03 Liquidated Damages
A. Contractor and O�vner recognize that time is of the essence of this Agreement and that 0�����er
wil]suffer:inancial loss iti the Work is not completed within t!�e times spec;tied in paragraph
4.02 above,plus any extensions thereof allowed in accordance�vith Article 12 of the Gencral
Conditions. The parties also recognize the delays, expense, and difticulties involved in
proving in a legal or arbitration proceeding the actuai ]oss suffered by Owner if the Work is
not completed on time. Accordingly, instead of requiring any such proof, Owner and
Contractor agree that as liquidated damages for delay(but not as a penalty)Contractor shall
pay Owner $600.00 for each of the first 30 days that e�pires after the time speciiied in
paragrapl� 4.02 for completion and readiness for final payment until the Work is completed
and ready for final payment. Thereafter,the Co»tractor shall pay Owner$1,200.00 for each
ofthe uext 60 days that expires u��til the Work is completed and ready for final payment. If
the Work is not completed and ready for final payment after 90 days from the time specified
in paragraph�1.02, the Contractor shall pay Owner�2,000.00 for each day that expires until
the Work is completed and ready for final payment.
ARTICLE 5 -CONTRACT PRICE.
5.01 Owner shall pay Contractor for completion of the Work ii�accordance with the Contract Documents
an amount in current funds equal to the price or prices in the Bid Form;
UNIT PRICE SCI�EDULE
Estimated Unit Total
Item uanti � Price Price
A. MOBILIZATION Lump Sum ......................... $ >j0,000.00
B. MANHOLES IN 60"SANITARY SLWER
1. Depth 25'—30' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
2. Depth >3�'—40' (4' dia FRP) 1 EA $ 3�,000,00/EA $ 3�,000.00
3. Depth >50'—�S (8' dia Conc—MH 1) 1 GA $ 40,000.00/EA $ 40,000.00
4. Cast-in-Ylace MH (MFI 4) 1 EA $ 25,00O.00BA $ 25,000.00
C. MANHOLES IN 42"SANITARY SEWER
1. Depth 20'—25' (S' dia Conc—MH 5) ] EA $ 3�,000.00/EA $ 35,000.00
2. Depth 10'— 1�' (6' dia Conc) 2 EA $ 20,000.00/EA $ 40,000.00
3. Depth >15'—20' (6' dia Conc) 3 EA $ 20,000.00/EA $ 60,000.00
4. Depth >20'—2�' (6' dia Conc) 1 EA $ 20,000.00/EA $ 20,000.00
5. Depth 10'— 1S (6' dia Conc—MH 12) 1 EA $ 20,000.00/EA $ 20,000.00
D. MANHOLES IN 60"EFFLUENT PIPE
I. Depth 5'— 10' (4' dia FRP) a EA $ 35,000.00/EA $ 140,000.00
2. Depth >]0'—15' (4' dia FRP) 4 EA $ 25,00O.00BA $ ]00,000.00
3. Depth >l Y—20' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
4. Depth >20'—25' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
5. Depth >25'—30' (4' dia FRP) 1 EA $ 30,000.00/EA $ 30,000.00
6. Cast-in-Place MH (EF-JC 1) 1 EA $ 25,000.00/EA $ 25,000.00
CSX65101 005200-2 AGREEMENT
RO—4/16/2012
. ,
WASTEWATER TRFATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
r.. snNrrnRY sE.wr-:tz
�. �o° [���e
a. Station 0+00 to MH 3 �98 [.}= $ 600.00/LF S 3�8.800.00
b.MH 3 to Mf I 4 (Includes concrete
encasement and rip rap at creek crossing) dl 5 i.F $ �00.00/LP S 207,�00.00
2. 42"Pipe �
a.MH 4 to MH 7 1,022 LF $ 200.00/I,F $ 20d,400.00
b.MH 7 to Station 33+00 1,267 LP $ 130.00/LF $ 16�3.710.00
c. Station 33+00 to Station 3d+00 100 LF $ 350.00/LF $ 35.000.00
d. Station 34+p0 to Station 36+95 29� LF $ I�0.00/LF � d4,250.00
e. Station 38+9� to MH 12 333 LF $ I�0.00/LP `6 49,950.00
3. Jacked 42" Pipc Under F2ailroad 200 LF $ 850.00/LF $ 170,000.00
4. Abai�don Manholes 11 G,1 $ 1,�00.00/LA $ 16,500.00
F. GFFLUENT VIPE
1. 60" Pipe
a. Station 0+00[o MII 2 671 L1� $ �12�.00/L1� $ 2R5,17�.00
b.MFI 2[o MH 3 (Inch�des concrete
encasement and rip rap at creek crossing) 408 Lt� $ 450.00/L1� $ 183,600.00
c.MII 3 to Station 33+50 2,272 LF $ 300.00/LF � 681,600.00
d. Station 33+50 to Station 34+j0 100 LF $ -3�0.00/LF $ 45,000.�0
e. Station 34+50 to Station 37+(6 316 LF $ 320.00/LF $ ]01,120.00
f. Station 39+66 to JC 1 34� LF $ 320.00/Ll $ I 10,400.00
2. Jacked 60" Pipe Under Railroad 200 LF $ 950.00/LF $ 190,000.00
3. 54" Pipe(from JC 2 to Outfall) 619 LI� $ 600.00/LF $ 371,d00.00
4. Concrete Outfall and Rip Rap at
Mississippi River Lwnp Sum ......................... $ 20,000.00
5. 21" Sewer and Manhole Remo��al 2,680 LF $ �.00/LF $ 13,400.00
G. FORCE MAIN FROM EXISTING FACILITY
1. 4"Pipe 707 I.,F $ 70.00/LF $ 49,490.00
2. Jacked Casing Pipe(]0"min,Two Places) 87 LF $ 180.00/LF $ 15,660.00
I f. ROCK EXCAVATION
1 For Sanitary Sewer and Eftluent Pipe 1,000 CY $ 250.00/CY $ 2�0,000.00
2. For Structural Excavation and
in Pipe Trenches) 2,200 CY $ 40.00/CY $ 88,000.00
I. PIPE PILES
1. Steel Pipe Pile Shoes 2,800 EA $ 9�.00/EA $ 266,000.00
2. Steel Pipe Piles 97,000 LF $ 34.00/LF $ 3,298,000.00
J. EQUIPMENT AT V1%W1'F
1. Screw Conveyors
(Section 411213.36)
Base Bid-SPIRAC(USA) Lump Sum ......................... $ 190,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
CSX65101 00�200-3 AGREEMENT
RO-4/16/2012
. ,
�'�'ASI�EWA"I�ER ZREATMEN"I� FACILI�I'Y
CITY OF CAPE GIRARDFAU, MiSSOURI
Z. Ili�h-Spced�furho Blo���ers
�s��t�on a�i i zs�
Base Bid—I lSl Lump Sum ........................ 5 800,000.00
Alternate Bid:
Name of Manul�acturer:
E3i�Amount: $
3. Recessed Impellcr Pumps
(Section 4321 1 d)
Base Bid—V�'emco Lump Sum ......................... $ 90.000.00
Alternate Bid:
Name oPManufacturer:
Bid Amou��t: $
4. Rotary Lobe Pumps and Cirinders
(Scction a32137)
Basc Bid—Vogelsang Lump Sum ......................... $ 80,000.00
Alternate Bid:
Name of Manufactw-er:
Bid Amount: $
5. Progressing Cavity Pumps
(Section 432138)
Base Bid—Seepex Lwnp Sum ......................... $ 30,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
6. Submersible Pumps and Mixers
(Section 432130)
BaseBid—Flygt LumpSum ......................... $ 1,080,000.00
Alternate Bid:
Name of Ma��ufacturer:
Bid Amou��t: $
7. Submersible Prc-Rotation Basin and Vumps
(Section 432143)
Base Bid—Wemco Lump Sum ......................... $ 57,000.00
Altemate Bid:
Name of Manufacturer:
Bid Amount: $
8. Automatic Back�vash Strainer
(Section 432734)
Base Bid—Amiad Lump Sum ......................... � 49,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount: $
9. Mechanical Screens and Compactors
(Section 462100)
Base Bid—Parkson Aquaguard Lump Sum ......................... $ 460,000.00
Altcrnate Bid:
Namc of Manufacturer:
Bid Amount: �
CSX65101 005200-4 AGREEMENT
RO—4/l 6/2012
. '
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MiSSOURI
]0. Grit Removal l?quipment
(Section 462300)
Base Bid—Hydro International I,ump Sum ......................... 5 74�,000.00
Alternate Bid:
Name of Manufac[urer:
Bid Amount$
1 L SBR Equipment(Sec[ion a6�3�3)
Base Bid—Sanitaire Lump Sum ......................... $ 2,650,000.00
Alternate Bid:
Name of Manufacturer:
Bid Amount:$
12. UV Disinfection Equipment(Section dd6300)
Base Bid—Trojan Lump Sum ...................... � 89�.000.00
Altcrnate Bid:
Name of Manufacturer:
Bid Amount:$
13. Dc���atering Centrifuges(Section 467633)
Qase Bid— AndCltZ �r All�a Laval Lump Sum ........................ $ �70,000.00
(Circle one)
Alternate Bid:
Name of'Manufacturer:
Bid Amount:$
K. Sludge Drying Equipment
(Section 467653.01)
Allowance for Pre-Procured Equipment Lump Sum ......................... $ 3,800,000.00
L. EXISTING WWTF
Decommissioning,Partial Demolition
And All Improvements at Facility Lump Sum ......................... $ 2�0,000.00
M. SYSTEM INTEGRATION
Instrumentation and Supervisory Control
System Integr�tion
Base Bid—Cogent Inc. Lump Sum ......................... $ 1,750,000.00
Alternate Bid:
Name of Integrator:
Bid Amount:$
N. NEW WWTF
All Work at Facility Lump Sum .......................... $33,748,045.00
TOTAL BASE BID(Total of A lhrough N) $ 55,674,000.00
FiRy-five million six hundred seventy-four thousand dollars and 0/00.
(Total Base Bid in Words)
If Owner accepts any ofthe alternate equipment or system integration Bid prices,total Bid price will be based
on the Owner-accepted alternate Bid prices. Bidder acknowledges that the quantities are not guaranteed and
final payment will be based on actual quantities detennined as provided in the Contract Documents.
CSX65101 005200-5 AGREEMENT
RO—4/16/2012
. ,
WASTE��IATGR TREATMENT FACILITY
CITY OF CAPE GIR.ARD�AU. MISSOtJRI
ARTICI_E 6- PAYMENT PROCF,DURES.
6.Q] Subn�itta! ar,d?';ocessing of Payr,ients
A. Conn-actor shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by Engineer as provided in
the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments in accordance with Section 34.057,RSMo,on account
of the Contract Price on the basis of Contraetor°s Applications for Payment during
perform�nce of the Work as provided in paragraphs 6.02.A.1 and 6.OZ.A.2 below. All such
payments will be measured by the schedule of values established in paragraph 2.07.A of the
General Conditions (and in the case of Unit Price Work based on the number of units
compieted) or, in the event there is no sched�ile of values, as provided in the General
Requirements:
1. Prior to Substantial Completion, progress payments�vill be made in an amount equal to
the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as Engineer shall determine or Owner may
withhold, in accordance with paragraph 14.02 of the General Conditions.
a. 90% of Work completed (with the balance being retainage). If Work has been
50%completed as determined by Engineer, and if the character and progress of the
Work have been satisfactory to Owner and Engineer, Owner, on recommendation
of Engineer, may determine that as long as the character and progress of the Work
remain satisfactory to them, there will be no retainage on account of Work
subsequently completed, in which case the remaining progress payments prior to
Substantial Completion will be in an amowlt ec�ual to 100%ofthe Work completed
less the aggregate of payments previously made; and
b. 90% of cost of materials a��d equipment not incorporated in the Work(with the balance
being retainage).
2. Upon Substantial Completion, Owner shall pay an amount sufficient Co increase total
payments to Contractor to 100°/o of the Work completed,less such amounts as Engineer shall
determine in accordance with paragraph 14.02.B.5 of the General Conditions and less 100%
of Engineer's estimate of the value of Work to be completed o�•corrected as shown on the
tentative list of items to be completed or corrected attached to the certificate of Substantial
Completion.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of
the General Conditions, Owner shall pay the remainder of the Contract Price as
recommended by Engineer as provided in said paragraph 14.07.
CSX65101 005200-6 AGREEMENT
RO—4/16/2012
' � f
WASTEWATER TREATMrNT FACILITY
CITY OF CAPE GIRARDEAU. MISSOURI
ARTICLE 7 - 1NTEREST
7.01 All monies not paid�vhen due as provided in Article 14 of the General Conditions shall bear interest
at the rate specified in Secticn �4.057. :?SMc.
ARTICLE 8 -CONTRACTOR'S REPRESENTATIONS
8.0] In order to induce Owner to enter into this Agreement, Contr-actor makes the follo���ing
representations:
A. Contractor has examined and careful ly studied the Contract Documents and tl�e oCher related
data identified in the Bidding Documents.
B. Contractor has visited the site and become familiar with and is satistied as to the general,
local, and Site conditions that may affect cost, progress, and perforn�ance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all dra�vings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the site (except Underground
Facilities) which have been identified in the Supplementary Conditions as provided in
paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous
Environmental Condition,if any,at the Site which has been identified in the Supplementary
Conditions as provided in paragraph 4.06 of the General Conditions.
E. Contractor l�as obtained and carefuliy studied(or assumes responsibility for having done so)
all such additional or supplementary examinations,investigations,eaplorations,tests,studies,
and data concerning conditions (surface, subsurface and Underground Facilities) at or
contiguous to the Site which may affect cost,progress,or performance of the Work or which
relate to any aspect of the means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor,including applying the specific means,methods,
techniques, sequences, and procedures of construction expressly required by the Contract
Documents to be employed by Contractor, and safety precautions and programs incident
thereto.
F. Contractor does not consider that any additional examinations, investigations,explorations,
tests, studies or data are necessary for the performance of the Work at the Contract Price,
within the Contract Times, and in accordance with the other terms and conditions of the
Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has correlated the information known to Contractor,information and observations
obtained from visits to the Site, reports and drawings identified in the Contract Documents,
and all additional examinations,investigations,explorations,tests,studies,and data with the
Contract Documents.
C5X65101 005200-7 AGREEMENT
RO—4/16/2012
i �
WASTEWA��ER�IREATI�IENT I�ACIL["fl'
C1TY OF CAPF.,GIRARDE�U, MISSOURI
L Contractor has given Engineer written notice of all conflicts, errors, ambiguities or
discrepancies that Contractor has discovered in the Conh-act Documents, and the written
cesolutio�: thereof b,✓Engineer is acceptab!e to ror,trac±or.
J. The Contract Documents are generally sufficient to indicate and convey understanding of all
tern�s and conditions for perfonnance of the Work.
ARTICLE 9 - CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the follo���ing:
1. This Agreement
2. Perfor���ance Bond
3. Payment Bond
4. General Conditions
5. Supplementary Conditions
6. Specifications as listed in the�able of contents of the Project Manual
7. Drawings �vith each sheet bearing the following general title: Waste�vater T��eatment
Facility, Ciry of Cape Girardeau,Missouri
8. Addenda(numbers 1 Co 3, inclusive)
9. Exhibits to this Agreement(enumerated as follows):
a. Notice to Proceed
b. Contractor's Bid
c. Documentation submitted by Contractor prior to Notice of Award
10. The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto:
a. Written Amendments
b. Work Change Directives
c. Change Orders
B. The documents listed in paragraph 9.O1.A are attached to this Agreement(except as expi•essly
noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in
pa��agraph 3.04 of the General Conditions.
CSX65101 00�200-8 AGREEMENT
RO—4/16/2012
. '
�'��ASI��WATER TREATMEN'l�FACILITY
C1TY OF CAPE GIRARDFAU, MISSOURI
ARTICLE 10 -MISCELLANEOUS
10.01 Terms
A. Tern�s used in this Agreement will have the tneanings it�dicated in the General Conditions.
10.02 Assignment of Contract
A. No assignment by a pa�Ty hereto of any rights under or interests in the Contract will be
binding on another party hereto�vithout the�vritten consent of the parry sought to be bound;
and,specitically but�vithout limitation,moneys that may become due and inoneys that are due
may not be assigi�ed without such consent (except to the extent that the effect of this
restriction may be limited by law),and unless specifically stated to the contrary in any�v�•itten
consent to an assignment,no assignment�vill releasc or discharge the assignor from any duty
or responsibility under the Contract Documents.
10.03 Successors and Assign
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal
representatives to the other pai-ty hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
10.04 Severability �
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions
shall continue to be valid and binding upon Owner and Contractor, who abree that the
Contract Documents shall be reformed to replace such stricken provision or part
thereof with a valid and enforceable provision that comes as close as possible to
expressing the intention of the stricken provision.
ARTICLE 11 -NON-DtSCRIMINATION 1N EMPLOYMENT
11.0] Contractor will not discriminate against any employee or applicant for employment because of race,
creed,color,or national origin.The Contractor will take affirmative action to ensure that applica��ts are
employed, and that employees are treated during employment, without regard to their
race, creed, color or nationa] origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection far training, including
apprenticeship.
11.02 Contractor will post in conspicuous places, available to employees and applicants for
employment,notices setting forth the provisions of this non-discrimination clause.
A. Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race,creed,color,or national origin.
CSX651 O 1 005200-9 AGREEMENT
RO—4/16/2012
t
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU. M[SSOURI
E3. Contractor ��ill send to each labor union or representative of �vorkers ��ith ���hi�h he
has a collective bargaiiling agreement or other contract or understanding, a notice, to be
provided by the agency contracting officer,advising the labor union or�vorkers'representativc
of the �ontractor's ce.n�l;itments under Section 202 ef Executive Ordei- Na ! 12=�6 0±
September 24, 1965, and shall post copies of the notice in conspicuous places available to
employees and applicants for employment.
C. Contractor will comply with all provisions of Executive Order No. 11?�36 of
September 24, 1965,and of the rules,regulations,and relevant orders ofthe Secretary of Labor.
D. Contractor will furnish all infot•mation and reports required by Executive Order No. 1 12=16 of
September 24, 1965, and by the rules, regulations, and orders of the Secreta�y of Labor, or
pursuant thereto,and will pennit access to his books,records,and accounts by the contracting
agency and the Secretary of Labor for purposes of investigation to ascertain compliance with
such rules, regulations,and orders.
E. In the event of the Contractor's non-compliance with the non-discrimination clauses of this
Contract or with any of sueh rules, regulations, or orders, this Contract may be cancelled,
terminated or suspended in���hole or in par[and the Contractor may be declared ineligible for
further Govemment contracts in accordance with procedures authorized in Executive OrderNo.
l 1246 of September 24, I 965,and such other sanctions may be imposed and remedies involved
as provided in Executive Order No. 11246 of September 24, 1965, or by ��ule, regulation, or
order of the Secretary of Labor,or as otherwise provided by law.
F. Contractor will ineLude tlle provisions of Article 11 in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order No. 1 1246 of September 24,1965,so that such provisions will
be binding upon each subcontractor or vendor. The Contractor will take such action with
respect to any subcontract or purchase order as the contracting agency may direct as a means of
enforcing such provisions including sanctions for non-compliance: Provided,however,that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the contracting agency,the Contractor
may request the United States to enter into such litigation to protect the interests of the United
States.
C5X65101 005200-]0 AGREEMENT
RO—4/16/2012
I � �
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIR�RDF.AU, MISSOURI
IN W("ITIESS WHEREOF,Owner and Contractor have signcd this Agreement in duplicate. One counterpart
e�ch has been delivered to O���ner and Contractor. All portions ofthe Contract Documents have been si�ned or
identified by O�vner and Contractor or on their behalf.
This Agreement will be effective on ���•� � , 20f�(�vhich is the Effective Date of the Agreement).
CTTY CAP�GTRARDEAU C TRACTO : KCI Construction Company
-����
Scott eyer, ity Manager
' � ;' 4,, tCsl P.._�-�� �,
Dou* a Jones, esident
Attest � � � '� ;��� � c ; t�`. �� -*�:-� [C ATE SEAI.]
_ /i�,5,.
Gayle!L. Conrad, Ci��Clerk Gti'' � ,�-
� k �,y��.'�� �-<r . �
AP OV D AS T FORM: 0 - ,� �i
�Q� �i�NiN ,;;a
� � � ���
'ty Counselor \ :�r�� � __�� �,/��;_;,
� �1Li�_ L ti'J€1 r / ".1�,�
\� ��'C` c�e2„ ea. ,.�.
\\�h 4 ,,__.�-� � .
Address for giving notices: � _. j ;
� �� ri
401 Independence Street Attest �--�.t�(�r.. �
Cape Girardeau,MO 63703 Carrol Tauser, Secreta�y
Address for giving notices:
I 0315 Lake Bluff Drive
If Owner is a corparation, attach evidence of St. Louis,MO 63123
authority to sign. If Owner is a public body,attach
evidence of authority to sign and resolution or
other documents authorizing execution of Owner-
Contractor Agreement License No. 1 10432
Agent for service of process:
Designated Representative:
Name: Scott Meyer pou�las Jones
Title: Ci Mana�er (If Contractor is a corporation or a partnership,
Address: 401 Independence Street attach evidence of authority to sign).
Cape Girardeau, MO 63703
Phone: (�73)339-6320 Designated Representative:
Facsimile: (573)339-6302 Name: �("ow. ��5�"�✓
Title: Proiect Mana�er
Address: ]0315 Lake Bluff Drive
St. Louis, MO 6�123
Phone: (314) 894-8888
Facsimile: (314� 894-7418
CSX65101 005200-1 1 AGREEMENT
RO—4/16/2012
PERFORMANCE BOND
Any singular reference to Contractor, Surety, Owner,or other party shall be considcred plural where applicable.
CONTRACTOR(Nnme and,4cldress): SUIZETY {Name, and Address of Principal Place of 13usiness):
KCI Construction Company Liberty Mutual Insurance Company
10315 Lake Bluff Drive 175 Berkeley Street
St. Louis, MO 63123 Boston, MA 02116
O WNER(Nume and Addf•ess):
City of Cape Girardeau, Missouri
401 Independence Street
Cape Girardeau, MO 63703
CONTRACT
Effective Date of Agreement: A ��U S i �, ����
Amoua7t: Fifty Five Million Six Hundred Seventy Four Thousand and 00/100 Dollars($55,674,000.00)
Description (Name and Location):
Wastewater Treatment Facility, City of Cape Girardeau, Missouri
BOND
Bond Number: 39s2o3�oa
Date (Not earlier than Effective Date of
Agreement): �;..)��,;3�5; � �ev��.
Amount: Fifty Five Million Six Hundred Seventy FourThousand and 00/100 Dollars($55,674,000.00)
Modifications to this Bond Form: None
Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below,do each cause
this Performance Bond to be duly executed by an authorized officer, agent, or representative.
CC�N'T'12A�'TOR AS PRINCIPAL SURETY
K�:Con�tr:,�ti ~�Company (Seal) Liberty Mutual Insurance Company (Seal)
Contractor's "ame a d Corporate Seal Surety's Name and Corporate Seal W
\%
By. BY' � �Y`� : �� ;�.�a , �� ,, , � - � "��'/
S� atu Signature(Attach Power of Attorney), �
��(� J��/� Stephanie L. Klearman
Print Name Print Name
�(j,���� Attorney-In-Fact
Title Title
_._---I —
Attest: y�(,�4q - Attest• '� .�z,
� , .�
_ - �r=c..�-�_- ..i�2. .
Sibnature Signature Renee Butler �
V �G� �Z�l��— Witness
Title Title
INIPORTANT—Surety comp�nies exccuting Bonds must appcar on the Treasury Department's most current list(Circular
570 as amended)and be authorized to transact business in Missouri.
' F.JCDC G610 Performance 13miJ (2007)
Prepared hy the Engineers Joint Contract Documenls Committee.
Page 1 of 3
Contraetor and Surety, jointly and severally, bind thcroselves, their heirs, e;cecutors, administrators,
successors, and assigns to Owner For the performance of the Conh��ct, which is incorporated herein by
refcrcnce.
1. lf Contractor perf�rms the Contract, Surety and Contractor have no abligation under this Bond, except to
participate in conferences as provided in Paragraph 2.1.
2. If there is no O�mer Defau{t, Surety's obligation under this Bond shall arise after:
2.1 Owner has notified Contractor and Surety, at the addresses described in Paragraph 9 below, that
Owner is considering dectaring a Contractor Default and has requested and attempted to arrange a
conference with Contractor and Surety to be held not later than I S days after receipt of such notice
to discuss methods of perforrning the Contract. If Owner, Contractor, and Surety agree, Contractor
shal) be allo���ed a reasonab(e time to perform the Contract, but such an agreement shall not waive
Owner's right, if any, subsequently to declare a Contractor Default; and
22 Owner has declared a Contractor Deflult and formally terminated Contractor's right to compiete
the Contract. Such Contractor Default shall not be declared earlier than 20 days after Co�ltractor
and Surety have received notice as provided in Paragraph 2.1; and
2.3 Owner-has agceed to pay the Balance of the Contract Price to:
1. Surety in accordance with the terms of the Contract; or
2. Another contractor selected pursuant to Paragraph 33 to perfonn the Contract.
3. t'�%hen Owner h1s satisfied the conditions of Paragraph 2, Surety shall pramptly, and at Surety's expense,
take one of the following actions:
3.1 Arrange for Contractor, with consent of Owner, to perform and complete the Contract; or
3.2 Undertake to perform and complete the Contract itself, throuoh its agents or through independent
contractor�; or
3.3 Obtain bi�is or negotiated proposals from c�ualificd contractors aeceptable to t)wner For a contract
for perfonnance and ec�mpletion of ihe Contract, atrange for a contr�ct to be prepared for execution
by Owncr and contractor selected with Owner's concurrencc, to be secured with performance and
payment boi�ds executed by a qualified surety equivalent to the bonds issued on the Co►itract, and
pay to Owner the amount of damages as described i�i Paragraph 5 in elcess of the Balance of the
Contract Price incurred by Owner resulting from Contractor Default; or
3.4 Waive its right to perform and complete, arrangc l-or completion, or obtlin a ncw contractor, and
with reasonable promptness under the circumstanccs:
]. After investigation, detern�ine the amount for which it may be liable to Owner and, a5 soon as
practicable after the amount is determined,tender payment therefor to Owner; or
2. Deny liability in whole or in part and notify O���ner citin�reasons therefior.
4. If Surety does not procecd as providcd in Paeagraph 3 with reasonable prompt��ess, Surety shall be
deemed to be in dcfault on this Bond 15 days after receipt of an additiona( written notice from O��mer to
Surety demanding that Surety perform its obligations under this Bond, and Ou,Iner sl�all be entitied to enforce
any remedy available to Owner. If Surety proceeds as provided in F'aragraph 3.4, and O��•ner refuses the
payment tendered or Surety has denied liability, in whole or in part, without further notice Owner shall be
entitled to enforce an_y remedy available to Owner.
5. After Owner has terminated Contractor's right to cornplete the Contract, and if Surety elects to act under
Paragraph 3.1, 3.2, or 3.3 above, then the responsibilities of Surety to Owner shail not be greater than those
of Contractor under the Contract, and the respor�sibilities of Owner to Surety shall not be greater than those
of Owner under the Contract. �I'o the limit of the amount oFthis Bond, but subject to commitment by Owner
of the E3�lance of the Contract Price to mitigation of costs and damages on ihe Contract, Surety is ob(igated
without duplication for:
� F;JCDC{'-(1D Performancc I�ond (2007} �
Yrepared by the F:nginecrs,loint Contract I)vcuments Committce.
Pa�e 2 of 3
5.1 The responsivilities of Contractor for c�rrection of defective Work and cc�mpletion of the Contract;
5.2 Additional legal, design professioilal, and delay costs resulting fi•om Contractor's Default, and
resulting fi�om the actions of os� failure to act of Sui-ety undcr Paragraph 3; and
5.3 Liquidated damages, or if no liquidated damages are speciticd in the Contract, actual damages
caused by delayed perfonnance or non-performance of Contractor.
6, Surety shall not be liable to Owner or others for obligations of Contractor that are �mrelated to tl�e
Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such
unrelated obligations. No right of actian shaIl accrue on this Bond to any person or entity other thaz� Owner
or its heirs, executors, administrators, or successors.
7. Surety hereby w�ives notice of any chan�e, including changes of time, to Coj�tract or to related
subcontracts, purchase orders, and other obligations.
8. Any proceeding, legal or equitable, under this [3ond may be instituted in any court of competent
jurisdiction in the. location in which the Work or part of the Work is located, and shall be instituted within
two years after Contractor Default or within two years after Contractor ceased working or within two years
after Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. lf the
provisioa�s of this paragraph are void or prohibited by law; the minimum period of limitation available to
sureties as a defense iii the ju��isdiction of the suit sha(l be applicable.
9. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the address shov,�n on the signature
page.
10. When this Bond has been funlislled to comply with a statutory rec�liirement in the location where the
Contract was to be perforn�ed, any provision in this Bond conflictina���ith said statutory requirernent shall be
deemed deleted herefrom and provisions conformina to such statutory requirement shall be deemzd
ir�corporated herein. The intent is that this Bond sha(1 be construed as a statutory bond and not as a common
law bond.
1 l. Definitions.
I1.1 Balance of the Contract Price: The total amount payable by Owner to Contractor under the
Contract after all proper adjustments l�ave been made, including allowance to Contractor of any
amowlts received or to be received by Owner in settlement of insurance or other Claims for
damages to whieh Contractor is entitle�l, reduced by all valid and proper payments made to or c�n
behalf of Contractor under the Contract.
11.2 Contract: The agreement betwecn Owner and Contractor identifie�i on the signature page,
including all Contraet Documents and changes Ulereto.
I 1.3 Contractor Default: Failure of Contractor, �a�hich has neither beerl remedied nor���aiveiJ, to perform
or othertivise to comply with the terrns of the Cocltract.
11.4 Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor
as required by the Contract ar to perform aild complete or otherwise comply with thc ott�er tei-ms
thereof.
POR 1NFORIvIATION ONLY—(Nan�e, AdclYess a��d'lelephone) �
Surety AgenCy ot'Broker:Aon Risk Services Central, Inc. 8182 Maryland, St Louis, MO 63105 314-721-5100
Owner's i�e;E�rc.entativa (L�r,��inec>r�r other ��c�r•t�i): ____�_� _
� EJCDC C-G1Q Perfnrntance Bond (2U�7)
Prepared by the Enginecrs.foinl Conlract Documents Committec.
Pa�c 3 of 3
PAYiVIENT BOND
Any singular reference to Contractor, Surety, Owner,or other party shall be considered plural ��-here applicable.
CON'I'RACTOR(Name und Address): Sli RE`i'Y {,�amc; und�?ddress of Prrncrpal Place of
KG Construction Company Bttsine,s_s):
10315 Lake Bluff Drive Liberty Mutual Insurance Company
St. Louis, MO 63123 175 Berkeley Street
OWNER(Narne and Address): Boston, MA 021 16
City of Cape Girardeau, Missouri
401 independence Street
Cape Girardeau, MO 63703
CONTRACT
Effective Date offlgreemcnt: ��v<;.� �� ,�,p/�.
Amount: Fifty Five Million Six Hundred Seventy Four Thousand and 00/100 Dollars($55,674,000.00)
Description (Name and Localion):
Wastewater Treatment Facility,City of Cape Girardeau, Missouri
BOND
Bond Number: 39S203708
Date (Not earlier than Effective Date of'
.4greemenl}: ���L,� �, ,��f�
Amount: Fifty Five Million Six Hundred Seventy Four Thousand and 00/100 Dollars($55,674,000.00)
ModiFcations to this Bond Form: None
Surety and Contractor, intending to be legally bound hereby, subject to the terms set fo►rth below, do each
cause this Payment Bond to be duly executed by an authorized ofFicer, age►lt,or representative.
CON�T'RACTOR AS PRINCIPAL S�UlZETY
KG Co slruction Compa (Seal) Liberty Mutual Insurance Company (Seal)
Conir�c r' IvTame d Corpoc-ate Seal Surety's Name and Corporatc ical;
=�// -
�y: - By: , - . � �,_. � ; � ,_�_ � . �L �;U� ��. ���.��=�--�
�, ibnature Signature (�lttach Power of Attorney)
� �(C� �.,(O Stephanie L. Klearman
Pri11t Name Print Name
pQ,Es���r'N'[' Atto rney-I n-Fact
Title Title
_--------�
Attest: ��.�{ �, Attest: � ' ,�-,, -�1G,,
.�:��._�1� L �- ._�
'C�
Signature Signature Renee Butler
�G� �(r,�,{l�nJ�" Witness
'I,itle Title
IMPORTANT—Surety companies executing Bonds must appear on the Treasury Department's most current list
(Circular 570 as amended)and be authorized to transact business in Missouri.
EJCUC C-615 Paymcnt Bond(2007)
Prepared by the EuKinecrs Jnint Contract Documents Committee.
Ya�e 1 oC3
1. Contractor and Surety, jointly and seve►•ally, binci themselves, thein c�irs, cxecutors, administrators,
successors, and assigns to O�aner to pay for labor, materials, and equiptnent Furilished by Claimants for use
in the performance of the Contract, ���hich is incorporated herein by reference.
2. With respect to O��ner, this obligation shall be null and void if Contractor:
2.1 Promptly makes payment, diz-ectlyo uc• indirectly, for all sums due Claimants, and
2.2 Defends, indemnifies, and holds harmless Owner fi•om all claims, demands, liens; or suits alleging
non-payment by Contractor by an�� perso�� or entity �vho furnished labor, materials, or equipment
for use in the perfor�mar�ce of the Contract, provided Owner has promptly ilotified Contractor and
Surety (at the addresses described in Para�raph 12) of any claims, demands, liens, or suits and
tendered defense of such claims, dem��nds, liens, or suits to Contractor and Surety, and provided
there is no O�vner Default.
3. With respect to Claiman�s, this obligation shall be null and void if Contractor promptly makes payment,
directly or indirectly, for all surns due.
4. Sui•ety shall hav�no obligation to Claimants under this Bond until:
4.1 Claimarl[s who are employed by or t�ave a direct contract with Contractor have given notice to
Surety (at the address described in Paragrapli 12) and sent a copy, or notice thereof, to Owner,
stating that a claim is being made under this Bond and, with substantial accuracy, the amount of�the
cl�im.
4.2 Claimants who do not have a direct contract��vilh Contractor:
1. Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, within
90 days after having last perlormed labor or last fi�mished materia(s or equipment includcd in the
claim stating, with substantial accuraey, the ainount of the claim and the name of the pai�t�y to
whom the materials or equipment were furnished or supplicd, or for whom the labar was done or
performed; aud
2. I�ave either received a rejection in �vhole or in part from Contractar, or not received within 30
days of furnishin�the above notice any communication from Contractor by«�hich Contractor had
i�ldieated the cla+m ��ill be paid directly or indirectly; and
3. Not having bcen paid within the above 30 days, have sent a writtcn notice to Surety {at the
address desci•ibed in Paragrapl} 12) and sent a copy, or notice thereof, to Owner, stating that a
claim is being madc under this Bond and enclosing a copy of the previous written notice
furnishcd to Contractor.
5. lf a notice by a Claimant reguired by Paragraph 4 is provided by Owncr ta Contractor or to Surety, that is
sufticient compliance.
6. Whe11 a Claimant has satisfied thc conditions of Paragraph 4, the Surety shall promptly arld at Surety's
expense take the following actions:
C.l Send an answer to that Clai�naTlt, witl� a copy to Owner, within 45 days after receipt of the elaii�i,
stating tl�e 3moui�ts that are undisputcd and the basis for challenging any amotmts that are disputed.
6.2 Pay or arrange for payment of any undisputed amounts.
7. Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be
crcdited for any payments made in good faith by Surety.
8. flmounis owed by O�a�ner to Contractor under the Contract shal( be used for the performance of the
Contract and to satisf�y claims, if any, undcr any pei•tormancc bond. By C�ntractoi• furnishing and Owner
acceptin� this Bond, they a�i•ee that all funds earned by Contract�r in the performance of the Contract are
dedicatcd to satisfy obligations of Contractor and Surety under this Bond, subject to O��ner's priority to usc
the fw�ds for the completion of the Work.
F:JCDC C-l15 Paymcnt Bond(2007)
Prcparcd by the Enginecrs Joint('ontract D�cuments Commillcr.
Pa�c 2 of 3
9. Surety shall not be liable to Owner, Claimants, or others for obligations of Contractor that are unrelated
to the Contract. Owner shall i�at be liable for payment of any costs or expenses of any Claimant under this
Bond, and shall have wlder this Band no obligations to make payments to, give notices on behalf of; or
othei-wise have obligations to Claimants under this 13ond.
I0. Surety hereby waives notice of any change, inclt�ding changes of timc, to the Contract or to relatcd
suhcontracts, purchase orders, and other obligations.
I 1. No suit or aetion shall be commenced by a Claimant under this Bond other than in a court of competent
jurisdiction in the lacation in which the Work or part of the Work is located or after the expiration of one
year from the date (1) on which the Claimant gave the notice required by Paragraph 4.l or Paragraph 4.2.3,
or (2) on which the last labor or service was performed by anyone or the last materials or equipment were
furnisl�ed by anyone under tl�e Contract, whiehever of (1) or (2) first �ccurs. If the provisions of Yhis
paragraph are void or prohibited 6y lativ, the minimum period of iilnitatioii available to sureties as a defense
in the jurisdiction ofthe stiit shall be applicable.
12. Notice to Surety, Qwncr, or Contractor shall be mailcd or delivered to the addresses shown on the
signature page. Acttial receipt of notice by Surety, Owncr, or Contractor, hawever accomplished, shall be
sufficient compliance as of the date received at the address shown on the signature page.
13. When this Bond has been fi�rnished to comply with a statutory requirement in the location where the
Contract was to be perfonned, any provision in this Bond conflicting with said statutor}� requirement shall be
deemed deleted herefrom and provisions confoiming to such statut�ry requirement shall be deemed
incorporated herein. The intent is that this Bond shall be construed as a statutory Bond and not as a common
law bond.
14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, Contraclor
sllall promptly furnish a copy of this Rond or shall permit a copy to be macie.
1�. Defiinitions
1�.l Claimant: Ail individual or entity having a direct contract tivith Contractor, or with a First-tier
subcontractor of Cc�ntractor, to furnish labor, materials, or ec�uipme►�t for use in the perforniance of
the Contract. `I'I�e intent �f this Bond shall be to include without limitation in the tenns "labar,
materials or cquipmei�t" that part of w�ter, gas, power, light, heat, oil, gasoline, telephane service,
or rental equipment usect in the Contract, architccturai ancf engineerin� services required for
performance of the Work of Contractor and Contractor's subcontractors, and all other items fvr
which a mechanic's lien may be asserted ii� the _jurisdiction whei-e the labor, materials, or
equipment were furnished.
152 Contract: The agreement between Owner and Contractor identified on the signature page,
including all Contract Documents and changes thereto.
15.3 Oti��ner DeFault: Fai(ure of Owner, which has neither been remedied nor waived, to pay Contractor
as required by the Contract, or to perform anc3 complete ar otherwise comply with the other terms
thereof.
FOR 1N}�ORMIITION ONLY—(Name, �Iddress, crnd Telephone}
Surety /�genCy or Broker: Aon Risk Services Central, Inc. 8182 Maryland, St. Louis, MO 63105 314-721-5100
C?wner's Representativc {Fn,�ineer or other-):
EJCllC GGIS Paymrut fiond(2007)
Prcpared by thc 1?nginecrs Joint Contract Documcnts Comrnittcc.
Pa�c 3 of 3
, �.
ACKNOWLEDGEMENT BY SURETY
STATE OF MISSOURI
COUNTY OF ST. LOUIS
On this ��,u day of �� = • .: �-- , 2012, before me, Maria Van Stratton,
a Notary Public, within and for said County and State, personally
appeared Stephanie L. Klearman to me personally known to be the
Attorney-in-Fact of and for Liberty Mutual Insurance Company and
acknowledged that she executed the said instrument as the free act
and deed of said Company.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed
my official seal, at my office in the aforesaid County, the day and year
in this certificate first above written.
��� //�.� ,,,,,,,,
��P�Y PU�', MARIA VAN STNATfnP!
o.....,BG,,
`?'IVOTARI':#': MY��issi�n Ex�ires
Notary Public in the State of Missouri ,�:. s�� • ; �,�e,�,?�,3
-;9�.• ;;�� SL Louis County
�'���,��'�`�` Cr,mmission�G9705800
--------_._ --_-_ __..... -__ ____
� THI$ POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. L�g 1 S�L6S
This Power df Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the
extent herein stated.
LIBERTY MUTUAL INSURANCE COMPANY
BOSTON,MASSACHUSETTS
POWER OFATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company(the"Company"),a Massachusetts stock insurance company,
pursuant to and by authority of the By-law and Authorization hereinafter set forth,does hereby name,constitute and appoint CATHERINE L.GEIMER,
THOMAS U.KRIPPENE,ROBERT A.MILLER,CHRISTINA BARATTI,STEPHANIE L.KLEARMAN,SUSAN R.SCHWARTZ,ERIC D.SAUER,ALL OF THE CITY OF
SAINTLOUIS,STATE OF MISSOURI...................................................................................................................................................................................................................
.................................................................................................................................................................................................................................................................................
, each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its
behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding
ONE HUNDRED MILLION AND OOi100'***•`**""'*******"***•**•****•*********•************•******••*• DOLLARS($ 100,000,000.00*"*•***""""**"'***"*** ) each, and the
execution of such undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents,shall be as binding upon the Company
as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons.
That this power is made and executed pursuant to and by authority of the following By-law and Authorization:
ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings. �
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the �
= chairman or the president may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make, y
p execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys- d
� in-fact,subject to the limitations set forth in their respective powers of attorney,shall have fuli power to bind the Company by their signature and =
-p execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if y
= y signed by the president and attested by the secretary. ,Q
N �,
�� C
� � By the following instrument the chairman or the president has authorized the officer or other officiai named therein to appoint attorneys-in-fact: �
�L =
'O � Pursuant toArticle XI II,Section 5 of the By-Laws,David M.Carey,Assistant Secretary of Liberty Mutual Insurance Company,is hereby authorized — 0
� � to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety v�
v 3 any and all undertakings,bonds,recognizances and other surety obligations. �W
oR = �
d > That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. L
*'�C +�'-'o
�.a IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty ,a M
c'N Mutual Insurance Company has been affixed thereto in Plymouth Meeting,Pennsylvania this day of 29th day of Au4ust O�
O i 2011 ��
�� � � LIBERTY MUTUAL INSURANCE COMPANY O �
° °' m`� �;� a c�c
r.+ v z
� � ``� ' y O
L ''�\ gy �C
�v� ~- David M.Carey, "sistant Secretary ��
� � COMMONWEALTH OF PENNSYLVANIA ss O c
��; COUNTY OF MONTGOMERY �y
�•� 'C 3
� y On this 29th day of August 20�� , before me, a Notary Public, personally came David M. Carev, to me known, and �� d
`p L acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company;that he knows the seal of said corporation;and that he executed >o
.a � the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said ��
�,N
• tt corporation. �
> a=i „� �M �c�
+r L IN TESTIMONY WHERE,O���1��er�e t�o subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania,on the day and year v�"�
Zv first above written ���� �,��;.����'� °� �� --� --- �� - ; ��
y�„��� �',��i' s � ��F � Oo
�+` �'� � �� f- 3 �'. 4 �t 3 E (, ��
�, � Q �."a� ';rvr, .sf T�r 1 ,s � CJ ; B 1��� � ��O
8 � �.r� � ta ��� � . y ��
� ��, ���� �� .:, � „,•. ;: .__.. .-v. , :"u` Te er sa Pastella,Notary Public
CERTIFICATE �, P� �°` �����������
I,the undersigned,Assist�nt��Gr���f,L�berty Mutual Insurance Company,do hereby certify that the original power of attomey of which the foregoing is
a full,true and correct copy,i��.ful6Evr'ce and effect on the date of this certificate;and I do further certify that the officer or official who executed the said
power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys-in-fact as provided in Article XIII,
Section 5 of the By-laws of Liberty Mutual Insurance Company.
This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following
vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company,wherever appearing upon a certified
copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the
same force and effect as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my n=:rne and affixed the corporate seal of the said company, this � day of
A u����: , o;�-.
, � �',��
;'w f;'°�°`�,�;
'- � , �--._
_=�� A�„6�,i '�'�
� �"��",�:�'� Greg ryo W Davenport,Assistant Secretary
-!r� OP ID: MI
A�(�R�' CERTIFICATE OF LIABILITY INSURANCE DATE�MM/DD/YYYY)
07I20/12
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER 314-657-2959 NAMEACT
JD Kutter Insurance Associates
C.J.Thomas Company,Inc. 314-657-2970 P,tiHONN Ext: A/C No:
800 Market Street, 18th Floor E-MAIL
ADDRESS:
St.Louis,MO 63101 PRODUCER KLOST-2
CUSTOMER ID#:
_________ _.__ _ INSURER(S)AFFORDING COVERAGE NAIC#
INSURED KCI Construction Company� IIIC. INSURERA:AIII@CISUP@ IIlSU�81lC@ CO 19488
10315 Lake Bluff Drive iNsuReRe:Zurich American Ins Co
St. Louis, MO 63123
INSURER C:
INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
'LTR NPE OF INSURANCE ADDL��SUBR� pOLICY NUMBER MMLDDY/YYYY MM DDY/YYW LIMITS
GENERAL LIABILITY � ! '. EACH OCCURRENCE �� $ ��OOO�OO
A X COMMERCIAL GENERAL LIABILITY �' ��IC7L2048�J7� 10/01/11 � 10/01/12 DAMAGE TO RENTED
PREMISES Eaocwrrence $ ���,00
CLAIMS-MADE � OCCUR MED EXP(Any one person) $ rJ��O
PERSONAL&ADV INJURY $ ��OOO,OO
GENERALAGGREGATE $ Z�OOO�OO
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ Z�OOO�OO
i POLICY X PR� LOC I $
; AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT � $ ��OOO�OO
A '� X �� ANY AUTO CA2048570 '�. 10/01/11 10/01/12 �Ea accident)
--� BODILY INJURY(Per person) $
I ALL OWNED AUTOS ��
---� BODILY INJURY(Per accident) $
SCHEDULED AUTOS �
PROPERTY DAMAGE $
X HIRED AUTOS I (Per accident)
� X NON-OWNED AUTOS ., ', $
I~ ' $
�X UMBRELLA LIAB I X OCCUR EACH OCCURRENCE � $ 'I O,OOO,OO
EXCESSLIAB CLAIMS-MADE � AGGREGATE $ �O,OOO,OO
B I--- — AUC508767906 10/01/11 li 10/01/12
� DEDUCTIBLE $
X � RETENTION $ O $
IWORKERS COMPENSATION X ORY L M TS oER
AND EMPLOYERS'LIABILITY Y/N �
A ANY PROPRIETOR/PARTNER/EXECUTIVE ��WCZO4HS72 10/01/11 10/01/12 E.L EACH ACCIDENT $ ��OOO�OO
i OFFICER/MEMBER EXCLUDED7 ❑ N�A ,.
(Mandatory in NH) I � E.L.DISEASE-EA EMPLOYEE $ ����0�0�
If yes,describe under
DESCRIPTION OF OPERATIONS below ' � E.L DISEASE-POLICY LIMIT $ �,OOO,OO
I II i I i
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required)
PROJECT: WASTEWATER TREATMENT FACILITY.
***SEE ATTACFIMENT FOR ADDITIONAL WORDING***
CERTIFICATE HOLDER CANCELLATION
LCAPEGI
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCEL�ED BEFORE
CITY OF CAPE GIRARDEAU THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
401 INDEPENDENCE STREET
CAPE GIRARDEAU, MO 63703-6224 AUTHORIZED REPRESENTATIVE
`�,
�� �� � � � ,�1
f ( � ,� r�( (� �t,r= t�t" ,-
OO 1988-2009 ACORD C�RPORATION. All rights reserved.
ACORD 25(2009/09) The ACORD name and logo are registered marks of ACORD
.
t - .
�� ��,,,,,r..�..�.�
�
� � INSLIi�,�►t�1C� A�SSC��IAT��
KCI CONSTRUCTION COMPANY
CERTIFCATE ATTACHMENT
PROJECT: WASTEWATER TREATMENT FACILITY.
CITY OF CAPE GIRARDEAU, MISSOURI AND JACOBS ENGINEERING GROUP, INC. ARE
INCLUDED AS ADDITIONAL INSUREDS AS REQUIRED BY WRITTEN CONTRACT UNDER THE
GENERAL LIABILITY POLICY (FOR ON-GOING AND COMPLETED OPERATIONS) WITH
RESPECT TO WORK PERFORMED BY THE NAMED 1NSURED ON THE ABOVE LISTED
PROJECT. SUCH COVERAGE IS PRIMARY AND NON-CONTRIBUTORY. WANER OF
SUBROGATION APPLICABLE WHERE PERMITTED BY LAW. CANCELLATION WILL BE
PROVIDED BASED ON THE POLICY TERMS AND CONDITIONS SUBJECT TO MISSOURI
STATUTORY REQUIREMENTS:
• (60) DAYS NOTICE—NON-RENEWAL ANY OTHER REASON
• (30) DAYS NOTICE—FRAUD, CHANGES 1N CONDITIONS, INCREASED RISK, CARRIER
1NSOLVENCY, CARRIER LOSS OF REINSURANCE
• (10) DAYS NOTICE—NON-PAYMENT OF PREMIUM
(2016)
�� s
Affiliated with Trio+rv�s C.J. Thomas Company
800 Market • 18th Floor • St. Louis, MO 63101-2506
Phone: 314-657-2959 • Fax: 314-657-2970
�, OP ID: KC
A����Y DATE(MM/DD/YYYY)
�,� EVIDENCE OF PROPERTY INSURANCE o��2oizo�2
THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE
ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE
COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE
ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE ADDITIONAL INTEREST.
AGENCY PHONE 314-657-2959 COMPANY
A/C No Ext:
JD Kutter Insurance Associates Travelers
C.J.Thomas Company, Inc. P.O. Box 66852
800 Market Street, 18th Floor St Louis,MO 63166-6852
St. Louis, MO 63101
ac No:314-657-2970 ADDR'ESS:
CODE: SUB CODE:
AGENCY KLOST-3
CUSTOMER ID#:
INSURED LOAN NUMBER POLICY NUMBER
BINDER#47812
KCI Construction Company EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL
10315 Lake Bluff Drive 08/15/12 08/15/14 TERMINATED IF CHECKED
St. LOUIS, MO 63123 THIS REPLACES PRIOR EVIDENCE DATED:
PROPERTY INFORMATION
LO CATIO NID ESC RI PTION
CITY OF CAPE GIRARDEAU, MO
WWTP
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS
SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
COVERAGE INFORMATION
COVERAGE!PERILS/FORMS AMOUNT OF INSURANCE DEDUCTIBLE
CITY OF CAPE GIRARDEAU,INWTP
BUILDERS RISK 55674000 25000
INCLUDING EARTHQUAKE 55674000 500000
REMARKS Includin S ecial Conditions
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE
DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
ADDITIONAL INTEREST
NAME AND ADDRESS MORTGAGEE X ADDITIONAL INSURED
X LOSS PAYEE
LOAN#
CITY OF CAPE GIRARDEAU
JACOBS ENGINEERING GROUP, INC. AUTHORIZEQjREPRESENTATIVE
SUBS&SUPPLIERS ATIMA ',-� .
t:��" �;, ���� ,:-�.��' � �� �.�-C 1� �'�
, �.
ACORD 27(2009/12) � O 1993-2009 ACORD CO PORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD �
���� OP ID: KC
'`��R�'� CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY)
07l24/12
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement s .
PRODUCER 314-657-2959 NAMEACT JUC� Mitchell
JD Kutter Insurance Associates 314-657-2970 PHONE 314-657-2959 a�c No: 314-657-2970
C.J.Thomas Company,Inc. ac No Ex�:
800 Market Street 18th Floor E-MAIL
� aooRess: �ud 'dkutter.com
St.Louis,MO 63101 PRODUCER KLOST-2
CUSTOMER ID#:
INSURER S AFFORDING COVERAGE NAIC#
INSURED SEMO PORT RAILROAD INSURERA:Tf1V@I@�S 25674
10 BILL BESS DRIVE INSURERB:
SCOTT CITY,MO 63780
INSURER C:
INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TypE OF INSURANCE ADDL SUB ppLICY NUMBER MM/DD/YYYY MM DD/1'YYY LIMITS
LTR
GENERAL LIABILITY EACH OCCURRENCE $
DAMAGE TO RENTED
COMMERCIAL GENERAL LIABILIN PREMISES Ea occurrence $
CLAIMS-MADE � OCCUR MED EXP(Any one person) $
PERSONAL&ADV INJURY $
GENER.4L AGGREGATE $
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $
POLICY PR� LOC $
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $
(Ea accident)
ANY AUTO BODILY INJURY(Per person) $
ALL OWNED AUTOS BODILY INJURY(Per accidenf) $
SCHEDULED AUTOS
PROPERTY DAMAGE $
HIRED AUTOS (Per accident)
NON-OWNED AUTOS $
$
UMBRELLA UAB pCCUR EACH OCCURRENCE $
EXCESS LIAB CIAIMS-MADE AGGREGATE $
DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION WC STATU- OTH-
AND EMPLOYERS'LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE Y�N E.L.EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? � N�A
(Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $
q RAILROAD - BINDER#47811 07/20/12 08/15/14 2,000,000 Per Occ
PROTECTIVE 6,000,000 Aggregate
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additlonal Remarks Schedule,if more space is requlred�
PROJECT: CITY OF CAPE GIRARDEAU, WWTP
DESIGNATED CONTRACTOR: KCI CONSTRUCTION COMPANY
CERTIFICATE HOLDER CANCELLATION
LCAPEGI
, SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
CITY OF CAPE GIRARDEAU ACCORDANCE WITH THE POLICY PROVISIONS.
401 INDEPENDENCE STREET
CAPE GIRARDEAU, MO 63703 AUTHORIZEDREPRESENTATIVE
_�
�." ;���, `,� `( � � /��4• ��".
1
O 1988-2009 ACORD C RPORATION. All rights reserved.
ACORD 25(2009/09) The ACORD name and logo are registered marks of ACORD
j w
: '' -z=� ,�_• '�= , Jaemiah W.(Ja})N'uon.Govanor . Sara I'arka Pauler.Direaor
�s�rarE oP.i�o�i;
D��'�T�EI�TT �F NATURAL RESaURCES
- - s . �
-�_��;+,_ -:;�� �n�tiv.dar.mo.gov
_ :;
- - _ ' .:�_ .
September 17,2012��-. .��`���--�`�' .--,.
Mr. Tim Gramling,P.E.,Public Works Director �
City of Cape Girardean
401 Independence Street
Cape Girardeau,MO 63703
RE: C295531-01 and 02 Cape Girardeau,MO—Wastewater Treatment Plant Upgrades,CP0001299,
Change Order No. 1
Dear Mr. Gramling: �
Enclosed is approved Change Order No. 1 for your contract with KCI Construction Co.,Inc.for the Wastewater
Treafinent Plant Upgrades to serve the City of Cape Girardeau. The project receives fundi.ng through the Clean
Water State Revolving Fund Loan program. This change order has been reviewed for compliance to
10 CSR 20�.040 with regard to changes in contract price and/or time and 10 CSR 20-8 in regards to sanitary
engiueering feaiures. This change order modifies the plans and specifications approved on June 5,2012;but, it
has no effect on the eligible cost of construction or construction ti.me.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the invoice refer
to the date of this lexter for eligibility purpases. Failure to clearIy separate eligible and ineligil�le costs may
result in the disallowance of project costs should the project be audited af�er project closeout Financial
assistance on this project is li.mited to the amount of the loan and cannot be increased. This change order is for
your official project records and should be maintained on file for a minimum of four years following the
completion of disbursement
If you have any questions,please contad me at 573-751-1402 or Missouri Deparlment of Natural Resonrces,
Water Protection Prograni,P.O.Box 176,Jefferson City,MO 65102-0176. Thank you. .
Sincerely,
WATER PROTECTION PROGRAM
�� � � ���
B �hawJr. P.E �RF�.,�,m'neerin Unit Chief
� a f -a �"`b"` g
FtI13IIC131 ASSIStat1CC�RII�L'
BFS:�1
EIICIOSUT6
c; Mr,p.I�.Mathai,P.E.,Jacobs Engineering Group,Inc.
Southeast Regional Office
Mr.Paul Dickersan,Water Protection Program
Mr.Dave Potthast,Water Protection Prograin„�inancial Assistance Center
c�
���
� � ..._ _"""T_
�
� ,,� I
- -���;
Yi��`�."AI�'���M�..-!
� �'__! �l��
� jazmiah W.Uay�)Nxnn,Govemor . Sua Parkc Pauley,Ditector
���;c5�i;�`�;tr�t[�
D; ����I"�� . T OF NAT[�R.AL RESOURCES
,�t ��,- ¢.►!�,-�,�
'� 'r ;.,.�;�.;:.-:_� ,
`�-��'s;�:f,'�'� -;°.`.t'�,� wt��wdntmo.gov
�� x,,�}—�/J�7:»�!
,�:H��.._i�=-:}�:-�/
`�-',-'••,���__.i�l.��y.\ .'y. . �
Ail�c:'LCti� .
�
February 6, 2013 �
Mr. Ti.m Gramling, P.E.,Public Works Director
City of Cape Girardeau i
401 Inclependence Street
Cape Girarde�MO 63703
RE: C295531-Oi /C295531-02 City of Cape Girardeau,MO—Wastewater Treatment Plant �
Upgrades,CP0001299, Change Order No.2 I
Dear Mr. Gramling: '
I
The Missouri Uepart�ent of Natizral Resources' Water Protection Program lzas approved the
enclosed Ghange Order No.2�or your contract with KCI Constructiori Co.,Inc. for the
Wastewater Tre.aiment Plant Upgrades to serve the city of Cape Girardeau. The project receives
funding through the Clean Watei State Revolving Fund Loan program. This change order has
been reviewed for compliance to 1 Q CSR�0-4.040 with rEgard to changes in contract price
and/or time and 10 CSR 2�-8 in regazds to sanitary engineering f�atures. This change order
modifies the plans and spec'ifications approved on June 5,2012 and decreases the eligible cost of
construction by$116,465.
Invoices from your engi.neer should clearly separate eligibie and ineligible costs. Vi�e suggest the
invoice refer to the date of this letter for eligibiliiy�urposes. Fa.ilure to clearly separate eligible � �
and ineligible cos�s may result in the disallowance of project costs should the project be audited � �
after project closeout. I
I.
i
Financial assistance on this project is Iimited to the.amount of the loan and cannot be increased. '
This change order is far your affieial project recards and should be mainta.ined.on file for a
minimum o�four(4)years fallowing the completion of disbursement.
c� �
��
�
I
' .
Mr. Tim Gramiing,P.E.,Public VVorks Director
February 6, 2�13 �
Page 2
If you ha�e any questions feel free to corrtact me at 573-75 i-1402 or Missouri Department of
Natural Resources,Wa.ter Protecrion Program,P.O. Box 176,Jefferson City�,MO b5102-0176.
'I'hank you. . -
Sincerely,
WATER PROTECTION PROGRAM
,� � �'��; . .
Byron F. Shaw,Jr.,P.E., SRF Engineering Unit Chief
Financial Assis#ance C�nter
BFS:cas
Enclosure
c: Mr. P.K. Mathai,P.E.,Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paui Dickerson,TJVater Protection Program, Compliance and Enforcement Section
Mr. David Potthast,Water Protection Program, Financial Assistat�ce Center ,
.
# ° _ �
Change Order
, No. 2
Date of Issuance: January 24, 2013 Effective Date: ,Jalluary 24, 2013
P�fe�c: Wastewater Treatment Facility Owner. City of Cape Girardeau or,�ners cornract No.: 3534
co��r: Wastewater Treatment Facility(SRF Project No. C295531-01) oateotcoMract: August 3, 2012
coM��co� KCI Construction Company, It1C. en9ineer's Pro�ect No.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
WCD No. 1 —Drilled Displacement Piles(Attached) Deduct($261,916.00)
WCD No.2—Probe Bedrock at UV/Effluent Structure(Attached) Add$1,774.00
WCD No.4—Revise Grating(Attached) Deduct($15,106.00)
WCD No.5—Dynamic Testing of Piles(Attached) Add$60,882.00
WCD No.6—Foundation Stabilization at UV/Effluent Structure(Attached) Add$57,355.00
Change Proposal No.3 from KCI—Probe Bedrock at Biosolids Bldg(Attached) Add$4,602.00
RFP No.3—Misc.Arch., Plumbing 8 Electrical Revisions(Attached) Add$27,855.00
RFP No.4—Crushed Stone Drive(Attached) Add$8,489.00
Total Cost This Change Order Deduct($116.065.001
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase][Decrease]from previously approved Change [Increase][Decrease] from previously approved Change Orders
Orders No. 1 No._(NA) to No. (NA)
Substantial completion(days): Same as original
$Q Ready for final payment(days): Same as original
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Same as original �ep
artmen� +��i
$55,674,000.00 Ready for final payment(days or date): Same as original Natural ��5�,;;r��S
[Decrease]of this Change Order: [Increase][Decrease]of this Change Order: r C� 0 U 2013
Substantial completion(days or date): (NA)
($116,065.00) Ready for final payment(days or date): (NA) APPRp�/ED
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): Same as original
$55,557,935.00 Ready for final payment(days or date): Same as original
RECOMMENDED: ACC TED: � ACCEPTED:
BY�,� ��a. - BY -'� � �� J �� - L�� BY ,�-� c.-�
Engineer(Authorized Signature) Owner(A horized Signature) Corrtractor(Authorized Signatu2)
Date: � 4 � Date: L�� � / 7 `l � Date: � � Z S" �J
Approved by Funding Agency(if applicable): Date:
EJCDC No.G941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and t6e Construction Specifications Institute.
�.
. �
ff,
S T�TE'O F M I S S O URI Jeremiah W.Qay)Nixon,Governor . Sara Parker Pauley,Direaor
DEPARTMENT OF NATURAL RESOURCES
_ www.dnr.mo.gov
June 24, 2013
Mr. Tim Gramling, P.E., Public Works Director
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 / C295531-02 City of Cape Girardeau, MO—Wastewater Treatment Plant
Upgrades, CP0001299, Change Order No. 3
Dear Mr. Gramling:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No, 3 for your contract with KCI Construction Co., Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau. The project receives
funding through the Clean Water State Revolving Fund Loan program. This change order has
been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in contract price
andlor time and 10 CSR 20-8 in regards to sanitary engineering features. This change order
modifies the plans and specifications approved on June 5, 2012 and decreases the eligible cost of
construction by $29,857.40.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four (4)years following the completion of disbursement.
A
��
Rm�cled Paper
� ����`�� , .
�uN i7 20�3 Change Order
No. 3
��� '�� -C,;c�;�n� ' F
ti = -� ��;, , ... ,..i
Date of Issuance: June 5, 2013 Effective Date: JUne 5, 2013
Pro�e�: Wastewater Treatment Facility Owner. City of Cape Girardeau or,-�rScom�allo.: 3534
coM��: Wastewater Treatment Facility(SRF Project No. C295531-01) �ateofco�tract: August 3, 2012
CoMractor. KCI Construction Company, InC. en9ineersPro�ectNo.: C5X65101
The Contrect Documents are modified as follows upon execution of this Change Order:
Description:
See attached list of modifications.
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days ordate): JUIy 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Decrease]from previously approved Change Orders [Increase][Decrease] from previously approved Change Orders
No. 1 to No._2 No. (NA) to No. (NA)
1 �p�ar u,��,C�„� pK. Substantial compietion(days): Same as originai
($1�6,065.00) Ready for final payment(days): Same as original
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Same as original n� (j1
$55,557,935.00 Ready for final payment(days or date): Same as original 3.�m� �`.kt'�°J
��� ����``
�1a�u�a �
``�''°�t
[Decrease]of this Change Order. [Increase)[Decrease]of this Change Order: i�. 4 � �''
Substantial completion(days or date): (NA) ��%�{ ��
($29,857.40) Ready for final payment(days or date): (NA) ����� '
�
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): Same as original
$55,528,077.60 Ready for final payment(days or date): Same as original
RECOMMENDED: ACCEPTED: ACCEPTED:
BY �///� �,�-- BY `S.is� �' U.H� BY�— �. �
Engineer Authorized Signature) Owner(Authorized Signature) Corrtractor(Authorized Signatu2)
Date: Date: l�(Q ��J��� Date: �'�• �7
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 3—Miscellaneous Revisions
The Contract Documents are modified as listed below:
1. SBR Influent Line Modifications (Change Proposal No. 11 attached) Deduct ($13,523.00)
2. Exploratory Drilling at Influent P.S. (Change Proposal No. 12 attached) Add $10,155.00
3. Foundation Revision for UV Canopy(Change Proposal No. 13 Rev attached) Add $4,961.00
4. Add Welding Receptacles in Buildings (Change Proposal No. 14 attached) Add $3Z,159.00
5. Floor Hatched in UV Building (Change Proposal No. 15 attached) Add $694.00
6. Relocate Effluent Pipe Under RR (Change Proposal No. 16 attached) Add $1,281.00
7. Grating Embed Changes (Change Proposal No. 18 attached) Add $4,079.00
8. Credit for Roc Excavation at Influent P.S. (Proposal dated 2-13-13 attached) Deduct($35,576.40)
9. Credit for Drilled Displacement Piles (Proposal dated 3-22-13 attached) Deduct($34,087.00)
Total Cost This Change Order Deduct($29,857.40)
,
.
;:;:;?-;°_��''�'u���,��:;��t:.,
� -> � <�
�� ,
, ��� ,
� �0� Jeremiah W.(Jay)Nixon,Governor . Sara Parker Pauley,Director
Q �, rR
I?�����' �� ' T OF NATURAL RESOURCES
�'..- � °� ,j�'�,�
� Y �.� � i i
i .
, ; ,��� �;,, www.dnr.mo.gov
��,.�.i,,r._,,,(„ t,.r_
'��„\:'fCl_\%':.;� -i
_ '�°\n� a�' .�
;.c�:ccx^
October 28, 2013
Mr. Tim Gramling, P.E., Public Works Director
City of Cape Girardeau
401 Independence Street
Cape Giraxdeau, MO 63703
RE: C295531-01 /C295531-02 City of Cape Girardeau, MO—Wastewater Treatment Plant
Upgrades, CP0001299, Change Order No. 4
Dear Mr. Gramling:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 4 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project
receives funding through the Clean Water State Revolving Fund Loan program. This change
order has been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in contract
price and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This change
order modifies the plans and specifications approved on June 5, 2012 and decreases the eligible
cost of construction by $3,530.00.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four(4) years following the completion of disbursement.
ta
Recycl d Papv
c
R
Mr. Tim Gramling, P.E., Public Works Director
October 28, 2013
Page 2
� If you have any questions feel free to contact me at 573-751-1402 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGRAM
,�� :�-v���w,-
��
Byron F. Shaw, Jr., P.E., SRF Engineering Unit Chief
Financial Assistance Center
BFS:cas
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
. . �������� . . .
NOY 0 6 2Q1:3
��� �52�'
� �v�C` .. i ' �,� rv.��
� t � 4 �
` � �'ac_� ..,._ E,f :_� �.r.�
Change Order
OCT � a 2�13 No. 4
�ate of Issuance: October 9, 2013�G�n�E-�C r�-t�C��=�%�i�i`� M�� �'�' ate: October 9, 2013
Proie�c Wastewater Treatment Facility Owner. City of Cape Girardeau owner's cor�tract No.: 3534
co��: Wastewater Treatment Faciliry(SRF Project No. C295531-01) DateofCoMract August 3, 2012
co��co� KCI Construction Company, InC. en9ineersPro�ectNo.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Sludge Drying System and Miscellaneous Revisions
See attached list of Revisions.
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUst 19, 2014
[Decrease]from previously approved Change Orders [Increase][Decrease] from previously approved Change Orders
No. 1 to No._3 No. (NA) to No. (NA)
Substantial completion(days): Same as original
($145,922.40) Ready for final payment(days): Same as original
ContracX Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Same as original
$55,528,077.60 Ready for final payment(days or date): Same as original
DeRrrtmert ��
� ����;c�.�Ev�,
[Decrease]of this Change Order: [Increase][Decrease]of this Change Order: N�tUr� '
Substantial completion(days or date): (NA) � � :� � ^^_`,^�
($3,530.00) Ready for final payment(days or date): (NA) �'"' '
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
��������
Substantial completion(days or date): Same as original
$55,524,547.60 Ready for final payment(days or date): Same as original
RECOMMENDED: ACC PTED: ACCEPTED:
By. � gY. � "� �'� '�,�� gY• 1 v'^'"'� �'�
�
ngineer(Authorized Signature) ner(Authorized Signature) Corrtractor(Authorized Signature)
Date: ,,/�/9/�� Date: �� �L,� � � Date: I�' l' ��
Approved by Funding Agency(if applicable): Date:
EdCDC No.C-941(2002 Edition) Page 1 of i
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
.
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No.4—Siudge Drying System and Miscellaneous Revisions
The Contract Documents are modified as listed below:
1. Sludge Drying Equipment Procurement Allowance
Per Bid Form and Contract Agreement $3,800,000.00
2. Sludge Drying Equipment Price per Agreement with Andritz
(Agreement attached) $3,444,710.00
3. Remaining Allowance in Equipment Price
(Item 1 minus Item 2) Deduct ($355,290.00)
4. Spare Parts for Belt Drying Equipment)
(Quotation from Andritz attached) Add $50,000.00
5. Local H-O-A Switches for Belt Dying Equipment
(Change Proposal No. 09 attached) Add $38,856.00
6. Revise Fan EF-9 in Biosolids Building
(Change Proposal No. 10 attached) Add $10,415.00
7. Miscellaneous Additions to Belt Drying System
(Chang�Proposal No. 17 attached) Add $50,180.00
8. Change 4" Force Main from DIP to HDPE
(Change Proposal No.20 attached) Deduct ($4,200.00)
9. UV Structure Coating and Additional Yard Hydrant
(Change Proposal No. 21 attached) Add $121,183.00
10. Modifications to Kasten Levee
(Change Proposal No. 22 attached) Add $7,670.00
11. Sheet Waterproofing at Headworks Grit Pump Room
(Change Proposal No. 23 attached) Add $10,583.00
12. Outfall Structure Wall Protection
(Change Proposal No. 24 attached) Add $10,021.00
13. UPS Panel Modifications
(Change Proposal No. 26 Revision 1 attached) Add $7,612.00
14. Control Panel LCP-POL-240
(Change Proposal No. 27 attached) Add $9,244.00
15. Additional Lab Equipment and Supplies
(Change Proposal No. 28 attached) Add $22,259.00
16. Additional Rip Rap at Kasten Levee
(Change Proposal No. 29 attached) Add $9,599.00
17. MC Cable in lieu of Rigid AI Conduit in Admin Building
(Change Proposal No.30 attached) Deduct ($4,284.00)
18. Revisions to MCCS Bus Bracing
(Change Proposal No. 31 attached) Add $12,622.00
Total Cost This Change Order(Total 3 through 18) Deduct ($3,530.00)
4 �
�4.
:-'M,.:'i_4"
:f•'�t' ,�:- `�il
c`�'�� ~ � ,�ry�'�-4
t��� �'�1
� ���:.,-�.�
Jeremiah W.(Jay)Nixon,Govemor . Sara Parker Pauley,D'uector
EST��.�, -��s'o,�r��
D�E��.�T'��,F�TT OF NATURAL RESOURCES
� '- �� ' � �l
y. �K 1"' -� www dnr.mo.gov
=���t' ;/� � ��—/?:-�--�
� ',t_,l.�_�/LV._:✓ - "'
_ ? 1 -:'�l�i ,
' 'SI11(:c:C:�� .
February 19, 2014
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 City of Cape Girardeau, MO—Wastewater Treatment Plant
Upgrades, CP0001299, Change Order No. 5
Dear Ms. Brunke:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 5 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project
receives funding through the Clean Water State Revolving Fund Loan program. This change
order provides for subgrade stabilization for the sequencing batch reactor and other
miscellaneous revisions and has been reviewed for compliance to 10 CSR 20-4.040 with regard
to changes in contract price andlor time and 10 CSR 20-8 in regards to sanitary engineering
features. This change order modifies the plans and specifications approved on June 5, 2012
increases the eligible cost of construction by $648,878, but has no effect on construction time.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official proj ect records and should be maintained on file for a
minimum of four (4) years following the completion of disbursement.
��
..
Recyded Paper
_ .
Ms. Casey Brunke, P.E., City Engineer
February 19, 2014
Page 2
If you have any questions feel free to contact me at 573-751-1402 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGR.AM
� � ,
� ��� c`�J�IC�� �
B on F. Shaw, Jr., P.E., WSRF Engineering Unit Chief
Financial Assistance Center
BFS:cas
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, VVater Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
,
*� ����a�a�
€� _�
5:� . 'L.� _ 4.._-�,::7
°�� 7 C ���4
: F� -
�. k . `, ���
� � - Department of
� Natural Resources Change Order
FEB 1 9 2t�14 No. 5
APPR�VED
Date of Issuance: JanuBry 21, 2014 Effective Date: JanUary 21, 2014
P�ie�: Wastewater Treatment Facility Owner. City of Cape Girardeau oWners cornract No.: 3534
co�a: Wastewater Treatment Facility(SRF Project No. C295531-01) �ateotcornract: August 3, 2012
coM��co� KCI Construction Company, InC. Eny��eers Project No.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: SBR Subgrade Stabilization and Miscellaneous Revisions -
See attached list of Revisions.
� , - -; ,
;;f�l �j : .;; -
Attachments: See supporting documents attached.
,�
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Decrease]from previously approved Change Orders [Increase][Decrease] from previously approved Change Orders
No. 1 to No. 4 No. (NA) to No. (NA)
Substantial completion(days): Same as original
($149,452.40� Ready for final payment(days): Same as original
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Same as original
$55,524,547.60 Ready for final payment(days or date): Same as original
[Increase]of this Change Order: [Increase][Decrease]of this Change Order:
Substantial completion(days or date): (NA)
$648,878.00 Ready for final payment(days or date): (NA)
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial compietion(days or date): Same as original
$56,173,425.60 Ready for final payment(days or date): Same as original
RECOMMENDED: ACC TED: ACCEPTED:
. ; (�
BY �/'����1�' BY' � .r '�-� By. I� �
Engineer(Authorized Signature) Owner(Authorized Signature) CoMractor(Authorized Signature)
Date:/�,� ��_ Date: C��� L„�- �� Date: � lLy�I"T
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'doint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
. �
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 5—SBR Subgrade Stabilization and Miscellaneous Revisions
The Contract Documents are modified as listed below:
1. SBR Subgrade Stabilization
(Change Proposal No. 25 Revision 2 attached) Add $145,306.00
2. Parkson Control Panel Modifications
(Change Proposal No. 32 Revision 1 attached) Add $5,219.00
3. Isolation Gate at and City Water to Service Water Pump Station
(Change Proposal No. 33 attached) Add $32,433.00
4. Splash Plates at SBR Inlet Distribution Pipes
(Change Proposal No. 34 attached) Add $22,659.00
5. Modification to Reglet Attachment at UV Roof
(Change Proposal No. 35 attached) Add $4,692.00
6. VFD Cable Revisions
(Change Proposal No. 36 attached) Add $106,547.00
7. Telephone Conduits from Administration Bldg to AT&T Easement
(Change Proposal No. 37 attached) Add $4,674.00
8. City Water to Headworks as an Alternate Service Water Supply
(Change Proposal No. 38 attached) Add $8,128.00
9. Rock Excavation for Sanitary Sewer and Effluent Pipe
Reason for Change: To increase the quantity of rock excavation to
match the increase in quantity expected over the unit price bid
quantity in Agreement dated August 3, 2012.
Increased quantity of 1,000 CY @ $250.00/CY Add $250,000.00
10. Pipe Trench Subgrade Stabilization
Reason for New Unit Price Item: Overexcavation and replacement
of unsuitable subgrade with crushed stone.
(See email communication on unit price attached)
New unit price quantity of 1,000 CY @ $69.22/CY Add $69,220.00
Total Cost This Change Order(Total 1 through 10) Add $648,878.00
Yfr't .�'��•�,:ry,��rrt?
"�'1� „ps�.`N`"'
��-� ��t Jeremiah W.(Jay)Nixon,Govemor . Sara Parker Paulry,Director
.�?�C f � �"; T OF NATURAL RESOURCES
z f� r
�� tr
�� �
�' //���
1 F '`�. -� www.dnr.mo. ov
sl ur,�;,��T��,� g
�,„� t i
�=`�'`�-;,,ts �i
AIU:,:CC?y` .
September 12, 2014
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 /C295331-03 City of Cape Girardeau, MO—Wastewater
Treatment Plant Upgrades, CP0001299, Change Order No. 7
Dear Ms. Brunke:
The Department of Natural Resources' Water Protection Program has approved the enclosed
Change Order No. 7 for your contract with KCI Construction Company, Inc. for the Wastewater
Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project receives
funding through the Clean Water State Revolving Fund Loan program. This change order
provides for the removal of the demolition of the existing plant from the project and includes
miscellaneous revisions including electrical changes to re-classify the Sequencing Batch Reactor
and waste activated sludge tank area to meet National Fire Protection Association requirements,
installation of a covering for the cascade structure, Parshall flume, and ultra violet disinfection
equipment, upgrade to improve the mechanical screens, additional rock excavation, and others.
This change order has been reviewed for compliance to 10 CSR 20-4.040 with regard to changes
in contract price and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This
change order modifies the plans and specifications approved on June 5, 2012 and increases the
eligible cost of construction by $273,323.00, but has no effect on construction time.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four yeaxs following the completion of disbursement.
A
��
ReqNed Paper
Ms. Casey Brunke, P.E., City Engineer
September 12, 2014
Page 2
If you have any questions feel free to contact me at 573-751-4102 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGRAM
� �J3�� �/�� �
By n F. Shaw, Jr., P.E., SRF Engineering Unit Chief
Financial Assistance Center
BFS/cs
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
Celebrating 40 years of taking care of Missouri's natural resources.
To learn more about the Missouri Department of Natural Resources visit dnr.mo.qov.
����� V ��
auU 2S 2o�Y� Change Order
�IVATER PROTECTI01�PROG�I� No. 7
Date of Issuance: August 13, 2014 Effective Date: August 13, 2014
P�o�e�: Wastewater Treatment Facility Owner. City of Cape Girardeau ow�ers�ontract No.: 3534
coM��r: Wastewater Treatment Facility(SRF Project No. C295531-01) �ate otcorrtract: AUgUst 3, 2012
coM�ao� KCI Construction Company, InC. e�9ineersPro]ectNo.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Delete Demolition of Existing Plant and Miscellaneous Revisions
See attached list of Revisions.
�`��{t�-�'�"'�r' �;��
..� s.v.3V,--� ,r�-� �
Attachments: See supporting documents attached. r,,��
������
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUst 19, 2014
[Increase]from previously approved Change Orders No. [Increase][Decrease] from previously approved Change Orders
1 to No. s No. (NA) to No. (NA)
Substantial completion(days or date): Same as Original
$1,528,024.60 Ready for final payment(days or date): Same aS Ofiglflal
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): S8R1@ 8S Oflglflal
$57,202,024.60 Ready for finai payment(days or date): S8R'1@ 2S Ofiglf121
[Increase]of this Change Order: [Increase]of this Change Order:
Substantial completion(days or date): Feb�uary 27, 2015
$273,323.00 Ready for final payment(days or date): M81'Ch 27, 2015
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): Feb�uary 27, 2015
$57,475,347.60 Ready for final payment(days or date): MB�Ch 27, 2015
RECOMMENDED: ACCEPTED: ACCEPTED:
.-1 n
�--4 � ' ,
By: � ,t�c��� !�l^ BY: ti� ' � � W+'��� By: l��.l�l L' k
Engineer(Authorized Signature) Owner(Authorized Signature) Corrtractor(Authorized Signature)
� /� t� _ 7', (
Date:_�,�J ��� Date: lJ� ���" � `� Date: U w� � 1
Approved by Funding Agency('rf applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Coutract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 7—Delete Demolition of Existing Plant and Miscellaneous Revisions
The Contract Documents are modified as listed below:
1. Delete Demolition of Existing Plant and Miscellaneous Work
(Change Proposal No. 54 attached)
Summary:
Bid Form Item L—Demolition: $250,000.00
Bid Form Item G.1—4" Pipe ($49,490-$4,200 deducted in CO#4) $45,290.00
Bid Form Item G.2—Jacked Casing Pipe $15,660.00
Bid Form Item N—All Work at Facility(Includes Mechanical Work at Exist. Plant) 30 027.00
TOTAL—Item 1 Deduct ($340,977.00)
2. Tempered Water to Safety Showers
(Change Proposal No.48 attached) Add $2,454.00
3. Crushed Stone Fill at Influent Pump Station Valve Vault
(Change Proposal No.49 attached) Add $2,126.00
4. NFPA 820 RE-Classification of SBR&WAS Tank Area
(Change Proposal No. 50 attached) Add $87,954.00
5. Modify Underground Piping at Ductbank Conflict
(Change Proposal No. 51 attached) Add $8,462.00
6. Additional Alarm Horn and Beacon in Biosolids Building
(Change Proposal No. 52 attached) Add $1,140.00
7. Cover for Cascade Structure, Parshall Flume & UV Channels
(Change Proposal No. 53 attached) Add $76,206.00
8. Revision to HVAC Ductwork and Grating in Headworks
(Change Proposal No. 55 attached) Add $23,600.00
9. Granular Stabilization Under MSE Wall No. 3
(Change Proposal No. 56 Attached) Add $16,149.00
10. Mechanical Screen Upgrades
(Change Proposal No. 57 attached) Add $141,876.00
11. Relocate Overhead Door Motor in Headworks
(Change Proposal No. 59 attached) Add $1,229.00
12. Provide Pump/Level Controls for DI/RO Water System in Laboratory
(Change Proposal No. 60 attached) Add $3,104.00
13. Rock Excavation for Sanitary Sewer and Effluent Pipe
Reason for Change: To increase the quantity of rock excavation to
match the increase in quantity expected over the unit price bid
quantity in Agreement plus the quantity of 1,000 CY added in CO#5.
Increased quantity of 1,000 CY @ $250.00/CY Add $250,000.00
(No attachment for Item 13)
14. Extension of Substantial and Final Completion Dates
(WCD No. 12 attached) NA None
Total Cost This Change Order(Total 1 through 13) Add $273,323.00
r „�
_ _ ��_
l - 4 `
ST.�TE OF MdsSO'U,RI', jeremiah W.(Jay)Nixon,Governor . Sara Pazker Pauley,Director
DE��RT�E�TT OF NATURAL RESOURCES
, _ F:
= /` _ � _ �Rvw.dnr.mo.gov
- , -� _
` .�'-=-_,:
..�.,c�_�,��
December 12, 2014
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 /C295331-03 City of Cape Girardeau, MO—Wastewater
Treatment Plant Upgrades, CP0001299, Change Order No. 8
Dear Ms. Brunke:
The Department of Natural Resources' Water Protection Program has approved the enclosed
Change Order No. 8 for your contract with KCI Construction Company, Inc. for the Wastewater
Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project receives
funding through the Clean Water State Revolving Fund Loan program. This change order
provides for miscellaneous work on the project and the installation of the ultraviolet
transmittance meter. This change order has been reviewed for compliance to 10 CSR 20-4.040
with regazd to changes in contract price and/or time and 10 CSR 20-8 in regards to sanitary
engineering features. This change order modifies the plans and specifications approved on
June 5, 2012 and increases the eligible cost of construction by$247,810.00, but has no effect
on construction time.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibiliiy purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four years following the completion of disbursement.
�.'.� eG�
�������
�;�� � � 2���+
� 4��
ts
en��:a ra�� �
gY: �S,
!T �
t
Ms. Casey Bnuike, P.E., City Engineer
December 12, 2014
Page 2
If you have any questions feel free to contact me at(573) 751-4102 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGRAM
//�� � ��(L�
�� �
Byron F. Shaw, Jr., P.E., SRF Engineering Unit Chief
Financial Assistance Center
BFS/jeb
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
Celebrating 40 years of taking care of Missouri's natural resources.
To learn more about the Missouri Department of Natural Resources visit dnr.mo.qov.
'��"` ;,
_.j � �����'�,(�� Change Order
� . No. 8
�
��,C �� 1ii1 ;.
Date of Issuance: November 25, 2014 Effective Date: November 25, 2014
f-., .�a ,
'' " 3534
Pro�e�: Wastewater Treatment Facil�Iy� ner. @`Girar eau Owners Contract No.:
co�t��c: Wastewater Treatment Facility(SRF Project No. C295531-01) oateotcontract: AUgUSt 3, 2012
co�,vaao� KCI Construction Company, InC. en9ineersPrnjectNo.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Miscellaneous Work and UV Transmittance Meter
See attached list of Revisions.
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): .lUly 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase]from previously approved Change Orders No. �Increase][Decrease] from previously approved Change Orders
1 to No. 7 No. (NA) to No. (NA)
Substantial completion(days or date): February 27, 2015
$1,801,347.60 Ready for final payment(days or date): Ma�Ch 27, 2015
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Feb�u2ry 27, 2015
$57,475,347.60 Ready for final payment(days or date): M2fCh 27, 2015
MO Department of
[Increase]of this Change Order. [Increase]of this Change Order: NatUrc�I �PS���rCes
Substantial completion(days or date): 1�0 Cfla(1g@
$247,810.00 Re�dy for final payment(days or date): NO Chang2 D EC 1 2 Z014
Contract Price incorporating this Change Order: ContractTimes with all approved Change Orders: �PP��V�D
Substantial completion(days or date): Feb�uary 27, 2015
$57,723,157.60 Ready for final payment(days or date): MB�Ch 27, 2015
RECOMMENDED: ACC �TE : ACCEPTED:
B � BY � _ 1 �:' �+�' sY �+� , �
Y
Engineer(Authorized Signature) Owner(Authorized Signature) Corrtractor(Authorized Signature)
Date: �� !���� Date: � �� L� ! � Date: f Z'�' �7
Approved by Funding Agency('rf applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
.... . . C.G�i:�"' ,� --(
� r r
f
� ` WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 8—Miscellaneous Work and UV Transmittance Meter
The Contract Documents are modified as listed below:
1. Revisions to Tie-In at SS-MH-12
(Change proposal No. 61 attached) Add $3,460.00
2. SBR Foundation Drain and Heat Exchanger Drain Modifications
(Change Proposal No. 62 attached) Add $14,793.00
3. Removal and Replacement of Unsuitable Subgrade
(Change Proposal No. 63 attached) Add $1,794.00
4. Electrical and Controls Works for Parkson Screen Modifications
(Change Proposal No. 64 attached) Add $46,784.00
5. Intrinsically Safe Circuit in.Panel CP-GRT36
(Change Proposal No. 65 attached) Add $3,444.00
6. Mounting of Sanitaire Level Transducers
(Change Proposal No. 66 REV1 attached) Add $2,790.00
7. Additional Wiring per Revisions to Interconnect Loop Drawings
(Change Proposal No. 68 REV1 attached) Add $62,189.00
8. New NEMA 4X Disconnect Switch for IPS Cable Revisions
(Change Proposal No.70 attached) Add $2,489.00
9. Automation of City Water Supply to Service Water Wet Well
(Change Proposal No.71 Attached) Add $16,137.00
10. Revisions to Switches for Belt Dryer and Truck Loadout Chute
(Change Proposal No. 72 attached) Add $1,125.00
11. Laboratory Casework Modifications
(Change Proposal No.73 attached) Add $509.00
12. Modifications to Site Entry gate
(Change Proposal No.74 attached) Add $1,629.00
13. MIG Welders for 3-Phase Power
(Change Proposal 75 attached) Add $12,247.00
14. Delete Type B Gutter at Top of Retaining Wall No. 1
(Change Proposal 76 attached) Deduct ($3,899.00)
15. Power to Laboratory equipment
(Change Proposal 79 attached) Add $11,713.00
16. Storm Water Pipe Repair
(Change Proposal 81 attached) Add $7,071.00
17. Miscellaneous Work and UV Transmittance Meter
(Change Proposal 82 attached) Add $8,214.00
18. Compressed Air Purge of Sampler and Hot Water Flush for
Septage Receiving Station
(Change Proposal attached) Add $55,321.00
Total Cost This Change Order(Total 1 through 18] Add $247,810.00
�
;� ��=� K��ai��c-n
;; - ;n:. . ..M.� ,���
� i ���. _. _..� i i ..,
; � _.,.., _3 ,..-.�_�_;<<: ... , Change Order
�
i �u� o � zU1s !
� � No. 16
� "i='s';?.�,��'�s� f
Date of Issuance: May 11, 20!1.8...._____..�_._...___.._...�__..._..__.....� Effective Date: May 11, 2018
P�o�e�c: WastewaterTreatment Facility oW�e�: City of Cape Girardeau ow�erscontractNo.: 3534
co�c�a�c: Wastewater Treatment Facility(SRF Project No. C295531-01) �ate of cont�act: AuguSt 3, 2012
co�t�a�to�: KCI Construction Company, If1C. EngineersProjectNo.: CSXG51O�
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Caul&Seal CMU Heads,and Dryer System Modifications per DHA
See attached list
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AuguSt 19, 2014
[Increase]from previously approved Change Orders [Increase]from previousiy approved Change Orders
No. 1 to No. 15 No. 1 to No. 15
Substantiai completion(days or date): March 31, 2015
$6,260,060.38 Ready for final payment(days or date): OCtobef 18, 2016
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days o�date): March 31, 2015
$61,934,053.98 Ready for final payment(days or date): OCtob2� 18, 2016
[Increase]of this Change Order: [Increase]of this Change Order:
Substantiai completion(days or date): March 31, 2015
$398,108.00 Ready for final payment(days or date): D2Cefil bef 31, 2018
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days ordate): March 31, 2015
$62,332,161.98 Ready for final payment(days or date): DeCet71 b2f 31, 2018
RECOMMENDED: ACC TED: ACCEPTED:
. /�
BYi�Q By, � G Q� By: /��
Engineer(Authorized Signature) Owner(Authorized Signature) ractor(Authorized Signature)
Date: �7 ��� Date: ��y /✓(�L d" Date: 5 �
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
associated General Contractors of America and the Construction Specifications Institute. �
' , , �
�f4
THIS PAGE INTENTIONALLY LEFT BLANK
., • '
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 16—Caulk & Seal CMU Heads, and Dryer System Modifications per DHA
The Contract Documents are modified as listed below: Bid Item
No.
1. Caulk &Seal CMU Heads on T&M Basis
(Change Proposal No. 135rev.1 attached) Add- NTE $5,511.00 N
2. Modifications to Dryer System per DHA
(Change Proposal No. 136 attached) Add 141,310.00 N
3. Fire Suppression System for Baghouse
(Change proposal No. 137 attached) Add $251,287.00 N
Total Cost This Change Order (Total 1 through 3) Add $398,108.00
1'
THIS PAGE INTENTIONALLY LEFT BLANK
,�' _ s ��P_(�Y1� v.,�'.
.�,:�;
C;
,�'� ��s�'
S � '1'f����� Eric R.Gceicen>,Gu�rrnor . Tc�d Sarnpscll.Acting Ui:cctvr
. D ° ��- T �F NATUR.AL RESOURCES
� ���
v y`
�. 1�
4��j „` t�Ill.lilU.L',OV
L.��5-.��7 r!�1
.�'���V i -"��'
\� UP�:11 SL�4.4.M� ��
�UC'CCa�'
January 19, 2017
Ms. Casey Brunke, P.E., City Engineer
CiTy of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02/C295331-03 City of Cape Girardeau, Missouri—
Wastewater Treatment Plant Upgrades, CP0001299, Change Order No. 15
Deaz Ms. Brunke:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 15 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau, Missouri. The
project receives funding through the Clean Water Sta.te Revolving Fund Loan program. This
change order includes changes dryer emission pre-screening and misc. automation and
improvements. This change order has been reviewed for compliance to 10 CSR 20-4.040 with
regard to changes in contract price and/or time and 10 CSR 20-8 in regards to sanitary
engineering features. This change order modifies the plans and specifications approved on
June 5, 2012, increases the eligible cost of construction by $614,291.38.
Invoices from your engineer should cleazly sepazate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to cleazly sepazate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official proj ect records and should be maintained on file for a
minimum of four yeazs following the completion of disbursement.
���
R�,�,�,�,.��
; �n
Ms. Casey Brunke, P.E., CiTy Engineer
January 19, 2017
Page Two
If you have any questions feel free to contact me at 573-751-5937 or Department ofNatural
Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176. Thank
you.
Sincerely,
WATER PROTECTION PROGRAM
�/ �
Kyle G. Te, SRF Engineering Unit
Financial Assistance Center
KT/ng
Enclosure
c: NIr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
'� j MO De���tm�nt c�f
Naturai F��,otArces I�ECE.I`V�;pj
JAN 19 2017 Change Order
JAN 0 G �u;
No. 15
��,,.,,
�.pi��':Q�/�C� j ���1�r�iFt .•i.c.C��..ii�i�! �%r� r.
j � l.jl��.�
Date of Issuance: 4 December 22, 2016 � �� Effective�ate: December 22, 2016
P�o�e�c: Wastewater Treatment Facility ow�e�: City of Cape Girardeau ow�ers�ontractNo.: 3534
co�c�a�t: Wastewater Treatment Facility(SRF Project No. C295531-01) �ate os co�t�aot: AuguSt 3, 2012
co�c�a�to�: KCI Construction Company, IIIC. Engineer'sProjectNo.: C5X651O�
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Dryer Emission Pre-Screening and Misc. Automation and Improvements
See attached list
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): JUIy 20, 2014
$55,674,000.00 Ready for final payment(days or date): AU9USt 19, 2014
[Increase]from previously approved Change Orders [Increase]from previousiy approved Change Orders
No. 1 to No. 14 No. 1 to No. 14
Substantial completion(days or date): March 31, 2015
$5,645,762.60 Ready for final payment(days or date): OCtObe� 18, 2016
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Ma�Ch 31, 2015
$61,319,762.60 Ready for final payment(days or date): OCtObe� 18, 2016
(Increase]of this Change Order: [Increase]of this Change Order:
Substantial completion(days or date): Ma�Ch 31, 2015
$614,291.38 Ready for final payment(days or date): DeC2f71b2t'31, 2018
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial compietion(days or date): Ma�Ch 31, 2015
$61,934,053.98 Ready for final payment(days or date): D2C2f'n bef 31, 2018
RECOMMENDED: ACCEPT D: ACCEPTED:
' !�� la_L-,l�-� B ���� ��-
By: BY� Y�
Engineer(Authorized Signature) Owner(Authorized Signature) Contractor(Authorized Signature)
Date: Date: � �� ��° ( � Date: I Z 2�' ��0
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America a�d the Construction Specifications Institute.
� i .
THIS PAGE INTENTIONALLY LEFT BLANK
. � , �
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 15—Dryer System Improvements
The Contract Documents are modified as listed below: Bid Item
No.
1. Dryer System Improvements
(Change Proposal No. 133 attached) Add - NTE $509,737.00 N
2. PVC Jackets Over Pipe Insulation in Dryer Room
(Change Proposal No. 130 attached) Add 40,070.00 N
3. PVC Jackets Over Pipe Insulation in Truck Bay& Mech. Room
(Change proposal No. 134 attached) Add $12,450.00 N
4. Dust Control Equipment for Biosolids Building
(Change Proposal No. 132 attached) Add $76,571.00 N
5. Pay Application Item 35—21" Sewer& MH Removal
Credit on Unit Price Work Not Required
(See Pay Application Continuous Sheets attached) Deduct ($2,005.00) F.5
6. Pay Application Item 250—CO#5 Pipe Trench Stabilization
Credit on Work Not Required
(See Pay Application Continuous Sheets attached) Deduct ($22,531.62) N
Total Cost This Change Order(Total 1 through 6) Add $614,291.38
a � ,
THIS PAGE INTENTIONALLY LEFT BLANK
, � �
KCI Construction Company
5 ake Blu Drive
St.Louis,MO 63123
(314)894-8888
Fax#(314)894-7418
www.kciconstruction.com
December 14,2016
Jacobs
Attn: Mr. P.K.Mathai,P.E.
501 North Broadway
St.Louis,MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treatment Facility ov��1`��'��'S
Change Proposal# 133 — �t��r S��'����mPr
Dear Mr.Mathai,
We propose to furnish the necessary labor,material,tools and equipment to Provide DRYER
SYSTEM IMPROVEMENTS PER RFP#51,for the increased LUMP SUM of FOUR-HUNDRED
EIGHTY-NINE THOUSAND,SEVEN-HUNDRED&THIRTY-SEVEN DOLLARS($489,737.00),
AND A CONTINGENCY OF TWENTY THOUSAND DOLLARS($20,000)FOR FUTURE
ADDITIONS IF REQUIRED FOR A TOTAL OF FIVE-HUNDRED NINE THOUSAND,SEVEN
HUNDRED&THIRTY SEVEN DOLLARS($509,737).
Please note the foilowing clarifications associated with this pricing:
SEE ATTACHED INCLUSION/EXCLUSION LISTING.INDIVIDUAL CHANGE PROPOSALS
SHALL BE GENERATED FOR USE OF CONTINGENCY MONIES TO ALLOW FOR
APPROPRIATE FEES
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval,please sign the attached copy in the space provided and return
it for our records. By signing this change proposal,you are authorizing us to proceed with the work and
agreeing to forward the appropriate change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
BY� �/����2�Lf./�/�I�---
Michael Opels
Project Manager Date: �.
Attachments
a t �
�
U
�
V
N ¢ �
Q '�
� �
� N
� y
� Q
z �
¢ �
U �
v�
v
c
G
w
m
T p.
� Y
ci
3
C T
`o
F � T
m �
w 'o
Y �
F � �
c
d U -
A
3 3
�
� m
3 a
� o
�u � c
� U
� d
� O N
v � � o
rzt a
F
v � O a`
� �
O O N O < O O O v� O f� O a M N E �y
� O O O � � O O O O O O V O� t� O � "' V
�D V a0 a0 — O O C V o0 — t� O V — Q� U
N �O o0 t� — N o0 �D R O O C � c0 � W
pi fLl � N N t� N V O — � V �
.. T � � N N N N V O O
ro O F p�j U
z � � Q o � �
� n p � o � N
� V +
v
a` i Q Z �a m E
e o e e o �
=o =' a
^ C L fd
� Y O �'N
� 3 � C�
� V � �I W
� �
�Y
C
�
N
O
F
e y
o �
o , ,$
� Uy F v
'� - o y O F F
`o `° c ¢ °' U
O i. v � p
� t.. �
� v,� N ^ N 3i a N � L p� {i � Q 0
- z ..-. 0 'O v � 3[ 3G � � N i. C � U Q '� �
_ e-i O �,. � , � � 6 d 6 v � U � OL � v Q fA
� m � � e c.
- o a a a c ai m a�i v m m � o � v� � � � ^ "'� H � `o
� a U o c °' _n ' � ��' �u a n � 'a � a `� 0 9 `° `v .o Z, a n r.0
_ _ � � v �� �> > � � :° y c c Q v
_ r � _ � � � O �i U rn � � W a�i � O � O F ri `n � c7 a�1 U � o Q
0
°' U
,•�-�-, � � }
c
A � G
Y � = y �
F
y V' t Q
O � ,
6
C N O
° o a`
O 6 N
en �.., t.x.l o 0
d Y V � c=C � � — GO
.0 O L 0 t O O
� ❑ � �
. � �
O R O O � � 00 00 O vMi N 00 V
� �' Q O M M v� � O �
t�l V N O � � ,�
� f�t O � O
¢ � � Q _
I-' �
O U
F
W #
Q �
� � � v
[" � �
L:7 2 0. Lt.
.-] � � .s..
¢ F' =v 3
v� —
O Q
O O
o�. V
� -� F [:7
Q F
z m � c
_ �
� v
o c o 0 0 o v, �
O � � O h N o0 C
� U O M M O � O �
C �
W ¢ � �
F, F -
Q =
� 3
o �n o � �n
0 o r
o �
F v o
� Q
z ¢
= C N
z
0
F
0 0 0 0 o e �
O V � M
� � � L
LY` N � M
Q M � '� n�
m ¢
� �
y.
� �
O [� 00 3
� �
o F E'"' O
Z
rv � � �
� O
o vVi
� O O N I� [� t� � l� �
O O �
N
N M
v- F
o z
� _
M
a F"' y ti y a c y a o 0 0 0
U � - s - - - - �o s s` _ - _ - s - - - � � E - E -
�
°� F
z � �'
o `
o �, ' z � °
a
� �
v � y o z � c 0. O 3 �
v� oZ$ � s 'a'7 � v.l CL �"' y �c
fS] y O A � � 6. GC S Q s .1 'C
ti _ = z z
� = �: = ° � a3i [cv- .L. `n 0 `i' '� g ° �
� ,o � c �> co =° � v o Z °' � Q `� O � � �
� � y v��, '�a � = o = � V � � � Z � � c�i Lv, ,`o
r°'.0 v � � � � � = � r `��° � a V L = n' c'" O °- �. .`O `o �o
Z � �� 9 0 ` � y � o h °+�j s Ll � C' V m � t�x.l °'`S V '� > °� � ia
� ca � c c� y Z, ^ � � V m � � � `o y C � F y � v� yi v� � E >
�a a. w c a C� a� .n ar ,, U �
F � � - � `n � c a a � � " �� e � a � >, � � =0 z � T a [�. c:7 � v o c
Ll �. ,i:_ m v d d �v o � � � ` � .a A � E � `m i •- O y o
� � c`. a v� a` ii. � V F � ` � ` o � � 7 " o v S O c.7 v� rs- �v � o
F a c1 a. Q U S Gl >- C] C7 U F a V > � O � �. Z a`
U
.� ,�
LII O O O O N O O O O O O O O O N '+1 O O O � O
� N � Q �--� N M �D �O 00 M N c'� O� O � O V^ 1� f� 00 ^ l� �f
O O O O O O N V R C v^ vJ' V' 'V `� V' r � � �` � N M
� , � � O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C7 a
, t ,
�
¢ F. s �c
F. cn =� N
O �
F V
N �, i+1
F o � x
� V ' I 1
¢ L N
G. f l N
L C
� U
L �
F F �
�' z �% =, r,
" .., o �
'' g �
¢ a
� _
0 � c
G
o a 3
y
y F U=
v �
z z ¢
¢ � �
x
v
� � o
4 x r� N
Q �� N
L-. r
G =
� 3
N
o F, ,..
o F
� 2 Q
r � c
0
c � �
o c, N
� a c
¢ - _
�
F L
M Z 4
�^ � c
x
n. cn
U O i- -
,� z
�
� �;
� -
z
C
E
5
G
s
� z
:� 3
3 �
z a Y `
o ¢
�
c � '�
� � �
v; � C
C � `
z �
�- �'
O � �';
� .
U p ;"
� �
O U
4 .
v. „�j''
at ¢ �;.
'� ., � �.
.�-��� -' ` �� L
� s O.
� � � G >
il � �
r� J U '�,
�;
. } , !
00 0 0
N � r i � i f+1 M
O rl Vf ul
�n m m m
.-i � oo a6
o � �n �c
Q W N N N
� V
� �
F a
N lA Vl Vl N Vl N Vl N tA
O O F
•-I N Q
�.., W O ti F
- V � m
Z '
� a o �
N
N tA
Z a w
� `.,
z
� .� '.
C
�
a Z
a p
� � a
� �
`�' o
�^ � v�i d
.ti Q
ac i c� ,�„
Z W �
� � O w O
a c u a �n
O
a
� O
Z z o 0
_ � o 0
u �
i —
LL
F'•
3
3
W
a
¢
v
� � ,
ao
00
�
0 � �������������������������
<
Z
�
�
�
�
��� �,
0
0
a
�
�
zY �
� Q 2 4 ',`�j
¢ C N FN
� � w
� w L a
- �
a < a <
i- r '-
o C C o
r- � r � o
� o 0 0
C
j � U
C
0
0
0
�
z
� _
� �
a �
0 0
z
i o
� o 0 0 0
0
� �_
i O � z
m K
Q
� 0 O
S
� Z �
h = O
i'�
� ^�+ _
\�
V
� � C� l� �
� u a
�`.. V
} � O O � O
s+l_ Z 2 Z
� j Q
� J � � � ~
F 'n Z Q LL Z
Z � Z m � z � �
p ��
_ o�� � O�� 2
4 � in � O v' v+ r � �
. m ¢ 2 r �m ¢ w p a w
C" - _ :-.., y �� F J J � � z F J � z o z d N
` 3 a o 3 a ¢ d d o Q o
'= 3 �° � w �o � ° � W ���z u x ��
� o �_ � � a z W � � o z o z ,.� "' � � u Y �
oN �� o Q Qou au W �+ u - Na6 � o
� z o � `o_ s:. m o 0 o c = 3 � o 0 0 0 � o a o z ? � - a�
¢ uo - o � � awy � � W s y � LLz � Q `-' � �
� z � r - �o ,�, � w�� � o3 Jrr � w � �w$ � � � `" Q
- < n � a � Z F Q w � � Q w p Q m z w Up 0
0
m a� � ��'e "' a 3 o z O c w d 3 o Z � _ � a 3 u d � a � ,� a �-
, ' r
00 00
1� Vt O N
� M h O .i
1� vt O M
� Q1 N V1 1�
V � tp
V�vl N N N N
K
� O O O
� O O O
�U rj I� �!1 O
M 1� O
� u I� vt O
Z d Q1 � u1
� �
.0 t/1 Ll N Vl
I,Q'.
O �
O �
i i � � � � N
�
r
�
C
�
V?tn N � p
Ci
Q R
Z � C Q
"' G Z I-
- � � G
- u ' v..n.n�n vi.n '
� ` Q m
4 � � �
G G G 4 IQ��_ � � � � �
r f- '- W in
�J � J O �V}N lh N N
� � � � H
Q
� y
a`
�
�
�
m
�
�
I o � � , � � �
H
Vr N N Vf N N
H
Z 2
� �
a
� �
� T
O T'
Z�
0
�y
.ti
S�
t=.:. A
0
H
� Vl VT V1 Vf N t/T
��"u
C
f- �>
Q ��
� J
x G1 O
Q tp=
� � �
� C�
� �? O O O O O
� L=
i
n
' Z=
z,� N>
�s ��
^-� �_��" 3 v
v�
�^
� o
0 0
_ �
Q
O
O
a
Z �
Z
� F-
z a
O
` a u
O
\ - Z
.. �� Q
s � J
�
H � N Q U �
Z � .. Z �
V _ Z
� v~i C � � a 'O
F
U �
� a � 0 C Z� � Q 1' w J
F= Q Q F- u m � V w U !a-
� � Q Z �'V � Z � ¢ �
m O F- � � vf Q � w a �-
.
k � ,
�N�Ti
Sepa�r�tion
November 10, 2016
Mike Opels
KCI Construction Company
10315 Lake Bluff Drive
St. Louis MO 63123
Subject: Coating Oil System Proposal for Cape Girardeau Belt Drying System
Mike,
Per your request, ANDRITZ is providing a proposal to add a coating oil system to the Cape Girardeau
Belt Drying System. The Coating Oil System will spray dust control oil (Dustrol 3010) on dried product
prior to loading into trucks to assist in control of dust.
Andritz Pellet Oil System Description
The basic system consists of an oil storage tote, heater, pumps, oil injection noules, pressure
regulator. The system is designed to be a recirculating system. Oil will be sprayed into existing silo
screw conveyor. The system is to be installed with heat tracing (self-regulating type 10W/ft with
thermostat) and 2 inches of insulation for temperature maintenance of the oil in the pipe.
• The oil pump is a gear type positive displacement pump skid mounted with a 2 HP 900 RPM
TEFC motor. The pump provides 5.25 gpm flow at 150 PSI pressure.
• Oil nozzles are selected to supply oil at a rate of 2 to 3 gallons per ton of pellets. Oil nozzles
are 304 SS.
• A back pressure regulator is used to maintain the proper oil pressure for the noules. It is a
diaphragm type valve with an iron body, Buna N diaphragm factory set point of 100 psig. The
set point is field adjustable.
• Oil piping is proposed to be 2" inch schedule 40 carbon steel pipe.
ANDRITZ SEPARATION INC.
1010 Commercial Blvd.S.
Arlington,Texas 76001
Tel.(817)465-5611
Fax(8�7)468-3961
separffiion.us@andritz.com
,
, � i
1�MR�TL
Separation
Andritr Scope of Suppiy
Mechanical
Qty Description
1 Re ulator Pellet Oil Line- PRV
2 Pum -Gear
4 Flexes
1 S ra Nozzles
4 Ball Valves
1 Pressure a e
1 Heater Housin
Electrical
Qty Description
1 Pellet Oil Pum Control Panel, NEMA 12
1 Pellet Oil Heater Control Panel, NEMA 12
3 Pellet Oil Heater Elements
2 Feeder breakers 1 for um s 1 for heaters
2 tem erature elements with thermowell &head; 1 for control, 1 for hi h tem limit
1 Solenoid Valve
Engineering
Description
O&M manual, drawin s, submittals
Software modifications
Andritz I&C su ort on site
S stem Trainin
Exclusions
• Installation
• Piping
• Insulation
• Heat Trace
• Coating Oil Tank or Tote
• Coating Oil Tank or Tote Heating System
• Coating Oil Tank or Tote Low Level Instrument
r
l � .
�MR�TL
Separation
• Anchors, fasteners, hangers, gasketing
• Coating Oil System Containment
• Platforms and access stairs or ladders
• Building modifications
+ Civil and structural engineering work, including design and supply of structural steel and
concrete as needed for support of the Andritz supplied equipment.
• Electrical field wiring, conduit, and supports
Deliverables
• Submittal Package
o Updated General Arrangement Drawing
o Updated P&ID
o Product Data Sheets
o Pipe Sizing Information
o Insulation Information
o Heat Trace Information
• Equipment
o Mechanical and Electrical equipment as stated in Scope of Supply
• Updated O&M Manual
• Operator Training (4 hours)
Schedule
• Submittal information 4 weeks after receipt of order
• Equipment delivery 8 weeks after approvals
• Software modification and training scheduled after installation
Price
The proposal price for the scope of supply is $67,716.00 USD.
Attachments:
815685 Proposed Pellet Oiling Cable List
Foamgias insulation
Raychem Design Heat Trace Cape G
P1401
i ,
�
0
U U U U U
� � � � �
y 2 Z Z Z Z
� O O O � �
d
� Fw- Fw- ~ FW- F
Q Q Q Q Q
Ci O O O O O
J J J J J
A
a a a x x
° a � a � a � a � a �
O O O O O
a V O V O U O V O V O
Q J � J � J � J � J �
N �
� (� W �
�
U � O � N
� w O w ¢ �
a+ � wa � �a
�0 J 2 W W J 7
U a. c� F- � d Q
.a a v v co v
C N
O ._
V N N N N � N
N
d
DO OD N N N z
+10-' C O
N >° �° v° �
J V
W �
J
m a Q a n = ¢ _ � = a cn
V � a � a � a � a � a � �
c� � E a o a o a o a o a o
Z � o o v a v a v a v a v a �
J U IL F J U J U J U J U J U �
� tn O � � O � O I—
� = 2 Z Z Z Z W w Z O
J y � � � � 7 � � � Z
a � � U' U' C7 (7 � � U' Z
o U v� �n v� cn u7 � � �l �
vWi u o 0 0 0 0 � � o w
O y � � � � � W W � cn
O
� V 2 2 Z Z Z � � Z �
a - - - - - - �
� a
�
tD N N O O O � W �,
�n C N � m �
co O
V y o 0 0 0 0 > > o O
v v v v v E E N �
d
10 '8 V �f V � � N N c'7
p O O
> �k U
a a a x x x
n
�t O O O O O O �
d p a ❑ a "' a `? ap ap ao � o 0
� o a w U w V U V U V w U w U w O w
a �
U tL f- LL J L.L J rL J � J LL J LL J LL � LL U
O
O7 m c�
N
c o 0 0
°1 a � �9 a � `O a a a a a a
m � . � � � g a �n g a u� u� �n �n �n �n '
o W o w o 0 0 0 0 0
� 3 d m 3 � O _ � O - vi
azwoz a v� � a �ni- a a a a a a X
a a �
�
a a w w O J � � � � �
J J lwL LL W O � � � I— U7
O O a � S � J W H J -' � @
J Q' J Z =
w w a Y a Y a � W O w � w � m
� � � a a ¢ aQ � Q ac� a = a �
w w � a
� a a �m N m N o wQ o W o N O
E r N C G � N �yJ �p Q t0 �
Z N N N N � W = W = � d
co ca � �O 2 ~ ~ w a
�a g g m m y
F U U a
n
0
a`
N
W
�
N
�
� � ,
o c� m Q
ss.So`;„ s,o��o,�,� ,�oaoaa: S l 548 �Niavo� �a l�naoad �vNi� `
�
�� ,„ NC1Y"`"��•tl"> �m�dse9s� WV2J�VI4 MO�j IV�INVH�3W � o�
i9ioE/oi/in n,i, N a o
9iDi 0�li W315A5`JNIAiiO SOI105018 � �
ii�iwv'
iNe'�d a3ivM 3tsvm nv3aavai�3dv��o uu
a
t
I 9tOL 0�/vt
I nI, �
� aL
Ln L(�
O
rv3
� �� �
sQ
C o ' - �
a� a� -
1-f�.-� hl�./
= se = s�
�__IV7i ` �
9� r
M '� r7
�� 4� `
"' :�a
�--- :R
.�
1
Y
u�
�
N N
v��a�agi
e�g;�`
�����i�
5a�s�€p�.—
�•�na;
l����g��
!p @�es
.A�[4��
S�y�Y•
q,q�5g
g'Si�9
� C) 0� Q
fdd+9Wv'�W"i0uId5895iB\*ONV�+otl�SL 509�+M+ui9 adq SG95i%a.pry�sqo�uetfiwyy�EW5w5ltlN\
, � l
�MR�TL
Separation
Proposal
i' �c.G �¢�E c ��.. �W_� .��vd����V��� � Y ���
��
�'���� ��a�a�✓'�
Issue Date: December 1,2016
Project No.: 12002 Andritz Project No.: 815685
Customer: KCI Construction Company
Plant name: Cape Girardeau WWTF
Attention: Mike Opels
Address: 10315 Lake Bluff Drive
� City, State, Zip: St Louis, MO 63123 �
� Phone: (314)560-4541 �
Fax:
� E-mail:mopels@KCIConstruction.com
; 1
,
,
� ANDRITZ SEPARATION Inc.
I
Division: Project Execution
Project Manager: Perry Schnuck
Address: 1010 Commercial Bivd. S.
City, State, Zip: Arlington, TX 76001 �
Phone: (817)419-1798 �
Fax: (817)419-1998 �
Email: perry.schnuck@andritz.com
www.andritz.com
Confidential document.Ail rights reserved.No duplication or disclosure to third parties permitted without the written consent of ANDRITZ AG
� i .
�MR�TL
Separa�tion
December 1, 2016
Mike Opels
KCI Construction Company
10315 Lake Bluff Drive
St. Louis MO 63123
Subject: Alternate Disposal Proposal for Cape Girardeau Belt Drying System
Mike,
Per your request, ANDRITZ is providing a proposal to add an alternate disposal system to the Cape
Girardeau Beit Drying System. The alternate disposal system will divert dried Biosolids from the final
product handling process to a dump hopper for alternate disposal.
Andritz Alternate Disposal System Description
The modification to the existing system consists of software program changes, additional dust
collection duct, diverter valves, and dump carts. The system will be designed to initiate temporary
alternate disposal when initiated by the operator. The final product screw(1630)will stop transferring
product to the sizing screen (9135) and the dust collection system will switch from the screen to the
dump cart hood. If adequate material is collected in the recycle bin (1620), material will overflow into
the dump cart for disposal.
ANDRITZ SEPARATION INC.
1010 Commercial Blvd.S.
Arlington,Texas 76001
Tel.(817)465-5611
Fax(817)468-3961
separation.us@andritz.com
i ',
�MR�TL
Separation
Andritz Scope of Suppiy
Mechanical
Qty Description
2 4" Butterfl Valves with 120 VAC Solenoid and Position indication switches
1 Hood and Frame
2 Self-Dumpin Carts
1 Lot Duct and Fittin s
Engineering
Description
O&M manual, drawin s, submittals
Software modifications
Andritz I&C sup ort on site
S stem Trainin
Exclusions
• Installation
• Piping
• Anchors, fasteners, hangers
• Platforms and access stairs or ladders
• Building modifications
• Civil and structural engineering work, including design and supply of structural steel and
concrete as needed for support of the Andritz supplied equipment.
• Electrical field wiring, conduit, and supports
Deliverables
• Submittal Package
o Updated General Arrangement Drawing
o Updated P&ID
o Product Data Sheets
• Equipment
o Mechanical equipment as stated in Scope of Supply
• Software Modifications and Testing
• Updated 08�M Manual
E � ,
�MR�TL
sep�ration
• Operator Training (4 hours)
Schedule
• Submittal information 4 weeks after receipt of order
• Equipment delivery 8 weeks after approvals
• Software modification and training scheduled after installation
Price
The proposal price for the scope of supply is��5?42��0 USD.
SEE REVISED COST ON SUBSEQUENT
SHEET (LESS DUMP CARTS)
Attachments:
PI-103P
CG Dump Hopper Information
Valve Information (Similar to Valve 2400.1)
, � ':
From: Schnuck Perry
To: Michael Ooels
Cc: Milbitr Andre;Chaoman Pattv
Subject: RE: Cape WWTF_Alternate Disposal-Suggested"NEW" Line Routing
Date: Thursday,December O8,2016 12:16:42 PM
Removing the dump carts lowers the price to $49,737. No other changes included.
Thanks
Perry Schnuck
817-419-1798 Phone
817-526-1256 Cell
From: Michael Opels [mailto:mopels@KCIConstruction.com]
Sent: Thursday, December 08, 2016 9:57 AM
To: Schnuck Perry
Subject: RE: Cape WWTF_ Alternate Disposal - Suggested "NEW" Line Routing
Perry,
Can you shoot over the Cost Proposal less the Dump carts?Trying to get this submitted this
morning.
Thanks!
_�E. ._....�.� ��:__�
Project Manager
;`: 314.2Q0.3546 d'� 314.560.4541 �: 573.332.1540
��� f0315LakE$IuftDn:e�� St.LflUis�Ut0�63i23 �
, yir� SS(]5 Uki Sbuth 5 I Cz�rncis nton,MO 65i�2a
From: Michael Opels
Sent: Thursday, December 08, 2016 7:13 AM
To: 'Schnuck Perry'
Subject: Cape WWTF_Alternate Disposal - Suggested "NEW" Line Routing
Perry,
See attached. I have provided mark ups on page 5 of 20 depicting suggested routing of new 4"SS
Line.The suggestion is to tie on to existing 4" SS line that feeds 9135 near Manifold on 1633
Scrubber.This would allow for clean routing of line in field.
Please advise if this is acceptable.
Tha n ks,
�i:�h���; (���4�
Project Manager
� � ,
o c� m a
ntx M
-63sfB' •������ ° ° S l S48 wva�via MOl! �V�INVH�3W
^°�s`� ,�/e/s �-.cs�.-µ3a3aav N a �
"°�i•"•"s�.a�`•• >��a��s �.re�-µ3�o�3n ��dsess� 3�ov `JNI�4NVH 1V12131VW A214 � o 0
�����I S�OZ/tZ/i 3LVOd� 0 {it/4L/v .�io 3w..Ln ��
w315A$�Nuild S�I105018 1
SIOZ/fi/60 4300Y Ni8 u5vtl1 l 2�/[Z�I WI W �
swz/6a/o� iiine sr z Ut�L ae� 1NVld i131VM 315tlM f1V3021tliJl`J 3dV�i0 UIJ d W
9lOZ/[t/i� SOOY��3a5�f0 a350dtlOd t N CO
� � e�
n 2 — —3
�g � aw �O � ___
�a � �- '
� &� �a
�
� a
0 0
0
�
� �� w N
N Z
d ON �
2
ln 6 ,� �
a � �
�� -� � �� ��a��
_ �3 ---, i =�
_ a���
S - sa _wo_
c � ' I ' I o�� o
F .o�
� �3 ��O I � owai�
F � a;3
I � �a���
`" S�
e3� ma
� � � �p���
� �
� �x � m�<�� �
�a
_ � I �__-__�_�
� Ks�^� �a I La
a ��� � '
_ �g —
� - -
aR �3
\
� , - \
\
\
� � Sa "� � �a �5 _ "a �r E3 "s
�3 - - �� �- � �
- �° I ' -
_ ` �„
� � �
� � � -
�� � �
_ �
- �� � � � � I;
M �- 3� ui �� � i � , �z �
,� �� � N �____`___`_
" I�I
� a
� H.1N.9 � a o�
�� �
�J - mo
�� �k -� � -
_ � I o F�
_ _ �'a �$
YQ � � -
_ I �m
V�- � � a�im
x' „'a w
N I�� � Ng �� � � � �s � � N
� � �a
O`� .a _
�q ss
�� -
�m ' �o � -
S �`a Nc�i
oQa�
ws�
W ��3w
� �y - ooZr Q��e
3� tl�13
a � � w _z 3 o gs��
U � W o � es
; ���o @���''9
? � �o�� ����a¢���
i o, � � `a o �`0 3 w o� �Y�Cgd�x
s� s �� o o' �a ��y��9g$i
� ' � � I — �[G9§6E
;9�F�
�
��z ��y��
�"-�a�'s��
�
� U �7 Q
dOd a9oPV'Wd 9LbEZ 9i0Z/OE/TS'6mP'dEOild\S4Id\s6uiMe�4\SZ S48 neap�eng ade�5895L8\ani3�V�sqonuo36wNy�E005W5121M\
) i
L�� � � � � � Engineering
Heating
. � � � � . MECHANICAL Ventilation
' " �t SNEET METAI, INC. AirConditioning
Plumbing
�i 116 Leneo Avenue•P.O. Box 4G5•Jackson, hA0 63755-0405 (573)243-3238•(�88)700-7557•Fax:r573)243-8�J5i
PROPOSAL
Date: December 6, 2016
To: KCI Construction
Attention: Mike Opels
Job: RFP#51 Oil Spraying S sy tem—Cape Waste Water Treatment Plant
We are pleased to quote the following work:
Proposal: $20,375.00
Installation Shalllnclude:
➢ Labor and material to complete the following:
o Installation, hoisting, and anchoring of two pumps,pumps furnished by KCI.
o Installation, hoisting, and anchoring of one oil heater and one tote, heater and tote provided
by KCI.
o Furnish two 1"drains with valves for installation by KCI while forming the concrete walls.
o Installation of one level indicator in tote, LI furnished by KCI.
o Installation of one solenoid valve/spray nozzle at injection point at product silo, solenoid
valve/spray nozzle furnished by KCI.
o Core drilling of holes as required for new pipe route.
o Furnish and installation of all interconnecting pipe, valves, and fittings beriveen the tote,
heater,pumps, and injection point.
o Insulation and PVC jacket for all interconnecting pipe and fittings. Valves to remain un-
insulated and un-jacketed for access.
o All pipe and fittings figured as galvanized schedule 40. All valves figured as bronze body,
same as other valves installed in this building.
Installation Shall Not Include:
➢ Any heat trace wiring.
1
. �
➢ Any power or control wiring.
➢ Installation of the three heating elements (we can if the electrician does not want to).
➢ Fabrication of the heating tube (including the two support saddles—assumed to be a part of the
heating tube). Per your email this is a pre-fabricated item, but I want to cover myself.
➢ Any concrete housekeeping pads or equipment support pads.
THANK YOU FOR THE OPPORTUNITY TO SUBMIT THIS PROPOSAL
Langford Mechanical and Sheet Metal
By: _3ri,�.wT. �avn.e.rv-w Date: _12/06/16
Brian T. Dameron, P.E.
2
�
L A N G F tl R D Engineering
Heating
. � � � � . MEGHANICAL Ventilation
' ' Fr SHEET METAL, INC. AirConditioning
: ,. _.,� . . .. , .. � Plumbing
1116���r��AvPnue•r�J. aox�u5•Jacks�n, �a'0�375�-04G5 {573j 243-3238•i888j?00-7�y5�•rax:(573)243-8057
PROPOSAL
Date: December 8, 2016
To: KCI Construction
Attention: Mike Opels
Job: Alternate Disposal System Proposal—Cape Waste Water Treatment Plant ��'/'�r.��/���v�'�'r��i'
%
We are pleased to quote the following work:
Proposal: $12,575.00
Installation Shalllnclude:
➢ Labor and material to complete the following:
o Installation of stainless steel hood over trash dump, hood furnished by KCI.
o Installation of stainless steel pipe, fittings, clamps, and valves,material provided by KCI.
o Furnish and installation of the required air line to the new valves.
o Fabrication and installation of elbow for flex hose to connect to the new hood. Degree of
elbow will be determined once the hood is installed.
Installation Shall Not Include:
➢ Any power or control wiring.
➢ Any concrete housekeeping pads or equipment support pads.
➢ Any flex curtain strips around the hood, assumed to be provided with the hood.
THANK YOU FOR THE OPPORTUNITY TO SUBMIT THIS PROPOSAL
Langford Mechanical and Sheet Metal
By: _3ri,a.vvT. �a.wi.eXa�w Date: _12 OS 16
Brian T. Dameron, P.E.
1
4 +
�
GU��ZANTEE
E L E C T R I C A L C O N S T R U C T I O N 3415 Bent Avenue St.Louis, MO 63116 ph (314)772-5400 tx(314)772-2526 web geco.com
December 7, 2016
KCI Construction Co.
10315 Lake Bluff Drive
St. Louis, MO 63123
Attention: Mike Opels
Re: Cape Girardeau WWTP
RFP#51 GECO PCO# 78
Scope of Work:
Electrical installation of the Operational Enhancement of the Dryer System based on the
scope of work dated 9/20/16 and drawings dated 11/22/16. All work to be completed
during normal working times.
����� �������� �� �� Total Cost...... $ 49,980.00
Please feel free to contact me at 314-267-4477 if you have any questions regarding this
proposal.
Sincerely,
John F.Hritzkowin
John F. Hritzkowin
Director—GECO Industrial
Building on our past. Connecting to the future.
� '�
VAN DEVANTER
ENGINEERING
A COGENT COM:A'7Y
cogentcompanies.com
RFP# 51 - Oil Coating System
KCI Construction
10315 Lake Bluff Drive
St. Louis, MO 63123
ATTENTION: Mr. Michael Opels
Project Manager
Email: mopelsC�kciconstruction.com
SUBJECT: RFP # 51 - Oil Coating System
Mike,
Vandevanter Engineering proposes the following based on information provided by
RFP # 51 - Oil Coating System. This includes:
Modifying Master Tag List; Interconnect Drawings for LCP-POP, LCP-POH,and CP-DRY-7A;
SCADA Programming for Graphical Additions and Alarm/Historian Tags.
Total for the above is$9,980.00 x1?.G/'P��G�f ��pOD �d/� a��/��������� '
Please let me know if you should have any questions. ��d� ,����d ��-�����,fe��r�/Dn•
,��1.���t V.eti�i�,/ a n�
Sincerely, A01'✓Ltf�p,p� �l�4rG�/h�a�i �d�/'',
�. �'°`� (`�L'�''„''"�S„-,�" ��� /
��/����Ll
Aaron Paine
VANDEVANTER ENGINEERING CO.
CALVERTCITY DECATUR ST.LOUIS
rF_£.
�.� ;��� i s � •s'►
�m �';�� • :� s�
� � :�
� ' ��. �
, ,
��a��������y PICK TICKET / PACKING SLIP
www.smcelectric.com **R E P R I N T �'L**
_ 2333 Rusmar Street oRn�ri.a�� o�x
Cape Girardeau, MO 63703- 12/ g/ 70162516-00
SM (573)334•2861. FAX: (573) 334-2883 ���, �R.� P�E
CUR KNOWIEDGE IS YOUR POWER QUEKTIN �, 20161794 1
a�u To: 11163 I�I IIII'III�I�I����II�1:'i��!�II�',I?�l��'I�''I�II I���II��III�1�II�A III I���I'�I�
CITY OF CAPE GIRARDEAU ORDER #: 70162516-00 CUSTOMER PO #: 20161794
ATTN: ACCOUNTS PAYABLE REMRTO: PO BaX 9491
PO BOX 617 Springfield. MO 65801
CAPE 6IRARDEAU. MO 63703-17$4
sr+ia ro: C ITY CAPE 6I RARDEAU st+�a�rrr aas�cnoNs
PO BOX 617 SMC Ca e 6irardeau
CAPE GIRARDEAU. MO 637020617 s��avw �ueaTon� - a�c►t�o ' -rn+�r�sr
Delivery 12/28/15 12/29/15 axm
__
cn�� ur� �aoucT _ sa+ QunumY j auArrirn ' nrr. Qrr. arur-
N0. NO. ANDUESGRIPTJON LOCATEON ORDER� 8.0. SNlPAED lU6t PRlCE AMOUNT
I .
1 AB1040420ED11 1.00 0.00 1.CG EA 4t�02.00 4002.00
IEC 420 A MCS D I���'����;'����jl��
CONTACTOR {�f �
i ***FACTORY STOCK***
CAN SHIP UPS RED APPDX S75-100 CAN HAYE TOMURROW 29TH
CAN SHIP UPS 6ROUND APPDX S25-S40 GAN HAVE WEDNESDAY 3QTH
Tota7 �002.00
Freight In 85.53
INVOICE TOTAL: 4087.53
�
t r�G!/� �'/j"�
L�n w��,--
r,����c���»���
i ��T�. �,��S��o i.o0
OIV 70TAL W�BY diECl�8Y QaNER�8Y TiMEIDATE DELNERED BILL OF IADtNG N0.
Last Page �rv�aY �-rf�,�
Time Printed: 10:04
. � ��
�� 314.894.8888
K�� � 1«i15L�ceStutfDrl�e StLoWs,�M0631�3 314.894.7418
_.. ,., 5505 oid south 5 Camdenton,Mo 65020
CAPE WWTF
KCI]OB#12003
CP # 133 : INCLUSIONS f EXCLUSIONS
ITEM 001 : GENERAL CONDITIONS
- General Conditions include KCI's use of the following items/services
provided by Cape WWTF (at no cost):
o Internet
o Sanitary Facilities
o Utilities (water/electric)
o Office Space (conference room)
- General Conditions covers a duration of EIGHT (8) Months to facilitate work
outlined below:
o RFP # 50
o RFP # 51
o Air Sampling Procedures&On-Site Coordination
o Project Manager has been assigned to 25% of Duration.
Superintendent will be assigned 100% of Duration.
ITEM 002 : EXCLUSIONS
- DUSTROL Oil or any other Coating Oil Totes.These shall be provided City of
Cape Girardeau.
- Dump Carts originally included in Andritz Proposal have been excluded.
- No Cost has been applied to potential impacts (Schedule/Construction) that
may arise from PHA currently being procured by City of Cape Girardeau.
Should services be reguested; we can review and supply Cost Information at
that time.
- KCI shall not provide any on-site Supervision/Project Management Services
through Test Report Generation (of Sampling/PHA).All inquiries regarding
these items shall be directed to JACOBS.
ITEM 003 : CLARIFICATIONS
- SCHEDULE : Based on Procurement Lead times and past experience with
Andritz; we do not believe work associated with CP # 133 can be completed
within MDNR Contract Time. Please provide information as to how"Contract
Time"will be awarded to complete this work.
- TAX EXEMPTION:All materials have been figured Tax Exempt. Our Current
Tax Exempt form expires year end (2016). Please confirm a new Tax
Exemption Certificate can be supplied.
Thanks,
Michael Opels - Project Manager
i ► g �,r, �•
��> -
� f
THIS PAGE INTENTIONALLY LEFT BLANK
� r
�4 KCI Construction Companv
10315 Lake Bluff Drive
St.Louis, MO 63123
(314)894-8888
Fax#(314)894-7418
� „ , www.kciconstruction.com
u
September 19,2016
Jacobs
Attn: Mr. P.K. Mathai,P.E.
501 North Broadway
St. Louis,MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treatment Facility '
Change Proposal# 130 � PVG-�aG��'� 01/) �/p� �'j'�.�u�a� �� �n ��'�er �°Om D� �
/
Dear Mr. Mathai,
We propose to furnish the necessary labor, material,tools and equipment to PROVIDE PVC
JACKETS ON EXISTING PIPE INSULATION WITHIN THE BIOSOLIDS BLDG,for the
increased LUMP SUM of FORTY-THOUSAND & SEVENTY DOLLARS ($40,070.00).
Please note the following clarifications associated with this pricing:
INSTALLATION OF PVC JACKETING WILL COMMENCE AFTER WASH DOWN TAKES
PLACE BY ANDRITZ/CITY OF CAPE
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval,please sign the attached copy in the space provided and return
it for our records. By signing this change proposal,you are authorizing us to proceed with the work and
agreeing to forward the appropriate change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
BY� �f'/'��s��,__./�z�t. .
Michael Opels
Project Manager Date: ?i' �
Attachments
4 �
�
a
�
c
>-
� C �
� 4 �
O �
O �
C �
a �
=� F
U Q
z g
¢ �
v �
V
A
�
��
Y
G
Y
O
T 3
- `o
U
R T
L� cd
C T O
� � �
U �
� � y =
-� .-
� s 3
`n a`> U fl
� � a
� 3
C :: o
v: � c
� 3 `
� � �
z � � o
_ -� Q a
` � o
F �
3 v �'
� w � �
z o. � F' � R
p V � � _- s
U ` �
4 O O O � O O O O O O O O O O O � (V lV 7 O _
O O O O O O J O O O � � '/� O 1� O I� M 7 [� �'J y
� � T o 0 0 > o �o 0 0 0 0 �o o� �.i ri vi o v — o r� � ' _
� O O� Q r"i N vi O� O� O� � ^ N 7 U V1 00 O N � O
ro o7 F .o 0o m .o � v� [� � v o �i � — c� v � U
Z z �o z cv = a ••; •o o = oo _ 3 � �
y � N r'1 � 9 ^
�7 aoi cv O .� � O � °�\j
z o a��i U
� +
�' z = � � F
� a a ¢ —
X = _ _ _ _ � �on �- c`
� �n v� v� vi " .� t �a�
z — — � � �
� F 3 � �
U o) �
z � U� U3 "
_ = r,
`� o
Y a
U w
¢ o � F�- �
M V
� � c� � `� O iC '�
x o . w p
u. — .. N ' p
O o �a � ° '� �
� � n s�s a� Q o
. o � � cv y K' � `., � cfl
c v, m --, ;c x �a ` a [:: O �
" < c� �, — c� .. .. � ` c N p ,...
�""' z .-. `p 'O � p � 3i � � p� C '/1 V p
[,`, 69 Q C Q
� - z O � � � m v o `m �a n n' � o c°� U3 'o o a a �a v
m � F r C � � r a n. � � x
o 2 a a a c 4�3 cd _ a�i a�i ia � �y c .� � R � n. ^ i7 ti7 Q ..N_
d � v� ;L, 0. y = � R m � a o s c a. � � � c�a � J z � ° S
; " Z U o o au a� � . � .o � o � a� a o., U
�., o a' v� � � �2S =_ c �� ia :0 3 � a v � 2j c> > > c c 4 0 �
.� o W m �a o � c c cn > cn o � v� � o
o � �^ p � �: O :a.. U rn � � r_c7 [z7 O O �-- u.. � C7 m �j �- m Q
J ^ � s a
� � � U [x7
��� ��.. � � s Q
;�'��b •
O �"' �]
n
C N O
, � o o a
r, o
O G N � �
�S'���� :J Y y �'{ � � C O � �
;;� 1 a 3 � o r O O '^
� ',
00 0 00 o c o 0 0 0 0 0 0 0 0 o c o 0 0 0
o c a` ��"
C �D N M
� ` �
Q �
F �
O U
F
t.: �
F F
4 C o 0 0 0 o c o o c o 0 0
� ¢ c U
. ' a�
� v; E
� z �-
� o = s
Q c =
F [:: :
v� -
O �
O O �
� U
�' -� F C�
� � z ¢
z m � �
a z
= m
c� c�
0 0 0 0 0 0 o c o 0 o c o 0 0 0
-� � � �
Q Y
C �
V F
F
Q =
� 3
� u
z ¢
� � :�
z
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ¢
O C N � U
� � N N [,t,
� �
�r ¢
Q .�.
-� a
s
a
o �, o 0
o c� o0 3
�
o F' F" O
�„ z ¢ r�
� � a� a.
a p
�
o y
0 0 0 0 0 0
v oo v
Cc. �
O F
,� z
�
0
at F' c a y a
U = _ L .0 r t L t 'O L t t � � t S — � �
R
�
CW
G
Z `� U °'
O � K `m
U
LSl Y �
[i. VJ N o 3 '�
� � � r �
�
U r � s � �
� a�ai � °? o 0 3 a o u
p S � o . 'm s � ... v� 3 �
'� � � c � � `-° ,°'„ v o � w' �
C �C � � C � V =4 U V h
� N " � ` � Ci 3 o Q t0 � c3 W
� � c � � � � � � � N � � `� o p V V c R o �o
z � � .a o ` ` � ° ` a'3 t C ._ = m � � E >
� � � c 4 � U � � � a � � 0 3 C� v .n y .E � .n �a
" �O o �`" 1O r.yn c :n Q a `v y
U U � U V' � � U U � '.: fl. '� m A L:: C F— R > p
� � a a � .` � � � _ � �o T � .. � a� o c.
Q :.._ 9J N N 'O O
Z. :+". O O � O � � � � qEj O R O 'O � ca N � 3 G tyj L. � O O
O � c: n`. v = :i.. � Ci i- F a` W � Q U .,. � >- � C7 U !- �. Z a`.
U
� �
Q � C � W O O O O N O O O O O O O O O N M O O C O
CL.��:�:'.�,�>.`...: N uj Q � N c�1 �O �D 00 M N r'1 Q� O .--� O �D I� l� 00 .— t� C v1 .
� � � o 0 0 0 0 o c� v v v v� �o � �o �o �o �o r r oo rn � c�i n
Z ,; ` =' U U o 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0
C��"�: _:: �
, �
_ Q
< � � �
� �
o �
F
z = = =
< A o c
v � N N
� G
F L
C
� �
— o
`�; Z J
`-� '� C
` � ,.
< _
`n � 'o
� d 3
O
c
� F �
Z Z �
� � C
v � U O
Q u
z Y
� �
F
< _
� 3
o F ta]
o F
Z C
� �
�
0
0
O
<
_ u
_ �
Z Q
: C
0
x o
� o
V rn —
� F
o z
x ,
� �
�
F
Q
�
L
v:
�
�
O
O
m
O
�
z a
O z
F ::.t
cL ¢
U �
n F
�
� Y
� v
U ^
Z j
Q c
U
� 4
� �
� Z
O � N
.:..:.�_ Z ... `
� v _ � � O
�
� r
c v U
f �
L�� � � O � D Engineering
Heating
: ' ' ' ' : MECNANICAL Ventilation
' ` `' Ft SHEET METAL, IN�. Air Conditioning
�:. . y . Plumbing
1116 Lenco P:denue�P.G.Box 4���,iacks�n. P��,1��03��:,-04L� {57�}243-3�38•(88���7�-7957•�ax:(5�3j 243-8457
PROPOSAL
Date: September 16, 2016
To: KCI Construction
Attention: Mike Opels
Job: PVC Jacket Over Insulation in Biosolids @ Cape WWTP
We are pleased to quote the following work:
Proposal: $20,415.00
Installation Shall Ii�clz�de:
➢ Labor and material to install PVC Jacket over existing pipe insulation in Biosolids building.
➢ Lift rental as required to get to pipe.
Installation Shall Not Incluc�e:
➢ Any fire protection work, i.e. sprinkler system piping, fire alarm system.
➢ Any electrical power wiring.
➢ Any painting of exposed or concealed, insulated or un-insulated, piping, ductwork, or controls
conduit.
➢ Any sales tax.
NOTE: Since this is not something that we normally do I have figured the price a little bit higher. If
acceptable, we would be willing to complete the work as a Time and Material project not to exceed the
above price. This will keep us safe as well as save the owner some money.
THANK YOU FOR THE OPPORTUNITY TO SUBMIT THIS PROPOSAL
Langford Mechanical and Sheet Metal
By: 3v'i,c�'�T. �a.w�.P�s''o-w Date: 09/16/16�
Brian T. Dameron, P.E.
1
THIS PAGE INTENTIONALLY LEFT BLANK
� '.
: , {r KCI Constructior�
�~�"''� ''' ompany
10315 Lake Bluff Drive
St.Louis,MO 63123
(314)894-8888
Fax#(314)894-7418
�° www.kciconstruction.com
December 20,2016
Jacobs
Attn:Mr.P.K.Mathai,P.E.
501 North Broadway
St.Louis,MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treatment Facility �"
Change Proposal# 134-ADDITIONAL PVC JACKETING - rrU�k Bq�/ �j M��'/�,�'��
J
Dear Mr.Mathai,
We propose to furnish the necessary labor,material,tools and equipment to Provide additional
PVC Pipe Jackets in the Biosolids Building,for the increased LUMP SUM of TWELVE
THOUSAND,FOUR HUNDRED&FIFTY DOLLARS($12,450.00).
Please note the following clarifications associated with this pricing:
.02 Thick PVC Jacketing to be app(ied on Piping that currently have standard paper insulation
installed.Lines that are not Insulated;will not receive PVC Jackets.Cost is in consideration of
covering piping within Biosolids Truck Bay/Load Out,Mechanical Room and Blower Room.All
piping within Processing Area has been Jacketed.
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval,please sign the attached copy in the space provided and return
it for our records. By signing this change proposal,you are authorizing us to proceed with the work and
agreeing to forward the appropriate change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
By: ,��
Michael Opels
Project Manager Date: �� Zv
Attachments
J
il
N
} �
/� �. �
� L
�
�
z g
< .
v �
�
c
`o
`v
� �
� y
V O
3
T �
U .D
G .D T
_. y
A � 'C
y O
� �
� U =
,3, 3
�
3 n.
� o
S " L'
� �
O R
� ✓� o
m [. a
a' = O `L`'
U � Z
0 0 0 o c o 0 0 0 0 o a o o a � - � �- y '-�Q
0 0 0 0 0 0 �^ o o .o o .o - o o � <r - � E _
pp O � � O C' O OO N � N oo O O r^� � � O� N ,_, �
a0 � � � Q; O � �O N Q: � _ � U
� � � � � � �
� G ..
� T O U °
z � z � = °'
� � ° � o
j G 'J ..� � U N
O y � z j� � N
_ _ G .._ ,.., � F
o a o a o � � - c:
v� y � �
'� _ � � c �
- 3 3 � R
�
� 2� 3 � � �I �
�
�
0
�
�
�
� �
z � ¢ o
� � N � ^ G
N
O
C) — � o � F- F" `n
� ,� F
-, o � a �' a vG., � �
G �°�n A a � — :.' " m x � �
„ > -- .-, � ` a v: G � �
, _ .� o•
� - � O � a A � _ � t r a c y c o � .o o � ^ � vj
�-: n ' a a � � � � _ ,_, �
m � C °' n. o. o '� � � _ — F ^ `° � A � ° v' `° c w �� J � � o
F-' 1' :. � � �, "� n. a � s � = @ o � _ y � Z. a _ [:.7
- _ %� v�+i �° � aj c c _ .. ."�. '3 �- � � �Z c v ✓� c�i o ¢ " o �
= s Q � ,� .=1 [� Ci v; � � Q � `n O `� C — - C: 0� U "� o Q
�
s G �
0
G � �.
¢
� � �
� @ � = F
v �
0
a
N O
� p 0.
.^. d N Cy0 u-. [� o � M
, � V � � � Q � Vl
v° 3 GJ O O O _ _ _
{
, '
'JC �
x x
� �
0 �
� �
�c N � -
G � G
F ='
f � c
< _ '>
� y
O C
� �
m ` -_
v � z ¢
z �
a z � -
x �:
u v
0 o c o 0 0
�
< X
� <
`-'7 F
�' s
< ..
� 3
z E
- z
c
o � o 0 0 0 0 � � o � �
� �
� �
5 E
� a
�
�
� � � 3
o � �
o " r O
z
� � � o
o vi
o c �
�
O �
_ z
_ �
�
u = L L L L s � .- � t S .L � - t C C � G - -
ti
�
c.y.
G
O �. a� �
3 X q .
" � [:.i Y T
� r/�j v� 7 �
'FO
� � � L � A
LLl � �c s, Y G
� � � i O p 3 � � �
x � �, �, � y3 �
:� ,o � � � � � � � o � � �
c = � _ � ° 'o � :�n C;
� �v y v� n 3 � ^ � � ,o
� � � G 7 �' � �� 7 K � .�'+ r,f � G CV V � y O 'O
z � � � � � `� � �, � y � V � � � � y tO v� y E >
O— � :cl :: < u � ` c = y c a 'J v � � � � ..] .n � N
= c °� ✓: [x� R o � o - `� :n � � :� � c u
c"i a"i y v -c o q a a � " ...'� :o � � E � ,.o ti � " O � p o
Z � o o' � o c� � � y � o E o � �o � m � °; r' �. Z a.
a c`. v� c. `_ .r U ' =. � - Q U S � >- C :. U '
4 � �� �-. ::� o 0 0 o c� o 0 0 0 0 0 0 0 o cv �, o 0 0 �n o
c� �n .o .o 0o n N M a c — c� �o � r oo — � � �n
'" � O p o 0 0 0 0 o N v v c �n .o � � � � � � x rn ._: �.i �-i
Z ,- � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� ;;�"= C.t6.
V1 V N V .�
� � � N
r � N N N vl N N N _
C � �
V
C -
N
� �
� ;
�
C /:
� � � _ �
� c C � �
� �
V' � G
C � 3
0
- c
� ? Q
z
< � -
v: N c � �n c�v c� � c � � o �n
� ... � - �" N �:°, N N �v c
- X
N �
= F
< -
� 3
�n �n ^ o
� _ _ - .o �o v� C
C L � N N N
o z �-
a � �
c
p C O C O = N � N
� � �
C
'L^
Q
�
Z �
� � _
a o 0 0 o c o ^ o 0
G o 0 0 0 o c � � �
t+ L v; � p 7 oO o0 00 �o � — — � —
° z
� �
� � r_ � G ¢ C ¢ � � �' _ �..�-.�
� = i7
i-'
Y
Q
O >
= O
N �
U Q
v; ,
�
n �
r z � � °
; O � <
- < z = �
> x
Z G V � [.r..` y�
E � a .' O r�
✓: O � ¢ 4 4 = ,z ¢ - �
Z .. < < - ¢ p < � < � 'v^ C 4
_ C � � � ��.' C _ C] � � �t:� u: < Z �c O
� � - O � 00 O� � N 7 C G � L F"
� � � /"1
J �
(E C..I C../
1
+ �,
KCI Construction Company
�b��5TaT e�iu�f�nve
St.Louis,MO 63123
(314)894-8888
Fax#(314)894-7418
www.kciconstruction.com
�� _... _
December 7,2016
Jacobs
Attn: Mr. P.K.Mathai,P.E.
501 North Broadway
St.Louis,MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treatment Facility �
Change Proposal# 132 — D�� �n����C�L!/�y'NA�'�'
y
Dear Mr. Mathai,
We propose to furnish the necessary material to PROCURE DUST CONROL EQUIPMENT,for the
increased LUMP SUM of SEVENTY-SIX THOUSAND,FIVE HUNDRED&SEVENTY ONE
DOLLARS ($76,571.00).
Please note the following clarifications associated with this pricing:
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval,please sign the attached copy in the space provided and return
it for our records. By signing this change proposal,you are authorizing us to proceed with the work and
agreeing to forward the appropriate change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
BY�/"i!���k�O!/��
Michael Opels
Project Manager Date: �
Attachments
�
U
C
r
Q LY a�.
O C C
,L G
� N
C �
U 4
z �
E F
V �
v
c
�
�
`v
a
�
0
2� 3
� "�
L T
T 'a
� o
�G Z `D
Y =
L
F � �
;, v 3
A 9
3 n
0
R C
3 `=
A �
9
O
1 Q
A Q
� G
�
F L.] -0
ti " O E �
u � z .. x
0 0 0 0 0 o c o �n o � c o o � o o c� — v
O O O [:; O O O N O O N O N o0 O O N O rt N � '^
� O O O O O O O G� O O � O � � O O � � O � ^ ^-Q t
z. � �Z Q �'J �'V :'� P t� � '�'
c�i °
� � � '--� � .. N
° e� �' z �, c �
a a Q _
� " ,c
0 o a o o :u a`
_u
^ ^ �w
— — .Y c
0 0 `m
3 � �
G � �' � �I o
� �
�
�
3
�
�
�
�
o`
�
0
F
c
0
a
z o � E� F
� a U
� � N o J c ;� �
a ' t o �; � o �
d \ o c, vi a � p �
� � � _ N x z .� 4 m c [i a y � u.
= C Z ^ i� D° 7 �J o � '� n a < � o �;y v p ° Q o
- V Z � � t ; m - ' a o. .. � ° �' � ? o a k itl O
- � O °. a a o °� � �' n s � = a o � o � v� A u y v � °oa a
y N . . E E o � `o v� a o � U z u
_ = F U `o `o a' w � � a`. ``u, .� .6 � � s � � � � � v -o .G y �'
— — � M� W �ie m � ._ � � a `° c ;n > v� o m o a y U
_ � G _ p .� .a O a` Ci v� � L ci [:� O O F c;: = C� m v � � a
� �—.-�� � U fal
ac y _ Q
Y � � � �
0
00 �
�..�:� - � � _
o n � _
_ w o � � `° O O � w
�� a � ° U Ci — —
,
0 0 0 0 0 0 0 � � a o a o 0 o a o 0 0 0 0 0 0
a
¢ F
F �"
O C
F U
a
E- F o 0 0 o c o 0 0 0 0 o c o 0
� �" E C
w z - `'
..� O � -
� F ::� �
O C
c. z o
o c
c�. � .,
'W `� F F
z w � �
¢ �
U C7
0 0 0 0 0 0 o c o 0 0 0 0 0 0 0
•� �i
4 X
F F
¢ =
� 3
F �
� ¢
a �
z
0
o c c o 0 0 0 o c o 0 0 o c o o F"
Q
x �
o ,�
ro ¢
¢ �
� a
�
� �
�' 3
� F F O
o �
N a y
� Q
� J
O �
p p O O C O O
Cx. N
O F
a �
M
a E' �, n c
0. � � � � _ � � L L � L — — ' ' _ _ � _ _
U - - -
m
�
�
�
z = � �
o � x �
� V (3� Y �
� O
� � 7 � � A
U �' �^ eNJ .s.. Y C
w � � � o � 3 0 `o �
O ^T, Z ° �y .o �a,, y 3 m
'° .o " c > :o —`� � v o a� � r
c ° C — .�°'i � 'Q � � V u N
� -� y � �0 3 0 � .o � °
� ^ � 5 T � N �3 � N a � `° o a V �j c � o �o
v� . � �d C7 �23 � .-. �' � ��y v � �
z eca c c �2'i ?� � v �,' u °' U a ' � ai o a� � v� u � >
O � W a� ¢ i� V ` c 0., 9 v, c 2 � a� � y `? �" � -p ".r �
� C °> V] W m .O � O L''" cJ '�4 G � Q C u
_ . U U J � � � U U` � G � ctl m W C 6 � ttl > O
p v v a� v �o o � a a � . � � � _ � �o >, R �- E p a� o d
z ' 'o o a o � � � � � o n ° �0 61 Ta 7 `m cd � 0.. v � F, � o 0
O �!� a a �n a i-�. .� U F- E- a W a ¢ U .-: Q r O c7 U F- C] w z a`
Q K N � W� O O O O N O O O O O O O O O N r'1 O O O �/'1 O
N M �O �D � M N �+t O� O ^ O 'J I� h o0 ^ r 7 �/1
W � O O o 0 0 0 0 o N v v a v, �o �o � �o �o ,o c� r x a .- c v M
Z � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� ,,r: <-. a
�
00
O C P
� � � � � �
� `
F `o c o 0
a -
<
c -
W c
�
� � V o
� � �
Q a �_
N � c
o d 3
�
[:1 N F
z
< � �
�
�, P � � o �
a � � � �
� Q - - � �c
F ~
4 �
� �
0
c p_. F N " _
rv ' -
7 5
0 0
5
C
¢
0
F F
� 5
a o 0
p. O O
{,1 L F � � � � �
o z
� _
� a < ¢ a a a a
� w w :v c� w �: m .:i
a
� v
L �
a
a �
o ¢
� a
_ a 9 �
- s �
_ - a o
a �
- � � z
m Q o .o F �
`o_ d � u � � m 9
z o � F ? `y ° <
F � � � ¢ ¢ � -
� a a � a c� oe W u
cG Z � o � c o
� K ❑ %�.�i ¢ C,7� � 5 p"
❑ z < ec a z o ,�
F Q � r~i� F .� v ¢
� O '�. C W m � rFn
� � � z - o � ,
� �
mc� � o �. o
C7 �F'i.7 c�.'� m � a r"" z
F- `m � � ~ � � ¢m
v w N z
t¢-� v O � Z F � O
o�C � � ,�y J z ¢ v
J
6 C.�
Z V. F. R1 (-
0 3 4 z o � z �
�-. g o ¢ � c�
_ � ¢ � o a Z � �i
. W
v�'i m � y � m o � cCu
Z N N (� � P O I� Q V]
W Q � °° �
v z 3 m ' � F
� F s o 3 � 3 3 3 3 E"v °
� :. m
0 0
� � �
' .
tat[a Equipment Company,Inc
330 East Hebron SI Suite 1 WorkDustfree.com
Charlotte,NC 282J3
(704)752-7944
! RUWAC - FRV110 EXPLOSION PROOF VACUUM
Propusai Prepared For: Date:
ioad Fulion 9114/2076
Gity ot Gape Girardeau
I I
Appiication: N�n n i N
ETL Ceriified to UL&CSA Standards for Combustible Dust Colle[tion C����
L'YYIASION
�Ciass I,D'rvision 1&2,Group D and Class 1�,Div 1&2,Group F&G) PItOO1T r� e--u�
Bas_e Unit�ecifications
•RUWAC DS3-EX3000 NRTL Certified Explosion Proof Vacuum Class I,Class II
•1.5 HP Motor,110 Vol[,Single Phase,60 Hz `_'���
•13 ft'MicroClean BVSC Filter,Manual Shaker System �� 1 _
•2"Inlet Connection with Branze Cast Deflector �
•Multi-Stage Centrifugal High Performance Turbine w/Relief Valve �'
),#
•9 Gailon,Foot Lever Actuated Dustpan - _
•Counterbalanced Base with 3"Heavy Duty Conductive Casters �
•Compreufon Cast Composite Modular Housing
•Carbon Impregnated,Anti-Static 10 6 Ohms
VACUUM MODEL FRV110 an' �
BASE PRICE: �0 57�034.'10
_
Includes:Accessory Packaqe 17515'IODEX-SP .-- : � J" /�
ld FlexStat Urethane Hose,1.50"ID(359810) y
54"Wand,55(3502) �
11"Crevice Tool(3507) � �
3"Round Brush�3520Cj �� �'
14"Floor Tool(35658) � �
Reducer,2"to 1.50"(5225-BL)
Additional Equipment Options Quoted a7r cosr
FRV31425-D51000-EX Vac w/151525DIX-SP kit o 57.295.Oo
FRVIiDH•10-DSIOOOHEPA-EXVacw/i51510DEX•SPkit 1 Sa.0a2.55 NCPA
FRVIlOH-25-DSiWOHEPA-EXVaCw/1515250E1(-SPkit D 58.525.10 HlPA
Conductive Rubber Tools nTv cosr
12"Fle�ible Nubber No:zle w/9D deg bend-1.5"(35655) 0 573.16
Bulk Pickup Tool-1.5"(35651) 0 555.74 �
5'Utflity Tool-1.5"(35656) 0 587.89
8"Bent Rubber Noale-1.5"�35653) o 561.6a
6'CrevimToo11.5"(35654) 0 555.7a ('� � k� 11
4"Round Brush w/Brass&Nylon Bristles(35652) 0 5145.79
16"Floor Tool(3523) 0 5195.00
I RUWAC - FRV110 EXPLOSION PROOF VACUUM
Misc arr cosr
Overl�ead Cleaning Accessory Krt Pkg(15600NDEX) i 547a.00
Extlnded CiStef Fnme ASSembly W/Antisbtic Usters(30t120.EX) 0 $995.00
Retractable Grounding Reel w/Stainless Steel Gamp(34878A) 0 5495.oD
Static Cnnductive Disposable Dustpan Liner with Lid(240�) o SSo.ss
Hose Man$er(909925501) 0 $56.30
ToolBasket�2517601) 1 Sloi.00
a
0
a
TOTAL COST S s,ss�.ss
Ruwac's FRVt�0 is certified explosion proof,OSHA and NRTL wmplaint and rated for continuous duty.Using an innovative MaxFlo
turbine,this compad vacuum operates at just 1.5 HP and yet provides 135 CFM(the most in its class)to be used as a point-of-
source dust collector.Ideal for grains,sugar,flour,plastics and other wmbustible solid or fine dust,the FRV110 produces more
vacuum in a compact compression cast housing compared to stainless steel models on the market.The uniquely-designed housing
is carbon impregnated,wmpletely anti-static,will never dent and guaranteed by Ruwac for life.
Rl1WAC Charlotte,NC 28173 FORM#-FRV110-2015
� ' .
latta Equipment ComOany,Inc
330 East Nebron Sf Suite 1 WorkDustFree.com
Charlotte,NC 78273
(7041752-7944
The FRV110 is also completely portable and can poweAully operate hundreds of feet of central vacuum tubing and hoses up to 2"in
diameter.It teatures Ruwac's indusVy-leading MicroClean filVation(available with a 3-year guarantee)and absolute HEPA filter to
punry the air.Excepcfonal deaning power,durability and safety have made the FRV110 an unbeatable value and vacuum of choice
for combustible dust everywhere.Ruwac also offers a full hne oi portable and central e�losion proof vacuums.
Wamnties:I yr varrs labor,3 yrs on f Iter,lifetime on vacuum housing Prepared by:
Lead Time:3-4 weeks.Sooner if possible. Mike Brown
Tertns:Prepay.Terms can be issued with approved crediL Returned goods
subject to a 23%rcstocking fee miker`Ia¢aeouioment.mm
Frei�ht:FOB Ship Goint
Validity:30 days
7 ' �,- ��
t�� '�1 �
I , � ' r( - - '� �.� �.','t
� �---'-- ' "�I I �t' I I .
.�;. � ��,' I .
. . _��� � _
,,, ' T _ T_' '
�, �' f-}
..-_. �`�
_v__ , _ _ .
, �—
,
� , �
,� , .
�7 t._, ; __ _.. ,
�---- -_ _
RU W AC Charlotte,NC 28773 FORM7f-FRV310-2015
. ' '
Prom: Mike Brown
To: Michael Ooels
Cc: "Fulton.Todd"
Subjed: RE: City of Cape Girardeau Quote
Date: Tuesday,December 06,2016 9:53:10 AM
Michael;
The quote is still valid. Freight would be $169.40
Please send us a check for$8,826.95 to the address below or i can get you the info for an ACH
transfer payment.
lead time is 3-4 weeks
If delivery is required before 1-1-2017 please let me know, I would have to verify those details.
Sincerely:
Mike
Mike Brown
Latta Equipment Company, Inc.
330 East Hebron Street, Suite J
Charlotte, NC 28273-5970
(704) 752-7944
(704) 414-6811 Fax
mikeCct�la_ ttaeouipment.com
www.lattaeauipment.com
\Natch a short 3 min movie on Latta E� �iom n
From: Michael Opels [mailto:mopeis@KCIConstruction.com]
Sent: Tuesday, December 6, 2016 10:43 AM
To: mike@lattaequipment.com
Cc: Fulton, Todd
Subject: City of Cape Girardeau Quote
M i ke,
As discussed via phone:
Please confirm the attached quote is still valid; and please confirm lead time is 3-4 weeks.
Also - please provide a freight quote to the following address:
City of Cape Girardeau, MO
2061 Corporate Circle
Cape Girardeau, MO 63703
• ` .
From: tredmond(a�alobalindustrial.com
To: Michael Ooels
Subject: Sales Quotation# 3821405
Date: Tuesday,December 06,2016 12:23:26 PM
11 HARBOR PARK DRIVE
� PORT WASHINGTON, NY 11050
Sales Quote -
ccount#: 2844832 Quote#: 3821405 uote Issued: 12/06/2016
KCI Construction Co mopels@KCIConstruction.com Quote Expires 30 Days from Issue
MIKE OPELS Phone: (314) 200-3546
2061 CORPORATE CIR Fax:
CAPE GIRARDEAU, Missouri 63703
Part# Description Shipping Quantity Price Extended
986671 Modern Equipment MECO SDHM150 1-1/2 Cu. YRC - 2 $g00.00 $1,600.00
Yd. Orange Medium Duty Hopper TRUCKING
B2196880 Powerblanket0 Insulated IBC Tote Heater TH275- YRC - 1 $1,594.95 $1,594.95
240V, 275 Gallon Capacity, 240V TRUCKING
298441 Global Industrial Spill Containment Sump with Wire YRC - 5 $179.89 $899.45
Deck TRUCKING
962357 GlobaiT"' Compact Flammable Storage Cabinet 22 YRC - 1 $355.00 $355.00
Gallon Capacity TRUCKING
986747 6 x 2 MORT Caster Kit for MECO Self Dumping YRC - 2 $119.95 $239.90
Hoppers TRUCKING
Item Total: $4,689.30
Estimated Freight: $500.00
PLEASE BE SURE TO REVIEW OUR TERMS AND CONDITIONS '`Total: $5,189.30
Notes Thank you for the opportunity to help with your
needs. To place your order or for further assistance
please contact me.
Name: THOMAS REDMOND
Email: tredmond@globalindustrial.com
Phone: (516) 608-7656 x7656
Fax: (516) 608-7747
'Applicable taxes and shipping charges will be added to invoice.This quote is subject to Global Industrial's Terms and Conditions of Sale
11 Harbor Park Drive, Port Washington, N.Y. 11050
Copyright �O 2016 by Global Equipment Company Inc.All Rights Reserved
� Y
OUnited Rentals° �II�II�I,��II�IIIIIIIIIII��I��!���iillli�llllilllll EQUIPMENT SALE
QUOTE
BRANCH 970
13727 SHORELINE DRIVE # 1 4 27 1 4 3 9 7
EARTH CITY MO 63045
314-209-7070
314-209-7474 FAX Customer # : 479765
Quote Date : 12/07/16
� CITY OF CAPE GIRARDEAU
�
•� 2061 CORPORATE CIR ux Job Loc : 2061 CORPORATE crR,
� CPE GIRARDEAU MO 63703-7671 Customer Job ID: 61
A P.O. # : PRICE QUOTE ONLY
O Ordered By : MICHAEL OPEL
h OffiCe: 314-894-8888 Cell : 314-560-4541 written By : DANA GHOLSON
Salesperson : HALEY MINAHAN
KCI CONST ST LOUIS MO -
10315 LAKE BLUFF DR
SAINT LOUIS MO 63123-7245 This is not an invoice
' Please do not pay from this document =
qty Equipment # Price Amount
1 3103050 CC: 310-3050 50128.00 50128.00
BOOM 30-33' ARTICULATING DC
DELIVERY CHARGE 1500.00
SALES TAX EXEMP� Sub-total: 51628.00
T ��� z�
Estimated Total: 55300.30
CUSTOMER WILL BE ASSnSSED ADDITIONAL PICKUP CHARGES IF MULTIPLE TRIPS
ARE REQUIRED TO PICK UP EQUIPM�NT
Customer is hereby notified that United Rentals has assigned its
rights (but not its obligations) in the agreement to sell all or
any of the used equipment described herein to United Rentals
Exchange, LLC. , a qualified intermediary, as part of a Section
1031 like-kind exchange program.
Note: This proposal may be withdrawn if not accepted within 30 days.
THIS IS NOT AN EQUIPMENT SALE AGREEMENTIINVOICE.THE SALE OF EGUIPMENT AND ANY OTHER ITEMS LISTED ABOVE IS SUBJECT TO AVAILABILITY AND ACCEPTANCE OF THE
TERMS AND CONDITIONS OF UNITED'S EQUIPMENT SALE AGREEMENTIINYOICE,WHICH MUST BE SIGNED PRIOR TO OR UPON DELNERY OF THE ECUIPMENT AND OTHER ITEMS.
Page: 1
. �
THIS PAGE INTENTIONALLY LEFT BLANK
.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 � o 0 0 0 0
•� O O O O O O O O O O O O O O O O O O O '-+ O t!1 tl7 O O I� O O O N O O O O Q1 Ol �O O O O
O O O O O O O O O O O O O O O O CO �/1 [f I� O N 01 O �1 .� �O �D O ti � O C O m V �D O O O
v v o o v, o �n �n o 0 0 0 0 0 0 0 0 �.n � � v v_ �n v a� o �o �n m � �n � o o N o � rn �n o co �o
J d' � t� m M d' N M Ct l0 N N Ct O M M M N u1 O O lD M cr C I� N W CO CO V O �--� 01 I� N c-i C ti tf1 W lD
(0 � .--I e-i M N N �--� �--� N N l0 N �--� N f�'1 N N
� �
O
H
V} V? V? [/T t/) L? VT L? t/T t/? t/T t/T VT V? VT VT t/T L? VT V? LT t/T V} VT lh VT LT V? [/T t�f V? V} V? i/T tn l/T VT VT V? V?
O
O �
~ � N O
v fl- 3 O -�
Y � � (6 N'
ca O �
� U
m
Vf i/T i/} t/T VT L? L} t/T t/} � y/} i/T i/T VT V? t/} {/} t/} t/T t/T U} i/? V} L? VT t!T lJT t/T V? V} L} [/} l/} � t/} 1/} �/} y� l/1 y�
v o 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 � � o 0 0 0 0 0 � o 0 0 0 � o 0 0 0 0 0 0 0 0
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ul O O O O O
� v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o co 0 0 0 0 0
v Q � � � ,� ,� ,� ti N N ti � � � � N � � � � .� � N N � N � ti N ,� .-� ti N N ,� � ,� � ,-+ N
u
a v
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o u; o 0 0 0 0 0 0 0 �ri o 0 0 0 0
N O O O O O O O O O O O O O O O O O O O N O �11 �11 O O I� O O O N O O O O Ol Ol tD O O O
� � O O O O O O O O O O O O O O O O c0 � � I� O N Ol O tf1 .-i lO l0 O � C O V O c'n � i0 O O O
O O u1 O v� i1i O O O O O O O O O ul c0 I� � V u1 � Ol O �O vi m' .-i t» �-+ O O ti O � Oi v1 O' c0' t0
Ip � � M M � N M � l0 N N V O M M M N tf1 O O �O M � � I� � CO CO CO V O � Ol I� N .-� V N tf1 CO l0
r-I �-I M N N N N N c-I l0 N c-� �-i M N N
O
V
i/} N VT t/f VT LT N N t/? VT LT LT V} V} V} LT VT iA L} VT t11 VT VT V? V} t/} VT V} VT t/T V? V} VT L? V} L? V} t/T VT VT
Y � _ i � i i i i i � i i r � i
� i i i i i i i � i i i i � � i i � i i i i � i � i i i i
_ � O �
N �
tA l/? V} V? i/? V? l/T VT VT N VT l/T l/t V? N i/} �/} N L? L} LT VT lh V? V? </T VT N V} l/T �/T V} t/T L? V? i/? V} V} l/T </T
-a u
,_ � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
= N O
>
l7 � �a c
� N N
_ '_
_ L
~ V} vT t/T Vf t/1 V? vT vT t/? V? VT t/} VT t/? L? t/T VT L? t/} V? th vT t/T VT t/t V} V? VT t/} t/T V} V} VT VT t/T t/? t/? N VT V?
�
._ � i i � i i i � i i � i � � i i � i i i i i � � i i i i i i � i i i i i � i i �
L u
H .
LL Y O
i �
O C
� � —
~ V? t/T V? V? i/? t/T V1 VT V? V? t/T VT L} V? 4/? V? �11 i/1 4h t/T t/? LT Vf VT VT i/T VT VT VT VT V} VT uT UT VT N th LT VT t/T
O
N
ti O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
cr� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� Y _ O O O O O O O O O O O O O O O O O O O O O O O O O ul O O O O O O O O V1 O O O O O
N p t- -O O O O O O O O O O O O O O O O O O O O �--� O Vl Vl O O h O O O N O O O O Ql Q� �D O O O
0 v O O O O O O O O O O O O O O O O cO i/1 V I� O N Ol O �n � �D �O O � � O V O M V �D O O O
�
w � � Y O O u'i O �/1 �/1 O O O O O O O O O t� c0 I� 7 V u1 V Ql O �O ul rn r+ V1 ti O O � O ti Ol u'7 O c0 �O'
� Lf'f f�'1 M � N fn � l0 N N � O f�'1 M (�'1 N � O O � M � � I� N CO 00 GO V O N Ol I� N �--� V �--� Vl W lD
O � -� C � .--1 �-1 M N N �--� �--� N ti l0 �--� �--� �--i M N N
_ C
� a` Q _
a
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
N
H
w O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
w O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
N -p O O O O O O O O O O O O O O O O O O O O O O O O O V1 O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O � O V7 � O O I� O O O N O O O O O O� �D O O O
Z � v O O O O O O O O O O O O O O O O c0 �l � I� O N Ql O tn � �O �O O c-i � O G O V C �O O O O
O � � � O O' iri O �f1 �n O O O O O O O O O tr1 CO I� � V �1 V O� O �O i/1' M .-i ul ri O O � O rn Ol V1 O o0 �O
�p tn M M V N M C l0 N N � O M M M N N O O �O M C G I� � W �0 CO V O �--� 01 i� N �--i C �--� Vl 00 lD
Q L > � �--I rl M N N .--I i--� N rl lD �-1 �--� c-I f�'1 N N
� u
Z �
� VT V} l/i l/} VT i/} V? l/T l/A L? VT VT i/T VT VT l/T LT V? V} V? V} VT N VT VT V? [/T l/} LT i/t i/T VT t�i a/T (/i V? VT i/T i/? LT
Z
O
V
�
c0 >
M O
Z �
O � Q1
� o oc
¢ n = _
lJ V - �
dN � tn N cn cn ln N tn VI VI � " � � `� � � ' ' ' ' _ ' ' '
a Q 0 ln {/1 ln {n {n {n {/1 (/7 {n w w W w w W O ' �
O O O O O O O V � � �
a � O O O O N N N N N O O O O O O � � � � � � � � � � v fO �6
> N l0 l0 l0 �D � � V C � � � � � � � C N N O1 N N dl N UJ Q/
Q - C C C C C C C C C C C C C C C _ _ _ ' " ' ' ' r9 fl- Q a O. G_ Q O_ Q i]. � �
d .- ._ . . .- .- .- . . .- . . ._ .- O O N N N N N N -fl a d d d d 2 a 'a d N v v Y Y vf
o x 2 2 x x = 2 x x 2 2 x = x 2 tD �o v v v v v v ¢ � � � — - - � � - i � u u v
LL � � � � � � � � � � � � � � � � v`�i cNii v�^i v�i v`�i cNi� v�i vNi v�i w w w w w w w w w c��l � ° � � a
� O
� m v �
Q
w io
� U
�
Q e, r� m a �n � � oo m o �-, r.i m v u� in � eo m o .-i c� m v �n � � co rn o r, N m a �n �o � co m o
d. rl rl ci i-�I rl ri i-i eti rl .-I N N N N N N N N N N f+l M M m m m m M M f�'7 �
— O ... ..^....
d a � Z �.,,.,. }
Q
U
� �.,,,,y "^��
�� . ?�
y
r e
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
C O O O O O O O O O O O O O O O O O O O O O O O O O O O O O �/1 O O O O O O O O O O
•� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V O O O O O O O O O O
� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
v
00 O O O O O O t� Ol O �/1 O v� O O O O �/1 O O O O O O O O O O �/1 V O O O O O u1 O t/1 O O
J C � Q1 Q1 O 01 00 M' c0 u'1 V �O [t V7 Ol I� O V1 � N tf1 00 u'f O O l/1 O O �/1 l/1 N o0 u1 �/1 O O O I� O N l/1 Ifl
c0 � M '-1 00 O � I� N 00 L!� M N � � V � M M 00 N N f/1 c-1 ri c'n N e-1 i-1 l0 �--I Vl e-1 M
O
H
iA t/T V} V? tA V? N VT VT L? tA V} t/? t/? VT VT Vf V? VT LT LT V? v? t/T N t/? i/t LT V} V? VT Vt t/f VT VT tA t/t tA t/T LT
F- y
� � � � � � � � � � � � � � � � � �
v Q ai
Y �
C E rp
�o o �
� U
m
VT [/T tA VT L} t/T VT t/t L} VT VT V? LT V? i/t L} V} VT V? V? VT VT t/T V} LT LT LT VT lA VT LT VT VT tA VT t/T t/1 VT V} Vt
y o 0 0 0 0 � o � o � � o 0 0 0 � � o 0 0 � o 0 0 0 0 � o � o 0 0 0 0 0 0 0 0 0 0
C � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
d p_ N .--� �-I r+ N .--� .--� �-I N c-i c-� .--� .� e--� �-I eti .--� .--� �-i .--� c-� c-� .--� .--� .--� .-� e-� .--� .--� .-i ti r+ .--� .--� c-� .--� N e-� N .--�
u
d V
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O u"1 O O O O O O O O O O
a1 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V O O O O O O O O O O
� � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
00 O' O' O O O O 1� Ol O N O u'f O O O O Vl O O O O O O O O O O �1 V O O O O O �/1' O' u'1 O O
� � Q1 Ol O Ql 00 M o0 �/1 V tO V �11 Q1 I� O � V1 N tn o0 Vl O O u1 O O �11 t/1 N o0 V1 tf1 O O O I� O N lll lll
N �--1 00 O V 1� lD 00 V1 00 N � V V 1D M M 00 .--I N f�'1 e-1 i--1 M N e-I �--I tD �--1 l!1 .--I M
O M •--I N M i--1 i--1 .--i N
U
LT LT V} V? N tA t/? VT t/? v} t/? t/T LT vT t/t LT t/T V? LT tA t1T V? tA VT LT tA t/T V} t/T VT t/) LT VT V? V? VT t/t tA V? t/T
U _
N N i
S � `p ip
N �
l/T VT VT LT tA VT LT VT l/T V} i/? i/T VT N VT V? V? tA i/T �/T VT t/t tA iA VT i/T V} lA V? iA N V} VT tA VT tA VT VT VT 1/T
� U
._ i � i � i i i i i � � i i i i � i � i � i i i i i � i i i i i i � i i i i i i i
- N O
C�' �p Y C
� � N
C •-
— L
~ VT t/T V} L? N t/T tA LT LT V? lA tA LT V? V? VT t/} LT i/t VT N t/? V? V? t/? i/? V? VT LT V? V? N tA LT tA Vf VT t/? VT tA
H
._ i � i � i i i � i i � i i i i i i i i i i i i i � i i i i � i i i i i � i i � i
L V
F .
LL y O
L �
O C
� � _
� y/� y/} �/} i/} j/} l/T i� V} LT VT t/? N VT i/T V? V? t/? L1 V} �1 tA VT LT tA VT t/T V? VT t/} LT V? t/f V? VT i/? VT V? LT i/T t/?
O
N
ti O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� �c _ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O �1 O O O O O O O O O O
N 0 i '6 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V O O O O O O O O O O
o a, o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
,,, � � Y o0 0 0 0 0 0 0 � ai o �ri o �i o 0 0 0 �ri o 0 0 0 0 0 0 0 0 0 �ri v o 0 0 0 o ui o �ri o 0
� Ql Ol O Q1 �0 M o0 lll V �O V �/1 Ql h O �/1 tn N �/1 00 Vl O O V1 O O �/1 l/1 N c0 V1 V1 O O O 1� O N u'1 �/1
O � -a � N .--1 00 O V I� lO 00 Vl CO N I� V V l0 M M 00 �--1 N M .--1 ri M N '-I c-I lD e-I V1 .--1 M
— C _ �yj �--1 N M e�-� �--� N N
y d Q
a
�
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
w
w O O O O O O O o o O O O o o O O O O O O O o o O O O O O O o 0 o O O O O o o O O
= O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
N -p O O O O O O O O O O O O O O O O O O O O O O O O O O O O O t�l O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V O O O O O O O O O O
Z � v O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O � � � c0 O O O O O O 1� Ol' O' V1 O �/1 O O' O O �/1 O O O O O' O O O O O V1 V O O O O O' tf1 O �l O O
fp Ol Ql O 01 00 M o0 V1 V �D V V1 O1 I� O � Vl N �f1 00 vl O O t!1 O O u'� l/1 N o0 �A Vl O O O I� O N V1 V1
QL � N .--� 00 O V 1� l0 W Lfl CD N I� V C �O M M 00 .-i N M ti �--� c�'1 N �--� � �O �-i ul �--� M
� u M e-I N M �--� �--� � N
Z �
� V1 V} tA V? VT V? t/T VT VT tA VT LT t�f Vf VT V? VT V? V? tA tA VT N VT VT t/T t/f VT V? t/? t/T VT VT tA V? t/t VT VT VT V?
Z
O
v
�
m
Z
O �
� o
v v n � L
J N O � m
d � N � � " -
d -
Q � O. d O' � n' 00 CJ GJ _ � � Y "6 � C C . k- Vf �.+ K m y
� U (p � C U ' !J Y w C
} lJ [.'0 � � 7 G� p a/ C Q ` d N ` i X � � to rv N @ O" 41 v u �p �p O 3 � � 'n �
a N 3 �o � a a � � c v w ' y � � ' w � 3 m x w � a w w m � � z > w w a cn
v � - J U � UJ (� �1 - � ] C i U C N v � K K � 2 OC C � C K V) Vl N V1 vf Vf t� cn tn !n
LL � � � � m ai � o � m m m m m m m m m a a a a a a. a a a a
� d in F � � a �n a in vi l7 in � c� O � m _ l7 w �n cn in �n in �n �n v� vi — — — — — — — — — —
� o
� m v o
¢ —
w io
o v
�
,� N m v vi � � oo rn o � N m v �n � � oo rn o .� c� m v� � r� ao rn o � N m v �n � n oo m o
� v a v v v v v v v �n �., �n �n �n �r, �n �n �n v, �c �c �c � � �o � � �o �o � n n � n n � � � � o0
w a � Z
a —
Q
U
�
� a
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
•� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Y v O O O V1 O �Il t/1 O O O O t!1 O �f1 u'1 O u'1 V7 O �ll O O O O O t/7 O �71 O O O O O �f1 O O O O O t/1
v
J � � V] N 00 N O N N O O O t/'1 I� O r+ �--� �O N I� u'f N O O O O V1 N Vl I� l0 00 �/1 tA V � �D lD O V �/1 N
�C e�-1 �--I �-1 c'�l M i--I N N N N M �--1 N �--I i--I �--1 N e-I M N
Y ,
�
�
V} U? tA V} N t/T V1 V1 V} l/T t/� VT l/� {A VT VT VT l/} V? tA t/t i/? 'VT 4/) V? l/? VT U} V1 V) V? N l/} iA iA V) 4/? V? V? VT
� v
i i i i i � i i i i i i i i i i i
� Q N
Y �
C E rp
to O >
m U
m
VT tA VT i/T t/? t/t VT t/T VT V? vT tA LT N t/? V} VT iA V} t/T VT V? V} VT VT L1 i/T a/T V? VT V? V1 VT t/? vT tA V? tA V? LT
� o 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 � o 0 0 0 � � o � o 0 0 0 0 0 0 0 0 0 � a o 0 0
C � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� Q .� � .� .� .� .� .� ,� .� � ,� .� ', .� ,� � .� .� ,� .� ti ,� r+ ,� ,� .� .� .� .� ti .� ,� .� .� .� .� ,� � ', .�
v o
a v
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O �/1 O V1 �/1 O O O O V1 O vl u'1 O Vl �/7 O N O O O O O �l O trl O O O O O t/1 O O O O O �/1
— p fl- V1 N 00 N O N N O O O � n O �--� �"� � N I� V1 N O O O O l!1 N tl1 I� �D W Vl Vl � N �D �D O � u'1 N
� � �--I .-1 '-1 (rl M e--1 N N c-I N M ti N �--1 �--I c-I N .--I f�'1 N
O
U
VT vT tA t/? aA Vf VT t/? Lf V? LT tA VT tA VT VT VT VT VT VT t/t vT t/? t/T Vt V? vT tA tA VT [n V? t/? VT VT LT V? VT VT V7
� _
� � �
= O O � i i i i i i i i i � � i � i � i i i i
�"' �",
�
i/T 'VT VT V? i/? V1 V) 'V? V? V? V? lA VT l!T iA V? i/? V) V? V� VT 4/T l/T VT yA V} l/T 4/T {A V? 'V} t/? V1 VT VT V? V) V} t/? t/?
� U
,� i i i i i i i � i i i i � � i i i i i i i � i � � i i � i i i i i i i i � i � i
- N O
('� ip ��4,, C
� � N
C •—
— L
~ V? LT VT VT i/T V? VT N V} tA N l/T iA t/T N V} K/T V? i/T V} V} L? t/T V? VT iA i/} l/} V? V? LT N i/? t/T VT L} iA V? VT i/?
N
._ i i i i i i i i i i i i i i i i i i i i i i � i i i � i i � i i i i i i i i
L u
LL y O
i �
O C
� � _
� VT tA t/t i/) t/t Vf v? L? i/? N V? t/} t/T VT t/1 N V1 VT LT t/T t/T Vt V? VT V? t/� LT LT N t/t LT vT Vt tA VT t/? tA VT VT [/t
O
N
� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 �c _ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
,� � � � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
p N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
tv
w � � Y O O O �/1 O V1' u1 O o O O tf1 O �/1 Vi O �ri u1 O' V1 O O O O O �/1 O �/7 O O O O O vi O O O O O �n
� Vl N 00 N O N N O O O V1 I� O e'-� �-'� � N I� u1 N O O O O 1n N Vl I� lD 00 ln V1 � �"� �D �D O V �A N
O � -d C �--1 c-I �--I M ('�l e-1 N N c-I N M e-1 N i--1 �--I .--1 N i--1 M N
- C
� d Q
d
LT VT V} VT V} t/? ih N [/? V? VT tA VT lA L} t/? VT tA L? VT V? [A t/? tA N l/T N i/T VT VT l/? iA VT V} tA l/T [/T t? VT l/T
N
W
w O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
= O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
N -p O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
Z � p1 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O 0 � � O O' O u'i O �i V1 O O O O' V1 O u1 u'f O' � ul O �f1 O O O O O �n' O u'i O O O' O O' V1 O O O O O �/1'
�q � N o0 N O N N O O O V1 1� O .--� � �D N I� t/1 N O O O O � N �ll I� lD 00 �/1 t/7 V � �D lD O d' Vl N
QL � �--I 'i c-I M M �--� N N �--� N M �--� N e-� �-i �--� N �--� M N
� U
z N
� VT tA i/? [A Lt L? V? VT L? N tR VT ih L} U} tA LT iA ih V? t/t Vf VT Vf VT ilt t/? [/) tA th V! U} N t/} VT LT i/T t/T t/T LT
Z
O
v
00
m
Z
O 0 �n a�
G n
_ � � p �n � N d n
F '_
U U � OD p � O Y 7 C �
� N i � � . C7 � � � a 'L � a
d � N "6 � �' C � C N � v� 00 00 V K � � � v� � �. C N C N C tn i O
a � in U C7 @ V 7 N � � O O a�+ O O O C i^ � C C Q U u � Y C Q � - V N C O O C y�, � C -�p G7
Y . a+ X N O @ ta 'O Q fa GJ p p 2 '�y O (c G O_ � C) G7 V u 7 � t9 v � p Q •� fp � ta C a.+
a i 2 l7 w m LL �i v� m z � � s � O a. x c7 'a 'n. x w u, w m ° m v� � d � v z 0 a. t7 F � � �
N �., � 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 � 3 3 > > > > m > > > > > > > > > > > >
� a a. � S 2 2 2 2 2 2 2 2 2 2 2 2 S 2 S 2 2 2 2 � � � � � � � > > > > � � > > > >
�
� O
� m y �
Q Y
W f9
� U
K
c-I N M V N l0 I� 00 Ql O �--� N M C �11 l0 1� W a1 O �"'� N M V tn �D I� W Q1 O �--� N M C ul �O I� a0 Q1 O
� 00 00 e0 00 00 00 00 00 00 Ql T Ol Qi 01 Qi 01 Ol 01 Q� O O O O O O O O O O .-i .--� � � � � •--� � � •--� N
� .--i ti � .--i .--i e-i .--i � �-i ri .--i N .--� � .-i e--� �--i N e-� �
O
a a � Z
Q
U
�
r i
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
•� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v � o 0 0 0 0 0 0 0 0 0 0 o u� o �n �n o 0 0 0 �n o 0 0 0 0 0 0 �n o 0 0 0 0 0 0 0 0 0 0
-� � — O V O Vl u"7 V1 l/1 O O tf1 Vl �I N � N M O o0 �/1 I� O O O �/1 N N tA N V O �/1 t/1 N .ti 1f1 l/1 M 1A u'i
� �--I �--1 N N I� V .--I .--I a--I V1 V M M N V e-I �--1 eti M
f0 � �'y
O
h
V} t/? vT t/T V? tA V? t/T N tA LT VT t/? V? LT tA VT N VT L? V! t/T N t/t LT Vf V1 VT t/} t/? tA t/T LT U? V? VT VT V} t/? tA
H v
i i i � i i i i i i i i � i i i � i i i i
v Q v
Y �
C E �p
ro O >
rp V
m
vt in v� vT tn vT vT vi tn vT t�f v� 1A an tn vi v? tn �A ln ln tn v� v� v� tn vf v? v? �n tn tn vT in a/1 an vt vt a/i tn
v o a � o 0 0 0 0 0 0 0 0 � o 0 0 � o 0 0 0 0 0 0 0 0 � a o 0 0 0 o a o 0 0 0 0 0
C � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� Q c-i e� ti .� � e� ti .--i � .--� �-i e-i .--� ti � �--i .--i .--i eti .--� c-� � .--i .� .--� eti ti e-� � � .--i .--� .--i e� ti e� .--� .--i e-i ri
°' o
a v
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a, o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 o vi o �ri �i o 0 0 o ui o 0 0 0 0 0 o vi o 0 0 0 0 0 0 0 0 0 0
� � O C O � �A ul �11 O O � ul �--� N V N M O 00 V1 I� O O O ul N N IJ1 N V O u1 Vl N �--� t!1 V1 M l!1 tfl
�--I .--1 N N I� V �--I �--I �-1 t11 V M M N � e-1 �--I e-1 f�'1
0 �
U
t/? t/T t/T L? L? LT N tn V? N VT VT v? t/T V? V? t/T tA V? V? VT VT t/T LT VT V} VT t/? V? tA tA tA LT VT i/} V} i/T tA tA V?
� —
2 ''' � ia
� O �
N
L? VT N VT t/� t/� V? t/? Lt V? t/T V? t/) V? t/t V? N t/f V} tA v} V? tA VT LT VT VT v? vT VT V1 VT tA LT VT V} iA VT V? VT
� u
,_ � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
= C/ O
U' �p Y C
� � �
_ '_
_ L
� {/� �/} t/� V} V? V} V} t/? t/t V? V? i/} t/T ✓T tA i/T t/T VT i/T VT [/? l/t VT V? VT L? V} y/T N N VT Vt t? t/} {/T (/� V} tf� i/t LT
H
._ i � � i i i i i i i i � i � � i i � i � i i i i i i i i i i i i i i i i i i i i
L u
F- .
LL y O
L ]
O C
� � _
~ V? t/T V? iA L? VT iA t/? tA LT V? V? a/T VT V? VT t/T VT VT VT VT V? t/? VT V? VT t/? V? VT a/? t/t V? V? V? i/? VT VT Lt L? L}
O
N
N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
M O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� �[ _ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
,� � � 'o O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� � a1 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
w � � Y O O O O O O O O O' O O O vl O �/1 tf'f O O' O' O tn O O' O O O O O �/1 O O O O O O O O O O' O
� O C O u1 l/1 I11 V1 O O t/1 l/1 N N V N M O o0 Vl I� O O O t/1 N N V7 N � O V1 Vl N .-� t!1 Ln M ul lll
O � -p C �--1 .--I N fV I� C �--1 ri .--1 Vl V M M N V .--I .--I ri fY1
- C �--�
� a` Q _
a
�
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
H
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
= o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
Z � y O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O � � � O' O' O O O O' O O O O O O Vl O' t!1 i/1 O' O O O tfl O O O O O O O vl O O O O O O O' O O O O
�p O V O V1 Vl Vl lfl O O I.f1 Vl �--� N V N M O W � 1� O O O Lf1 N N t!1 N � O ul V7 N c-1 u'1 l!1 M Ln u1
QL � r1 a--I N N 1� V �--I e-1 i--1 V1 V M M N V e-i �--I '-1 M
� U �""�
Z �
F Vf LT V? V? V? VT tA LT VT V? V? V} V1 VT LT N l/T iA {/T V? tA V? VT VT VT i/} L? tA tA tA V1 t/} VT V} i/T V} t/1 LT L} V?
Z
�
U
W
m
z a � E c
C � �n Y L V'
O o -c w � � � oo ,� � �o � 0 3 � Q � � �° — � °' �n vTi o O `
v v 'n m � ro � � �' u ° N � o 0 3 � c m � v � a`� ¢ u c� � v� � � v c � s — °� c
a v, � �v c� � d �a = � •- O °- c ... ] ai ai �c „ +J — " o C u u k. '0 v,
a v x o �a o o �o o v o � u � m m � c • n y v �n �c c _ o
o � w LL m 3 n. � � o � O 0 a � d �n a � = w w x � c c � c> >
¢ � U � N N N N V1 N N � Vf N N VI N Vf N V1 V1 N Vf VI VI W m L � L U � d W W X � O �i G
> Q V U �O �6 �O �O U -O � �O N "O "O 'O � �6 �6 � � �G 'O �O � � Y Y Y �C Y � v Y Y Y W 0� LL � C
Q � N GJ � '6 ' H H F F- F- � Q H H F- C C C C C
a x ,,, �, o 0 0 0 0 0 0 0 �o 0 0 0 0 0 0 0 0 0 0 0 0 0 „� ,,, �„ ,,, ,� ,�, N N �n v� � E � � �
LL > > > o 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 o a a a Q a a a a Q a � -6 -a -a .�
� > > > m m m m m m m m m m m m m m m m m m m m m m � 3 3 3 3 3 3 3 3 3 a a a a a
3 0
� m � o
Q +� -
w ca
p U
�
ey N M V Lfl t0 I� 00 01 O �--� N M � IJ1 tO I� 00 Q1 O �--� N M � L(1 l0 I� 00 Ql O �--� N M � Vl l0 I� 00 Ol O
� N N N N N N N N N M M M M f!1 M M M M M � � � V V V � V V' V lfl V1 l!1 If1 111 1f1 l!1 ln V1 Vl l0
�--I i--I i--1 �--I e1 i--I �--I �--I �--I �--I rl �--I �-i e-1 �--I �--I e-I �--I �--I ri �-1 �--1 c-1 '-1 �--1 `-�1 �--I �--I �--1 �--I rl '-1 �--1 �--1 r-I e-1 '-1 �--I ey i--1
w a � O
a ,� z
a
u
1
� �
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
C O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
•� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� j O O O O O O O O O O �/1 O ul O O O O O O �/1 O V1 O O O O �l1 �/1 O O O O O O O O O V1 M �
J � — lll .--� r-i O l� O O M V1 c-i 1� O u'1 t!1 N O O O o0 I� V1 N O �/1 O u7 1� N �/1 O O .-i Ol tA O U1 N Q1 �l1 t!1
� e-I N .--1 eti .--1 c-1 I� .--I i--1 N O I� M ri e-1 e-1 N i--1 ll1 ri lll l0 e-1
Y � e-I N
O
H
i/? t/T LT L? VT LL L? t/T VT V? LT V? V} Vt i/? V? LT VT VT tA LT VT LT Lt L? t/? tA LT V? 1R VT a/T t/T tA t/T N iA Vf L? tA
H v
� n 41
Y �
C E �p
�a o �
� �
m
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
v o 0 0 0 0 � o 0 0 0 0 0 0 � o o � o � o 0 0 0 0 0 0 0 � o 0 0 0 0 o e o o � a o
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v Q � ,� ti ,� .� � .� � � .� ti ,� � ,� .� � ,� � .-+ .� � � � .-� .� .� � .� ,� � � .� � � .� .� � � .� �
u
a U
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
'O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O' O O O' O O O O �n O t/1 O O O O O O �/1 O u'i O O O O �ri u'f O O' O O O O O O O vl n'1 V
— � � 1l1 .--� ti O �O O O M v) ti I� O �1 vl N O O O o0 h V1 N O �/1 O tn 1� N �/1 O O �"� Ol U'1 O N N 01 tfl V1
ri N e-i �--1 e�i .--I I� .-i '-1 N O h (�'7 .--I e--1 c-I N a--1 lfl '-1 tf1 tO i--1
� e-1 N
U
VT VT N lA LT l/T tA VT VT t/T l/T iA VT LT LT V} VT i/T VT V? N VT VT LT VT VT y/T V? N V} l/} t� Lf V? [/T V1 V? VT V? i/T
_ � _
to N L
= r O � � i i i � i i i i i i � i i � � i
N
LT VT VT VT VT LT tA VT L? V? VT VT N i/t VT t/? ih t/T VT VT tA t/? iA VT Vf LT tA tA tA t/T VT L? t/T V? 1/? i/t VT t/? t/T V!
-6 u
,_ i i i i i i i i i i i i i i i i � i i i i i � i i i i i i i i i i i i i i i � i
= N O
U � Y C
� N N
� '�
— L
~ i/} N LT [/T t/? y/T VT LT V} tA VT lA iA V? VT iA i/T VT LT VT VT VT VT t/t LT V? N t/T VT V} N V? Vt N iA [A V? i/T t!? VT
N
.� 1 i � i i � � � i � � � i i i � i i i � i i i i i i � i � i � i i i � i i �
� U
LL Y O
L ]
O C
� � —
~ V} LT tA LT Vt LT LT tA t/T Lt LT VT LT VT lA i/t V? LT VT t/} t�f VT VT VT t�l LT Lf VT 4/? tA VT t/T iA VT V? l/A LT t/t V1 i/T
O
N
e�-i O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m O O O O o O o o O o O O O O O O O O O o O O O o O O o O O O O O O O O O O o O O
� Y _ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
'y � •- 'O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m
N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
� W � � Y O O O O O O' O O O O V1 O ul O O O O O O �/1 o V1 O O' O O �/1' Vl O O O O O O O O O vl' M V
� lll .--� .--� O �D O O c'�l t/1 � i� O u1 l/1 N O O O o0 I� �/1 N O �11 O V1 I� N t!1 O O � Q1 V1 O V1 N 01 Vl V1
O � � � �-1 N e-i a--I e-i �--1 I� .--I e-I N O I� N e--1 ri �--I N e-1 Vl �--I t!'f l0 �--1
C _
�v a` Q
°.
�
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
F-
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
,_,� a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
z °' o, o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O o � ? o 0 0 0 0 0 0 0 0 0 �ri o ui o 0 0 0 0 o vi o �ri o 0 0 o ui �i o 0 0 0 0 0 0 0 0 �ri cri �
�p vl ti �--� O lO O O r'�l t/1 N I� O �/1 tn N O O O o0 I� V1 N O vl O V1 I� N V1 O O N O1 l/1 O ul N Ol tA tf1
aL � e-I N r-I .-i .--� .--1 I� c-I .--I N O 1� M .--I �--I .--I N '-1 Vl .--I l!1 l0 .-i
� � �--1 N
Z �
� a/� tn an v? v� an �n v� t/f tn v� tn v� v? t/t an tn an tA vf vr tn tn v� vT v� v� a/} vf tn vt tn vf vT t/t in vf v� tn vf
Z
O
� m � v �
m Y n N � m °�° � _ @ aYi
z � � 6 Y n d � O 00 O. O N — �n
O � f0 � w � L (�C a d ,d y � L C Y Y � 4/
Q O. i N C O y �l � � 00 7 � N Y — V t�o i ' ` �p cc c�
J V ,V � � � C O ,� N to m LL C tn a=.+ m N 4 U � 3 O O to t9 �o � � m l7 ta 00 [1t1 op �O tn � j� a
bD C � J N p_ 'p
a v a3i �e v • v o 3 c dS '� � �i c� oc � o � � � ¢ W � � � c 'u =a � � r`o � m
a � v � � r o � O 2 �' v °1 �ca � � � '6 � j a—ui a`''i a C7 C7 (7 C7 :� t7 N � � � � aCi a�i v � � o�n nc U
r in u U �n � in � O 0 U H a � LL J m` a 2 w w w � � � � in � � �n a ii l7 � �n w a �
a c c c c c c c c c c c c c c c c c c c c � � � � � � � � � � � � � � � a � Y � Q
E E E E E E E E E E E E E E E E E E E E y v v m v a� v a; v a v v a; a� a� 3 � • L v
LL � -o -a -o v -o v � v -a -a � -o �o � v � -a -a -o •� •� •• ,r •� •� Y •� •� ,. .� v � 3 on L
� Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q V1 N N N tn V) in in N V1 N tn N iN ln Z VI N J I.i
� O
� m � �
Q
w fo
p U
K
Q e-I N M ul � n � � O N N M � lll �D 1� 00 O1 O �--� N M V lfl �D I� W a1 O � N M � L(1 lD I� 00 Ol O
� 10 tD l0 � tD �D l0 lD �D I� I� I� I� 1� I� I� I� I� I� 00 00 00 00 00 00 00 00 00 00 Q� 01 Q� Q1 Ol Q1 Q� Q1 Ol Q� O
�--I e-I �--1 '-I �--� i--1 e--� �--1 e-I �--1 e-I �--I �-I 'i �--1 .--I .--I �--I e--1 �--I .--1 e-1 e-1 e�i .--1 .-i �-i e-� e-1 ri �--1 ri .--I .--1 �--I e-I �--I e-I .-i N
W a � Z
d —
Q
U
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C O O O O O O O l0 N iA N V1 Q� �O � c+') N rl � V .--� Ol 1D I� O O �D t!1 O O M O M e-� N � 01 01 � N
'� O O O O O O O O 00 Vl O Vl 00 N I� N �l1 lD u1 01 00 I� 1� 00 01 O u'f .-+ 00 O o0 I� 00 N rl V ul Ol 00 N
� O O O O O O O N o0 M iD o0 Ol I� �n .� Ol .� tD N O u� O N O o0 t7 e-i N .--i iD �l O �O N N il) N �D
� N n O t/1 �/1 M O t/1 O I� V 1� .� .� M O V N .--� c7 �rl V �r1 O o0 O O V N I� O O I� Q� N 01 � N
J K � �-ti ln Ol M M O d' �--� �D l/1 N tD .--I e-i M M M V1 V1 M ti V1 � N N e-i N ` �--1
f0 � l0 N � fY1 �--1
O
F
N VT 1h VT V? VT N VT VT VT VT i/T V} VT VT t/T V} VT V? V} N VT tA iR N L? N LT V? t/t lA V? t/? t/? tA 1A �/T tA t/f �/}
F- v
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � i � � � � �
v n N
Y �
C E ry
ta O �
fp U
m
LT y/? VT t/T t/T 1/T t/T V? N V} t/? V} VT VT VT t/T tA V? N tA V? VT V? t/T V? t/? V? tA iA LT t/T t? V? V? VT t/t V? V? L? tA
y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 o a' 2� a o 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v Q .� r, .� ,� .� .� .� .� .� .� .� .� .� ,� .� ,� .� ,� .� .� ,� c, .� ,� .� ,� .� .� .� .� .� .� �, c, .� r, .� ,� ,� ,�
u
a v
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-p O O O O O O O �O N V'1 N �/1 Ol l0 V M tll .--i Oi � .--i Ql l0 I� O O tD ul O O M O M `-i N c7 Q1 Q1 V N
d) O O O O O O O O 00 Vl O V1 00 �--� I� N V1 1D lll Ol 00 I� I� c0 Ol O l/1 .--� 00 O o0 I� 00 N cy V �ll Ol 00 N
O O O O O O O N o0 M 1D o0 V Ql I� tf1 � Ql � �O N O �11 O N O o0 V N N .y lO u1 O �D N N tll N lD
y � N 1� O u'f u'7 M O u"� O 1� V I� 00 N ti M O V N r-i � v)' � �l O o0 O O a � 1� O O I� Qi N Qi � N'
— �- '-1 tn Ol M M O � �--� �D Vl N l0 .--I e-I M M M V7 V1 M .--1 Vl � N �--� �--� N '--' e-i
� � l0 N `--' f�'1 ri
O eti
C.1
V? LT tA VT V? VT N i/T VT i!T L? t/? t/? VT V? N l/? L} Vt t/} t/? N VT N V? V? LT th t/T LT t/T VT a/t LT Lf tA t/? v} V} v?
_ � O �
i � i i i i i � i i i i i i i � i i � i i i i i i i i i i i i i i i � i i i i �
V? i/T LT V? (/f N VT N VT VT i/? VT VT V? N VT t/1 1/1 tJt VT L? [/T V? V} VT V? V? VT tA tA tA V1 iA VT t/? V} 1? l/T V? l/}
� u
,_ i i i i i i i � i i i i i i i i i � i � � i � i i i � i i i � � i i i � � i i i
— ai O
(7 � ryo c
� N N
� '�
� L
~ S/? VT V? tA t/? t/t tA t/t tA t!t tA i/T iR tA VT V} i/} V} VT N N VT VT VT L? tA tA L1 tA t/T (/1 tA 1/} {/! VT [A l/T VT VT V}
N
L 41
i � i � i i i i i i i i i i i i
� u
LL Y O
i �
O C
� � _
~ lA N VT L? VT i/T i/T i/? t/} LT i/T VT L? VT N V} V} 1/T {A Vt N V? VT VT VT VT LT L? VT i/T LT LT iA iA VT tA N i/t i/t t/T
O
N
�-�i O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
p L _ O O O O O O O tD N v) N tf) Oi lD V M v) e-i Q� V r-i Ol lD I� O O � Ln O O M O M .-i N � Ol Ol V N
�.y � � '6 O O O O O O O O o0 �ll O �/1 00 ti 1� N V1 �O �r) 01 00 I� I� 00 O� O vl .--i o0 O o0 1� 00 N N � V) O1 00 N
0 ` jy Gl O O O O O O O ti 00 e/1 lD 00 V Q1 I� Vl N 01 � lO N O v1 O N O o0 � e-1 N .-� l0 V1 O tO N N V) N tD
w � � � N I� O Vl tl1 c'Il O V1 O 1� V I� 00 N .-+ M O V N .--i � �l1 � Vl O o0 O O V N I� O O 1� 01 N Oi �T N'
� �--i LJ1 Ql M M O V �--� �D tf1 N lD �--� �--� M M M lfl LIl M �-1 lf) � N �--1 .--I N ti
p � a � l0 N '--' f�'1 �--I
C c-j
v a Q -
a
N V? V? N VT t/t VT V1 tA Vt VT VT VT t/t t/? t/t tA VT VT VT V? V? V} t!? VT t/? i/t t/? L1 tA t/f V} L? t/} tA t/? N VT V} V? V?
F-
w O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
w O O O O O O O O O O O O O O O O O O O O O O C O O O O O O O O O O O O O O O O O
= O O O O O O O �D N il1 N u"f a1 tD V M v1 � T V � O� t0 I� O O tD �/1 O O M O M N N �f Q� Q� t1 N
� � O O O O O O O O o0 N O V1 W �--� I� N u"f l0 N Ol 00 i� I� 00 Ol O Vl �--� 00 O o0 I� 00 N .--I � Vl Ol 00 N
Z � y O O O O O O O �--i o0 M lD o0 V Ol I� � .--I Ql �--I t0 N O Vl O N O o0 V �--� N c-� l0 V1 O �O N N � N tD
� N 1� O � V7 f�1 O V1 O I� V 1� 00 � � Y/1 O � N c-i � Vl V' tll O o0 O O V � I� O O I� Ol N Ol V N'
O � � �p c-I tn Ol M n'1 O d' ri tD 1f'f N tD �--1 �--I M C/1 M V1 V1 (Yl e-1 V1 "" N e-I �--I N � �--I
Q t > l0 N � (�'1 .--I
� N ~
Z
� vf �cA an v� v� t/i a/> t/> in a/� a/T vf v� an an aA �/? in tn tn t/� v? t/� iA vT a/� v1 vT v? v� V� vT v� an vt tn tn t/t vt t/t
Z
O
v
00 � � Y ,� u
m � o � -o c vn �, ar L. y � _ > v E m
N � C] � � r GJ U } 3 � �6
O � 4J _ C 0 41 � a � Y � O in Y � d O N fn �- f�0 3 � N � p � � C w d � Q � Q C]
a n io f° '— u � � " ,.�o, � =' v� v � � a� o�'. 0�0 2 w t � Q p � Q O ''' _ 0�0 y O "O O� w �° m
v v � Y v P' cn a, �7 ° v, � a'� 'o d s° � � o �o `o P' v X > o- � c° � `t �y' m � a � `" � n � v
d N i fD ` � C LL N � U � L � — OO C L O v C w a N � Q OD � V a f0 d Q � � @
N v a w- C �o V � O Y �
a v a g a �� • � a r � a - - v �, LL o �e a`� v m � u e v -o w a v
0 f0 > in 7 � � = p � - i U p� N f0 � �p a+ VI 'O � U >
c c� , v o0 0 0 o a, v o ° m - > v > a, o Z' Z' �' u. .c > > a a -o -o a,
Q c i L � � i �O K � LL a Q CJ � a tn 0 � w � � U' � a � � � w � l.! � � � O � V Q Q � z
d � y � � N N N N N N N N M M ('�l M Kl M M f�'1 M Cf V V V V V V V V � � � �{ V V �
iy 00 f4 3 00 N 41 N � � � � � � 0 � � � Q � � � � � � � � � � � � 0 � � � � � 0 � 0 �
� J C7 VI J Z �7 U' (J U CJ U CJ U U U �J U (..1 U CJ CJ U CJ U U U (> LJ (> U U U CJ U CJ U l.J l.J l.J U
� O
� m � �
Q
w ro
p U
�
Q �--I N (+'1 C u1 l0 1� 00 Ql O �-1 N M V Vl lD I� 00 Q1 O .--I N f�1 V Ln �D I� 00 Q1 O r1 N f+'1 � Vl t0 I� 00 Ol O
� O O O O O O O O O �--� � ti � ti ti ti �--� ti �--� N N N N N N N N N N M M K1 M M M M M M M �
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
W a ✓� Z
d —
Q
U
�
a �
0 0 0 0 0 0 0 0 o v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� lD Ql M 01 N h � c0 O W l0 �/1 O Ul M O N O N I� V �D d' N O �O O1 l0 Q1 O � O O (�'1 V V d' Ol 01
'� O N h'7 Vl Ql V I� N O W V N W M c0 I� tD t!1 lf1 I� t!1 N V1 tD c1- O C I� N O O O �O Ol Ol 00 �' W o0
� M N V l0 l0 � l0 c-I O lD Q1 M I.II N V O� Ol I� l0 01 C c-I Ol � N N .--I W N lD rl O Cf I� I� I� V `-I d'
� = lfl Lf7 N N � l0 V CO O lD �D M N �}' M � N O "" O N N I� W c-I l0 lD c-I c-i M M O M V �"'� l0 [�'1 N N
-� � - � M N O �1 � I� M CO N V LO I� ti � N l!1 rl � lD
f0 � •--I rl N o0 K1 c-1 N
O
H
t/T t/T a�f t/T LT tn t/? V? Vt tA VT VT i/? ✓T V? V} i!? V? LT t/T t/T LT t/T t/T VT N 4h V? t/T t�f N V? N L} V} L? LT V? t/? L?
N
O �
� N .-I
i i i i i i i � i i i � � i i � i i i i
N
Q �
Y � � �
ro O �
- U � N
�
m
i/? L} i/T t/T i/} � [!T t!T t/} y/} N V? L} L? V? U} i/T i/} i/T t/T [/T t/} l/T i/} i/T </} l/T l/T i/} VT t/T t/T i/T i/T l/T t/T i/T t/} t/T t/}
� o 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � � � � � � � � � � � � 0 � � 0 � � 0 � � � � � � � � � � � � � 0 � � � 0 � � 0 �
� Q � � � � 0 � 0 � � l� � 0 0 � � � � 0 � � � � � � � 0 � � � � 0 � � � � 0 � � � �
V
a v
0 0 0 0 0 0 0 0 o co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O O O O O O O M O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
-p l0 Ol M O1 N I� � c0 O c0 tD �/') O u1 M O N O N I� � �O � N O t0 Ol l0 O1 O V O O m � � � O1 O1
N O ti m N Ol � I� N O CO V N CO M CO I� lD V1 ul I� v) N ul �D � O d' I� N O O O �D Ol Ol W � W W
M N � lD lD L.fl lD c-i O l0 Ol M I..f7 N V Ql Ol I� lD Ql � �--I Ql � c-i N �--I W N l0 rl O � I� I� I� � �--I V
y � L!1 L.fl N N � lD � W O �O l0 M N � M � N O ` O N N I� 00 �--1 lD l0 c-I '-I K) f�'7 O f�'1 V �"� �D K7 N N
� � � M N O N � n M �W N M GO I� .--I � N N c-i cr �O
O
U
V} VT N i/} V? V? VT t/f t/T VT VT t/? V? VT VT VT L? V} t/T a/T tl1 VT a/T iA t/T LT t/T LT VT L? LT VT t/T t/? V} VT t/? a/T t/? VT
_ � _
2 � N �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � N � � � � � � �
-a u
,_ � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
= N O
>
C�' �p y C
� � �
� '_
_ t
~ t/T L} VT 4/f LT i/T i/} y/t y/� i/T t/T V7 N VT VT LT L? V} LT VT i/T VT VT VT VT 4A (/T i/} t/} {/} l/} � �/} l/} {/} �/} (/} (/T t/T </?
�
L N
i � i i i i i � � � � i i i i i i i i i i i � r i i � i i i i i i � i i � � i
H V
LL Y O
i �
O C
� � -
� �l/? i/? i/T V} V? V} V} V? i!� i/? t/T i/T a/T LT N V} V} i!T V? t? N VT VT i/? V? t/T VT VT VT V? t/T </T VT t/} i!} � y/� a/} �/} y/}
O
N
� O O O O O O O O O c0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
m o 0 0 0 0 0 0 0 o m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O i i lD Ol M O1 N I� C CO O CO �D �/1 O ul M O N O N I� V lD C N O �D Ol lD Ol O d' O O M � � � Ol 01
� � 'O O N M �l1 Ql � I� N O c0 � N c0 M c0 I� tD Vl �ll I� �/1 N Vl l0 � O V I� N O O O �O O1 01 c0 V c0 c0
O CJ M N � lD l0 tf1 lD �--I O �D Ol ('�1 �f7 N V Q1 Ol I� lD Ol � .� Ol � .-i N r-I W N l0 c-I O � I� I� I� V .--I V
w � � � ll) tn N N V l0 � 00 O l0 l0 M N � M � N O v O N N I� CO '-i lD lD � � f'/1 M O M � rl l0 M N N
O � N � M N O N V I� M � N m 00 I� c-I � N N r-1 � l0
'6 =
- C
� a` ¢ -
a
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
H
W O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
W O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
= l0 Ol M 01 N i� V o0 O O l0 u'1 O v7 c+l O N O N h � tD � N O tD Ol l0 Ol O � O O M � � � Ol Ol
� � O e-+ M �/1 Ol � I� N O N V N c0 M o0 I� t0 t!1 u1 I� V1 N V1 l0 � O 7 I� N O O O tD Q1 Q1 c0 � W W
Z � � (+1 N � lD l0 lf1 l0 c-I O N Ol M lfl N � Ol Ql I� l0 Ql � .--I Ql � c-I N c-I CO N l0 ri O � (� I� I� � .--1 �
O � � � tn Vl N N' � lfl d' 00 O Ql l0 f�'1 N � (�'1 Cr N O ` O N N I� 00 N lD lD �--� c-� (h M O M � c-I l0 M N N
�q � M N O N lD I� P/1 � N m 00 I� a� � N N ri V lD
a u �
� �
z
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
z
0
u
00 m -o � _ > -o
m -a a s > n o > � s `^ '� o v t o -o p i^
cn � +� }a ai v w ,,, a v, m o _ � o a
� � � a m > '� a � � � � � a � y .� f0 � v � i� ° _ � �n c� � m m �
c ra o ai .6 ?� �n a y rv � � 'm -o Q � � ,� � � m
� ° 'n a � c o � c x w L '� ra u cn � °; � o � v ar ro f6 � � � .°�' o ai � � H a `°
Q Q � U !n •_ � � O O Y C � 3 .0 - 7 p V � � N LL � � @ Vui w � L1 f0 � � = w V1 N 4.' Q. O
V U ' 0 a. .Q V U C LL J y0 U Q f° v) � = Q O � U' u v�i
� � � c > � o a o � l� � o w c � v E U � �n O ] � v = � a a�
a `^ v�i o a`� N � v n � � H v a o`D t � `a n. � ai ra � p w � Q t u x O � � v`ni R'S o � v w o
Q o s � � � o o v +�'. � n a_�i o � v�i o o u c °J a � �n � o -o > r�Ya a ° > � a � > � E � > -a 3
m �o a v -o a v o v m -o o v v X > v m v v -o v
T �n a � vi � > f- lJ Q a w �i in - o] m � U � � �i V v� � Q U in � � � � w � � v� [G w � ¢ Z
Q
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
d u� u� �n �n �n �n �n �n �n �n � � � �o �o �o � � � � n n n n n � n n n n � � � co 0o W co 00 00 00
LL O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O o O O O O O O O
� c� v � � v v v u v u c� v c� c� v � � � v c� u v u u u u c� � u c� u u � v c� u c� u c� u
� `o
� m v o
¢ -
w fo
p V
�
N N m a �n �o � co rn o ti rv m a u� io � co m o .� cv m v �n �o � oo rn o � r� m a �n �o � co m o
� � v a a v a v v c �n �n �n �n �n �n �n �n �n u� io � �o � �o �o �o �o �o �o � � � � � � n � n � co
N N N N N N N N N N N N N `N N N N N N N N N N N N N N N N N N N N N N N N N N N
w Q 4J z �e ' �'
a - 6 a i
Q
v
��
a..�.�
�
�
f F
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
C I� u'1 O Q1 Ql I� O1 M N V .--� Q1 00 'i N V1 00 I� 00 c0 u'f 00 R Ol O � V O O �O l0 V1 O O V I� O Ql lD T
•� M N Ql O N a' 01 e-� I� �--� N N f�'1 O 1� O �0 �D CO (�'1 N N N I� O N � � � (Y1 l0 01 tfl O ul l0 O �"{ O N
� .--i .--� f� u1 �D N o0 I� O N cr1 I� O1 Ol O V N 1� .� lD tD �ll �D O O ti 00 M I� a1 Ol 00 I� O l0 00 O �O 1� �D
l0 cy N �--� N M �--i I� 00 tfl �--� N O V O1 W Vl Q1 V �"� N O CO �--� V O N M I� M O 1� M l0 lll 00 lf1
J 1' � �--j eti V ri � N M N � e-i M �--� 00 V Ql N CO �--i I� O
f0 �-i 00 M c-1 V �--I
� �
O
H
�n a/� tR tn Vf LT t/? V? V? VT Lf V1 VT N V? Lf V? L? N t/T tA N Vf VT Lf V1 Vf tA VT t/? V? Vf t/t tA LT VT VT t/? VT vT
O
� � O
i i i i i � � i � i i i � i i i i i i i � � � � i i i i i i � i i � i i i i i
y Q v N
Y � m
� � m ti
to O � M
� U
m
VT V? VT N t/? LT VT tA L? VT VT N vT aA t/? t/? tJT VT V? Vi t/t t/T LT V} VT i/? t/T a/T t/T a/} N VT VT L1 t/T VT t/T v? V? tA
v o 0 0 0 0 0 � o o � o 0 o a � o o � a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o
� � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i/1 O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O I� O O O O O O O O
v Q .--� N � .--i .--i �-+ � .--i � .--� .--i .--� � .-+ .--� � e-+ e-i ti .--� .--� .--� .--� .--i c-� .--i .--i .--� .--i .--i e-i eti ti .--� � � c-� .--i
u
� U
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
"O t� u1 O Q� Q1 I� 01 fIl ri V .--� Q1 00 ti N i11 00 I� 00 00 u1 00 V Q1 O .--� V O O t0 l0 l/1 O O V I� O Ol lD O1
d/ f+l N Ql O N V Ql �--� I� �--� N N f�'1 O I� O CO �D W �'�1 N N N I� O N cr �{ � M l0 Ol Vl O �/1 1D O �-'� O N
a+ .-7 �-f I� i/1 1D N o0 I� O N M I� Q� Ql O � N 1� .--i l0 tD V1 t0 O O ti o0 M 1� O� Ql 00 I� O lD o0 O �D I� tD
� � �D e--1 N .--� N f�'1 e-I h 00 Lf1 �--� N O V Ql W V1 01 V �"� N O CO N V O N M I� M O 1� M l0 I.f) 00 V1
— d .--� .--i �--' .--� Vl N � N � •--� M� �--I o0 M Q1 � 00 �--I a O
H �
O
U
VT L} V? V} N t/1� V? tA i/? L? t/? t/) t/T t/T V? VT U? t/1 VT tA L? V? V? VT t/? t/T VT t/? LT t/1 t/T VT t/t V? V? tA L? V? LT VT
� —
Yy L � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
= Fo @
� �
t/T V? VT V? t/? t/T tA V? LT L? LT VT [A v! VT LT VT [A V? t/? VT VT VT Vf t/t L? tA iA LT VT N VT VT vT [/? N t/T V} t/? t/t
� V
,_ i i i i i � i i i i i i i i i i i i i i i i i i i i i i i i i � � i i � � i i i
= N O
C7 c� Y C
C � N
C •-
— L
~ VT VT V? V? VT V? VT i/? N l/T N l/} tR l/} ylT y/t VT N VT L? V? Vt t/? VT LT tA VT VT t/T VT V} VT t/? l/} N V? t/? VT t/? VT
O
N O
�
� u O
LL
�e O �
O C O
lD � �--�
~ LT V? VT V} VT t/t LT VT VT t/T t/T t/) V} V} VT LT VT VT VT i/? Vf tA V! V? t/t tA VT VT VT i/? VT 4/T V? LT VT VT VT LT [/T V1
O
N
N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
\ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
p Y _ I� i!1 O Ql Ol i� 01 crl N V e--� Ql 00 .--i N u'f o0 I� 00 00 � 00 V Qi O '-i a O O �D tD vl O O V I� O Q� Oi
cy � �- -p f'�l N Ql O N V Ql c-� I� � N N n'1 O I� O 00 �D CO M N N N I� O N � � � M tD Ql Lf1 O L.f1 lD O �--� N
O v e�+ eti I� �ll l0 N o0 I� O N M I� Ql Q) O C N 1� .--� lD tD Vl �D O O .--� c0 M I� O1 Ql 00 f� O t0 00 O �D l0
w � � Y lD e-� N �-I N M �--I I� 00 tf1 �--� N O � Ol CO Vl Q1 � ."� N O CO ti V O N M 1� M O 1� M lD Vl Lf1
.6 c-1 �--I � �--1 Vl N M N � e-1 ('/1 .--I CO V Ql �--I 00 �--I I�
o i -o � � w m .� v
c
a`� a ¢ -
a
�
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
�
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
w o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
= I� l/1 O Ol O1 I� Ql m c-1 V �-i O1 00 eti N �ll 00 I� 00 00 ill 00 V Ol O N V O O t0 00 l/1 O O V I� O 01 lD 01
� � M N Ol O N G� Ql e-� I� �--i N N M O I� O �0 lD CO M N N N I� O N � �' V M 00 Ql V1 O �A �D O �--� O N
Z � v .--� .--i 1� tf1 tD N o0 I� O N M 1� 01 01 O V N I� � �D lD N t0 O O N o0 r+l I� Ol N o0 I� O lD o0 O l0 f� t0
O � � 3 l0 �--I N �--� N M .--1 I� 00 LIl e-� N O V 01 GO U1 01 V N N O W c-� V O N 1.l1 I� M O I� M l0 l/1 00 ll1
�p �--1 e-1 `--' r1 Vl N � N V �--1 � `"'� 00 M eN-I c-1 00 �--1 � O
Q L �
� U
Z N
F V? t/} VT t/? V? VT t/? tA t? VT Vt t/t VT t/T N V? tA tA VT VT VT V? VT VT V? Vf VT t/T V? lA (A Vf t/T tA VT VT t/? V? LT V}
Z
O
U
00 ro Q t � — u .fl � n
z c 2i a � o ? � "' n > � � � 3 a m > � "' c � J ° -o � o c ° � �n N ° o � o = � � o
O o Y@ � � c � 3 � °' � � ro p a� • a� O o2S ai � o � o 0o vi g � '^ � a � g o � `� -o a
�" p f' ua °' � � io f0 .+- U' c ai °C° t r `^ c _ >' � c °. in °� u c7 � ar � m �«. a
U U � � J � � a.�+ N 2 � O. Y �n U � cn �Q N � G7 � � � O GJ Q � � 41 p_ � �O v1 pZf a�+ J C� fy v C �
� t..) Y > vf 7 > aJ — 61 L]. V C L N u � f0 a.+ O 7 M �
N U OJ ta Vl 3 O d � � p_ � d 00 t6 � � C (0 m vl @ 7 � — � � LL � L l7 � 41
a, o ° > � � � C� > 3 " " u' 3 E " f6 � " a £ +a'-' c� � cn °3 •Q LL n v X � � � •- n N o a �
Q � ai m ro � v o � � � O o �o � �' o a `-^ � a f0 > 3 a ii cn a z a w 2 C� �n l7 Q a vi �n �
> Q � �n � � � z a v� � x � a o O � �n z � _ ¢ � � in
� � � � � � � � � � � � � � � �
Q � � � � � � � � � � � � � � � � � � � � � � � � o 0 0 0 0 0 � � ,� ti .� ,� .� c� m m
a ao 00 00 00 00 00 00 00 00 00 0o rn rn m rn rn m m m m m rn rn m r, .� .� .� � .� .-+ .� .� .� � .� .� .� .� .�
� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
3 0
� m � o
a -
w �
o �
�
Q �--1 N M t7' Vl lD I� 00 Ol O �"� N M � L!1 �D I� 00 Ql O �--� N fn cf ll1 l0 I� 00 Ql O �"� N M � lf1 lD I� 00 Ql O
� 00 00 a0 00 00 00 00 00 00 Ol O� Ql Ol O� 01 01 Ol Ol O� O O O O O O O O O O N � N � N H �--� �--� N N N
N N N N N N N N N N N N N N N N N N N c+l m m m m m m M f�'1 m m m m M M m m ('�7 M m m
W a � Z
a -
Q
U
F
^ � � , R�
O O O O O O N O O O O O o0 Ol
� �"� f�1 i11 O �"� U1 1� M N M Q1 �' � i�
•@ c+i v rri o 0o t� � v o; ni v v o vi
� /�'1 N l0 O N t0 Ci V V I� I� ti 1 V V
y � t� m o v ao �n � m v � �n v v v
J C V V1 Ol a--1 Ol N e-1 '-i i--1 Ol V1
f0 � •-i c-1 r-1 e-1 O
O �O
F-
tn v1 vr an v� v� tn t/� tn t/t tn t/t vt tn vT tn
O c0 O N O tD
� a� oo m oo � v
N p_ v � 01 � M O
Y C � �
f0 O � Ql .-I c-i lD Vl
� U O M lD N
m
i/? L? i/? V} i/? tA N t/T N VT 1A i/? VT L? iA V}
Y � � O O O O O O O O O O O O O O
� � O O O O O O O O O O O O O Q1 O
� O Q� O O O O N O O O O O Ol
V Q .-� eti N .-� N .--� N .-� �-7 �-1
a v
0 0 0 0 0 0 0 0 0 0 0 0 �n m
O O O O O O N O O O O O I� Ol
� c-1 (n ln O a--I V1 I� M N n'1 01 V V 1�
v m v m o 00 � � v m m v v o �n
� a� m N � o ni � v v v r� � �n v v
ri ai o V oo �ri ri cri v t� �i v V v
— � � � �n rn � m N � ti � m o
o �
V iD
v? N t/� v? t/T vT vT vT tA V? a/} VT VT t/T vT an
— a _
� v �
_ � o �
� �
� � � � � � � � � � � � � � � �
� u
v �O
U' � Y c
� � �
� '-
_ z
~ th a/T v? v1 v? t/� vi tA t/� vf vt tn vt v? tn tn
N �M � N �N O o0
L u N N o0 V O Ol
~ . Ol W 1� V ul e-I
LL Y O
� C c�-� .�-� � � V 0�1
� �
~ iA V? N i/? VT VT VT V} VT LT VT VT i/T i/T l/? i/?
O
N
.-�-i O O O O O u1 O O O O O O �l 00
M O I� O O Qi I� N O o0 O O O I� O
� �C e-1 00 Lf1 O N i--1 I� (�'1 N l+l Ql V V I�
� o � � m .� m o �n oo � a v m � v o �
� v m m � o v co v v_ o n r� �n rn r�
° w �i � Y � v o v � vi � m r+i � �ri v � o
� � v� cM- Vl Ql O 00 N '-I e-I �--I � 00
� �
_ C
v d Q l�D
d
N LT VT V? LT VT VT VT VT VT K/} N VT VT VT V} V?
H
w O O O O O O O O O O O O O O O O
w O O O O O O O O O O O O O O O �D
_ .-1 M V1 O �--� U"I l0 M N (�'1 Ol V M M lD N
�' � m v m o 00 � m v m m v v m � '-+ �
z °' y m cv �o o rv �o m a a � r� �n n o� m �
3 r� ai o v e6 vi � cri <F � vi v .-i vi �o ai
� � � `° � `n °i � -rn+ � � .� ,� m � � m
Q L 7
� tn �
Z
~ t/T VT t/t Lf t/t VT Vt V? t/t LT V? V? VT V? V? v}
Z
O
u
co -o v � o
O c �- � c v � -�a ��., f0 � � � ° v Q
a� — � 3 -a �
� Q � o c a� a� � u E
Q 'a y � °�° g '` � � o a Q � � � Q ar
lJ u ai 'a > N Y ~ m ro io � x a � U
a � l7 � a � o@ � ro = 3 = � v, u o2S
a p in 3 3 � c -c Y 3 � � `
� tn �n F Q � Q U 2 J � d w � N
} — —
a m m m m cn rn v v v v v v v a a
� � � � � � ti ti N ti � � � � �
� O O O O O O O O O O O O O O O
3 0
� m y o
Q Y
W f0
o v
z
,� c� m v in �o n oo rn o .� c� m v in
pa[ N N N N N N N N N m m M (�'1 M M
M M M M M M m m M M m m m m c'�1
� Q � O �n
w ,,, Z �
a —
¢ o
U H
a
;,, . . �,
THIS PAGE INTENTIONALLY LEFT BLANK
._-ti-,,
,�;tc•," /'J�, �..�
� �.'.� �U,-%-::`,:- ��`���.
�ST�TE�,F:2�I�Si��.URI; Je'Tm'ah W Uay)N'ixon,Govemor . Sara Parker Paule};Direaor
D���l��'.l�'I�k�TT OF NATURAL RESOURCES
�----___
�� l
\ _ � . ', www.dnr.mo.gov
� -_
-- `,i_ �
May 19, 2015
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau,MO 63703
RE: C295531-01 /C295531-02/C295331-03 City of Cape Girardeau, MO—Wastewater
Treatment Plant Upgrades, CP0001299, Change Order No. 9
Dear Ms. Brunke:
The Department of Natural Resources' VJater Protection Program has approved the enclosed
Change Order No. 9 for your contract with KCI Construction Company, Inc. for the Wastewater
Treatrnent Plant Upgrades to serve the city of Cape Girardeau, MO. The project receives
funding through the Clean Water Sta.te Revolving Fund Loan program. This cha.nge order
provides for nuscellaneous civil,mechanical, and electrical work on the project. This change
order has been reviewed for compliance to 10 CSR 20-4.040 with regazd to changes i.n contract
price and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This change
order modifies the plans and specifications approved on June 5, 2012 and increases the eligible
cost of construction by $271,782.00,but has no effect on construction time.
Invoices from your engineer should clearly sepazate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four years following the completion of disbursement.
�
Rmded Pnper
, ��
Ms. Casey Brunke, P.E., City Engineer
May 19, 2015
Page 2 �
If you have any questions feel free to contact me at (573) 751-1402 or Missouri Deparkment of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGRAM
��`j�a��—
l
Byron F. Shaw, Jr., P.E., S Engineering Unit Chief
Financial Assistance Center
BFS/cas
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
Qr
�/�%�
- ���` �,�'����
y �� . Chan e Order
� MAY I 8 ��Q15 � g
No. 9
,�r- `��� � �-`i:�Gt����t
Date of issuance: May 4, 2015 �ATE�����t�''`�``�� Effective Date: May�2015
Pro�e�: Wastewater Treatment Facility Owner. City of Cape Girardeau ownersco�tractNo.: 3534
co��c Wastewater Treatment Facility(SRF Project No. C295531-01) oate ot�orwacc: August 3, 2012
Corrtractor. KCI Construction Company, Inc. en9ineersPro�ectNo.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Miscellaneous Civil,Mechanical and Electrical Work
See attached list of Revisions. epr'lCtR1Qf1� 0 f
^��fi�r.+1 r"�_
sources
Attachments: See supporting documents attached. rt � 9 C��5
n poo��EG
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSi 19, 2014
[Increase]from previously approved Change Orders [Increase]from previously approved Change Orders
No. 1 to No.8 Na 1 to No.8
Substantial completion(days or date): Febfuary 27, 2015
$2,049,157.60 Ready for final payment(days or date): M2fCh 27, 2015
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): February 27, 2015
$57,723,157.60 Ready for final payment(days or date): M2fCh 27, 2015
[Increase]of this Change Order: [Increase]of this Change Order:
Substantial completion(days or date): MarCh 31, 2015
$271,782.00 Ready for final payment(days or date): OCtObef 31, 2015
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): MafCh 31, 2015
$57,994,939.60 Ready for final payment(days or date): OCtObef 31, 2015
RECOMMENDED: ACC TED: ACCEPTED:
, -----T-� �'--��
BY. �l C�L BY. ' . ,Oi�— BY
�ineer(Authorized ignature) Owner( uthorized Signature) Contractor(Authorized Signature)
�
Date: r Date: r J"''�� '� Date: K- �I• � �
Approved by Funding Agency(if appiicabie): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
v
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 9—Miscellaneous Civil, Mechanical and Electrical Work
The Contract Documents are modified as listed below: Bid Item
No.
1. RO Faucet in Laboratory
(Change proposal No. 84 attached) Add $729.00 N
2. Power to Glassware Washer in Laboratory
(Change Proposal No. 85 attached) Add $938.00 N
3. Actuated Damper in 32" Duct in Biosolids Bldg
(Change Proposal No. 86 attached) Add $1,901.00 N
4. New Steel Plate at Outfall Structure
(Change Proposal No. 87 attached) Add $2,072.00 F.4
5. Miscellaneous Piping Modifications in Biosolids Bldg
(Change Proposal No. 88 attached) Add $20,405.00 N
6. Miscellaneous Equipment Modifications and Storage Shelves
(Change Proposal No.89 attached) Add $134,288.00 N
7. Additional Rip-Rap at Outfall Structure
(Change Proposal No. 90 REV1 attached) Add $29,767.00 F.4
8. Miscellaneous Mechanical and Electrical work
(Change Proposal No.91 attached) Add $8,188.00 N
9. Vibration Sensors for Influent Pumps
(Change Proposal No. 92 attached) Add $45,638.00 N
10. Administration Building Condenser Loop Modification
(Change Proposal No. 93 attached) Add $19,625.00 N
11. Water Still for Laboratory
(Change Proposal No. 94 attached) Add $4,528.00 N
12. Penetrations at UV Canopy for Full Gate Travel
(Change Proposal No. 95 attached) Add $1,624.00 N
13. SW Wet Well Gate Modifications
(Change Proposal No.96 attached) Add $2,079.00 N
Total Cost This Change Order(Total 1 through 11) Add $271,782.00
Av
�
�,,F �1�`"��!✓�,-,J J�.�.`
, =�.,�; �;�
"�_ � Jeremiah W.(Jay)Nixon,Govemor . Sara Parker Pauley;Director
�ST�����;�U�r;,
I��-i�`�� '�'l�r.��TT OF NATURAL RESOURCES
z r .. , f
� �, ,�� �f www.dnr.mo.gov
{s���. `=--il'�' ?
-; �f_,i.�'L-!^ �
July 28, 2015
Ms. Casey Brunke,P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 / C295331-03 City of Cape Girardeau, MO—Wastewater
Treatment Plant Upgrades, CP0001299, Change Order No. 10
Dear Ms. Brunke:
The Department of Natural Resources' Water Protection Program has approved the enclosed
Change Order No. 10 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project
receives funding through the Clean Water State Revolving Fund Loan program. This change
order provides for miscellaneous civil, mechanical, and electrical work on the project. This
change order has been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in
contract price andlor tune and 10 CSR 20-8 in regards to sanitary engineering features. This
change order modifies the plans and specifications approved on June 5, 2012 and increases the
eligible cost of construction by $1,277,981, and extends the contract to October 31, 2015.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four years following the completion of disbursement.
r
tJ
Req�cled S':iper
Ms. Casey Brunke, P.E., City Engineer
July 28, 2015
Page 2
If you have any questions feel free to contact me at (573) 751-5937 or Department of Natural
Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176. Thank
you.
Sincerely,
WATER PROTECTION PROGRAM
Conrad Blume, E.I.,SRF Engineering Unit
Financial Assistance Center
CB/jb
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
�e����°��D
�
JUL 3 1 2015
�-€. ��,-�'
� ti . �� -
�
RECEIVED
.
� JUL 1 't 2015 Change Order
Water Protection Program NO. �0
Date of Issuance: July 1, 2015 Effective Date: JUIy 1, 2015
Pro�e� Wastewater Treatment Facility Owner. City of Cape Girardeau o�+�ners co�tract No.: 3534
co�c��c: Wastewater Treatment Facility(SRF Project No. C295531-01) �ate otco�tract: August 3, 2012
co�c��co� KCI Construction Company, InC. En9ineersP�o)ectNo.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Schedule Delay Impacts,and Miscellaneous Civil and Mechanical Work
See attached List of Revisions. MO D2pa�tme�t Of
5
Attachments: See supporting documents attached. �J U I_ 2 � ..
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): JUIy 20, 2014
$55,674,000.00 Ready for final payment(days or date): AugUSt 19, 2014
[Increase]from previously approved Change Orders [Increase]from previously approved Change Orders
No. 1 to No.9 No. 1 to No.9
Substantial completion(days or date): February 27, 2015
$2,320,939.60 Ready for final payment(days or date): Me�Ch 27, 2015
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Feb�uary 27, 2015
$57,994,939.60 Ready for final payment(days or date): MB�Ch 27, 2015
[Increase]of this Change Order: [Increase]of this Change Order.
Substantial completion(days or date): M2�Ch 31, 2015
$1,277,981.00 Ready for fina►payment(days or date): OCtObe�31, 2015
Contract Price incorporating this Change Order. Contract Times with all approved Change Orders:
Substantial completion(days or date): MarCh 31, 2015
$59,272,920.60 Ready for final payment(days or date): OCtObef 31, 2015
RECOMMENDED: ACCEPTED: ACCEPTED:
gy; ����`�� BY ` 1L'� � �U.�� By. L•
ngmeer(Authorized Signature) Owner(Authorized Signature) Corrtractor(Authorized Signatu2)
f (
Date: �'`���y Date: �� rL � �� Date: 7•�0' �
Approved by Funding Agency('rf applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
,r` -
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 10—Schedule Delay Impacts, and Miscellaneous Civil and Mechanical Work
The Contract Documents are modified as listed below: Bid Item
No.
1. Schedule Delays Due to IPS Shoring Impacts
(Change proposal No. 786 attached) Add $830,000.00 N
2. Replacement Filters for Automatic and Manual Strainers
(Change Proposal No. 97R1 attached) Add $18,121.00 N
3. Modifications to Spirac Conveyor Drain Lines
(Change Proposal No. 98 attached) Add $1,844.00 N
4. Provide Parshall Flume Grating Planks
(Change Proposal No.99 attached) Add $4,340.00 N
5. Rip Rap Placement for Erosion Control
(Change Proposal No. 100 attached) Add $80,740.00 N
6. Provide Pre-Filter and Duct Modifications at Biosolids Building
(Change Proposal No. 101 attached) Add $342,936.00 N
Total Cost This Change Order(Total 1 through 6) Add $1,277,981.00
�::�_>:
.�: _�;;.,.
;�:; :�;,.
���- -
;, �Jl�'y
.�4������`, :�U� Jeremiah W.(Jay)Nixon,Govemor . Sara Parker Pauley,Director
Dr��,���'��TT OF NATURAL RESOURCES
�, � _ _ ��-�
�� '�i�-, '�, t�`- �� www.dnr.mo.gov
��*�-1`�/��'-�F ��/�
�_ 'j'�---`:'i'``�{'��
� .Li tii�v^�''-
'�i��c-cc:Yi=J
June 2, 2014
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 /C295331-03 City of Cape Girardeau, MO—Wastewater
Treatment Plant Upgrades, CP0001299, Change Order No. 6
Dear Ms. Brunke:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 6 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the city of Cape Girardeau, MO. The project
receives funding through the Clean Water State Revolving Fund Loan program. This change
order provides for the shoring system at the influent pump station to accommodate excavation
and unforeseen subsurface conditions and has been reviewed for compliance to 10 CSR 20-4.040
with regard to changes in contract price and/or time and 10 CSR 20-8 in regards to sanitary
engineering features. This change order modifies the plans and specifications approved on
June 5, 2012 and increases the eligible cost of construction by $1,028,599.00, but has no effect
on construction time.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four (4) years following the completion of disbursement.
Ea
Recycled Paper
Ms. Casey Brunke, P.E., City Engineer
June 2, 2014
Page 2
If you have any questions feel free to contact me at 573-751-1402 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176.
Thank you.
Sincerely,
WATER PROTECTION PROGRAM
� �� �`�(u,j " .
B r�on F. Shaw Jr. P.E. WSRF En ineerin Unit Chief
y > > > g g
Financial Assistance Center
BFS:cas
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
Celebrating 40 years of taking care of Missouri's natural resources.
To learn more about the Missouri Department of Natural Resources visit dnr.mo.qov.
- -_ -�- :- _ := = =s -- = - __ -- _ -- �=- -- _ -_-=
�� ��
- _ - ��-. �: � �z� _� -��_. � -� _ - -
; �-�--�--_--___=____� __------ -
�,
I�l���i�IE I� - --
-� Chan e Order
� M.aY � 6 zo�� 9
No. 6
�'VATER PROT�CTiOiV PR�uR�;'�".
Date of Issuance: May 7, 2014 Effective Date: M2y 7, 2014
a�o�e�: Wastewater Treatment Facility o�,e�: City of Cape Girardeau owners contract rvo.: 3534
co�c�a�c: Wastewater Treatment Facility (SRF Project No. C295531-01) �ateotconvact: AUgUSt 3, 2012
co�t�aao�: KCI Construction Company, InC. en9ineers Pro�ect No.: C5X65101
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Shoring System at Infiuent Pump Station and Miscellaneous Revisions D
See attached list of Revisions. atUra� R@SAUfGOS
►UN 0-�-��'��
Attachments: See supporting documents attached.
OVED
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Originai Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): JUIy 20, 2014
$55,674,000.00 Readyforfinal payment(daysordate): AUgUst 19, 2014
[Increase]from previously approved Change Orders No. [Increase][Decrease] from previousiy approved Change Orders
1 to No. 5 No. (NA) to No. (NA)
Substantial completion(days): Same as original
$499,425.60 Ready for final payment(days): Same as original
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial compietion(days or date): Same as original
$56,173,425.60 Ready for final payment(days or date): Same as original
[Increase]of this Change Order: [Increase][Decreasej of this Change Order:
Substantial completion(days or date): (NA)
$1,028,599.00 Ready for final payment(days or date): (NA)
Contract Price incorporating this Change Order: Contract Times with ail approved Change Orders:
Substantial completion(days ordate): Same as original
$57,202,024.60 Ready for final payment(days or date): Same as original
RECOMMENDED: ACCEP�ED: ACCEPTED:
� r�
��
By:��� �_ By: ��' �.Z � �Li �`� By: � . ��
T�
Engineer(Authorized Signature) Owner(Aut rized Signature) Contractor(Aulhorized ignature)
,L ,[
Date: Date: �' -� 'I � I L� Date: S �/I7
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
i �
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 6—Shoring System at Influent Pump Station and Miscellaneous Revisions
The Contract Documents are modified as listed below:
1. Shoring System at Influent Pump Station
(Change Proposal No.40 Revision 1 attached) Add $884,235.00
2. Electrical Conduit and Cable Changes
(Change Proposai No. 39 Revision 1 attached) Add $76,946.00
3. Wonderware Upgrade from 3000 to 60000 Tags
(Change Proposal No.41 Revision 1 attached) Add $33,325.00
4. Sludge Grinder Panel Modifications
(Change Proposal No.42 attached) Add $2,580.00
5. Roof Insulation at Drains at Biosolids Building
(Change Proposal No.43 attached) Add $3,483.00
6. Conductor and Fuse Revisions for Blowers
(Change Proposal No.44 attached) Add $4,970.00
7. 30-Amp Receptacles for UPS
(Change Proposal No.45 attached) Add $2,962.00
8. Concrete Encasement for 60-inch Effluent Line
(Change Proposal No.46 attached) Add $20,750.00
9. Deletion of Sewer Lateral Connections
(Change Proposal No.47 Attached) Deduct ($652.00)
Total Cost This Change Order(Total 1 through 9) Add $1,028,599.00
,
�
Change Order
No. 1
Date of Issuance: AUgUst 20, 2012 Effective Date: AugUst 20, 2012
P�o;e�t: Wastewater Treatment Facility oW�e�: City of Cape Girardeau owner'sContractNo.: 3534
co�t�a�c: Wastewater Treatment Facility �ateotco�t�act: AuguSt 3, 2012
co�t�a�co�: KCI Construction Company, If1C. Engineer'sProjectNo.: CrJXCS�O�
The Contract Documents are modified as follows upon execution of this Change Order:
oes��Pt�o�: Incorporate the attached Federal wage determinations to comply
with the Davis-Bacon Act requirements.
Attachments: (List documents supporting change):
1. Federal Wage Determination Replaced on 06/12/2012— Heavy
and Highway Construction Projects
2. Federal Wage Determination Replaced on 06/15/2012— Building
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase] [Decrease]from previously approved Change [Increase] [Decrease] from previously approved Change Orders
Orders No. NA to No. NA No. NA to No. NA
Substantial completion(days): 0
$0.00 Ready for final payment(days): 0
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(daysordate): �UIy 2O, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase] [Decrease]of this Change Order: (Increase] [Decrease]of this Change Order: /�' ��Q,��
Substantial completion(days or date): 0 'Y�(��" %��e�Og
$0.00 Ready for final payment(days or date): 0 '��f
��� �, ��rqeS
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: ��� �0/?
Substantial completion(days ordate): July 20, 2014 �
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014 ����
RECOMMENDED: ACC ED: � ACCEPTED:
--� �
v -��iGl�lo��' � �,
B : �.� gy; I✓�G"ALk1 L,�.�f�—
Engineer(Authorized Signature) Owner(/�uthorize Signature) Contractor(Authorized Signature)
l
Date: ����. Date: �'d�.l Z" Date: ��'��' ��
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
�
Page 1 of 31
M0120001 MOD 6 REVISED 06/15/12 MOl
******** THIS WAGE D�'TERMINATION WAS REPLACED ON 06/15/12********
General Decision Number: M0120001 06/Ol/2012
Superseded General Decision Number: M020100001
State: P9issouri
Construction Types: Heavy and Highway
Counties: Missouri Statewide.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Fublication Date
0 Ol/06/2012
1 01/13/2012
2 02/03/2012
3 03/02/2012
9 04/06/2012
5 05/04/2012
6 06/O1/2012
CARP0002-002 OS/O1/2010
ST. LOUIS COUNTY AND CITY
Rates Fringes
Carpenters. . . . . . . . . . . . . . . . . . . . . . .$ 32.78 12.25
---------------------------------------------------------------
CA1�P0005-006 04/dl/2008
CASS {Richards-Gebauer AFB ONLY) , CLAY, JACKSON, PLATTE AND RAY
COUNTIES
Rates Fringes
Carpenters:
CARPENTERS & LATHERS. . . . . . . .$ 33.00 12.03
MILLWRIGHTS & PILEDRIVERS. . .$ 33.00 12.G.s
---------------------------------------------------------------
CARP0011-001 05/O1/2011
Rates Fringes
Carpenter and Piledriver
ADAIR, AUDRAIN (West of
Hwy 19) , BOON�, CAZLAWAY,
CHARITON, COLE, COOPER,
HOGdARD, KNOX,LINAT, MACON,
NiILLER, MONITEAU,MONROE,
OSAGE, PUTNFIM, RANDOLpH,
SCHUYLER, SHELBY AND
SULLIVAN COUNTIES. . . . . . . . . . .$ 28.57 11.00
ATCHISON, ANDREW, BATES,
CALDWELL, CARROLL,DAVIESS,
DEKALB,GENTRY, GRUNDY,
HARRISON, HENRY, HOLT,
http://www.wdol.gov/wdol/scafiles/arehive/davisbacon/2012/mo 1.r6 7l26/2012
�
Page 2 of 31
LIVIYJGSTON, MERCER,
NODAW7IY,ST. CLAIR, SALINE
AND WORTH COUNTIES. . . . . . . . . .$ 2� . 67 10.55
AUDRAIN (East of Hwy.19) ,
RALLS, M.�RION, LEWIS,
C�ARK P.ND SCOTLAND COUNTTES.$ 28.83 13.05
RARRY, BARTQN, CAI�IDEN,
CEDAR, CHRISTIAN, DADE,
DALLAS, DOUGLAS, GREENE,
HICKURY,JP.SPER, LACLEDE,
LAWRENCE, MCDONALD,
NEWTON, OZARK, POLK,
STONE, TANEY, VERNON,
WEBSTER P.ND WRIGHT COUNTiES.$ 27.32 10.55
BENTON, MORGAN AND PETTIS. . .$ 27.27 11.00
BOLLINGER, BUTLER, CAPE
GIR�R��AU, DUNKLIN,
lyISSISSIPPI, NFW MADRID,
PEIKISCOT, FERRY, STE.
GENEVIEVE, SCOTT, STODDARD
AND WAYNE COUNTIES. . . . . . . . . .$ 28.67 13.07
BUCHANAN, CLINTON, JOHNSON
AND LAFAYETTE COUNTIES. . . . . .$ 28.32 10.55
CARTER, HOWELL, OREGON AND
RIPLEY COUNTIES. . . . . . . . . . . . .$ 27.75 13.0`1
CRAWFORD, DENT, GASCONADE,
IRON, MADISON, MARIES,
MONTGOMERY, PHELPS,
PULASKI, REYNOLDS, SHANNON
AND TEXAS COUNTIES. . . . . . . . . .$ 28. 68 13.05
FRANKLIN COUNTY. . . . . . . . . . . . .$ 31.23 13.05
JEFFERSON AND ST. CHARLES
COUNTIES. . . . . . . . . . . . . . . . . . . .$ 33.38 13.05
LINCOLN COUNTY. . . . . . . . . . . . . .$ 30.34 13.05
PIKE, ST. FRANCOIS AND
WASHINGTON COUNTIES. . . . . . . . .$ 29.39 13.05
WARR�N COUNTY. . . . . . . . . . . . . . .$ 30.73 13.05
------------------------------------------------------—--------
* ELEC0001-002 06/Ol/2012
BOLLINGER, BUTLER, CAPE G-RARDEAU, CARTER, DUNKLIN, FRANKLIN,
IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW I�uizID,
PEMISCOT, PERRY,R�YNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,
ST. LOUIS (City and County) , STE. GENEVIEVE, SCOTT, STODD7IRD,
WARREN, WASHINGTON AND WAYNE COUNTIES
Rates Frinqes
Electriciar_s. . . . . . . . . . . . . . . . . . . . .$ 31.75 22.37
-------------------------------------------------------------
* ELEC0002-001 09/04/2011
ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON,
CLARK, COLE, COOPER, CRAWFORD, D�NT, FRANKLIN, GASCONADE,
HOW7IRD, HO[�'ELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN,
MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMFRY,
MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM,
RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRP.NCOIS,
ST. LOUIS (City and County) , STE. GENEViEVE, SCHUYLER,
http:!/www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
,
' Page 3 of 31
�CO'rLANJ, SHANNON, SHELBY, SULLIVr'1N, TEXAS, �7ARREN AND
WRS�IINGTON COUNTIES
�ates Fringes
Line Construction:
Equipmen� Operator. . . . . . . . . .$ 31.39 18.03
Groundiran & Truck Driver. . . .$ 24.27 '-5.0?
Lineman & Cable Splicer. . . . .$ 36.36 2C.09
----------------------------------------------------------------
* ELEC0�53-004 09/Ol/2011
Rates Fri^qPs
Lire Constr�action: (ANDREW,
ATCHINSON, BARRY, BARTON,
BUCNANAN, CALDWELL, CEDP.R,
CF-:RIST=AN, CLTNTON, DT-.DE,
DALLAS, DAVIES, , DEKP:�B,
DOUGLAS, GEN'�RY, GR�ENE,
GRUNDY, HARR�SCN, HICKORY,
HOLT, �P.SPER, LACLEDE,
LAWRENCE, L�V�NGSTON,
MCDONALD, MER�ER, N�4dTON,
NODAGdAY, OZARK, PCLK, ST.
C�AIR, STONE, ''_'A^1EY, VE�NCN,
GIEBSTER, 6�?ORTH ANC ?rJRIGHT
COUNTIESj
Grourdmar_ Fcwd?rma�. . . . . . . . .$ �5.88 13.93
Grour_drnar. . . . . . . . . . . . . . . . . . .$ 23. 98 13.2i
Linemar_ Operat�r. . . . . . . . . . . .5 35.12 l�'.12
Linemar.. . . . . . . . . . . . . . . . . . . . .$ 37.10 1?.80
Line Construction; ;BATES,
B'�NTON, CARROLL, CP_SS, CLA`_',
flENRY, JACKSON, JOHI�SGN,
LI�FAYETTE, PETT�S, PL•A_^TE,
RA1 AND SAI,INE CGuY�T�ESJ
Groundman Po���der�:_an. . . . . . . . .$ 26.84 '4.26
Groundman. . . . . . . . . . . . . . . . . . .$ 25.44 '�3.?8
Lineman Operator. . . . . . . . . . . .$ 3�.$2 i�.36
Lineman. . . . . . . . . . . . . . . . . . . . .5 38.4U i8.25
-------------------------------------------------------------
ELLC009�-001 06/01/2C11
EP_RRY, BARTON, CEDAR, DADE, JASFER, L71G^7R�NCE, P�iCDONALD, NE�ITON,
ST CLAIR, Ar1D VERNON COUNTIES
Rates Frir_ges
El�ctri�ians:
Cau1e SpliceYs, , , , , , , , , , , , , ,$ 24.35 12.86
E�_ectricians. . . . . . . . . . . . . . . .5 24.00 12.�3
--------------------------------------------------------------
ELEC0124-007 09/O1!2010
BATES, BENTCN, CARRO�L, CASS, CLAY, COOPER, HENRY, JACKSON,
�OHNSOI�, LAFAYETTE, I✓10RGr'1N, PETTIS, PLP_'='TE, RAY F�ND SALINE
COUNTIES:
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2o 12/mo 1.r6 7/26/2012
Page4of31 1
Rates Fringes
Electricians. . . . . . . . . . . . . . . . . . . . .$ 33.83 i8. 63
------------------------------—------------------------------
* ELECO257-003 03/O1/2012
AUDRAIN (Except Cuivre Township) , BOONE, CAI,LAWAY, CAMDEN,
CHARITON, COLE, CR7IWFORD, DENT, GASCONADE, HOWARD, MARIES,
MILLER, MONITEAU, OSAGE, PHELFS AND RANDOLPH COUNTIES
Rates Fringes
Electricians:
Cable Splicers. . . . . . . . . . . . . .$ 30.42 16.085
Electricians. . . . . . . . . . . . . . . .$ 30.42 16.085
----------------------------------------------------------------
ELEC0350-002 12/01/2010
ADAIR, AUDRAIN (East of Highway 19) , CLARK, KNOX, LEWIS, LINN,
MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS,
SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES
Rates Fringes
Electricians. . . . . . . . . . . . . . . . . . . . .$ 28.16 15.20
--------------------------------------------------------------
ELEC0953-OQl 09/01/2011
Rates Fringes
Electricians:
CHRISITAN, DALLAS,
DOUGLAS, GREENE, HICKORY,
HOWELL, LACLEDE, OREGCN,
OZARK, POLK, SHANNON,
WEBSTER and WRIGHT COUNTIES.$ 23.93 13.82
PULASKI and TEXAS COUNTIES. .$ 28.58 14 .28
STONE and TANEY COUNTIES. . . .$ 19.72 12. 99
----------------------------------------------------------------
ELEC0545-003 06/Ol/201i
ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER,
GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAC�IAY,
AND C�ILDWELL COUNTIES
Rates Fringes
Electricians: . . . . . . . . . . . . . . . . . . . .5 31.00 12.22
---------------------------------------------------------------
ELEC0702-004 06/23/2011
BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON,
MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE
CQUNTIES
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
f
, Page 5 of 31
Rates Fringes
Line Cons�ruction:
Groundman - C1ass A. . . . . . . . .$ 2?.'79 '_2. 60
Grourdman-Equipment
Operator C1ass II (all
other equipment? . . . . . . . . . . . .$ 30._6 14.43
Heavy-Equipment Operator
Class I (all crawler type
equipment D-4 and larqer) . . .$ 34 .40 i5• 6=
Lineman. . . . . . . . . . . . . . . . . . . . .$ 41.91 17 . Ei
-------------------------—-----------------------——---------
ENGI0101-001 05/Ol/2.011
ANDREW, ATCHISON, BATES, BENTGN, BUCHI�NAN, CALDWELL, CARROLL,
CHARITOrI, CLINTON, COOPER, DAVIESS, DEKALB, GEbITRY, GRUNDY,
HARRISON, HENRY, IlOLT, HOWP.RD, JOHNSON, I�AFAYETTE, LINN,
LIVINGSTON, P�IERCER, Y30DAWAY, PETTIS, SALINE, SULLIVAN AND WORTH
COUNITES
Rates Fringes
Power equipment operators:
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 29. 94 13.76
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 29.54 13.76
GROUP 3. . . . . . . . . . . . . . . . . . . . .5 27.54 13.76
POWER EQUIPNENT OPERATORS CLASSIFICATIONS
GROUP l: Asphalt roller operator, finish; asphalt paver and
spreader; asphalt plant operator; auto grader or trimmer or
sub-grader; bacichoe; blade operator (all types) ; boilers -
2; booster pump on dredge; bulldozer operator; boring
machine (truck or crane mounted) ; clamshell operator;
concrete mixer paver; concrete plant operator; concrete
pump operator; crane operator; derrick or der.rick trucks;
ditching machine; dragline operator; dredge engineman;
dredge operator; drill cat with compresscr mounted
(self-contained) or similar type self- propelled rotary
drill (not air tract) ; d�illinq or boring machine
(rotary-se]f-propelled) ; finishing machine operator;
greaser; high loader-fork 1if�-skid loader (all types) ;
hoistinq engineer (2 active drums} ; locomotive operator
(standard guage) ; mechanics and welders (field and plants) ;
mucking machine operator; pile drive operator; pitman crane
or boom truck (all types) ; push cat; quad track; scraper
operators (all types) ; shovel operator; sideboom cats; side
discharge spreader; skimmer scoop operators; slip £orm
paver operator (CMI, Rex, Gomeco or equal) ; la tourneau
rooter (all tiller types) ; tow boat operator; truck crane;
wood and log chippers (all types) .
GROUP 2: A-frame truck operator; articulated dump truck;
back fiiler operator; boilers (1) ; chip spreader; churn
dri11 operator; compressor; concrete mixer operator, skip
loader; concrete saws (self-propelled) ; conveyor operator;
crusher operator; distributor operator; elevating grader
operator; farm tractor (all attachments) ; fireman rig;
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 6 of 31
f1_oat 0�2=cLOr; S�ST. �?"3ua CrJJeTctGY; h0lStiriC e:G1['� ��^.�i�'
d�um) ; mair_terance cperator; m�sltiple compactor; pavement
b~eaker, sel�-prepe�led hydra-nammer lor similar tlpe; ;
paymill operator; power shield; pumps; roller operator
(�aith or witrout blades; ; screening and washing plar.t;
self-p�opelled street �rcom. cr sweeper; siphons ar.d jets;
s'-�raw blower; stump cutting machine; siphons and jets; tank
cay heate� operator (c�mbinat.ior: boiler and booster) ;
welding machir_e; cibrat;_rg r.a�h-�ne cp�rator (not har.d
held) ; weldinq mach;_ne.
GROUP 3: (a} Oiler;
(b) Oiii2r �'riv2r
(c) Mechar-�c.
HOU�LY PREMIUA9S:
T:-3F, FOLLOPIING CLASSIFICATIOPdS SHP_LL REC:�IVr. ($ .25) ABOVE
GKOUP 1 RATE: D_raglire operato- - 3 yds. & oti�er; sho��el
3 yds. & over; clamshell 3 yds. & ever; Crane, rigs or
piledrivers, 100` o` boom or over (inc1. �ib. ) , hois`� -
each additional �ctive d~�um vzrer 2 drums
T=1L FO�LOWI2�Iv CL.�SSIFICATIONS S�ALL RECE�V� ($ .�0) ABO`JE
G�OUF 1 �'?TE: Tandem scoop operator; crane, rigs or
piledrivers 150' to 200' of boom (ir.c'�. ji�. }
TH� FCLLOV7ING C�ASSIFICATIONS SHALL RECEIV� �,$ .75) r'1BGVE
rR�,7n 1 �a,�m�: Crane rigs, o~ piledrivers 200 tt. or bccr..
cr over (including jib. )
--------------------------------------------------------------
F^�GIO"-01-005 04/O1I2011
CA�S, CLAY, JF�CKSODI, PLATTE AND P.AY CCUNTIES
Rates Fri-�ges
Power e�uipment operators:
GRCUF 1. . . . . . . . . . . . . . . . . . . . .5 32.33 13.88
GRGU^r 2. . . . . . . . . . . . . . . . . . . . .$ 31.29 13.88
��ROUF 3. . . . . . . . . . . . . . . . . . . . .5 26.82 ?3.8�
GROUF 4. . . . . . . . . . . . . . . . . . . . .$ 30. 1� 13.88
PGv�ER EQL"'TF�ENT CPE�.TORS CLASSI_ICATIOIQS
GRCOP l: Asti:�alt roller operator, finish; asphalt paver and
=pr�aaer; asUhalt plan� opera�or; au�o grader er tr-r.u;:er cr
sub-arader; 'tiackhoe; blade operator (all types? ; b�'�1ers-2;
booster pumti cn dredge; boring machine (truck or crar.e
mvunted) ; uulldczer operator; clamshell ope_ator; cor_crete
ciear.irg �.e�ontamination machine opera�or; concrete mixer
paver; concrete plant operator; concrete pump aperator;
crane operat�r; derricY or derrick truc;cs; ditchinq
machire; dragl�ne operator; dredge enginem�n; dredge
oper�tor; cril-�_:^at with compressor mounted (self-cor.taired)
or simi'�ar ty�2 self prcpelled rotary drill (not air
tractj ; dr=_li�ng cr boring machine (,rotary -
se1=-pr�pe112d; ; fin;�shing mac�ine operator; greaser; heavy
equipmer_t robotics operater/mechanic; norizon�al
directior.al aril= operator; norizcntal directional drill
locator; �eacer-fcrk'�ift - sk_id lcader (a11 '�ypes) ;
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 7 of 31
Y.cisting engineer (2 active d-umsj ; locomot�ve operator
(standard guage? ; mastFr envi_ronmenta' r.�.aintenance
necran,�c; mecPanics arld o-�elders (-`ield ar_d p,-ants) ;
muckiny �.acnine operator; piledrive operatcr; p,�tman crane
or boor-: truck (all types} ; push cat; quad-track; scraoer
cperators iall types) ; sho:Tel operato�; side d�scharqe
spreacer; s;d?boom cats; skimmer scoop operator; sl=-�-form
paver (C;��, R.EX, Gomaco or equal) ; la to�rr.eau rooter (all
ti-ler t si ; tcw boat operator; truck crane; u�'�tra high
YP�
perssure water.jet cuLting tool sys'�em operator/mechan-��;
vacuum blasting T.a�hine o�erator/mechanic; �aood and _cg
chip�ers (al'� ty:.es)
GkOUP 2: "A" Frar..e truck o�erator; bac:c fille� operatcr;
boilers (1) ; chip spreader;churn dri11 operata=�; cor.crete
mixer operator, sk-ip '-cader; concrete saws
(self-propelled) ; c�nveyor c�erator; crusher operator;
distributor operator; e'_evating grader operato_; f�rm
`-�ac�or (all attachT,ents; ; firema:� rig; floa� operator;
fo-m grader operater; hcist;_ng engine (1 drum) ; mair_tenance
operator; multiple corr.pactor; paJement breaker,
self-propelled h_ydra- haT-rer ;or similar type) ; power
shield; paymill operator; pumps; siphons and �e..s; stump
cut�ing machir_e; tank car heater o^erator (combin�tion
boiler and booster} ; compressor; rcller operator (wi�h or
wi'�hou� blades) ; screerir_q an� wasning plant;
self-propelled street broom cr sweeper; straw blower; tar.k
��i hea*Er op�r�tor ;ccmbination b%i��r and booster) ;
vibrating machine operator (r.ot hanG held)
GROU? 3: Oilers
GROUP 4: Uiler Driver (Al1 Types)
FGOTNOTE:
HCURLY PREI�IIUI�IS FOL'�OWING CLASSIFI�ATIONS SHP_LT; R�CEIVE
�$1.00) �P�OVE GROUP 1 Ri-�TE:
Clamsnells - 3 yd. capacity o� over; Cranes or rigs, 8Q ft.
of boom or over (including jib) ; Draylines, 3 yd. capacity
cr over;
Fiiedrivers 80 ft. or boom or over (incluuing j;-b; ;
Shovels & backhces, 3 yd. capacity or over.
---------------------------------------------------------
ENGI�"�D1-022 0�/O1j2011
BP.RRY, BARTO�7, CAA9DEN, CEDNR, CHRISTIxN, DADE, DALLA�, DOUGLr�S,
�REENE, HI��KCRY, JASPER, LACLEDE, LAt�JRENCE, MCDONALt�, NETr7TGN,
OZ�RK, FGLK, ST. CLAIR, STONE, TANEY, VERIvON, WEBSTER P.ND
WR�GHT COUNTIES and CITY O'- SPRINGFIELD
Ra�es Frir_ges
Power equipmenr cverators:
GRGUP 1. . . . . . . . . . . . . . . . . . . . .$ 26.�i 11.81
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 2o.3b 11.81
.� r ll.�`1
GF�OUP ?. . . . . . . . . . . . . . . . . . . . 20.16
GROliP 4. . . . . . . . . . . . . . . . . . . . .$ 24.11 11.81
P069ER EQIIIPMEN� OFERn'IGRS CL'�SSIF'ICATICNS
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
r
Page 8 of 31
�RCUF l: Asphalt finish�r_c mach-_n2 & trench widening
s�reader; asphalt plant console cperatcr; au�ograder;
autem.atic slipform paver; bGckr:oe; b'�ade opera�or - all
types; boat operator - tow; boilers-2; central mix concrete
plant operator; clamshell ope�ator; �cncrete mi::er paver;
crane eperator; derr.icx or de-rick trucks; ditchi,g
ma�hine; dozer cpera�or; d_raglire operator; dredge boos'�er
pu-.p; dredge engineman; ci=edge operatcr; dri�l cat with
compress�r mosnted on ca_; drillir.g or tior�-ng �cchine
rotary self-propel=ed; highloader; hois:,�ng engine - �
active druns; launc� hammer �.=heel; locomot�yve cp�rator; -
star.dard �uage; mecha:�ic and welders; mucking �:acnine;
o`L-read tru�ks; Yiledriver operator; pitman crane
ope_ratcr; pusn cat operator; quad trac; scoop e�erator -
all types; sh�vel operator; sideboom cats; sk,�_-�uner sccop
ope�:.tors; trenching maehine operato�; truck crar_e.
GROUP 2: A-fraM.e; as,.�halt not-mix silo; asphalt p-lant
fir�mar_ (drum cr boi].er) ; asphal� plant man; aspha��t p'ant
man; asphalt plant r,-xer opera�or; asphalt roller cperator;
bac�{filler operater; Aarber-qreene loader; boat operatcr
(bridges ar_G dams) ; chip sti?-eader; concrete mixer operator
- s'.sip loader; cor_crete p-'-ant opera�or; concrete pump
opera�or; cru�her operator; dredge oiler; elevating grader
cpera�or; fork l�_ft; greas2r-fleet; hois�ing engine - l;
locomctive operator - r_arrcw gauge; mul�iple compactor;
pavement breaker; po�erbrccr�. - self-propelled; power
shield; roote-r; �ide u�-scharge .�cncrete spreader; siip -^orm
finishing machir.e; stumpcutter T.ac�ine; �hro��le man;
tracte~ operator (ocer sC r..p. ; ; wir,cn truck.
GROJP 3: Bcilers - 1; chip sp.reader ;iront man) ; chu�n drill
cperator; clef plane operator; ccn:-rete saw opera�or (self-
�aro�elled) ; curb finishinq machir.e; d-�stributor opera�or;
finisning machine operator; fiex plane eperator; float
o�erator; form grade= operator; pugr,.-.��1 ocerator; roller
o�erator, other than high type aspha�t; screening & washing
p'-ant operatcr; siphons & jEts; sub-qrad��ng mac:�ine
o��rator; spreader box cperator, self-prope�led ;nct
as�halt) ; tank car heare� operator (coTb-_naticn boiler &
bocster) ; trac�or operator (50 h.p. or iess; ; iiimac, ulric
or s'�milar spreader; vibr�ting machir.e op2ratcr, nct nand;
GROIIF 4: Grade checker; Oiler; Oile-�-Driver
HOURLY FRE�9IUT�IS:
The fcllowing classi.fica�ions shall recei�e $ .�5 aba��e GRCuP
1 rate:
Clamshe-'�ls - 3 yds. or over; Cranes - Rigs or Piledrivers,
lOC ft. cf �ocm or over (including ;i.b) ;
Draylines - 3 yds. or cver; Hoists - each additional active
dr�;m over 2 dru:ns; S:�ovels - 3 yds. or ove�;
The following classificaticns shall receive $ .50 above GROUF
1 rate:
Tandem scoop op2rator; Cranes - Rigs or Piledrivers, 150 ft.
to 20G =t. o� bcom ('_nc�'�uding jib) ; Tandem sccop.
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 9 of 31
The =o-ilowing classifications shall rece--v2 S .?5 aucve GROU?
1 rate:
Crar.es - Rigs or Filedrive�s, 2G0 i�. o= boc-. �r over
(ircludir.g j--��. ) •
-—-----------------------------------------------------
ENGI0513-00�' 05/04/2011
�'RANKLIN, JEFE'ERSvN, LIN�:OLN, ST CY,AR'.,ES, AND WARRE�N �OUN'�IES
Ra�es r-i.rges
Power equipmert operators:
GROUP i. . . . . . . . . . . . . . . . . . . . .$ �9.11 21.36
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 29.11 21.36
GRdUP 3. . . . . . . . . . . . . . . . . . . . .$ 2�.21 21.36
GROUP 4. . . . . . . . . . . . . . . . . . . . .5 23.7� 21.�6
PCG]ER EQUIPI�IENT OPE�'rORS CLASS-F�Cp�'IONS
GROUP 1: Bcckhce, Cab1e; Backr;,e, Hydraulic l� cu yds bucket
and under -�egardless of �ttGch�ent, cne oiler for 2 or 3,
two oilers for 4 through 6) ; Backh_oe, Ilydraulic over 2 cu
yds; Cableway; Cr�ne, CYawler or ?'ru�k; Crane, Hydraulic -
Truck or Cruise� mounte�?, 16 tons anri cver; Crane,
Locomotive; crane with boom including j_b over. 100 ft from.
�in to pin; Crane using roc;c sock_et tcoi; Cerrick, Steam;
D�rric;k Car and Derrick Boat; U_ragline, ? cu vds and over;
D-red~e: da'1, Crawler or. r;-"e mourte�; T.c�o�otivF, Gas,
y Gra L
Stea_r. & other powers; Pile llriver, Lard er Floatin�; Scoop,
SkiIC'��•..22"; Ji10�'21, Fower ,EZeCt'_"'iCj �dS� 5t.E3i:: O� Ot71:Y'
7�0'v:cYS� � JhOVCl� POW2T' ��i Cll `y'�S eP.Cl OVET;� ; .`��.W1C�1'i �C?t;
�:h��r�'�ev; Air Tagge-r witt-i air c�mpresscr; Ar_chor F_a�--::g
Barge; Aspnalt Spreaker; Ar_ney �'o�ce Feeder Loau2r,
self-tirepelled; Backfilling Machine; Boat Operat�r - Fush
Boat or Io�� L�oat (jo� site) ; Boiler, High Pressure Break=�ng
ir. Period; Boom Truck, Placing or Erectir,g; Boring Machine,
Footing Foundation; Bullfloat; Chcrry Picker; Combir.at=-on
Concrete Hcist and D.i�er +,such as Mixermobilej ; Compresscr,
T�.�c 125 CFM and and�r; Compressor, Two through Four over
125 CFM; �ompressor wnen ocerator runs -_hrottle; Concrete
Bre�ker (iruck cr �ra�tor mounted) ; Concre�e Punip {such as
Pumpere�e mach-_ne; ; Ccnc-ete Saw (self-p�opelledj ; Cor.c�ete
SpreaGer; �onveycr, Large ;not selfpropelled) hoisting or
movinc brick and cencrete inte, or into and on floor 1ece1,
one or both; Crane, Ci:nbing (sucn as Linden) ; Crane,
Hydraulic - Rough "errain, self-�ropelled; Crane, Hydraulic
- Truck or Cri:;�ser :m�our.teu - under 16 tons; Driiling
machine - Self-powered, used for earth or rock drilling or
bo=ing (wagor. dr-�lls and ar_y hand dr,�lls obtaining power
from other souces inc-��dir_g c�n�rete breakers, ;ackhammers
and Barco equipmr_et r.o engineer requ_red} ; Eleva�ing
Grader; Enqine P�ian, Dredge; E�cavator cr Powerbelr_ Machine;
Finishing Machir.e, sel�- propelled oscillati-±g screed;
rorklif'�; Gener�to-s, T�No through Six 30 KG, or over;
Grader, Road with power blade; Greaser; Highlift; Hoist,
Concre�e and Brick (Brick caUes or concrete ski_Us operating
or on tower, Towermcbile, or similar eGuinment; ; Hoist,
Three or mo_�e drums in use; Hoist, Stack; Hyuro-Hammer;
Lad-A-Vator, hoisting bricK or corcrete; Lcad�ng Mach-�ne
sucn as Barber-Greene; I�7echanic on job site
http:/Iwww.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mol.r6 7/26/2012
Page 10 of 31
GROUP 2: A-_r Tugger with plan� air; Boiler (fcr power or
heating sheii of building or temporary enclosures in
connection with construction work) ; Boiler, !emporary;
Compressor, One over 125 CFM; Compressor, truck mounted;
Conveyor, Large (not self- propclled) ; Conveyor, Large (not
self- propelled) moving brick and concrete (distribut?ng)
on floor levei; Curb Finishing Machine; Ditch Pavinq
P�lacYiine; Elevatcr (outside) ; Endless Chain Hoist; Fireman
(as required) ; Form Grader; Hoist, One Drum regardless of
size (except brick or concrete) ; Lad-A-Vator, cther
hoisting; P�anlift; Mixer, Asphalt, over 8 cu �t capacity;
Mixer, one bag capacity or ]_ess; Mixer, without side
loader, two bag capacity or more; Mixer, with side loader,
regardless of size, not Paver; Mud Jack (where mud jack is
used in conjenction with an air compressor, operator shall
be paid $ .55 per hour in addition to his basic houriy rate
for covering both operations) ; Pug Mill operator; Pump,
Sump - se1= powered, automatic controlled over 2"; Scissor
Lift (used �or hoisting) ; Skid Steer Loader; Sweeper,
Street; Tractor, small wheel type 50 HP and under with
grader blade and similar equipment; Welding Machine, One
over 400 amp; Winch, operating from truck
GROUP 3: Boat operator - outboard motor, job site; Conveycrs
(such as Con-Vay-It) regardless of how used; Elevator
(inside) ; Heater operator, 2 througn 6; Sweeper, Floo-r
GROUP 4: Crane type
HOURLY PREMIUP�tS:
Backhoe, Hydraulic 2 cu yds or iess without oiler - $2.00;
Crane,climbing (such as Linden) - $.50;
Crane, Pile Driving and Extracting - $ .50
Crane with boom (including job) over
100 ft from pin to pin - add $.O1 per foot
to maximum of $4 .00j ;
Crane, using rock socket tool - $ .50;
Derrick, diesel, gas or electric hoisting material
and erecting steel (150 �t or more above ground) - $ .50;
Dragline, 7 cu yds and over - $ .50;
Hoist, Three or more drums in use - $ .50;
Scoop, Tandem - $.50;
Shovel, Power - 7 cu yds and over - $ .50;
Tractor, Tandem Crawler - $ .50;
Tunnel, man assigned to work in tunnel or
tunnel shaft - $ .50;
Wrecking, when machines are workinq on
second floor or higher - $ .50
----—-----------------------------------------------------—-
ENGI0513-006 05/Ol/2011
ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY, CP.PE
�IRARDEAJ, CARTER, CLARK, COLE, CRAWFORD, DENT, DUNKLIN,
G�SCONADE, HONIELL, IRON, KNOX, LEWIS, MACON, MADISON, MARIES,
MARION, MILLER, MISSISSIPPI, MONIiEAU, MONROE, MONTGOMERY,
MORGAN, NEW MAURID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS,
PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST.
FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNODI,
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 11 of 31
SHELBY, STODDARD, TEXAS, WASHINGTON, AND WAYN� COUNTIES
Rates Fringes
POL^72.� �Qll1.pIi PRt O.r'i2?"��LOrS:
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ L4.89 21.33
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 24 .59 2�.33
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 24.34 2,_.33
GROLP 4. . . . . . . . . . . . . . . . . . . . .5 20.69 2'_.3�
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt finishing machine & trench widen�ng
spreader, asphait plant console operator; autogracer;
automatic slipform paver; back hoe; blade operator - all
types; boat operator tow; boiler two; central mix concrete
plant operator; clam shell operator; concrete mixer paver;
crane operator; derrick or derrick trucks; ditching
machine; dozer operator; dragline operator; dredqe bocster
pump; dredqe engineman; dredge operator; drill cat with
compressor mounted on cat; drilling or boring machine
rotary self-propelled; highlcader; hoisting engine 2 active
drums; launchhammer wreel; locomotive operator standrad
guage; mechanics and welders; mucking machine; piledriver
operator; pitman crane operator; push cat operator;
guad-trac; scoop operator; sideboom cats; skimmer scoop
cperator; tre.^.chino mach_ne operator; truck crane, shovel
operator.
GROUP 2: A-�'r�me; asphalt hot-mix silo; aspnalt roller
operator asphalt plant fireman (drum or boiler) ; asphalt
plant man; asphalt plant mixer operator; backfiller
operator; barber-greene loader; bcat operator (bridge &
dams) ; chip spreader; concrete mixer operator skip loader;
concrete plant operator; concrete pump operator; dredge
oi]er; elevating graded operator; fork lift; grease fleet;
hoisting engine one; locomotive operator narrow guaqe;
multiple compactor; pavement breaker; powerbroom
self-propelled; power shield; rooter; slip-form finishing
machine; stumpcutter machine; side discharge concrete
spreader; throttleman; tractor operator (over 50 hp) ; vainch
truck; asphalt roller operator; crusher operator.
GROUP 3: Spreader box operator, self-propelled not aspnalt;
tractor operator (50 h.p. or less) ; boilers one; chip
spreader (front man) ; churn drill operator; compressor over
105 CFM 2-3 pumps 4" & over; 2-3 light plant 7 .5 KLvA or any
combination thereof; clef plane operator; compressor
maintenance operator 2 or 3; concrete saw operator
(self-propelled} ; curb finishing mancine; distributor
operator; finishing machine operator; flex plane operator;
float operator; form grader operator; puqmill operator;
rill2r operator other than hiqh type asphalt; screening &
washing plant operator; siphons & jets; subgrading machine
operator; tank car heate-r (combination boiler & booster? ;
ulmac, ulric or similar spreader; vibrating machine
operator; hydrobroom.
GROUP 4: Oiler; grout machine; oiler driver; compressor over
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 12 of 31
=05 C�M cne; conveyor operater or_e; ~�a-ntenance o�erator;
puT.c 4" & over one.
FOOTNO��'E: HO�JRLY PREMIUMS
Backhc2 nydraulic, 2 cu. yds. or ur_der l�ithout e-. Ier - $2.0�
Cert=�f=-ed Crane Operator - $1.50;
Ccrtifi_ed Hazardous Material Operato~ ,�1.5G;
Crane, cii�.bing (such as �inden} - $0.50;
C-~ane, �,�le driving and ex�rac'�ing - $0.50;
Crar.e, with bocm {izcluding ;ib) over 1C0' �ro� p_n to pin
aGd SO.Oi �er foot to maximum of $4 .00;
C�ane, using rock socket tool - $0.50;
Derr-_:.k, diesel, gas or elec�ric, hoisting materia'� and
erecting steel (150' or more above the grourd; - SC.50;
Dragl�_n�, ? cu. yds, and o-ver - $0.50;
Y:oist, thre2 or more drums in use - $0.5C; Scoop, T_andeT� -
$0.50;
Shovel, pcwer - 7 cu. yds. or more - $0.5G;
Tractor, tandem crawler - $0.�0;
Tur_re'_, T.an assig�ed to faork in -.unnel or tur_nel sraft -
YC.5O;
G�recking, wh�a T�a�hiae is wor;{ing on second floor or h�g�:;er -
Y0.5C;
----------------------------------------------------------------
EN��G5�3-00� C^/�4i2011
ST. LC�-S CIi� A�IC CGDNTY
Ra:es Frirges
�ower equipment c�erators:
GROLP 1. . . . . . . . . . . . . . . . . . . . .$ 29.11 21.�6
GR.OUP 2. . . . . . . . . . . . . . . . . . . . .$ 29.11 21.�6
GROUP 3. . . . . . . . . . . . . . . . . . . . .5 27.21 21.36
GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 23.7:, 21.36
POWER EQU-FMEC:`� CFEt�.�,'��'CRS CL;SSIFICATIONS
GRGUP l: Backnoe, catile or hydraulic; cableway; c-ane
crawler or trucY.; �rane, nydraulic-�ruck or cruise� mour_ted
16 tor.s & over; crane locomotive; derrick, steam; derrick
car & derr��cY. k;cat; draqline; dredge; gradall, crawler cr
tire mour_,ted; �c�cr.'.ot��ve, gas, steam & o'�her pcwe_�s; pi'_e
d-�iver, lar.d or fleat,�ng; scoop, skimmer; shovel, power
(steam, aa�, ele�tri� or other powers) ; swi�ch boat;
whirley.
GROUP 2: Air tugger wiair compressor; anchor-placine barge;
aspha�t spreader; athey fcrce feeder loader (self-
propelled) ; ba�kfilling machine; backhoe-loader; boat
operator-pusr b�at or tcw boat (job site) ; boiler, high
p�essure break-�ng in period; boom truck, placing or
erectir.a; bor_ng machine, footing foundation; bull- float;
cherry picker; camb�.nation concrete hoist & mixer (such as
mixer mobile`, ; compressor (when oper.ator r�sns t�rottle) ;
concrete breaker (tru�k or tractor mounted) ; concrete pump,
such as pump-crete ma�h;ne; concrete saw (self-propelled) ,
concrete spreader; conveycr, larqe (not self-propelled) ,
hoistir_g or moving br=�ck and concrete in�o, or into �nd on
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012hno 1.r6 7/26/2012
Page 13 of 31
flocr level, one o� both; crar.e, nydraulic--'�ough terrain,
self-propelled; crane hydrau'_i�-truck or cruiser
mounted-under_ 16 tons; dri�ling macnines, self-powered use
for earth or rocc drilling or boring (wagon drills r.d -any
hand drills obtaining pocaer =roT: other sources includir.c
concrete breakers, jackharuriers and barco equipment-no
engireer requi�edi ; elevGtir_c arader; engineman, dredqe;
excavator or po��erbelt machir_e; fin-shing macnine,
self-propelled oscillating screeu; ferklift; grader, road
w�t� poYrer blade; highlift. greaser; hoist, stac;c,
hydre-haruner; loading machine {such as :^ar'tier-greene) ;
machani�, on �ob si�e; mixer, pipe �.rap?�ing machines; p1Gr_t
asphalt; ^lant, concrer.e p-oducirg or ready-miy �ob site;
plant heating-�ob si�e; plant :r�ixina-jo� site; plant power,
generating-�ob site; pumps, two through s;�x self-po�r.�ered
cver 2"• pumps, electric subme�sible, twc tnrcugh six, o•ser
4"; cuad-track; rotler, asphalt, top or sub-grade; scoop,
tractcr drawn; s�reader box; sub-graaer; t=_e tamper;
tractcr-crawler, or wneel type with or without po�.yer uni-"
power take-offs and attachmen�s regardless cf size;
trenching ^��achine; t�anne]. boring machine; v_brating machine
auto��atic, automatic propelled; weldinq rnach�_nes ;gasoline
or d��ese-i t�ao throagn six; well drilling rnacr=ne
GROUP 3: Conveyor, large (no'-� self-propclledj ; ccnveyor,
l�rge (r_ot se�f-crcpelled) moving b-�ick �r_d concret2
distributing; �n flcor level; mixer two c:� mcre TM.:xers of
cr_e bag capacit_y er 1Gss; air �ugger w/plant air; boiler,
for power er rieat;�ng �n �onstruction projects; boiler,
temporary; compresscr ;n:ounted on truck; curb �inishing
machir,e; ditcr. pav=�ng machine; eleva+or; endless crain
noist; rorm arade-r; h�ist, cne drum rega-rdless o` s�ze;
lad-a-vator; mar_��ft; ��-�-xer, asphal�, ove-r � cu. -t.
capacity, witl-iout s-�de ieader, 2 bag capaci'=y or more;
mixer, caith side lca�er, regardless of size; puq mili
operator; pump, sump-sel'-pew�red, automatic controtled
over 2" during use in conr.ection with cons�ruction work;
sweeper, street; welding machine, one over �00 amp. ; winch
operar.ing from truck; scissor '-ift ;used for hoistingj ;
tracto�, small wheel type 50 h.p. & ander with grader blaae
& similar equipmer.t; O�ler on dredge and cn truck c-�ane.
GROUP 4: Boat operator-cutboar^ *notor (;ab sire; ; cenveyor
lsuch as con-vay-it) regaruless cf hcr: used; sweeper, florr
EiGU'_�LY PREI7IUNIS:
Backhoe, hydraulic
2 cu. yds. or under without oiler �2.00
Certified Crane Ope�ator 1.50
Certified Hazardous Material Operator 1.50
Cra~�e, climbing (such as �inder.; .50
Craae, pile driving and extractir.g .50
Cranc, with boom (including jib) over
100' (from pin to pin) add $.O1
per foot to maximum of 4•��
Crane, using roc;c soc:set `ool .50
Derrick, diesel, gas or elecrric,
ho_sting material and erec�inq steel
(i50' or more above ground) .50
Dragline, 7 cu. yds. and o�rer .50
http://www.wdol.gov/wdol/scafiles/archiveldavisbacon/2012/mo l.r6 7/26/2012
Page 14 of 31
Ho-st, t�:ree (.5) or mcre d_urns ;�n ��se .50
Scoop, �'andem •5�
ShoJe�-, pcwer - 7 cu. yds. or more .50
Tract�r, tandem crawler .5Q
Iunn�'_, nan assigned �o wo_k ir_ tunnel
or tunne= shaft •5�
v�reck-'�ng, whe� machine is wcrkir.q en
se�onc f"�oor or higher •���
----------------------------------------------------------
IR.��N0010-v�_2 J�101I2012
Rates Fringes
Ironworkers:
ANDRE�7, ATC�IISON, BARTON,
BA1ES, BENTCN, CALDWE�L,
GP.N_GEN, CA3RCLL, CEDAR,
CHARI^lON, C�RISTIAN,
�LINTGN, COCPFR, DADE,
DAT,LP.S, DAVIESS, DF KALB,
GEN_RY, GR^�N�, GRUNDY,
HP_RRISON, H�NRY, HICKORY,
HOL�', HO`rIARD, LACLEDE,
L_NV, LIVINGST�N, MERCER,
�ONITEAU, MC�GF�N, NODAWAY,
FET1'IS, POLK, PUTNAM,
RP_i�IDLOPtl, ST. CLr'�IR,
SAL=NE, SULLIV.�N, TANEY,
VERNGN, WEBST�R, t�IRIGHT
and �NORTH Counties and
�crtio�s of ADAIR, BOONE,
ULACCV, MILLER and RANDO�DH
Ccunties. . . . . . . . . . . . . . . . . . . .$ 26.00 25. 60
BUCHANAN, CASS, CLAY,
JACKSON, JOHNSON,
LAF�?�ETTE, PLATTE fiND RAY
C�unties. . . . . . . . . . . . . . . . . . . .$ 29.00 25. 60
----------------------------------------------------------------
�RON032�-002 08/O1/2009
DOJGLAS, HCVJELL and OZARK COUNTIES
Rates Fringes
Iron•,�orker. . . . . . . . . . . . . . . . . . . . . . .$ 18. 10 "'�.2. 34
---------------------------------------------------------------
=RC�;0396-004 Ol/02/2012
5T. LCUIS (City and Coun�y) , ST. CHARLES, JEFFERSON, IRGN,
FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FF�P.NCO-S, STE.
GENEVIEVE, and REYNOLDS Counties; and portions o� �viADiSON,
FERRY, BGLLINGER, UTAYNE, and CARTER Counties
Rates Frir.ges
Iron•r;orker. . . . . . . . . . . . . . . . . . . . . . .$ 31.98 ^_o,l-,
----------------------------------------------------------------
IRCN0396-009 O1/02/2012
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 15 of 31
AUDRAIN, CALLAWAY, COLE, C�AW�ORD, DENT, GASCONADE, MARIES,
MONTGOMERY, OSAGE, PHELPS, PIKE, YULASKI, TEXAS and WRIGHT
Counties; and portions of BOONE, CF,MDEN, DOUGLAS, HOWELL,
LACLEDE, MILL�R, MONROE, OREGON, SHANNON and RALLS Coun�ies
Rates Fringes
Ironworker. . . . . . . . . . . . . . . . . . . . . . .$ 2i.51 19.55
----—--------------------------------------------
IRON0577-005 08/O1/2011
P.DP.IR, CLARK, KNOX, LEWIS, NiRCON, MARION, MONROE, RALLS,
SCHUYLER, SCOTLAND, AND SHELBY COII�ITIES
Rates Fringes
Ironworker. . . . . . . . . . . . . . . . . . . . . . .$ 24.00 16.31
---------------------------------------------------
* IRON0589-004 06/O1/2012
BARRY, JASPER, LAWRENCE, MCDONALD, NEWiON AND STONE Counties
Rates Fringes
Ironworkers: . . . . . . . . . . . . . . . . . . . . .$ 22.70 12.28
----------------------------�--------------------
IRON0782-003 05/O1/2012
CAPE GIRAR�r�73U, MISSISSIPP�, NEW MADRID, SCOTT, & STODDARD
Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN,
MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties
Rates Fringes
Irorworkers:
Locks, Dams, Bridges and
other major work on the
Mississippi and Ohio River
only. . . . . . . . . . . . . . . . . . . . . . . .$ 2.9.39 20.03
All Other Work. . . . . . . . . . . . . .$ 23.67 17 .�9
-------------------------------------------------
LAB00042-003 03/07/2012
ST. LOUIS (City and County)
Rates Fringes
LABORER
Plumber Laborer. . . . . . . . . . . . .$ 28•87 12.62
-------------------------------------------------
LAB00042-005 03/07/2012
ST. LOUIS (City and County)
Rates Fringes
LABORER
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 16 of 31
Dynamiter, Fowde~mar.. . . . . . . .$ 29.37 �2.62
Laborers, �laggers. . . . . . . . . .$ 28.87 12.62
4drecking. . . . . . . . . . . . . . . . . . . . S 28.75 12.62
--------------------------------------------------------------
LABG042�-002 0�/O1/20G9
Ratcs Frinqes
LABORER
P.DAIR, AUDRF�IN, BOONE,
��LLAWAY, C�RITON, C�ARK,
�OLE, CGOP�R, HOV7ARD,
IR^vN, KNOX, L'�WIS, LINN,
`�lA�ON, Iv.ADISOU, 1`�RION,
M_LLER, �ONITEAU, MONRQE,
PERRY, PIKE, FJTNAM,
RALLS, RP.NCOLP:I, REYNOLDS,
ST. FFiANCCIS, ST�.
GENEVIEVE, SCHUYL�R,
SCO^_LP.ND, SHELBY AND
SULLIV'AN COUN_'�ES
GROUP 1. . . . . . . . . . . . . . . . . . . .$ 24 .56 9.29
GRODP 2. . . . . . . . . . . . . . . . . . . .$ 25.16 9.29
BOLLINGER, BCTLER, CAPE
GIF.ARDEAU, CP_R^_ER,
C�WFORD, DEN�', DliNKLIN,
GASCONADE, HOLvELL, ^"�RI�S,
T�IISSISSIPP�, CdEG: NIIDR.iG,
OREGON, OSA6E, PENIISCOI`,
PHELPS, PDLASKI, R�PLEY,
SCOTT, SHF.NNON, STODGP.RD,
TEXAS, 6�It�SHINGTON P.ND
WAYNE CQliNTIES
GROU� 1. . . . . . . . . . . . . . . . . . . .$ 24.50 9.29
GROUP 2. . . . . . . . . . . . . . . . . . . .5 25.16 9.29
FRANKLIN COUNTY
GROUP 1. . . . . . . . . . . . . . . . . . . .$ 26.Oi 9.29
GROUP 2. . . . . . . . . . . . . . . . . . . .$ 2E. 6i 9.29
JEFFERSON COUNTY
GZOUP i. . . . . . . . . . . . . . . . . . . .5 26.06 9.29
GROUP 2. . . . . . . . . . . . . . . . . . . .5 26.66 a.29
LINCOLN, I�IONTGOMERY AND
VIARREN COONTIES
GROUP 1. . . . . . . . . . . . . . . . . . . .$ 24.81 9.29
GROUP 2. . . . . . . . . . . . . . . . . . . .$ 25.41 9.29
ST.CHARLES COUNTY
GRCUF 1. . . . . . . . . . . . . . . . . . . .$ 27 .33 9.29
GRCUF 2. . . . . . . . . . . . . . . . . . . .$ 27.3� 9.29
LABORERS CLA�SIFICATIONS
GROUP 1 - General laborer-flagman, carper.ter terders;
sa'aTander Tenders; Dump Man; Ticicet Takers; ioading trucks
ur_der bins, :�oppers, and conveyors; track man; cement
handier; dum� man on earth fill; georgie buggie m.an;
materia-� bat�h nopper man; spreade� on asphalt machine;
mater;_al mixer man (except on manholes) ; co=fer uams;
riprap pavers reck, block or brick; scaffolds over ten feet
not se�.�-supported from grouad up; skip man on cor.crete
pavir.,; w-re mesn setters on concrete paving; all work in
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mol.r6 7/26/2012
Page 17 of 31
COriri2CL10i1 W1�r1 S2w�T� b�idteY'� CJdS� U�"aS0_i i pa�� O_.i� uY�?1P,3�'�
pipe, cor_duit pipe, tile and duct lines ar.d ali other pi.ce
lines; power tcol cperator; all worK in cornectior_ ti�ith
hydraulic or generai dr�dging operations; form setters,
puddlcrs (pGvinq �nly) ; straw blcwer nozzlemar.; aspY�a��t
plant plat=orrt man; chuck tender; crusher `eeder; men
handling creosote t-_es cr creosote ma�eriGls; men work_ng
wi�h ard handlir_c ep�xy material; toppe� of star.dir.g trees;
feeder man or. �•:�ood pu'_ver'_zers, board and willow mat
weavers and cabelee t>ers cn ri-ver work; d2ck hards; pi�'_e
dike and revetmer_t work; a�'�l la'wcrers wo-�king on
underground tunnels =ess tha� 25 ft. where compressea a�r
is no� used; abutemer_t ana v--er hole men workina six (6;
ft. or more belcw ground; z�en wcrkinq in coffer dams �cr
bridge p�.ers ar.d `ooting in the r_iver; barco �ampe-r;
jackson or any otrier si�ilar tamp; cu�ting rorch man;
liners, cu�b, cu�ters, :itch ] ;�nes; ho: mas_ic kett_lemer.;
hot �ar applicato�; har.d b-'_adc operator; mortar reen or
brick or block mar.holes; rubbing concrete, air tool
opera�or under 65 lbs. ; caulker and lead man; chaii� or
concreLe saw under 1� h.p. ; s�gna�- Gan; Guard rail and sicr.
erectors.
GROUP 2 - Skilled laborers - J�brator man; asphal� rake-•�;
head pipc layer on se�-ver wo�k; batterboard man on pipe ard
ditch vaorx; cliff sca'lers work'_n, frcm bosun's chai�s;
scaifolds or plctforms on �.�a-rs or power plan�s over 10 ft.
'-�ig�; air tool ope-a�_or over 65 ''_bs. ; s�ringline man on
concrete paving; sardblast mar.; -�aser beam man; v�agan
drill; churn d�ill; air track dr=_-_i and al1 other simila~�
type drills, gunite nozzle mar; pressure grout man; screed
ma� on asphalt; conc=ete satia 15 h.p. and o�er; yrade
checker; strigline m�n on electranic qrade contrcl; manhole
builder; dynamite inan; powder mar.; w�?der; tunnel man;
waterblaster - 1000 psi o� ocer; asbestos and/cr hazardous
waste removal and/or disposal
--------------------------------------------------------------
LABC05�9-005 05/C1!2012
Rates :ringes
LABCRER {ANDR�I^�, ATCHIS�JN,
FtiCHP_'VAN, CALDt^IELL, CLINTON,
D??VIESS, %ET•tF1LB, GENTRY,
GRJNDY, HARRISON, HOLT,
LIVTNGSTO�I, �1�RCER, PIODAWr�Y
and ��GRT� CGUNTIES. }
GROJF 1. . . . . . . . . . . . . . . . . . . . .$ 23.89 __.39
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ �4.24 -i1.39
LP.BGRER (BP_RRY, BI�RTON,
BA'�ES, BENTCN, CAMDEl`I,
CARRCLL, CEGAR, CHRISTIAN,
DPDE, DALLP_S, DOUGLAS,
GREENE, HE�1RY. HIC�ORY,
JASPER, JOHNSOV, LI3CLEDE,
LP_itiREP�CE, �9CDGNALD, I�10RGF�iQ,
NEWTQN, GZARK, PETTIS, PO�K,
ST.CLAIR, SALINr�, STONE,
TP.NEv, VERNON, 4dEBSTER and
TnTR.IGHT COUNTIESj
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 18 of 31
G3CUP 1. . . . . . . . . . . . . . . . . . . . .` 22.2�i li.z�::
GR.CUP 2. . . . . . . . . . . . . . . . . . . . .5 22.�9 11.2�
LABCRER (,LAr:=�YET`PL CvUi�_'.�)
GRGUP 1. . . . . . . . . . . . . . . . . . . . .a 23.�9 11.�9
GROJP 2. . . . . . . . . . . . . . . . . . . . .$ 2� .14 11.�9
LABORERS CLA�SIFI�A�ICC3S
GRQC,P -_. General Laborers - Garpe:�ter ter,ders; sa'-amander
ter_aers; loading t�ucks under bins; hoppers & conveycrs;
track �.en & all other ger.era- -ia:orers; air tool o��rator;
cemer.t handler-bulk or sack; :~uT.p man cn earth ti,_l;
ceorg�e buggie man; material batch hopper man; mater=_a-'_
mixer r.lan (e�;cept on marho�es; ; ccffer dams; riprap pavers
- rcck, b'_•ock or brick; signa_ man; scaffolds over ter f�et
not seif-supporLed from grour_u up; skipman on concrete
paving; ��-ire mesh setters on corcrete paving; all work ��n
connectien with sewe�, water, qas, gasoline, oil drairage
pipe, cor.duit pipe, tile ar.d duct l;_nes and all other p:p�
lines; po�er tool operator, all work in �onnection 4eith
hyd-�aulic �r g2neral dredqing operati.ons; psddle-rs (pGvir_g
only) ; straw blower noz.:lemar.; aspha?t plant pla�form man;
chuc:� tender; crus_�er feeder; mer. rand�-ng creosote ties or
creosote rnaterials; men wo=kina with and handling epoYy
ma�eri?1 or ^.at2rials {whe_~e special prot�ction is
requiredj ; rucb=_r_g concrete; topper o� standing �rees;
ba'��er bo�_d man on pipe and ditch work; feeder man on wood
pulz�e�izers; board and vaillow ma� weaz�ers and cable tie_rs
on river we-k; aeck �anda; pile dike ar_d revetmen-.. work;
all labo_~ers saork=�ng cn underground tur:r.c'�s --ess than 25
feet where compressed air is no� used; abut^.ent a�d pier
�ole men iaorkir.g six ('o) feet or more below grcund; men
working in co�-=er dams for bridge pie=s and fe�tings in the
ri��er; ditchlirers; vressure grou�men; caulker; chain or
concre�e saw, cli=fscalers working from sca=foids, bos�ans'
chairs or platforms cn dams or power plants cver ;10) feet
above ground; mortarmen en brick or block mar.hc--es; toxic
and 'nazardous waste work.
C-RCJF 2: Sk� lled Laborers - :Iead pipe laye= on sewer work;
laser beam man; Jackson or any other similar tamp; �utting
t�.r�h man; form setters; liners and stringline men on
cen�rete paving, curb, gutters; hot mas�ic kett]e;nan; hot
tar aotilica�or; sandb'�asting and g���ite nozzlemen; air tool
cp�rator in tunnels; screed ,<<an cn asphal� machir_•e; asphalt
raker; �3YCO tampe-r; churr. dr.i'�ls; air track d=i11s anc. all
s'_�:;�'-ar drills; vib�ator r.�an; str;�ngline man for electrcni:-
arade centrol; manhole builaers-bri�k or block; dyr_ar:.ite
ar.a pcwder men; grade checker.
--------------------------------------------------------------
LABOC663-002 04/Ol/2011
CASS, CLAY, JACKSON, PLr�TTE P.ND RAY �OUNTIES
Rates Fringes
LABORER
GROC;P 1. . . . . . . . . . . . . . . . . . . . .$ 26.64 12. 49
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 27.85 12.49
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 19 of 31
LABOR�RS C�ASSIFICP.TIONS
GRCDP 1: Gene�al labor�rs, Carpen_er ter_ders, salamander
te�ders, loading tr�ck� under bir.s, hoppers and �o�veyors,
track men and G11 other �eneral laborers, air tool
operator, cement har.dler (bul� or sack) , cha-n cr concre�e
saw, deck hands, dump mar. on ?arth fill, Georgie Bagg�es
.m,an, material ba=ch hopper ^�.an, s��ale mar., mater--al mixer
man ;ex�ept on manholes) , ccffer dams, abutmer.ts and pier
h�'-e T,en :�orkir.g below grcund, r-prap pave�s rock, black or
br_ck, signal ztian, sca��olus over ten feet not
se�f-su�.,crted from g�our�c uo, sk�-pman cn concrete tiavi�g,
wire mesh setters on cencretc= pav;�ng, a11 wo�k in
connect=_cn �ith sewer,water, cas, gas�linq, oil, �ra_nage
pipe, cenduit pipe, �ile ar,d duct lines and a17. other
pipelines, po�s�er �ool cperator, a�l work in connect-�cn with
hydr�ulic or general dredgir.q operations, straw blower
nozzleman,asc'�ialt plan` plat_"orm r�.an, �hac:'�c tender, crusher
=eeder, rnen handliag creosote ties on creosote materiais,
men work=�rg with and handling epoxy :naterial or materiais
(where specia-i �rotection is �equired) , topper of star_u=_ng
trees, batter board man on pipe and d,_tcn work, feeder man
on wood pulverizers, board and wi11o�,� T.at weavers and cab'-e
tiers or_ river wcrk, dec;c hands, pile d�ke and re��etmert
vacrk, all laborers working on undergrovr_d tunnels less thar
25 feet where compressed ai-f is not used, abutmen-� and pier
hole mcn taork�ng six ;6) fee� cr more be-�ow gro�sr.d, men
wc�kiz�g in co=�2r dams for bridqe pie�s and footings in the
ri�er, ditch�lrers, Nressure qroutmen, caulker a:d chain or
coner=te saw, c�i--ffscalers working f�om scaff�lds, bosuns'
chairs o- plat�cr:ns cn dams or power plants ovnr (10) feet
abave ground, mortarmen on bricx o= bloc;c T.anholes, signal
man.
GROC7P 2: Sk=-11ed Laborer - spreader or screeu man on
asphal� machire, aspha-'_t raker, grade checker, vibrator
man, concrete saw over � np. , las?r beam man, barce tamper,
jackson o-r any otrer G�m; lar tarno, wagon d_i11er, c'nurn
drills, air track dril-s and other similar dril;s, cutting
torch man, fo:m setters, liners and stringlir.e men cn
concret� paving, curb, gutt�rs and etc. , hot mast�-c
ket}leman, ho� ta= appl;ycatcr, na�d blade operators, mcrtar
men on bric:�c o_r b1_ock manc�-'�es, sand blasting ar.d gunnite
nozzle men, rubbing cor_crete, air tool operator i.r_ tunnels,
nead pipe layer on sewer wcrk, �an'-��le builder (br�ck or
blcck) , dynami�e and pawder T.er..
---------—----------------------------------------------
P�_N0002-002 O9IV1/200/
CLARK, FFcl�NKLIN, JErFEhSON, LEG��IS, L�NCvLN, IN�pION, PIKE,
RP_LLS, ST. CHARLES, ST. LOUIS (�ITY & COJNTY) , �ND tVARREN
COUNi`IES
Rates Fringes
Painters:
Brush and Roller; Tape�. . . . .$ 2�.61 10.24
High work cver 50 fee�. . . . . ,$ �9.11 10.24
Lead P.:,ratement. . . . . . . . . . . . . .$ 29.36 10.24
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mol.r6 7/26/2012
Page 20 of 31
Pressure Rolle�; High work
under 60 ft. . . . . . . . . . . . . . . . .$ 28.86 10.29
Spray & Fbrasive Blastir.g;
F]a�er Blastinu_- (Over SCOG
?SI) . . . . . . . . . . . . . . . . . . . . . . . .5 30. 6�_ 10.24
Taper (Ames Tools &
Bazooka) . . . . . . . . . . . . . . . . . . . .5 30.2-_ i0.24
--------------------—-------------------------------------
PAIIQ0002-006 04/O1!2G11
ADAIR, AUDRAIN, BOONE, CALLAWP_Y, CHP.RiTGN, COLE, GASCONi-�DE,
HOV7ARD, KNOX, LINN, NIPCON, MONROE, MOI�TGOM�RY, OSAGL�, PUTNFS�I,
�N�OLFH, SCHUYLER, SCOTLAND, SHELBY AND SJLLIVAN COUNTIES and
the City cf Booneville.
Rates `rrir_�:2s
Painters:
Bridges, DGms, Locks or
?owerhouses. . . . . . . . . . . . . . . . .$ 22.8U 10.8�
3rush and Roll; Tapinc,
Paperhanging. . . . . . . . . . . . . . . .$ �0.80 10.87
�poxy or Any Two Part
Coating; Sandblasting;
�tage or other F,erial LVork
- Pla�forms over 50 �eet
high; �ead P.oatement, , , , . , . ,$ 21,80 10.87
Spray; S�ructural. Stee1
(over �0 feet) . . . . . . . . . . . . . .$ �1.30 10.87
Tapers using Ames o-
Comparable Tools. . . . . . . . . . . .$ 21.G5 10.8'
--------------------------------------------------------
PAIN0003-004 04/O1/2011
CASS, C�AY, CLINTON, JACKSON, JOHNSON, LP_FAYETTE, PLATTE & RAY
CCUNTIES
Rates =ringes
Painters:
Bridgeman; �ead AbGtement;
Sandblas�; Storage Bir_ &
Tanks. . . . . . . . . . . . . . . . . . . . . . .$ 29. 93 14 .04
Brush & Roller. . . . . . . . . . . . . .$ 28.31 1�.0�
Drywall. . . . . . . . . . . . . . . . . . . . .$ 28.5� 14.0�
Paper Hange_r. . . . . . . . . . . . . . . .$ 28.�1 14.0�
Stageman; Beltman;
Steelman; Elevator Sha_`t;
Bazoo;ca, Boxes and Power
Sander; SpraymGn; Dipping. . .$ 29.43 14.04
Steeple;ack. . . . . . . . . . . . . . . . .$ 3�.5C 14.09
----------------------------------------------------------------
PAIN0003-011 04/Ol%2011
BATES, BENTON, CALDWELL, CARROLL, COOPER, DAVIESS, GRJNDY,
HARRISON, HENRY, LIVINGSTON, MERCER, MONITEP_U, N_ORGAV, PETTIS &
SALINE COUNTIES
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 21 of 31
Rates F_ringes
Painters:
Bridgeman; Lead Abaternent;
Sandblas'�; Stor.age Bin &
Tanks. . . . . . . . . . . . . . . . . . . . . . .5 24.06 ��4.04
Brush & Roller. . . . . . . . . . . . . .$ 22. 6i -'-�,�q
Drv�,aa11. . . . . . . . . . . . . . . . . . . . .$ 22.84 "_4.04
PaU�r Hanger. . . . . . . . . . . . . . . .$ 23.07 14. 04
Stageman; Beltman;
Steelman; Ele�Tator Shaft;
Eazcoka, Boxes ar_d Power
Sander; Sprayman; Dipping. . .$ 23.56 1��.04
Steepleja�k. . . . . . . . . . . . . . . . . 26.�2 14.04
—-------------------------------------------------------—--
PAIN0098-002 05/O1i2010
ANDRE��', ATCHISON, 3UCHANAN, DE KP_LB, GENTRY, HOLT, IQODh�'dAY &
�dORTH COL'NTIES
Rates Fringes
Painte�rs:
B�ush & Roiler. . . . . . . . . . . . . .$ 24 • 93 ll.17
Sandblaster. . . . . . . . . . . . . . . . .$ �5.4� ll.li
Steeplejack. . . . . . . . . . . . . . . . .$ 27 ,4� ±1.17
------------------------------------------------------------
PAIN0203-001 C4/Ol/2010
BARRY, BARTON, �EDAR, C�RISTIAN, DF�DE, DALLP.S, DOUGLAS, G�EENE,
HICKORY, HOWELL, JP.SFER, LAPIB-�NCE, MCDOIQALD, NE'vJ`�'C�], CZ�RK,
?OLK, ST. C�AIR, STGNE, TA�1'�Y, VERNON, WEBS'�ER, and DdRIG:3T
COUNTIES
R.ates =ringes
Pain�ers:
Finisher. . . . . . . . . . . . . . . . . . . .$ 19. 09 11.06
Painter. . . . . . . . . . . . . . . . . . . . .5 19.26 11.49
Sandblaste_r, I�igh �Iar,
Spray Man, Vinyl Han�er,
Tool Operato-. . . . . . . . . . . . . . .$ 20.26 11.4G
----------------------------------______------------—----------
FAIN1265-Q03 Q9%Cl/2G11
CANL'EN, CRAWFORD, DENT, LACLEDE, M.ARIES, MILLER, PHELPS,
FULP_SKI FiND '1'EXAS COUNTIES
Rates Fr'�nqes
Pa,-nters:
Brush and Roller. . . . . . . . . . . .$ 29 .25 11.71
Flcor Work. . . . . . . . . . . . . . . . . .$ �4 .7� 11.71
Lead Acatemen�. . . . . . . . . . . . . .$ �6.�0 11.71
Spray. . . . . . . . . . . . . . . . . . . . . . $ 25.75 11.71
Structural Steel,
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 22 of 31
Sandblasting and Al1 Tank
Work. . . . . . . . . . . . . . . . . . . . . . . .$ 25.50 11.`]1
Taping, Paperhanging. . . . . . . .$ 25.25 11.71
-----------------------—--------------------------------------
PAIN1292-002 09/O1/2011
BOLLINGER, BUTLER, CArE GIRARDE[�U, CARTER, DUNKLIN,
MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, REYNCLDS,
RIPLEY, SCOTT, SHANNON, STODDARD and WAYNE COUNT�ES
Rates Fringes
Pairters:
Bridges, Stacks & Tanks. . . . .$ 27.99 10.39
Brush & Roller. . . . . . . . . . . . . .5 23.Q9 i0.39
Spray & Ai�rasive Blasting;
Waterblasting (over 5000
PSI) . . . . . . . . . . . . . . . . . . . . . . . .5 25.04 10.39
Height Rates (All Areas) :
Cver 60 ft. $0.50 per hour.
Under 60 ft. $0.�5 per kiour.
---——--—--------------------------------------------------
PAIN1292-003 09/0]/2011
�RON, MADISON, ST. FRANCOIS, STE. GENEVIEV'F and WASHINGTON
COUN'I'IE5
Rates Fr_inges
Painters:
Bridges, Stacks & Tanks. . . . .$ 27.99 10.39
Brush & Roller. . . . . . . . . . . . . .$ 23.64 10.39
Spray & Abrasive Blasting;
Waterblasting (Over 5000
PSI) . . . . . . . . . . . . . . . . . . . . . . . .$ 25.64 10.39
Height Rates (All Areas) :
Over 6C ft. $0.50 per hour
Under 60 ft. $0.25 per hour.
----------------------------------------------------------------
* PLAS0518-006 03/21/2012
BARRY, BARTON, CEDAR, CHRISTIAN, DADE, DALLAS, DOliGLAS, GRE�N�,
HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK,
POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER, AND WRIGHT
COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER. . .$ 22.06 8.74
--------------—---------------------------------------------
* PLAS0518-007 04/01/2012
CASS (Richards-Gebaur AFB only) , CLAY, JACKSON, PLATTE AND RAY
COUNTIES
http://www.wdol.gov/wdollscafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 23 of 31
Ra�es Fringes
Cement Masons: . . . . . . . . . . . . . . . . . . .$ 29.24 14.38
----------------------------------------------------------------
* PLAS0518-011 04/Ol/2012
ANDREW, ATCHISON, BATES, BDCHANNAN, CLINTON, DEKALB, GENTRY,
HEDIRY, HOLT, JOHNSON, LAFAYETTr�, NODAWAY & WORTH COUN`�IES
Rates Fringes
CEMENT MASON/CONCRETE FIi7ISHER. . .$ 31.08 16.15
--------------------------------------------------------------
PLASQ527-001 09/06/201�
Rates Fringes
CEI�7ENT MASON
FRANKLIN, LINCOLN AND
WARREN COUNTIES. . . . . . . . . . . . .$ 27.53 14 .9E
JEFFERSON, ST. CHAkLES
COUNTIES AND ST.LOUIS
(City and County) . . . . . . . . . . .5 28•70 14.56
----—-------------------------------------------------------
PLAS0527-004 06/01/2011
CRAVJFORD, DENT, IRON, I�DISON, N�RION, PHELPS, PIKE, PULASKI,
RALLS, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SHANNON, TEXAS,
WASHINGTON COUNTIES
Rates Fringes
CEMENT MASCN. . . . . . . . . . . . . . . . . . . . .$ 25.54 14.48
----------------------------------------------------------------
FLAS0908-001 05/Ol/2011
BOLLINGER, BUTLER, �APE GIRARDEAU, CARTER, DUNKLIN, HOWELL,
MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, RIPLEY,
SCOTT, STODDARD, AND WAYNE COUNTIES
Rates Frinqes
CEMENT N`�ASON. . . . . . . . . . . . . . . . . . . . .$ 24.25 12.40
---------------------------------------—-------------------
PLAS0908-005 03/Ol/2010
BENTON, GALDWELL, CALLAt^7AY, CAMDEN, CARRdLL, COLE, DAVIESS,
GASCONADE, GRUNDY, HARRISON, LIVINGSTON, MACON, MARIES, MERCER,
MILLER, MONTGOMERY, MORGAN, OSAGE, PETTIS & SALINE COUNIIES
Rates Fringes
CEMENT MASON. . . . . . . . . . . . . . . . . . . . .$ 25.08 9. 60
---------------------------------------------—---------------
* PL[7I�0008-003 06/O1/2012
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 24 of 31
CAS�, CL[��, JfiC:;�ON, JOfiN�ON, A�1D P;�i�TTE COOPd���E5
Ra�es Fr,�nges
Plumbers. . . . . . . . . . . . . . . . . . . . . . . . .$ 3i .45 20.4-i
----------—--------------------------------------------------
P=UM000&-Oi7 QE/Cl/20-�"'�
BATES, BENTON, CP_RROLL, H�NRY, LAFAYETTE, CiORGP.iJ, PETT�S, RAY,
S1. CLAIR, SF�L=I�'E AND VERNON COUNTIES
Ra�es �rir_ges
Plumbers. . . . . . . . . . . . . . . . . . . . . . . . .$ 34 .36 2G.41
-------------------------------------------------------------
?�UM0045-003 09l01/2C"_"-
ANDRES^7, ATCHISC'�, BU�HANAN, CALD"vd�LL, CLINTON, DAVIESS, DEKALB,
GENTRY, HARRISON, HOLT, NODAWA� AND VJCRTH COUIQTIES
Rates Fringes
Plumbers ar.d Pipe-itters. . . . . . . . .$ 33. 10 i8. 1G
--------------------------------------------------------------
PLU�1C178-0O3 11/C1/2011
BARRY, CEDF:R, CHRIS�IP.?�, DADE, GALLAS, DOUGL�S, GREEtar.,
:-i1C{ORY, LAC�,EDE, L?:inRENCE, POLK, ST0�1�, TAN�Y, t^7EBSTER AND
k7RIGHT COUNTIES
R.ates -ringes
Plumbers and Pipefitters. . . . . . . . .5 26,75 14.32
-------------------------—----------------------------------
FLUD401?8-U06 11/O1/2011
BARTON, JASPER, [�ICDONALD AND NE4�"_'ON COUN�InS
Rates Fringes
Flumbers and ?ipefitters
Projects $i50,G00 & ur.der. . .$ 23.7II 14.32
Pro;ec�s ever $750,OG0. . . . . .$ 26.75 14.32
----------------------------------------------------------------
PLUMC533-Q04 Ob/Ol/2011
BATES, 3ENTOT], CARRCLL, CASS� CLAY, HENRY, HiCKCRY, J�CKSON,
JCH�ISCN, LAFAYETTE, MORGAN, PETTIS, PLAITE, RAY, SALIN�, ST.
CI:AIR AND VERNON COUNTIES
Rates Fringes
Fipefitters. . . . . . . . . . . . . . . . . . . . . .5 39.58 19.0?
-------------------------------------------------------------
PLUr70562-00� O1/01/2012
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 25 of 31
ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CE�LLAWAY,CAMDEN, CAPE
GIRARDEAU,CART�R, CEARITON, CLARK, COLF, COOPER, CRA�AFORD,
DENT, DUNKLIN, FRANKLIN, vASCONADE, GRUNDY, HOWARD, HOWELL,
IRON, JEFFERSON, KNOX, LEWIS, LINCGLN, LINN, LIVINGSTON, N�.CON,
fdADISON, MARIES, MARIOI3, MERCER, MILLER, MISSISSIYPI, MONITEAU,
MONROE, MONTGOMERY, NEbV MADRID, ORLGON, OSAGE, PEMISCOTT,
PERRY, PHELPS, PIKE, PULASi{I, PUTNA^�, RALLS, RANDOLPH,
REYNOLDS, RIPLEY, S'P. CHARLES, ST.FRANCOIS, STE. GENEVIEVE, ST.
LOUIS, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD,
SULLIVAN, TEXAS, WARREIQ, WASHING�ON,AND WAYNE COUNTIES.
Rates Fringes
Plumbers and Pipefitters
Mechanical Contracts
includirg all piping and
temperature control work
$7.0 million & under. . . . . . . .$ 32.91 17.79
Mechanicai Contracts
including a11 piping and
temperature control work
over $7.0 million. . . . . . . . . . .$ 39.25 23.18
--------------------------------------------------------------
PLUM0562-016 O1/Ol/2012
CP.MDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIES, MILLER,
1�10NITEAU, OSAGE, PHELPS, PULASKT, ST. CHARLES, ST. LOUIS (City
and County) , WARREN and WP.SHIPdGTON COUNTIES
Rates Fringes
Plumbers
Mechanical Contracts
including all piping and
temperature contro- work
$7 .0 million & under. . . . . . . .$ 32. 91 17.79
Mechanical Contracts
including all piping ar.d
temperature control work
over $�.0 million. . . . . . . . . . .$ 34.25 23.18
-------------------------------------------------------------
TEAM0013-001 05I01/2010
Rates Fringes
Truck drivers (ADAIR, BUTLER,
CLARK, DUNKIN, HOWELL, KNOX,
LEWIS, OREGON, PUTNAM,
RIPLEY, SCHUYLER AND SCOTLAND
COUNTIES)
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 25.84 9.85
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 26.00 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 25.99 9.85
GROJP 4. . . . . . . . . . . . . . . . . . . . .$ 26.11 9. B5
Truck drivers (AUDRAIN,
BOLLINGER, BOONE, CALLAWAY,
CAPE GIRARDEAU, CARTER, COLE,
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 26 of 31
CRAWFORD, DENT, G1ISCONADE,
IRON, MACON, MAD?SON, MAR�ES,
MARION, MILLER, MISSTcSIPFI,
MONROE, MONTGOMERY, NEW
NIADRID, OSAGE, PEMTSCOT,
PERRY, PHELPS, PIKE, PULASKI,
RALLS, REYNOLDS, ST.
rRANCOIS, STE. GENEVIEVE,
SCOTT, SHANNON, SHELBY,
STODDARD, TEXAS, WASHINGION
AND WAYNE COONTIES)
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 26.57 9.85
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 26.?3 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 26.72 9.85
GROUP 4 . . . . . . . . . . . . . . . . . . . . .5 26.�4 9.�5
Truck drivers (FRANKLIN,
JEFFERSON and ST. CHP.RLES
COUI�3TIES)
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 28.93 9.85
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 29.04 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .5 7_9.08 9.85
GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 29.15 9.85
Truck drivers (LINCOLN and
WARREN COUNTIES)
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 27.58 9.85
GROUP 2. . . . . . . . . . . . . . . . . . . . .5 27.69 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 28.73 9.85
GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 27.80 9.85
TRUCK DRIVERS CLASSIFICATIONS:
GROUP 1: rlat Bed Trucks, Single Axle; Station Wagons;
Pickup Trucks; Material Trucks, Single Axle; Tank VJagon,
Single Axle
GROUP 2: Agitator and Tr�nsit Mix Trucks
GROUP 3: Flat Bed Trucks, Tandem Axle; Articulated Dump
Trucks; Material Trucks, Tandem Axle; Tank Wagon, Tandem
Axle
GROUP 4 : Semi and/or Pole Trailers; Winch, Fork & Steel
Trucks; Distributor Drivers and Operators; Tank t�Iagon,
Semi-Trailer; Insley Wagons, Dumpsters, Half-Tracks,
Speedace, Euclids and other similar equipment; A-Frame and
Derrick Trucks; F1oat or Low Boy
---------------—-------------------------------------------
TEAMOd56-001 05/Ol/2010
Rates Fringes
Truck drivers (ArIDREW,
BARTON, BATES, BENTON,
CALDWELL, CAMDEN, CARROLL,
CEDAR, CHARITON, CHRISTIAN,
CLINTON, COOPER, DADE,
DALLAS, DAVIESS, DEKALB,
DOUGLAS, GREENE, HENRY,
HICHKORY, HOWARD, JASPER,
LACLEDE, LAWRENCE, LINN,
http://www.wdol.gov/wdal/scafiles/archive/davisbacon/2012/mo l.r6 7i26/2012
Page 27 of 31
LIVII�GSrON, v10CviiEAU, MC�GAN,
NEWTON, PE'rIS, FOLK,
RP.NDOLPH, ST. CLAIR, SALINE,
VERNON, WEBS'�ER AND JdRIGHT
COUNTIES}
GROliP i. . . . . . . . . . . . . . . . . . . . .$ 2n.2' 9.85
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 26.53 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 26.42 9.85
GRQUP 4. . . . . . . . . . . . . . . . . . . . .Y 26.54 °.85
Truck dricers: ;A"�CH=SO_�,
BARRY, GENTRY, GRliNDY,
H�-,RF.ISON, FiOLT, `fCDONALC,
P�IERCER, NODAWAY, QZARK,
STONE, SULLIVAN, 'iAi\'EY ??i�D
WORTH COUNTIES}
GROUP 1. . . . . . . . . . . . . . . . . . . . .:. 2�.54 9.E5
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 2�.?0 9.85
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 2�. 69 9. ��
GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 25.81 9.85
Truck drivers; (BtJCHANAN,
J�HNSON ATQD LAFAYETTE
COUNTIES)
GkOUP 1. . . . . . . . . . . . . . . . . . . . .$ 27.48 9.�5
GROUP 2. . . . . . . . . . . . . . . . . . . . .5 27.59 9.85
GkOUP 3. . . . . . . . . . . . . . . . . . . . .$ 27. 63 9.85
GRQUP 4. . . . . . . . . . . . . . . . . . . . .$ 2?.?0 9.�5
T�L'CK DRIVER CLF�SSIFICP.TIOI��S
GROUP l: Flat bed trucks sirgle ax1�; station wagons; pickup
�rucis; material trLcks sina'_e axle; tank wagons single
axle.
GROU? 2: Agi�ator �nd tYansit T�-_x-trucks.
GRO[JP 3: _�lat bed trucks tar.dem axle; articulated dump
trucks; ma_erial trucks tandem �xle; tank wagons tandem
axle.
GRCUP 4: Semi and/or pole traile�-s; w,-nch, fcrk � steel
trucks; distributor drivers & operators; tank wagons semi-
trailer; insley wagons, dumpsters, hal�-tracks, speedace,
euciids & o�her simila� equipment; A-�raT,es and derrick
tracks; floa'� or low boy.
--------------------------------------------------------—---
TE?�M0245-QOl 03/26j2012
BARRY, BARTON, CF��iDEN, CEDAR, CYRISTIAN, �P.LLAS, L'�'V�, DOJGL�S,
GREENE, HICKORY, HOWE�L, JASPER, LACLEDE, LAWREN�E, P✓CDO�`1ALD,
AIILLER, Nr�taTON, CZARK, ?HE�,PS, PO:�K, PULASKI, SHl-,I�NON, �'i'GNE,
1?�NEY, TEX�S, `dERN02d, L�EBSTER AND [��RIGHT COUN`�IES
Rates rr-nges
Truck drivers:
Traffic Conr_rol Service
Dri�Ter. . . . . . . . . . . . . . . . . . . . . .$ 20.45 C.00
PAID HCLIDAYS: New Year's Day, Decoration Day, Ju1y 4th,
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/201 Z
Page 28 of 31
�a'r�o~ Day, �"hank.sgiving Day, Ch~istmas uay, e�_loyee' s
b;-rtrday ar_u 2 �erscnal days.
-------------------------------------------------------------
T�NLL��o=��i-ccl c��o_��o�,�
CASS, CLP.Y, JACKSOV, PLATTE AND I�Y COUIQTIES
Rates �'ringes
Truck drivers:
GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 29.i6 11. 65
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 29.19 11.65
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 28. 57 11. 65
1'RUCK DRIV�,RS CL�:�S-"-Ca'�'IGi'�
GROCIP l: C1ec'��r_-cs ar_d ��ve-ders, Field; A-Frame vow Boy-Boom
ruck Dr�ver.
GROUP 2: A_�-c�:-_atea Dur.�� -ru�k; Insley Wngons: Dump Trucks,
Excav�tina, � cn yds an:: ever; Dumpsters; Half-Tracks:
Speedace: Euclids & s_m��lar excav�ting equipmen� blateYial
�rucics, Tandem Two teaTs; Seni-':'railers, ti^Iinch trucks-r'ork
trucks; Distributor Driv2rs and Cperators; Fagi'-�a�o� and
Transit Niix; Tank slaccr_ Dr��ers, Tandem or Semi; One Team;
S'�a�ion Wagor_s; Pickup ^rucks; Material Truc:�cs, Sinqle
Axle; Tank Wagor_ Dr�vers, S-�ng'_2 �le
G�OUP 3: Gilers ar_� Greasers - Field
----------------------------------------------------------
* T�PM0682-002 G5lO1/�Oi2
ST LOUIS CITY AND COliNTY
Rates Fringes
Trsck dri��ers:
G�OUP 1. . . . . . . . . . . . . . . . . . . . .$ 30.605 8. 69+a+b+c+d
GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 30.805 8.69+a+b+c+d
GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 30.69 3. 69+a+b+c+d
a. P�NSION: 5%1/201� - $1E2.�C p�r week.
b. HAZMFT PREi✓fIUP✓: I� Hazmat cert-_f;��atica cn a job si�e is
req�.�ired by a state or �edera'� ager_�y or r�quested by
projec+ owner or by tre employer, e;;�pioyees cr. that �ob
site shail receive $1.5G premium pay.
TRUCK DRIVERS CLt�.SSIFICATIONS
GROUP 1 - Pic:�-up trucks; forklirt, s_ngle axle; flatbed
trvcks; job site ambular:ce, ar_d tracks or tra-�1ers of a
water level cap�city of 11.99 cL. yds. or less
GROUP 2 - Trucks or traile_Ys of � water level capacity of
12.0 cu yds. up to 22.0 cu yds. including euc'_i�s, speedace
and similar equipment of same capacity an� ccr.pressors
GROUP 3 - Trucks or trailers oi a water levei �apacity of
22. � cu. yds & over including euclids, speedace & all
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo l.r6 7/26/2012
Page 29 of 31
=loats, flatbed trailers, baom t�ucks, w'�r.ch tru�:ks,
ircluding sma11 trailers, farm wagons tilt-tc� tra=�lers,
field o�f;_c2s, tool _railers, concrete pu��.cs, corcr�te
concey��rs & gasoline tank _railers and truck r^.ounted me'�ile
concrete �,ixers
r 00Ti�?O1'E FOR '�RJCK DRIVEZS:
,.. PAID HOL-GA_'S: C_hr; stm�s Day, Indeper.cer.ce Day, La�-�r
Day, Mer.ier_a'� Cay, Vet�rans �ay, New Years Day,
Thanksgiving �ay
d. P�ID VACA^ICN: 3 days paid vacation for 600 hours �i
Se?"ViC2 ly dIly OL'i� ..OP.tT'�CL y?3T�i � C�d�%S paid VcCGt10T'i 20T
&00 hours of serv�_�� i� any cnP con�rac* year; 5 days pa-�d
v�ca�ior. �or �, 000 h�urs of ser�ice in any or.e cor_tract
yea_~. I�dhen such an �T:p-_cyee has completed 3 years of
continuous emp�'�oymc-nt w�-tn the same einployer and then wozks
the abo�ae recu-_red nur.ber of hours, he shall receive double
=he number of days of vacation specified above. taheii such
an cmployee has co�-.p��_eted ��0 years of con`�inuous employmer:t
wi�h the same e;nploy�r and tn�n works thc a�ove -equired
number of r.ou.r�, he shal'� rece=�.ve tri�le the number or days
of �=acation �pec=---ed above. v�h�n such an employee has
comple-�ed 15 years o= cor.t--nucus employr.ien� with �he same
elTlplO}'�t d17C1 tri2i� G�'OTKS tl"i� dbOVc required riUIT1�JET O� �'1011TS�
he shall receive 4 tiTM.es tre r.u�.ber ct days of �*acation
specified �bcve.
----------------------------------------------------------------
1r��,LDE�S - Receive rate prescribed for :raft performi�g
o�eration to �ahich welding is incidenta�.
Unlisted classifica�ions r.eeded =or work not incladed witnin
the scope of �he classiiications listed may De added atter
award only as provided in the labor star_dards contract cla�sses
;29CFR �.� (a) (1) (ii> ) .
--------------------------------------------------------------
The :^ody of each wage de.ermination lists tre �_ass�-f�catior.
and wage rates �ha` haee been found to be preva-�-!ing fcr the
c-ted type (s) of construc�ion in tne are� covered by the wage
deterr::ination. The classifications are li�ted ;_r alphabet=-ca,�
erder of "identifiers" `hat indicate whether the particu-iar
rat� is union or non-union.
Union �dentifiers
Ar_ --d�ritiFi�r enclosed in dotted lines beginning with
characters otner than "SU" deno�es that =he unior
class�_fi�ation and rate ha�e found to be prevailincr �or that
ciass,wficaticn. Example: PLUM0198-005 07/Ol/2G11. The
i�rst four letters , PLUI�1, ind�cate the inte-ratior_al unior and
the four-digit number, 019�, tha-. follows indicates the local
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2412/mo l.r6 7/26/2012
Page 30 of 31
11i.1CIi i:liT.'�'JEi OT C�15�T�1Ct C0�1;;�1i T1UPtibE= "t']77Er2 3���_-C3"J1�' �
i.e. , PluT,b2rs Lo-�al 0193 . The next number, C05 in thc
ex�mple, _s an --nternal nurnber used in process�ng the wage
determirat'_cn. The date, 07i01/2011, folloti�ir.g trese
char�cters is the effective date of the most current
negoti-at_ed ratei co�-iective bargaining ag�eement �,h�_ct-: would be
July i, 2011 in the abcve example.
Unicn pre-vaiiing wage rates will be upda`�ed to reflect any
changes in the ccl'�ective bargai.ling agreements cevernir.g the
ra�e.
Non-Union Iden�i=�_er�
Classificatior� 1=�sted under an "SJ" iden�ifier were de�i�e�
from sureey data by cc:nputing average rates and are not Lrion
ra�es; however, the data used �n c�T��uting �hese =ates may
include both union and r.on-unicn data. �xample: SULA2004-00�
5/13,12010. SU indicates the rates are not union rates, LA
indicates �he State o= Lo�:is�ar.a; 2004 is the year of the
sur-vev; and 007 is ar -�r.terrai nuT�ber used in producing the
wage dererminatior.. P. 199� or =ater date, 5/13/2010, indicates
tne classifica�ions ar.d rates unAer that identi=ier �-�rere issued
as a General Wage Determir�.atior. on that date.
Survey wage �a'�es will remair. ir e�P�ct and will not change
�ntii a new survey is cor_ducted.
------------------------------------------------------------
ititiGE DETERMINATIOiv �rFFALS FnO���j
_. ; :�as there been an initial decisior. in the r.tatter? This can
be:
� a� existing published wage determinatior.
* a survey underlying a wage determinatior_
* a TNage and FIour Division letie� setting fcrth a cosi.tion on
a Nage determina~i�n matl.er
x a cenfermance (addi�ional classification ar_c rate; ruling
Or survey related mat�ers, ini�ial cor.tact, ir_clud�ng requests
ror sur�:aries of surv2ys� should be with the Waae anu Y,oar
R.e�:.ona-� Cffice for :he area in which the survey was conducted
becaus� tnose Regio�al Ofiices have respor.sibility fcr tne
Davis-Baccn ssr-vey program. If '�he response �rom trr�s ;-nitial
contact --s not satisfac`�ory, �hen the process descr;�bed in 2. )
and 3. ; should be followed.
Witr regard to any other ma``�er not yet ripe _`or the =or�a'-
proc��s ^escribed 'nere, ini'�ial con`�act should be with the
Bran�h of �enstr�action V]age �eterminations. �drite to:
Branch of Coastruction Wage Determinatiors
TN3�2 and Hour Division
J.S. �e�artment of Labor
200 Constitution Avemie, N.N].
Wasnington, DC 20210
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo 1.r6 7/26/2012
Page 31 of 31
2. ) If the ar.swer to the questien ir. 1. } is yes, then an
intereste� party (tnose affected by the action> can request
review and recansidera:ion from the Wage and Hour P.dministrator
(See 29 CFR Aart i .t3 ar.c1 29 CE'k Part 7) . Write Co:
Waqe and fiour �?dministrator
U.S. Uepartment of Labor
?.�0 Const?tution Aver.ue, N.W.
4aasi�:ington, DC 2021C
'rile rec.;uest should be accompanied by a full sr.atrment of the
interestea party's position ar.d by any iniormat?an iwagn
�ayment data, project descrip�ion, area practice material,
etc. ) that the requestor c�nsiders relevant ta L'ne issue.
3. � Zf the decisian of the Administratar is not favorabi.e, an
inLeresled par:y may appeal directly to the Admini_strative
Reviecv ��ard tfcrmerly the Wage Appeals IIoard) . V7rir_e to:
Administrative Review Board
U.S. Department of Labor
'L00 Censtituti�n Avenue, N.n'.
h'ashin�tan, DC 20210
4 . } A11 cieeisions by tne Acimini�trative Review Board are final.
E:PiD OF uENEt`�L, ��CISION
http:/Iwww.wdal,gov/wdol/scafilcs/archive(davisbacon/2012/mo I.rG 7f2612012
.
Page 1 of 5
M0120006 MOD 6 REti'IS�;� 06/15/1'l M06
******** THIS WA^v� GETuRMiNATION WAS REPL:ACED ON 06/i5/12*#**�r*'�
General Decision Number: h1412U006 06/Ol/2012
Su�erseded General Decis.ion Number: MO?_Q100066
State: Missouri.
Constructir�n �'ype: &uilding
County: Cape C�irardeau Coun�y in Missauri.
SUTT:.DTNG C�NSTRUCTION FRCJECTS (c#oes not include si::�1F f3mily
homes or apartments up to and includinq 4 stories) .
Modification Numbe?- Publication Date
0 OI/06/2.012
1 Ol/13/2012
2 02/03/2012
3 03/02/2012
4 0�/0612012
5 OS/OA/2012
6 06I01/2012
ASE3E�001-006 10/03/2011
Rat�s E'ringes
ASBESTC?S E^7C�RK�.'R1HER,T & FRJST
INSGI�AT�R. . . . . . . . . . . . . . . . . . . . . . . .5 36.76 1�3.Ft1
---------------------—---------------------------------------
BRI�;00�?_3-0�1 06/UI/?_Gli
Rates ['ringes
BRICKI:A'.✓ER. . . . . . . . . . . . . . . . . . . . . . .S 2"I.72 8.13
BF.M00023-Q03 O6/OI/2011
RatEs I'rinqes
TiLE SETT�k. . . . . . . . . . . . . . . . . . . . . .5 27.?2 8.73
--------------------------------------------------------------
CARP0014-QOl 05/Q1l241Q
Rat�s Fringes
Cf1RPENTER (Ineludirq Fcrm��ror�:) . . .S 21 .88 12.19
----------------------------------------------------------------
C�RP1310-005 09/01/2011
Rates rringes
CRRPENTER (Floor Layer)
(Vinyl Installation Only} . . . . . . . .$ 29.UB 12.9�
---------------------------------------------------------------
* EL�C0001-003 06/01/201�
Rates Fringes
http://www.wdol.gov/wdoUscafiles/arcluve/davisbacon/2012/mo6.r6 7�?G�?�1�
Page 2 of 5
ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .5 3i.?5 22. 3i
----------------------------------------------------------------
E��,EV0003-001 01/O1/2012
Rates F=inges
ELEVATOR MECHANIC. . . . . . . . . . . . . . . .$ 43.345 23.535+a+b
a. VACATION: Employer cort�ibutes 8% �f basic �7ourly ra�e as
vacation pay c=edit �or mo:~e thar_ 5 years of ser�Tice; and
6% for 6 months to 5 years oi S2rV1C?.
b. FAID HOLIDAYS: New Year's D�y, Menorial Day, Independence
Day, Labor Day, Veterans' Day, Thar_ksgiving Day,t:ze Friday
after ThanxsgiJing Day and Ch�istmas Day.
----------------—-------------------------------------------
LNG10513-014 05/Ol/2d11
Rates Fringes
PGWER E4UIPMENT OPERATOR:
Backhoe/Excavator/Trackhoe. .$ 25.81 21. 43
Bulldozer. . . . . . . . . . . . . . . . . . .$ 25.81 21.43
Loader. . . . . . . . . . . . . . . . . . . . . .$ 25.81 21. 43
Paver. . . . . . . . . . . . . . . . . . . . . . .$ 25.81 2�.43
Roller. . . . . . . . . . . . . . . . . . . . . .$ 25.81 2"�.43
---------------------------------------------------------------
TRO�I0782-008 05/O112012
Rates Fring2s
IRONWORKER, REINFORCING AND
STRUCT�RAL. . . . . . . . . . . . . . . . . . . . . . .$ 23.87 17.79
---------------------------------------------------------------
LABOliO4-001 03/O1/2012
R�tes Frirges
LABOR.ER
Brick Mason Tendcr. . . . . . . . . .$ 21.38 10.52
Commcn or General &
Landscape. . . . . . . . . . . . . . . . . . .$ 20.06 10.52
----------------------------------------------------------------
PLAS0908-002 0�/Ol/2010
Ra�es Frirges
CEMENT MASON/CONCR�TE FINISH��. . .$ 20.40 "15.00
-—----------------------------------------------------------
PLUM0562-�11 Ol/Ol/2012
�ates Fringes
PIPEFIT^lER, Inclndes HVAC
Pipe Tnstallation
Nechanical Contracts
incl�sding all piping and
temperat�re control work
$7.0 million � uzder. . . . . . . .$ 32. 91 17.79
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/201 Z/mo6.r6 7/26/2012
�
Page 3 of 5
P!echanical Contrac`�s
inciuding all piping and
tem�erature control worx
over $7. 0 million. . . . . . . . . . .$ 34.25 23.i8
PLUMBER, Excludes HVAC Pipe
Instailaticn
Mechanical Contracts
inc'_uding all �iping and
temperature ccntrol aaork
S7.0 _.._llicn & under. . . . . . . .$ 32.91 17.79
Mechan�cal Contracts
ir.clud-ng all piping and
temperature ccntrol work
over $7. G million. . . . . . . . . . .$ 34.25 23.18
--------------------------------------------------------------
ROOF0002-0�1 G6/O1/2010
Ra�es Frinaes
ROOFER. . . . . . . . . . . . . . . . . . . . . . . . . . .5 20.25 9.52
-------------------------------------------------------------
SFMOC669-003 Q4/O1i2012
Rates Frir_qes
SPRINKLER FITTER (Fire
Sp_rir.'.�c�ersj . . . . . . . . . . . . . . . . . . . . . .$ 30.52 18.40
-------------------------------------—-----------------------
SHEE0036-Q17 02/Ol/2011
Zates Fringe�
SHEET METAL b�JORKER, -ncludes
HVAC Duct ar.d Spstem
Installatior. . . . . . . . . . . . . . . . . . . . .$ 3�.Ro 21.20
-------------------------------------------------------------—
SUM02010-G05 C3/C8/2010
Rates rringes
OPERATOR: Grader;Blaae. . , . . . . . . .$ 22.8D 10.78
PAINTER: Brush Only. . . . . . . . . . . . .$ 16.44 6.01
PAINTER: Roller. . . . . . . . . . . . . . . . .$ 16.44 n".Ol
PAINTER: Spray. . . . . . . . . . . . . . . . . .$ i8.?9 8.12
TRUCK DRIz�'EK: Dump Truck. . . . . . . .S 2�.57 0.00
----------------------------------------------------------
WELDERS - Recei�e rate prescribeu ior �raft pericrming
operation to which weld�ng _s �ncidenta=.
Unlis�ed classificatior.s needed =or work not included within
the scope of rhe classiiications listed may be added after
award only as provided in the labor �tan.�'..ards contract clauses
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo6.r6 7/26/2012
Page 4 of 5
(29C�R 5. 5 (a) (1) (ii? ) .
----------------------------------------------------------------
Tne body of each waqe determir_ation �ists t:~�e ciassification
and wage rates that h��re beer� f�und tc 'tie pYevailing for the
ci`�ed _ype(s! of ccnstructior_ �n the area covered by �he wage
de'�ermination. 1'he classificaticns are iisted in alphabe}icai
order of "iden�ifiers" that ir.uicat� whether. the par`icular
ra`�e is union o� non-union.
Union Identifiers
An iden�ifier enclosed in dotte� iines begin�ing wi�h
CY1dYdC���2YS O�l'lA'_" triGTl ���U�� denotes that t:l? ''.1ri10T'l
classificatior and rate have �ound t� pe prevailing for that
classifica`ion. Ex.ample: PLliM0198-005 0?/O1/201i. The
iirst four i.etters , PLUI�1, indicate the iriternational union and
the four-digit number, 0198, that fo'�icws indi-�ates the local
union number or district council r_umber where apnlicable ,
i.e. , ?lumbers Local 0198. The next number, 005 in tne
example, is an internal number used ;-n precessing the wage
determina`ion. The date, G7/O1/2C1"_, fol�cwing tnese
�harac�ers is �he effective date o� the mcst current
nego��ated rateicollective barcainir.g aqreement .anich taould be
Ju1y l, 2011 in Lhe above exGmple.
J�ion prevailing wage rates wi11 be upuated tc r�flect any
changes in :he collective bargair.ine a�ree^�.ents gove=ning the
rate.
Non-Union Iden�ifiers
Classifica�ions lis�ed under an "SC" --der_t.ifier were derived
from survey da-�a by computing Gverage rates and ar� nct union
rates; however, �he dat� used in computir.g thes2 rates may
inc]ude both tinion and non-unior. data. Exampie: SULP.2009-007
5i13/2010. SU indica�es *he -�ates are r.ot union rates, LA
�_ndicates the Sta'�e of �ouisiana; 2004 is the year of the
survey; and 007 is an in-�e-nal number used �n prcdu�,_ng the
wage de'�ermina�ion. n 1993 0-� later. d�te, 5/i3i20"'��, ,_ndicates
the classifica�icns ar�d �a*es under that ident'�fier were issued
as a General 4�7age De�ermination on that date.
�urvey wage ra�es will -remain in e=fect ar_c wil-'� nct chanqe
until a new survey is conducted.
-------------------------------------------------------------
PdFGE DETERP�III�ATION APPEP.LS PROCESS
i. ) Has there been an initial decisior_ in the matter? Th-s can
be:
* an existing published wage determir.ation
� a survey underlying a w�ge dete-rmir.atior:
* a Wage and Hour Division letter setting �ortY: a pos�ticn �n
http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2012/mo6.r6 7/26/2012
�
Page 5 of 5
a ��age determina�;on m�:ter
F a co�formance (additional classificatior_ ard ratej ru'_inq
On survey related ma�ters, initial contact, includir_g requests
�'or suT.maries of sur�reys, should be with the �ti'age a;.d Hcur
Regiona-'_ Office for '-:.he area in which the �urvey was conducted
be�ause those Regional Offices inave respor_sibitity =or the
Da-v=_s-Ba�on survey program. If �he response {-om this ��nit-�a'�
contact ��s nct satisfactory, then �he process de�cribed ir 2. ;
and 3. ) should be followed.
Witn regard to any ot�er mat�er r.ot yet ripe for the `ormai
process described nere, initial contact should be with the
Branch of: �cnstruction (�7age Determina�ions. td�ite to:
Brancn of Construction Wage Dete~minations
Wage aad Hour Division
U.S. Department of Labor
200 Co:stitutio� A�enue, N.Gd.
Washington, DC 20210
2. ) �� the answer to the question in l. } is yes, then an
interested �arty (tnose affected by the actioni can reques�
�evie�a and rece.~�sideration frcm the Wage and Hou~ AcL�ninistrator
!See 29 �FR Part l.B and 29 CFR Par� 7) . W�ite to:
Ttiage anci Hour �dmi�is_rator
U.S. Ge�;artme�t of Labor
200 Ccnstitution Ave�?ue, N.ta.
Tniasnington, ;C 2Q210
The request should be ac�ompanied by a full sta�ement oi the
irterest=d party's positicn and by any informa=ion (wage
p�yner.t data, preject description, area prac�ice material,
etc. ) that the requestor considers relevant to �he issue.
3.} If the dec;�.si�n ef the Admi�istrator is no� favorabie, ar_
interested party :nay a�peal directly to the Ad.*nin?stra�ive
Rev,-ew Bcard (formerly the Wage Appeals 3oard? . W-ri�e to:
A::r,=_nistrai.-ve Review Board
U.S. De�artment oz Labor
200 Constitution Avenae, N."v7.
Washingto�, DC 2�210
4. } Al1 decis;_ons :y the Ad�•ninistrative Revie4a Boa=d a~e final.
END OF �EN�RAL LECISIGN
http://wv✓w.wdol.gov/wdol/scafiles/archiveldavisbacon/2012/mo6 x6 7/26/2012
� KCi Constri�ctior� Company
� ':�,i�::
a e u nve
Sf. Louis,MO 63123
(314)894-8888
Fax#(314)89�-7418
w�vw,kciconstructian.com
_�, -----
April 2, 2018
Jacobs
Attn: Mr, P.K. Mathai, P.�.
501 North Broadway
St. Louis, MO 6310�
Re: Job #12002
Cape Girardeau Wastewater Treatment Facility
Change Propasal # 135rev.l - Caulk & Seal CMU Heads on T&M basis
Dear 1VIr. Mathai,
We prapose to furnish the necessary labor, material, tools and equipment to Provide additional
CAULKING OF CMU HEAD , for the incrsased lump sum of Five-Thousand, Five Huncired and
Eleven Dollars (n5,511.00} as perfarmed on a T&M basis.
We have attached a copy of our change proposal estitnate summary and backup for your review.
If this proposal meets with your appraval,please sign the attached copy in the space provided and return
it for our records. By signing this change proposal, you are authorizing us to proceed with the work and
agreeing to forward the appropriate change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
�
� BY= �1�i��'�L����'�y,'
Brent Krueger
Project Manager Date: /� ,/
Attachments
�
n.
¢
N
� } �
� �
O � Q
� N
0. �
w
c7 �
�
� N
U w
u
m
�
�
�
� '1
� 3
c� �
C T �
N �
� � m
� �
�,V„ U `�O
F' t c
� U ;G
> •
.J
u
`� 9_
3 �
a.
� o
A G
� � w
� 2 �
� '� � o
� � o � a
v a z � „ m
0 0 0 0 0 o v, o o v� o �n o 0 o vi c� �+ v ^, �
0 0 0 0 � o ri o o a� o a c o o M m c� c� � E
O O � 00 M O � O O oG O o0 � O O � N v°�l vl v'� ~ U
� Q � N N
N �
N � � � C �
� v ..
m fA F ^ � °'
z V z � a
� o
� � � j o � N
+
o u � � m R E
c� a ^ � N
e e o o e V �p "' OC..
F t ��
N N � � � O m
3 '- � a
C LJ V V C �� Q
C
.Q
�
� f"'
F
C �
O � � �
� �
p N �" u
� � � o � � F y
= o p, ss aci � � _
U �i '_m ... � � � � � n. �i a p �
� _ � z ^ N o � � o � � � � v � _ � � o o e
a � � a � c o a � �n
� O a � � u o � � � o D � o o a Q c9
m o a�3 c�. a ,�' A ^ a �n v a�i '� '° '� ❑ r' 3 '� $ a '" w y Gl �
A o � �n � .� a G o
� � � ^ � � � � u � � C C E E `o .�c `o a v� � o � �
� ` V a o, _n �• e� a, .a ,a, p � a o b � e c c' '� v
_ g ,7 ,� W t� � a�' .5 o W o- � � +� � 4'i a a"i v� a � X ° �
_ y U ^ Cl ,.�` .; O c�. U v� � � W cu `r' O `n O E- u.. S C7 rA V "'� a
U �
°' p^ U
_ o
;� a � }
¢
� � N y
S J ¢
� ° v r �
,� a
G N O
�y vi O � �
��,q � a O � W O ^ O
Y�li u '� y � � cF/1 Q � � b
.SM � q � � O L Q �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � � � �
¢ F
F �
O �
F-
u� 't
Q � o 0 0 0 0 0 0 0 0 0 0 0 0 0
� a � � N N
w z a O
a O o� L
�Q F" W 3
O L
O O o 0
0
0. U
W ¢ � F
� �� a �
W
W
U C7
00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
Q �
� F
4 �
� �3
0
F '�
� � N
O
00 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 ¢
,� `o c" U
CG
P� `�
Q ¢
a �,
�n o �
� �° � 3
o F" w O
� � � �
� o
o �
V N N �
L �
�. 0 'F"�
� � �
�
�
�
F y T N N N N N N (A N Q d � 6 N N N
V � � L � L L L L 'D .0 L t � � C L C'
A
.0
N
��+
r-� �r
F N N
O � N 6�1
E"n � % �
� N � t�.• T
(J V7 �n 7 � '9
� q� � .0 tQ
y Y 'D
O �
A 61 7'r � � � 3 0 o u
T. �n �v+ d y + u
c �° 2 .� � c a. � a� o a� � c�
v `v � .D .�n°�. � � � 3 � o A �l � `n w
� @ c � 3 Z' 3 v� m v�i aci A ` o °' .U.+ U � � o ;c
z R c c u � °= ` �, 'c�i '? � v Q � � a o � `° v: u E >
� � u] .°3 < � � ;? c a. 9 N c n. � w � v u •E ^1 �v .� h
F .c �n W �n .o ? o ,`� au c y m Q c m
� � u u � � c a a � � ;? : � c. e� �a W c F R > o
Q � .� v .� �v o � :: m 9 �a � E �o a, � • � � a a
p�_ n`. ci v'� a '��-, �' a °' a � A ° v � ra o A ° � a a F- a? o 0
� .� v F- E- a ca a d U � Ca � O c7 cU F- u. z a
U� �
� �
p � Q O O O O N O O O O O O O O O N �'1 O O O � O
���� N M �D �O o0 t�l N t'1 O� O O �D t� [� ao 1� <f �/1
w t N O p o 0 0 0 0 o r+ v v v �n �c � �o �o �c �o � � oo rn � cv ri
z_>. � � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v=�' a
o � $ o 0 0 0 0 �
,-.1 � v' N
� r
O �
F V
0 0 0 0 0 0
N p
� ��,
Q C
0. p
U
V p,�,
Q. N
� O O O o O O
F z �
U
� � o
_
o a �
a �
a
U E.. w
Q � �
x
U
N o o � o0 0 0 0 o e
� r,1 � N
G ,D �
� Q ..
Fg F
2 r
�
vi �n o
c•1 N
o F F �
�� z �
x �
0
0 0 0 0 0 0 0 oM
R' o� �n N
O
�
o m
� F
� _ �
�
a o 0 0 0
V w N rn oo — c
O �
� �
� L L v� >+
„7, E �C 'O
n
0
�
�
N
O
S
W
�
r
z o
o �
F �
G �
� �
Uj I�
C7� O
� �
O
Y
r
F
[�
Q� C
� �
a v � cn
-� � aCi °� a�Ci a F
n�__ a �' n v �
��� W rn U � .`� t^
=� o
� m � Q
:� :� O O
.w '�s`P1°. U U
. �S I\VI VVIIJl1UV�IVt1 VV.
, K�' 10315LakeBluffDr. EXTRA WORK OR�DEF
St. Louis,Missouri 63123
�_ (314)894-8888 No CMUgap
Fax No.(314)894-7418 009
'�.i
PROJECT NAME: Cape WWTP pROJECT#: �2002 DATE: 07-17-17
WORK PERFORMED FOR: DESCRIPTION OF WORK:
Supervisory take off order and secure
City of Cape Girardeau WWTP materials �
LABOR
HOURS UNIT COST AMOUNT
1 Journeyman Carpenter 2
u
SUPERVISION: AI N i 1
MATERIAL&EQUIPMENT
SUBTOTAL LABOR
Menards Sificonized Latex Caulk 2 cases $43.79
KCI Constructlon Company COMPANY:
SUBTOTAL MAT&ECiU1P
� TOTAL:
BY:C��?Jj�� APPROVED: OVERHEQD&PROFIT:
GRAND TOTAL:
r � �, ���^ �j r� _ �� r��C' � ; �.
f_ �f(.� �;�, �.��,�_/._�'f-i:;�y �,
�„Y.�.:, . =�= II
e�,,. �,��:� ��kr H�,rr, C..� {' �
,(:.a�`� � ' ' `)' �
t•1�:t i.i t tJ_s t�.s���: (► t t ��i �! �
'►:�!, :� i�:ru�:r�:. I�i iv�► �
i:.�{.)u l31 t �r'�I . t-t(I Ei:31111 �
LL
r:�r� ��-�� ���'..i i��i --
!�t 1t;h"� i'��lli:'i '�n:li`; tii i c,;i:;;;,! �v; �
L !�- i:u1L�1 Uel < i'��-,:a'v�l;i icli��r;:: 1r.� �
�iL� .:ii 1�:�'v lt �k'i n��� �.C� �li ��.r_ j✓IS�
.:�f 3't �l; �I�,Ic il�:t)il :�..�:�"�,cf t1 �h'd �
�ut:,:r� i� i!�., �f,��r turt�l�!
�
r
i� �/Ull ��G�4 tjl.iCa����;p fCv�l�i���%� t��c �
1.11.a.flJ�:: t:-1 ����.� (C4q��'z� ��I�����= �
Er.a 11 u5 ct:
i�FE(r G�iten:l�;�c;t�J.;s.c�=, �
�11'�%1►i1'.�llll�ll:�;l���llflf��l�1��i�
Sa,e Irai:aa,:tt:r�
U�P �1��:� l:�l`4h: L'i.R
�a�u;iJl ('r,�i 1f) 2'd
C�P kl E'A► C�'JLK ��i
�s�aar� r�.r3 ru.2a �
, �
tuT&i �U.�n i
thC �,.;-E GJR�ti-r.1) t,975� 3.23
TuCa� Szi� ,3,79
w15A Lnkti:i 2;:�T�� s3,7`�
P� t iZU02
�li11i Cui�,i;al;;�
LtFS� Inser tec:
aG�OuUC�.Y31 D 1 t;�l l
1C - 9n�u41�;�ic.8t21+.;:��
tu1At �,'UNBtk G� 11Et4� = '1
T�� iGLiQi4lNii H[$ni£ 4iEt;El�iS t;�iiE
FRItl1c�� FL�R IFi�S IR�'i�ACtl��ll:
lt?T
Gu�:t Ccfr
`, if�e Cara��nl�l�r aci;r�:;�le�Bcs cecal�3t i3f
�7�id�I=erYlCcy 1i1 lF!d 1ntd� a�Otril S�iO�>u
��flfr�ll alld aitrecs tG �cr' kha earcf 1s��ier
d�COt��fla lfl 115 CJrfeRt iefui5.
lNiS IS Yl�ii2 Clift►1[ CAND S:�Lt� Slfi'
�LEA:;c RfTA(�+ FC� YUJk A:Cfii��,
h� Hiri�-��ly 1a�y
TN�IHr, YC�t, Y[�Jn CF�iICR, Ciirlstir�:
16ii;� i�c 69c8 0]I{I111 (it:;i(,}t 3?ou
, �■ KCI Construction c:o.
� � ; 10315LakeBluffDr. EXTRA WORK ORDEF
� KC' St. Louis,Missouri 63123
�- (314�894-8888 (�f o CMU GaF
Fax No.(314)894-7418 0�0
`u
PROJECT NAME: Cape WUVTP pROJECT#: 12002 DATE: 07-�$-17
WORK PERFORMED FOR: DESCRIPTION OF WORK:
City of Cape Girardeau 1NWTP infill CMU to twin 'T' gap with foam
LABOR
HOURS UNIT COST AMOUNI
1'ourne man car enter 3 hours
�
SUPERVISION: Ai Nei( 1 hour
SUBTOTAL LASOR
MATERIAL&EGlUIPMENT
KCI Construction Company COMPANY: SUBTOTAL MAT&EQUfP
J TOTAL:
gy;C� . APPROVED: OVERNEAD&PROFIT:
GRANDTOTAL:
�■ KCI Construct�on c;o.
K�' 10315LakeB(uffDr. EXTRA WORK O �'� ���
St,Louis,Missouri 63123 �
�- (3i4) 894-8888 CMU gap
Fax No.(314)894-7418 011
'�
PROJECT NAME: Cape WWTP pROJECT#: 12002 pqTE; 07-19-17
WORK PERFORMED FOR: DESCRIPTION OF WORK:
City of Cape Girardeau WWTP sa ilE thP CMl 1 tn t�A�in 'T' nan at hincnliri�
electric room.
LABOR
HOURS UNIT COST AMOUNl
1 'ourne man car enter
u
SUPERVIStON: � 3 hours
SUBTOTAL LABOR
MATERlA! & EQUIPMENT
Menard's, 2 cs cauik and pfanks for access. 125.56
COMPANY• SUBTOTAL MAT&EQUIP
KG Constructfon Company •
J TOTAL:
gy, APPROVED: pVERHEAD&PROFIT:
GRAND TOTAL:
• .G.+`a uc'r_ �— � -�� �,,.,�)�_,
� ' � - ���'�'�. � ���c�
�
u�e Yuui 2��
eto CARt��,�
xe�nre
G�..`YS:,�:�'
lena rd_, Ca{�t� G l i r�i�cJ
538 � ic�mers I]rlv�;
;{lpe L:i rard , M(7 E�:�7U1
KLEI� �r0uft I;ECEtJ:t`� `
NEIUi1t1 F��1CY V;,htl!`.+ hY PB[iUui'1 IYf�L
Il�;lc�a i�atatl�ela: alla,�,�l�i� rel�uns i;u
t12ms on liils re�:ei�;l ;rill t;r 1n tl�a turai
ul an i�� sloia e+erllt vuu��er 11 ll,c
retu�-n i:; du�ia t,ftrr lU/17/17
It you have c;uesliun; icgardlii� U�c
ch;ir�rs an yuu� receipt, plea;e
L;,;ail us at;
C.AFE1 ronleruiA�n.nard�,cr.-,
.��������������!����i������������l�ii���'.�{;��
Sale iransactfr.n
D�P ALiic: C�UIR i;LR
5635�01 P;(C '�u.26
�rP Alti;+ CrUIK 1,11
565fid75 P�G ?u.28
FLEX SEp� SPRi;Y PIt;11E
5630112 12.88
?"fEH CAH!c i"M!P i,QUf��.l
691<d15 �y,g9
2" ICSER( t��ll �.L�P(ll� .
E!s945_1 1.;'1
2" p'1L O�LI YAL1E rIP
e9S017; 1t.95
�?ROER :oS�l
`tY,10•iu' vl SY{'' -P1Cn
1Q22u�1 ; uy,35 3i.;u
FIID OF OnO�R
101�L Iio.i9
lAX CkPE iilft?it-N;1 1.3t51 9.?�
IOtri SaIE 125.50
UISA CREU1+ 7a13 125.cfi
PO s 1"tL'�3
�ul'n L'c�;z;Uii?o3
Clitp Ir�sertac!
a000u0t1Uir3 l U t i1t71
TC � 1f332c50�392ee�1�
tOTAt hyJli[fER OF 11EM5 = 10
iHE;FDlliriiiNG AE6�lE REt,E[FiS:NERE
PRIlIlEG FOR 1t115 TrZAt�4C11�N; .
1127
_GUESI CAPY
TE� Car�wlcf�r a�.rloaled�i�ca�p�,af fi���:
�oadslaervtcas�tn ti�e`1b�ai a�l�'n�"�n � „
i�e�aori and;agree� ta''=pa�the�"sa �
aCtY�CalP9h�A�t��` -f���9: _ _
�f.3��.
�71iiS��
_,,�;
`�` � '
itY � �
}f!a
�i�
`9.T{J_
'�' S
J�
i�
�'.
��
�"' �'I
-" ��� �� S� u� U �V. E � TRA W4RK ORDE �
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
�- (314) 894-8888 njo �
Fax No. (314) 894-7418 �z
PROJECT NAME: ��1�� �L��T� PROJECT #: � �'�� DATE:� ' � %�� � 7
WORK PERFORMED FOR: DESCRIPTION OF WORK:
C /�Y �� C ,�'��- �r��,�i�� ���a� �/� �t /�c ��;= c��i�
� �'� f`v ����� �������
L= 1 I- c��Ci� l�o6�-i �-- ��«
�j c� if/���i 1 7 ^
LABOR
HOURS UNlT COST AMOUNT
� C '��C�'�`,r/rL-/� ''.TDf'�C�� ` ��.�!r-,� �'
SUPERVISION: < < !'L��" /� � �f
SUBTOTAL LABOR
MATERIAL & EQUIPMENT
KCi Construction Company COMPANY:
SUBTOTAL MAT & EQUlP
TOTAL:
BY: / APPROVED: OVERHEAD & PROFIT:
(.i -� r
GRAND TOTAL:
rr , <.
..
KCI Con�truction Company
__._._____;�_
�
St. Louis,MO 63123
(314)894-8888
Fax#(314}894-7418
ww�N.kciconstrvciion.com
--- --.,..._
�; ,
Ma��ch 1�, 201 S
�aco�s
a��,: r��. �.t�� r��m��, t�,�.
SOl North Broadway
St. Louis, M9 fi310�
Fte: Job#12002
Cape Girardeau Wast�water T'reatment Faci[ity _�
Change Proposal # 136 A ����i�q,���3� �� ���'��'��,,�-���°�� ���
Dear Mr. Mathai,
We propase to furnish the necessary la�or, material, tonls and ec�uipment to perfarm the work
assoicated with RFP#53, maclifi�iations to the dryer system per the DHA report, for the increased
lum�sam �f One Hundred, Forty-One Thousand,Three Hundred ancl Ten Dollars ($141,310.00).
Please note the fo(lowing clarifications associated with this pricing:
Does not include fire suppressian system for baghouse-to be resolved via RFP#54. Addresses it�ms
#7,11,20,26,27 of the DHA on(y. Submittals to be provided frorn Andritz 4-6 weeks after receipt of Change
Order. De(ivery of equipment and material to be 6-8 weeks after submittal approval.
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposai meets with yaur appr�val, pleas� sign the attached copy in the space provided and return
it for our records. KCI requests issuance of a Change Order prior to being requested to proceed.
If you have any questians or comments, please do not hesitate to contact us.
Sincerely, Approved
_--------- By'������- �','
Brent Krueger
Project Manager Date: / ��
Attachments
�
�
�
Q
� � �
� ¢ o
° �
° �
0. w
C7 Q
� � c
u� "'
a
G, �
W �
G� Q
cE y
� C
d L
� U
o �,.,
N � U
c0 C
n� n. > m
p 'a� o �
o F a. o
A �
� � c� a
o � ' x
t >, � E o
°q u .n
� p o 3 y a
�
� 4° x �O � i,
C T � Q � Y O
N � �L„ N �O
� 'U H 4• C i
Q C
4 U O [� ¢ 00 �
F L H N p `� :
�
� U � N `� � ;a
3 � o � o R
,v_ a
� y O
N � "' � � C
' R � r Q � W
3 � � a �
� .� �, � �; �
.o y
a1 � V � O v �
c a
� � �
y O
� �
X `��' � ° a`
C7 �..�j °c y a�i a� a�a
� � E. E . E c
ea'a °: O o v � a� � m
U C1 z � Q v� L1 L
u U
0 0 0 0 0 0 0 0 0 0 � � o 0 0 � � � � o r. ro y
O O O (,L,) � N O O O O N � O O O O O -' n N � �j
ai O O oG � �D c�i O O O O I� [� �1 vi O vi vi �D �O N � y C .'�.
� 0� (-• S � r�'1 � � C � � d;, n � o�o � � N N � O �+�i d' " (,) �
,Z 'a z � � ¢ N � � � � � � M M � _ '-�' 67
l7 7
�, � 3 0 � �
r v � O --� m ° `-' �''
° o a��i � U c T a �,
a z Y
;; a a. < � a �a E
¢ o o a a o � � .; �
Q � � v� `n �n Q Y c °�
" o m
;, = � E rL
a 'o
� � C�' U3 E' �I N
� ..
� �
�' 4
i �
Q o � F Cn
� M H �' U
� �v o �3 p " �
o �
�, .-f0i � o � J O Q
c w �v c ¢ A
0 o n. �s a�
o � � a �, v e
� c °v��i A ,-. at � m � A c. w o N p v,
�'e � � `o a � a � � r�s � � � c s"'s � O � Q c
Q � � O 3c � m � ai e R m �' a � o p o e a. °' d Cw7
� a m
m � � a��. � � c a�i E a a � � y � � O � � J V a, � �x a 4,
� o � m �a E E o � o v� c o ° ;° '� � x
� .a � ' o n .. a� v � ^� U
', � vUi .°n �° �Zi .� � w c��a c��c 3 3 7 � 7 �' o a°Ji v� y u o � o a�i
� w � w ..t°a .� O u`. U rn � � [.0 w `" O `n O F- w � C7 W V o. � �'
o N � p W Q
aR„ L C+
i:n` c U LL'1
�_ . " N (
� o � F a
� *
� 6
vl p p �
= w " o a
O G � � ... p
y �ti y � C VF] (� O � oM0
F-- � '� � � O L � 0 � �.
ao 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0
C �O e�Ni N �Nn
vl V N
� F �
f"' [A
� O
F V
W �
¢ � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � � C7 �° �°
w z E O
a c:
� O a� 'Y
�d � W 3
O Q
O O v' a
d. U
w F �
z � � �
xW
U C7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
< �
W �
Q t
� �
H W
� � �
O
00 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 o N Q
v o c�Ni c� a V
�y �n v
O 4`
Fo `�
¢ ¢
`' a
a � o � o �
3
N �" H o
0
o � � W
� �
� o
� �
�o o v o0
t+l C N
Q �
� �
�
M
� � N ` N L/i rn rn N T � H N N � a C' 1., a Vl N �n
V t t L .� .� .� .� 't7 s .0 � " L �" p .L s —
A
�
A
�
N y
0 � X �
F '•'�
p, a�i , 'X c�'a
a �' y � 3 �
a� _ � „ �
� � � s � � Y �
W � � °' o 0 3 oa �
A x ' �
� � U C � � � .�.. N O � .Q''_' I�
C W
� 'C w � = � • O c � V c�i h o
u a � . � " H 3 0 � � `° `o v
v� c°a° C y � ��-' 3 y � v�, aCi � T� `� o °. V U �
�C •m � $ ` � o y � t O ._.. E �� � °' w
O � Ctj a�i Q � U � � c " ai V A � A u � a°'i .� �n � ,E >
� a. 'o c °' w � � Q 'a � �
H � � 'S � `n � c a n. " ° ° •° � ° a A W ,c E-. c� > o
z�_ � �°� a' '°� �o o` R E E :: -� � :a `� � � �o 'a � n: �n p a� o n
O a` o: v, a` 'u. � U F F�- a` tG a` Q U x Ga � Gl C7 U F'-'• w` z a
.U.� � N
N � W� O O O O N O O O O O O O O O N M O O O �l O
^ N M �O �O oo e•1 N M T O -+ O �O t� t'� oo ... [� V �l
W � 0 Q O O O O O O N V 7 � �l �O �O �O �O �D `O [� n � a �--� N �'1
� � � � U U O O O O O O O O O O O O O O O O O O O O O _
� 0.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 � o 0 0 0 0 0 0 �
� ^' V O I� N O vt v1 O v'� vl �
l^ �n O Ni O N N p
F O i0 N
O U
0
F � � �
� � ^ �
� �
F. e �
0
� U
� _
(/]
O O O O O O O O � O O O O
C�/1 � U � ON O O Q'
W � �
� � L�,
V7 � O
° °� 3
o �, 00 0
G � � �, �
0. �y N
W F �
� � �
z
T
U
� � o0 0 0 0 00 0 0 00 0 0 0 0 00
� O V1 vl N vl
� � b
F,w„ F
� 3
0 0 0 0
o F � ��
� � a
a
c
00 0 0 0 0 0 0 00 0 0 00
c
� a o 0
� N �
�
.-a
� N N
W
H u
� �
°
,t o 0 0 0 0 0 0 0 0 0 0
n, o 0 0 0 0 0 0 0 0 0 0
U � -: o -� o v v -= -� � ^ o
O F' � _
x �
� = � = =' o -c = = E = v
�
O
� �
U �`+
� N
Q v
�
9
9
� L
� � V
� m °� 'C
y � E
�' a N �a E E � �a R
� o 'c c `° a? � �
�
e�, �" v c�a a. � n' a� A ee m �
# `.� c � W c, o °_' � •S '� x
i�s-� a �o � y H L � o j u � A p
�� '^ `�' � U � � c� ¢ U a, cu v� � E--
`o
� �
� O O
����c U U
Jacob� Engi�+eering Group inc.
501 North Broadway
SL Louis,Missouri,63i02
314,335.40Q0 Fax 314.335.5141
March 2, 2018
Mr. Brcnt Krucger
KCI Construction Company
10315 Lake I31uf'f Drive
St.Louis,1v10 fi3123
S«Lje:.t: �:�y°��s:f�: T':���sa� N�. S3—IVV_Intli��ati�ns to llryer S�ystem ne�-D��A I�$poi•t
Dear I3rent, �
Please provide a pro}�osal e��ith detail:.d breakdo�vn of labar,material and equipment custs for the
rnodiCcations to the dryer system per lhe DHA reporl and �s dcsci•ibeci belo��:
1. Replace thc existiiig hoses wilh static dissipative hoses at each lacation per recommendations 7, l 1 and
20 in tltc DI�IA report and per tlyc attachcd proposal fr�m Andritz. Tlle hoses shall be�rouiided as stated
in the attachment.
2. Install an explosivn deflector in the baghouse per recommendation?6 in the DHA report and as
praposed and supplied Uy Andritr.
3. Tnstall two (2} dust explosion isolatiou interceptors per recomin�zlclation 27 in ihc DIIA report and per
the attached proposal from l,ndritz. The interceptors s1za11 be instatled in the 4" dust pipes froni thc silo
and the truck]oadout chute to the baghouse and upstream of the bagliouse in each line. The units shall
be providcd with 24 VDC power and conirols per the design by Andritz.�
4. Install a 8"x4"Wye and a 4"cleanout with tlu•eaded plug in the drain undcr the iloor slab Eor the dryer.
Please contact rnc at 314-650-4412 or pk.mathai(c�iacobs.com if you have any questions or need any
additional information.
Sincerely,
Jacobs .
�/� �" �
P.K. Mathai, P.�.
Project Manager
Atlachments
c: Casey Brunke
CSX65101-932
Jacobs Engineering Group Inc.
2/2t7/2018 nose reoucen a�o��������-w
� �
!ll�rW�1��
(8()Q) 343-0425 � Espano!
Products> Hoses and Accessories>Industrial Hoses
Industriai Hoses
Conduct-O-Ftex
. _ ____ .
_
Double-ply black neoprene coated polyester fabric hose coated with a conduc#ive
elastomer reinforced with a spring steef wire helix.
FEATURES
_;; �_ • Good crush resistance&tensile strength
" ~-��:- � • Neoprene coating offers excellent abrasion 8� chemicai resistance
• Good flexibility
• More durabte than double-ply cotton hoses
_..�• High conductivity reduces the danger of static buildup and ailows e{ectrostatic
buitdup to escape whe�i_proper(y_c�rounded
• Surface Resistivity Level: 103-'I_Q� OhmslSquare
• Standard Max. Inside Diameter= 18", consult sales team for pricing 8�
--' minimums on farger sizes
Static Cvntrol
LINE Fiexaust
MA7ERfAL C�ated Fabric
INSfDE DIAMETER Min: 1"lNex: 6���
TEMPERATURE �ow: -40' High:250°
I.ENGTH 25'
Downtoad Datasheet
titt�://www.flexaust.cam/producVstatic-conductive-hosel
�
ENGINEERING & TECHNICAL DATA - Flexaust° Conduct-O-Flex
INStDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGH? THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBS/FT) (IN� RADIUS (IN/HG) (PS11
fN
1 .145 N/A 1 2.8:1 29 30
1.25 .178 N/A 1.2 2.8:1 29 30
1.5 .21 N/A 1.4 2.8:1 29 30
2 .297 N/A 2 2.8:1 29 30
2.5 .303 N/A 2 2.9:1 29 30
3 .361 N/A 2.13 3:1 29 29
3.5 .42 N/A 2.48 3:1 25 21
4 .586 N/A 2.8 3.7:1 29 16
4.5 .655 N(A 3.15 3.7:1 23 16
5 .727 N/A 3.5 3.7:1 22 15
g 1 NIA 4 4:1 22 13
7 '{.15 N/A 4.7 4:1 14 14
8 1.138 N/A 5.5 5:1 7.3 10
14 1.417 N/A 7 5:1 3.79 8
12 1.696 N!A 8.2 5:1 2.22 7
14 2.38 N/A 9.4 5.5:1 3.11 5
16 2.72 NJA 10.8 5.5:'1 2.09 4
18 3.2 NIA 12 5:1 1.5 4
24 4.2 N/A 16 5:1 •62 3
Technicai data based on 2 ft. straight lengths of hose @ 72°
Construction: Double-p(y neaprene coated polyester fabric hose coated with a condu�tiv�
elastom_er_reinforced_with a spring steel wire helix �
,.._�....�_.. ____-_. �
Temperature Range: 40°F to 250°�FY
Standard Color: Bfack
Standard Lengths: 25 Feet
• Surface Resistivity Level: 103-105 �hms/Square
Disclaimer.The proper use and maintenartce of hose andlor ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ultimate user of the product. Thls information is presented as a general guide only. The number of variables which can be present in any
applicafion make firm recommendations impossible.
Tel: 574-267-7909 • Toll Free Te{: 800-343-0428 •Totl Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
�TT
',, A gCHAVENBVRC� HOSE TECHNOLOGY COMPANY
�
ENGINEERING & TECHNICAL DATA — Flex-Tube° FlexStat� CR
INSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
((N) (LBS/FT) (IN} RA NUS (IN/HG) (PS!)
� .17 .032 1.5 1:1 29 50
1.25 .21 .040 1.9 1:1 29 50
1.5 .24 .040 2 1:1 29 50
2 .3 .040 2.5 1:1 29 50
2.5 .5 .040 5 1.5:1 28 35
3 .55 .040 5.5 1.5:1 26 32
5 � .045 7 1.5:1 18 28
g 1.25 .045 7.75 1.5:1 12 26
7 1.5 .045 10 1.5:1 �1 25
g 1.75 .045 12 1.5:1 �0 24
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Specialiy formulated static dissipative thermoplastic polyurethane hose
reinforced with a rigid external ABS helix & an embedded copp�r �rounding wi,rey
Temperature Range: -40°F to 200°F ��� ��~M ��y�� -�
Standard Color: Clear Wali with White Helix
Standard Lengths: 25 & 50 Feet
• Surface Resistivity Level: 108-1010 Ohms/Square
Disclaimer:The proper use and maintenance of hose and/or ducting manufactured by Flexaust Is the sole responsibifity of the purchaser and
ultimate user of the product. This information is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tet: 574-267-7909 � Totl Free Tel: 800-343-0428 •Toil Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
� A BCI�AV$NBVRt�r HOSE TECHNOLOGY COMPANY
"9 _ ��t . . �t- .;y ' . ., _- s.: �v �r..
.' � � Y ."fi t�. � .�-1 �, i : t �;e tl-�F t�� ��.��i�`�,t5y.�s�'i��}}
�� � f ��T S��l Sr�? �t �i 'i..i �� _: r i �. ` s � �'li `L� +�_ � ? L'.�� }{����Y��'Fi���y'�� � �:.r��:.
-t .� }z �-t }I- � !� �,. 3 c � :. . � i.. ak, 1+.�a c;-7� x t
\ ',�,. t'S �t F .-s,�K}. � a � ? 5.. : t r .f � �-i ZE `�``1ro�„�.� .�� ��x�:._�-.
.� �3 Y. �5 � .Y�E .) t �� j i ( [ s�. -�S S K`T � S N
:K s;s.� ��,• �:� ��.ry ;r I ;p . � d,, �• �. . � £ :� }�l,yZ q.,
.. e.. 1 � .. . _ - � ' �.:P �3 . P � _
�i f 1 .. vi �' �. b i��� �.�r -'t � •� - s z.- u :�>,y + €g' { s---�`cr�tU -c`�`
�,� �y'��'�'�,�t �t.�, �� f.� s �r' ? + ��� � �� TECH�o�o��. `�} �-rf�.�kt�� aL ��'�x � �3�r�{Y�� �S . '
�x
�:� f s-c��"Y�� {�- d ... r�`' }s'�. r.. ( 3 - '
...- 3 : '� . . � Y 1. ''�bdaE�� �1 ��1��'
-�'` � � z,� ,a�';F���c t rfr F .• 1�C - _ ' • _ _ �k�.i ' ,�-fi Ja � Y`9 � �t �}.
� fi :: t s,r {saY -� � t.i+' , ,.` .�,. : .. .". . � • • • � ' �� i �E �� .( . ��� ��'
.�.�:f4�!� ; �Y fY .�t..:' � �Kt ti.t Y�, � ..�. . . . ' _ _ �'_t �� y � .I�� .�}i�rsT.iS��}���.�Y"tt
� z
6��cn � �� i� ts - - -' � .?:�"�:�,�°7 i-1 �R7f :x�y�y- r
`vF }�Y-��y��y. ���..tt'4-'k i". _ ' . - ' _ .'
�� � � �����.:.:.:�-;.:� � ' �.:
- �i '��. � � ��L■.�i.��V i I � .
_�.. .,,,. . . � .
. . � � �;Q„�FRu�.M'+-3L�'n'Y�`K` . .
�rF7e�.rnt S:�c�•ra�uin 5��rr�„
� The Interceptor•HRD explosion suppression system is designed to provide
f an octive mefhod to protect process eguipment from a dust explosion
1 hozard. The principle of operaiion for Ihe I�terceptor-HRD sysiem is limely
i
t detection of fhe pressure rise during the initial stage of an explosion,
Q ,, � followed by fasf injection of an extinguishing agent. The 5L Inlerceptor-HRD
;• �;
' -__ B battle includes a iow pressure monitoring switch, OSHA lockout and a
,� � �``�--•- telescopic nozzle as sfandard features. Each HRD suppression botile
,.....,....._.�,
is acluafed by a micro gas generator (MGGM that reduces maintenance
costs with a 10 year service (ife. Severa) suppressant agents are oFFered
to co�er bolh sanitary and non-sanifory opplications. The Interceptor-HRD
s�ppression bottles can be used for isolation purposes as well. Chomica[
_,���.
isolation is often used in conjunclion wifh explosion supprezsion, explo-
`-�....,,,.,,� sion venling, or flameless veniing.
�"' t .......,
��'`"" Chamical suppression and isolation systams are designed for use in almost
+�'� any process handling combustible dust. The Intercepfor-HRD system can
be used for pneumatit conveying systems, dust collection systems, cy•
Explosion Suppression Systettt clones, mills, dryers, conveyors, and storage vessels.
���������� _
Power Requirement OSHA Latkout -
24 VDC, supplied by CONEX Controller ' Standard
Set Pressure Suppressont Moterials
1740 psig (120 bar� @ 72°F Sodium Bicarbonate or Furex
Attuation Medium Body Materia)
Stored compressed Nilrogen Powder coafed steel
Process Temperature Nozzle Material/Type
24�'F (-4°C� to 320"F �160"�C) 5lainless steel - slandard telescopic design
Environmental Temperature Certifications
-30"F (-35"C� to 158"F (70`'C� ATEX - third party independent fested to EN
Attudtor 15089 and EN 14373
MGG-micro gas generator- 10 yr. service life Complionce
Environmenta) Ingress NFPA 69, FM 7-76
IP 65 Application Pred
Low Pressure Switch s 1 .0 bar (14.5 PSI)
Standord Application Kst
s 320 bar•m/s
.s� ts,�g.-w,� _ �- n �e'���:� *��4'��i!�'�.�. � ' :ea��'�;—��-
"'` ��-iy"�iy�jn..{.r�'f.�}�,:3F�..zy r�,���>�A�r.+r'�i r> _ ��B :-.s Cf" '� �s �-�4�yt'�t� ,�d3�T,�+o�� ��r �� �.,�-�F,�:i
-_,�,�r.�'A�'Tr�?F1'�{�S4SJ��Y� 2D.fD .y,3�i!b�1 :Yy^� .- ` �t g i'` ��"..��u'�-��ti �;r.. ��{`. -"�=, .4 5 �i'�F ;�
�`��`'���� �. n�c�`��s ,���� r �}" 7 �{ t�1 29.25" 743 mm -. 41 5$ j1056 mm���r�33 OQ{16s���`�j�9�
it.5�"���� ��v.7��y� �����'9_t• �{1 OV ��Jm��� � � a .,_ r��v � f . �i a^r.�tyC��- h�� -'�5 l'
e �" ���� '.��..r ..,+'�+..,��` r-''...t���y ��. ..- - . . _ f A ��y� �-'fa't b� SiF ��a.i'.,���s'���� ti'}� �
{; ��''� a �.t �a:, T � �,�..>` y��t "
��-�r� �.a �:t .- 4 r- :.1 1 . 2� F, s,i S e<„ ti.f`� A a ' P- '
�- �Y�"" -Y •� .�t t y � :J � � .� 7 ..�e'� `S' ��'���^��T,��'�y.�.��g�i;���S 5',J '
Fi F �r
��..�� l� � '�Yr�:T�� i {. i.e'� �T'Ze �, _ - �:
,:s. 't . ' �zl ��' tr ��."}. �-r s s �Is ��� x - t�'YiS�-r i��"��� �'�����.£ ..
� y�A y -,, i ,� r a Z 7 � � �n�b�»�7� .a;
� y",�r' s z.i�` � � °� i -.7 5 .r d � _ f c2S _ t �x � ��''��_.,��5
+c• ' — �3...- ' .- ..... -.. .. ..a...- ..- ..._._, ,.�_._ ...
.. . ..�._ ._.,.u.�.. _ ... ..1 .. . _ „ .us e.. .1.-.. . . . .. ..._. ... . .._. .. ,.. . _ ., ., . . .
� ' y .
Brent Krueger
From: Mathai, PK <PK.Mathai@jacobs.com>
Sent: Monday, March 12, 2018 10:49 AM
To: AI Neil; Brent Krueger
��; perry.schnucks@andritz.com; tfulton@cityofcapegirardeau.org
Subject: FW: FormToEmail Comments
AI/Brent,
See below on how to ground the hoses.
Thanks
PK
From: Ron'Darling [rdarfing@kanaflex-usa.com]
Sent: Friday, March 09, 2018 1:Z8 PM
To: Mathai, PK
Subject: [EXTERNAL] Re: FormToEmail Comments
PK
Our 180HR due to the carbon black in the rubber compound is static dissapating on it'd own when attached to
steel equipment. It then goes even further with the built in static wire far a positive ground. To assure a good
ground the fitting installer pulls out at least a 1" piece of wire and folds it into the hose. Then when installing
the fitting the wire is assured to have good contact with the metal fitting. Hope this answers your question. If
you need pricing you couid contact one of our distributors such as Bi-State Rubber in St Louis.
Thank you
Ron Darling
Kanaflex Corp.
Regional Sales Manager
Cell - 847-687-1142
-------- Original message --------
From: PK Mathai <pk.mathai@jacobs.com>
Date: 3/9/18 11:28 AM (GMT-06:00)
To: Ron Darling <rdarling@kanaflex-usa.com>
Subject: FormToEmail Comments
Name: PK Mathai
Company: Jacobs Engineering
City: St. Louis
Region: MO
i
Phone: 314-650-4412
Email: pk.mathai@jacobs.com
Cominents: What is the electrical resistivity of Kanevac 180HR? How to gound the hose.
Thank you for using FormToEmail from http://FormToEmaiLcom
f:OT[C� - i-his communicatio�i may coi7Cain con��idential and ��rivilegecf inforrnation thal is for the sole use of Lh:�.intended recipienC. �1ny
vi�}:ti�iny, co�ying or distributiori of, or reliarce on lhis mcssage: by unintended recipients is strictly prohibited. If you have rectived this
rnessage in errur, please notify us imrtiediately by reply�ng to tl�e mcssace and d�leCing it from yCur coi�iputer.
2
Brent Krue er
From: Mathai, PK <PK.Mathai@jacobs.com>
Sent: Thursday, March 1, 2018 7:09 AM
To: Schnuck Perry
��. AI Neii; Brent Krueger; Fulton, Todd
Subject: RE: Cape Girardeau DHA Change Order information
Perry,
Jason hasn't call me back yet. He is not easy to get hold of, but I will. In the mean time, could you please check with
the supplier of the existing hoses what the resistivity of the hoses is?
Thanks
PK
From: Schnuck Perry [Perry.Schnuck@andritr.com]
Sent: Wednesday, February 28, 2018 4:41 PM
To: Mathai, PK
Cc: Ai Neil; bkrueger@kciconstruction.com; Fulton,Todd
Subject: [EXTERNAL] RE: Cape Girardeau DHA Change Order information
The protape afso looks like it has wire in the hase which I thought was an issue with DHA consultant. Let me know if you
get a response.
Perry Schnuck
817-419-1798 Phone
817-526-1256 Ceil
_ . .. _ . _ _ _
_ __ _. _._ _ _ _ _ _
_ ___ ...._. _
_ _ .__._
From: Mathai, PK [mailto:PK.Mathai@jacabs.com]
Sent: Wednesday, February 28, 2018 1:18 PM
To: Schnuck Perry
Cc: AI Neil; bkrueger@kciconstruction.com; Fulton,Todd
Subject: RE: Cape Girardeau DHA Change Order information
E-MAIL FROM A NON-ANDRITZ SOURCE: AS A SECURITY MEASURE, PLEASE EXERCtSE CAUTION WITH E-
MAfL CONTENT AND QNY LIhIKS QR AT7ACHMENTS.
Perry,
As we discussed on the phone, attached are (1) Felxaust hose product info and (2) Protape product info. Flexhaust
needs graunding, which may not meet the requirements in the DHA report. I have feft a message w/Jason Reason for
clarification. {I am not sure whether he is going to calf ine back.) The Protape hose indicates it is "permanently
antistatic . I don t know whether that means no ground+ng required. I think this is a German product; I didn't find a
„ �
phone number to call. May be you can find out. When I googled some time back, I remember finding a product that is
static free; but cannot find it now.
Thanks,
PK Mathai, P.E. f Jacobs � 314-650-4412 � 314-335-5141 fax � pk mathai jacabs.com
_ . __..... ._ _ _
_...__ _ .__ _ _.... _.
From: Brent Krueger [mailto•bkrueqer@KCIConstruction.coml
Sent: Wednesday, February 28, 2018 7:54 AM
1
T�: Mathai, PK
Cc: AI Neil
Subject: [EXTERNAL] FW: Cape Girardeau DHA Change Order information
PK,
Please see the attached. Please call me after you have reviewed as we need to discuss complete scope of work in order
for the entire change proposaf pricing to be submitted.
Thanks much,
Brent
e�r'��:� ��'t�a���-
X
C}: 314.200.6489 C: 618J81.9357 F: 314.894.7418
�x �� �
__-•---�-----
From: AI Neil
Sent:Tuesday, February 27, 2018 7:01 AM
To: Brent Krueger<bkrue�er@KCIConstruction.com>
Subject: Fwd:Cape Girardeau DHA Change Order information
Brent do you have some time to talk about this later on this afternoon?
Alistair Neii
Superintendent
KG Construction
573-535-9582
From: Schnuck Perry<PerN.Schnuck@andritz.com>
Sent: Monday, February 26, 2018 6:45:58 PM
70:AI Neil
Cc:Chapman Patty; Milbitz Andre; Gambrell Dusten
Subject: Cape Girardeau DHA Change Order information
AI,
Andritz can provide for the Cape Girardeau Drying system the following equipment to modify the facility to reflect some of
the recommendations of their dust hazard analysis.
E ui ment:
Quantit Descri tion
3 Screen Flexible connectors with roundin rin s
100 FT Materia{ Dischar e Hose, Conduct-O-Flex 8"
20 FT Dust Collection Inlets, Flexstat CR 4"
2 Dust ex losion isolation, 5L Interce tor
1 Ba house ex fosion deflector
Engineering:
z
• Mechanical Engineering and Design
• Controls System Engineering and drawings
• Updated P&IDs
• Updated O&M Manuals
• Controi System Testing and Training
Other:
• Includes equipment shipment to site�
• Does not include fire suppression system for baghouse
. Does not include instailation of components
• Does not include pipin , conduit, supports, or wiring
Price: $65,100
Please see attachments of equipment cut sheets. Baghouse dust deflector to be designed by Andritz. Submittais to be
provided 4-6 weeks after approval of CO. Delivery 6-8 weeks after submittal approval
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Inc.
1010 Commerciai Bivd.South
Arlington,TX 76001
817-419-1798 Phone
817-526-1256 Ceil
817-419-1998 Fax
perrv schnuck(a�andritz.com
www.andritz.com
Thrs message and any attachments are sole/y for the use of the intended recipienfs. They may contain privileged and/or
confidential information or other information protecfed from disclosure. If you are not an intended recipienf you are hereby
noti�ed that you received fhis emai!in error and that any review, dissemination, drstribution or copying of this email and
any attachment is stricfly prohibited. If you have received this email in error, p/ease confact fhe sender and delete the
message and any attachment from your sysfem.
Thank you
fdCJT[CE - This co�rrnuriication rnay cor�tain confidential and privilcged infonnalien that is for the sole use oF th� intended recipient. Any
vi��.;iny, cvpying or distribution a(, or reli�nce on khis messaye by uriinte.nded recipien'rs is stric'�iy prohibited. if you have received Ci�is
rriessage in error, pfease notiPy us i�nmediately by replyinca to tite n�ess�g�ancl deie�fig it Prorn your cornputer.
This message and any atfachments are sole/y for the use of the intended recipienfs. They may confain privileged and/or
con�dential information or other information protected from disclasure. lf you are not an infended recipient, you are hereby
notified that you received this email in error and that any review, disseminafion, distri6ution or copying of this email and
any attachment is strict/y prohibited. lf you have received this email in error, please confacf the sender and delete the
message and any aftachment from your system.
Thank you
.._�.__..._._,_�._ 3
� .I 9���rr�/G l�:�Ur �N�,Z 2
Brent Krue er 1 ��
Subject: FW: Cape Girardeau DHA Change Order information ��"�� SSoG�/�TEI� ���;��,
Attachmen�s: 1 - Neoprene Sock for Screen flex.pdf; 2 - Conduct-O-Flex- tuts eet.p f;3 - ex5fiat���
CR,PDF;4 - SL isolator.pdf
Frorn:Schnuck Perry<Perrv.SchnuckCa�andritz.corn>
Sent: Monday, February 26, 2�18 6:45;58 PM
To:AI Neil
Cc:Chapman Patty; Milbitz Andre; Gambreli Dusten
Subject. Cape Girardea�a DHA Change Order information
AI,
Andritz can provide for the Cape Girardeau Drying system the foilo�r�ing equipmenf to modify the facility to refiect some of
the recommendations of their dust hazard analysis.
E ui ment:
Quanti Descri tion "
3 Screen Fiexible connectors with roundin rin s
100 FT Material Dischar e Hose, Conduct-O-Flex 8"
20 FT Dust Collection Inlets, Flexstat CR 4"
2 Dust ex losion isolation, 5L Interce tor
1 Ba house ex losion deflector
Engineering:
• Mechanicai Engineering and Design
• Controis System Engineering and drawings
• Updated P&IDs
• Updated O&M Manuals
• Control System Testing and Training
Other:
• Includes equipment shipment to site
• Does not include fire suppression system for baghouse
• Does not include instailation of components
. Does not include piping, conduit, supports, or wiring
Price: $65,100
Please see attachments of equipment cut sheets. Baghouse dust deflector to be designed by Andritz. Submittals to be
provided 4-6 weeks after approval of CO. Delivery 6-8 weeks after submittal approval
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Ir�c.
1010 Commercial Blvd.South
Arlington,TX 76001
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
1
a vo rA rioN
•� KaSON CORPORATtON
` 67-71 East Willow Street( Mil(burn, NJ 07041
� Te1: 973-467-8140 ( Fax: 973-258-9533
www.Kason.com
� Description
096S-SD12L-GW FLEX SOCK,WHT.NEOPR., 8"X12"L WlGROUNDING WIRE, 1RING
VENDOR#FSRO80-120-AA1 R
ELASTIC BAND ON BOTH ENDS
1 i 1
�F ��,;���.,`�`.3`'`'i�-C+;C�C:l�:y������T.t�,{ �� .�r r .�j,.. �' .�-. L F_ L iy r y , r .-. - S .
*r's��,�'y` � �> K c �- .. j , - . i r Z
� � � � m��a.(3�rF-.��,7F���.� �� 'r+� ��d r f' .r i ,.� ,,� .- �. t f�� �? i - x.
rt
� 1.�-�9���?+ "'� � ����tnn'FR`-'•��. t�#zxiy-�( �. �z =` � � )� -.� � �tl r � � � .^ T t
.' �`��kc ��`"'�.5� � ,.�� i n?^`}s t 73,.- � �y f �t,4 .r ,t" Y .a�.{�� � � �. :� a j t..( + .
s`�.r+ � .y--�.i. t� s 2 n.�K r r � ,"1 _C,. �'+ � .` t � �. r. �
�.�a�1tl�� � � 43..'{''�.z,�' L-'�� T �6 W . f.� 'C <a.::?y Y - _�i� t �S?r� � ^-'f r� 't�42�
'r4
.;.-�SY��z,�. . �t ��-`�'��.s �x '�.:�r .:L'�T , i� ��� {S� y�z �"�.� � � :�:
F�'�'��fi ,_ '.��3.�`r''��er`t'���,t�„ _.,.> " � . �--k � n,� % ���� �+ �: '
<'a x 3+�''. 1 °�i°.n,,,.r'%.'�'' .y,y _._ -�+ l �pl ';
� - -'���.'ha� ��M:f1��e��� � � ' " �.
E 'y' �. "�, . � Fr � ��y.7�S"���i,� � K;A.
.�,�yt� .�y�Y .� �_- . �+� -,�,'�� �.s�fs,�.34 '�,,-�C
,���1 �- t �'� _ F � ' e� *'3 �.r�'s �r�,r.��"'�-
f ^�y . � �..: _ . ,� . � c �}�4' •"fst�"� �5 �;
. k y , � -k 's �'F � r 4 Y`t�-t��+rR.k-tv�"'"'7'i
.. - -.~������ ' �-1� �+. �`' �.,�r���''�2G'�:'�- ,
�� � : � �z4����� Y�,,��.,.��� ����� l '
_ ��3.y=�cc�.` •.�� `- . _ �F�7 r w�'� . �"�*.d.����Y d��� �
"sF���:a '�1�.�..': . - .. .,�.c �.�X��� `�T� - vR�FF'.y ..,} .`
£ � e, .�.� .'�' . . ,. �"7 `�'. .
. � . . `� �� �z rf c��ji :t-�">� ��`�
��'�' ! ` . t r ��,�r'� ~�.� :�' �f� �, -' '-��,
i F -.' . . � = - i �s'a t�- T-r-�';.j� � -� n-`4`
L�i . . � . . � - � .. ..�5`� �. �q.ri�.-��r-� _ ;s":f
. � � a-�`-hf -�?��r�;'�e�Y��. ��'Y
,4 y-?f L `� i.'z
F ��:' -' �� � . . �.��.� �'s � -k-��:� ' ��i
�L�����������h�S�' � �, �rt� .^ �`''�'�� '�-'`'
� � � ����
��'?'�-�< ��'M� - � '>a-�i i � - ' . � � �s'�� �c ��, ,a�.3.'.�'s _ g ':
°�`,�n'�..r- n� �r�d ��{k � _ . ' . ,_i i �.. �w ��d� :� ..
��:
.�-,F�°���f'.a �- a�� �' � _ . r a � ��^ _ �
2✓r `.-t�4.,�,al .`^?�4��s"��� �-�� �' s�{�s- . /'.1 �c"`T�'�'. 'p __ �-`��
Y-? YG k-.''��, �� 'F. w:`°�'
�� `� t �? ��s�.�a S 0. . . � . �, t 1 �*�'F�� .��-y . ��
� ,'`a�' �� Yr�� , � � a,
a- t�' �-k �r�,,•��,t`� . � '-�� Q �`��;
� � �''' '.#. ^-�i-'�'. � , . �' `y' z � c 1
r ?�"'" YF t��" c;.'y�r`a�""` �- . . . ,t �` �3.a � �'s J
-. s e i'� ��Z ^7 -�t ♦� , - . . 'b � v-u J 7 S�u� -* ,.i'.,i
a�����" ����°c�'� ��'t,,�}�� - _ . . cf ,�"0.� .. t�,v- -x=�� . 'i �„,xz ,t� _ . �.r�--t
� y�`�����+-'��r k�� ���r� ?, -.. . . _�'� ; Y.`,."���'x h_.�`�`��,,�ih^�.'�. �.. �`�
.� +�-�i-�.'�..�,t�"c's&�""Y _. r n� \�k .i ` ��,�"t�"��'-�'" „Y'3�
� �r"-��;s,. �`��xa�f-� ���;3 � i.+� 1 - � ::"y,w3z ,�V t :�F fz,s ��'o%S
z��i�' z.;s r.��'`-.c.�-' �ia _ ` r ' y .� ' .�. "��t„ L,i. �.���� �v,�'
� ..,r ,x"�,�� `� 9�Y J 1 _ � ��#'i�2��1' �'rc�� i S,3y��.�„`�'-���
�"4 ��� �� {�E ' � �,,,,s;,�.*. �� � . z�n,�,.*,�aF�,
"�� . '�`�'-�i '; l . _ . t�r �..�a fi a r .. a'+��y,
�,k t'T��^v. ""-z�s��3:�. �� .r�� �'"� __ •,�-i�° 1 . `Y' _z� �,� . ��_��,.
-# �
'��' �%�` -. ' ` _^ t g.
+��{ r
f ;-� d
''�k,r�- '��.�`�- . �s4�'� `';_:,- -��'2.x— ' - -
� _ , _
.�_�.��� > - _" _.
,.�-,.�f,er'`,. , _ .�. �<
r� �
r C �s �.t,� {cy..:. _, . . .. . . � -_ ,
} �
f." pl " _ �� , -� ' Y� '
� Va`. . ?-`�P:� � _ - �y.,� .f '
S �= e - ' '@'� -
�z'�� "e` �7 _ . ; _
� -r
v° � �
a � } �
�T�� � '}'�'`�'' --�4�� �'� :�y��,.
�3c�..�.��' -�-�a, ..'�� Y-z�3""1 t,�� � ��'j �`s . � �. .�,x �4
c Y ' �
�-� �������� -`
S �C �a'' _w '� w�d,.a4,�k_��E;�����„�y . � . . �^«,y-
�ry�� �a����` ���,�,� .ti�,��5.:" � .
s ` �„`_-. - . - � � -
_m�'� '�s�� '. . � � �:�- -
�� -� �� 4 - . �� .
h ���� -+F. �.:r
:�� � - `� ,�:: }t
� t�-FKr � ' _ � . .. .� "
�> ,
F. �.f. _ ' . . �i " "
'�y� �`. �.` � ' ... ' S
.�:r.< ',� �;� • � .� � -: . . ' . -�-�
'-�'G'� .. ' � � ���� 2
�;M1 r
y.. ,.... ..
✓} • . •�. .:' . ��.' , _ . '
.. -
,y r , ,. � : ' � 4 _ _
. _ A .. ` :. . .".: .�.' _ . _
�' �,.�;. :. ... ,.. ;.,-
.-
��Y �Yy'� . . . :.. �,.: . . '�. ' :-:.. ' _
�
b�y j+
�
1
.+x'-b. -- . �i
������p c {
t� 3 .-.t�".3'i,.vavt�i^'� "3i-.1 �. � . - '
" �3F:. f 2J^�'���_., . . . _ F
. Z 2'i,.�".3�y�#y.�y R..- .
l-i� "� -7'Y'-- ��. ' , ' - _
�d��i � � � ' _ _
h r �`� t �� L � ���).. - � .. � - '
�*c
. <.�-��:�. �"`s �� � _ 5
�,�,4 a ..� � � . .
�
`` !
. " `T -4`� �F i`. "t' .
�;.'. ._._ c 5 .-t ... 1;.: " . � s
- �� ...� i .,.:::: .. .. ..
'. '.1 - � c � _ _
. h i' . . . . ' �
�
�
ENGINEERING & TECHNICAL DATA — Flexaust° Conduct-O-Flex
tNSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBSIFT) (INj RADIUS (IN/HG) (PSI)
IN
� .145 N/A 1 2.8:1 29 30
1.25 .178 N/A 1.2 2.8:1 29 30
1.5 .21 N/A 1.4 2.8:1 29 30
2 .297 N/A 2 2.8:1 29 30
2.5 .303 N/A 2 2.9:1 29 30
3 .361 N/A 2.13 3:1 29 29
3.5 .42 N/A 2.48 3:1 25 2�
4 .586 N/A 2.8 3.7:1 29 16
4.5 .655 N/A 3.15 3.7:1 23 16
5 .727 N/A 3.5 3.7:1 22 15
g � N/A 4 4:1 22 13
7 1.15 N/A 4.7 4:1 14 14
g 1.138 N/A 5.5 5:1 7.3 1 Q
10 9.417 N/A 7 5:1 3.79 8
12 1.695 N/A 8.2 5:1 2•22 7
14 2.38 N/A 9.4 5.5:1 3.11 5
16 2.72 N/A 10.8 5.5:1 2.09 4
18 3.2 N/A 12 5:1 1.5 4
24 4.2 N!A 16 5:1 .62 3
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Doubie-ply neoprene coated polyester fabric hose coated with a conductive
elastomer reinforced with a spring steel wire helix
Temperature Range: -40°F to 250°F
Standard Color: Bfack
Standard Lengths: 25 Feet
• Surface Resistivity Level: 103-10� Ohms/Square
Discfaimer:The proper use and maintenance of hose and/or ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ulEimate user of the product. This information is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 • Toll Free Tel: 800-343-0428 •Tott Free Fax: 500-382-8464
sales@flexaust.com • www.flexaust.com
,._:
A SC�3AVENBVRG HOSE TECHNOLOGY COMPANY
� .' • �
" C
ENGINEERING & TECHNICAL DATA — Flex-Tube° FlexStat° CR
INSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBSIFT) (IN) RADIUS (INIHG) (PSI)
IN
1 .17 .032 1.5 1:1 29 50
1.25 .21 .040 1.9 1:1 29 50
1.5 .24 .040 2 1:1 29 50
2 .3 .040 2.5 1:1 29 50
2.5 .5 .040 5 1.5:1 28 35
3 .55 .040 5.5 1.5:1 26 32
5 1 .045 7 1.5:1 18 28
6 1.25 .045 7.75 1.5:1 12 26
7 1.5 .045 10 1.5:1 11 25
8 1.75 .045 12 1.5:1 10 24
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Specially formulated static dissipative thermoplastic polyurethane hose
reinforced with a rigid external ABS helix & an embedded copper grounding wire
Temperature Range: -40°F to 200°F
Standard Color: Clear Wall with White Helix
Standard Lengths: 25 & 50 Feet
• Surface Resistivity Level: 108-1010 Ohms/Square
Disclaimer:The proper use and maintenance of hose and/or ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ultimate user of the product. This information is presented as a general guide on{y. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 • Toll Free Tel: 800-343-0428 �Toll Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
� a SCBAVEN$VRC� HOSE TFCHNOLOGY COMPANY
. _ - . -
� ,�.,
t.� .�s y, q }
4 � t � , x ; .;
r `'ra �._ '-t �' a, 7 'a' .-�, ;y
} � ,� - .=� ... _ . . I .�. ! � .5 i
_ TECH��I���'�' , . ,.
- r �� � -_, ' � �`� ��� = a
� �
,�. .:t � . �. '� � • • ♦ YI� 3� ��5�{ i ��� �� J2�
�f
`i_� � ��S +3 �'�S.
' - r _ � _ !`.J =s x.... � F� �r-I`?:Y.r'�.;z�`�`��a�-;'a�:�7-S Z?-i�Yv,.r
' r
-���
� :_ . - � �1TE�G'�PTQ�� :
{ - , . _ ��„h 3��r�.;�g� j� . _
� E�as�vn Sc,�,xession S�tfrm
� � Tha lntercepfor-HRD exptosion suppression sysfstn is designed to provide
; � an ackive mathad to protecfi process $quipment fram �a dust explosion
i ' ' f�azard. The principle of operation For the lntercepfior-NRt)system is timely
� detsction o�the pressure rise during ihe initial sfiage of an explosion,
/� �� � ; �'. F � fallowed by fost injection of an extinguishing agent. The SL Interceplor-HRD
# :y, � ' -�_ g EsoftEe includ0s a low pressure moniForing xwitch, OSHA lockout �nd a
; " _ teEescapic nozzle as standard feotures. Each HRD suppression bottle
� ��' is actuated by a micro gas generatar (MGG) that reduces maintenance
� casts with a 10 year ser�ice li�e. Severai suppressant agenFs are affered
fo covsr bath sanitary and non-sa�itary applications. The InFerceptor-HRD
� suppression bottles can be used for isolation purposas as well. Charnical
E isolatian is often used in conj�nction with explosion suppression, expla-
•,�
�"•-�-...,� sion venting, or �famaless venting.
�" C -�.._.��v
"'`--�-�_�, Chem'scal supp�ession and i:olation systems ars designed for use in almost
any process handling cambustibls dust. The Intercep3or-HRD system can
be used for pneumatic conveying systems, dust collection sysiems, cy-
Explosian Suppression Systern clones, milfs, dryars, canveyors, and starage vessels.
- 5������k�'�'� _ . . .= _ - _
Power Requirement ` : t35N1� l.bckout : �
24 VDC, suppl�ed by�4NEX CQntroller Stanc�arc� :
Set Pressure Suppresscrnfi Ma�eriols _
1740 psi� (120 bar� @ 72°� Sodium Bicar6onate or Furex
- Actu�tion Mediurn Bady Ma#erial
Stored campre$sed Nifrogen Fowder �oated stes)
Pcotess Temperafiure T�Iazz[e N[ateriellTYpe
24°F (-4°C� to 320°F {1 GO°C� Stainless steel -standard faiescopic design
Environmentc�{ Ternperature Cerfiifications
-30°F (-35°C� to 15$°F (7Q°C� ATEX - third party independent tested fo EN
Attuator 15089 and EN 14373
MGG-micro gas generafor- 1 Q yr. service fife Complicrnce
Environmentai Ingress NFPA b9, FM 7-76
IP 65 l�pPlitatian Pred
Low Pressure Switch s 1 .0 bar (14.5 PSI)
Standard App[itation Kst
s 320 bar•m/s
� s.�,YF-^,!,1„'�-` ��s�. no-.-� r��Y'S' :.:� � .' `^ - "u r -�..s+"._-�„�,F'L's��`'�p�"�^3t�fG ..a e+
�.��r✓ �yr 4 z r'�� � �^e� . � � ..�- � 13 �r 1 ''. r,�' �.F-i -c- f�i-�_ fi�y, ���
.f"���Lf � ,� '=.I � � �. ti.cr.:"`* �---� n c +} X,{g r�, ;, tR'� �`y �.y t r 3e"�s` b. "�'�-.' X ''s
; ��� - -i F {�_ . Y . �� .
� �' �fi"� � `�`w3j r� /�}( ��y �7 2.�".`(���.t Crilt't[ " �� ��� �!y�L� ��,�..-�.����ai ���`;+`��� �
5 .x ��+� �M��w���'�"uY -f�l ��t;i�VV 111��P j„ .{ [ C(-".4 :J 7 `���.e �ti ��.�."�'�'����Y����....�
s x4 =��§�s ;� -a� ..� �s.� � � '-. E 4'y� . � � 4 . �z 2 ��F;��s:�'�?'->�.,�{��,��.- . '- �'�' �-r�
- .K', .��.r, 3'�,,4,��� +r� -�T.'4 v�, - < .er-?- i:i �: ' .. 4-_ ,� t }�!-�-.�.� :G�zt�`L�.C�..."K"a +-� - .+.�^
-;❑ �^�-`3.�`r?�1a1,'5��1 x :; /' �:.-1 � a-_.�rs '"'r"-ss� �"` r .u� +r; _ Fxf' k r,'y?�4�^' �.�y,�r-�'��.+1� .=g� N � � •_$-�,�
- ,"�'�.c�_3.�Y`����'�-.v: �"."; S -�� ..� ,c r' t '� -�-5'� �.:_ .-_�_� ,�5 �..:d En L�:� Xty f`��?' a�e:Y Pw•r'"�'_"k�� `'�',`i� �. ., �
�
.,:� t �;,s rP�-„".�'"-u�''s�.�=.r'. r tF.'t �" r-f =^-"S�'s .�x,. y, s p��.'� �`�-.� �� F.� ,�;r � ,
-r .� � �� 6 .?
• n
. r,.a 't�f -_. : — �'i f s e•�.. z .- � ..��:.�t �� . � s , ._.._ y..._ _ .., _ . .'--.,...i�.D'� .
v �i � t'�
�..
..; . .. -.�. �.+. __ .
.. . � �.,7< .. ,. __r<_.' , ..._ _ . . .. .,.. .
. i
, .. y� -.,, �.
.. . , :, g -..
.. _ _, a,.. z.�.> .. . ...,. . , ., �c. �,. ., .
• mE
. �o ^
�u
n� �
�k ,� � w Q o �'- O
0 N Q H �m
w^
W N w Z n� W
a N
o • _
� o ,� �• W "' ^
r Q w
� u�
Z U = c< �/
w
Z v� vf `° u- �'�°. W
O W W � �N "� N
� � � � r m w ,_._
V � � O �` � � _'^
y N Cj V
� Z � � � O >
� �
o � Ur' vi
a �5 `� � Z
X X '7 $ �
> a�. X X E� aT W J
� r � �!1 J N Q
� F N� N
' c) c�
� p � � z
¢ � P c0 y1 � �
� - O u.
� ,p O O Q Q��=O �
U € � _
w N Z d a~LL m
ac � � v m � ao�3o=
w a�l Z p � Y z �aZoo°
� Z .-; �°, °oax��
O apiO�WO
� Qa�
O � a a �C�O�u'O
� =�C=
0 ; U < ¢ d �3wa3w
a w � c� Q o w��aw�
-� o? co o u W � a 4 �ou��u
� v
c
� �
N m 6 uZ " z
5 ,o« o o U �
_ �O �O W Z y �=I tii�!i �w � �
� 'n �Z MU I 1 F d � � C'r
O n c J
u°Ci az wj� Q� �Z W U
s �� ¢ -
� v, o, -- Q � Zo a�g i�wa �a � a O
N N W �¢ wQ�ZOx w w � = Z
z oo ��amzX �0 f Z o
w Ur
u, 07 M � Z
�ri vi = �
� �
� Z
�0 �O O �
W � � W
M f`') �
�
a
�
1� 1� � '�
pN N _ _ ,a
v v Q Z
�
� � U W
U Y
�
o � Q p
� � w
��r'1 N � -�� �,Nj Q w Q
m N O� � ���-.S W Q Q��
N U -�
wO u�'a�
('') N w z � �W
� h � N � a.
a N � .� p z
Z O
= C C N
~ ^ � N �
Z "� N = O
W �--+
N V /n
0 � � v �
S o o �
U �
� N z O
0 o z m
O Z
0 o U �
h t� N Z
'- '- 0 �
S
Brent Krueger _ -
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, March 13, 2018 1:43 PM
To: Brent Krueger
��; AI Neil
Subject: Cape G wiring of Cannons
Brent,
1. 120 VAC feeder circuit breaker in PLC panel: $30.00
a. Contract�r to wire to LCP(a)to be located on dryer room wall, suggested iocation between oil tote and
man door to truck loading room
b. Contractor to mount two(2) LCPs for chemical isolation system side by side
c. Contractor to wire from optical sensor to be mounted in dust collector inlet duct to LCP(a)
d. Contractor to wire from 5L chemical isolation bottle to LCP(b)
e. Contractor to wire three (3) discrete outputs from LCP(a} to PLC panei, we have I/O available to support
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Inc.
1010 Commerciai Blvd.South
Arlington,TX 76001
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
perry schnuckCa�andritr.com
www.andritz.com
This message and any attachmenfs are solely for fhe use of fhe intended recipients. They may contain privileged and/or
con�dential information or other information protecfed from disclosure. If you are not an intended recipient, you are hereby
notified that you received this email in error and that any review, dissemination, distribution or copying of this email and
any attachment is strictly prohibited. If you have received this email in error, please contact the sender and delete the
rr�essage and any aftachmenf from your system. •
Thank you
1
KCI Construction Company
St. Louis,MO 63123
(314)894-8888
Fax#(314)894-7418
w�n�v.kciconstruction.com
May 9,2018
Jacobs
Attn: Mr. P.K. Mathai, P.E.
501 North Broadway
St. Louis, MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treahnent Facility
Change Proposal # 137 — F(� ,���.�?//I•,L����� ��j���/��°`� �'� "�'���
�-
Dear Mr. Mathai,
We propose to furnish the necessary labor, material, tools and equipment to perform the work
assoicated with RFP #54, fire suppression system for baghouse and control of the loadout chute, for the
increased lump sum of Two Hundred,Thirty-One Thousand,Two Hundred and Eighiy-Seven Dollars
($231,287.00), and a contingency of Twenty Thousand Doilars(�20,000.00) for future additions if
required for a totat of Two Hundred, Fifiy-One Thousand,Two Hundred and Eight-Seven Dollars
(�251,287.00).
Please note the fo(lowing clarifications associated with this pricing:
Pricing based upon email dated 5/8/18 from Perry Schnuck re(ated to scope clarification questions as wel( as
email from Perry Schnuck dated 5/1/18 with Andritz pricing and scope clarifications. Wiring to local fire
alarm panel within the Biosolids building for system tie-in with existing fire alarm control system. System to
We have attached a copy of our change proposal estimate summary and backup for your review.
If tllis proposal meets with your approval, please sign the attached copy in the space provided and return
it for our records. KCI requests issuance of a Change Order prior to being requested to proceed.
If you have any questions or comments, please do not hesitate to contact us.
Sincerely, Approved
,���� By� ,
i'
Brent Krueger
Project Manager Date:
Attachments
�
T
�
00
� � Q1
� ¢5 C
Q C
Q �
G. �
C.� ¢
Q �
-r F
U �
W
V
C�
�
Q
Y
O
� w
" O
U �w .o
v � �
� � G
� .�E t
� v
f— L �3
� v �
� 1O
3 °'
g; o
c
�s w
3 '�;
� � °
� m o
� `� 2 °-
,'� c7 x u a� m
� � c E-� E c
5 �v i O � ca
o U C1 Z L
o V
N O O �'f v1 V1 O O O O �n �D -� O O O � � � N
a O O t� (Z] N N O O O O N rl �O O O �D c`i � � N � ti
� Y in O o7 � W^ c� O O O O t� t� � vi N v'i [� �O O� c�i N y C �
t E �' � � a � � oN+ � � v r�i � t� � vi rn r�i � � N N � U
O z 'D z O� Nl �+1 m 7 I� � f� t� N 7 N CV �D CV � 3 �
t� d N `T N Q 'o
O U � � � N � O V '
n �
o ° � � z y >, a
� n. a. G � � R E
c o a ' ° ' Q c t C"
.. � � � � � y � C Id
N � � �
o _ 3 E �
� � � � F � M
t� " I �_
y o
� L
� n
r °�
� � a H �n
5 F � U
N
ti � � Q N O � ]
•,�-n .-1 � O N � Q Q
� p v' 69 a� Q Q d
O � �- d C!J �%7
� C in m � N at �t ia � 4 � W � a> Q �...
� � z r. o �o � o a 't co c�d' °' t v3 y � � Q �
� = '-' O �t a D p a'^i o � � �' a' � o D � o \' c�.. a c�
m o L. c�,,, � � .� ,a � ., a a v a�.� �a q �a � � �i ;? � c' ^� W W a �
� 0. �
o E � A A E E o � o ° cn � o � � � � � 0 4
•. 'S. ..�. O � � � O '¢*�' � 67 U
Y vl '
` G Z �
� �'o� w M w � � a3 � o w m n c c r'n > cn' °� °' ' ° �'
o y � p .a ,� O U cn � � W W O O F ca'. `n � c7 z1 V a � Y�
r. � � �
� U W
�x_ � y v, F
v L 6
o t F
a
�� �n o o � r
z;� a
w � o
a`g � .A" N C�'0 W p ^ �M
y� Y y � � � a � 00
� � � � �J � L � � O
��, � a 3 C�
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � �
� � � o
N
.-] �
Q �
� O
F U
W �
Q � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N �
� 0. v U
O
� z ,o, u:
,..� O a� L
� F. u 3
O O � �
� U
�" -7 F �
z � a a
x w
U � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q W
� �
¢ L
� �3
F w
� 0.' u7
�
OO O OO O O O o O O O O o O � O O O O O OO o � ¢
O� v7 � L7
� `� oo � L:.
O .:a
.¢_1 �
�
o � oo � � O
3
H
0
� � � o
N �
O V1
ti
O O �
� � �
Lr. N
Q �
� �
M
� � N lA Kl N VI �/1 Vf T tA N N y y N G a N CS. N � Vf
U z L L .0 L — .L L �p L L .L � t � ._ �' L �
�
�
�
N
R
� N
L+ �' U b�'
O � f.L] Y �.
E"' y � cC
R � 7 L � td
V y s `� � -� c
�i � � :? o 0 3 o a �
a x x � � `-' H R � N N 3 �
� w 2 .c �� a�o w � a� o � � c�
C ,� -• � , � V OD (� U N O
„�„ 'O ` Cn tC 3 C �0 pp �� tC �..
!`,�,p � C C � 3 C a' C R o �. U L C O 'D
Z � � a� p � 3 � C1 �' � q� L q � E U � ¢1Oi � R
ao � � ` a� � o ` y -r � � y cn � E >
p � e�i � c� U, °-' �' c a °' y c a Cl a°'i �° a01i •� �-1 �v ��
�, � =u � ¢ � � o W m ` o � o w � � � on Q c a� H
U U ' U �
c a a " .^ e a ca � W c F. w > o
Z�_ . . «: 'O T N � o.
O O � O a] � � y y 4 � � 'G °� c�6 7 c�d �C 7 0. a.i O � p O
p a, c. v, c, i,.. ..a U F- F- a o] a Q U w Ca >^ C� U U F F' w z a.
V � �n
a a F- W o 0 0 o c� o 0 0 0 0 0 0 0 o c� � o 0 0 �n o
V] O N M �O �D oo t+1 N rl O� O ^ O �D I� I� oo -- f� 7 v1
w . � O O O O O O O O N 7 �t �t v1 �O �D �O �D �O �O [� I� oo O� .: N M
W � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(�;.tia �-�+ C'
O O o O O O o � O O O N o 0 0 o ri
O N O �/1 O O V'1 O — O O O V1 00
� -- V� O G' O �n N O 7 �0 O O N �
F V �D O O (� r� v'i v'i oa� O c+i ^' �O
F, v� v t�i ri - -
O �
F U
ry p C`7 N
�V U O^ � Q�
¢ � 7 � �/1
L`. C �
O
W p
F
Q �
� F.. o 0 0 0 0 0 0 0 0 0 0 0 0
� z � � � N �
W E� o
a "
�i 7 'o
a d :
O o 0 0
cC �n �� '^
� N
W F W
� � �
U � � o 0 0 00 0 oa o 0 00 0 � o �
¢ � o � � o o �
� ¢ N
`� F
Z 3
�n o
O O O N �
O F � o � � M
^� <
� � �
0
0 0 0 00 0 0 0 0 0 0 0 0
O � o m o M
e o �
� N �'r1
a
� �, �, �,
0o N oo N
F �
z �
�
�
a o 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
v v = "� �. `^ o�o oQo -: vi
u' F' �"1 N
o z
� �
� " E ^ � E =' 'o _" " E E - i
a
�
F
r
�
O W
� a
a ~
U
y Nt�.� ¢
�
0
Q � w O
A
F C1 c"
0, �o � o0
� E � `
� r � �
O v� � �
�
o � �
h � � i
� E ` E � R
0. r,� U � V U
3 � G q � �,Cj tyE
`� � E �
C V�i
� a M � E � h a V b ia
ti. o � a � 'aCi Q �+ � a�
� �' � E ,,� � 'G ,� '£ � � ` E � ¢
� � �
;-'T_� a[...', � -P�' '" � � G °' `^ �d F
"�y�-�' �� 4' < CJ �R. � u] W � � ¢ U u] � � �
:� o
� �n F W
� ?� O O
�� U U
� ��
' ������' Jacobs Engineering Group Inc.
501 North Broadway
Sl.Louis,fNissouri,63102
314.335.4D00 Fax 314.335.5141
March 6, 2018
Mr. Brent Krue�er
KCI Constivction Company
10315 Lake Bluff Drive
St. Louis, MO 63123
Subject: Request for Proposal No. 54 (Rev 1) —Fire Suppression System for Baghouse
Dear Brent,
Please provide a proposal with detailed breakdown of labor,material aild equipinent costs for the
modificatians to the dryer system per the DHA report and to add loadout chute control as described below:
1. Install a�xed industrial fire suppression system using a dry cheinical as the suppressant inside the
baghouse and as tnanufactured by Ansul or approved equal,and with the required controls; all as
designed and supplied by Andritz.
2. A float to control the operation of the loadout chute has been supplied; however, tIus control function
was not included in the original scl�ematics for the Ioadout chute. Provide the necessary controls to stop
the loadout and to automatically raise the chute upon sensing the truck is full.
Please contact me at 314-650-4412 or pk.mathai�jacobs.com if you have any questions or need any
additional inforinatioil.
Sincerely,
Jacobs
��/���c��
P.K. Mathai,P.L.
Project Manager
c: Casey Brunke
CSX65101-932
Jacobs Engi»eering Group Inc.
, . t •
Brent Krueger
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, May 1, 2018 5:05 PM
To: Brent Krueger
��; AI Nei{; Milbitz Andre; Kirkland Ken; Chapman Patty
Subject: Cape Girardeau RFP 54
Attachments: RFP No. 54 (Rev 1) - Fire Suppression System for Baghouse (3-6-18).pdf; CO2 High
Pressure Manual.pdf; Ansu1542R.PDF;Ansul CO2 Brochure.pdf
Brent,
In response to the Cape Girardeau VWVfF's RFP 54 Rev 1:
Andritz offers an updated quate to provide a Fire Suppression System for Silo Baghouse, including Carbon Dioxide (CO2)
system with an automatic detection system with heat deteckors, a manual pull station, system disconnect switch,
engineering, programming, commissioning, documentation, and training for$44,100. Price excludes installation, conduit,
wiring, anchoring, foundations, platforms, ladders, or supporfs, Design Engineering Review per DHA, and sales tax.
Andritz.anticipates that KCI will need to run wiring and conduit from the fire suppression system to the building fire alarm
monitoring and ensure the Andritz PLC is able to monitor status of fire alarm system to prevent operation in event of a fire.
Andritz offers to provide work to allow functioning of the truck(oadout chute tilt switch. Andritz offers to provide barrier
relay, engineering, programming, commissioning, documentation, and training for$15,412. Price excludes instaliation,
conduit, wiring, anchoring, foundations, platforms, ladders, or supports, and sales tax. Andritz estimates that KCI will
need to run wiring and conduit from the Truck Loadout spout junction box to the Truck Loadout Panel and from the Truck
Loadout Panel to the PLC Panei.
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Inc.
1010 Commercial Bivd.South
Arlington,TX 7600t
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
perrv schnuckCo�andritz.com
w�riw.andritz.com
This message and any atfachments are solely for the use of the intended recipients. They may contain privileged and/or
confidential information orotherinformation protected from disclosure. If you are not an intended recipient you are hereby
notified that you received this email in error and that any review, dissemination, distribution or copying of this email and
any attachment is sfrictly prohibited. !f you have received this email in error, please contact the sender and delete the
message and any aftachment from your sysfem.
Thank you
i
_ F t_ '� '���n T
� `>. ` � t� �'.�t c� � � �` � � :
�•.: � � t � .. � `'' y ;
�. t �µ
U 1.�.' .1Y t � ��` - ';'�.:.t .
� if� .
a :+ -�
� �;t ..
��: • '�a
�,� s�*�+' _ •.�<
� �'� . ~f.�'
_ ��
,. n `•. -- � ' �:
.;... .:.us . w /!iii�4+�,� - .�
r% -..,, : �' "' '�
7'�' �;:f '_� F '
''.a� .e► -kk".,. ��t ' t
''` .�`- ` 'x -
�y.' �. � �� -,�'s:;�=t..�r���Y� :�_ ...�
x.� t j�
. C � � ! �N }�.�} � ry r �•
_ - y' . _ k� r �ce
.
� : . 1 '-+N 3 '". �+.� � � { �:
; �,t.Y � .S ��. -r� 1{.�. C�
}E .. .. ��.. 'i,1.7s���� a - f � ��� _ �>_'_ }. .�• p.'
. . � '-s�a.�r 4 ti,� � ak�£_� �-��
.� _ �,.:_<.� ':�.: y
�' .A �:.
r���.. 4 . � i..� � . ��,���� '0
�?�� 6 . f"� .r t ?
j]`r� .�?�
�`'�:'• �IIRR�""'" • . _ .
r
� • ... ��
�-.i ��'�'r . ._ . . . � .. � � � r'
Ktt'''. ,� � �,y �:
- �.
_ .�
�" ,�� � �' � �
� �' � �
q > .
i �. � ��, �4, a.. . .
_i �x �
.i �a
s : .__ . . +w�.,, . ' _ ��`�
� � f� ��r - • . . . . : .
_ � � ., »S,r,��* :
� s� ���� Y F .c- _, ...�$ri'"`f'C`` �V�.. . '
. �'� ��L .s- ' �` •. , _ -
p?�� � z ��e� .r+..��M �� .. � � ��,s
+" i �i�dd� . ' ! �
a '-'• .��. . , . , .s� _ .
} i"
�, f. . . .
r s � � t�
k . ,�`
' . � .
��2�4 ��� . . '
�
.y,'a, :�:f� ��: . � f " . � ..� ' � _
;i*�: � St {r ,/��- ! .� .��H�.���r . � . .. �
����� ��` �r��, ��`s:��� ����'''�`3�
. � � �k,, '� ��. � ,
� ?'�I"'. �� r`im,.,R°i'�` 1�'�` *S `',�� � '�'_..' :.:¢^7ci�'::
r
��. �_o'+,Y�y���. � ". . he£"�y^s4���} ' ��•-'+�Va
.Y'v ��[a'Z'i�.s Y =
.frs �-�wa;tr'�
., r r; �.�'': .�
x �� ,,.�y ;:.
. . . . . .. � . . F aSa._ '�.� s � .L .
� ^� •� ��±{sy
. . . � 1K—� ..
� � . � . . . � .. ' � .
i.+��� � � - . ' .
q'i.'.� � , . -. �'� i-. .
P X
�� a .�a �R��r^ � y,��;��i������ -��L ��o�'� � .. . ,:
.��,�y : xt''��Y��r�s�__,,,�.3^"�y,�.�, � '--J.''�� �..-.'.�'.� " ' -:
� �� � ^ J -'� ..�'�t
'� 3)y � t Z �� x .. � > � � � w � �
"' ��'�'''� ��� t � � i .•x'"3`.4 ;,r ���� � .. -.x� X -��f�s ��..� .
Q.o �+, { t€. � >.1� ���'�' �' �. a- •� s �,�,�
' - z ,y� f%
:-'� "" -� _,t' i �t�,�..s`.��`� L.4 . . . _. . J $`7' F�L,�. ...
- T .� „�a+k - ,r-� �.
�.i«+.+"f � � - � -� e.+��„'s+'y�" L"�� �.
���a -'} :6 '�� ��~ � ����;��..w
• _ ,x,;.
y 9 �
_ � ' .: Y�.;y2.35Y . '}' a� �.
1_�_...y F� { �}_ .��i�'�
. . =x -_ s �� � , � ���. . ��
.� ��. t -. �
..- _ "
i1"� �� �:�e � '� 1"� .. � � J .
' .`"�r� � � !
�^ � 5
� � ���� �,- ,�r .-+ -. �
- . � § i�;�. '� "i� 1 1 .� •
�.....� - - : � �� . � ��"s���. :� --- -=,.a.,.�s��, - _
j,.,--..�... ���# - �- ' ,� _ �„'_"...� . ` ' �-
.
: :.
+t�.^,.�.�. : • - . �_ �y�`if •. "' ' ��
����€ �n ;/:�.��7 � '�+a�- -
'wm.Y y"� �°;.Sw�. ; �+ve'' - _ _-
.�..r.t.�+ a' .�*,�' . s��..- Y .��� -
�
�; �'_ n
ar-�� . � - ���,y��', .�4.� {
���� �� � i �I�,';�b y.+����
.t� .
�� ; �,a
!K k �dTr_
� ' F~�,��� • �F.��
�. - - �''�.� I
�.;.�.�,_,.�
Y �' ..
S� �i•
� � ✓5
c�Y v � :
r �""
R�3�; ��c���
�ry �, ��tw r.�--
.,a-.
:
�.o-� �� �.,N
> ,�„�.��� T
; �
. :_, _ �nnab_ :
�r� ��
�_
_^. �.,�P ' _.. g 7 ...,� S .� . . .
;
�i �::�
:i'��'S�' �
. ?1�j•-��Y`�•`!'=s� -'
, k r . .
'�� �:`:A.::. �-� ;: _..�
.. .�. �.#.' '_ _ . . �
.�y T-!�=.1` - , - .
�Y = h
c:�. .f��.: . �.
.
�-�c �t ' �.< ?s-, �
,�.un. _ � - ceu:�[ �. �,_.��� � #F�s=_ �"� _ .. . _
Y7.*
ct � . •.� za'' � .
� y:l:
" �.�....a�.�„� �� '� � _ - � �
-;��`V`�.a-^ f �t #y . ..
t�"" ,r r , �
���.,v.�u:*'+.'.'a?:"� _' '� :.; . .
� -'_. � ' .. .
_. ' ���;t.• .l- .,;'.:
��-
:.".�.['_ " z�.... _
� "�..'��sY'-"t±�=.`
Z'T..� `���y.,?�rrK ' .
_ si'%-
_ - - 4F;
<.� �
`��" '
� � _ C -
� i
.
. � 1
�I .
�- �,
.� . �� t , - �.,-
,.. . 'Y ., . : . , :
� �
� ' "". ,.. . . ' � . .-
9 ),;;
„y. � _ �� �
t"x,° ��
, �.' ^i.2'� 1._ .. �. .
.f_s #F"' t-,,�
f::.�-y
+�c
.� ��yX"''��Y�F,�..�^'�'F"�'r4"� a.' r _ - �
',?+rri^L� � Y� _ _ .
s
��X��^` ��-.� " _ .
�� � � ���..� _
� } �
- `� ����?�r"�_ t - � .
Ld _
" .: ' .
II _
"� � �
_ w.ti ly ��' _ .� ' .
�� �=�
S �� .� S cryl .�G�
��v���*-� Fq
_{ _. :' '"t3-�F.+.�-R�/� `. +Y. Y
�1�:•- :�. ��+��' C��'� 2�' �w4'� R ('_, _
.�:�� �:;-. ra�c� � xe, ,. �= -
!:^ a�. -
`y�y '�J � �'; r
��F - ���'� • � �+-a�' �'�` �.-�'
" t .»S"iet`��'�£vt' s:i�..[.����e.. �� . a���__.._, . _ . ' .. .. ..
g _:��2-"r,"4C.'t��aKF��3""�t �. -y,�,z.-c,t _;. c. ��:' ,.-z �Y�'� . 7-. ,L 7.,. .r.� r_ ��.r •..��g•.- hr�- .r-� ?.�-^�r�,TZ��e.g'.
�s .^'�f�-�'��'�.���'s�-�' �,xt �.r-��`._:�4��`�::� ,r�`2'�..,.'��� '4� t�}��..s �""���,����_,.TF �� _ .L�-ir'`F t y_f ..,.�'.��.�X-s, `..�y��a��� ��`[���{:R ��. _ _
a . �_t � '`���i�y_{ �'rt� dr�#.7e�`�� 3F-r�i'T�,i�� �� � r��'?r � 'a�'��6�";>4. � -��r- �< -r c_�._ -x i!. .r'�,���`�., a,-�"�� .�.; -
yj;��-�'fi, �":,�. xy»-"-Y `�'rzt yqF'F''`�'s-�-'"!�T �'A��. �t:.y`'Fa^:��_-��a�`c"YY>`�i.�`+�b*,��.��.,�s,� a-� F�" .
y��F � £.+ r^(' _ 1� ^h-`.d' . { �r ., y.'C t �„�✓ Y-
�'}.4' '7 ��''�. �'s �.--51. Y���� '+," '",3A .^ .. � C� .."1y. .c'i"•C:.�����2'' .��ai
�. ,.. � .:�� ,,. � .x_r c rzt`,x_�.£��„y�� 1 . �"�.rn F-z � i '�"�Y"r3 Y +� •:i-,.,�"���;�z. '��. .�C�. .c.r 1 � .��y.��-�i��K. _�;r �si'�''
"'x-�z'~'� '!� �t�.'L�.���.�r�s�"�"�d '"�`-�s.+. k��,.�� ",c-_q j¢.�,�."li"{.. ""ai'�ti �*K,�F;�_.i.,.� '�-':_'J +' ;Fr' -.- "��'��r µ�':' 3 ,_-h, s.
�' �t^x+ .�. s �. � ''� `� �,�o � �U�� � � '� � �"'r�
�-�� ��'`������u�,.�,�,�����.�� t c ,"-�� �y"` ,��,� �.�'._",.�i � � t� � �.� '� �,s' ��
�4� r�c �n. � � ' .. .�
�' ����s ri �'� �`.`���zt- �� � �a h . 4 � '�� � �' ��., ���u� � }- � ..���'1
� �,�-"`a r -�'S s� �T � �..E 'Y_ � �
^+ u' X't' �,.:.=.,,+ s , F „� . ;, .ii !:�.. r c � . �e ??'C { a� Y �''S.'+�,
' ��-b.�:-'.�'-c � �' �c s s�,z-'�- -.�:.. -q5_, '�` _�L� -r z ��.,�t y����, '� ,� ^�� 27 -.��.-. '�--yc,�.�l,z K y.
x s i. -i t � �:t z Tt'- ... .y_�.�+ -3,- �-i
^,�3�, F � � ��a� -s.`� -'y, Sfi3'� '�'� 3 � ��� 'z� 4's � ��z�`skJ°�. ��.z�
T'.7 i . r£�', .r- r` 1t�^av � �., x �
-� {,k'a...-..,^T 2, n'�s' �R.. xir�- v^.:�� �ri,,�Yt� �'�.'�� r, x'�Ysa,eS�y��.-�� Ca��,,�o:�.�f�xid����r�,�� -;�pre�ss on-kS,ystern.��-� .
- ' ' ;?r�� '�`�Y..`f�� =�„4C 'rR���� Y�r'��'�' +,- '��, 't� r�- � .'',� �'�,��a, i °��Y'C' r � ,r ��t ��,..;sv�.!,' x,.-�,a�-,� sr, ��-�;•
r. - �s ..,-r �,.-��-�� .�E...t x��� i��.5.�`rl��-:i�-� �.� �� a z� <�,�,�3x,s,s ' �- t 1� t�r ..r i�n �F:�r j,�'� x '� 3��`�-�'� � 's°.;
� �� _�e r -� ,� �-+;t. �.�'� '` � a'`'}.cR ��t t r� �,c - �' -�:� r+1,.4_ �'��r'°�.r'� �z� �� #�.,a�;:.��� ''7,'x;
� s s, ,«�'f 3��• t '�}e ` �,S� U...,' I+` ^ �..t�..���. ,s ,'��.. � {^ _�� !�' -> '�`.s �.��'.1 �"��,'�`���.���Pj''�,�-y' �.s�
t .+c�.,_ry �3:� .x� ���� ...:�.�.. 1 �s ,� s� .�s�.� t y'.'.d�€� � fi�.�-� T,s,.��,.� � � --��s� ���� �r�"3-sz'- �"����s�'��r � 's� �a"�s�-
.: �, . . . �.r' a- :i E_ .�.: d F-Yt .. a�-2�s�.r s r�-����+C���-,L
,
..,
;�.:.:: _. ,.ii,-J�..,t�f�-� . ,- . .,.�'i..:..1� .., `�. � ...__..._ c> �' ,�f?".--.',��«,...�.._ _v.r'r_�_- ,.: ..?t__si..,tSr__.,.> �_. _..,�....✓-z�,�_-�� ...,x,_'4 �-'sw..tiM.:.3.`�,..
f c ,9
� � z: -z �.�. +� s�t- z� -y z.r} p}nw,� .r :2 �. -; ��»_ V;'" 3g.-..
;' Y ; � t�-,� sM1, ..Y � ._� S s� y e ti� �5 e.c�r �s�`�a`"'��'�-03��'Y`'..w��'�-" ,;c�.�1� r< ��#,*?F'''����;�'-g y a=
�:� i r}.�r f� � v' }.�� 6 �. �y§ g�..,,�rz�,�Nr, -.K�`f �.. sr�.;a �'.ti �T£.�' �';z- & .:: �r�' �+�� A�s� �1. AN SUL.:.. �;
1 �-,rt-� .�''3. � ��•f.r"S-d -�'�a � �-3."t� a y ,,;, ,.x , -�r.. ��+�.{{, t�i'•y
'�r� ,rJ�.c�c �s,� 1K r-�k'4 j _`ir t 2 �y��__'S'�9r <"� �Y .s e r���� ; {��ur-<��' i,�� 't�s� 3?'�Y ��•� • ��
.s; .:TT� x. �3 �£Gy x .3 t t; . { -r ,�- j,� �� .<.,,,,� �y ,j=
_.�,. ._ '� ..�. .. -. _. ._i-; ... . ... . __. ,,a...x.-._.._ ,.. _ _ _.._.,_ _. __ .... �._.F� ., ._.. `_� s.�t� ._ �_.�. Lanovutiz�eFireSohctioris :rE:�,
�, � ..cK � f,. S� . ..��. { �, . �. � ,_. ,�, . -.� -�I , S .. 1b .
�14 2 r F. S 3 � > ' � � �l+ : t_vJ,1 .i T� �` \ 1
:� J - C i �-� d s' �dt...�'i� L'1 � - '� ��� �> 3
`y..' � :' '4 z `kr � tf �.t� �{:tf �� . � �, 7? �i-''x rr.� c'��� 7 .�u�t � r ..t ` � a � �
Y .
s
'� .,�,., Y s ^v.
1, � .�r C �`� w v� t
' } �r� �J� ��f``tf f�� w {y, '� � ,��' r � � II� k s:it � :i �,,.n,� � 1. � r"...�, , � t i4�- � ,ri €�
•-f,f -.L��v-L a't,t3_�'`X..� fK`.. RS'q�i'�i.: `4 � �sF'-+� �'�-v-F > � � � �,",`'.�. t tt,r � i {
�.:7.J�ats.��� �r {. �,'...;' y-x���t� �..��"���.� � ;/_,..<..k c� . j ;::� t�.ir.�` . �;' ^ � �l f� -
� {'� Y ,.� t 1-� F �' �'9 � � .� i � �`", z = h : ! F�; . 4-Y2 � " _
^4 � � 1 d � '� ��� � � t �{i � :'3 � d t t � i ia�� tt i Xw- :.
'- � n f5 ` j 4 - �- t � y` t : � 4.
4
- '` • � - 4 l: V
r c
tl � ° - ' _ � ;'t ,
_ i j �, ' 3-��. ,c t t r
_ -
..J: ;�.; � .:- 'i. .�e `_ � - , . - . _..�._._, _�_.. i. _,. , . . _
y� •s � .� _ L' � .y' ' __:
_ r� r .? r i '� ti .f- �.: .a
r 3 �. �. �' ..
F � _� �:>>..,i 7 �r �:y `� z e�= _ � �.f . t ..� F iu t��
� . � � 5 � �� '1 � w� � xa + iz , � . ; �' t !,1
# � t � � 3 ' � A fire�ri yovr facility ts ne�rer`pieasat�t Bu�y�t y�f,{ � t -
- � �� , �
_ �,� � .. � ., ��� �, , .�»k _ k :��G y F � _ r
�r �- g s � _ �� � � y �loesn't have �o be�debiiita��ng Carbon�djox�cle�the� �`
� � a .I y �- ''f� �.2 �� '. T' ��. T . � -/ ;� 'f f-
� .. �. �.v �i.F, !.- I {.,�,� 1 _ • ) �,i•.' _� f�.'�'. 5 �.-` t � T � � y- -��
��} � 3 = s _3 k.�F� _ �ortg�nai "clean agenfi," is stfil an,ecanorp�cat sol��ron,�` `t
lt ,�r ii Y-., t.' t --��` : i'� ti� sr �. r �-� . C,C r' .' r� -.; a s �- ,5 ..S s �:�
- i. , ;� � �n a " m fii t ;o = _
s � 3�-Y� } � t, provid ;g uta a c=or manual protec �on r C(ass
Z. e �
=F ' � � - � A B�or 4C fires ' � � � ' }�= i' ' � �
� � --- _ �-
3 �
-4 S ;\ l
) N- 1 � � s.£,,. . .7 _ �."
,f.�` :w .z , _ - � it" _ � i . ,,: `' � � 1 4' a..
'_ S L �� i ,� c ._3- � a�. } : � , .,y
: �..w 4' Y --CFr 1' y � £ .: ��� � 3��: ,n i �.-.���r :. �C. f} .c r:��u y .
'"�-�!� ' '�.Y �1j !� .�� ' 1 S_ ? Y . 'S L f.A 1- '+` � t
X�., t x � i r ;ae`' i ro+taK} ,�' f �-� .rt £? 1 o jr > { y .i E.,.-xvp -�c� ` o e *s � �, ,��}-
' -3l 'X t �`s� . .. 2 .$�.� � 1 ~� A � �� 9 i 5 `£1 S S A� ..r i
v�.�s� .r..r �,; �_ � r k �,� �' � '�$ t � � � � �s '� �
� � �__.S ,-��:s«9rz�v,���..�--i�.�._�,,.::.��.�i��. ��,._.ir � �.`� F^c e 'F �. 3. �L� c�4''.�y.s r�' � `� t'� � r_ 7 �'S^� ' ; v + •`.
e .,�z �- �. ,.�_� � �s�� r e sr,:i���ra�'wT,._'s,,,`J!'a-t � 'y�F� "����4.- �se`"( ��. �i t> p��.r
�- � _ � �-�� T,he onl� gas�o�s a��ent c�pab{e ��deep seated � �
` � � �t s .'Zy- f� �l'LL'ss'Ti--s-��"� :_4 s--t;�',a°� a ��'`y'.:- � ' r y�3`a ? �- x•^�. � �.
� -.� � ;r � �_�Y �,Y,�v� �"'c�.,.tr a�t35��-�� �"''S^F� r � -v""�-{-.� ,�,.a '� '�
� -,dadK� � ., � 2.3:�'" � s e+ f�-.�
� � ; � Ciass ?;PFi�za�d=pro�ection, versattle G4� can�f(oacl
k '� �. ��� _ �� ,�?: "L? ,y� x`€3^s}a.,'.,�<5��_�`c.- v'\F2-y4 {5�s f���Yz�}�`+` ^.� A3-s��r �$` .
£ � ��� s `�enclflsed areas or�discharge:-d�rec�ly orito burn��g_
� £^ � K �: ..�: t -Y. „�y' ' +�¢ �+S Y� 't '��>_ 1 � -
1 . .- . �"ct�t�.v' +t s S � Y`
.j '�'��:-i�.r . �. a� f�� tI.� '3'� � !1 t�?�s` 3 s�'rT�"S
�3 x ` swrfaces ln�e(ligen� cont�oi�pa�els and de�ectors� _
-r -� z . 3" �+, . +„ '�'}w+-" r^�7 � rs �. 'x. i ��--� '' '' �.
r 3 �� ,$�" .„ r- A t�`�.*��r.r� . '� p ks �. � ,} ti � �- W �. s ;
' - r �
T � such as a►arAU��PULSE� Gg:rt�rol�Sys��m, offar�z x �. '
;',x �r.���. ;� - ,,,x � � �t, -7 ,.x r� �r � -
f 5i -3 �_ �, - j d ''��-.�^�'�� sl "' .�--s 3tr{ -,r _ �e^�_. �c r,..rY ��.s,- ? �c3 r
�{ _ �l �(arm auxtliaey cantro� a�d au�omati��elea$e;� �
��' t� s� �"r .,r��... �. F x` ��' _. st'S +. ,t �� Y , 'S'� ,s� � `a3 �- v .
�� �-. F�" . _k _ . ^ .. ' t ry �`G`� Z -.
.�: .- �ST �' `s� £J _ 1�r. "`d.
-�'A �.M�.,} -} � -L
# s, ; �Ta help enscire sa.,`ety�`�ii�per�orriel�mus�rb� �� x
� � i.�` Xf � y h� � Y :.. 'X!
� - . : si-.. F,.� ria f.�_aJ'r1 -V� {-
F ` � ; � � �--�traili�c3�or� �h�e'��O ��Ystern an�JNiarned not�to y � � 5�
� �.. rt-.��- � � � � ,�� 3 sx � 7
f ��: ; � �"_. ���f�,��hs�� r'` ?�c���,� 4 i:F� �,}'��..�'��`�'��r k
4 r _ . - 'dp 4{✓Q y }.F��ry Qn�Y7('�'S�� �rjy � rry.F y5ryz*t 7,�.,y.r/��J�.� 'Pr€j� y +n� -u {�.y� } ..yE- 3
} 35'�.E .� �"'•' 3„c. rG��Vrl�I.,IyfG'lJ�Zi.71� -.�l�� �.A41 II`g �I�'4F I�1�C>> OY L11 I�II�� �'+F
��,T�„- .��7., ..- ���� -. 4� �^3T�elr' %'� .��y�„�hxL�.` '� 4�r ii-�i r''�? �F i h�- '� rn � � �'f� k _
Y�. ,. .i -r�. ts.� x ,a,.. i, .t� �' �..� . �:� � . .. 5 r� ',.�r- �.._� ��.
� .:.� � r t' `. t' '4J z _ '�,�{� q'4 yp e� �i n fp'- �,��.a'•z -._ t.. F�'t--. �.0 r S_3 � r. � `
� '�f-3," t �'�'rv. �Y r t � r +'��'l�Y. t�i4C�xI� C�GarC.� �ix�L��' r k ._ � z3 a"� ax 4r�"'Y 3�>
� s� -� ..�:e� +�_ � ;.� c i� .�3�t'.i � ,, T s
_ `s .,3- .a�.,-�s� „��..t'� � �r � -�.r �.. e�'- t-;�.�7 �s'�: - f- c„ -� „'s' .e2 � 2' re %=i ,�.i-5 1�.�,
.. -.' i�� -4 '�; �.� y .,s�'� �.•- i -. �f: •-ri -.s.,,,,.:,s .ti:,, .� '4z s-�»s, �..E.,'�s� "�"�^y.F.� �:; 15,���_���*,�"�t K� .,:
�,s. _ .�-ra'�ir.,�'�?- ;�� r:.,.',.s.� 3� t�"s'3-'`£� l�rt 'j.^-= n �%- xE. �. �..� } _r.�. .•,-� ����s-.^? `'a �.� .
'f'2 ��s 4 ;� , S-_ �. ... "�r a r �"' K..d r�" -> ' -*'a'�,+ �'"-�� '2ry-,s"'F�:,.'�"�'�.�-`'3� y'' Z.
��� �'rt ;;, �'��¢'.'""�'�,w� � � � � b� � :r, ,I. . ;c .r k���-c'�; �g_;,}? ,ev �-��m�'�� �,;�,. '-s �.,,�.,� � �.�1�r ��'.,,Y��.,�.c �'�; .
x �a-. .q., ,3'"- � -°-w -'.,� r .:` 1. -as �-.- r � � s� ..-�r �� L,4�+ �, h -� ✓ 7-��- s��t'�,��a ._�� �'
=-� -� c•"-i '3�'S»" -� .� .��.-- � - �.E, t h'�' i 3 �.+R "h�c�.. f,7 "f'� p..�_t F.. 3�= ? � 'l,. '��''' �i '-.
- �.z+�'n.�, �-:� f � ��,..r� .F - r� - �'„a�-"'�� �',a' �: �_ -�>'�.-7.r fi'�� -,.r-x. �... ._ � �
's �" 5 .�?a"#� .';� {�.,� 3'�-.✓�`-a ix,t•,,�,�.__ f ti .�. f �.�?"F i=+ .r .A� v.l�`t..
_ ��.���.�4� �:�� _ � �� s ��our�fi�r'e �r�tec�{on par:tner ANSIJ�� confi�nu�s.��o�� { -
� .�� r ..��i "€�� y''Y SJscLt ,.�+tG`a� .j-�' �i „ � --T"e q'��.�za,,r-^2���y�,K�i�,`��.C'��1,,�y,-�.,.'Y%���.��{��"�+`�x^�".' F
� ,�'>' � �"-� �i,�,:
rf .i�, �' � � � *�,�. �;,� '�". -: :...z,� ��_�5�,�x�'�::22,Q,'�`'��,��`v"�cr.�-�.�•�.o'�-.l�S s � .�s'S '4':-r .��'i�-a�s , ' ,+-Y`` s.
���:,- � ,�..�����}��A������'��..�k.r-� � -v _��f..�„�t�lead�the.f[_e_,supp.r,�ssco.n��ndustr.y`w��t��a�� i}>rangetiof,� �r -
�; ,r�;�r3,4:�.-ps� .?�Q"""'�_�ys``��.:h:;�`z,�s;s�'i�`�y�`�.., �,�..5.� �Y",�';�-,rr,r_ �;,':l- m�'��b,:���s��;�1]� .;'f�-'� a�-r:�^�S'�3`�''M`b�'`'�-'T s:c:3c�. ' 'y-'-��'�'r-F 7�..-"�t�„',�r'�-t-�` '
F ��':�:.-C ., ��.�:.t�X' �c'_.,:Y'-'y� •s >4,v�ya-� y .SS S � '"J[ �"`^y�1y���/� q p>/+:Yr,I tY�p'�y^` {+cTw���/��}��+��� Q '4�wg
::t�-z'•4�.C��.��''�•;�`:.PX ����3��'i�--'�'�j�`sy'R` £�...�r^��`��� �i�� 7���:1'� Gl.:��11�L���si1��� 4L7tx���C��� �'r�^�'
';',,"--.'''��=' �°`;;.�--�v,-.�`�_' -�'r'�.�,,���?=��r-�i�r�.����,� .P� �� � a�a��ty,z�so�u�ior�san p �,. � z���.:��t�. _� _,#.E�„�r� ,:��.���;
r :,'y, �-.������{�.�,v,�ydc�t`z s��i:�� '_3�3`�t�.���"��s.'y `���-�. '` x __{S., `±�t'd'��'�1��� aK�'�2x'�.+.�'�"E,,"t��^T s�R���'�tJ�.'i�L �7.� �;gG,'.� �..�'b"-� .,'��`'•-�"�s&-�`:�'�.
�1��.Ya.a"°. y,{-1 �f �Sfi.� �.�i-c�F � -S 3�rlp -`-�'�"kjR.�. "'� :, � u,rti3�i ��%•s s=a�n.t��Nrs.. j. -, �:� :;�'£l�a�f;�f.��»�s'Y,&-��....
Y���. ��`.��,����.���: �-���'�-� �����-�._-�4���� :��`�ijy�a-wo�ldwi����ie�vwork o�.�he�most�qr�a�lE�ec�,�,,y��,�� �� -
_�
tl�r����az<,ri ,y k�"'s�„"�.���;t'��- c:,;^�, rc�,�. ,T-� r.�-'€+ -� ,ast-c ���,. � -s�i�=.`:�r�.�.��-- r"'i�.€� •cr�:,e,.� ,�:� 9�_.�. ;� �'�" -"r
r - 4 t,£�z2�; ,� �, �+ .�.� t y`��:._��"`�x._r�e,XYr..a*.�`�"�i�'y'`�� -2?.Y�:�.�Y�1..���v�,.���.'r"'�:'�} y�'''3'y'.=-.z fi F ti"s' _���'�;-_�_"x"�� �,2'.X+';� -
^;;_..9. ��•-*F�l+�`'-c.y,''�-'E-�. v�S�������'�.�'.�'"'�-�r-�.rzyw .c-� � � .c -Y,,Y-a2��•-'v,�.]. } _}' ,� }� r ,j ���'F- a�¢`�S��4;��'� b�� .r-z
n... "'�?vs - ��. --�...a�-•"^+l�• 'x`-.. �-+,%*'' i f � `4� `S �2. .�.x. -'i'�:
���,�'" �r'�" �s . � ...n-h`,-a ,,5� :-�`.�,r��U l�l� Q � .�.��1 .i�JL�x �� s �-"�eJ- :� -'`�3y ����� .-,
-:.�,,c. { . :� ��.3`�.r�j:�°����"'4,0-�.�-'v,.�--i, xar. �r- _ .-S �"� }-��1�! ,�.;- �'... �s-� � ,'i
5 -C�.,ret .'Ks � c#,,.Y"' ,r-:�� -�ta�.; s v....y-.,,,�y,a r.�:u-' a+�� g,c.�� =2 �t- .�.4t���. ��� T�?�*t&'Sc---x?�p# �_�
� .'e' r NK '�s �4�bK � -�-'F -.:. .c r ,� r�. ..� .�� ' . :s'yr '�y,,-"`l�v-"� "� s¢t:.�r^e3' �i�5:`' -a s:.-...n. ��`6,.�p�� .r .rs-�`i. .;�
i ��� - "� {�`_ ,'c s� � s.> �"'-- �.�� _ �'.�.E'"e . _:r-,�^, a aT't�. , � .-y' e , � t�.e�z p �-y .
.:.'.:c� ,.�- v_ $ .�.,'�y=,t'�.c�„� �,r�a . �'.tt .- ,x -z, ��, 'S�---�� � c 5;-; +��' ':r,�� rr. _
' 3-�?-t �� � . '� b �'�i``- �(''�r .a-4 p ,t3 � r .f Y ,z;r�,� �,*z4k�„ _�,i,x ..�..� '��4,, `s-� :�rh L'` �-n' ;.����.-zs
.y.. t ,.r:- r•.�� `� �. a' � it.,� -�.v a.'��! �' - "�"r-� 1 i c r-� ...d. 3 ..r
�r7 �� '£ �-3' .,i n;k t�` :��'� .c � �- �. �S �„^ r C. �c �r�- ,f 7-s�„� 2���'�- �'' +.a...�s�� _
� � � � � ,.�� ��u- ��, 3-r.x� < �- �?' � �3" �.,, a"�^ �S �,.s-3��'=�� -�`� �i 1 Sx�.�3 o-,,.'T',�"er�' `
I;r x��: : x ... .�z' '.�,'; .�"..... z � _-.' �.``� '�?;��'.�a:'� "r`_".e_j-'.'z��.�'��k:��,,�-,�'«:r... x�.�..����..Ca...az�z.?:��s��s 3''-�'1__a
._.. a...,..,�..-5;��.>...,_.�Z}..�,..:.a..._s.r ,.._�._. } ,� _.�r'>.�.��:a_�..,-,,.a:_-.. __ a sa-_ ^^`�nz�
;F_.) a C:f�.� %�., . � .i:. ,� . 't � "�` � -.-�} . : � . � _ ., . .�..� ' -�.' ;.��'<�` ./:"1 .
�-. � • 5':�_ • � . Y_.: . .�:_. _ . . - _�-:a. '_.�.'�_-. :_ .�,, �,'.> .•�.. cY�. - ''.y -�)�-,� _
. : �� ; - . _ -; � ;.. ,:
_ y ,
, ; ;-.;r -. ., �: �.. a, . - e: ,.: x; _ ,
' '. " �f. , - .
z _ . . : C ..:< " .,+ !�� � Y a: ,T S � / _
.,Y ' 4 i�l � "� � � � .. � � _ 4 r
J .
: 2 r y`�, �• i � � t � � "`-{ ] � r1 � � � t �� - L T ' .-
p � i � y y f-.. I y t � i `.( 3 -
t � � � ( t F �` t . 1-` ' Z ._ 1 .� 4, -
.t �y - -� t i �
}. r yh "
... .`^ ` ': 3 ,� ..` ''; `' f
., 1 ' ��� S � � � r-� � Y
- .. C ���5 9 ., .' , . �.
__ r r .,. _, � _� �.. 1 � �` .� - .. - _ � ,
�` ANSUL H_�gh Pressur.e Carbon Dioxide. Systerns are especially effectt�e�fior non acc���ed hazards ` ,;
-t .. ._. � : �. . ��-z:'t �.k �w t �. '.� �_a r : l,��_ � .
� �uch as serniconc�uctor wet benche�r control roorns aricf pa�nt 4mes r Whatever the,appl�cation;�
_ a . ..� _` . � .4 z f J � 'L .._ ,:� .�. . . � -.- .. ;
i: `t ;� .� ��.� � _. :` , n Y�.' 7- y ? �r^4
�- firom cy(�rider to �ozzle, each systern is custorn designed for your-specifiic fire hazards � y. �
_ . s : ��2 y .. r5 -.S .�r L l _t t _ , 7 G
. - ., � � - '.. f - .
.� � ._t � -� ,i r ` '' s- s- t�-c�` . r ___ _ T
'i ..y Y _. . �1. �t t .� 'a r- ' � .` �� :
c � {,r� ts .- x.. _�... -, . ._ _. Y.`G . r� . � , �'
4 �F�."t =r � t � c
=High press�re s�s�ems use �ndiv�dual:storage c�i�nders �`from 35 4b C16.kg) to _
�20 (b�,(S4 kg) �
r � : , � � r 3 � .�
' s � -F r . % t �E. ' F �" v -t "
L�r� ..' � � . .� C 7 t.;i 1,� �.. � �+_ ..r .,�..�.r �-,kr� �. .,� .�,�:{t + s` ,7t � -
- capac�ty each — fhat can be�man��oic�ed ta�e�her�orsrapic(fsirnuftaC�eousd�scharge Cy�[nder
�t ��.4. � �..� :� .' f„�t .-� _ . � <
� valves �at�xbe_op�ned autornatic`af�y or�nanualfy, and eitne� [ocaily �r reri7otely4using electric;
....:: . .�.. � -� . � .:� 4
` __�� . .. � .�.. �'�� .•4 t �
✓.._ �.F � Y .: : 1
pneurnattc or mechani�al vafve�actuators kY � _ ` ' r
�
� ��
� � � .w<<t � .__..._tis,ai..�1z.��,..._ _.�.�._,,..�.`...,,_ __.�. ,..YF..J.-.. �..S�,..-,� .� ___ ._._.�Y s_.�,._,....._�.....� �J.... _ � ...
k.
a..
:�
•�• -
_ �
� M - �
•
� � - � � ' •
/�`; , . - .. • . - •. . . .
r-
i._ _ . • - •. • - •
►� .• • "
t- �
I t ', •4 •�' •'
�'i • • •. •
a-_ ��' �r
� - . •- • � .
�t •. . . . •- �.• . � • .�• • . -
{;
':�c -
- _'�, .y�-� -:;i'�- • s c
' � •� � � •
�. - _
K'
i: ^i r • .�
S � _
C ; j"�
p� f - � - - 1 • t '
d.� :'1 •
:' •
�:T - _
_ • � ' � '
_ ..: � �
,.ti'-:.
:�
„,.. ,.. , ,.., _:� -.. -
, . .,�.
� , y > r ` `, } �_ , t � �1
,� y '_ .' „ . ._ � F . � �.. .:� t ; � tf .i a 1 � � '�� � .,,,k ( 1 :�.
j
y a
i !
”
t � ,+ � �r `E `F f ; t u � -� z � � '� � � .,� �, ,� � .t �
� - -
' � I , t � ,� - -
1 1 c S,
e �_ . . . _ , ..
�_ _:. ,; -r �• , ,> >-;
f s; :. _..` � � : �t .. : _ r 7� ,; j E ,�S �r�� i,� �.`t r
i f .
. ; ;: . i 4+� a 5 t �t � - r � _ .y -.= i z S
S �
t x ��
..- � t :. a �-. _ �.x o is � � ._�J .� i ..
. :�' t : 1 � � r. ;.S -.,y :,� , _ �n �c
� { }i
S . ] r'^ < � `T aE�..{ - 1 J 3 _ � _ � �.�'�l 1 { .7-� t'.'P 3.� 4 :2.,,?
--AN5l1t� PREFERRED Bulk Low Pressure Carban D�ox�d"e Systems are �deal for`non ;occupied f�re F -
r b a s .= s � : -: � t,,., x- Y-• . ` s i � : i,x�� -
-,r _r y .. ,z . � .-; .. t .: -` <.,, � �� c.. � t' �ti � . .� .
hazar_ds requ�ringflarg�e �mounfs ofi ext�ngursh�ng'agent�n$a I�mited space �A sit�g le bu l k tan k t
..,,-{r ' � <;, L7{ �''�Y, sa.' � .2_..i,; �,�._.,- i.��;; � sy :i' F -^ . .� F `•.� � ,� '��� i. a. f
. �,
�'- '... u
,�can store:from`�%4`fo�6'O�to1��;(684 ta54430`kg rbon e, n�ain
)��� of ca � �daox�ct ii�h�ch�s�rna� ed,m a� � �
Y' S '� �.�T'� � .. .� � F:.. � ; y.�.,F �S : �� a� ,.`L^�..�a'-�F �, �_..�s � �.i�c\.i �" � �
���fiand by'�i�e iead�`state ',This allovtis�t�e`sys�em��to prov�de�effe"�cfEv�'ci�s�ri�ut�on,�of agent on�
..3 S.`�-1'�r`<-���.�`�? .c�-n`a h'�} . a -L� r rq- .1_�i� � � � � .,�� ;� r.� Y � ��- � 2,-�,r G _ �. .� t�x'�-;-. _ �-..r.r L
��de�-tanci �Bu�c low�?re�su�e�COz�:syster�s o�Fer muit+ple`-disch�arge capab�li��es betv�i�enr�charges
-`' . ��� '�:..=�rmz��",ff'it r��_'f r-i �.�y�. 7 fin Yt r � t t.� �G:t vi . j '` _ F...:.#� '�.-�.i�.t� Y .,i g r�....,y, .,q '. �7
� �
A�S'ari econornic:al o����on �>� ; �k � t K,��. 4 . . v _N ., l� _ t 'f. ,:a1-< y
_ ! F t� .0 1.;�,y�r"s' -r€-,-i.. �� { r S � �c- , -•,,� �c�.1c t ;�� �s�. � .
Y S -'Sr 2 �Y.- � f F' � { '� 1, . :. S f _.� _
, i� . e : rx <� i• �ri .� � � �5 . � -£ ��_, .�..:.,
-, Z �F,r� �r k� _- b . � �- ` t � ; J � . j,'L 4. � ; : ,�,x-,. .-. !
's i .}a �•,,,y s�. .: �,��� �. _ ;�-? a _ --7 .; �s� _ - � F-
a.. _.�-c� y� — � < i
: The lrquid}C4� �s stflred �n an QSME coded pressureyvessel equ�p�ed with its own.re�r[gerat�on =__
.�: r ,.�r .{� w �.i �^v:t..�. . :. � ; � ...,-T� ..•. e�> �.�_ � 4��� �.�`� �"'2,c-z���• `3 .
'�: s st�m3�Th�-teri�perature_ydithiri t�i�e vesse��;►s kep� at approx�mately OcF'( �7°C� C�y maintaEnipg
Y � �.+�' �`v`r fi: Y � ,�? , /Y#� s:3 r 4 �. � �,, r=a k ,F s � "S.c� �t3`z � y�,-- 3 �
f 1 ., 'k':.�-'� ��..�.u.'-�F�H��.'�,,��.,.�, ��'� i�' �i'� "`�Rz.,s r -� .�� ��,f--''� '�.��. � .. --i '�a
a s :`-t
�`: �rt�Jl1t@t"t"j����'@�SU1'£�tCle�Y ����Sl �2d37��J�t"� '�i xrs-�"r � �,»� �'�`�� _<�+' 1 � �3� � -ti,
a 5 .�x
�` r`�r e � '�r � � ,z� .s � .f 1 _�, c.��� zt „ �'� - �- ,< N" i'1-'"s Y _
�`_h S .,r 2- > ,�.'-.v'y{,� `x� } r����'h+ rr-' °� , xj �� � �{;a � _r �-�i. ''z "' _>sr -t^� pYy ri �u' .
S�. � - R -F 3, � � �. L{ f ._ ,� . t } f . ,y r _ N4'G ; :tR- �,T.-�4 '� :
- �F ,f }T :� e < �`�"` �. � t �`J,.. -., .'tX3 c .���'� _. Yf '. �2 a..-e � Sv.4 :J � �',,
� Vafrie �ontro��s elec�'r_c� p�e:�matic orfmanci:al Eacf� rnaster and`se(ecto� valve,asser�bly constsrs
..r ..` r .-, .._ .,��_ 'k_o -�a " ��a ��'�z.L . �--s :L f� � -
�.h -, sr � � r� ^� " '�' -�-. �#- �.n . -�c -;� tr �..,�- F "4 ,z, '
...� y:,+ - yc'G.-�r ;s_� r,�,t�5'�2�-G- s r�y�`" ..=r�s �k'.p ' ��-.` _' s �i'"��-y'� -7�� {.� f
�of;eitheraibail or�uEterfl�v�{ve,a sprmg:returr�pne�ma�acs�ai�e operator ai�d a �hree �vay : --
�-s�,--r Nc.,,.x� -*,�.�r 4 .fi#=� r�� � � � �� � _';,��,fi �� � ` �, �`k�; �t� 4�.2 -£ 3 ._`� '�' 'y -=� i -"�s��
1 :_-�r��'�!:.�:. ��s+�._,�w-�"��-'�a��:': _.�:��'w:: { c i�;��'�i''`�;'✓ . ri'r }.::r --k �" s" -t � � ��-� ..
y��efec�►'o���all�{operated�sgleno�d value `A3l�sted and ap�roved t�eleastng cQntro! panei 1s�used � � ,_ _
� s� rt-
+ �.._< �:.�4-�"r�"f:L�K�(`s�-�c3!y '''` . £r 3-, ���,,,�s��i J' , 1 y� .� � . ,n 4.�: _r r, v'�-��, n "� � cv -
' �o�pro��de�au�q,rna�Rc defie:cfiton and controi � � �
-1 Kr �dt �cT l`!� K .S '� � � �� j f f{-. � �� �.
� x � x �3 s �'r
.� �`�,-��`x'�` .-� '''e-.. -,fP:"Z ,.�f r„ � k �t s r �: s . J � 1.. �.V; ��s.
'7 -��� � d s a � � � r x �. ��i �s. � � � � � i� t ,r
�
.
; 3 ... > �} S,� L ,.t ..•_.Z�i h �.' k J` c 4 ` f c.-,*S '��` .�ti �fr� ♦ ,�' '
� ylz � _ �_ f . ..<.F r�.,,n��..r«.� ..ti,,.r.�..�...._ .v...�.....c�.. �.._�+ .._ `._t: ., r_�, _.. .� _�, A..,r_:Sr��f�...�.�._
..._ . ...u..,c.E�-. ..�. �.... f�..�..ir...x... ....'`��x�.�.c.S:.,�._,_ _, �...�.�... � �.� �
.• ' • ' ���� _
� / • .• . �
• • •'
�k' ���'.
i..: _
• •
� ' •
_„/. .>� f�1 {��'._
_'.,C}.' '.
�$
• � � �
�{.
• � � . • • • •
�- - �II��
�s'-s- �b - • • • •� •
v
• � � } �/ • / •�.
� �� • �...__
1 � • �1 .� ���
:�:
; ]
• • ? j�}.� /�� � � � • . �
t ,S T ���r�." ���� •
ta:=-^_ � �..�:
-�5£��.4. �_ '� • • • �• • •�,
� • •
� LY.i- _
.A � � 3 4 � i k � ..• _ '} G _ �
, E� '' �� ,� t° � rt _�3 � T��� � _ � _ � � r s -
�' ? P v' - � .
F ] a 3 t ,-s s,! � �._s � t F . ,
� � � E . �. t _: � . C. # > � ,� �+... y � � _ t �.r
_ � � I� � i � �� -� r , , � - ��_ � z< �� x �
Z t .l �'a+ .x�.r� a,��;...�+':L s.�r4:3 t �Y..� ;:� s- � .. h f r P 4 i -
� ,...-� Y t 3 . � . .
% .�t �'; ' `F ; � , � ��-` r :� _ - .,�si�^ r..�+ � �u. ' -t
y
i '� �.r 3 ? S � j' ..� A - �
f .,� S _7 ,r - - [ r � 3 3 - �N ?X '4 " �
Z �
� x .
, r r
t �
_ '. k l 'y } � 1 -.1-� _ � - _�y l .... . r�YF"S} � f
{ � -._. .. .Y ���, --� ." S .� . 4 �. ' - .'- - _ ( �� '
> Br�dgmgythe gap b'etween h�gh pressur,e cyl�nde�s and fow pressure bul}c tanks, _
� k ' �rs .t�,� 1 .'># �-.i ,� -. k ,r y '�'` �3 Y�1 _:�t4. � l��-� ..c I -- �.�} �
i �
_ min�}bulk tanks nffer�Scapacitie� of-1,0�0 and 1,5�C7 lb� (_�54 and G8(� kg� ��e�ANSUL - _ _ _
� . �-r : ,, �.^ r . , s .' rb :� � �F ia 3��� � �- df _ a T� �� r 1,. ' i
PREFERREC M�ni Bulk L�ow Pressure CarE��ot�;D�oxide Systems were d�veloped to -� � _
v....f S,� - t a y,+ ,t.�L ., .. � �t. - r f f '
' � � . � ..' \ L �."� �.'. -t a � : � ��-.� .. # 1 .' 3} . 2h�. F -. .
prav►de:an al€ernat�ve to marirfQldiFng �ii�h pr�ssure cyl�nders Tner�anks are confEgurecfr 4
_ v"5 l, `3 r ?. >> } . ' J :y R � '� . �.�-y ' ;
`, vert�ca{ly to save,�valuab'le floor space min� �bulk tanks can provide protec�Eon for - ;;
... ,�� � S f .. C t : L. � _. '. .l � ', . .
�: �� �.� .i .�: r. . .
�` non?oceup�ed`2total flood, Iocal appl�cat�on hazards, hose reeis or.}cusfom designs such �
_ ; T �, � ; } : ;
- . x f . f -. 1� r >-�` . f4 = _�
as 1n�e�ti�ig or�spurt �ys�ems � - ` � ;� _ ' -
� � ' }
{ �� i
� � - �.?� ' - �?t .i- - - r��r-.�
_�� a i e •c i� ''� �• � � .._� c ,S,r t .' �.�..� .,..
..,_...._.._. .. �. ._x x .�_...__....,_..._. ........�.< .._.3.��_. .._ _.....�_ ��_:.-,..v_,. '.�........�.,_�<_ ._...�...�_�t.�:�._c2�..a.r:sc�Y._4__�.tE.�,,.__.�5fi_._:`Ta._..�a..>3s.:._l:::ss�:c� _ .
.� ' • ' �� • �
• .• •
•�• '
� • �
� •
S'{�:
f= '
• • �r��;
• ' •
• • - � • i•
t�
�
� � � • • • ••
�'i�� •��• �
i��
~ .*�
``R� °'l�l�
_ -. � - _
�
, . - .. .• ��� . .-
`:.,
. - .. . _ . �� - ��• . �� . . :•
._ . . . . - '�� ...
..- - .
�Y��l� _
m� _- �
� -
Sr
- ._ . . - -
1:: -_ . . . .
- �: . . -- . -
� . - - -
� -� Missouri Department of dnr.mo.gov
'�.. � NATU RAL RES4U RCES
Michae) L. Parson, Governor Carol S. Comer, Director �
�'
July 5, 2018
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 / C295331-03 City of Cape Girardeau, Missouri
Wastewater Treatment Plant Upgrades, CP0001299, Change Order No. 16
Dear Ms. Brunke:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 16 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the City of Cape Girardeau, Missouri. The
project receives funding through the Clean Water State Revolving Fund Loan program. This
change order has been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in
contract price and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This
change order modifies the plans and specifications approved on June 5, 2012. It increases the "'
�
eligible cost of construction by $398,108, and changes the Contract Time-Ready for Final
Payment from October 18, 2016 to December 31, 2018.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four years following the completion of disbursement.
t�.
Rerycled paper
Ms. Casey Brunke, P.E., City Engineer
July 5, 2018
Page 2
�
If you have any questions feel free to contact me at 573-522-9723 or Department of Natural
Resources, Water Protection Program, P.O. Box 176, Jefferson City, MO 65102-0176. Thank
you.
Sincerely,
WATER PROTECTION PROGRAIVI.- .
_.,l .
,:
� �
M__ ..
�._'I� :� �� � �i'� , , I`u-�'
�
Cynthia M. Smith, P.E., SRF Engineering Unit
Financial Assistance Center
CS/ng
Enclosure
c: Mr. P.K. Mathai, P.E., Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson, Water Protection Program, Compliance and Enforcement Section
Ms. Courtney Zimmerman, Water Protection Program, Financial Assistance Center
�'
�//�Y l_✓/
�,i __�
`3 . � ,
Redecker, Cindy
From: Brunke, Casey L.
Sent: Wednesday, December 04, 2019 1:48 PM
To: Redecker, Cindy; Mathai, PK
Subject: FW: Change Order 17
Good Afternoon!
I spoke with 1oe with MDNR this morning. Please see below. I think we're goad to proceed with processing CO
#17. Thank you!
Thank you,
Casey Brunke, P.E.
Assistant Public Works Qirector
City of Cape Girardeau
Phone: (573} 339-6351
From: Blume, Conrad [mailto:conrad.blume@dnr.mo.gov]
Sent: Wednesday, December 4, 2019 1:45 PM
To: Brunke, Casey L.
Subject: Change Order 17
Casey,
The loan SRF Loan for Project No C295531-01 has been closed out.Since this change order did not included any technical
changes to the project and the loan is closed no approval from the Missouri Department of Natural Resources is
required. I also talked to Todd and he provided adequate information on the spare parts. If the City wishes to use the
credit towards the existing loan it is recommended to use it to on the regular required repayments rather than doing a
separate repayment.
Conrad (Joe) Blume, P.E.
Cleau\�'atc.r F�nbinee►-ing Ui�it Chief
Financial.lssistanc�Center
1
Change Order
No. 17 (Final)
Date of Issuance: November 13, 2019 Effective Date: NOvembe� 13, 2019
P�o�e�c: Wastewater Treatment Facility oW�e� City of Cape Girardeau oWne�'s co�tract No. 3534
co�t�a�c: Wastewater Treatment Facility(SRF Project No. C295531-01) oate ot co�t�act: August 3, 2012
co�ua�co�: KCI Construction Company, �f1C. Engineer'sProjectNo.: C5X651O1
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Project Completion and Credits
See attached list
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(dayso�dace): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUst 19, 2014
[Increase]from previously approved Change Orders [Increase]from previously approved Change Orders
No. 1 to No. 16 No. 1 to No. 16
Substantial completion(days or date): MarCh 31, 2015
$6,658,161.98 Ready for final payment(days or date): OCtObBf 18, 2016
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): MarCh 31, 2015
$62,332,161.98 Ready for final payment(days or date): OCtObef 18, 2016
[Decrease]of this Change Ord r: [Increase]of this Change Order:
�(�(���j 4�-.`j(�� C� Substantial completion(days or date): MarCh 31, 2015
__{$C6;�4_.�-}--- Ready for final payment(days o�date): Decem ber 31, 2018
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion�days or date): MarCh 31, 2015
$62,265,217.22 Ready for final payment(days or date): DeCemb2P 31, 2018
RECOMMENDED: ACCEPTED: ACCEPTED:
� J--___
By. ,'P.-�����4�tw`'_ BY: �l J�`�.�'11.s�- By:� _����C
Engineer(Authorized Signature) Owner(Authorized Signature) Contract r(Authorized Signature)
Date:��I.��D/9 Date: ��J �1..,� (�� Date:_�5 (9
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 17 (FINAL)—Project Completion and Credits
The Contract Documents are modified as listed below:
1. Pay Application Item 345
Credit for Spare Parts (Note 1) ($42,391.82)
2. Pay Application Item 346
Reduction of CO 15—Contingency per CP 133 (Note 2) ($,4,552.94)
3. Pay Application Item 347
Reduction of CO 16—Contingency per CP 137 (Note 2) ($20,000.00)
Total Credit,This Change Order (Total 1 through 3) ($66,944.76)
Notes:
1. Credit for Spare Parts is the price of spare parts that were not delivered to the City and agreed to by
the Contractor. See attached spreadsheet of Credit for Spare Parts—Cost Estimate.
2. Final Pay Application, and coversheets of CP 133 and CP 137 from CO#15 & 16, respectively are
attached.
, „
885888 � 880 8 8 8 8880. 888888. 8 8 8 � 8 $ 8 8 88o S g g 88 8 � ^ 8S8 8
8 � 8 � �8 w 8 8 8 H 8 � �8�� 8 8 8
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 � 8 8 8 8 8 0 8 g 8 $ 8 g 8 � a 8 8 8 8 8
8 8 8 m 8 � 8 � 8 8 8
� m
os
a E
3 _
E ; '
a" Q 3
� - 0 3 0
a
_ ; _ - p _
_ a o � _
3 — ; - — - °n5 �
_ _ � 3 3 q o E -_ r Q
_ 3 - .E ; _ ; _ 3 ; ; _ _ Q
; 3 �E 3 _ - _ - - _ n 0 - � _- �'
- - - � _ a$ o c � - 3 3 = __ _ E
_ - - �E N - E 3 2 ' - E -- - E�v� n p _ - - E _ - - _ _
� - 3 E - _ '� m�? _ - 3 L "' E E E - -
� E ° ' _ _ _ E 3._ - E r O .. 3 v '° - 8' _ - E
gE � _ - � E E 9 _ _ _ c$ _ - _ '_-\ - _ ' _ _ a o ' _
V ° E E E ° _ _ _ E -` ��o _ �;�� E °P o �a _ - _ mg 'E '
° 'bN`' ��„ - o E ' n o a _ _ - 'E Y @i m `"o ���_ 3 - _ _ E a '
aE _ _ _ _ _ _ _ _ - _ ' �° ' _ u _ _ _ _
W _ o � a - _ _ _ _ -� �+o c� _�`m�oi .� _ '�c;o _ _
m _ m� _ _ _ _ _ E 3 nQ„ _ _ g;� a E '
�n _ _ � „ _ _ _ o,., _ _ _ g „ wg
m o - E � _ - - . m - - `o o < _
w ' - a� _ � E � -_ -n E E'N� - _ '-p '009 0 0 - ,
� - _ E � _ - '°D - e a v�P - - � _ }ij E�
r+ _ - 3 E _ - c r ;�- _ -E y �A N� 3 _' _
lJ - - _ _ - u g _ - _ _ ' _ _ ' _
oE 3 _ i� _ - _ _ _ _ _E` _ _m E„ _ a 3 v ; 6 _ 3 E 9 E� _ � - � A
E _ _ d � 3 3 c � a o a ' E E� rv�X a _S„'._ _ �a d - E m � m a..
E E E E E E E E
� � � � � � _ _ � _ _ _ � ' _ _ ° _ _ ' _ _ _ _ _
`v � � `w � � � � � � \ � °„ � � � � � � F � �
� � � � � � f �
E e
>°
E E
- E
� _ _ _
E E _
� a -
¢ - " � _
3 E
_ $ - _
_ E j � _ E 3 O o = � Q $ 3 - _
E `c o E - ' - o - o`o E ; 3 a � 3 � � - _
z` � � a
E ; 8 8 8 8 � 8 8
8 8 8 8 8 o S $ S � 8 3 8 8 8 $
� �
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 8 g
�s
oa
— ¢ a'�
_ � o 0
O V
i - E � �
a" o � �
� s F
Q E �
- a
_ - 3 _
3
_ _ - E �
- _ _ E _ - � _ @1 A
g.. - o _- E_ -
- - E E °c O _ o <_
N _ - o - - _ - E E
m E � _ E _ ' _ E _
E ;e - " - -
_ - _ � E� E __ - _ _ e
V o _ � O S'" E 9 E .3_ n E 9 ` E
�0 O - 3 L � - - - ?. ' 3 L - ' 6 �3
� 3 E - - E 9 _ - 3 E m
V�-f _ m 'p o _ �L _ a ` -
w _ 3 'o _ - - _ _ _ ' - - ; E 3 E
W _ _ _ _ E ' O' .. = � - _ _ _ _ _
V - - _ _ ; ''__'''___''
— q a - - E E E - F a E �0 9 - v O O o O O o O r O o 0 0
E � � n _ �
,V¢
� � � � � � �
E
i
E
_ " E `
E - E
_ a w '
_ �'
E _ _ � _
E ° a Q _
8 8 8
f �
, . . �
� -� _�. ��l
f�.
C,
m v l
O N N N N �) N N
O N N N � '
onr- n � u�im
O N N N N �� �
O ��N N N r� O�
� U u�i �� � fO �O J � �
�W Z � � v { N
o Z � Z p o.�, i o � ��
�7� ZO >, ;
�OwU � �' = -�
y Ui fA tA �� �i di EA �
H a "�"� "� ` � t� �� � �U�uj R U �
N C M ^ � � � � �
p O �
� N V J O N � � :� � in 7 � �
ch
o � � � � . v a T Q i -� � c.) c� vs
@ J � .c � W : 'a � Q, o o �_:7 ', � t) �� iy
n' Z N 3 ..;.� ? c° N m U .. V ',L �� >C p i
LL � O . . ' . � Z ; � ^a LL Q� "' ry W t j � �N 7
� � �
- c � c ; �. 1- . O � m f- U a `J 7�� � ,O r-
� . . . 6 : d W �. fn �. N �= � c : _� �� �-- �7 s�.
� p . � Q ; � ' ~ �U � � �..: � � a 1
3 +O � W p� Z � � � : o ca�- m� :e � L) �
u. m Q U U .� Z � m G �
� � �r- W '� yU F- � � m O c `
� a a � W � : m Eo U
ui � �� a`,�� c a Q .-.¢ a m N�'N zO ; '.�'o Q Q�? �. S �
p F o g'D m g? ��~�,ov W� .c�� ; �o 0
Z ¢ t � � � � � + � °�-` o]a �.�'`r U : °�-' v � t
N OQ � Fr....o �
p � m � oi� Q �� ��`�K �o I-S co � E 1 Cc� O : m ai m 3 ----_--,.__.�5
O D U a� w W N � �. u. �
F-' F' � Q N� W O � O C J C U C W Z J N � �v � : C � N O
U p � � L � U� WV �� "pm�J'�u- � Na�J� } � o rn �w
a K O m m O�u=i a� E° m z d O Z a O a� � o`J`, �Q : � �d N
d W U d � U mF- � oW °' c� v> w M �,.�" ~ � o �t
a a p N J C U O-Q V i :a W N��Z(Wj C �\,`i �'Z W C C L 01
Q � CJ � Or, U7 Ep„y' WZ 3� � �- O y ���
� '� ZL � EZ ` ��J Q � � m) Cw F � m E C
�6 L �VZ F� � � I :9Fvy°'�g � a U °O w m c �0
� v� KmOOVW � 00 � Um m '_ NZ U n� � o
M � c OZUr � m I-�- �� EW r xW Coy
o � o . 9a m Z mw a� � g
crn o � o'u Z.ou� � � � U L°�
�O 3 N .� � r ni ri v �ri co � �m �� a�,d � 4 W m F U a
a�� O m a V cnc�2�: Q
u- o '�o Z m �
� n c� r
vi �
o � V � O z o
a a� Q U
NU NU a � u~i �p coc� rn
� � 1� N N
Z Q
� � � N N L"
� �
{� t- W ~ U � � � � � � � � �,.
Z LIJ Z W � (O �G N C � � N N �
W ' Z � Q � N � O � � � d N �
� � G 01 E �`"
a W � p O C L L N N � � 3 � U
Q a, Z � � L C C 3 � � �O N O I..��
N C E �
a, O m � oE � d >. � m � L u r
� � ~ � >.� E a �' � ° � '� �
� `° a ca �� a� Q o � o c W Q
� � ¢ � o @ a � � n. `� '" 3 U LL o
LL LL v � m° � c $~ °' w
�
� � ^ � U � d U
{� 'Z N °.� c `� L 4 � .°aw �3z �
a a�!� v
U � W o ,N a¢�m@ p LL� m C9 m �0 `�
�W � I� � N �U a m � Z
1J.. � � � � Q �� � �n � V a �w oE < N
_ � z � ~ � � '�
� � c~n � a � U ° �m° p � (� aci � � mw j �
� � V� o c N J �w � n� U ., � c a � a �
� Z � � � a N � a = u- o � =_ �, � o ..�
W � p � o � � d � w o�� o � i �— � u ai� E � r
U aZ � Um � t� Q o C " �Y V' � " av � c�'a �
�
� V a � N Y� ,/� y a � y c�i o.� o d p �j,j � m 3� o c� �.
Z W C J N � V+ � Q J'O p�j'3� .� („) U p j p y �yJ .
a � ZW V � � a � � .ac � O� :° ,L�., c° � Y (f� °' m N o �' a�`�, c
Z � ¢ Vo . Q O � d3 � p F- � cymo ..N ym �Ti �''� LL�" m
O U � U Y in U � � pOF .S mT L c�J�a�Dm a�i � � � � f0 � O �
� V � a�O o U "o� �� E � � LLI 3 c` Q� � 1 0
E- p � mYF- � �� R `o m�° O W °�'w � o � _ v
LL � � � � y � a,mcU a3 r c c ¢ w � U ,�
a � OP ° � � � o-o °' a � U Z ,mo �} ,o �° � e
(� W V � W�� .o � ,No.r, v ra m !� � � p p � � W-�.
N QI f0 N T t,] (..1 O Z T
� Ea v� ~ � '`�- V
n- 3 � ~ Z ¢ � °-y nE � LoE.� y � O . \ W c �� cL�, O u
0' � � � O r�j U a C z Z F- � c� n!� L C� m
Q o LL v
$ 888 $ S, 8 $ o $ $ 88 $ 8 $ 8 $ 88 $ 88 $ 8 � o $ 8S8 $ 5888888$g$8$$ 888$8,8 $S$88�
_ � � ��g�� � �����g������ �� �$ � a � � g��� � � ���$ �� � �s����88�����a��
a e � �M�� � � rv�� �a m m��d� �N w���H
� , �O1 M N r1 a r1 oU tC
�vf (�Y M N VI O n �O M V V (��m W � O O
a f�l f�l d N M V lD N N � O 1�1 N r-I 'i N e�
� '��J 1I1
7
�
N VI N uf Vr UI Vf Vf Uf UI V�V1 v1�/f N Uf N N N N vf V1 N uf VI V�tn�R Vf N U1 V�N N N Vf Vf V1 V1 u��A V�N N UI N N N LI V1 N N�A VI N V�N
I'� U d
Y � E�
�u°�
N V1 N VI�//VI N UI N Vl N N�/1 N V/V/V�V'V1 1I�N Ul N N IM1 VI N N V�N N�A IA IA N 1A 1A Uf N VI N N Ll a/�1A V}1A b L]b b N IA V'N VI N
vv � � � �� � � � � � � � � � � � � �� s��� �����$���� ������o������� o �oo� �����
�a., tititititi � � titiH .. ., � ., r � ., r .,
6 S
O O �
8 $ '0, 800 $ SSBoS $ $ SP $ $$ 88SoF88o8ot� SS $ 88Qa $888o8goQ8�ggg$�$o8� �$`g' 8�
pp p S 08 88pp o8 g� 8 op o � Ot!� 9i $ Sn 8 �25�� � �S�ga',��� � 25250
O p p O O o O O $ o O O O O O O O M �V r �`(QL �~� �r1 uf 0p �L OC O O O G O f`Qi O�II G OC Ou�O O
L O O O Op OV� O G p p ut o0yp � U� O�� m 00 M� ul �<n� M o0 N n
io 3� ��if M M O N fN�l C � N N � O t�+f t�n M N M N N � ��+1 V O � ti H H � � n�� m N .�1 V .i 00 N M m �/1 rcj �
_ r E ,^ � ,� �
V �
N iI�N N 1A L!Vf 1A N N V/N VI Yn N V1 V1 N�n Vf N V�N VI VI Vf VI N N V1 N N N N VI Vl Vf V1 vl N N tI�V�uf N Vf N N tIl N�//V�V�VI N V1 tn �
v �+ � , � � � � , � � � � � � , � � � � � � � � � � � � � , � � � � � �
x o N� � � � � , �
N 1A VI 1A N N N N�A VI�A N N V!N N N V!V!N N V�VI�M1 N VI N N 1A N N UI Vf UI U��A N N VI N V�1A N V/VI N N N VI Vl U!VI V1 Uf VI V/
Y i � i i i � � � i i i � i i � i � i i i � � � � i i {
4 i i i i � � � � � i i � � � i � i i � � � �
� � � � , , , , �
_F� 1
_ r vl u1 ul N�A N N N V1 N L�N N V1 1M1 N V!U/V�IM1 Vf V�V�Vr Yf N Vf N N N VI VI N V�u�N 1A V/N N V/V1 N�n V�N UI Vf U1 V1 VI Vf N VF N v1 N
i
a
;
. � � 11
LL .�[ j
p C
3` p
N Vr N VI N 1A N N N V�N N N�A V1 N u�U/N N VI N V�L1 VI N�/f�/1�?N V1 UI Uf tA IA IA 1M1 UI VI Vf Vl V/V�N Vr VI L!N O S S O H H�O O
sssass8ssosassgssgs �s. � � osg$ $���$ ���$$$� �$og��8,ss$g�$sso��
gg�BS�os�S�� o �o� �n�� ���s �,.; � Q,�
=a p y� ppo 0 0 0 0 � � u� o g � m � o n N � � �a o�� n n � a� �°a����g m�m �� e� n�o°�o�$N �
O N al 1�/f M M V N fN�1 R �D N N � O M M M N N rl ei N �-1 ''1 1� �i .
�y 7i �q u1
� Q C
N N 1A 1/1 a?N 1R th N IM1 u1 v1 VY uf Vf v�N V�N v1 N Vf uf N VI N N 4)N N N ul NI Vf N V,�n uf VI N v1 Ul N V!�A Vf v��n�A N V�vl V��/1 1/�N N
88588 $ $ 88858 $ 8¢ 84 $ 8oS888S888880$88888�,5�,8�.8�,58888888g$S88g88oS
gQ Q5� gQq $ c� g ^ $�$��� �SSa� a4�8������ o��S� o����
�py $p 8 8V��o Yu� 8 qp �5�i5 25 �25 �S o 8N 35 ��p �` O(� �a't m o�"��w 'p"p v a� a�+ ^n n.�'^, v "�•�N�� 0e0�� ��i$m o I�n v�n�`ln' Si Ci$'�'^1'9n' �.
j � Ui m IYi V IV m V t�o N r�1 �S m m r91 rV m � N �`f�l O v � � ry .� �D .�+`.� N m !V M M" ^i
p 9 '�
d j
�
N V1 Vf UI N N N Uf Vf N U1 N Vf 1/�N VI N N VI N N LI UI N N N VI IA N Vf N N Vf N N N N V�Vf V!N N N IA Vf N VI+A Vr U!U1 Vf ul V/N VI VI V1 '
a
�
0
$ ��
d
� �
� �
Z �
6 V � �31
_ � {
O @ �
� d '
O x
s = � °
V� y� y� NU1y� y�� � �� � W �• a° o
y � VI N N V1 N Vf N N N W W W ` • • F
} �o �o � � a avvv2 �d �o �o �2 � ,6,_$' a a �' ��� �! �" a� b 3$'_;j� E� � �' m> d t'�"
4 00 � ``�y � 2�n �S�o� Si ��` � � Jc' � 9 E d a �w S b�
€�o i�+ N N N N
a 9 c c c c c c c c c c c ,5 c c e � '�,� °�.i 'ri f.rv irv 7v a c.n`.'a.e. 6 a a
� a a < a a v °n �
� � �� � � � � � � f � � f � � `u1 'SILI' YiIL^iL1' S�"iI `v�wwww�w�E � �°�'j, Su°.c�czn.a ��'- ddav'� � �u�' vi� uo
� z
0
� m y o
a `� �c n m e+ m �n�o n m r+ m in n ai .� m .�n �o t�
�qa tirvroa �n �orrom � � ti � N `,a � .�i °.�+° � rv � � "aNe'� NNn°��m� m �immmr°4. m �eaa� v`� v� a9i�n("n�n �i�n�n�n
.� 6a � z°
�
888� 88S8a $ 88 �SS88 $S888g88S88o $888888588 $8� g $o$ $ $88$gg� $�888
pSp8pn 8 }{8�g���� � �s �� 8� o��������.g�$��a�s���� a���s
000 O Oo epfpp8ppQu� N0000 NV� �����a� � �
•� �S O O OQ tl O d�Ov1 O�n�O O�C�0 n N �M � N N��O m m O N N v�n O H r1 �N I�� N m N N ti� �1 N
N � M m� � N M ei ei rt1 rv
J � � �l O � H(J
��
H
y�Ny�N.{/�u�1/�N N N N�//
N Uf IR VI VI Vf VI N+/�V/VI UI�A N N N N VI N N VI N VI�/1 V'N V1 N N N V!V/Vf�/1 N V1 V1 lM1 V�VI 1A IA N�/1 N
� a v
a
u � u�
�
VI IA V�V��/1 N N V/1 V1 N V�N N ul u1 V�Uf uf V1 V/IA IR N V�N N�/1 uf vl N vr�A VI N Vf�A N(/�Ul N VI v'N Vf VI v!N N vf�n N�n vf N Yl Ur�A vl N
� d������� ����������a�� �� �o ����������������$������������ �����
� � � � � � .,
ea.� ti ti .i r+.y � ti .-� .+ �r .+ .� .� .i .. .1 .�� .i.y �r.-i .� .�r .i � � �
E
a �
0 o a
SggcB$ o $ S88800S,SSSo8888o$ qg?oo $ o$�� 8.$80��8$o88S�� '�SSoSoo i
� �sg�s ��� �� o_o�� �,��8�d�� �88����a�����g��S��g$$ �
voo8p��� oo �S,� oo`�d,�S� Sooa oo � � uic � $$8
L° -S' r'�Iu�ipp� o8�V7 ogu�i � r"� � v�iu� g �bono "���iu�i� � r"�g'rM� Mg $g�ir �.'� `•�� r'�nin '� �
� Fp E V < �O M Hf 00 R N M � M N ei 1D N J
U � �
N N h�
�A N N Lf N�A V}N N V1 N u!N N VI N N i/1 Y/N N�/1 Vf Vf�/1 N VI LI N N VI VI VI N uf v1 an IA VY Vf N Vf VI VF Vr VI N N Vf Vf N N N L�VI �
y �
N ` � i � � i i i i i i i � � � i i i � i i i � � � i � � � � i i i i i � � i � � � N LI N N N H VI V�N N VI�A 1
= F o � {
� VI Vi N N N�/1�A ul N�/1 Vf N VI N N Vf u�Vti V1 V1 N�A N V/N 1/i V1�A N V/V1 V�v/�LV 1A N V�N N Vl VI�A N Ur N N �
U � � i � � � 1
�� o , � , , , � „ � � , , , � „ � � �
� �� = I
y
�N N N UI v1 N�n N V1�A V�N�/1 VI N VI V�N N U�Vf N vY U1 N V1 Vf VI tA�n v��n N VI N VI V�V1 N ul�n U)uf N U/�I1 1h N V'tI�U1 N v�VY v�Uf VI
I
,hC � '
F .-O!
O C
3 -
Vf UI iM1 N V�N N N Vf N Vi VI VI VI Vf VI�A VI N V1 1/)N N N L�N N Uf N�A U1 N U1�/1 N N V1 V�U�N UI N N�A V1'�A N UY UI YI U�VI 1/�1A V1 N W Vl L1
s�8o�sa � osoa88$$S$8$3$�$ �����������g���8�$������o����s�g ���
�s���Q�s �� s�c��sya�g������u�� og � o o qv�c� � $� ������
iy 3f� aa� 'n�Yi�"�-N�"�:�lm r"7'9':-i���" S�:7mv�isi �rv�'�o 'mmg�8u�+ n�.� .'�- � "� nsi� �g Hgrl 'liJ� ,-�
bg � .r � N
aa-
N V�N N N V!i/1 N V�1/1 N N N U Y N N N U�V l V f N N N N V I 1 A V i N V I N V f V I V�N U l t A N 1 A N N V I N N U I V�V I N V}V f U/N N N V I V I V�l/�N
8$080088Sa8 $8$888888$58888$R,o88$ Q888o$888808880� 88�0,$o888oao
g����,��soa� s �sS8��oss��a�so�������s�� ������ag�g���s$�����$�
� =ad��gg�$��� M�'"�5�8� ��m.��, � � �8��8N8 8��,�
� �? 'j .+ N
�� N N Vf�A N N N�A N VI N VI VI V/tA N N N N VI V�tIf VI N V1�/1 Yf Vl i/f N N N N 1A VI VI 1A N N N 1/�N N
�A 1I�VI N V1 N ul UI u�N N Vf N N N V��/1 .
�
9D
O
'Cy
1N
W I
N g i
Z r �
Q u ,�
ZF
Z
O '�
� �
F � p �°� 8 � �
. ? .° m a�c m� g `.�e c�a3 ~ „8 a rRo;��C °�« nfia�y, �i 6�� 3 �� � `� ` $ $ � � I
� �
°d � �� .��- 5 � .. "J-� o �'�"a � '^ g 3gS� u�°. 3�m s � � s S o " = u�" 'n. a�x�3-u'S '�LL �' u'�i 3 a�f 3 m a � u�"
Y � �� f 3 m s w o s�,� m" �;8 >� w s� X' �6 3�3 3 �3 3 3 3 �x x x x x x � s x x � �� ����'S�3�S �� I
°' � � � �oerez � cx,� ti�'�' aad'^ - F xx xxxx '�
� u m m m N m m m N m a_a _ _ _ - .
m � u� w in �n �n �n vi�n �n
r
� m "a
a � .i n m in n m m � .' .�.-� .-�. .y.y .y.y.y.���`a.`�� .`i-i
4a �iS'i� Corn � � `tn' � rc��nn�.��nn �.°n° nwmo'�oa"'o � 'cdmm ��o' S, mmm�m`B+ mmmg000� `� `Bo�$
.. ,��„ Q v Z
t� �
' i
o ��
ggg
as �ssgssssspas,sssgssgossssgssgssoasssaa$o8S �8$ B�,S�8�,8�.8�.Sg$g$�g8 $ '
ga � �a g�������g������o�u1�������� �� oo � �oom���o���
= s � � �,a ���s�oo�����
�_�a vi� c do v��n �ui o�u+ � ��'+ a rlrrioeo�nn u�i ��m'"N 'r� Na ov��n ri.ivi vi�ui.n�� •-�Q .
27>
�
i//1A V/�V1 VI N v1 Uf ul VT 1/�N N Vf UI uf V�Vf Ml N N N N N Vf N N V1 N VI N N Vf Uf N N VI Vf N N V�N N Vr VI VI N VI uf N UI VI N V1 VI�A N 1/�
O
r d �
a
" � s>
�
v�N U1 V1 N u1 N a/�VI�/1 N VI N N N N VI+/!V�V�N N Vr V�V,N Uf Vf�/!h N V�N N N�/1 uT�/f N N N V�N N L�Vr N Vf VI+A VI N U�v1�n VI N Vi
�E������������������������������������������������$�������a�g
d �
a8$88o008 $ o $�a$88S$ 88$`d,$o5� 388 $0,�o, 8go� S888$8 �o800S8o88F8o$ o8$ `b',o $
g c o d a � 8 ��8 S�5 0 0�8 8� � g � S5� � go a o 8 0 o g$$�8 �8 8 � `Qd �
g co$o 0o g g � � ��o uos��o,t5�� o� o Sqo �000vi � d
� � �8 d 8 0 ��8$�o�,0 8 0 � �o0 0 o d c o c�o,�o 0 0�a c d S �8 8 8��
_ o Eg �u�i"� ��g �ug ��o �Siv�i �`r�� �`� mgw9ii� $� gm rvu� a� a ��nRi .i �n ".a m ',� '' .' n �'+""`� �.� n.`�
�
3 N Vf Uf Vf 1/�N VT N+/l�/r Vf Vf N V�VI N Yf V�VI N vf V��AVI Vr VI VV Vf u!N�A V�N u�Vf N N N N Vf N VI VY Vf VI L�N N tM1 Uf Vf N VI vf vF ul VI Vf Vf
= oo� � „ � , , , , , , , , � , , , , , , , , , � , , , � „ , , , , , , , � , „
� v1 uf VY u1 VI N N V1 VI Uf�/f N UI N N V�N V1 VI N V1 v�N V1 VI N N N V/�A Ll N VI Vf Vf Uf N N tM1 V/V/N aR u�tI�Vf v1 41�/1 VI N Uf LI�A N�/1 N N V�
9.1�
� C i � i i � � � i i �
�
� � h
��N N�N N N N N y�N{/�N N N t/�N N V?N N N�/f�H N N N N N N N�/1 V I V 1 N N N N V 1 N 1 A N N N�A N N N N V 1 V 1 H h��N H��
F up
'L >
y C
> Vf N 1I�N N N N N VI N VI V�VY�A N�N VL Vr u1 Uf VI VI V!VI VI�/f VI N N uf V1 uf N VI V/VF N V1 N V/V/Vf ul V�N N N VI N N VI N u1 VI�A�n N N N
SSBoo$ 8S�$g88$$$88aSS$ 8$$$0008$8� 0$$88$8�, 8 $8 $ R$88o �g88�8��8
��o� sa �s��,������o���s8Sg�8� ������ ���q� ��o������ sg�gga o
p't� o 0 00 o�S$u�iv�i�� ��'`a mg $u�in��8��-�ir�i �a$ S��-19�N� 8i8i �'.��9� v��� e m��na�n ��
w ��_ �� in`� S c 8 va ui� n a '+ .+
�� �
V�N N ul N N N N UI N�n N N N V1 N V�N N N N�/1 N 1n N VI+I�N N 1A N v1 V1 V1 VI�/f�/r uf Vf U1 N N Vf VI Vf V�N v1 N N V1 V1 1A�A N N N N V�
8$�858 $8 $ a$88� $$8 $8S$$8$ $,88 $SS$85888 $ 80 $808$ 888SS8S8S8go88S
� ������ ���o��o�$�������s �� ��o�� o� s�s� ���g ����oa�o�g����g��a
S8M ��
�r�i�'i ���o 'u�i�rv� u�� � ��-7 n`,J'
o a o 0 0 o vi o o�n M �
� � 8���8�5��9�����,� �� � � m8��, �8� 8 � � a „ �
o �
�> N V�Vl�A 1/1+/f N�A VI VI N V�N VI N i/1 V1 N N N N N V�N N N 1A N VI U11A M N 1/f�41 N V1 V/YY UY V�N V1 N N VI Vr N�A i/1 Vf�/1 N V/VI YI Vf VI
�
qD
'C
S
�
N �
O °�
F � ��
�
z �
0
V
a c� :r w
F h" � L'. �y cf A ._ o .� °a° 5° u �° 3 � C'^ 'o o'�'tl Z' o c� o`p� $ �g'� 't��
'g � �� a'. .'�P g�� U � °�cP o$ " o `° n—g °1 �s u9�7 � D��� `� c g n�i �' `�9c 'a c d �� N $ _ �=d �a.b �a
w �° �-0 � o f3S �°� �. a�f °oo°Oob° fa �' a � � 3S 'r8�3f vawu�� 'cBs3 � i: '� ��� ❑ Oav4= fu.5
�d c � C �v¢� '��'4 � '����.� ;��'�:� ��� �'.�"�;��q'�� �''�rF�eF.e � 6F'� 'F� � � e c c c c c c c c c e c c
� g g o 0 9������� `a��v v�9 � E E E E E v c v a v v v v v E
a r f � = �x G' � � a 1 4 1 � 4 � � d
a e wv ��° � � .� .� � .� ._ s
� ?�2� � �j �j � �j m m m m ia 'm m m ao a��3 'm m m m m m m m m m m 3 3 3 3 3 3 3 3 3 3 ¢a a a a a���� a a a a a a a a a a
a
� m °�o q oq
c � a� N M v� g ,�, m v, �a r O1 �a a a� a '� a� °i '� `��"..1:.7".� � ".-1 �i�� .1O+.�c-�SO����� .",^..^.���S.
� .�� a '�'�:7 :�7�:�7 `�����1 "�� "��`� "�'��'� .,., ., � ., tiH ..., �
' Wg a u Z
�7
: ,
. �
�
I
s oago ���8$��$8�8��
8S88o �$g888$88$$� $88 $$$�8888,888Sory�i���i �F� ���e�� ��g�god�G�g
� �� ��s���sg �8o �gg�g� � ��� � ���oem � � —��
a� mm �nm.+�
8 S � � o ,�ou����������� n �• � � —m
� 41 OO O 00 h N O N O vi'1�-1 N .i�� N vt � UI N��Vl '1 V1 Oi 1+1 M� V��D N N H ,
�� ,-� nS rrf"l,' .+
� �
� �
N 1I!all Uf N v�N N N N tA v1 VI vf N�/1 Uf Vf N N VI V1 VI N N N V1 uf U1 t/�N N V�N VI VI Vl N a/�V�Vf Vf VI VI�?N Vf VI N u1 N N Ul Vl N Vf V1 UI V1
I
I- N v
f�c
x E-'
�V'
lA Ul iA N Ul 1/�Ul N Uf UI VI N Vf N LI V}t/�N VI tA N N N N V1 iA J�N�A N N Vr Ll N N 1A LI N N VI U1 N N VI N V1 IA Lf VF Y�Vl Vf V�UI 1/�VI N Vl N
� � .,�� �.. .,�����$�s�������������
� d � ������� ��$������������������������ ����oo ., � �
�E.t ti .r •-' � � .
o,� � � coaoggg88800$ og$oo
oo8 $oga$$$oo08 $$�$�� m� � �����g ����� �
$88oS$8 0 00 � 088� 88ogp$8,000pp88pppp8 pp �,�.j{ Nu�'" v�� no�nor+ gopopo�oo�ry��o
a S Gp Cp OO O OO G O S pS O O�S S H O O O O O O O OO O O O�a�S� ��M a N m � �y..l O V M e-�<V1 d�M M �-1 `'i _
Op O O Op S{/� O H �. `: yry� p O C� O o vbi N Oi�ut .�n a�i M p .� � m m
p 6 p�$00 1� v�nl�O N O t�11 N N�V�f � N � ` `
r E �
V
� V�VI V4 N N Vf VI Vl 1R VI VY V�N N Vf VI LI N N Vf N N VI V�N N VI N Vf N i/1 N Ul UI N V�N N N
N Vf u�VI N N uf vf U�+n N Vf N N Vf II�an�n N� .
= O�i� � � i � � � � � � � � � � � � � � ' , 1 1 ' ' 1 ' ' ' � , 1 ' r � ' 1 ' � ' ' , V�u�N N uf N N�n N N VI u�N V1 N .
� �Ul IR N N N N Lf N N Uf N N VI Vf Ul�/Y
N i/�VI 1M1 l/�N U�N N VI N N VI V�LI VI VI N Vl N N N N N VI VF t/�
� �� � � � � � � � � � � � � � � � � � � � �
� � L7 ' ' ' N N N N t/V V�Ve N Vf N N L,N L�N UI V�N N VI Uf N VI VI UI N Uf N N N VI�A
— r U1 VI VI V'N VI+A V�U1 N u1 Vf Vf VI N V1 l?VT N Vl�/Y V1�A V,N Yf Vf
3 � pO p p O p
N u1 N N Uf V/N u1 N V�N VI V1 Vl N U1 V1 VI V1 u�N N UI Vf Vr N VI N N N V�Vr t/'V1 N Uf�/t N V1 N uf O O O O S O O O O H S O S O O O O O
SQ$Q$Q8S5�8Qgo$Q8o`�$05�0y�$8 $�0, $8 $5�8$5�88RoS88 'o,o$SS88dd88o � � � � �� � �$�� $onsoa�' �,j
SY25� g25o�L5a���,EEoa $� �� g�Eo §$oogo�°��'��°.�N�N��ovm� ��M���m .�.�`��6� �
W ��� o�S $i:�m o�S � `�-.+"rr�, �gg�oou�igu�iNm��`,-1"'8+"�'�a `��o
o �
ri
6 Q � N VI N UI VI N VI N L1 N N Ll UI VI VI
N N N N y�y�N N N�M1 H U N N��N N N���N�N N N S �p $S �H O S S S O S S S S O O S S V S O Q O S O�,S� H O
S o088$ $ 88$ 8 a$8o d8 $$ $QS$$ $$S go .-lai .doi �d �o
g v; �� � F�����mgG �°�I,��< $�i�°.��
� ��FpH00 N""��ti`r m �e m��� �.�.�=�noo
, ga,s � g � o��S�.����s���o ��������m�$�������� N rm
"„ �S $����8�8���� �5 ��� ,�
0 �N rl
�
N N VI N�/1 N N Vf U1 Uf iA N N N V1 N N VI N 1/�N N�
+A N V�N+/�VY N V�N�vf N N vT VI V1 VI V�N�//�n V�VI Ul N Yf N 4�N N N N N v1 V�N
�
O
8
ar �
N � �I
O a i
� V � j
Q
� O
ZF
Z
O � a m ,¢,�7 m �y �� N o �� i g � C�° �3 �F e71 �� &
Z a� � � � m a o � � c ° y � S.e ?5 .S $ ��a �,n' '6 c=y� o Q�'O � O 'm D a ''-�' Y" e
F �C E c o. n° 3 a" g c o a °� � � " ,p a � -�° '° � �$°. �'� " $z �� l a i„x� ¢ ��3 �--�,
s � � _ � °' � „ _� e � m s � � � A < � � � � = 3 .��� t d,�� � 3���'e'�a � " z°' � � 8 "
� �
6 va � � � 6 0 ,�'j � 3m �r ����« E � �E � � ,�°. o o « g a ��c Lm'����z � � 000u`����f 30
a mEq t? v�33 �aw •�.h d � 6 w � m m � l° L° ��-�4 <uoain � �
< c 3?S W.ud- '�i t7 t7 t7 �`� E a ti ce7 � �Y Ll} ����� y t u m m m rn m in .n m < a a o a .i e e V a
6 aG a C C W �� 7 7��7 N � � � C� T C C N N N N N N N N m Q Q O O O O O O O
� ; „ dc00000000000000gg $ ��,,,, ,,�� uu
E E E E E u m v � w a v v m a u m w u u � ',4'.' � v� ) Z ln l7 u u u u u tl u u t� u u u�u u
� Q Q Q Q Q v L�1 'u�i in 'v�1 fn'��it Lt'vei in�vCi 'N'N ln IYii 2 SS v�
Z
� �y v O pp O�G �y �y N Nry try+� N1ry!� �ryq �y ry pry� �(y�M m
� V � (�p�pp G� O� O� O�O� O� O O O� O lp(1 O O O O�-I� �� N N N N N N N N N "N " ^N N f� fm`I fV N tV�
� . �F 'n-I�a��0 O�0 �ti��N�{'1 ��-1 �-1� �.-1� e�l r�l '1� .�tV N N fV N f`� N N N N n N
' W a v Z
a -
s
0 0 0 0 0 0��� ry g$�� �S�, o g m��o�m ��$� �°�M� g�m�
� � mQ�� ��r n �n�g S � �g � � g ry S ry n o a S V vy W oa mW ti n���
c ��� � N��� d � m�p �W� � m m� ��T��� O N��� �� ��� M m O�fj M v N �M �N� �N H�M���� �
� a I� Ol�01`�N-1 Y�l1 N N V 10 Q OO�1D n M� � � �✓y ry V
tri fV � � M
C§�
b'
H
VI N 41 N N VI�/1�A v1 N VI N V1 V/N N uf N Vf VI ui N vl N N N uf VI tA V,Vf Vf N N Ul�/F N Vf VI N N U1 V/VI Vf Ul VV Vr N Vl Vf Vl V1 N VI Vf N Vl
O
F- N '
y � o? t
�p V �
ao In 1//l/�N N N N N VI Vf N LI VF N+A N Ul VI N VI N N V1 N VI i/r V1 VI�N Vl N Uf 1/�i/,�M1 N N Yf N N N N N VI VI N N VI iA N N N V�V�N 1/�N tA
�4�������� ��� ��$����$����������������������������$������$���$ �
� � ..�., � ., � � � � �� � � � ;
a
°'u � 8g $g8o8$88$880800.oS8 j
8008gSggogg8SS8a88 $$S88S888S88SSoS,888 0 .+�M^m j
ma; v ,��.77 �„ � ry� "' ro.fn� ��ma''��' a� �n�� i�$ �`��,m�',�r',�n ���°�' `�' gn',NmG''N$;w,"��6 N°�I�
y � ��ry�N l0 M�Q �b�V � 4 ry� ��N���l �'j M� tp 1+1 fV 1G rl N 'i�M',y I� 00 Nit f
� !� T ry Of..a.f� <N m N P O v � V�1 l�0 n m ��T V N N��N N m 00�"�r �N'1 d� N 1�1 � � Q l0 �-1 �
1� a ,.q ''I tV � i
f°- E
U N N Vf 1h VI V1 N VI VI N N Uf Vf N�A N .
v�V��/1 N N N Uf�/l VI N N Vl V1 VI N V�Vf N u1 V�V)vl VI vf VI t/�VI N v1 uf N�n
y�i/�V1 N V1 N N�A�N� .
�r i � � � � � � � � � i � i I I � � i i � � � 1
_ � y � 1 ' 1 � 1 1 � ' ' ' ' ' � � � ' ' N N N N V1 N N Vl Vf N VI V�N th V1 VI Vl V�N N IA N+A N N U1 Uf VV�II VI�A N
N U�Vf i/�N Vf UI N N N N Vl N lA N N VI VA V�VI N Uf LI N Vl VI N VI
_� O � i i i � � i � r _
" � �`F'' IR V1 N Vf N N V�Vf V/�N Vl N Vf V�V�N N N VI N V/4l N VI N V�Ul UI Uf Vl IA
- r U�Vl u�Vf VI�A VI Vf Vl N v1 Uf V�N N N N Vf V/N N Vf V1 VI ul N N�1 '.
Lh
F �
'� >
? C
' y�1/�1A N N N V F�A�N N N N N N N V�N N N N N V 1 V 1 N N tA V 1�N N N i/�V I N N 1A N'�A�/1 N N���N N N V 1 N N N N N N H N�A�M1
O O Oo O�O O O O
888o888oS $ S000SB$S$ ooSS �88S.8.8880,0 $8$ $ $88$o8o`c3.8o8800 , o. ,
$ g !� a� �+ �?,
pO�1p40 �n mNrl am o Qvim o �Jou^ti{��1fO��i � ao�nry� g $ �� K �'n1.00-i�"��ln��nnad� m°��i
Q� p t�O N 1��1
^ry 1y ,�jry� ppc er N N 00 N ltDr� N p �p
.� O ��N�rv� ��M � �l0 rl��Y�M 'l N O e�0�1�r�O 0�V ''l� n r-1 �f N 1f1 rl O t0 ri
ri.7 t+l KI�t.ti M N N � ri rI N�.i I�W�
�3 V 1�Cy t0 N f�'1 N �M O N N r�N N 1�CO�1�0�D�
O F y 1�OI(�` Ol��p � M N d O�� N lmO n m lV
W 3� ti N
d G �
0.6
N Vl N N VI V�N N tA V1 uf v1�A V�V1 Vl N N N Vf V�N U�V�N V1 Vf V�Vi N N VI N vI vT u�N N VI N N N VI V�N Vr V�VI Vl tA v1+/�N N N V1 N N
8885888 $ 0�0,800888g$800S888$q8,8� 8oS$ °o,BS q88oSo8F88�jc�SqjoSS$8P8o
o �f Nri �c e; �e �. �� � $�� ������U°�'$l�^<�, `�'��� }v��
Q `�� he u���, ���nv� ^wr ^ �^�'��^°'N
�� 01 q��� �a��a ��� .� 25 i�;�^:v;i`l�,m al n,_,m e,.ry �'i �m�N ti.-1 rv
� g ^°n"�' me���^ m '^Ja ga °° ��n �� �mvN n oNNn�oo .+ n,�n,��-� ,"��"P �`".a-i
�
o a —
4y >
N N y�y�Uf N N N U1 N Vf N N N N U�N N N N 1A N�R N N N N N N N Vf N N M N�/f N�/1 N M N N VL V1 N'�/1 V!N N V1 ul��M1
VI VI N V�VF V!VI
Q
�
O
O
�
0.
�
N C
O
Z �'+ �
U
a g i
z n
0 0 � � 9 i N 5 2�" = w'' 'a3 3
'+t u Q.a a c0°.� v � oN� �Mm w= o � � v`�i Nf "$ m �°a Nf � �" 3� �3 � ��
> E L° u � �n w]! �.4 a ti a cL �^ n u 'S aK ' �7
'$ inac e i19 � ^z za E �i
z °J Q ro a m�« �'o ti E� ° � �' �° .� '�^ "`° 8 3 �� � 9' ° N f � u�i � �$ " �i �d� �' ,�, y� � S
O B U° f6 v�iEr . u a m m q ou w `�1 ,r ws �'
n o � ` 3 � P a a x w o i� �� "� o�^- oc w x f �7 �' h�
F f Ya u.,,`o,u oli o E 4 �i .4 � 2 p r � � �i o ya�+— LL y
s —� w< uv �oo, �= u °� �9c � i7 'gg `m "„`� wg y a ��'a v�t� o�� �lii � �3urS'++ � � � 6 �� 306
� � a u'su � 'tg n3 zt- s� minz ; a �,y d �nm o9 a u �i� m u z � 9f f a�c � f ?<t i
dp, N O ��K � � � « C 4 9 � O 9 uf S' t0 9 O � �2 G: K Q T' ¢Uf K� 5 a Z � '
6 V 9 U � m y� � d �'4 � � 1'm m C V O �� l� N �Q U ' � aD 00 m 00 a0 a0 00 a0 c0 a0 rO 00 00 00 00 a W a0 T 0�
Q �8a< � oc � �° 3v,`� > r a's 3 �n
°� v � a .f a O u+ u+ '^ '^'^ '^ `� `� � 1O�O iO tD 4O � �D 1O� n n n n n n n n n n n n n
U V U ll V V U U U U V U V V U V U U V u V V U V V U V V U � V U V U U U V U U V u V V U V lJ U V V
0 0 0 0 0 o s o 0 0 0 0 0 0 0 0 0� o 0 0 0 0 0 0 0 o s o 0 0 0 0 0 0 0 0 0�i a o 0 0 0 o a o S o 0 0 0 0 0 0 0
� _
0
� m y�
� � ppp pV� u� V� t!1 y� ���� � ��6 � �� � �� � �`1°�F� °' ����� ���������
� E Q �� ���� N N N� N� N rv H rv n� rv�N ~�� N N N N f`� N N N N N N N N N N N N N N N N �N N N N N N N f�
W < v 2
ya �
V
o g�����h ��n$�N�� ��� m�g$g n h��$ �o��� �
�N �Wn �� $ ��8��$o�$ h8g� r � mN � ��� �����pKh� ��gn�g���
o r �� � �� � � Q � �n M m �n�� �$�ro �n m �� ti ti ti M � rv v ti� H a �n e N �
c o $ rv n a ti Q 6�N v o��� „ ^ � m � � �
� , � N N��� a� �� m� � � a � � ���
� � i
p uf ul Vi V��A In N N Ul V/V�N V� t/�
H
V1 N v�U�Vf VI V/N�/1 V�V�IA��A VI N�/f V�V1 N V�Vf Vr N LI+R N u1 Vf tM1 VI�A N N N u1 an VI Vf N N V/N
�
�
O
F- N d
n
Y � E—'
� ��
N+A N ul u1 vI V'v1 N VI Vi v�Uf�//N UY N v1 Ur 41 v�uti�n N UI V�N N V�uf N vf VI N N vT Vf tA Vi uf N Uf N VF V1 tn N N Vr N Lf v1 N V��/F ul VI
'� �$g����������������$����������� �
�� ���$��������$���o��$�o���oa � "
E
au � � 88 �' $ oS$S �a8S000go88 $8$8Po,.I8S88o88o8 $ S8o$g$�$oga� �$ M
88SSo8S o to "�, m"' m `"�'�'n ,�,^�c�rt�,o o <Cl$�N,�1�'i� ""�`l � �i
`° °�'� ��� � � "N n io r�� �nri �driao,�
0o co a �+` .'�� � in� o � ��rv�r;�o� a �y
a � o�,����� �� o � �^.alr;ao� ry� �m v�n m N odupi� nmdti�aMp� mQ� `,��—'�u' � rI V `.' N �
_ O Q�N O �� �O� d `1 N� � �p W �� ^�� r fl� a O H � e�1 e% eM-1 ~ ~� � lO
1- E
u NNN�NNNN��N � ,,.
U�N V I U l U f N N N L I�A�R N N N N V��A N V�V I 1/�N N
t/�N N VI N N V�V1 N V�N Vl V�N 1/,N V1 N Vr Vl V�N �
Z� ..r'J � � � � � ' ' , ' ' 1 � 1 � 1 1 1 � 1 ' � N UI U�VI N�/I N VI V1 v�VI VI
1 ' , 1 ' N N h N 1/1 N V 1 h��N N N N�N N N N N N N V F
O ��N N VY Uf uf N u1 vf Vf II�Vf N VI u1 v1 u��n Uf v1 N N N
9 .Y i i i � � � � � � i i i i � � i � i � i i �
� � � � � � � i � i i � � � �
- �N Vf N V1 N N N V!VI IA N VI N N V�Vf VI N VI N N N Vf N L1 N N N Vt Vf N V�lI�N 4�N N V1 UI�/f N N O a N U�N N�S S O S 00 Oa1 S �'!
� O O � g ,� ,.1 p D
r� � r1 g O�Ui O �
8,,I � �, NN�d�ao
�r�n � m n �ra ri a N a
� � r'"n
3 � �
N U/N Vl UT Vf VI N N IA�//N Vf N N N N N VI N�/1 ln UI Vf N N N N V/1/�Uf U�U1 N iM1�/1 N N O O O S O N S O S S�N N VI LI VI V1 V� �
g �8o $1�SoS. S $8�a8,8Sp8 $NSBQoa{o$o$888$Mda$$SS88oy�j�M �a ' oN��� gry
�,n, lG W N N r �~ V t+l �O ��a lO�W O�h t0 M�.t`{�O S N �M�O f�n"t'S 00 �t` C V �N rj
�nf�o' �nuo `a�,��^�l�l c n �o�noouinm ou uii:.ri ti ,^�'.�< `"'" � �`.a'�n—� F
`o�u��Ng°�°8aa� v.-trim�m,�.' < c�'�m�� w "a n� o �9i�i� °�"� °a � �
w �� --�� ;a �
a� - p p C p
Uf Vf VY v1 VI a/f u�v��th vf VI N VI Vf N�A Uf N VI uf N u1 VF v�Vr V1 VI Vr Vf N VI N uf us N N N N N V1 N�/1 N N VI VI N N N V�U�uf V�VI Vf V1 �
p p pp � S O O O� O O S O O S��o p� o ��o rl
O O $ S O O O S S O O O S � O ry� ry� ry�p �p f�
p p p � p O O g$$8 g ��� 8 O O � 1;?� fY f`{��C '7 1�n n 00 rtl I� O O O l0 N N 1l1 N A C f`(,O,OO N
8 8�y O 8 Of.Oo0 8. $�n O b O a} p a 00 � �I �-1 vi m M �T ��m!�rY O n Vf 1� 8 ��M N
y � ^�o a0 �O 00 M N N �D O O�w�'`1` al�'{m n S��O � �i m'1 p�0 �� a � vi�o oi C o Y�
S y��`7 N�e9 °°a .�`f .�i ri�o,i�'"v m r� �^ •m-� �n `� � ���n n � u�i m .�°� �M .a+ .�� r� a�ic� rv V .�r"N .�i r� �" � ro
o � �-� �
O '��p
� >
� V!N Vf V�N V/N N LI N Uf UI N VT N VV VI N V1 Ih V}N N 1/�N V/VI VI VI{A N N N �
N N N�A N VF�A V�Vf ul Vf N H N VI VI Vf UI VI UT N�/1 N '.
� o �
� {9 � I
8 M � p� "a4d1 ,
c � °. y y �i �' m r` �
� � c °C�= ¢. v " �"� �
� I
� � � o M.�. z �� � � I
�' .°-� 3 u° r " � a 3 � u `u
F " 6 � � � � y'a� � g� �` II
i � � EZ g>v u a = ` '� '� y� ° s
� � e�� n d m� O�.�.LL b.° `r�e
° E E �L 2 'v c c" 9 � ��o o I
� a � y E c . �� $ O)= g E $ c � tu� u 17 �J e '��'� � o . . �o 0
4 W o 0 3 .� N = 9o'$v$- _ ' $ a m ca 3 v�� u u ��o ' nn o `o_,`q I
z G m `�° � �C � ..L° $ � o'A � �g og �ava Q �3 � . � S� 0 3 4F � o� S_�' �u � Y Q � a"" Y
� � S c 2 c y v ,of� �n f a q o tl°b l� � d Emc y cf C F mE y � E vin�n qs an � °n •e � 3
FG �� c.��O r '�' c_ n f c 3 o u n `�'Y' oU r � � �° m� E v 'n> Yn ^� « x10 ;�"ii f ,h °ti ¢� °1 u u � >>>� L �$ �8i
U - q �i n` � '� o ;;g :: � s li°. c� t7 L° �. v l� 3 ' � c in x a W '� � L' Z'�� '�j f II IL u` oc ¢
� d� ma� Su � � in a� C � 'aq �ct �2 .«� � o $ 2'd33 d5 � �u=. ."., f_ � oo nob.° n , � �
¢ E'� y o o. y� v � ?.�G��—, I�.'. v�i a z i '.,S s u Tn t7 'a �,n o _ �n �n r a � , � � ��ie�n n„H
`r � .di� .a.titi� .ai 'a`a � .`���� � � ,y
Q o o� �n z � 5 ¢3 � � o 0 0 0 0 0� ti � � �.�i�(-1' "� "�'�' �"� "��"�"•.1 .+ p
o � �� � m o� m rn c+ m o` O O O O O O O O O O � O O O O O O O O O O O O a O O O O �� � ��
� o 0 0 0 0 0 0 0 o a o o $°°$°� o 0 0�
u u V V �+ u u u u V V V u u u u U u V U u u t�
u� u u � � � � u u � u � u u u u u � u u u u� �� v � �
z
� m v� g y
o�Q � �{ p p0p0 �H � .�ti� .1Oi ti.���rvirv� r�n�N N�N rv m mF'n m�m ��b m�m r7i� �i r��a�i��i y
K T p� p�S � M m M �
l7 E ����N fJ N M t�t� f��l M M M�+1 M M� H1 T M 1�'1 1+1 M t�l M M M m m M M M M M M M M t+� M M M M M M M O
F
6 Q � 2
U I
.. II
- �:�� :i�� v .�.'G.".1
�:. 10315 Lake 31ui Drive
St.Louis,MO 63123
{31�'.)894-8888
} Fax#(314)894-7418
wwwJcciconsiruciion.com
�ecember 14,2^vl�
9acobs
A�'in:I��r.i�.K.1VIathai,�.�.
501 11o�ih�roadway
Si.Louis,iViO 53ic2
i�e: �ob�12002
�ape C�irardeau V�Iasietivater Treair�eni Facility , � F a ;.j ��
Change Proposal# 133 — t��`'a�•.�,7 �'n'-�����'`� ��"�a�'�'������✓�
,� �
Dear,Mr.Mathai,
We prapose to furnish the necessary iabor,material,tools and ecguipinent ta Provflde�RYEit
SYSTEIVI IMPROVEMENTS PER RFP#51 ,for the in�reased Y�tiMP SUM of FOUR-HIJ1�1Dd'.E�
EIGHTY-NINE TbIOUSAND,SEVEI\T-Y-IUNDRED&TI-IIRTY-SEVEN DOLLARS($489,737.00),
AND A CONTINGENCY OF TWENTY THOUSAND DOLLARS($20,000)FOR FtiTURE C.�fQ.l�: ����f'If7' d 6
A�DDITIONS IF REQUIRED FOIt A TOTAL OF FIVE-HUNDRED P+iIi�iE THOUSAIVD,SEVEN ��J�� . ��,���,Q/
HUi�TDRED$z THIRTY SEVEN DOLLAAS($509,73�. l
Please note ihe iollowing clarifications associated with this pricing:
SEE ATTACHED INCLiJSION/EXCLUSION LISTING.INDIVIDUAL CIIANGE PROPOSALS
SIYALL�E GENERATED FOR USE OF CONTINGENCY MONIES TO ALLOW FOR
APPROPRIATE FEES
We have attached a copy of our change proposal estimate sumrzary and backup far your review.
if ihis p;oposal meets with your approval,please sign thP atiached copy in the space�rovided and return
ii ior our records. By sia ing thi�change praposal,you are authorizing us tfl procPed with th�wark and
��-:,eing t�fo��✓ard th�appropriat?ch�-�ge doctunents�nd p�ym���3f i'�v abos�e a:�aur.[w?th�n 60�ays
of work pe�ozi��ance.
Ii y�ta have any quesiions or cem�:lents,ple2sv do n�i hesitat�io cont�ct us.
Sincerely, Approved
�Y� ����������-�
Michaei Opels � �,�.
Proj�c�I+�ianag�r Daie: ,J�.�°��'��°�-.
�ttachments
� , . -''��'i�-�.�.
a ' � �, >
;';,'�' �.:::s t�ii=aCi9Ca€i s��''i��3���
i u,:�ti:.a,c.. :;�i s ��P���
��i. ���is,���B3'�23
{3;„)�94-8888
t=a;;=(3?�)394-id'i�
c,wrbv.�;vi�orsst:�t�r;o:,.�orn
_... _... _ . ._
UL;?, 2���
��v��i��
_^:�fi: �/i�', �.��.I`�c.�a��.i; _ :�.
5�1 1��z�<��:����,�b���
�*. �e��s, i,��� �3?!�%
?e: �c�L12�G2
�Gp��i�ar�leau�T+��stL�a�er Tre�t►ne�t�acilit-y *��� �af��y�� ��� � �A�f��
Ct�a:�ge Pro�osal� i37 � �;.�,� ,��t,���`1���� ,,. =� m �`
6 ;
�°
Dear Mr, P,/Iathai,
We propose to furnish the necessary labor, material,tools artd equipment to perforrs► the vvork
assoicated with RFP#54, fire sugpression system for baghouse and control of the 14adflut chute,for t�e
increased lum� sum of Two Hundred,Thirty-One Thousand,'Tw� Hundred and Eighiy-Seven Doilars
(�231,287A0}, and a contingency of Twent�Thousand Dotlars ($ZO,OOO.Q4) for future additions if NQ1�� G1,5'P�
requirecl for a total t�f Two Hundred,Fifty-One Thousand,Two Hundred and Eight-Seven D�iiars
(�251,287.00).
Please nQte the iollowing cla,ificati��s associated vviih this pricing:
Prici��g based upon email dated 5/�3/1$ fr�m Perry Schnuck related to scope c;arification questi�ns as well 2�
email fro7r�Perry Schnuck dated 5/1/18 with Andritz pri�ing and sd�p��larif;cations. `vViring tQ locai fire
alarm panel within the Bicsoiids build�ng for system tie-in vaitl�existing fire alarm �on�r�l s;ste�n. System t�
We�ar� ai�acl��d a�opy of�ur c�ange preposal es�iir�ate su���na,ry ai�d'�ac�Cup for your r�view.
If�l�is p���p�sai ;;,w��s v���l, j�v�a€•apYr�v�t, please s���±tz�e��tache� evp; ���t1-�e s�a��� �r�ivflde�i �r��l r��a���
i±fa=���rec����. KCI r�c�ues�s iss��nc� of a �E�a�g���°�er�rior to befr�g re��aest��l t�s prnc��e�.
If y�?:� h��� any questions er cernm�nts, piPase do n�t hesitat�.t� contact�.�s,
S�neere�y, `�Ppra��,d
/��� By:��,��� �.......�
.�-�
�
� I3rL�t Krueg�r ,� ,�
P;t�j�c�M��a�er ��`':
I
✓
��>ks���"l�13���5
Redecker, Cindy
From: Brunke, Casey L.
Sent: Friday, November 22, 2019 1:01 PM
To: Redecker, Cindy
Subject: FW: 3534 - Change Order#17 (Final) -- Numbers do not match.pdf
Mi Cindy!
I will be at City Hall later this afternoon, around 3;30 ish. If you have these ready, I can sign ther-n then. If not, I'll sign
therr� next week. Th�nk you!
Thank yc�u,
Casey Brunke, P.E.
Assistant Public Works Director
City of Cape Girarcleau
�hane: (573) 339-�i351
From: Mathai, PK [mailto:PK.MathaiCa�jacobs.com]
Sent: Friday, November 22, 2019 12:59 PM
To: Redecker, Cindy
Cc: Brunke, Casey L.
Subject: RE: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
Cindy,
Yes I see the typo in [Decrease] of this Change Order as $66,994.76. It should be corrected to $66,944.76. Please hand-
correct the number on all 6 originals and ley Casey initiaf the correction. And then she can sign the CO for processing.
Tha n ks,
PK
314-650-4412
From: Redecker, Cindy [CRedecker@cityofcapegirardeau.org]
Sent: Thursday, November 21, 2019 9:15 AM
To: Mathai, PK
Cc: Brunke, Casey L.; Redecker, Cindy
Subject: [EXTERNAL] FW: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
P K,
Casey asl< me to forward rny questians to you. Please direet as to how you v,rould like ta proceed witk� this.
"I�lYank }�ou,
Cindv Redeci:c►•
Project 5���;cialist
C"ity of Cape C;irardeau
Duvelo��ment Services
4(�l Intlepe��dence St�•eet
Cap� GiX�z�rdcau; 1�-'(iss�7uri 6�7{)i
Phane: ;�73-33i)-Ei�?7
i
' �^a�: y73-i 39-Cj;�{}j
credeckerCa@citvofcape.or�
From: Redecker, Cindy
Sent: Thursday, November 21, 2019 10:54 AM
To: Brunke, Casey L.
Cc: Redecker, Cindy
Subject: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
Casey,
How do you want to proceed? Change Order#17—has a typo on the front page.
Please see the attached and direct.
Thank you,
Cindy Redecker
Project Specialist
City of Cape Girardeau
Development Services
401 Independence Street
Cape Girardeau, Missouri 63703
Phone: 573-339-6327
Fax: 573-339-6303
credeckerCa�citvofcape.or�
�y�.i t:.�;.- ti��i.� ....r..��=t:�� ._, ,.•t �<«,> �.�r�r��<�€� .:., . ,...��.�.a! ,,€�.. �r:�•�•�°� �<�c, €r� � r���t:r„ C���°�is I3,�+ !`3,:_^ .>e .��<>c�c��t:�'3f:x 3:�:�. �u..�t� 3;r������.::�t. .=��y
c>:€s�i:,, :.�.,b�ir rr t:i;�tr3 3��,;:,.°5 , �� 3�; 3.r _s:�iz�a :. .t>;�r�c�s��r:�e°l��y��r�i•ttc�3•�Jrxd r� E,.€.�.��, . . . i��.: ,� }?�:.1 �k;�..r,. �F y.�t3 t���vE. . .r�',�.t7 1t�:•��;
a r.�__a<�:; i:��err�r,i, }�'`��5�. L,ti;'�� €,� ,r��i:�r; !�;itr..l: �;� s.<,;iy�•c� tr>t��_ r t�.;tas�,e ,�rici . .{r=1�i�., .� .,r;�� �,�,,.�r .r�=ti����,�t<�r.
2
��--� OP ID: MI
ACG�`ij��'� DATE(M M/DD/YYYY)
�— � CERTIFICATE OF LIABILITY INSURANCE o��zo��2
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
314-657-2959 NAMEACT
JD Kutter Insurance Associates 314-657-2970 PHONE FAx
C.J.Thomas Company,Inc. a,�c No Ext: A/C No:
800 Market Street, 18th Floor E-MAIL
ADDRESS:
St.Louis,MO 63101 PRODUCER KLOST-2
CUSTOMER ID#:
INSURER(S)AFFORDING COVERAGE NAIC#
INSURED KCI Construction Company� IIIC. INSURERA:AfII@I'ISU�@ IIlSU�811C@ CO 19488
10315 Lake Bluff Drive iNsuRERB:Zurich American Ins Co
St. Louis, MO 63123
INSURER C:
INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR 7ypE OF INSURANCE ADDL'SUBR pOLICY NUMBER M�DY/YYYY �� MMLDD/YYYY I LIMITS
LTR
' GENERAL LIABILITY I ' � EACH OCCURRENCE $ �,OOO,OO
IQ X COMMERCIALGENERALLIABILITY GL2048571 I� ��/0�/�� 10/01/12 pREMISES�aoocurence $ _100,��
CLAIMS-MADE � OCCUR II MED EXP(Any one person) $ 5,��
PERSONAL&ADV INJURY $ ��OOO,OO
GENERALAGGREGATE $ Z,OOO,OO
GEN'L AGGREGATE LIMIT APPLIES PER�. � � PRODUCTS-COMP/OP AGG $ Z�OOO�OO
POLICY X PR� I, LOC $
I AUTOMOBILE LIABILITY ' COMBINED SINGLE LIMIT $ �,OOO,OO
A X nNv,4uTo !�CA2048570 10/07/11 l; 10/01/12 �Ea accident) _
i '�I BODILY INJURY(Per person) I. $
ALL ONMED AUTOS
BODILY INJURY(Per accident) $
1I SCHEDULED AUTOS � PROPERTY DAMAGE
X I HIREDAUTOS I��, (Peraccident) $
1, $
I X �, NON-OWNED AUTOS I _ _.____ ____
$
I X I UMBRELLA LIAB � X OCCUR � EACH OCCURRENCE_ $ �O,OOO,OO
EXCESS LIAB �I CLAIMS-MADE AGGREGATE $ 'I O,OOO,OO
B r -- AUC508767906 10/01/11 10/01/12
� I DEDUCTIBLE � $
� X I RETENTION $ O �� $
'�, WORKERS COMPENSATION � '', X TNRY LIM TS �ER
I AND EMPLOYERS'LIABILITY Y�N iI I
A �I ANY PROPRIETOR/PARTNER/EXECUTIVE WCZO4HS72 10/01/11 'IO/O'I/'IZ E.L EACH ACCIDENT $ 'I�OOO,OO
'� OFFICER/MEMBER EXCLUDED? ❑ N�A I
�I (Mandatory in NH) j EL DISEASE-EA EMPLOYEE $ ��0��,��
i If yes,describe under I ��, li ,� �,000 0�
'� DESCRIPTION OF OPERATIONS below � E.L.DISEASE-POLICY LIMIT $ �
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required)
PROJECT: WASTEWATER TREATMENT FACILITY.
***SEE ATTACFIMENT FOR ADDITIONAL WORDING***
CERTIFICATE HOLDER CANCELLATION
LCAPEGI
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
CITY OF CAPE GIRARDEAU ACCORDANCE WITH THE POLICY PROVISIONS.
401 INDEPENDENCE STREET
CAPE GIRARDEAU, MO 63703-6224 pUTHORIZED REPRESENTATiVE
,�' . 1
i , r .
•�i �i (� t J ' P �� �f,
O 1988-2009 ACORD`CORPORATION. All rights reserved.
ACORD 25(2009/09) The ACORD name and logo are registered marks of ACORD �
�i!' �„e.r�..�w�rrr„
,/
INSURANCE 1�SS+�►Ct�T°ES
KCI CONSTRUCTION COMPANY
CERTIFCATE ATTACHMENT
PROJECT: WASTEWATER TREATMENT FACILITY.
CITY OF CAPE GIRARDEAU, MISSOURI AND JACOBS ENGINEERING GROUP, INC. ARE
INCLUDED AS ADDITIONAL INSUREDS AS REQUIRED BY WRITTEN CONTRACT UNDER THE
GENERAL LIABILITY POLICY (FOR ON-GOING AND COMPLETED OPERATIONS) WITH
RESPECT TO WORK PERFORMED BY THE NAMED 1NSURED ON THE ABOVE LISTED
PROJECT. SUCH COVERAGE IS PRIMARY AND NON-CONTRIBUTORY. WAIVER OF
SUBROGATION APPLICABLE WHERE PERMITTED BY LAW. CANCELLATION WILL BE
PROVIDED BASED ON THE POLICY TERMS AND CONDITIONS SUBJECT TO MISSOURI
STATUTORY REQUIREMENTS:
• (60) DAYS NOTICE—NON-RENEWAL ANY OTHER REASON
• (30) DAYS NOTICE—FRAUD, CHANGES IN CONDITIONS, INCREASED RISK, CARRIER
INSOLVENCY, CARRIER LOSS OF REINSURANCE
• (10) DAYS NOTICE—NON-PAYMENT OF PREMIUM
(2016)
�► .�
Affiliated with rrrorv�s C.J. Thomas Company
800 Market • 18th Floor • St. Louis, MO 63101-2506
Phone: 314-657-2959 • Fax: 314-657-2970
�, OP ID: KC
ACOROM � DATE(MM/DD/YYYY)
�� ' EVIDENCE OF PROPERTY INSURANCE o7�2oi2o�2
THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE
ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE
COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE
ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE ADDITIONAL INTEREST.
AGENCY PHONE 314-657-2959 COMPANY
A/C No Ext:
JD Kutter Insurance Associates Travelers
C.J.Thomas Company, Inc. P.O. Box 66852
800 Market Street, 18th Floor St Louis,MO 63166-6852
St. Louis, MO 63101
FnAic No 314-657-2970 ADDRIESS:
CODE: SUB CODE:
AGENCY KLOST-3
CUSTOMER ID#:
INSURED LOAN NUMBER POLICY NUMBER
BINDER#47812
KCI Construction Company EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL
10315 Lake Bluff Drive 08/15/12 08/15/14 TERMINATED IF CHECKED
St. LOUIS� MO 63123 THIS REPLACES PRIOR EVIDENCE DATED:
PROPERTY INFORMATION
LOCATION/DESC RIPTION
CITY OF CAPE GIRARDEAU, MO
WWTP
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS
SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
COVERAGEINFORMATION
COVERAGE/PERILS/FORMS AMOUNT OF INSURANCE DEDUCTIBLE
CITY OF CAPE GIRARDEAU,WINTP
BUILDERS RISK 55674000 25000
INCLUDING EARTHQUAKE 55674000 500000
REMARKS Includin S ecial Conditions
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE
DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
ADDITIONAL INTEREST
NAME AND ADDRESS MORTGAGEE X ADDITIONAL INSURED
X LOSS PAYEE
LOAN#
CITY OF CAPE GIRARDEAU
JACOBS ENGINEERING GROUP� INC. AUTHORIZEDREPRESENTATIVE
SUBS&SUPPLIERS ATIMA �
��� � � � E � ,� �� i r�'��� ��:
ACORD 27(2009/12) O 1993-2009 ACORD C�RPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
�•�-, OP ID: KC
DATE(MMIDD/YYYY)
'`��oRn� � CERTIFICATE OF LIABILITY INSURANCE 07/24/12
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement s .
PRODUCER 314-657-2959 NAMEACT Jud Mitchell
JD Kutter Insurance Associates 314-657-2970 PHONE 314-657-2959 aC No; 314-657-2970
C.J.Thomas Company,Inc. ac No eXc:
800 Market Street, 18th Floor aooR�ess: �ud 'dkutter.com
St.Louis,MO 63101 PRODUCER KLOST-2
CUSTOMER ID#:
INSURER S AFFORDING COVERAGE NAIC#
INSURED SEMO PORT RAILROAD INSURERA:T�aV@I@I'S 25674
10 BILL BESS DRIVE INSURERB:
SCOTT CITY, MO 63780
INSURER C:
INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BEIOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR 7YpE OF INSURANCE ADDL SUB pOLICY NUMBER MMlDD/YYYY MM/DD/YYYY LIMITS
LTR
GENERAL LIABILITY EACH OCCURRENCE $
DAMAGE TO RENTED
COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $
CLAIMS-MADE �OCCUR MED EXP(Any one person) $
PERSONA�&ADV INJURY $
GENERALAGGREGATE $
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $
POLICY PR� LOC $
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $
(Ea accident)
ANY AUTO BODILY INJURY(Per person) $
ALL OWNED AUTOS BODILY INJURY(Per accident) $
SCHEDULED AUTOS PROPERTY DAMAGE
HIREDAUTOS (Peraccident) $
NON-OWNED AUTOS $
$
UMBRELLA LIAB OCCUR EACH OCCURRENCE $
EXCESS LIAB CLAIMS-MADE AGGREGATE $
DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION WC STATU- OTH-
AND EMPLOYERS'LIABILITY Y�N
ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ N�A E.L.EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $
A RAILROAD - BINDER#47811 07/20/12 08/15/14 2,000,000 Per Occ
PROTECTIVE 6,000,000 Aggregate
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Addltional Remarks Schedule,if more space is required)
PROJECT: CITY OF CAPE GIRARDEAU, WWTP
DESIGNATED CONTRACTOR: KCI CONSTRUCTION COMPANY
CERTIFICATE HOLDER CANCELLATION
LCAPEGI
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
CITY OF CAPE GIRARDEAU ACCORDANCE WITH THE POLICY PROVISIONS.
401 INDEPENDENCE STREET
CAPE GIRARDEAU, MO 63703 AUTHORIZEDREPRESENTATIVE
ti �
��� ���� �. �� �� � �� ��t ( ��.
OO 1988-2009 ACORD C RPORATION. All rights reserved.
ACORD 25(2009/09) The ACORD name and logo are registered marks of ACORD
.. ., . ,�.
�
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRAIZllEAU. MISSOURI
OML�Contr�ol No: 209Q0030
Approved; OS/O1/200B
� Approval Expires: Ol/31/2011
��E �ttvit'OXUIlE'_Ttta��
T'ratec�tion Agency
Disadvantaged Business Enterprise Prngram
DSE Subcoritractor Perfozmance Form
N.�IE OF SUBCONTRACTOR3 I�ROjECT NA11�SE
Gornmerc�u,l �a�wares Cape Girardeau WWTF
ADDCP.LLSS BID/PROPOSAL NO.
�I. Lou,is, /YIO n/a
'fEGEP�It�NL PV'�. E-4IAIL f1I7I�P.F.5.5
3(¢- 256 - 0985 �bafh�,�,,��cs�s c- b l.�e-F
pR.I�vi�CO1�II'ItAC'T'fORNAME KCI Construction Company
CpNTTtr�CX' I'�'GM QF W�TtK OR DESQZIi'TTON OF$SRVIC6S BII]TO rRICt'C3�N'nRK
l'XTu`l�i NO. 1'RIIvIF3 S[iEfiiITI�T.)'I O
PItIh1E{:()I�TItACl QIZ
� [�erS'� �r�C+ /�cGCSSari�S� �'Lp�000. 00
f-�rC ��G�intjr,t�s�+c:�s
Currenfly eerdfied as an MBE or.WBE un r II' 's.D gram? Yes Na 5ign ature of
Prime Contrac4or Date Piint N'ame T3 7 3/12 Doug Jone s, Pr s ident
S' ature of'Sulxonnactor Date
ItiTanie Title .���� _ _._ _
Print
'3ubcvntractor is defined E+s n�vmpany,firin,joint venture,or individunl who enlers into an agreement with:a contractor
to provide set�vicos pu:svant to an HPA awnrd of iinancia3�assistance.
EPA FORM 6;00-3(DBE.Subcontrector PetfottnonceFarm)
CSX65101 004300-5 BID FORM SUPPLEMENTS
RO-4/16/2012
� - .
�
WAS'I'EWATER'I'REATMENT Fi1CILITY
C11'Y Or CAPE GIRARDF,AU, MISSOURI
c3��coz,�,na�a4: 2�a�o
n�y,�.��a: as/o�/�_>oc�
� A��ro��t�a����: m/3i/za��i
���,� F;tl4irvncn4�ntal
Protc�c�ti���tl�eiacy
Disad�antaged Business Enterprise Progxazn.
DBE SuUcontTactor Perfonnanee Form
"I'lie piiblic rc�>arting ancl rrcnr�ikc�epizig burden for t3us collectron al infonnatioitLs estirtiate�E to averap;e tifieen
('k5) minaites. C3urden means tiie t��tal time, el�ork, ur finutcial risources expen�lect by persons to gan�rate,
mai-ntain,eetvn,oz�ctisrlose or pzovide uifomiation ta or#c�r a�edertil iigenry.TTus includes the time�i�eded tc>
review instzuc8vns;<levelo},xqi�ire,inst.�IL aztid utilize teehnulhgy an�i systems for lhE purpases of colleeting,
valiii:ifing azid vecifyin�infoz�nation,processiny,�nc�maititainuig uiformatian,and ciis�lo�ing and pr�viding
infc�xznaiion;a�ijust Ehe e�stizig rvays to cUniply rtiitli any pre4ivusly ap�licable instiuctions an�l requirements;
train p<<rs�mXel ko i�c able[��re.spanct tv�z c�ile.*ctian ot infotmatio��;sea�h data souzXes;�omplete ana rr.vtew thc
caElectlozt nf znEarmrattun:an�i trt7n�anit or�Eherwise elisclose th�u�.fa�n��tinn. An agency ytta�rtc�t condrzet at.
sp�nsor; ruicl a p�.rsc>n is itot rec�uired to res�>nsid tn, a colleclian of intonnatioti unless it disylays a c�arrentty
valld OR�TRronfroi number.
S�n�tumnl�nts cm the���ncy's need Eox tlus informatiQn;the accvracy af the prouici�ci bxrrden estimat¢s,�nd
any su�;g�estecj�netfio�ls fur 7nuurtxizittg x�esponcient:buzde�,includin�the use c7f aukomated ct�llertioit tecluuc�ues
ko flie t)itectc��•,Co33tctian 5trateg,ies Divisiozy U.S. Environmental Protection r'�genty{7$:..�), 12QO I'ennsyl�axua
Ave.,N3^7,4'Vashingtan,D:C.20460. Inelude the OMB�ontrol niintber in�iy correspandenCe. Da fiof send the.
com�l eted F.Pf1 TJI3E Subcoiitractor Performance Form to tkis ai�ciress.
EPA FQRM 6100-3(ABE Subcontrador Performance Focm).
CSXb5101 004300-6 BID FORM SUPPLEMENTS
RO—4/16/2Q12
� '
WASTEWATER TREAT'MENT FACILITY
CITY OF CAPE GIRARDEAU. MISSOURI
OMB Control No: 209QOQ30
Approved: O5/O1/2008
� Appm va1 Expires: Ol/31/2011
� EIIVIT021II1C'Iltal
Proteetion Ageney
Disadvantaged Business-Eitterprise Prograin
DB�Subcoritractor Performance Form
NAME O�SLtBCCO1VTF2AGTOR� P7{OJ�CT NAIvIL
J.D. Kutter Insurance Assoc. :Cape Girardeau WWTF
r�DDRE'S5 BIDFPROPOSAl I*IO.
St . Louis, MO 63101 n/a_
TELLPII03VL':'1VQ: L-IvIAIL A'DDt2ESS
314-657-2959 brendamainer@cjthomas .com
p��carrrriAcroxN�� KCI Construction Company
_ _ � ,. _ rnic�oawozue
CQ1�1TTtrlC"� �EMOFYVOTLKORDESCTtIi'TtONOF:SER�iC'ESBIDTO SLIBIti�iL3.l.&D�7�a
1T'Efi2N0.:, 1'RIIvIF3 , ',
- ERINIE'EO1�iIRAC`I'QR` :
IIISUY'd11C2 ����QV—"
Currently certified as an MBE or WBE under 's. E ogram� X Yes No 5igt�ature of
Pmne Contractor Date Ps�int Nante Titie -� � �L 'IOM �S?�2�,V t� Ps�rS.
Signa_re ofSubcontractor Date
��,Prutt
Nanrc President
�Sicbmntmcfor is d�Iinea ns a.company,firm,joint venturq.or.individual:wFo enters into qn ags�eement.wifh a conf�sctor
to provideservices pursunnttto aaFiPA avtord of Einancial.assisiancs
$PA.FOIiIvI6100•�;(DB�:Subconh'actor Perfocmancc.Formj.
CSX6510I 004300-5 BID FORM SUPPLEMENTS
RO—4116/2012
��,u�
. -
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARllEAU. MISSOURI
OME3 Contr�ol No: 20940Q30
Appioved: OS/Ol/20Q6
� Appmval Expires: Ol/31/2011
,�,, F.�rvicontnexitai
Protecfion r�gene5�
Disadvantaged 8usiness Enterprise I'rograut
DBE Subcoritractor Perfozmance Form
NAA�f&OF SUECON'TItACTOR� PROjECT NA�ZE
�D4- �,�-�t�,�� Cape Girardeau WWTF
ADDP.ESS BID/PROPQSAL NO.
S?, Wu�S, �"�� n/a
T�t:#iP�IO�G NC}. L-lIAiL�'1I7DP.ES5
3 t4- - ��44
�R.iM�CotvTltAcroltNAlvtE KCI Construction Company
�ON'T:Itr�Ci' XTFiM QP WORI<OR DES(TtII'TION OF,$EItVICES BII]TO T'RICG()P Y107tK
CITit4rNp. PRIIvIE S�L'NII1'T"GB"I'O
PItIhIE'�C3N7It 1CI QR
Z''"-' ��z E�-�uM c,� Su13 �Nt�� <v'��, odo�
(�U d i��'2`C G�-c'�"Tu L
Currently eertified as an MBE or WBE under II'A's,T/�BF Program?�Yes 1Vo 5ignature of
Pzime Contractor Date.Pi7nt Name Titl�--ff,:.� ���'I 1— -76M f'�_1TFYL V� 'PI�
5ignature ofSvbcontractor Date
Print
�ttUll£ rll�t. --+"J.��� .
�3ubcontractor is deEined as a cvmpany,Firin,joint venture,or.individuel�vho ente:x into an agreement with a centr;�ctor
. to provide set'viees pu:vuant to an$PA a�ti�nrd o!iinancial.�s�istnnce
EPA FOItM 6�00-3(DBE:Subcontzsctor PerfotruunccFmm)
CSX65101 004300-5 BID FORM SUPPLEMENTS
RO-4/16/2012
- �,
- .
.
WASTEWATER TREATMENT FACILITY
CITY OP CAPE GIRAItDEAU. MISSOURI
OMB Control No: 209QOa30
Approved: OS/D1/20�
� tlpprovaYExpires: Ol/31/2011
,��� Environnierttal
Pz•�fiec�tian rl�eric},
-�.
DisadvAntaged Business Enterprise Prograin
DBE Subcoriiractor Performance Form
NA11�IH OF SUBCONTRf�CTOR� PROJECT N,�1E
�mR i�vG'o t^'�fnf Cape Girardeau WWTF
AI3i)PL•SS BID/PROPOSAL NO.
5u.11;va�� i')'I 0 n/a
TEi.EP�IO�L iVO. L-1IAIL e�I7DI2ESS
3�4- �03 - 9o8S
��M�CONz'RAeTORrrt�t� KCI Construction Company
CpN�;�C1 �TM QF WOTtIC OR DESCitIP130N dF$EItVI:CES BIIJ T0 ��Z��'t���ln�K
T1�ti1 NO. 1'RIIvIS SC�Px�IITI"L�'I'O
PRFA4E t;ON'tIt�CP�R
�/jec,{��;c„�,( .�r�stalc��-r'on $40�oo0•vo
Currenfly certified as an MBE or WBE un II' 's.D grarn? �C Yes NoSi��n ature of
Prune Contractor Date Piint�Tame Ti ���/12 Doug Jone s, Pr s i dent
ature�f Svbcontractor Batc
r.t:v,�� rt1� _.___
Prutt
�Subcontractor is deFinec�as tt mrr�pany,firtn,joint ventvte,.or individunl�vho enlers into an ngreemant with�a centrldor
to provida scuYicc�p.u:svxnt to sa&pA a�qerd o?Ein2ncin7�ssistance
�PA FORM 6�00-3(DB E,Subcontrec[or Performnnce Formj
CSX65101 004300-5 BID FORM SUPPLEMENTS
RO-4/16/2012
. ..
� r
WAS'I'EWATER TREATMENT F��CILIT'Y
CITY OF CAPE GIRARDF,AU, MiSSOURt
c:�1�r.conrro��a�,: z�ia au3�
Apyibved: OS;�QIf 2bD£3
� �iF}�r�val t:a-�+u es: O]J31 f 2Q k 1
�-,,�,� I:stvia•onmentai
Prot�:c3ic�7� ;�y,ency
Disadvantaged Evsiness Enteiprise Yrogram
DBE Sul�contcactor Perfonnanee F.orm
Tiie p�tblic rL}>orting anil i•ecorcll:eepuiv Lurden£or Utis collecttvzr oI nYfoi�itation is estimatecl tU a�ei age#ilteen
(15) minutes. T3ur�ien means tlie tuial ti�ne, effork, or tinanc(a7 ,rrsoutcea escpe�titecl hy persons to genet•ete,
mai.ntain,retain,r�r cfiscIo�e or yrc>vide ii�tonnat�on to or fara F.ederal ap;ency.71u�isuludes'Uic time�ieecle�i t.n
revic�v instzucti�sts;cle�•elc��,a�:qtiire,install,a�tti utiliz�icchnulo��anti systems for ihc purposes af collectine.
vali�i�iting� ancl3recifviti�inf�J-m�tion,processing anc3 znainta'v�u1g uif�rmation,and ciisclasing�nct pmviciin�
infounali<>n; afljusk t7ie e�tistiiig tivays to uoniply ti�itli any pre�iously applicaUle insuvctiq3is ana requirzrnents;
train pe.isonnel tn Ue able t��i•esE�and to a collr�tion ot infannation;searclt data soun:es;tnm�leke a�id r�v1eFv the
cnilection of infornaation; and tr�+nsnnii or athei��vise clisctuse tlte snkosmation :�n ages�cy lnay not eonii�sct uz�
spnnsor, :ui�l a p�rsszn is nof requircd ii� res�>an�i to, a 4iillect�on oE.infurmatf�n unless ir�iispIays a 7��rexiity
valld OAT6 coniroi niLmUer.
S�.nd L��snnienis on tlle f'��eney s neerS for tlus in.foranatiQn;the accuracy of the�mti-icled Urirden estimales,aiid.
any sci��estecf iucllio�s tur micurr�:izing x espor�cient:buxcie�,induding the use tff ai�to�nAlcd rtc�llt*ction tecluui7ucs
ta tlte Dixrctor•,Goilectivxc Stxategies Di�isiozi,U.$:Erivironrzieittal Erotecfioii agencY(762?),1�00 l'ennsylvai:i�
Ave.,N4V,�Yashingtan,D:C 20450. Include the OMB control nvnttier 3n any.coirespondente. I3o nof send flie.
compl eted'F1'A TJT3E S1�bc;oictractor Performance Furm to this a�dress.
EPA FQRM G100.3{DBP Subcontrada�P.�farmance Fam).
CSX65101 004300-6 BID FORM SUPPLEMENTS
RO—4/16/2012
_ , "
WAST�WATER"fREATMENI'FACILITY
CITY OF CAPE GIRARDEAU,MISSOURI
OMB Contrvl No: 209400.30
Approved: 05�O1J2008
�1ppro val Ekp'sre s: O l/31/2011
�� Environmental
'�`� Protection Agency
Disadvanfaged Business Enterprise Pxogram
DBE Subcozitractor Utilization Fornt
BID/PRaPOSAL NO. PROjEC i'NAhTL
n/a Cape Girardeau WWTF
N.AIVIE OF PIiIME BIT�DEI2/PRbPOSIIt E-Tv��IL.�.i7DRE5S
KCI Construction dougjones@kciconstruction.co
,�1I�DRESS
10315 Lake Bluff Drive, St . Louis, MO 63123
�etErzic�N�:�to. 314-894-8888 ������ 314-894-7418
The foll'owing subcontractorsY will be used onthisprojec�
Ct)\�iPr1iV Y Ne11�1[?>s�I"JI)I2T?SS,PIIONL� '7�`PE Q�WC%ILIC TO S$ FS`IIb1t1IE CUI2ItI:N'£T.Y
NUh[fi[i[t,�1ND t i4fi��IL r�DD3i£SS PCRC�I21tiSTzD D i)QLI..�#IL CGIYI'III"F�
AhiOUNl .AS.�N 2vili�
DT2 WIiia7
����Mc,�c��! ,��-Ti,�-�2�s zv�,���;%rr��,4�r; r=;,��;, �-�.�e �' y�s
�
,j D i<+� E7�/�' ��s�+R��,v cc Ck'c�) �f ��'�� Ye.s
�i�l-{- CL..�C'T/���'�4L �"G��'Ti�i�?<+L loS�'2�c�' 1��5
JN+� r��'v����Z.��.�v�-- ,�d�e����1 ck/-�.vs�l:�r.�.:�.• �j�.�- y�.s
ce�tity�xnrtc.�r stalty ra!��juz'y Hiat the fo�•gcruigstak�ntcnta arz h'ue and correct Izt ihe event af<j
pl ement f a subcontraetor,I will adhere tu khe re}?laceri�erit re��uirement�set forth in 40 CFR.ParE:33
S UI1�.�.3. .�C�. -
l'
07-03-12
i e P ' e C t�•aclor Date
Douq Jones President
Piint 1Vartte Title
'Subconlraetoc is de.'ined as a eompan}r,firm,joint yenture,or individual who enters inb an ag:-eement with:a ccntractor
m pro�ideservices pvrsuant to an�A awarti of!inancial a�istance.
EPA FQRIvi 6100-A(DI3�Subcontractar Utiliza�on Form)
CSX6510] 004300-7 BID FORM SUPPLEMENTS
RO—4/]6/2012
• • . . 4
WAS'1'EWATER TREATIvIEN'I'FACILITY
C1TY OI�CAPE UIRARDEAU, MISSOURI
anSG'Contxol i1o: 2[�a0630
:�p�>rovo�i ASJUI J'.5.Of1Ei
Approvalktyires: D1J31J�b11
r� Environrnei�tal
�� 1'rutection�1�enty
Disadvantaged Business Eilterprise Yrogram
DBE:Subcontra�tor Utilization Form
The pubfic reporting and recorcikeeguig burden for this collection of informat3on is esfunated to average fiiteeti
{15) minutes. Surden:means the total time, efEor�.or ficiancial iesourcea �ded by psrsons to generate,
maintain,retain,os disclvse or provide intvrmation to or for a Federal agency: This 7ncludes the time needed to
revietV instructioris;d�evelop,acquire,install,3nd utilize-tacMtolo�y aitd syst�ms for the ptuposes of collecting,
validatiztg, and veri�ying iiiformation,processing anci rttaintaining inforrnation,and disclosing and providing
information;adjust.the�xisting ways to compiy with any previously applicable instructions and.requirenients;
train personnel to be atile ko respond to a collection of in£ormatioi�;.seazeh data sou�.es;complete and z�eview the.
eollection of information;and transmit or otherwise disclose the infortnaflon. t1n agency may not eondu�t 4r
spo�sor, �nd a person is.not required to respond to,a collection of informaFion unless it clisplays a curr.ently
vaLid OMS control number.
5eud cqmments nn the Ageney's nee�f�r d�is u�fnnnat�o�j,the aCcnsacy of the provided burden esriinates,ancT
any su�gesfeiin�ethadsFor�ni�iusilr.iiig�•esponcientbiu�elen,includingtheuse ofautomatedcollection terluiiques
to tlie llirecEbr,Collectlon Strafegies Divisiori,U.S.Snvironmental Pi'ote�tion�gency(2822),12IX1 PennsyTvani,a
Ave.,�1W,.Wasltuigton,D.C.20460: Include the�MB contrqi number in any correspondence: Do not send the
complefed EI'A DBB Su�contractor Ut�7i.zakion F.orm to this ad"dre�s.
EPA FORM 6100•4(DBE Subcantractor Utili2ation Fom�)
CSX65101 004300-8 BID FORM SUPPLEMENTS
RO—4l16/2012
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 16—Caulk & Seal CMU Heads, and Dryer System Modifications per DHA
The Contract Documents are modified as listed below: Bid Item
No.
1. Caulk &Seal CMU Heads on T&M Basis
(Change Proposa) No. 135rev.1 attached) Add - NTE $5,511.00 N
2. Modifications to Dryer System per DHA
(Change Proposal No. 136 attached) Add 141,310.00 N
3. Fire Suppression System for Baghouse
(Change proposai No. 137 attached) Add $251,287.00 N
Total Cost This Change Order (Total 1 through 3) Add $398,108.00
, ,
- �I Y'.�:r%�
-� � � �-�3 n�.R
' � � � c ? _. ��,. ti+_ C3;.v..__,�
, � ... . i
3 ' ` � `���'� =`' � Change Order
� :
� �u� o � zcls �
� No. 16
a
; ,��,;,-`r'l';'±� E
Date of Issuance: �
May 11, 20C1.8....._____Y j_._.___._,..__._._..._.r__�.._� Effective Date: Mey 11, 2018
P�o�e�c: Wastewater Treatment Facility oW�e�: City of Cape Girardeau ow�er'scontractNo.: 3534
co�t�a�c: Wastewater Treatment Facility(SRF Project No. C295531-01) �ateotcontract: August 3, 2012
co�c�a�to�: KCI Construction Company, IIIC. EngineersProjectNo.: CrJX6�J�O�
The Contract Documents are modified as foilows upon execution of this Change Order:
Description: Caul 8�Seal CMU Heads,and Dryer System Modifications per DHA
See attached list
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): .IUIy 20, 2014
$55,674,000.00 Ready for final payment(days or date): AugUSt 19, 2014
[Increase]from previously approved Change Orders [Increase]from previously approved Change Orders
No. 1 to No. 15 No. 1 to No. 15
Substantial completion(days or date): MarCh 31, 2015
$6,260,060.38 Ready for final payment(days or date): OCtObel' 18, 2016
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial compietion(days or date): MarCh 31, 2015
$61,934,053.98 Ready for final payment(days or date): OCtObe� 18, 2016
[Increase]of this Change Order: [Increase]of this Change Order:
Substantial completion(days or date): MarCh 31, 2015
$398,108.00 Ready for final payment(days or date): D2C2t71 b2�31, 2018
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): MarCh 31, 2015
$62,332,161.98 Ready for final payment(days or date): D2C2m b2f 31, 2018
RECOMMENDED: ACC TED: ACCEPTED:
By , By: �C.i� C��i1(.L� By: /��
Engineer(Authorized Signature) Owner(A�thorized Signature) ractor(Authorized Signature)
Date:�7���� Date: ��� /✓�r l 9 Date: S �
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941 (2002 Edition) Page 1 af 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
� .
THIS PAGE INTENTIONALLY LEFT BLANK
r .
THIS PAGE INTENTIONALLY LEFT BLANK
� ,
; KCI Canstructian Campany
_ ,:...._.._�._::.'---' a e u nva
St. Louis,MO 63123
(314)894-8888
Fax#{314)894-7418
vwvw.kciconstruction.com
April 2, 2018
Jac;obs
Attn: Mr. P.K. Mathai, P.�.
501 North Broadway
St. Louis, MO 6310�
Re: Job #12002
Cape Girardeau Wastewater Treatment Facility
Change Proposal # 135rev.1 - Caulk & Seal CMU Heads on T&M basis
Dear IVIr. Mathai,
We propose ta furnish the necessary labor, material, tools and equipment to Provide additionaL
CAULKING OF CMU HEAD , for the increased lump sum of Five-Thousand, Five Hundred and
Eleven Dollars ($5,511.00) as performed on a T&M basis.
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval, please sign the attached copy in the space provided and return
it for our recards. By signing this change proposal, you are authorizing us to proceed with the work and
agreeing to forward the appropriate �change documents and payment of the above amount within 60 days
of work performance.
If you have any questions or comments,please do not hesitate to contact us.
Sincerely, Approved
, / BY� ��i2'�C-��°��Ov✓
Brent Krueger
Project Manager Date: j/
Attachments
� �
�
a
a
N
� � J
� �
O � Q
fy. VJ
0. �Ctl
(7 �
�
�
U �
u
m
�
� �
x
� `o
u. ,3
C T �
N L
� � 9
� V O
F °' �
L
� U �
m
s
: 3
:3
`e� n
3 a
, o
A � G
� N� W
� j �
C7 � N R.
v � O
� �'�.. O G'
� aa z
0 o O o o O � O o �n o � o 0 o vl h N v � � m
O O O O `O O �'1 O O U O O� ? O O t'� a0 t� n C �
O O C � h O O� O C 00 O W �n O O � �/1 oG ^' � " U
n r� �o 0o ri o �o o -.• .-• �n t� ri �n vi �n �
MQ v1 N N �.. .... ^ N c4
� N w M'i Vl V"� �
E T O V o
A m [- � u
z u z ¢ ° � o
y� e`d Q .] � � N
c� c`. � � .�. A A E
e o 0 o a ��-, � ^ a�,
v, �, ° � n
� °' '� o A
3 ' � �
C; � U�' c �� v
e
�1
� �
�' F
F
c �
o ❑
v; _ .] o
q v' Q n.
x¢ � r+ O � O �,
..t°.l � o y F F- v�
a `" U
� o o y a v� Q � " _
V c °v\i .D^a r. ae � ;a � � a f j O p �
� z � � � � � # � � � � � _ � � � A e
e - � o � � � m � o � � aQ � o � �, 00 a � � �
m O �d GF. � � � a�S � ~ 6 � v a°i � A � ° � v3i '� � 0. _' W u q �
� � �. a n. o G � m '3 E E o v `o � �n � o � � � � � ¢ °
� °-' � �° � dS � c ,: °' °�,' � 5 � v o a � ° > > c c z n. '� �
S ¢ � W .`� .a O u. U v� � � w w a' O a' O F uu, `n � c7 � � W a �
_ �, U O V � o
�_ � � <
v U Cq
-``
a � H FQ
' a � � ..]
a
� o o �
:._ �.. -a o �-
� ° .� = � F, W o •• o
'" a`°. 3 � o L O O '^ = m
� 1
OO O OO O O O O O O O O O O O O O O O O O O 0
�O [�1 � � �
"� F
F �
O �
F V
Lt7 �
¢ � OO O O O O O O O O O O O O �
� a � � N N
W z a O
..a O 3a� L
�¢ F" W 3
O C]
O O � o
0
� U
,.� [-. W
W Q F
� `� � �
W
W
U C7
00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
Q �a F
2 t
� �3
0
F �
� � �
O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 o Q
e `n �^ U
O �
In `�
Q ¢
a Q,
� �O � 3
F �~
o � � �
� o
� U
o �
�T N N V
L:. N
_. O F
' � ��
�
�
� �'" y >, �n � � H T �, H H N m a a � n. _ —
V �^ � L � .0 L L .0 '9 L L .0 � � C t G
J
<a
.0
v
m
z � y
o � ;, v
C, j X � vi
� V � ` T
� O �p
V N " '0 3
w yy � r `m
W .°e `� .s�, y c
� �
�
v x � o 0 3 0 , �,
G ,� 2 °F° ,^', c `-,,,° °_' � o ^ � `�
m � � - � ' o c m V u s
` N m 3 e`e c�v `^ w
o°'o v � � Z+ '9 � � � t ro o n' v U c � `o �g
N � � � o m 3 � � o °' °23 L C] E m � °' a
z A � c c�i :'. � ` 'L' � °_' U �y ^ � a� o y E v: u E >
� � w :? d u � A c p, � H � a � a� � � a� . .._t .fl � N
F' i� i� � i� N 3 � ° W u c�°i � •° ? ° a � � c W c (-¢. m > o
p�_ � � � � ,o o � n n � E m v � � E 'a � a 'N O � o a
z �o �o a �o v a, v v v o � ° .o " a 3 a � �- a� F ;? o 0
O � �� a`. 0. v� 4 iz. .� U F F- 0.. W a. Q U T C a Y� L l C 7 U F u- z a
U �
,„
p N Q O O O O N O O O O O O O O O N t1 O O O �/1 O
� �, •• N M �D `D 00 �+1 N t'l O� O O �O I� (� 00 I� Ct �/1
�. O O O O O O C`1 V' ? t � �D `C �O `D `D b � t� � Q� � N t1
Z� � � �U � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
t7 ' ' a'
o � � o 0 0 0 0 �
� � � N
F
F `n
Q O
F V
0 0 0 0 0 0
N p
F u
� �
a o
U
ILI ,p,J
� �
� p O O O O O
z �
U
a a O
� � o
o a ;
° �
c�
u] F W
� � �
2
U a � o o � oa o 0 0 0 �
Q {i] � .--. N
� Q
F F
� �
�n �n o
M N
0o F' F �o
r� ,Z, Q
� a cx
0
0 0 0 0 0 0 0 0
0.' � �' r�v
�
�
O �M
F F
� � �
�n
c1
� O O O O
a
U � o: od v
O �
� N N
L L �`
.�. E � ^ 'Q
n
O
N
n
N
O
2
00
T
r
Z O
O �
F �
G� a0
uV-� �
Cs] �'
� �
O
Y
r'
�
�
a a
�
a v � cn
� aCi °� a�Ci '°'O F
�- � � n � O
,���� '^ W v� U � .� F-
=a �
: W
� r-, F^
""` ;� O O
r���a V U
��s �w�vanwuu�uvn vu.
. KC' 10315LakeBluffDr. EXTRA W � RK ORDEF
' ` St.Louis,Missouri 63123
�- (314)894-8888
F8x No.(314)894-7418 N� 0 9U 9ap
���
PROJECT NAME: Cape WUVTP pROJECT#: 12002 DATE: �7-17-17
WORK PERFORMED FOR: DESCRIPTtON OF WORK:
Supervisory take off order and secure
City of Cape Girardeau W1NTP materials
LABOR
HOURS UNIT COST AMOUN7
1 Journeyman Carpenter 2
u
SUPERVISION: A1 N i 1
MATERIAL&EQUIPMENT SUBTOTAL LABOR
Menards Siliconized Latex Caulk 2 cases $43.79
KCI Construction Company COMPANY: SUBTOTAL MAT&EQUIP
J TOTAL:
BY:C������ APPROVED: OVERHEAD&PROFIT:
GRANDTOTAL:
r � r, �.� �_ �� 'f. _ �, r�,C, � . .
,
�_ c,t,��� ;�, c.:.��i:��_o f-�;�y �.�; ,
�., �r...., .� . ; , �: �II� �
t3��: �A.Hi) ,�H£HA f t ='�
WLl`` � � � i�1 �
t•i�;i t:i� cJ:s L'.it►i� (� 1 r.i r�! �
`.►:3!� :� ii:rnt:t':; 1�� Ivii �
1�.�{.��� l� f t :�i��! . t-1l{ ti:3ltt 1 �
rt�l' ,�>�:� ntt,Ci��i --
!'���;N>� {1�ll�.r :�,':li`i U; f;�.i;i:�;Li �1��, G
L';�C),: IititC�� Uul��:.� 1i�+�%�:��,;'�:t IU�I�I�,� '1'.t "'
��ui::., .:tl �f:i[, i:_1�y;i nl�l �it �SI }s.r ��..I..� �
.II .r�l ��G v�li�C l.ICij�� '.1,.,,.��,t�� tl t'�` �
tul;�:r� i:, i!�_ 1};��I' lU(13111
0
r
;R �i:tl I�.;�c i;;;2sI1L:';t, lc,;dt;1��;� 11�c �
'..�1���J,'L.. V I )'��. �� fS:4C.I�;� �:�Cj�:.. �
br.all t�5 ct:
.
L�FE f�c��itEn:iy;�e;t�r uJ.LL-1 �
������.c�►��.�iili���i.������if�������������r
Shce i�ciad,'.:i:�,
U;,P �L��:� l:.�l:`4M: L'LR
���;;tiJ1 I'r,(i 2�7 ?'d
��P �1 E:A� CAULK '+tii
�63tl815 Pk�,('i tU.28 �
I
�uTky ;u.bn i
iwC C.AFE Glh�k-!!fJ i.J151 3,23
t�r�t ���� ;3.r�
y15A [.rikf"�Ii ��}l�s �'a,r�
F� i 12UA?
�UTi, cu��:ca�:;�
C��ia lnser te�
dfiJOtit�C;{i�j i O 1 C�1!
iC - 9n�uEis�l�Bt2l�.id�
1�1At �,'UNBEk li� liEt4� = 1
t'r,t• it1LtQ;tiltlii Ht8h1`t SilL'E14�t,�, ��'tiiE
F�RItl1�(� FLR I�i�S iR�'��AGtl��t�:
11?7
GUE:T LG�'f
� I1ti� Car�s�nl�3vr ac.i�r�J,rle3drs cec�tpt ��f
�,���d:�I�c�viCc:� tn t��e totd5 axourit a!�G�,�i
� �idt"cUit 611d aitrcr� SG c:e! kk7r eard Is��iai'
��C�rdtna ta lts c;�rrcnt terins.
INiS SS Yt;�t;;� CFiFU3f CAi?D S:+l.t5 SlI"r
�LEA�z�R�TAf►� fC�? YUJk R�Cf1R��.
N� Hirir�g-k�ly T�ay
tNA�i}: YC+J, Y(�,'n CF��ifCR, Cltr15i1��
�t.w� i;e b�ca 4�!��1�i u7:;�r,k 3?�u
�■ KCI Gonstruct�on c;o.
� , ' 10315LakeBiuffDr. EXTRA WORK ORDEF
• K�' St.Louis,Missouri 63123
�- (314)894-8888 (�jo CMU GaF
Fax No.(314)894-7418 o��
`�i
PROJECT NAME: Cape WWTP PROJECT#: 12002 DATE: 07-18-17
WORK PERFORMED FOR: DESCRIPTION OF WORK:
City of Cape Girardeau VWVTP infill CMU to twin 'T' gap with foam
LABOR
HOURS UNIT COST AMOUN i
1'ourne man car enter 3 hours
u
SUPERVISION: AI Neil 1 hour
SUBTOTAL LABOR
MATERIAL&EQUIPMENT
SUBTOTAL MAT&EC�UfP
KCI Constructfon Company COMPANY:
J TOTAL:
gy;C� . APPROVED: OVERHEAD&PROFIT:
G RAND TOTAL:
�■ KCI Construction Co.
K�' 10315Lake8luffDr. EXTRA W � RK O �DE��
St.Louis, Missouri 63123
�- (314) 894-8888 CMU gap
Fax No.(314)894-7418 011
'�i
PROJECT NAME: Cape WWTP pROJECT#: 12002 DATE: 07-19-17
WORK PERFORMED FOR: DESCRIPTION OF WORK:
City of Cape Girardeau W1NTP rauik thP C:Mt I tn twin 'T' nan at hincnliris
electric room.
LABOR
HOURS UNIT COST AMOUNl
1 'ourne man car enter
u
SUPERVtSiON: � 3 hours
SUBTOTAL LABOR
MATERIAL& EGIUIPMENT
Menard's, 2 cs caulk and planks for access. 125.56
SUBTOTAL MAT&EQUIP
KCI Constructlon Company COMPANY:
J TOTAL:
BY: APPROVED: OVERHEAD&PROFIT:
GRAND TOTAL:
:�,+�"c-'- �-- > 'i� �.-,�1�-'
.t," ,� � ��
. . ��' �����c�
�i►e Y�ui � Z;ti
BIO CARt)�,�NEIiA IE
�4�.�.c�.�a:.t��
I���a rcl:-s Cupc� G l i r�r�cJ
��'� Sie.mers C)riva:
;ape Ls f rci rd, M(7 (337t)1
Kltl� �rOUR RECE�I)?1L � �
HEIUfft1 FOLi�Y v;�Itl!c� hY fNUUtli'1 I�rf�k
lh;lu�a ir�letl l�tlu„ alli;,�,�lile rrlwns i;�r
fie:ns on thfa re�:ri�,l ;�i11 Lr 1n tl�a fura�
ol ail In slute tiedit vw;��er 11 thc
t'eturn is ,lu��a nflrr lOJll/17
If you ha�,�e c,uesllun, iegarding U�e
ch:ir�e; a�i yc�n re�elpt, plea�e
�,;:a11 us a1:
CAFclronlrrdAr;,narcls.cra
,�II�IIII��I��1�'�II",l�I1lIV�II'�:Illll
Sale irans�ctfr.n
D�P AlEil. C�Ut R i:lR
5638a01 NlC ?U.2d
D?P aLEi;+ CAUIH t,1t
�6�fi875 PnG :u.28
FLEY, SEA� SrRkY t�i�;llE
5630t1? 1?.e3
?"F�!i CAH ti t"M1P �lluf�t.!
G91yd15 �y,g9
2" lIi�ERI HAIt �.L�P(CR "
65�,b?1 l.dl
2�� w�c a�u va��r F rn
6B5�J f 7 c: i t.95
�RDEk :03�7
'[Y.10-lu �1 3YP -P1C.n
1QZ2u�l ; uy.35 ii.4u
EtIO OF driOEtt
1GThl iio.�9
iNY, CkPE ulii�t-H;1 1„3751 9.?7
TOTM� SaIE 125.56
V15A CAEpIi ?nT3 125.�6
PD s ItL93
Aul'n Ccd�:U42263
C1�1p Irsertad
a0Q0u0UilG3lGiilui
iC 1f332c5003922a1t
tOTAI l+Jt!(iER �F 11EN5 = 10
1NE.FOIIuk{lNG REBAIE REt;EtPIS:WrRE -
PRI1ftEG fOR itils 1�At�S4CilOH: -
112t
GiIESi fAPY .
Tix Car�u�ld�r ad�rxmled�e�i�r.��P�af x�. j�
gaods/sgrvt�es�t�itt� lntal,'aa�unl"`n1`�t� ,�".
harzon aiul aeree�,to DaY"gti�'zar���� ���
� acc��al� �o��ts sz��r�'t is�� _
=,���4 's�t���-�'r_�
� 7xIS_���t t,�3" � �
_ ��,��_
=_`"',��;� � �
- � i.
,.��-,.
,
I�ti�
�;w�� �
:=���;£�
.�
�;� ��.
-� lu
� ^yyv � u� vvv. EXTRA I�IORK OR �,E �
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
�- (314) 894-8888 No �
Fax No. (314) 894-7418 /Z
PROJECT NAME: ��1�� ����T� PROJECT #: �1 ��� DATE:� � � ��'�� `'
WORK PERFORMED FOR: DESCRIPTION OF WORK:
C- /�Y �� C ��'��� c�d��i��, f;��iP �/T �h /��-- ��i= �/Li�
� ��' //U /��i�l� 1��G���
L=C 1- �,��1 i� l����'i�--i �- ����
�''j � if/��� �7 �
LABOR
HOURS UNIT COST AMOUNI
� C ,���d G`'"T-c-�� ,T4��«�-` �i.-�-�-� �
SUPERVISION: , � -''���" /� � `�
SUBTOTAL LABOR
MATERfAL & EQUIPMENT
KCI Construction Company COMPANY: SUBTOTAL MAT & EQUIP
TOTAL:
BY: > APPROVED: OVERHEAD & PROF(T:
�� �.
GRAND TOTAL:
t t
-- KCI Construction Compar�y
St. Louis,MO 63123
(314)894-8888
Fax#(314)894-7418
www.kciconstrvction.com
March 1�, 201$
Jacobs
Attn: Mr. P.K. Mathai, T',E,
501 North Broadway
St. Louis, M9 b3102
Re: Job#12002
Cape Girardeau Wastewater Treatment Facility
Change Proposal # 136 � ����d�q,�'l�� �� c���'��'��,,���� ��� ���
Dear Mr. Mathai,
We propose to furnish the necessary labor, materia�, tools and equipment to perform the work
assoicated with RFP#53, modificiations to the dryer system per the DHA report, for the increased
lum� sum of One Hundred, Forty-One Thousand,Three Hundred ancl Ten Dollars ($141,310.00).
Please note the fo(lowing clarifications associated with this pricing:
Does not include fire suppression system for baghouse - to be resotved via RFP #54. Addresses items
#7,11,20,26,27 of the DHA only. Submittals to be provided from Andritz 4-6 weeks after receipt of Change
Order. Delivery of equipment and material to be 6-$ weeks after submittal approval.
We have attached a copy of our change proposa(estimate summary and backup for your review.
If this proposal meets with your approval, pleas�sign the attached copy in the space provided and return
it for our records. KCI requests issuance of a Change Order prior to being requested to proceed.
If you have any questians or comments, please do not hesitate to contact us.
Sincerely, Approved
� -- � BY: ..__�__/�/i'%��, �
Brent Krueger
Project Manager Date: /
Attachments
�
A
�
�
� � �
o � Q
° �
a W
v ¢
z
� F
U W �
a �
u. '�
a O
ro �
� c
v L
C w
N � V��.
�
p U O �
o � o. �
A �
� C A c
o � � x
L T � E O
� ,�p p � � 3
- 3 " o
: � �
� `� x �° � i,
❑,
ro �
a�i .o a��i Q ,� H
Y p
� �
`�G 'O v�'i w G j �
U Q
� U O I� a o0 �
F' � �' � p `� i
a`� V °� c� � p v
3 � � u $ a
y N .�
vl N "'� � C'.. O
d C
� 3 �.`'. a n, a �
� � �
R � � E -� '� c
v � � � o a� a
� � ycp
9 � V] 0 ��' L �' G
N � [-w• v v 'a � E �
n ` �
U Lry � C1 Q v� � " t
0 0 0 0 0 0 0 0 0 0 �o � o 0 0 � m �n v+ o .. ` U
O O O �] O N O O O O N o0 O O O O O ^ � N ^
a) O O M � �O ri O O O O [� c� �l v1 O vi vl �D �O N � y C �
� m E.. a v � � - v � � v � `�' a°io_ rn � N N � o � � � U 3
Z v z � �G � t�i �O a � ri � � � � � ia � �
r�. � � � � o
� N � Q '� m � �
N
°n, o d � V � T —nq, �
� a a < z � .� � �
a a o e a o - � �= a
z � �, �, Q =_ .� ��
(,] � y^ 1 C �
'" O iv
� = �j E �
G O
v � � F �I �
N
� �
� Q
a� a
Z' a v
Q a ,� F �n
y �Ml
� � N � v � .�.� �
C w C O uNi j Q �
0 o n � � d � e
' o � v
� o � ^ N .y„ i) � X � 69
� C Vl � i. �[ �t ,W V �p G. {,L� O y [�
o � � z .� N o ? c' o a � R � a� � c � � O � � o
� O �e 3e c�o Q y o A m �' n' �a o o � o e a n. �a W
'° � � x
m � � F crd� � o �j c'�a � a � aci a�i `c � `S °o a v� �9 � � � � W °n, �
� _ "' � � � a � � �, C � .q, ,a, ° ,� ° p- `n o ,c � � v � .� a`.
a o, vUi p �° �3 � � w c��a m > > > > 7 q'S :° d a v�, a�i o � � V
^o N � �,' p .".7 .� O w U cn � � W w `" O `n O E-� w `n S C7 0� U a � Y�
i s c.
�_, : v U W
a � y E.
`0 * F �-¢1
n.
w � � o
a`
° .n' = c°',o F. w o �
a� -s0 y � � cn A `^ � o`^o
ctO. 3 � o � O O "'
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � <+Ni N vN'�
V-� er N
a F —
HN
O �
F V
W #
¢ � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � � �j � �o
� � n O
a � �� �
� F-- w 3
O Q
O O „' o
a V —
W � F �
z w � rt
� w
U C7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
< W
W �
¢ L
� �
E""' �.7a
� � �
0
0o O 0o O O O O O O O O O O N O O O O O 0o O O ¢
� O �'1 N a ()
Q � � �
CL1 '�
Q ¢
-' a
o � o � o �
� � o �, �, 3
� F H o
o � � W
�.
� o
-O U
° �
M � N �
� F
� �
�
M
a � lA ` N LIl VI N rn T �II v1 N N I.. 0. G L. n � N �
(, t L L -C L t .� �p .0 .G � -' — .� � t t
A
�
�
�
y y
,� Y��` � 7�i
� � X N
0. � � � NT
a �' �' � 3 �
a� = t „ �
vVi � � .°c � s Y c
A x x = y ° � 3 ° 3 �
U
tl0 p V C > pp � ` '� H a' l�
G W � .� � C 4„i N O V
„C�, �G N C/) - CY' ' O C � U U N O
V 6I C . � � y � � O L 00 F �"'
�n .v°° c c ❑ 2�' 3 y � � � � o a U V 5 � `o �o
z C '� 9 � F � � O N °� ,C 0 •--• E N y tC � � tO
td c c c� � ` u °: �n U A � a> `o y Q v� � ,E >
0 � W °J Q � V � c a. � y c a A � .o � v � v r �
� � u � � � � � ° w u ciOi v 'D 3 ° a '� ca [i7 c E.; c� > p
z�_ �� �°' °- °' 'v o+ `° � E " � �'o �c � � E �o � � a; �n p v o n
O c`. a` �n n`, 'c��'.. .� U (= E= a` m a` ¢ U x 4 � O C7 U E= � w` z a`
U �
.� "'
N N W� O O O O N O O O O O O O O O N M O O O �n O
N N1 �O �D o0 t�1 N M Q� O ^ O �O I� t� �O ^ n 7 h
w � � O p o 0 0 0 0 o cv v v v �n �o .o �o �o �o �o � c� o0 0. ...: cv <-i
W � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� 0.
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 � o 0 0 0 0 0 0
� .--� V� O h N O �/1 �n O � �1 �
F vi O �'i O N N p
� (/] �O N —
0 O
F U
0
F � � �
� � ^ N
a �
� �
0
W U
�
N
p p OO OO O O O O OO O O O O
� z�7 V n N O N Q
W rt �
� � L:
V] � O
° �' 3
� �n o 0 0
� I� vl N N
G. W
v F Fa
¢ � GL�
�
U
� � o0 0 0 0 00 00 0 00 0 0 0 0 00
� O vl v1 N v1
� M �
F �'
� y
:
0 0 0 0
00 0 0 0
o F= F
^ z
� � �
0
a o 0 0 0 0 0 0 0 0 0
rK o o �
0
Q N M
�
� � N
op N
F V
� �
r`�i
a O O O o O o O o O O o
O O O O O O O � O O O
V �, � � o v v - ^ � ^-� o
G'^ F iv
O �
� s � R s �a
� - E - - a �a - E -' v
O
d �
U r+
W N
Q v
A
�
M �
.� � C q
d h E � E o a�i
� o .. �� n `° � �C �
� � ' L 6 �
�+ � �y � � N t0 c0 F �
� � c � W 'c O � � '� 'C `�
'W�g" _ ' �ps.�, .v4 � y `� a V � U u a�i A �
.,"'� -�� GX ¢ U � � U 2 U a W fi] � O
0
� �
� O O
� �� U U
• � , � Jacobs Engineering Group Inc.
501 North Broadway
St. Louis�Missouri,63102
314.335.4000 Fax 314.335.5141
March 2, 2018
Mr, Brent Krue�er
KCI Construction Compariy
10315 Lake I31uff Drive
St. Louis,MO fi3123
S�,bj�ct; ::e�•��st f3: Pror�sal 1'1e. 53—Nlotii�cati�ns to llryer System per DIIA Report
Dear Breiit,
!'lease�rovide a pro}�osal with detailed brcakdown of labor, inaterial aizd equipnien! casts for the
rnodi C��ations to the dryer system per lhe DHA reporl and �s dcscribed bcl�w:
l. Replace the existin�hoses with static di�sipative hoses at each lacation per recominendatious 7, 11 and
20 ii1 tllc DI�IA report and per tl�c attachcd pi'oposal froii� Andritz. Tlie hoses shall be�rouiided as stated
in the altachmEnt.
2. Install an explosion deflector in the baghouse per recornmendation 26 in the DHA report and as
proposed and supplied Uy Andritr.
3. Install two (2) dust explosion isolation interceptors per recominendation�7 in the DI-IA report and per
tlie attached proposal frc�m l�t�dritz. The interceptors shall be installed in the 4" dusi pipes from tlic silc�
and the truck loadout chute to the b�ghouse and upstream of thc bagliouse in each line. The units shall
be providcd with 24 VDC power and controls per the design by Anclritz.�
4. I.nstall a 8"x4"Wye and a 4"cleanout with tlu�caded plug in the drain under the iloor slab for thc dryer.
Please contact mc at 314-650-4412 or pk.maihai�c�iacobs.com if you have any questions or need any
additional information.
Sincerely,
Jacobs +
`1/� �!
P.K. Mathai, P.l;.
Project Manager
Attachmeut s
c: Casey Brunke
CSX65101-932
Jacobs Engrneering Group lnc.
2l2bJ201 S f10Se f@UUcra aiaut,vww-uN . .
0
�� ����
(8(10� 343-0425 � Espanol
Produ�ts� Hoses and Accessories> Industrial Hoses
Industrial Hoses
Conduct-O-Ftex
Double-piy black neoprene coated pofyester fabric hose coated with a conductive
eiastomer reinforced with a spring steel wire helix.
FEATURES
�, • Good crush resistance &tensile strength
� " � • Neoprene coating offers excellent abrasion 8� chemical resistance
• Good flexibility
• More durable than double-ply cotton hoses
_.-f• Nigh conductivity reduces the danger of static buildup and allows electrostatic
buildup to escape whe� property.,grounded«
• Surface Resistivity Level: 103-10�OhmslSquare
• Standard Max. Inside Diameter= 18", consult sales team for pricing �
-- minimums on farger sizes
Static Control
LINE Flexaust
btATERIAL Coated Fabric
INSIDE DIAMETER Min: 1"Ma:c: 60"
7EMPERATURE low: -40° hi9h:25D°
LENGTH 25'
Downtoad Dafasheet
http:t/www.tlexaust.com/producUstatic-conduclive-hosel
�
ENGINEERING & TECHNICAL DATA - Flexaust° Conduct-O-Flex
INS{DE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBS/FT) (IN) RAD{US {IN/HG) {PSIy
IN
1 .145 N/A 1 2.8:1 29 30
1.25 .178 N/A 1.2 2.8:1 29 30
1.5 .21 N/A 1.4 2.8:1 29 30
2 .297 N/A 2 2.8:1 29 30
2.5 .303 NlA 2 2.9:1 29 30
3 .361 N/A 2.13 3:1 29 29
3.5 .42 N/A 2.48 3:1 25 21
4 .586 N/A 2.8 3.7:1 29 16
4.5 .655 N/A 3.15 3.7:1 23 16
5 .727 N/A 3.5 3.7:1 22 15
fi 1 N/A 4 4:1 22 13
7 1.15 NlA 4.7 4:1 14 14
8 1.138 N/A 5.5 5:1 7.3 10
10 1.417 NIA 7 5:1 3.79 S
12 1.695 N/A 8.2 5:1 2.22 7
'14 2.38 N/A 9.4 5.5:1 3.11 5
1 g 2.72 N/A 10.8 5.5:1 2.09 4
18 3.2 NIA 12 5:1 1.5 4
24 4.2 N/A 16 5:1 .62 3
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Double-ply neoprene coated polyester fabric hose coated with a conductiv�
elastomer reinfarced_with a s�ring steel w�re helix
_ __.._._ .___
Temperature Range. -40°F to 250��F� �
Standard Color: Bfack
Standard Lengths: 25 Feet
• Surface Resistivity Level: 103-105 Ohms/Square
Disclaimer.The proper use and maintenance of hose and/or ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ultimate user of the product. This inFormation is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 • Toll Free Tel: 800-343-0428 •Toll Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
�TT A gCBAVENBVRGi NOSE TECHNOLOGY C�MPANY
ly
�
ENGINEERING & TECHNICAL DATA — Flex-Tube° FlexStat� CR
INSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THiCKNESS BEND RATIO PRESSURE PRESSURE
(�N) (LBS/FT) (IN) RA NIUS (IN/HG) (PSI)
� .17 .032 1.5 1:1 29 50
1.25 .21 .044 1.9 1:1 29 50
1.5 .24 .044 2 1:1 29 50
2 .3 .040 2.5 1:1 29 50
2,5 ,5 .040 5 1.5:1 28 35
3 ,55 .040 5.5 1.5:1 26 32
5 1 .045 7 1.5;1 18 28
6 1.25 .045 7.75 1.5:1 12 26
7 1.5 .045 10 1,5:1 �� 25
g 1.75 .045 12 1.5:1 10 24
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Speciaily formulated static dissipative thermopiastic polyurethane hose
reinforced with a rigid external ABS helix & an_embedded capper �rounding wirer
Temperature Range: -40°F to 200°F
Standard Color: Clear Wall with White Helix
Standard Lengths: 25 & 50 Feet
• Surface Resistivity Level: 108-1010 Ohms/Square
Disclaimer:The proper use and maintenance of hose and/or ducting manufactured by Flexaust ls the sole responsibility of the purchaser and
ultimate use�of the product. This infortnation is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 • Toll Free Tel: 800-343-0428 •Toll Free Fax: 800-382-8464
sa[es@flexaust.com • www.flexaust.com
� A BC7t;AVENeVRC� HQSf TECNNOLOGY CQMPANY
��` a{t 4�xr ;j_�, � �- - � { r� k Y T x i? �y .Y� .�L-t � �c3���� �s��l� s �.
:"!LZ r ..�•� 4i. -_ F t L-''w >•t ..� � ' 3 , t �" ,i G' �,I t
� y Y� . , d� �g p."
�� ,.� i � �{,4.� .,,.5��,�' 33 .� : 5,� . Z� :ti.,rl 3i.�.. �t-#t S.,
E =t
d 3 �'" 3,:^ � a �`�.,� � { r t .'t � -� s�' ��� F; > ����.�`�'
$ts +.r � � .�t{ } • ... , .� � �� -. 7/y 3
F x� � �. 4 r� �. ; y - _ ,'� � '. # i i 3 fi� µ aF. �i�� 4
� ��� � rt F�� _ ,t- ? _ r }� � TECHN�LaG'Y << �{ M�d x'� }� � ���� �:
�� f �. -'�J�s `,f 3 '$ 'F
" r'�7+'�x'i � '� r� `� ,zr tr -- t) � -. . 6 r u
� �� ..� ' Y � $ `l. y )R :���`
L '�� � -.�1- I'� �.lL ''^� �, � � � �� � � � {�, h LL i � �t� ��1
s
s.� �-�'t � t � � # - - �. ` � .' r �l`'r,."-:z '�r�3�t �� �"L .
�,. � �e�`.,�`- y� S#:'i t -. " _ ��'• _ - -
�- .
y , . .:- r., . ;. .,` ..
.,
.. ._: ,�., ' y,�_ -_� X�
'.' r;,,.,t:
is".:,.��,.� .e r.,
. . . ' . , � � - � ���� o�-'� .
.;... �I1TER�'E�'l0�
x�j.�Kare�scr:,:rYK+ �
�rplas��t s�:��ix�t`a=in,,5y3 trru
� The Interceptor•HRD expiosion supprossion system is designed lo provide
i an active method to protect process equipment from a dust explosion
1 hazard. The principle oE operation for the Interceptor•HRD system is timely
# deteclion of the pressure rise during the initial stoge of an explosion,
,
A '-?'�',� �,� Followed by fast injection of an oxtinguishing agent. The 5L lntercepfor-HRD
- -k B botfle includes a iow pressure monitoring switch, OSHA locko�t and a
4'`"•- telescopic nozzle as standard feotures. Each HRD suppression botile
.....�......_.�,;,
� is acluated by o micro gas generator (MGG� lhot reduces maintenance
- coils wiih a 14 yeor se�vice (ife. Several suppressant agents are ofFered
to co�er bolh sanitary and non-sanifary applications. The Interceptor-HRD
suppression bottles can be used for isolalion purposes as well. Chomicol
_�� isolation is often usad in conjunclion wiih explosion suppression, explo-
""`"�---..._.,,,��, sion venting, or flameless ven►ing.
C
�� �"`"`--�._.. Chemical suppression and isoloiion systems are designed for use in almosl
�'Y any process hondling combustible dust. The Interceplor-HRD system con
be used for pneumatic conveying systems, dust colleclion systems, cy
Explosion Suppression System clones, mills, dryers, conveyors, and storage vessels.
` 'Sr#�'�I���CL"1�`1t`31`�S -
Power Requirement OSHA Lackout
2d VDC, supplied by CONEX Controller Standord :
Set Pressure 5uppressant Materials
1740 psig {120 bar) @ 72°F Sodium Bicarbonate or Furex
Actuation Medium Body Material
Stored compressed Nitrogen Powder coated steel
Process Temperature Nozzle Materiol/Type
24`'F (-4"C) to 320"F �160"C� Stainless steel - standard lelescopic design
Environmental Temperature Certifications
-30"F j-35°C) to 158"F (70°C) ATEX - ihird party independent tested to EN
Attuator 15089 and EN 14373
MGG—micro gos generator— 10 yr. service life Compliance
Environmental Ingress NFPA 69, FM 7-76
IP 65 Application Pred
Low Pressu�e Switch s 1 .0 bar (14.5 PS1�
Standord App(ication Kst
< 320 bar•m/s
� �^2�s'r.A't^3 -.�ro,+ r K°t'r .-r�: . r�,'�.. cr�r� x 4;�'-�, ,+t�`#'�` r-�3+� � �'�
y � .. .�..grl�-�ia �' �' i ri + _�' ` � � _ .'����'�d"��,��� ��ti�A'r '�
1 1 J-t � A .�' � 4'� i( it t
.�,y�y�F� 3`
� t Q �'t�'�'s s;�'�ra iv.:�,� ���� '� � s .. k� � f."a�''t � ".� ���; �
" z SL�x�1:o�` � � `r:= ��'r`�7r41'�{{708 mm} -29.25" (743 mm), - 41 58" (1056 mm� �4rF3� OQnlbs����k8 ��
: � ngHos��q .. . � *� �
: �Y .� -y ; ..
::. � y,a�-�` ��Y�. � _ i��. 4`f,. ,��� . n ' , # i° f: 1 .�� e-. ''r�.��y�{t' s :_� ..
�� � � >. ���� � t �'�,� � �* �x�Ez �-� �,���i����,��s�� �
�'� t-„I�" � L. _� R � L � J .;`i' �$ � )�. F T .. �� �'������jY�
j� '4. Y ��_ T t
! �, .
t � �r � ;t` _ S ; � Y x. F t s^ ?�f+..sY�^�� ��'
� . . ._ r.... ... __ . _. _ .. .._- _. .s.,s.... . .. . . ,.. .. . . . ... � .. ... . . . > >._ . . ..,..�.. . ...._ . -. �. , _.. ��'F�_,�:
Brent Krueger
From: Mathai, PK <PK.Mathai@jacobs.com>
Sent: Monday, March 12, 2018 10:49 AM
To: A) Neil; Brent Krueger
��; perry.schnucks@andritz.com;tfulton@cityofcapegirardeau.org
Subject: FW: FormToEmail Comments
AI/Brent,
See below on how to ground the hoses.
Thanks
PK
From: Ron^Darling [rdarling@kanaflex-usa.com]
Sent: Friday, March 09, 2018 1:28 PM
To: Mathai, PK
Subject: [ExfERNAL] Re: FormToEmail Comments
PK
Our 180HR due to the carbon black in the rubber compound is static dissapating on it'd own when attached to
steel equipment. It then goes even further with the built in static wire for a positive ground. To assure a good
ground the fitting installer pulls out at least a 1" piece of wire and folds it into the hose. Then when instailing
the fitting the wire is assured to have good contact with the metal fitting. Hope this answers your question. If
you need pricing you could contact one of our distributors such as Bi-State Rubber in St Louis.
Thank you
Ron Darling
Kanaflex Corp.
Regional Sales Manager
Cell - 847-687-1142
-------- Original message --------
From: PK Mathai <pk.mathai@jacobs.com>
Date: 3/9/18 11:28 AM (GMT-06:00)
To: Ron Darling <rdarling@kanaflex-usa.com>
Subject: FormToEmail Comments
Name: PK Mathai
Company: Jacobs Engineering
City: St. Louis
Region: MO
1
Phone: 314-650-4412
Email: pk.mathai@jacobs.com
Comments: What is the electrical resistivity of Kanevac 180HR? How to gound the hose.
Thank you for using FormToEmail from http�//FormToEmail.com
f•!0 fIL� - l�l�is co�r�municativn may contain �oniidential and ��rivilcgeci iniorrnation thal is f�r the sole use of the intended recipienC. riny
viev:ing, co�ying or distributi�n of, or reliarce on lhis mr�ssage by unintrnd�d recipients is strictily prohibited. If you havc received this
mcssage in e.rror, ��Iease notify us immediat�;ly by re(�ly�nq to thc messace and :I�leting il from yCur co�nputer.
2
Brent Krue er
From: Mathai, PK <PK.Mathai@jacobs.com>
Sent: Thursday, March 1, 2018 7:09 AM
To: Schnuck Perry
��. AI Neil; Brent Krueger; Fulton, Todd
Subject: RE: Cape Girardeau DHA Change Order information
Perry,
Jason hasn't call me back yet. He is not easy to get hold of, but I wili. In the mean time, could you p{ease check with
the supplier of the existing hoses what the resistivity of the hoses is?
Thanks
PK
_..._.,____..�..:.�...�.�....._.,w.__...R..�_._.___.�,_..,...,_�..�...............__�
From: Schnuck Perry [Perry.Schnuck@andritr.com]
Sent: Wednesday, February 28, 2018 4:41 PM
To: Mathai, PK
Cc: AI Neil; bkrueger@kciconstruction.com; Fulton,Todd
Subject: [EXTERNAL] RE: Cape Girardeau DHA Change Order information
The protape aiso looks like it has wire in the hose which I thought was an issue with DHA consultant. Let me know if you
get a response.
Perry Schnuck
817-419-1798 Phone
817-526-1256 Ce�l
__. . __ _
From: Mathai, PK [mailto:PK.Mathai@jacobs.com]
Sent: Wednesday, February 28, 2018 1:18 PM
To: Schnuck Perry
Cc: AI Neil; bkrueger@kciconstruction.com; Fulton,Todd
Subject: RE: Cape Girardeau DHA Change Order information
E-MAIL FROM A NON-ANDRITZ SOURCE: AS A SECURI7Y MEASURE, PLEASE EXERCISE CAUTION WITH E-
MAIL CONTENT AND ANY LINKS OR ATTACHMENTS.
Perry,
As we discussed on the phone, attached are (1) Felxaust hose product info and (2) Protape product infa. Flexhaust
needs grounding, which may not meet the requirements in the DHA report. I have left a message w/Jason Reason for
clarification. (I am not sure whether he is going to call me back.) The Protape hose indicates it is"permanently
antistatic". I don't know whether that means no grounding required. I think this is a German product; I didn't find a
phone number to cafl. May be you can find out. When I googled some time back, I remember finding a product that is
static free; but cannot find it now.
Thanks,
PK Mathai, P.E. { Jacobs � 314-650-4412 � 314-335-5141 fax � .Lk mathai(a�iacobs.com
_ _ __
_._ _ , ....
From: Brent Krueger [mailto•bkrueger@KCIConstruction.com]
Sent: Wednesday, February 28, 2018 7:54 AM
i
To: Mathai, PK
Cc: AI Neil
Subject: [EXTERNAL] FW: Cape Girardeau DHA Change Order information
P K,
Please see the attached. Please call me after you have reviewed as we need to discuss complete scope of work in order
for the entire change proposal pricing to be submitted.
Thanks much,
Srent
�r��� �St'�at���
�X -----
_:----�-----
0: 314.200.6481 C: 618.781.9357 f �: 314.894.7418
X -------
� ___=---•------
From: AI Neil
Sent:Tuesday, February 27, 2018 7:01 AM
To: Brent Krueger<bkrue�er@KCIConstruction.com>
Subject: Fwd:Cape Girardeau DHA Change Order information
Brent do you have some time to talk about this later on this afternoon?
Alistair Neil
Superintendent
KCI Construction
573-535-9582
From: Schnuck Perry<Perrv.Schnuck@andritz.com>
Sent: Monday, February 26, 2018 6:45:58 PM
To:A! Neil
Cc: Chapman Patty; Milbitz Andre; Gambrell Dusten
Subject: Cape Girardeau DHA Change Order information
AI,
Andritz can provide for the Cape Girardeau Drying system the following equipment to modify the facility to reflect some of
the recommendations of their dust hazard analysis.
E ui ment:
Quantit Descri tion
3 Screen Flexible connectors with roundin rin s
100 FT Material Dischar e Hose, Conduct-O-Flex 8"
20 FT Dust Collection Inlets, Flexstat CR 4"
2 Dust ex losion isolation, 5L Interce tor
1 Ba house ex losion deflector
Engineering:
2
• Mechanical Engineering and Design '
• Controls System Engineering and drawings
• Updated P&IDs
• Updated O&M Manuals
• Control System Testing and Training
Other:
• includes equipment shipment to site r`�
• Does not include fire suppression system for baghouse
• Does not include installation of components
• Does not include pipin , conduit, supports, or wiring
Price: $65,100
Please see attachments of equipment cut sheets. Baghouse dust deflector to be designed by Andritr. Submittals to be
provided 4-6 weeks after approval of CO. Delivery 6-8 weeks after submittal approval
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Inc.
1010 Commercial Blvd.South
Arfington,TX 76001
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
perrv sChnuck(a)andritz.com
www.andritz.com
This message and any artachmenfs are sole/y for fhe use of the intended recipients. They may contain privileged and/or
confidentia!information or other information protected from disclosure. If you are nof an intended recipient, you are hereby
notified that you received this email in error and thaf any review, disseminafion, distribution or copying of this emai!and
any attachmenf is strict/y prohibited. If you have received this emaii in error, please confact the sender and delete the
message and any attachment from your system.
Thank you
fd0"fICE - T�his cornmunication rnay cor�tain conficlential and privilcgecf isiformatien that is for the sole use of the intended recipient. Any
vi��.;iny, copying or distributian o(, or reliance on this mes5aye by uriirttended recipien�s is strir�iy prohibited. If you h�ve received tliis
rnessage in error, µfe��se notify us irnmedi�itely by reply(ng Lu the n�essa,e�nd deleting it frorn your cornputer.
This message and any atfachments are sole/y for the use of the intended recrpients. They may contain privileged and/or
con�dential informafion or other informafion protecfed from disclosure. If you are not an infended recipient you are hereby
notified thaf you received fhis email in error and that any review, dissemination, distribution or copying of this email and
any attachment is strictly prohibited. If you have received this email in error, please contact the sender and delete the
message and any attachmenf from your system.
Thank you
..__._�...._..�.._ 3
� � � � ���-��-,�� r���r �N����
Brent Krue er
Subject: FW: Cape Girardeau DHA Change Order information 'U� SSaG��?TED /Y��y�
Attachments: 1 - Neoprene Sock for Screen flex.pdf; 2 - Conduct-O-Flex- tuts eet.p f;3 - exStat'��
CR,PDF;4 - SL isolator.pdf
From:Schnuck Perry<Perrv.SchnuckC«�andritz.com>
Sent: Monday, February 26, 2018 6:45:58 PM
To:AI Neil
Cc:Chapman Patty; Nlilbitz Andre; Gambrell Dusten
Subject:Cape Girardeau DHA Change Order information
AI,
Andritz can provide for the Cape Girardeau Drying system the following equipment to modify the facility to reflect some of
the recommendations of their dust hazard analysis.
E ui ment:
Quanti Descri tion
3 Screen Flexible connectors with roundin rin s
100 FT Material Dischar e Hose, Conduct-O-Flex 8"
20 FT Dust Collection Inlets, Flexstat CR 4"
2 Dust ex losion isolation, 5L Interce tor
1 Ba house ex Iosion deflector
Engineering:
• Mechanical Engineering and Design
• Controls System Engineering and drawings
• Updated P&IDs
• Updated O&M Manuals
• Control System Testing and Training
Other:
• Includes equipment shipment to site
• Does not include fire suppression system for baghouse
• Does not include installation of components
. Does not include piping, conduit, supports, or wiring
Price: $65,100
Please see attachments of equipment cut sheets. Baghouse dust deflector to be designed by Andritz. Submittals to be
provided 4-6 weeks after approval of CO. Delivery 6-8 weeks after submittal approval
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Ir+c.
1010 Commercial Blvd.South
Arlington,TX 76001
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
1
QUOTAT/ON
•� K/�SON CORPORATtON
� � 67-71 East Willow Street� Miliburn, NJ 07041
������ Te1: 973-d67-8140 � Fax: 973-258-9533
www.Kason.com
� Descrtption
096S-8D12L-GW FLEX SOCK,WHT.NEOPR.,8"X12"L W/GROUNDING WIRE, 1RING
VENDOR#FSR080-120-AA1R
ELASTIC BAND ON BOTH ENDS
1� 1�7' " !I� . ;I� r �-y 4 _ a s � ' �` . r
:�'� 'I , �li� �, �.Y3':''3.''a -' - t' � i S ,� �1
�� ��� 3� ''�.�',�r ��""xr��. .� - .c� � �- �` �.� � r �
fi
' r-�` ,rf��'j�� . � ���'�'2�i".,3..n z�.s � - * ���`r�� f',s����1 a�„ `
� r� �tr� � ,�.ra� 3 1�.r`�-�4-Y�.v''�- � ._
1.,� ^cy�.���, � c-� .''�` _ � .� i �' � .v
��f ��C�r������� y � ' � ., i . __ .. ,. q NC'
4
t���' R � ���u • a ^ • . . . . ���~ 4 �N� ��i 5� ���:
r�,��'�.: vfc 13J � " } .. L
jrrh'��� :9'.:j- �'. .l- .Z 'i t
��e+t:,. uR5'-�"'� " ..j E�V i C.A .YL+ f .
:-: "4�f 55�� : �y ''�' , .. . . Y,� ' ; :. -t+.�-�s r 4 �� �_�'
_.Ls-�,T� , ; r�' c.� g�� � -2 �.e A -c�,�,s,��-x ��.F
4 t. F $ t „i " � k . � i �'„r- ,4.3x �t� 5` -.
F Y�-
�� � .� "� �' . '� � "} "$ .�i'�x ��,rya��x.4 '.
�� � �� �� . ' �` ,�. � r .� t'� cwicr#,,,r-yn}:
. <,`�,,�+'1 3,•r . �3 �, .=�'�',�.�.L .,�-.�a �.� �`'2L; F,.
�y���?^� ' . ' . .. . Y �.-���ry�r�������z"
�� � �� ���. � . . . , .� �h Fr`- .r�{��z�-� '� YF+�Xe� i
:f�s' �'��'`:� �„ �� ,kc 3� 'r�.�n� _ s'.�„^� --
� £ . a' p'>; r ��.�ya��"& �.F�F{s�� �. � �=��
3.{�'":; � ' � . . . T 3 r. �[0.� �, uj �� : �y�{y�- �
" ,�� . . Y .,�ET-�y '1' v?YR� '��
�, . -� .i» �.> , � � 1- �,`w�'�i'� ' �`�
z' � �,� r"'���'��' ��:
_: ', a
� . ` d r.r. 3" r, .
; _. � � . . . � � � .
�� p � .
t t'.;�� "�F a F i . .. . . '� -
X '�i i f �
.r < - ,� ��
-''' o`�.� ` �_i'" �"� c � � :. . - '. �� � s.� v��»_�S� . -
' � .&:z � ,LF ���, 'a _ .
"Y z y t'x^`t
_3 tS - c' .-r'�E''�"nr '' . . . °� } QE � '�t ,z�q^�-
r �1 k� ��� C iC 3�C� .-� '�`�y'�.�'ycRw2�5.'�v � '.
\* �.� l }s�'�'�r' ' . �� ; �JS � x��k`��Z7 [.4fi. ..s
,, .;�2,.�� ,,�,����." 3, " , � Y � } �`{` ¢'�.��-�;,.;���
� �,'��-yF7�`�'�,��"�'- �_ , . _ �-��- .s� `:� �- �+._�f.�.,>� ..
��� � �� Y '` ai��",��.F, -.i � � . a ��t`^�''y. *`���-y�s'��
�• 3 y
-yn�'�� �:. ti����`� .� . T'��'' �- �°�'�;'t �.� � .a.-�.kTf"�.�..'���,f�t
s'x s_ °. �x ��.8`
, hc „s} ; �c ... Nc, i
s c. �y . ��- ,
z � ��
,���.,;�7s��� t�'�,a.�'} ;i�� r¢, - � } 4 . - - .�, � "�� � `` t.���.,��:. ,
r S`�'�G'�fS.- �;��`' T ,i : � . . ' � �Sy ��� -.,
cs�.��-" ' d �'ad-���z r .� �` C� .. ti.-< a -- j a . �,r .> .
,_�, _ �4. '.��s y z;' ' .. � ry�` ^a��� � 'r'z� y�,�:�_
s''�s '�'��'` .c '
;s��� .�r''k� ,�. -���, r �,� � zy ''t�7�
' r �,''� y s � : �y '� + �
�: Y#�..L' � Y.�+�# .v ' ,, .� ..;" .�"�<:r� . . . '' �
: ,; .,�
� ��'*�. �>:- ��.. �...�` - ' . ' �� e . .,,�e+''. � : . _ _ -:
�� s a :.-✓"'� . ;:��`+. '�'
� ,,i „�
M
{'��s rff - r � ' '.��s�'
t� ' s
��� �' a � =,z� -
{?,��� r " �
��,�'A"' K a'F -~����� �, '��S f� +�� - . . . . . ��'
"�T�i k2{ �H .4 �r+..tkyi'�.���R 1 .. "
� '(�Y�Fl - i.` :i 4 .` �],,,�.� _ � , � ��
Q r�' A h �
.�y��ti '� `�f '��T'��� '�„"�'�`' . �� -
_
�, -
, �
. '
?;r,� . �. s+ � .,.� .
�, '..,
.. �4 . . �`-L
���r � �
� ���
f z.�. �
- , ,
,� �. �
�; �- �� �s
,.P � _
.�� :
�� s:- _
� �; _
�-
�r,,��A�'E,� � �,,;. � ; � �
� r � . .'�,�Y �Y- a, .
t"..����� {, " � f:` .
_ C` �a��rcx c.
'� � 4 F-3 4 . � .. _ '
1 ^�+t�y . . ' - _
I
� S � A - r � �. � � . ��. . . .:. '
1 .y3} .�„r, � . . y.r
�:y# .� . . . _ . . - _
� a_C '� �t 7 0. _ .' . _ - _
= ��� . � ' -.�)�.
. .
.� 4 .;.y �-.� ' . .: ';
� ' .. -.�• .t . � . . ..-'. "
:: � '-4 .., �; .
e.
�: 5.�• .", 1. .�
(,_ '
}
.
1� ' , '
C
ENGINEERING & TECHNICAL DATA — Flexaust° Conduct-O-Fiex
INSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBS/FT) (IN) RADIUS (IN/HG) (PS�)
IN
1 .145 N/A 1 2.8:1 29 30
1.25 .178 N/A 1.2 2.8:1 29 30
1.5 .21 N/A 1.4 2.8:1 29 30
2 .297 N/A 2 2.8:1 29 30
2.5 .303 N/A 2 2.9:1 29 30
3 .361 N/A 2.13 3:1 29 29
3.5 .42 N/A 2.48 3:1 25 21
4 .586 N/A 2.8 3.7:1 29 16
4.5 .655 N/A 3.15 3.7:1 23 16
� ,727 N/A 3.5 3.7:1 22 15
6 1 N/A 4 4:1 22 13
7 1.15 N/A 4.7 4:1 14 14
g 1.138 N/A 5.5 5:1 7.3 10
10 1.417 N/A 7 5:1 3.79 8
12 1.695 N/A 8.2 5:1 2.22 7
14 2.38 N/A 9.4 5.5:1 3,11 5
16 2.72 N!A 10.8 5.5:1 2.09 4
18 3.2 NIA 12 5:1 1.5 4
24 4.2 N/A 16 5:1 .62 3
Technical data based on 2 ft. straight lengths of hose @ 72°
Construction: Double-ply neoprene coated polyester fabric hose coated with a conductive
elastomer reinforced with a spring steel wire helix
Temperature Range: -40°F to 250°F
Standard Color: Black
Standard Lengths: 25 Feet
• Surface Resistivity Level: 103-105 Ohms/Square
Disclaimer:The proper use and maintenance of hose andlor ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ultimate user of the product. This information is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 • To{I Free Tel: 800-343-0428 •Toll Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
,.�.
A SCHAVENBVRG HOSf 7'ECHNOtOGY COMPANY
c
ENGINEERING & TECHNICAL DATA — Flex-Tube° FlexStat° CR
INSIDE APPROX. WALL CL COMPRESSION NEGATIVE WORKING
DIAMETER WEIGHT THICKNESS BEND RATIO PRESSURE PRESSURE
(IN) (LBS/FT) (IN) RADIUS (INlHG) (PSI)
IN
1 .17 .032 1.5 1:1 29 50
1.25 .21 .040 1.9 1:1 29 50
1.5 .24 ,040 2 1:1 29 50
2 .3 .040 2.5 1:1 29 50
2.5 .5 .040 5 1.5:1 28 35
3 .55 .040 5.5 1.5:1 26 32
5 1 .045 7 1.5:1 18 28
6 1.25 .045 7.75 1.5:1 12 26
7 1.5 .045 10 1.5:1 11 25
8 1.75 .045 12 1.5:1 10 24
Technicai data based on 2 ft. straight lengths of hose @ 72°
Construction: Specially formulated static dissipative thermoplastic polyurethane hose
reinforced with a rigid external ABS helix & an embedded copper grounding wire
Temperature Range: -40°F to 200°F
Standard Color: Clear Wall with White Helix
Standard Lengths: 25 & 50 Feet
• Surface Resistivity Level: 108-1010 Ohms/Square
Disclaimer:The proper use and mainkenance of hose andlor ducting manufactured by Flexaust is the sole responsibility of the purchaser and
ultimate user of the product. This information is presented as a general guide only. The number of variables which can be present in any
application make firm recommendations impossible.
Tel: 574-267-7909 � Toll Free Tel: 800-343-0428 �Toll Free Fax: 800-382-8464
sales@flexaust.com • www.flexaust.com
� A S�CHAVENBVRGi HOSE TECHNOLOGY COMPANY
�-,
r " ' - t '� - � _
- �..`
� - - 5 i ,
� _ -TECH�C�I��`�� �� ` �` Y ;
t: t
_ T ,. ,.
: r .
: � ,
. . _
,�. .- . ,... .., � 5
� _ iK � � � r1^ 'f � f �
� � - a- �� ,�< -
��� �
s
� . :� �11E��'�PT01��
� - }lar�3�G�cfi.�rgJ �
j f�a�:.n Su�r,x�m�r S�scsr�
� The lnterceptor-HRD exptosio� suppr�ssion system is designed to provide
} dn active �sthad to pratect process eqvipment from a duzt explosion
� f�azard. The principle oF operation For the Intercepfio�-HRD system id fimeiy
? deEection aF the pressure rise during the +nitial sfiage oF an explasion,
A � � _. ��' ,�_ � Foflowed by fast injectiort of Qn axtinguishing agent. The SL Interceptor•HRD
� { ; ; ' --�. g battle incEudes a low pressure moniforing switch, OSHA lackout and a
; � ' �""�-- tefescapic nozzle as standard features. Each HRD suppression bottle
� y TM��' is acEuated by o micro gas generator (MGG) that �educes maintenance
� `• casts with a 10 ysor service lifa. S�vera) suppressant agents are offered
� _ to cover bath sanitary and non-sanitary applicalions. The InFerceptar-HRD
f _ suppression bottles can be used For isolation purposes as wall. Chamical
� isafatian is often used in conjunction with explosion suppress+on, expla-
�"```---.,,� sion venting, or flameiess venting.
�. �
-�.:�,���w
`�-�-�_�, Chemico) suppressian and isolation systems ara designad for use in almost
any pracess handling combustible dust. The Intercepfior-HRD rystem can
be used for pneumatic conveying systems, dust collaction systems, cy-
Expfosicn Suppression System ciones, mitls, dryers, canveyors, and starage vessels.
__- - _ -�, , .,.. _-� ... -
` �r�;����+����
Power Requiremenf ' �SHA Lackaut .�
24 VQC, supplied by CONEX Contraller Standa�cl
Set Pressure Suppresscrnt Materiols _
1740 psi� �120 bc,r� C 72°� Sadium Bicarbonate or Furex'
Actuctian IV�edium Bady Mofierial
Stored compressed Nitrogen Powder coated stee)
Protess Temperafiure hiozzte Moterial/Type
24°F (-4°C� to 320aF {160°CJ Stainless stee) - standard telescopic design
Environmenta( Terrrperature Gertifications
-3d°F (-35°C� to 15$°F (70°C� ATEX - third party independent tested to EN
Attuator 15089 and EN 14373
MGG-micro gas generator- 1 Q yr. service Cife Complience
Environmental Ingress NFPA b9, FM 7-76
IP 65 �PPj�ta�ion Pred
Low Pressure 5witch s 1 .0 bar (14.5 PSI)
Standard Applicafion Kst
s 320 bar•m/s
� ' �
v� 'T'e'ti�'�3 s �.*.- _ �:`� . �3-' o^, n..,�,. .� �_-,. -pYy'�'ar�`.��g:�,ft� � ,p .
�3s�.-t»�r�."*�' - ; /� �s �j� ro � ki�
-;'€�al `�T�'.`�"�-2 -`� t r't`"s :; � - - �J i i►,t ; �-� �a.E a�y i�1G�����r��£'��.5�.
T►V��� ��,� } ��� �� � � � m-� ��� 3��s��.���� �
: �L��vri�;Has�=� �7.9�'� ��C38 mm�: 24.25';'.(7�� mmj ;41 58'� {1�35� �n} `� �� Y,.��`��
A
*`- r>�Y°�r��r--a� �� "�
� ���_. ° , :� _��1 ,: i �`s zt'` �.. -z��,,,.� s�r�.C';� �` �.����
_ $ �+i ��`5'-y. :�r - .; '�� �` -������ti�'3��,^1�..`'-�s..'T�`:
- y,��i ��. ��~ t �`_ r a . r ej:� .. .'�' 3`' �XZ'f a'�:2 �a'� �'-y ���.t�r'�-�'3`"�...
,�"c ,r' �'-a,a',*�r ,. � +.. >E� +� _ f �, x - ��Ic�' ,• ,. �r �,.'�`"�'iL 3"�.`��= ..�s
' ;
���"`° �_'g � r e t.�� ��a �- -���'-��" E���f��� `f- ^!1 k..,F� �„�_.,�,�s,�3��-'�.§„ �:: ��9n
. �' yh S: y Fx� °� �`� ���`:. s _ 3 ..,s1���_�''.���.�
. --...�'..,.��,S,x.u��e�s..�...... ........._r-z,« _...a.,.., _ __K:,��--z:5t�ii'n•�.., .. .,,_� y,'. � x r. �,��?<�,:s����.r��s.��z:--s'�`�,c.ns'�.'m�=?.. s ,< _..5.__� .._� ..-�... .. ..__ .. . . .
u v m �
. mE
^o ,_
• ,�u
��
�
� Yo ��_ 0
N Q � sm ^
ON W Z a� �
r � � _
a m -� cn
� o� x �• w `i' ^
z (¢j � 4� �
w a mC = `oa W
OW W < LL �N N t V
►- J p� �
e�m
� � � � �� � O =
v -� � ^ � Op
W � N N � O o w
o ~-
Z � m z 3
o � �j � vi
cv ,� '� � Z
X X � � n
W d X X F"' i11 w� J
K ,l� � N Q
(� p�
�% F- h N
� c7 M
�
a O P CO � C�
� . O
� N � � Z O�j
`p O O Q ��O �
O�O=
w � U � Z a d� m
U Ox
.-I � � m � a0ec3LL-
w Q� Z O � Y O OwZ00�
�, �. Z -� u U�<x��
� apOONaO
� Q � � a ��0Ow0
� =�Ci
� Z � < a °C O3wa��
3 �U Q �;a3>
"� � � O U w � C7 � �OU�.=-V
� 'R
G
W �
�E Z
m m d �z '°« oo � . ¢
_ 'q 'q z�, G i 'i" � � �
N x �i
•- � Q O M Q �� O wa P � ('f
°° Z W_'� �¢ w 2 t' <
_ �� Zz�Ma� �U U
� „�U �z f `^
o; o� -- Q � �o a�g i Uw �a � <
N N W wQ wU�O�� wt w w N �Z
Z �� ��QmXX G� � Z O
W Ur
u, M o') � Z
�ri ui = �
� �
� Z
�o �o o �
W ^ � O J
W
ri ri � � -,-:: : -
^ �
� N N � Z ��� �' V
V � Q
a
U �
�, � W
U � � Y
h
o � Q �
LL � w
m h N � �`.' N a Q�t
� N � V;:r;% w -+O CnO�
� U ��
w O wd
ch N � Z � �W
OJ h � N Q
a �
c�v c� o z
Z O
= C C � J
~ I� `O N �
Z �ri N = O
W
N � /n
� � � v �
0 o U �
W J
N N Z
O O Z m
O O O Q
� � V7 �
�
_
, `.
Brent Krueger
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, March 13, 2018 1:43 PM
Ta; Brent Krueger
�c: Ai Neil
Subject: Cape G wiring of Cannons
Brent,
1. 120 VAC feeder circuit breaker in PLC panel: $30.00
a. Contractor to wire to LCP(a) to be located on dryer room wall, suggested location between oif tote and
man door to truck loading room
b. Contractor to mount two (2} LCPs for chemical isolation system side by side
c. Contractor to wire from optical sensor to be mounted in dust collector inlet duct to LCP(a}
d. Contractor to wire from 5L chemicai isolation bottle to LCP(b)
e. Contractor to wire three (3) discrete outputs from LCP(a}to PLC panel,we have I/O available to support
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRtTZ Separation Inc.
1010 Commercial Blvd. South
Arlington,TX 76001
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
perry schnuckCo�andritz.com
www.andritz.com
This message and any attachments are solely for the use of fhe intended recipienfs. They may contain privi(eged and/or
confrdential information or other information protecfed from disciosure. !f you are not an intended recipient, you are hereby
notified that you received this emai!in error and fhat any review, dissemination, distribution or copying of this email and
any attachment is strictly prohibited. !f you have received this email in error, please contact the sender and delete the
message and any aftachmenf from your sysfem. •
Thank you
1
KCI Construction Company
St. Louis,MO 63123
(314)894-8$88
Fax#(314)894-7418
www.kciconstruction.com
May 9, 2018
Jacobs
Attii: Mr. P.K. Mathai, P.E.
501 North Broadway
St. Louis, MO 63102
Re: Job#12002
Cape Girardeau Wastewater Treahnent Facility
Change Proposa] # 137 — F(,r�,�� ,����/LlLJ'����� ��'����/��� �� `����
Dear Mr. Mathai,
We pro�ose to furnish the necessary labor, material,tools and equipment to perform the work
assoicated with RFP#54, fire suppression system for baghouse and control of the loadout chute, for the
increased lump sum of Two Hundred,Thirty-One Thousand,Two Hundred and Eighty-Seven Dollars
($231,287.d0), and a contingency of Twenty Thousand Dollars ($20,000.00) for future additions if
required for a totat of Two Hundred, Fifty-One Thousand,Two Hundred and Eight-Seven Dollars
(�251,287.00).
Please note the following clac•ifications associated with this pricing:
Pricing based upon email dated 5/8/18 from Perry Schnuck related to scope clarification questions as well as
email from Perry Schnuck dated 5/]/18 with Andritz pricing and scope clarifications. Wiring to local fire
alarm panel within the Biosolids building for system tie-in with existing fire alarm control system. System to
We have attached a copy of our change proposal estimate summary and backup for your review.
If this proposal meets with your approval, please sign the attached copy in the space provided and return
it for our records. KCI requests issuance of a Change Order prior to being requested to proceed.
If you have any questions or comments, please do not hesitate to contact us.
Sincerely, Approved
���� By� �r��°��'��
i �
Brent Krueger
Project Manager Date:
Attachments
�
T
�
�
� �
� ¢ �
� �
� N
0. �
C7 ¢
¢ �
x �
U W
U
h
�
Q
Y
O
�, 3
- `o
� �
u. ,o
d � �
� � �
� U t
�
F- � 3
� U ,v_
3 �
a
� o
� c
3 w
ro
� � o
9 � q
N R � 0..
� � C E-� E �
5 A :? O =, `°
� U CA Z L
A O O �n �n '� O O O O � �D ^ O O O — � N t� t� .-. ` y
� O O l� N N O O O O N c•1 �O O O �O N eo N �
y y vi O o0 7 �O l� O O O O t� � V v1 N vi t� �D O� c+i � v G �
w, A m �.. v ��-, rn m �o o`�+ a o v � M n `v v, a M � �o N �-+ " U 9
O ,Z 'Q z O� M M C t� �D Q I� � V N N N �O N N iE 7 �
.J � I� Q N N � O � o
cp ,.a N
O � n � Z � >' n. �'
o `
u a. a < � 9 � E
^ N 1..
C o o ._ .
<p o o � Q C L �
h � � � Y C �
Ly - L O E Ck�
a 3 � ..
m � F- o I �o
.cOn � � o`^o
� C
w O
L
n
w � a�
� a �] � v�
�
�' F � U
o � � a � � � A
.-7 O N
�
V O 0. �1 a Q �
�
-�-�
Q o L ^ N � y Q W O v Q b9
C V1 N � 3i 3L c0
> C!J -� '�+ �k it � � y � G y�q t� Q V1 ^� p
� � :? O it a D° � � c C C a a ia c o .°� o; c Q
� `� Cp a� o A m � o � � o o � o. i� �
m � � '��, c�s � c � E � io ia E E =4 t0 -`g ° � �n '° c o' � (� W n' 4
� a a n a c� � ' a n. ° � ° c. �' � 3 A �° z v °
.",� �n �, 2
� _ � V o o . , o a a� v e�
M N � � Ll .j7 « M1�
'� a � '� .`d.t ,� O :i U v� � � u.°'t W `n O � O E-� w `n S C7 � V ci, � Y�
v^ M
� �n CY' � F L 4
� � U ti]
�_ �t aci � F"
� v � 6
o *
.:. a
s C N �
`�., ° o a
o c, ^ a� o
.� � F � o �
� a� � � �= � v� C] � �n
m
�� � a 3 p o s O O
OO O O O O O O O O O O O O O O O O O o0 O Q
U �"� �O
�D O� M O
N
•--� E-'
Q �
� �
F U
W 'x
¢ � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N
� � � �
F= E O
� z a u.:
� �� s
a O c ;
� F. W 3
O O � �
w' U
W .a F �
z w a �
i w
u c�
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q ��
W �.:,
H L
� �3
F- W
� Lt. U.
Q
O� O o0 O O O O O O O O O O 0 O O O O O � O O Q
U � � V
(y� � � � Lz.
o a
� �
�
o n o� ,'n,� � 03
F-
c�
o F. O
� � � O
N 0.
� U
,° v�
0 0 �
v m �
❑. `�
O F-^
a �
M
� F N N Kl N N /�,,,f N T Vf N N y y N G. G. N C1. N � y
� z L L .0 L L L L �p L L t "'� .L � .� � �
U a
�
�
R
� '
N
Z � V �
� � LL7 Y �
F y a ty
a � �, 0 3 v
c� ,� � s � `�
V "+ s � r -� c
r.."'�a � � � o 0 3 0 0 �
Ll x � � H '�+ a g; ., 3 u
m ,0 2 .c a�i °`b `—° :? a� o � � c�
� w
C y .- � ' O U oD U U L
;°- �v ` v� ca vi 3 a m m � " �°
r°'.n � c � 2�' 3 �9 � � a C � o a U V c � o ;o
� � � � o � �A a �3 ,c O _ 8 ia � °' �
z c c c"i � � ` � a� y U � � � � `o � � v� u E >
O � W m Q � � �' c a °J �, c a Ca a� � a� . .a -o 'C
F � �n '� o W m � •° � ° u.' � on � uj °c° ¢ m > c
q�_ - a�i .v �' u �o o A E E °U' .� � v � 3 E 'n A � a; � ` ° o
O O � O a) �p � y y � � � 'O � co 3 c� 7 ai [-� �
O a. a v� a i,. .� U F- F- a. w a ¢ U S L1 ?� C] c7 cU F- u. z a
.� � �
¢ p [--I W O O O O N O O O O O O O O O N �'1 O O O � O
W . � O O O O O O O O N 7 � � � �O b � � � �O t� r o�o � .-: N �+i
� U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
v �,� � c.
,
0 0 0 0 0 0 0 0 0 0 o av o 0 0 o r�
O N O �/1 O O V1 O ^ O O O �1 K1
� v1 O G„ O �n N O 7 � O O N �
F v � o o � �i v; vi co" o ri = �o
F, v� v c�i M —
O �
F U
N p N N
E-' � � � v1
?
Q � V � v�i
a. C �
U
F '�
Q �n
Fz � o 0 0 0 0 0 0 0 0 0 0 0 0
(/� � O � �.�j N �
W
0. �"
� a o
o a >
a w -
� o 0 0
a �� N
W �-' F
� � �
U � � o 0 0 0 0 0 0 0 0 0 0 0 0
W o 0 0 0 � o
� Q o � � o o N
w F.
� f
3
v� o
O O O N �
o � F p � � rl
�+ z
,� � z
0
O O O OO O O O O 0 O � N
fL � p �D O �
O N n
�
a
� ry o�o N
H F
z �
�
�
a o 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 � o 0 0 0 0 0
V � N c�i O� M � 0�0 � �
4' F M N
o z
� �
S .N- T >. N vi vl �.., .
� " E =' a E - � -" N E fi ' v
�
�
F-
�
�
O `''l
� a
� S
`� U
N � O
�n q
z �, � �
o q � o
a � � �
� � � �
u�
o � � �
� � �
o � �
N >^ a
"' E � E :.' `°
a u " u " y
� ' C :v � � c0
v' N E c �y � E �
0
� o � t° a � �� � � � d
� '9 c, m rn
`v � e " ;,u � � = � � c .� 8 � ¢
E • C u
�_ nt..., � � a 'U^ a�i a��i � � �o �' a"i � � O
`�,�,-''�� '^ �L Q � �lS. � W V] � � � U !it � � F
� o
� � v�'i Ll
� O O
�� �y U U
� � ������° Jacobs Engineering Group Inc.
501 North Broadway
SL Louis,fNissouri,63102
314.335.4000 Fax 314.335.5141
March 6, 2018
Mr. Brent Krue�er
KCI Constivction Company
10315 Lake Bluff Drive
St. Louis, MO 63123
Subject: Request for Proposat No. 54 (Rev 1) —Fire Suppression System for Bagl�ouse
Dear Brent,
Please provide a proposal with detailed breakdown of labor, material and equipment costs for the
modifications to the dryer system per the DHA report and to add loadout chute control as described below:
l. Install a fixed industrial fire suppression system using a dry cheinical as the suppressant inside the
baghouse and as inanufactured by Ansul or approved equal, aiid with the required controls; all as
designed and supplied by Andritz.
2. A float to control the operation of the loadout chute has been supplied; however, this control function
was not included in the original schematics for tlie loadout chute. Provide the necessary controls to stop
the loadout and to automatically raise the chute upon sensing the truck is full.
Please contact me at 314-650-4412 or pk.mathainjacobs.com if you have any questions or nced any
additional inforination.
Sincerely,
Jacobs
✓1 L/��,l/C����`''" ��._..�.,-
P.K.Mathai,P.L.
Project Manager
c: Casey Brunke
CSX65101-932
Jacobs Engineering Group lnc.
<
, � .�
Brent Krue er
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, May 1, 2018 5:05 PM
To: Brent Krueger
��. AI Neil; Milbitz Andre; Kirkland Ken; Chapman Patty
Subject: Cape Girardeau RFP 54
Attachments: RFP No. 54 (Rev 1) - Fire Suppression System for Baghouse (3-6-18).pdf; CO2 High
Pressure Manual.pdf; Ansu1542R.PDF; Ansul CO2 Brochure.pdf
Brent,
In response to the Cape Girardeau W1NTF's RFP 54 Rev 1:
Andritz offers an updated quote to provide a Fire Suppression System for Silo Baghouse, including Carbon Dioxide (CO2)
system with an automatic detection system with heat detectors, a manual pull station, system disconnect switch,
engineering, programming, commissioning, documentation, and training for$44,100. Price excludes instaliation, conduit,
wiring, anchoring, foundations, platforms, ladders, or supports, Design Engineering Review per DHA, and sales tax.
Andritz anticipates that KCI will need to run wiring and conduit from the fire suppression system to the building fire alarm
monitoring and ensure the Andritz PLC is able to monitor status of fire alarm system to prevent operation in event of a fire.
Andritz offers to provide work to allow functioning of the truck loadout chute tilt switch. Andritz offers to provide barrier
relay, engineering, programming, commissioning, documentation, and training for$15,412. Price excludes instaliation,
conduit, wiring, anchoring, foundations, platforms, ladders, or supports, and sales tax. Andritz estimates that KCI will
need to run wiring and conduit from the Truck Loadout spout junction box to the Truck Loadout Panel and from the Truck
Loadout Panel to the PLC Panei.
Thanks
Perry Schnuck, PMP
SEPARATION
Region North America
Senior Project Engineer
ANDRITZ Separation Inc.
1010 Commerciai Bivd.South
Arlington,TX 7600i
817-419-1798 Phone
817-526-1256 Cell
817-419-1998 Fax
�errv schnuck(a�andritr.com
www.andritz.com
This message and any attachments are solely for the use of the intended recipients. They may confain privileged and/or
confrdential information or other informafion protected from disc/osure. If you are not an intended recipient, you are hereby
notified thaf you received this email in error and that any review, disseminafion, distribution or copying of fhis email and
any attachment is strictly prohibited. !f you have received this email in error, please contact rhe sender and delete the
message and any aftachmenf from your system.
Thank you
1
-"� 4 , � . �y�aJ'� . .d ���. � � ! , w , ,�
.� � ' "+ ..��... .Y� ! • 1 :::�..
� `�'
F� y� yeMy��.. �� �C, . .' I.�^�"' '��'.
v�
:r � ' i
: '1M�..,;t� . . �` . . . `'� - . .! "� � a.*Tr�_.,��
,w� '. � .'+��r+�'��' "' �� � sa� ,
. '�� �'� . . . �.�� w-.-�`_ '� �� �3 � �.
c, � � .�ls y � �'�� e,,,...r...� r E. �� "` � .
, . ,� _. •':��' S � � � ,� �� . � -.. •' -
: +r" *'.�` {,r ����� ' a' �'+ . 1 � + i�
� '��.. ..y� . ;_`�_ +�.��#x�'.`,'�`��''t . 1 - ��....�.�e�+�w"'s �'' . r-. . ... � .
',� ,id■..r. . _
ir wP�... � ] .�n'w:n � . .
'xv`r'.� �o
. �. { } ' : . .� ;
• �� f �'� x � R � . ? . � � • . .
� r>..�awr ry;j�` a�yq� 6 1 �i . ' �e � � � � � . . :
... •r,�� ss e :&�. 3 - ` t �� .' �' .
^a" ��... �,� r�.�� :��' �i {���' 'r« "t e�if �''°'�r" ..-r.....x+w+
i���+. # � � . r>t.�. .a°+�+'! .. ; :.� . :' :
s � .. :" a. +s-4''� � - , ��'s�e �
� �. ..:. .. '. ._- .. ��1... T.Y` ,�s .-���u3• 'Ys:�� G'�`��Es��r'�'s , _�` t.
1� d
��� Ai � �' `�-� .��'� t' ��'�����+t' �'_ � xw n ,rca..s,.y _a>. • r.,,:='4.. - s.
4� f
.._ �: . - 1. ���2'�l•-*`�7 „o`„r..e � -- " -
' �. �'��?"„� � �s :�, `�'''Y".
.�r.� '.���� '��.,.� d� ,Y�w � `:
� � �
_ � L:
� NS
t
;
�:.: � '�..., -"..' : :a' �,1 ... f .,. ' � _
�
2 ���; R
� � � � ��Yt� �� - �..
�, 3 i .. -
�.. ����. � : '_. a� �� •�.
.
.�,. � . . ,. .. .. �,. :� . 7, ..�a.`�`�:
. .. '... _ ' '. _`y �. ...,s..�. :i:�.� ...-�' '-�j.
T Y,
_ 3 �
�.R� �,����'�'^y'�{ � � i. �
�y'�w d 5.': 1 f.'��. F` � -t
*�:K� ,.. � _ ��
-e.,...,� . {; ��. e-��M;.� r �.. ss'�.�f^�,��'�t� c--'.��i,��.�'" a�r � 4`Z
Q�: .y_�... . �:� 3 L � #�y+'�.�y,�aBfS S�i�3'TJ.� � �9q ,:P J$ ..
�:. :�` - .'"'-� �:�'" S -s. r`�-rc�g-..-���.;. . "'-4� � �� :
� z +�- y,z� . sea-�'
� . £ ���'� y^'wis^�3'"�� - -3` �' #';%� �. s: �`
' s +%�'� T�t'-.,. ��,��� ".��y syG`". "��w�'� � ,�.,,� t ; L � .
4 '��yy'ys•�Yh��r ���`E�#'t . 7i � _ .�_.�, _
2 fir '`�. .Y; 1 �.�j�/��.�'�'•+�#�'{�n"�,'�,,,y. �����Yns�������.�,,.����y�� x�+�' ^' � ��
..� �. � 4� < �a„�'a�`'� rt4s"kY' ^�:..-'s" --��s�"'�"s��'�` '�s�'�
- �� �'�-4� 'c a ���?z�'� h"���'` T�Y�F ���.+ �q�..Z'�r-� `
,T'-�`'l'�. °- j y � �'� n� x�`' ":��Y-`�`s`m}�h- �,s`.� �e �"zT'�^x�-�e . �^'�'�,�,-.�'.�`i �. gr.,�-a � �
�� a. 7>- ,� „ L.Vs� �. a y�'F F � ��.!�'��'�'�.� ''.s.s �,g�. "��.a ��i�'s a � , I �
�.:�.... w: �;� � '�� -�..�.�rst.,:�'" �,��,R�.3.�����'..�t��A"'ti�,ws����7�'�;. y�'�`� �p ��'� 4.
�
_ 'q� . Y`: :"�[: '�. ..���zr �c+. . 2,�+s.-�:'.��'� ;7�� �� 3-. ' .
-. �s��g--L s�'-��E ����s3���� ���:sY��">�"t.� �d����'�, ; *x
.^ � s,� 4 r c.,.��,.^. � � r' �W" ��srY�„1. k@� � n�-,w ��'.y� u� :: .�x, �
,r #'�'.�.�'j..�.� �tz,`�$�`�` f s't-,�, , � x 's..--.' � �,� K a .,a;.T �i y. ,.3
i 3 �nw,,,3 '� � ur a` �`'X� `'T't�r- i . ,� ' '�'•r.:
� Y�� 3 � } �5 a�.�r'�E �.srrvS' � �.r�`t.s,{�t��y,T��,�' �
t � >�.,�,�e�f�'�,�'Y�s�.SY���"�".��"�r ��`4.-zJ:,-,vv .
�`�' s � `^�c- ,e�S�-r .a.y,ry� ��' .P t F s � s-� .w t �-'"+
,�.: � C� r-'� ss� �:. r. �E'°� �` �-� " .�.7'.';u.
.. i"t y{� 4-���... �, F �f� 'k . '�' � �J�'�.-.:
.�x .S i TS' T- „�.t•
2 ' C� ��E - ..K'
_ :'C. �' �}�a.��'��� �i`'a"Y�,� .fif^4 y'^{
- � � i; a �, ���. 33 -r� � .�t-:.� -x
x� �, t h��r��H=
� r k �` ;� E. ��`�,�Q`
r
r�:. �
�c. �'� i ..
. T ..!"'t', j'e Y•�f c-.r
- �:.� _9 ��c �.�-
.:r R. �.. ��s
. . r . �� � ...
a.
:. .,.. ... �-� :'.`. # __`�r'��'�"= :. - :•y,�.,,,,�.�� ..`
;.
_ j � ..
T�+, . .,.., .n' �� ' y
- ��Y ' :�'
�: -
. oe � o e - oo - •
� '
- '.. - f k :. t,.�#::� '_
� -. .r x x', ? �:t �� .
S: . . €C..$ 2' r� � .
+.�g ; f.
F�
&s�" ' ; > .��;i��'
� �'• _ '�L"'P ��. �.�..
_ � � „.qk'
�.��'3 K. . �� -Yv.
1
. _ ' "� - _ '.T.�..
s.
a
� �wr/��' _ y'.
j ,�}'�:�' r+ � �•. ! a�..
�� _ - `lnr-..
��� . . . T�� � , u� .�_ . .
-t � � t 'scs`�''.^�_�.�3�>-�`,* f " .";k - ' c
" ��r { �:
-+ i�` .y .. Wro, ;� i __�+� �.'. '1�." F_ �
�S _�� �, �. . � q: __._._^. ' �z �
'��, f� - '{ - ��. -ad": �c
_:i . .3 �-, ���•� � 4 .t. l{ "� .'t,�£.
�, � - � � ...- . �- �:
� ;� fi; t'"���" "' .A S.•
�, �.� l��� ` ����� i _ �:.
1:'` �'i
� �ti ��r �.... . . ' . .... . ...... . �.
...`� . ..��.: . �j,,:
-_s ,,,," _ *�- �'
-:;� ".�;
_ �.�_ � --._ � �
II �� �
� ..�� �.. � . , �
2.. _ .. .... � - � - �--w` �S
t v^��,
-�l .��� � 'S` .i.^n+ xl f `� ..�.wu-�'„ ... .
. � �; � g '. � �
.�wf• :;s Y ', :; �.' . � .
...y � �L"��y. _ _ 4�'���rWf.t.� � �. Y�.
w�";.f�. '..'+{i {i �
..w} ��'� -1 .� . ' _ i" ' '
`�� �~� C.: „i� . �� ... . � ..._. _.
:„� f �: ��:.
._� ��� .. . . ..
1 � s T4:'� . . .
�y . � . ' � � , � . `� �,+
.� � . �. . .. ' . . .. . �.
7z52.. �: ��, _ . .'"y�'� . ._�s. . � . � . .
.''� ,}�
�_..r ��� ,� � ��'�' 'r,- .
x
���r7 �"� " . ��"�'_-y+r'
..�c " � :. r�+'�'"��'�y3� s
'a . +� +�-sa l�� �-r-� �.? :
� A
" e`.-�. ,'��..v,p �T2 4 � �:
� �R.�`�T� '7`-'�+� . Y+h✓..
' j'�-�`x�i'y�3�3 .
'.:'A� . , . s��*i+�"'��.T�"�� .. '
? d"�:�9 `.��-� �"::.
. . � . ` �,s' c.�^.r��� �t . . . .
� .. s _ - ��� '- ..
_ :�
�'�'t'�"-� ' � . - � . � .�.
��� � ��n�.�,� � � � . ; .
..:s,� S.: 2� Z�s �s`�i+CR„- :dt L .
.* SC��`"'a,£ �S .�,�.. . �, ' r} '� f
�� �i`�F t`C _.x �-y. .:, �-_e„�,.\' w .. _ 4 .-'.'+ :�".
- e�'" t : .� �'� `F'�'���� i '` x.y� . . . . ' . . � . � z �'t#a
`i' '�`� "` �-�� , s � ��YY3 �,. - �' ` . :��A..^ �� �'"r� 'i����
' �. .:^ ?- : .� .i �"+ .s`_ � .�'.�s�' _ � � _
: . -, + . a, '�!��T`.
... • I � :� . • . . . �.
` '��-� � � �� .; '"i'+"�; �`t ,�'.4�r.��s K � � . � - #`n�..':w°^�* -.
� �.
..; . `.� .� ' _ � .— �� �„+...� � kx�r t'.i'..
� � �
��_..0 ,. { y`�
�... . ... ..... �. ` " . , .. . _
. . �� ��' �� ': ^'� .�.v��:
�. . . ' ..' k .:' �� .j; ..� 'fl�� 'ic��Y
' � - '...- P t � � e:: �. 'i .
•
, '1 ''. 5+y'9IP�..C�K4��'ab�... y ' . '} _:'.�'� ��.
Ltvi " .: . .'.:.i .�:
. � .� _ ��t � ." ' N ' :
'Y •` �
ill.'f! �� �r . . .. � ��p .Zs �.r ':.. !� Sv4.�
. �� � ' �� . �.. �
';4a�� : �+ F ' •.A
e . S ���� .,}.;i4' ...i' .� } . .
- � . _ �� i ! }w ' . '. � 1 i � .. �. .
��sM1 z4. ' . ..�1:�� . � _ ]Y�::. ��' �� '..`��I.I,� - + .
, - "
�.��awr � ..�^+gy- - � ..... ' � . :
�^.: . . . ..T:�� ''�_ ..� . `�. i ��.� } ._.:: r"..^-�a�-.._.
! q
�r�_.� �;� -�4} :i� s' . �j � . �+� p
SRiI -
jc ro ss
e•-
��r E �;�� � � s�—, � _ � - -
'� _ -
i S
, ���� :��. .:�q f �� � -.7 u g5 sr � ,��� �Y.:` t�.:° f "L. `� 3�.� ; ',
ii � ' a.7 } `� ; ��s�t� � �'� 745. `� """� � � r"' �` � z .�i
-�u ��'y�''�+� l FJ �� t�. � _
�d+,-�v��•`�� �> ? t,.S�,��. �N„ `:�yS 3��� �°��a�"����-.���i':�'� ?.�,.. � � �
� � � M� �� ,� � ����
k[." �g ��+ F'' . 3n '�;.��'�'`-.�e ma �� t ` i� r }
- � 7y � Y �i ' � 'A � � ��� a�'-a E '�^zfi�'y�c �
� K ��R �.� �� ���,` �����,� �W. � _
lt'.' R yFa . . . `�r3b�y .��+t`�..�AY 3�����.a�x,�`�-Yv.� 4
�k� . f. '.` "�'FI � �M`r����A•u .,cY�....o� �� .�''P�t' d
. .. .._. ....�•� � .w.:.�.��'..k � �_�-3,.o-�� .e��..fa`,'�?'?,. a.�'T.xa^�-xzc.���.�.._.•.�.. xs,..� �....i..>�c.�_, _,.. . .. . �. . . ' ' ' _ . . _ _ .
' _ _ _ - -� - _ _ _ „� '
_ S.,; c � Y _j K _ _ l�. r S: C £.. �
� _
� � � ' = A fire�n your�fac�l�ty is never pieasant Bufi� �� r 3 =
, K
_ .> 4 .s}_ i� d
� f: � <° � = doesn't have �o�be debil�tat�c�g ,Carbon'd�ox�de, the
, _ � � ,
3
-� �' � _- - � ar►g�nal,�`cle�nx�gent," �s-st�fl�an economical solv��on;
_ _ r { r �- � ,� ' � �-
_ ; � �_ � .� - ; �� �- - � � � �
�
,� a pr"ov�d�ng`automa�t� or manuai profection for Class; ;
2 #
f A; B or.C f�res ' � '
� .
� �
_ #� _ , z�, � _�. k `
.
- c � - „ � s � ��f
- - � - .��-' �� �'_a } �-c � _
,� i � �- . �
.�'�L G Ty i-i .r� _. � ,, �.� l � T Y y .:� _ Y � _
I
.��� yt � � r � 9p, g b3� ,@ � << z� � � � � � 4
1 ... - - .'f- ^it`3a.. 4 1 .
. . .�_;:,�'��.-„-E,>,..r.._.��.. ...�_�..�_ _.�_, _ 4 .� : �1 V I����-�3 -; s :.� � :a,h � r i . �.
- � The oriiyagas�otrs agent capabie':of deep seat�d -
'- `"r :• ` .,�' J�� ''13;-"�F �- :;. � .:, i�. �- �"`��i�.�- ,C::arit� .
,s ;
,X ,�
� i �G(ass A f�azard protect�on;versatile,CO�cari;flaac!
�� � _� y � � .� s� � a.�tE i'P -` 'u � .,,T:1� < �-e a i a't�#� .� �a -'- � _
�� encl�sed areas or disc'harge d�rectly�onto burrnng ?
s., � #:�r " ,- : � , ,G - � _ ,
� '� 2
� �
� 1 , '� �. . _ Q _ .,A
� : ' . . : _r � .
�_ _ � �
� ` surfaces,� Intefligent con��oi�par�els and de�ectors,
; ,
i � s�uch as an AUTOPU�S�E� C�n�ral�Sys��m, offer
� _ , , ? � _ ,
� `
p �Iarm, aux�l�.ary contro� and au�arnat�c:�elea�e� ' ry
A.'- 'r : .. t f� � � :.. ..Y.: ���Yt _ . i i� �y � hi� . e^
�--: `� �. To hefp ensure sarety, aN��ersannei mus� be
�
� , �� " � , �_� � ,. , ��� „
trained on the CO� �ystem and�warned �o�to �
z �
F. '�'; � ��'; ' u r . � ;��`�x�; s� x � -
. �-. enfer�h��hazard�area dt�rin�� d�sc�arge, or�nt11 �
� � � �� the �r.�a s e#eare'd � ' �� �-� -
. '� F �• ���r - ��" ' - > `3-s �-� 3 y.�S` � s r _ `j' ,-F
[ ,� :-� r -: � .' �
? V� )' f � k .� F - �� ti}t � .�'t
_ �• ,� £ � k � �� , � �s• �� _ -r•.. �. �- �xi..� .� 3 + �
Y� � '=�� Your fii�e protee��on partner��ANSUL� cont�nu;es�o � -�
j
t � �� 1"� � � � ' Y Y , F [. '� , - 0 -5'C h �'r
. . � �.� s r ,n t. - .- �'� s '-a. r-<� ^'- ,r � �� �..�.< --. `z„�'da ,���r� .. �
.t �� z F �:. _ .
A�� , � � � � �iead �i�e f�re suppress�on �ndustry w�tk�4a full range�of s
'�, r �`�i . r� � � 't . ':% '` „'"r � ::i �- r a.�'v� . ��f�-� �r��' -s,.�:, r-� ^
� } � i 4 k i _
{ � : 4 � �. ,ta l 3 ' ._ � . - ",�'f�' 1'L f ::
t �� � _ ���, � �� � "�qua��ty �oit�t�ons and special►zed prod�ct� bac�ed��= _� �
.���r �f'�'` r„y :h xx� ,., z ; .. .�. :�-sr" tF_,. r .:� � ?sC����,+�-t`�„��-z���'4�t C �..� -"'�
� yf � � '� -r�� t � ..�" T - .. ��. ✓r �frt".'3, �-� ..�" L-c �•^r'� r � 1 �' - ''i
� -� , � � � 3 �y a V�orldw�ide �ietwork o��he rnosf qtia�I��Gec�� 4 �
� � �
{ � r � f � $ � � s t �
� - � ,, `4 .�+.. +. .i '��}; �w. r 2 v� y�, .�� _' �' F . 3-� �'i``a'� ""-t�z` � {�� a �
`� ���a ��_N r � i a #y j,� }. 1Y1 �( }. ��� _ '�'� ef �r:�=x 3..t �,, ui
y ��� K ,� <.,-�� sYsr-� a � ��rJLt�6..luLQrr�1-�.It tl��� ���U.�lt� � j X .,, 9
�:r � 1 - � : ':''` - �t�� a s75� j- ?=?
Y ."� .�l'`t t _ 4',.� 4 � � ! t' .�-- j �: -` F�_' .'��l
i i �5" - � � � ,� .
'�� ti,,."` Y {�� � � � t � �A 7;
.'. .. �:, .. x
3. ... _ 1 .2 S �y'� 1 r ; .�^ ' ..
_ r�. ..�. .� .,n._a.c. _ .�...;�._ � � �� �. -..._ �,. .n _ .a �_, ,.� -_c _ , es...._ , _:-s.`m..s�.,_1�...... � •�L�..G�'G`�Z._- �+-r._.,G S..F.:S,..a.__ ..�.<v.«J w�.,xY`�vei"L°��......�-�.��xy
;'., 1'♦ t.:� ;. y- . ' �^ " :.Y ' 'e � -- ��: } .. :� � ' �� � � �- 1. � ' .'-< • .�,
}.;�-� � . :�. -� . � . ;�.... _ � .:� � .: . �. � . _ _ " .:.f��
. ' _-'. � , .'�. A .�
, • . eo � a •- . s- . s s s e -e . o
e e e- • e o• o o. • - - •`° •
• �- o • - e •- a -• e s •- - . o
e
• e . s .o- e- e o e o o • e � •
.6. �.
. . •� 6 i�0 •s� O .O • �i O . .� O�
. O� •�� �! • • A . • • � O . • O O �
� 0 � � •
,�SS
.;✓�
_:.
.. .;.;.
. I �
�`
bcfiorizer emits win ergreen
scent during disc ge
' ��
Discharge pressure switch
Lock-out
vaive !
Manifoiding atlows single or multiple hazard
protection from°one storage location(selector
valves evailabte for muitiple hazards)
�M' Resettable/stackabte electric valve � �
_ actuator with manuai lever release
_ .,
, : -
:. s .
, P . .,:. .� � . . ' . _ .;..
; : � � Cylinder valves operate automatically via
� � manifdd backpressure
� �
�>�
_ The industry s widest selection of total
j — Modutar Fnounting bracket design flood and local appiication nozzles
r .� _ _
'�
' '' _ CO2 cytinders:35,50,75,100 and 1201b.
r ; (16,23,34.45 and 54 kg)capacities
.:�, �
.. . '.�: F - ,-s . .
t -r '' USCG applications aliow only manual or Detection and control system availabie
` - pneumatic actuation systems.Must also (not shown).Automates system and
, ; � have a time delay and siren. provides more flexibility to meet design
= requirements necessary for the hazard.
� =i
,t _
k'+, ..y �s `t - .e
i � c - : .. � _ '
J ,1 x
. �� :� "a ��� -. >' �� l� :
� � �� � �n f -. A
J ( h y _„L J 't A :..
.. '. r
�. � 5� � 1 i 3 k i P 1 �� 1 � � x , � r �, �i'
7 (, �.
� _ - �._ � - ���.t
-`r �1� �� t�.� Ff C., t � % - - •t
� ANSU�. PREFERRED�BuIk=Low;Pressu,re Carbon;Diox�de Systems are id�a1 for non occupied fire
� � . s � -
°' hazards requtrangflarge amounts o�extinguishmg agent �n a I�mited space � A single bulk �ank <
�.:
' `� y T'� .� �' .„) � },5 z..; .�{ �.'' :: S ... �v x:� .a a L !; '� .; Y �, _f
, can�store frorn;�/4 to 60 ton�,(68Q to 54430 kgj of car�on dioxide, which�s maintamed m a.
`_ � �`: �� `�, ; , , = 3 �-d. =
, 5fiand by �ii�e �eady state Th�s aliows the sy�teri� fio pro`v�de effective'd�stri�u��on_of agent or� r
� .�3-v �' .. F ;� Y : f `. �. � �.F : �� � � 2� 'i j .
�y der�and Bul�C low�ressure CC�2systems of�er rriuit�ple c��seharge�capa;���it�ie's b�fiv��een 'recharges _
.. �L =
}'�" x }�, ,.d .T� �, a 7. _=, 1 ) .;3 ,/' +Y _ „z:'
�S���J C-rlJ�I 10{�'1w+�� O.�4�L7!1 +r Y � :9 f - �-
_ �
t � •
_ �.
. ,
J. _ � '( _ ), S Sr t � '1 '
`r ._ '' "� �.' _F ._ . .-f ' � :� '_ '.�7 =J .. :i -.� �� �
_' The 1�qutd C4� �s stored �n an ASME cod�c! pressure vessel equ�pped with �ts own refirigeration -
.. . :: . y� � .. ,. .
= system The�te�rr�pera�ur�,w►thin the vessel Rs kept at approximately OQ� ( 17°C� by rnaintaining
;. � 1 :� � -
. � �- .
- the interria( pressure-n�ar:�300 ps��(2{�7,bar) r
_ x _ . t s r -e� "'. � _
c,s �"� _� �. r7�,�- ::J
P e.u.,h,tr ' � ty' F
�. ��.'T ." � : �: '.- � � : '. _ A ::. - y �.� ' � _
= Ud�ve c�nfiro}�s electrg pneumatic or man�al Eachs rnaster and`se(ector va.lvesassembly coris�sts
1 _ � . . . � � : h.� _ 'S . .
f-v�L ,l"3 X . J�' "'C �" ..� �".. .. t ` 'i�} en . .. 1 r,,,.s �"'c-� . V- '.
: of7e�ther a bali :or butterfly valve� a spring returr�xpneumafi�c t�aive opeYator and a three-way '
��s�.1z r.�.s�- { � _; � s ' } a-}.. .�.�rx `` ''T ; ,�s ._� 4 �. ; �, _ ;.�, .,r .
: elee�ronicall�'operafied solenotcl �alve `A listei� �nci ap�roved rele�s�rig cc�itrol pane) is usecl
� . � � -�
_ .� � r3zr t � ,\ t� i ' i _ - ...
: �o pravid�au�om��ic detect,Qn and car�tral _ _ _ -
_; � � � � � r _ '� �
. ��.+�.�_. _..r� �S. _��.�v � .� ��. _\e� t�_ �. ��._. .� � .�._ Vt�.� e ia�� a_�_ ._.. 3��_r.,_._er�> _..�. . ..._...�.... a ....� � ...�.�. z_ � . ..-. - .� .._. s,,.... "_
.• ' • �� �1• '
•
� � � �• . • _
� � ��
`,♦
• •
1 ' •
�' �1'�'1 {rn
� • � � � �
�{,
• • � • • �
' , �%�
�i- ��� L ••�; . . • • . • •1 •
• � • 4 �� • � •/.
.� �• • �"�e�t:- .
• ' • • s.,
1 s '
• • '��i,,.' �-.'1c � _ � . � '
N`���"�r. � G.i�.� •
-y�`v, ir'..
i .J. ,��`k�'T-f •
� -Y` ' • � ' • • � '
• • • • �''1'-.:.
' • �
�_ > >; ,_ �� :�,• ,�ri - - _ _ -
,
_ _ _ .. - _ _
. . ._.- _,._-.;- ..- , . - .,: .
� :
, _ ;:
,_ . , :,
}
t j^_�
�� - �� �"` �.�' _ 1 � _
; ���� � ���' -� r ..�s � z;. � Y . � �� � � � �� j _ 5 �� �
5 � `�
S � Z s F � i � � ...S . I � � � 5„� Y � � Y �:
}& � 3 - K �".
3 �y 3.'� �' u`'�'� ��X';� i �-��'s��� `� -1+ �" � -
��*�`� �J�'�:a'�� .� � � � � � l
_'�.�.i'� V `!4'.. �S � J. � ^�S 5 - _ r �
r
_ t H
�•E 1 5 d 3
( �^ � f i - ! j r � _ 3 f � F -
' " r � _ _ r.f� X L y ,�
. g .s t� � _ � ,� ) . _
�� �� �i .: ... �� .� ; r .
.: .. Y : (} � .} .,. - . .- .' .: C � ? . L.. ._ { : , '
� Br�dgtng,;the gap between h�gr pressure cyiinders and fQw �ressure bulk�anks,r ___
e . .J x �t P..d.:�, t '',- a <a �'`' ':.
��:� �> 3.` �� � .:-4 ;
l
mini�bulk tank`s �ffer capacEties of 1,040 and�1,5�0 lb (454 and 680 kg) Th� ANSUL '
Z. 4 ._ _= ��.J� N ;�s � .` - � .' " _
." � PREFERRE{7 M�ni Bufk L:ow Pr�ssu�e Carborl Diox�de 5ysterrts were de.veloped to - _
. . -: . A : i 3 - .- . � : .. - _. -'
�: C .,;i ..� .�.. .. 3 ��� v .. � : _ { -
prov�de ar� a�tern�tive to man_�foldi;ng h►gh pressure cyiinders The �anks are configureci r ; -
- L t : ��.v = 9 _- .. �. r.� Z :. �.� :- � � ..
�,: vertical�y<to �ave ualuabie f{oor space min� bulk tanks can prov�de pratection for
_ . � _ -
. , ,, f : : , �- - �
�.- non=oceup�ed:totalrflood, Iocal appl�cation hazard_s, hose reels or;custom des�gns such , _
: ._ - �' ._ , ,_ � '
as �n`e�ting or.'spurt; syste`ms ' = � �
_ � _ .; - - _ _ � { _�
,
- x � - ` `� � ._._,�.�,_. � �__�:, . .. ...x���._.��_�__.��.�__L��.�..�.—.s�__�..�:t._..�..1':�x.�_��,.. �...
.u__ a, �t.__ _: .� u .� _�_ ��._._a ____�_ . _,..__ �__� .,_� _ _
.. - . .- • �
. .. . .
•.. -
. . -
� - . - -
s�r�
. . - ;-;-;
. - .
. . - . . - .
�. �
, . . . ..
� j"� •�' •
�::. �.
�u
� �.�j"
. -. � -
3
� . - .. - .- z '- • �-
. - .- . - . �� � ;'{ •�• . •• • .• :•
.- • . - . . - ,..: ; ...
����'' - ?�"
..- . ;i, � -
,r`4.
5!�
� •L_ —
�
r �
� ' •
5� • • • •
,.``"Cis'..'.' • • • ' � � • __ � �
- � - • . �
� .
Brent Krueger
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, May 8, 2018 10:51 AM
To: Brent Krueger
Cc: AI Neil; Chapman Patty
Subject: Cape G Fire System Information
Attachments: 75-100 CO2 cylinder.pdf; Aegis 2017.pdf; KF Lockout Valve.pdf; 3300 Manual Pull
Station.pdf; KF Pressure Switch.pdf; KF-MT Multitone Alarm Signais.pdf; KF_Detect A
Fire.pdf; Kidde_Electric_Control_Head Kit_with_Control_Head_Monitor_K-85-3001
_AB.pdf; Maintenance Disconnect Switch.pdf; Dicharge Head Plain Nut.pdf; Dicharge
Head Plain Nut.pdf; CO2 Warning Signs.pdf; S Nozzle Flanged k-81-1140_screen.pdf; 75
Ib. Strap.zip; S Nozzle Flanged.pdf
Brent,
Please see below and attached:
Perry Schnuck
817-419-1798 Phone
817-526-1256 Cell
From: Clint Burleson [mailto:clint@baconfire.com]
Sent: Tuesday, May 08, 2018 9:59 AM
To: Schnuck Perry
Subject: RE: Contact information
E-MAIL FROM A NC)N-ANDRITZ SOURCE: AS A SECURITY MEASURE, PLEASE EXERCISE CAUTfON WITH E-
MAIL CONTENT AND ANY LINKS OR ATTACNMENTS.
Perry,
Answers will follow each question.
If the instafler needs to he can talk to me direct, should that be helpful.
Can you provide information and guidance on:
• Components supplied - All CO2 hardware, alarm panel, alarm devices
• Requlred manifoids— No manifoEd, single cylinder
• Nozzles—easy adapt nozzles? How many- Nozzles will include a fiange mounting plate, two nozzles
. !s system full and pressurized -Cylinder 75 Ib. shipped full
• How big are cylinders—See attached cut sheets
• Mounting frames supplied for bottles? - Mounting bracket will be a cylinder strap
• Explain controis for heat detector and alarm —Fire Control Panel will come pre-programmed, two heat detectors
on one circuit. Manual pull station on separate circuit, key disconnect located at panel, Horn/Strobe, stop valve
with supervisory circuit, Discharge head plus a supervisory circuit separate.
. What is needed for installation? Pipe '/z' schedule 40 seamiess A-106 or A-53, fittings 300 pound malleable iron,
Galvanized if installed outside or in corrosive area. Conduit, wire, electrical fittings.
• Are you familiar with the size of the application? Yes, basically a 4'4" X 4"4" X 15' include collector barreil
I think this cavers all the parts, but l may have,misseci something. Fecl fr.ee to call,
Best Regards,
Clint
Clint A. Burleson
1
}
. � :9 P
� )�.
Sacon Equipment Co. '
Z709 N. Beckley Ave.
Dallas, Texas 75208
214-742-5871
FX 214-741-5932
email: clint@baconfire.com
www.baconfire.com
� �
�
;
�
This message and any attachments are solely for the use of fhe intended recipients. They may contain privileged and/or
confidentiat information or other information protected from disclosure. If you are not an infended recipienf, you are hereby
notr�ed that you received this email in error and that any review, dissemination, distribution or copying of this emai!and
any attachment is strict/y prohibited. If you have received fhis emai!in error, please contact fhe sender and de/ete the
message and any attachmenf from your system.
Thank you
�
2
, •' ' 3h `'�'� • .
CO2 Component Description �!' K�dde Flre SyStemS
A UTC Fire&Security Company
75 Ib. and 100 Ib. Carbon Dioxide Cylinders
Effective: May 2010
K-81-1010
� TYPE "I" CYLINDER
VALVE
�// THREAD FOR
CONTROL � DISCHARGEHEAD
PORT �� .�
SAFETY DISC
- �_
ASSEMBLY
�' THREAD FOR
� PROTECTION CAP
\� CYLINDER
�
A � � i �
i � I�
\��— SIPHON TUBE
� i
B
Pressure Ratinqs:
Service Pressure = 2300 psig NUMBER CYLINDER TMPE A B
Hydrostatic Test Pressure= 3834 psig
Nominal Pressure = 850 psig @70°F s�o2a� 75 LB. 60.0 in. 9.25 in.
5/8 in.
870269 100 LB. 62.0 in. 10.50 in.
MATERIALS
CYLINDER: STEEL
VALVE: SEE K-81-1050 FOR 5/8 in.
SIPHON TUBE: ALUMINUM
FOR ADDITIONAL DATA,
SEE K-81-1030 FOR P/N -SEE TABLE
This lilerature is provided for informalionai purposes only. KIDDE-FENWAL,INC.assumes Kidde Fire Systems
no responsibility for the product's suitability(or a particular application. The product must be A UTC Fire&Securiry Company
properiy applied to work correctly. 4Q0 Main Street
If you need more information on this product,or i(you have a particular question,contact Ashland,MA 01721
KIDDE-FENWAL,INC.,Ashland,MA 01721. Telephone:(508)881-2000. Ph:508.881.2000
K-81-1010 Rev AC OO 2010 Kidde-Fenwal Inc. Printed in USA Fex:508.881.8920
www.kiddefiresystems.com
�
. �.
, �
AEGISTM �■O � r�l.�$Kidde � �
���;:.:__,
Conventionai Fire Alarm-Suppression Control Unit ' �
F� re Systems
Effective: January 2017
K-84-200
FEATURES
• Suppression Focused Contro!Unit • Builf-in Cfass-A and C/ass-B Circuitry
• Triple R Redundancy Provides Maximum Protection • Listed for use with Kidde,Fenwat and Chemetron agent
Against lnadvertent Release re/ease devices including Control Heads and lnitrators
• Agency Approvais • Sophisticated Programmable NACs
• FM Approved to ANS/864, 9th edifion and NFPA 72 • Independently ProgrammabJe Agent Releasing Circuifs
(2002) • Compact Cabinet Design Supports Large Number of
• UL Listed to ANSI 864, 9ih edition Input and Output Circuits
• California State Fire Marsha! • 3 Detecfion Circuits
• City of New York Fire Department • 2 Supervisory Circuifs
• Listed for a Wide Range of Suppression Systems: • Option to Use SUP 1 as 4th Detection Circuit
• Kidde ECS HFC-227ea and FK-5-9-12 • 1 Manual Retease Circuit
• Kidde ADS HFC-227ea and FK-5-1-12 • 1 Abort Input Circuit(with 6 Abort Modes)
• Kidde HP CO2 • 3 Noti�cation Appliance Circuits
• Kidde IG Argonife &Nitrogen • 2 Re/ease Circuits
• Kidde FE-93 • 3 Programmable and 1 Trou6le Form-C Relays
• Fenwa/Spheres • 1 Auxiliary Power Output, 1 Amp
• FenwalBDCs • 5.4 Amp Power Supply Unit
• Kidde INDT"'Dry Chemica!8 WHDRTM Wet Chemical • 120/240 V, 50/60 Hz AC Input
Systems • Easy-to-Use User Interface and Display
• Sprinkler Supervisory Service • Flexible Confrguration Opiions
• Deluge, Pre-Action, Foam, Foam-Wafer Systems • Password Protected
• Combination Clean Agent plus Pre-Action Sysfem • Digital Re(ease Countdown
• Option with Door Mounted Abort and Manual Release • Battery Voltage and Charging Current Display
Switches Availa6le • Charging Capacity of B8 AH
• Extensive Diagnosfics
• Backwards Compatibie
DESCRIPTION
The Kidde AEGiST"' 2.0 is a Conventional Single Hazard i�, i ��� ,i;�ie , � '
Agent Releasing Unit which provides configuration ' k � , � i
flexibility in a compact footprint to protect life and assets in '°
commercial, high-tech and industrial applications. The
AEGIS 2.0 control unit has a NEMA1 enclosure and an
option for door mounted Manual Release and Abort
switches to avoid the additional expense of wall mounting
these items.
The AEGIS 2.0 is well equipped to handle all special
hazard extinguishing systems due to the high degree of
programming flexibility provided and the following full
complement of input and output circuits:
• Three(3) Class A or C/ass B Defection Circuits
• Two(2) Class A or Class B Supervisory Circuits
• Option to Use SUP 1 as Fourth Defection Circuit
• One(1) Class A or Class B Manua!Release Circuit
• One(1) Class A or Class B Abort lnput Circuit
• Three(3) C/ass A or C/ass B Notification Appliance Circuits � �
• Two(2) Ctass B Agent Refease Circuits
• Three(3)Programmable and 1 Trouble Form-C Relays
DETECTION CIRCUITS CU TS
The Detection Circuits support Conventional 700 Series, Both the Manual Release and Abort Circuits accept
CPD-705x lonization Smoke, PSD-715x Photoelectric Normaily Open contact closure type devices. Activation
Smoke and THD-705x Heat Detectors as well as of the Agent Release Circuits can either be
Normaily Open contact closure type devices.Two circuits instantaneous or delayed up to 30 seconds (maximum)
are dedicated to the main suppression function and can upon receipt of Manual Release input. Agent release can
be programmed to activate the release circuits by either be temporarily delayed by activating the Abort Circuit.
single-shot or cross-zone input. The user configuration The Abort input can be programmed for 6 modes of
allows automatic release via detection to be delayed from operation. These include the UL 10-second mode, the
0 to 60 seconds in 10-second intervals and also allows a full-delay mode, the IRI mode, two NYC modes, or the
choice of which of the two Agent Release Circuits to abort can be disabled.Aborts can also be programmed to
activate. be applicable for either one (ARC 1) or both Agent
The third Detection Circuit is programmable for either Release Circuits thereby allowing use with DelugelPre-
Waterflow or as an independent Detection circuit. When Action systems.
programmed for Waterflow, Notification Appliance NOTIFICATION APPLIANCE CIRCUITS (NAC)
Circuits can be programmed as Non-Silenceable as The three Notification Appliance Circuits are rated 1.5
required by certain jurisdictions. Additionally, the Amps each and accept polarized 24 VDC Notification
Supervisory 1 circuit can be configured to be the fourth Appliances. Each circuit is driven independently and is
detection circuit. user configurable for First Alarm, Pre-Release, and
SUPERVISORY CIRCUITS Releasing as well as for 60 BPM, 120 BPM, Temporal, or
The Supervisory Circuits accept Normally Open contact Continuous pattern.
c(osure type devices such as pressure switches on the The control unit supports appliances that provide the
agent cylinders or on the water or air pipe network. The option to use silenceable horns and non-silenceable
system configuration enables the supervisory input to be strobes on the same NAC. Multiple NAC circuits
a participant in the suppression function. For example, (connected to audible devices only) programmed with the
low air supervisory can be included with detection for same master code pattern are synchronized, regardless
release of pre-action systems as required by certain of any differing starting times that preceded their
jurisdictions. concurrent operation. The NACs configuration includes a
user-selectable intelligent synchronization feature which
allows a silenceable horn to be shut off while the strobe
continues to flash in synchronized fashion.
SUPERNSORYIJ MANUAL WATERFLOWI
SUPERVISORYi OETELTOR� ABORT RELEASE DETECTOR3 OETECTOR2
� � � �
RS.7�t �� �� j'" `\ ��• �� . ��• ��
T87 TH6 � O � TBS T84 TB] TB2
TROU9LE 0 TB8 �`'_ j -
TB7 0 " DETECTORI
RELAY 3 S � TBB '
RElAY2 � � T610 �Kax Qviriceo Q""�'a�F"sE (jKidde
p�"`��� Fire 5 stems
o.� y
RELAYI S �T811 Q+�� Q+uin�� �
Or..w Qwun. Q.x��ie. a 8 S
�mi.�.� Qwrusam��•r.nm Qsn,mnu
Du�nta� Q�uwwm Qxvstc�+
9ATTOUT , � T812 Qneusi D�w.�rn�LOn�cnn Qs.aev
Qur� �sv�n� Que:imi �rsur�aw•
Qu Qx Qiuc �oirow�mi "' _ ,
� �
AC SUPPLY SELECT SWlTCH(S6)
m�7-� TBt9 0 � NAC1
�W '
ACIN � 2� T814 T815 TB18 TBtl T81e � � NAC2
rF� 100 �� �� �� �� �
�T017 � � 2.�- �
RELEASE 1 RELEASE 2 AUX NAC 1
ARC 1 ARC Y 24 VDC
Figure 1. Printed Circuit Board (PCB)
- 2 -
6
BUILT-IN CLASS A AND B CIRCUITRY POWER-LIMITED CIRCUITRY
For the input and NAC circuits, the choice of Class A or Alf circuits are inherently power-limited. ARCs can be
Class B supervision is made at site on the board itself by configured for power-limited or non-power-limited
selecting the terminals used for wiring. Neither operation. One in-line releasing device is required for
conversion boards nor additional hardware nor jumper each solenoid on a power limited ARC. In-line releasing
selection is required for this purpose. devices are not inciuded with the panel; the appropriate
AGENT RELEASING CIRCUITS (ARC) number of in-line releasing devices shouid be ordered
using part number 06-220023-001.
The two circuits can be programmed for activation by
different inputs, with independent time delays and abort ROBUST POWER SUPPLY UNIT (PSU)
modes to fire combinakions of two of the following The AEGIS Z.0 features a universal 120/240 V, 50/60 Hz
releasing devices: AC Power Supply Unit with a robust 5.4 Amps of 24 VDC
• 1 or 2 Kidde Continuous and Momentary Solenoid PoWer. Input voltage selection is via a slider switch with
Contro! Heads no jumper cutting required. The on-board battery charger
is able to charge 24 VDC (2 x 12)batteries of capacity up
• 1 Kidde Actuator or Fenwal Initiator to 68 AH thereby allowing from 24 hours of supervision
• 1 Factory Mutual Group A, B, D, E, F, G, I, J, or K plus 5 minutes of alarm to 90 hours of supervision plus 10
Solenoid minutes of alarm required by some jurisdictions.
In other words, operating in tandem, the two circuits can AUXILIARY POWER SUPPLY
release: Up to 1 Amp of auxiliary power at 24 VDC is available to
• 1 or 2 Control Heads on ARC 1 and 1 or 2 Control power external 4-wire devices such as Fiame Detectors,
Heads on ARC 2 AlarmLine modules, Duct Detectors, etc. The auxiliary
• 1 or 2 Control Heads on ARC 1 and 1 Actuator/ power output is resettable.
Initiator on ARC 2 or vice-versa ELEGANT USER INTERFACE
• 1 or 2 Control Heads on ARC 1 and 1 FM Sprinkler
Solenoid on ARC 2 or vice-versa The user interface consists of an array of LED Indicators,
• 1 Actuator/Initiator on ARC 1 and 1 Actuatorllnitiator Control Switches, a Digital Display, and Buzzer. Over and
on ARC 2 above the System, Power Supply status, Input circuit Fire
• 1 FM Solenoid on ARC 1 and 1 FM Solenoid on and Trouble and Output circuit Troubfe LEDs, the AEGIS
ARC 2 2.0 annunciates its suppression state-of-alarm via three
This configurability is useful for those jurisdictions where additional Pre-Release, Refeasing and Post Release
the gaseous suppression agent is required to be LEDs. Four switches are provided, one each for
supplemented with a pre-action system. Acknowledge, Signal Silence, System Reset and Output
Disable. The 3-digit display provides a countdown of
TRIPLE-R PROTECTION FOR ARCS impending agent release. On command from the user
The two ARCs feature a triple failure redundancy interface switches, it also indicates the battery open
safeguard system to protect them from inadvertent circuit voltage and charging current.
activation by the main microprocessor. The Triple-R SIMPLE SITE-SPECIFIC CONFIGURATION
system requires that in order to activate an ARC, the
main microprocessor issues two release commands of Setting the site-specific configuration is easily done using
opposing polarity via separate channels and that these the digital display and user interface buttons. To prevent
commands be combined with a third signal from the panel unauthorized use, the configuration menu is protected by
watchdog timer to confirm the micraprocessor operation. a user-changeable password. Factory technical support
The Triple-R system ensures that electrical transients or can provide assistance with lost or forgotten passwords.
disturbances such as power surges that could interfere Apart from the input voltage selection performed on both
with the operation of the main microprocessor will not the PSU and main board via a slider switch, no other on-
inadvertently activate the connected suppression system. board settings or jumper cuttings are required.
The result is a more robust and reliable suppression- EXTENSIVE DIAGNOSTICS
focused panel.
Also initiated via the digital display and user interface
PROGRAMMABLE RELAYS switches, the troubleshooting function displays diagnostic
Of the 4 relays,three are user-programmable for a variety codes that assist in determining causes of trouble. A
of alarm related conditions and the fourth is a dedicated comp�ete list of diagnostic codes and their meaning ships
trouble relay. All relay contacts are rated 3.0 Amps at 30 factory installed on the inside of the enclosure door for
VDC/120 VAC (resistive). easy reference.
- 3 -
_ , `.
� ,
BACKWARDS COMPATIBILITY TECHNICAL SPECIFICATIONS (conf'd)
The AEGIS 2.0 is backwards compatible and listed for • One (1) Abort Circuit
use with a full range of conventional detectors and alarm -Compatible with normaliy open contact-closure type
devices as well as suppression accessories from Kidde, devices
Fenwai and Chemetron. Going forward, this will allow - Configurable as Class A/Style D or Class B/Style B
legacy panels to be replaced with relative ease. - Supervised for ground fauits and open circuits
EASY TO INSTALL CABINET -Six(6)Abort Modes available
The cabinet design allows for easy instal�ation by fitting - Power-limited
between the studs of a standard 16 inch studded wall. It • Two (2) Supervisory Circuits
is large enough to house two 12 VDC, 12 AH Batteriss -Compatible with normaily open contact-closure type
and provides up to 2 inches (51 mm) of wiring and finger devices
space between the circuit board and the cabinet wall. - Configurable as Class A/Style D or Class B/5tyle B
An optional door design features a Manual Release and - Option to use SUP 1 as 4th detection circuit
Abort switch for applications with space constraints. Both - Supervised for ground faults and open circuits
switches incorporate guards that prevent their - Power-limited
inadvertent activation. • Three (3) Notification Appliance Circuits (NACs)
TECHNICAL SPECIFICATIONS - Compatible with polarized 24 VDC Audio-Visual
devices
• Hazards Protected - Rated at 1.5 Amps each
- One -Up to 35 synchronized appliances
• Power Supply - Configurable as Class A/Style Z or Class B/Style Y
- 120/240 V, 50/60 Hz(90 to 264 Vrms, 47 to 63 Hz) - Supervised for ground faults, shorts, and open
AC Main Input circuits
- 5.4 Amps at 27 VDC Output -Power-limited
- Battery capacity up to 68 AH @ 24 VDC - Common NAC/ARC output disconnect switch
-Auxiliary power output rated at 1 Amp at 18.8-27.6 • Two (2)Agent Release Circuits
VDC (resettable) - Each compatible with 1 or 2 control heads, or 1
• Three (3) or Four(4) Detection Circuits actuatorlinitiator, or 1 FM sprinkfer solenoid
-Compatibie with 700 Series, CPD-705x, PSD-715x, -Circuits electrically capable of simultaneousiy
and THD-705x detectors as well as Normaliy Open releasing any combination of two of the above
contact c{osure type devices. Refer to documents devices
K-70-100 and F-70-63 for details on compatibility -Factory configured as Class B/Style Y
and the maximum number of devices supported. -Supervised for ground faults and open circuits
- Configurable as Class A/Style D or Class B/Style B -Default setting: Power-Limited. Each solenoid on a
- Supervised for ground faults and open circuits power-limited ARC requires the use of an in-line
- Power limited releasing device, P/N 06-220023-001 (order
- DET 1 and DET 2 used for suppression separately, not included with panel).
-DET3/WF configurable for detection or waterflow -Common NAC/ARC output disconnect switch
- Option to use SUP 1 circuit as DET 4 circuit • Four(4) Relays
• One (1) Manual Release Circuit - 3 independently programmable, normally de-
-Compatible with normally open contact-closure type energized Form-C Relays
devices - 1 dedicated normally energized Form-C Trouble
-Configurable as Class A/Style D or Class B/5tyle B Relay
- Supervised for ground faults and open circuits - Relay contacts rated 3 Amps at 30 VDC1120 VAC
- Power limited (resistive)
-4 -
�
a � �
TECHNICAL SPECIFICATIONS (cont'd) ORDERING INFORMATION
• Enclosure
- NEMA 1 rated 18 gauge sheet steel with door Description Part Number
- Red color
- Suitabie for wall and surface mounting Kidde AEGIS 2.0 Control Unit 84-732001-901
- Optional Trim Ring
- Optional door with Manual Release and Abort Kidde AEGIS 2.0 Control Unit with 84-732001-902
Switches
switches
-Optional Dead Front Plate In-Line Releasing Device 06-220023-001
- Dimensions:
- with Standard Door: Dead Front Plate 06-220175-001
14-1/4 in. W x 5 in. D x 19 in. H EOL Resistors(10 pk) 06-220184-001
(362 mm x 127 mm x 483 mm)
- with Switch Door: Trim Ring 76-600000-007
14-1l4 in. W x 6 in. D x 19 in. H Large Capacity Battery Enclosure 76-100010-001
(362 mm x 152 mm x 483 mm)
• Environmental Criteria lnstallation/Configuration Kit 06-220148-902
- Indoor/Dry use only Replacement Hardware Installation Kit 06-220149-001
- Operating temperature range: 32°F to 120°F
(0°C to 49°C) Replacement Enclosure Assembly 06-220172-902
- Humidity: 93 t 2% RH at 90 ± 3°F (32 ±2°C) Replacement Enclosure Assembly 06-220174-902
• PackaginglShipping (with Switches)
- Enclosure, PCB, and PSU packaged in individual Replacement Door Switches Kit 06-220176-001
cartons. Field assembly is required.
-Accessories shipped include mounting hardware, Replacement PCB Assembly 06-220150-901
battery leads, IOM manual on CD-ROM, operating Replacement Power Supp(y 06-118394-002
instruction sheet, and EOL resistor kit.
- Order in-line releasing device (required for power- Reptacement Bezef Assembly 06-220151-001
limited ARCs) and batteries separately. Spare Key 06-118013-001
i
Spare Keylock with Keys 06-129924-001
�
,"; �
. �
- 5 -
� e
•
a �
EXPORT INFORMATION(USA):]urisdiction: EAR, US ECCN: EAR99
This document contains technical data subject to the EAR. For detailed installation,operation,and configuration Information,refer
to the Kidde AEGIS 2.D Conventional Fire Alarm-Suppression Control
AEGIS is a trademark of Kidde-Fenwal,Inc. Unit Installation,Operation,and Maintenance Manual
Ail other trademarks are the properties of their respective owners. P/N 06-237463-001.
This literature is provided for informational purposes only.KIDDE-FENWAL,INC.believes this data to be accurate, ;Kidde
but it is pubiished and presented without any guarantee or warranty whatsoever.KIDDE-FENWAL,INC.assumes no
responsibility for the product's suitability for a particular application.The product must be proper(y applied to work F i re System s
correctly.if you need more information on this product,or if you have a paKicular problem or question,contact
KIDDE-FENWAL,INC.,Ashland,MA 01721 USA.Telephone:(508)881-2000. 400 Main Street
Ashland,MA 01721 USA
Tel:508.881.2000
K-84-200 Rev AC O 2017 Kidde-Fenwal Inc. www.krddefiresystems.com
�i
� � � M
d•
i i
THIS PAGE INTENTIONALLY LEFT BLANK
Brent Krueger
From: Schnuck Perry <Perry.Schnuck@andritz.com>
Sent: Tuesday, May 8, 2018 10:51 AM
To: Brent Krueger
Cc: A� Neil; Chapman Patty
Subject: Cape G Fire System Information
Attachments: 75-100 CO2 cylinder.pdf; Aegis 2017.pdf; KF Lockout Valve.pdf; 3300 Manual Puil
Station.pdf; KF Pressure Switch.pdf; KF-MT Multitone A(arm Signals.pdf; KF_Detect A
Fire.pdf; Kidde_Electric_Controi_Head_Kit_with_Controi_Head_Monitor_K-85-3001
_AB.pdf; Maintenance Disconnect Switch.pdf; Dicharge Head Plain Nut.pdf; Dicharge
Head Plain Nut.pdf; CO2 Warning Signs.pdf; S Nozzle Flanged k-81-1140_screen.pdf; 75
Ib. Strap.zip; 5 Nozzle Flanged.pdf
Brent,
Please see below and attached:
Perry Schnuck
817-419-1798 Phone
817-526-1256 Cell
From: Clint Burleson [mailto:clint@baconfire.com]
Sent: Tuesday, May 08, 2018 9:59 AM
To: Schnuck Perry
Subject: RE: Contact information
E-MAIL FROM A NON-ANDRITZ S�URCE: AS A SECURITY MEASURE, PLEASE EXERCISE CAUTfON WITH E-
MAIL CONTENT AND ANY L1NKS OR ATTACNMENTS.
Perry,
Answers will follow each question.
if the installer needs to he can talk to me direct, should that be helpful.
�
Can you provide information and guidance on:
• Components supptied - All CO2 hardware, alarm panel, alarm devices
• Required manifolds— No manifoid, single cylinder
• Nazzies—easy adapt nozzles? Now many- Nozzles will include a f{ange mounting plate, two nozzles
• Is system full and pressurized -Cylinder 75 lb. shipped fulf
• How big are cyfinders—See attached cut sheets
• Mounting frames supplied for bottles? - Mounting bracket wili be a cyiinder strap
• Explain controls for heat detector and a(arm —Fire Control Panei will come pre-programmed, two heat detectors
on one circuit. Manual pull station on separate circuit, key disconnect located at panei, Horn/Strobe, stop valve
with supervisory circuit, Qischarge head plus a supervisory circuit separafe.
. What is needed for installation? Pipe '/2" schedule 40 seamiess A-106 or A-53, fittings 300 pound maileable iron,
Galvanized if installed outside or in corrosive area. Conduit, wire, electricai fittings.
• Are you familiar with the size of the appiication? Yes, basically a 4'4" X 4"4" X 15' inciude collector barreil
I thitnk this cavers all the parts, but 1 �nay have,missed sometl�ing. Feet free to call..
8est Regards,
Clint
Clint A. Burleson
1
x
Bacon Equiprnent Co. '
2709 N. Beckley Ave.
Daflas, Texas 75208
214-742-5871
FX 214-741-5932
email: clint@baconfire.com
www.baconfire.com
� �
�
i
1
This message and any atfachments are so(ely for the use of the intended recipients. They may confain privileged and/or
confidential informafion or ofher information protected from disclosure. If you are not an infended recipient, you are hereby
notified that you received this email in error and that any review, dissemination, distribution or copying of this emaif and
any attachment is strictly prohibited. If you have received this email in error, please contact the sender and delete fhe
message and any atfachment from your system.
Thank you
�
'
2
, o
' i ,�
CO2 Component Description y �' I�idde Fire SyStei'1'15
75 Ib. and 100 Ib. Carbon Dioxide Cylinders A UTC Fire&Security Company
Effective: May 2010
K-81-1010
� TYPE "I"CYLINDER
j VALVE
�— � THREAD FOR
CONTROL � DISCHARGEHEAD
PORT � _.
SAFETY DISC
_� _ ASSEMBLY
� THREAD FOR
� PROTECTION CAP
\� CYLINDER
i I � �
A �
�/
y
�— SIPHON TUBE
i
B �
_ : ',
Pressure Ratinqs:
Service Pressure = 2300 psig NUMBER CYL�NDER �PE A ' a
Hydrostatic Test Pressure = 3834 psig
Nominal Pressure = 850 psig @70°F s�o2a� 75 LB. 6�.0 in. 9.25 in.
5/8 in.
870269 100 LB. 62.0 in. 10.50 in.
MATERIALS
CYLINDER: STEEL
VALVE: SEE K-81-1050 FOR 5/8 in.
SIPHON TUBE: Al.UMINUM ,
FOR ADDITIONAL DATA,
SEE K-81-1030 FOR P/N -SEE TABLE
This literature is provided forinformationai purposes only. KIDDE-FENWAL,INC.assumes Kldde Fire Systems
no responsibility for the producYs suitability for a particular application. The product must be A UTC Fire&Security Company
properiy applied to woric correctly. 400 Main 5treet
If you need more information on this product,or if you have a particular question,contact Ashland,MA 01721
KIDQE-FENWAL,INC.,Ashland,MA 01721. Telephone:(508)881•2000. Ph:508.881.2000
K-81-1010 Rev AC �O 2010 Kidde-Fenwal Inc. Printed i�USA Fax:508.881.8920
www.kiddefiresystems.com
AEGISTM 2.0 �-�=ri� Kidde
Conventional Fire Alarm-Suppression Control Unit � �
F� re Sys�e m s
Effective: January 2017
K-84-200
FEATURES
• Suppression Focused Confrol Unit • Built-in Class-A and Class-8 Circuitry
• Triple R Redundancy Provides Maximum Protection • Listed for use with Kidde,Fenwa!and Chemetron agent
Against Inadvertent Release re/ease devices including Control Heads and Initiators
• Agency Approvals • Sophisticafed Programmable NACs
• FM Approved to ANSI 864, 9th edition and NFPA 72 • lndependenfly Programmable Agenf Releasing Circuits
(2002J • Compacf Cabinef Design Supports Large Number of
• UL Listed to ANS!864, 9ih edition lnput and Outpuf Circuits
• California State Fire Marsha/ • 3 Defection Circuits
• City of New York Fire Departmenf • 2 Supervisory Circuits
• Lisfed for a Wide Range of Suppression Systems: • Option to Use SUP 1 as 4th Detection Circuit
• Kidde ECS HFC-227ea and FK-5-9-12 • 9 Manual Release Circuit
• Kidde ADS HFC-227ea and FK-5-1-12 • 1 Abort lnpuf Circuit(with 6 Abort Modes)
• Kidde HP CO2 • 3 Noti�cation Appliance Circuits
• Kidde IG Argonite&Nitrogen • 2 Re/ease Circuits
• Kidde FE-13 • 3 Programma6le and 1 Trouble Form-C Relays
• Fenwa!Spheres • 1 Auxiliary Power Output, 1 Amp
• Fenwal BDCs • 5.4 Amp Power Suppiy Unif
• Kidde INOT"'Dry Chemrcal8 WHDRT"" Wet Chemica! • 120/240 V, 50/60 Hz AC lnput
Systems • Easy-to-Use User Inferface and Display
• Sprinkler Supervisory Service • Flexible Configuration Options
• Deluge, Pre-Action, Foam, Foam-Water Systems • Password Profected
• Combination Clean Agent plus Pre-Acfion System • Digita!Release Co�ntdown
• Option with Doar Mounted A6orf and Manual Refease • Baftery 1/oltage and Charging Current Display
Swrtches Available • Charging Capacity of 68 AH
• Extensive Diagnosfics
• Backwards Compafible
DESCRIPT/ON
The Kidde AEGIST"" 2.0 is a Conventional Single Hazard - ! ,r,, � ��, � , "I'i °i''4 ' I
Agent Releasing Unit which provides configuration
flexibility in a compact footprint to protect life and assets in
commercial, high-tech and industria� appiications. The
AEGIS 2.0 control unit has a NEMA1 enciosure and an
option for door mounted Manual Release and Abort
switches ta avoid the additional expense of wall mounting
these items.
The AEG(S 2.0 is wefl equipped to handle aIl speciai
hazard extinguishing systems due to the high degree of
programming flexibility provided and the following fu!(
complement of input and output circuits:
• Three(3) Class A or Class B Defection Circuits
• Two(2)Class A or Class B Supervisory Circuits
• Option to Use SUP 1 as Fourth Defection Circuit
� One(1)Class A or Class B Ma�ua!Release Circuit
• One(1)C/ass A or C/ass 8 Aborf fnput Circuit
• Three(3)Class A or Class 8 Notifcation Appfiance Circuits � �
• Two(2J Ctass B Agent Retease Circuits
• Three(3) Programmab(e and t Trouble Form-C Relays
DETECTION CIRCUITS MANUAL RELEASE AND ABORT CIRCUITS
The Detection Circuits support Conventional 700 Series, Both the Manual Release and Abort Circuits accept
CPD-705x lonization Smoke, PSD-715x Photoelectric Normaliy Open contact closure type devices. Activation
Smoke and THD-705x Heat Detectors as well as of the Agent Release Circuits can either be
Normaily Open contact closure type devices. Two circuits instantaneous or delayed up to 30 seconds (maximum)
are dedicated to the main suppression function and can upon receipt of Manual Release input. Agent release can
be programmed to activate the release circuits by either be temporarily delayed by activating the Abort Circuit.
single-shot or cross-zone input. The user configuration The Abort input can be programmed for 6 modes of
allows automatic release via detection to be delayed from operation. These include the UL 10-second mode, the
0 to 60 seconds in 10-second intervals and also allows a full-delay mode, the IRI mode, two NYC modes, or the
choice of which of the two Agent Release Circuits to abort can be disabled.Aborts can also be programmed to
activate. be applicable for either one (ARC 1) or both Agent
The third Detection Circuit is programmable for either Release Circuits thereby allowing use with Deluge/Pre-
Waterflow or as an independent Detection circuit. When Action systems.
programmed for Waterflow, Notification Appliance NOTIFICATION APPLIANCE CIRCUITS (NACj
Circuits can be programmed as Non-Silenceable as The three Notification Appliance Circuits are rated 1.5
required by certain jurisdictions. Additionally, the Amps each and accept polarized 24 VDC Notification
Supervisory 1 circuit can be configured to be the fourth Appliances. Each circuit is driven independently and is
detection circuit.
user conFgurable for First Alarm, Pre-Release, and
SUPERVISORY CIRCUITS Releasing as well as for 60 BPM, 120 BPM, Temporal, or
The Supervisory Circuits accept Normally Open contact Continuous pattern.
closure type devices such as pressure switches on the The control unit supports appliances that provide the
agent cylinders or on the water or air pipe network. The option to use silenceable horns and non-silenceable
system configuration enables the supervisory input to be strobes on the same NAC. Multiple NAC circuits
a participant in the suppression function. For example, (connected to audible devices only)programmed with the
low air supervisory can be included with detection for same master code pattern are synchronized, regardless
release of pre-action systems as required by certain of any differing starting times that preceded their
jurisdictions. concurrent operation. The NACs configuration includes a
user-selectable intelligent synchronization feature which
allows a silenceable horn to be shut off while the strobe
continues to flash in synchronized fashion.
SUPERVISORY1f MANUAL WATERFLOW/
SUPERVISORY3 OETEGTOR! A@ORT RELEASE DEfECTOR] OETECTOR2
� � . . . .___ � _ . . .. . . �
a5.z�: �� a� ; `t �� e� �� ��
T87 T86 i O � T85 784 � TB� TB2
TROUBLE � � TBB �`—� , _
�� TB1 0 � DETECi0R1
RELAY3 � � Tgg
RELAYI ��ox Qr�wceo O�at«E �
a � rsia Q�<i�..�o �Kidde
ove� ,�,�,,, Fire Systems
RELAYI � � T811 Q+u�� Quun.�
��uu Q.uurc. �.a,ie� s s S
�rm.�.� Q�wr�airam�.p.v�iei Qarnusu
Ownix� Qw.wwm Q_vcr
BA7TOUT , � TBt2 QuuRi �.nn.re��dnain� Qrt>�e.umr –
Qu.� �a++nc Qxtiirvi �.cum
Qun Ox Qiuc �airow�m� "' .
� �
AC SUPPLY SELECT SWITCH(S6)
c� TBt9 0 = NAC 1
ACIN rE� 2O T814 T615 TB16 T817 T01B � ^ NAG2
tio �� �� �� ��
�T811 � � �. x.i- �
RELEASE 1 RELEASE 2 AUX NAC 3
ARC 1 ARC 2 24 V�C
Figure 1. Printed Circuit Board (PCB)
- 2 -
BUILT-IN CLASS A AND B CIRCUITRY POWER-LIMITED CIRCUITRY
For the input and NAC circuits, the choice of Class A or All circuits are inherently power-limited. ARCs can be
Class B supervision is made at site on the board itself by configured for power-limited or non-power-fimited
selecting the terminals used for wiring. Neither operation. One in-line releasing device is required for
conversion boards nor additional hardware nor jumper each solenoid on a power limited ARC. In-line releasing
selection is required for this purpose. devices are not inciuded with the panel; the appropriate
number of in-iine releasing devices shoufd be ordered
AGENT RELEASING CIRCUlTS (ARC) using part number 06-220023-001.
The two circuits can be programmed for activation by ROBUST POWER SUPPLY UNIT (PSU)
different inputs, with independent time delays and abort
modes to fire combinations of two of the following The AEGIS 2.0 features a universal 120/240 V, 50/60 Hz
releasing devices: AC Power Supply Unit with a robust 5.4 Amps of 24 VDC
• 1 or 2 Kidde Continuous and Momentary Solenoid PoWer. fnput voltage selection is via a sfider switch with
Control Heads no jumper cutting required. The on-board battery charger
is able to charge 24 VDC (2 x 12) batteries of capacity up
• 1 Kidde Actuator or Fenwal fnitiator to 68 AH thereby allowing from 24 hours of supervision
• 1 Factory Mutuaf Group A, B, D, E, F, G, I, J, or K plus 5 minutes of alarm to 90 hours of supervision plus 10
Solenoid minutes of alarm required by some jurisdictions.
In other words, operating in tandem, the two circuits can AUXILIARY POWER SUPPLY
release: Up to 1 Amp of auxifiary power at 24 VDC is available to
• 1 or 2 Control Heads on ARC 1 and 1 or 2 Control power external 4-wire devices such as Flame Detectors,
Heads on ARC 2 AlarmLine modules, Duct Detectors, etc. The auxiliary
• 1 or 2 Control Heads on ARC 1 and 1 Actuator/ power output is resettable.
Initiator on ARC 2 or vice-versa ELEGANT USER INTERFACE
� 1 or 2 Controf Heads on ARC 1 and 1 FM Sprinkfer
Solenoid on ARC 2 or vice-versa The user interface consists of an array of LED indicators,
• 1 Actuator/Initiator on ARC 1 and 1 Actuator/initiator Control Switches, a Digitai Display, and Buzzer. Over and
on ARC 2 above the System, Power Supply status, Input circuit Fire
� 1 FM Solenoid on ARC 1 and 1 FM Solenoid on and Trouble and Output circuit Trouble LEDs, the AEGIS
ARC 2 2.0 annunciates its suppression state-of-alarm via three
additional Pre-Release, Re(easing and Post Release
This configurability is useful for those jurisdictions where LEDs. Four switches are provided, one each for
the gaseous suppression agent is required to be Acknowledge, Signal Silence, System Reset and Output
supplemented with a pre-action system. Disable. The 3-digit display provides a countdown of
TRIPLE-R PROTECTION FOR ARCS impending agent release. On command from the user
The two ARCs feature a triple failure redundancy interface switches, it also indicates the bat�ery open
safieguard system to protect them from inadvertent circuit voltage and charging current.
activation by the main microprocessor. The Trip(e-R SIMPLE SITE-SPECIFIC CONFIGURATION
system requires that in order to activate an ARC, the Setting the site-specific configuration is easily done using
main microprocessor issues two release commands of the digital dispiay and user interface buttons. To prevent
oppasing polarity via separate channels and that these unauthorized use, the configuration menu is protected by
commands be combined with a third signal from the panel a user-changeable password. Factory technicai support
watchdog timer to confirm the micraprocessor operation. can provide assistance with lost or for otten asswords.
The Triple-R system ensures that electrical transients or
9 P
disturbances such as power surges that could interfere Apart from the input voltage selection performed on both
with the operation of the main microprocessor will not the PSU and main board via a slider switch, no other on-
inadvertently activate the connecfed suppression system. board settings or jumper cuttings are required.
The result is a more robust and reliable suppression- EXTENSIVE DIAGNOSTICS
focused panel. Also initiated via the digital display and user interface
PROGRAMMABLE RELAYS switches, the troubleshooting function displays diegnostic
Of the 4 relays,three are user-programmable for a variety codes that assist in determining causes of trouble. A
of alarm related conditions and the fourth is a dedicated complete list of diagnostic codes and their meaning ships
trouble relay. All relay contacts are rated 3.0 Amps at 30 factory installed on the inside of the enclosure door for
VDC/120 VAC (resistive). easy reference.
-3 -
. .
BACKWARDS COMPATIBILITY TECHNICAL SPECIFICATIONS (cont'd)
The AEGIS 2.0 is backwards compatible and listed for • One (1) Abort Circuit
use with a full range of conventional detectors and alarm -Compatible with normally open contact-closure type
devices as well as suppression accessories from Kidde, devices
Fenwal and Chemetron. Going forward, this will allow - Configurable as Class A/Style D or Class B/Style B
legacy panels to be replaced with relative ease. - Supervised for ground faults and open circuits
EASY TO INSTALL CABINET -Six (6)Abort Modes available
The cabinet design allows for easy installation by fitting - Po�er-limited
between the studs of a standard 16 inch studded wall. It • Two (2) Supervisary Circuits
is large enough to house two 12 VDC, 12 AH Batteries -Compatible with normally open contact-closure type
and provides up to 2 inches (51 mm) of wiring and finger devices
space between the circuit board and the cabinet wall. - Configurable as Class A/Style D or Class B/Style B
An optional door design features a Manual Release and -Option to use SUP 1 as 4th detection circuit
Abort switch for applications with space constraints. Both - Supervised for ground faults and open circuits
switches incorporate guards that prevent their - Power-limited
inadvertent activation. • Three (3) Notification Appliance Circuits (NACs)
TECHNICAL SPECIFICATIONS -Compatible with polarized 24 VDC Audio-Visual
devices
• Hazards Protected -Rated at 1.5 Amps each
-One -Up to 35 synchronized appliances
• Power Supply -Configurable as Class A/Style Z or Class B/Style Y
- 120/240 V, 50/60 Hz(90 to 264 Vrms, 47 to 63 Hz) - Supervised for ground faults, shorts, and open
AC Main Input circuits
-5.4 Amps at 27 VDC Output -Power-limited
- Battery capacity up to 68 AH @ 24 VDC -Common NAClARC output disconnect switch
-Auxiliary power output rated at 1 Amp at 18.8-27.6 • Two (2} Agent Release Circuits
VDC (resettable) -Each compatibie with 1 or 2 controi heads, or 1
• Three (3) or Four(4)Detection Circuits actuator/initiator, or 1 FM sprinkler solenoid
-Compatible with 700 Series, CPD-705x, PSD-715x, -Circuits electricaily capable of simultaneous(y
and THD-705x detectors as weli as Normally Open releasing any combination of two of the above
contact closure type devices. Refer to documents devices
K-70-100 and F-70-63 for details on compatibility -Factory configured as Class B/Style Y
and the maximum number of devices supported. -Supervised for ground faults and open circuits
- Configurable as Class A/Style D or Class B/Style B -Default setting: Power-Limited. Each solenoid on a
- Supervised for ground faults and open circuits power-limited ARC requires the use of an in-line
- Power limited re►easing device, P/N 06-220023-001 (order
- DET 1 and DET 2 used for suppression separately, not included with panef).
- DET3/WF configurable for detection or waterflow -Common NAC/ARC output disconnect switch
- Option to use SUP 1 circuit as DET 4 circuit • Four(4) Retays
• One (1) Manual Release Circuit - 3 independently programmable, normally de-
-Compatible with normally open contact-closure type energized Form-C Relays
devices - 1 dedicated normafly energized Form-C Trouble
-Configurable as C(ass A/Style D or Class B/Style B Relay
- Supervised for ground faults and open circuits - Relay contacts rated 3 Amps at 30 VDC/120 VAC
- Power limited (resistive)
- 4 -
r .
TECHNICAL SPECIFICATIONS (cont'd) ORDERING INFORMATION
• Enclosure
- NEMA 1 rated 18 gauge sheet steel with door Description Part Number
- Red color
- Suitable for wall and surface mounting Kidde AEGIS 2.0 Control Unit 84-732001-901
- Optional Trim Ring Kidde AEG15 2.0 Control Unit with 84-732001-902
- Optional door with Manual Release and Abort Switches
switches
-Optional Dead Front Plate ln-Line Refeasing Device 06-220023-001
- Dimensions:
- with Standard Door: Dead Front Plate 06-220175-001
14-1/4 in. W x 5 in. D x 19 in. H EOL Resistars(10 pk) 06-220184-001
(362 mm x 127 mm x 483 mm)
- with Switch Door: Trim Ring 76-600000-007
14-1/4 in. W x 6 in. D x 19 in. H Large Capacity Battery Enclosure 76-100010-001
(362 mm x 152 mm x 483 mm)
• Environmental Criteria lnstallation/Configuratian Kit 06-220148-902
- Indoor/Dry use only Repiacement Hardware instaliation Kit 06-220149-001
- Operating temperature range: 32°F to 120°F
(0°C to 49°C) Replacement Enclosure Assembly 06-220172-902
- Humidity: 93 ± 2% RH at 90 ± 3°F (32±2°C) Replacement Enclosure Assembly 06-220174-9Q2
• Packaging/Shipping (with 5witches)
- Enclosure, PCB, and P5U packaged in individual Repiacement Door Switches Kit 06-220176-001
cartons. Field assembly is required.
-Accessories shipped include mounting hardware, Replacement PCB Assembiy 06-220150-901
battery leads, IOM manual on CD-ROM, operating Replacement Power Supply 06-118394-002
instruction sheet, and EOL resistor kit.
- Order in-line releasing device (required for power- Replacement Bezel Assembly 06-220151-001
limited ARCs} and batteries separatefy. Spare Key 06-118013-001
Spare Keylock with Keys 06-129924-001
I � II �' I I .
�
��
, �
- 5 -
�
'.� ,:
EXPORT INFORMATION(USA):Jurisdiction: EAR, US ECCN: EAR99
This document contains technical data subject to the EAR. For detailed installation,operation,and configuration information,refer
to the Kidde AEGIS 2.0 Convenkional Fire Alarm-Suppression Control
AEGIS is a trademark of Kidde-Fenwal,Inc. Unit Installation,Operation,and Maintenance Manual
All other trademarks are the properties of their respective owners. P/N 06-237463-001.
This literature is provided for infortnational purposes only.KIDDE-FENWAL,INC.believes this data to be accurate, ��� �
but it is pubiished and presented without any guarantee ar warranty whatsoever.KIDDE-FENWAL,INC,assumes no o Kidde
responsibility for the producYs suitability for a particular appiication.The product must be properly appiied to work F i re System s
correctly.If you need more information on this product,or if you have a particular problem or question,contact
KIDDE-FENWAL,INC.,Ashland,MA 01721 USA.Telephone:(50B)881-2000. 400 Main Street
Ashland,MA 01721 USA
Tel:508.881.2000
K-84-200 Rev AC O 2017 Kidde-Fenwal Inc. www.kiddefiresystems,com
� �
� �N�
-� li�issouri Departrnent of dnr.mo.gov
'�.. NATIJ RAL RES U �CES
Michael L. Parson, Governor Carol 5. Comer, Director
July 5, 2018
Ms. Casey Brunke, P.E., City Engineer
City of Cape Girardeau
401 Independence Street
Cape Girardeau, MO 63703
RE: C295531-01 /C295531-02 / C295331-03 City of Cape Girardeau, Missouri
Wastewater Treatment Plant Upgrades, CP0001299, Change Order No. 16
Dear Ms. Brunke:
The Missouri Department of Natural Resources' Water Protection Program has approved the
enclosed Change Order No. 16 for your contract with KCI Construction Company, Inc. for the
Wastewater Treatment Plant Upgrades to serve the City of Cape Girardeau, Missouri. The
project receives funding through the Clean Water State Revolving Fund Loan program. This
change order has been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in
contract price and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This
change order modifies the plans and specifications approved on June 5, 2012. It increases the
eligible cost of construction by $398,108, and changes the Contract Time-Ready for Final
Payment from October 18, 2016 to December 31, 2018.
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited
after project closeout.
Financial assistance on this project is limited to the amount of the loan and cannot be increased.
This change order is for your official project records and should be maintained on file for a
minimum of four years following the completion of disbursement.
.�
�r
Recycled paper
�.��
UJ"
�� ��n�'
Re�fecker, Cindy
From: Brunke, Casey L.
Sent: Wednesday, December 04, 2019 1:48 PM
To: Redecker, Cindy; Mathai, PK
Subject: FW:Change Order 17
Good Afternoon!
I spoke with Joe with MDNR this morning. Please see below. I think we're good to proceed with processing CO
#17. Thank you!
Thank you,
Casey Brunke, P.E.
Assistant Public Works Director
City of Cape Girardeau
Phone: (573) 339-6351
From: Blume, Conrad [mailto:conrad.blume@dnr.ma.gov]
Sent: Wednesday, December 4, 2019 1:45 PM
To: Brunke, Casey L.
Subject: Change Order 17
Casey,
The loan SRF Loan for Project No C295531-01 has been closed out.Since this change order did not included any technical
changes to the project and the loan is closed no approval from the Missouri Department of Natural Resources is
required. I also talked to Todd and he provided adequate information on the spare parts. If the City wishes to use the
credit towards the existing loan it is recommended to use it to on the regular required repayments rather than doing a
separate repayment.
Conrad (Joe) Blume, P.E.
C�le;<�r�1�'ater f:?iigine;ei�i���t.Juit C'hief�
I'inancicil.-lssistanci;Cent�r
1
Change Order
No. 17 (Final)
Date of Issuance: November 13, 2019 Effective Date: November 13, 2019
P�o�e�t: Wastewater Treatment Facility oW�e� City of Cape Girardeau Owner'sContractNo: 3rJ34
co�c�a�t: Wastewater Treatment Facility(SRF Project No. C295531-01) �ate of co�t�act: August 3, 2012
co�t�a�to�: KCI Construction Company, I11C. Engineer's Project No.: C5XC51 O1
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Project Completion and Credits
See attached list
Attachments: See supporting documents attached.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days . Calendar days
Substantial completion(days or date): July 20, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase]from previously approved Change Orders [Increase]from previously approved Change Orders
No. 1 to No. 16 No. 1 to No. 16
Substantial completion(days or date): MarCh 31, 2015
$6,658,161.98 Ready for final payment(days or date): OCtObBt' 18, 2016
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): MafCh 31, 2015
$62,332,161.98 Ready for final payment(days or date): OCtObef 18, 2016
[Decrease]of this Change Order: [Increase]of this Change Order:
�(�� ,°�}�;,'j(�j �',� Substantial completion(days or date): MBrCh 31, 2015
__.($��,����---- Ready for final payment(days or date): DeCembe�31, 2018
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): Ma�Ch 31, 2015
$62,265,217.22 Ready for final payment(days or date): DeCembef 31, 2018
RECOMMENDED: ACCEPTED: ACCEPTED:
�
By: .�/G,q���A�-o,� BY: ` e By:��- Yc��
Engineer(Authorized Signature) Owner Authorized Signature) Contractor(Authorized Signature)
Date: ,��'�,3 �2�� Date: �� � ���� 1 Date: �� �4
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of l
Prepared b��the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
WASTEWATER TREATMENT FACILITY
CAPE GIRARDEAU, MO
Change Order No. 17 (FINAL)—Project Completion and Credits
The Contract Documents are modified as listed below:
1. Pay Application Item 345
Credit for Spare Parts (Note 1) ($42,391.82)
2. Pay Application Item 346
Reduction of CO 15—Contingency per CP 133 (Note 2) ($,4,552.94)
3. Pay Application Item 347
Reduction of CO 16—Contingency per CP 137 (Note 2) ($20,000.00)
Total Credit,This Change Order(Total 1 through 3) ($66,944.76)
Notes:
1. Credit for Spare Parts is the price of spare parts that were not delivered to the City and agreed to by
the Contractor. See attached spreadsheet of Credit for Spare Parts—Cost Estimate.
2. Final Pay Application, and coversheets of CP 133 and CP 137 from CO#15 & 16, respectively are
attached.
8 $ � 888888 8 8 8 888888a8888 8 8 8 8 $ 8 8 88 � 8 8 8 is 88 8 8 � 0 888 � S
8 � 8 �8 w 8 8 �8 � �8� � 8 8 8 $ 8 8
8 8 8 8 8 8 8 8. 8 8 8 8 8 0 8 8 8 8 $ 8 8 8 8 8 8 0 8 8 8 $ 8 8 is 8 8 8 8
8 8 8 8 8 8 8 S � 8
aa
a E
3
_ E ; _
a" ' Q 3
- �
e o 3 0
_ 3 _ _ � _
x '
e � 3 L q o E _ c a"
_ z .E E _ ; 3 - i ?.. _
; _ 3 - - - _
- w N
3 - `; _ _ ' `�n _ ' _ _
3 _ _ E _ _ - - _ _ '
' - _ _ - a$ o - � �6 a e ' 3 3 � ' _ - _ o
E L E 3 _ E _ _ E N o Z n o � C _ E - _
R3 E - _ - - - o �o N i z ; E E _ _
E E ` m _ _ _ ' E � i.m;.V = _ 'E r o „ L E - - c
8 '� - S _ c$ - _ - _ - � _ � 9 � E _
O _ E E E E - E m _ _ _ E _- `i E� P;�c `o��a _ - � - c '3
u � v�oi _ E _ _ a� i ' _ ' - _\ @i'a a o �••_ E n �o - _g E
� E E - - - - _ E Y - � ' 3 ��� _ = E a
y - E"' o �O - - _ _ ' - g - `a� - 3 - _ _ - - _
P d° -9 `a : e p � };�c _
6 = _ ^�g - - _ _ - _ _ _ ? 3 n a v - - a E - -
'� _ - a _ 0 - _ _ ' om ' _ g J '_^g �
� _ _ n o O _ E E _ _ ' -�E �E� - _ q o y _ - _ _
_ - E _ = V - �„3�� _ m�s a o
� - � o � - - ' 'eD - o fW - E a' _ � E
V - 3 E - - - - - 3 t 3 m_ _ - 3 A N� p f _= _
3 9 _ _ o - 9 _ m$ _ _ _ _ _ _ _ _
o E v � - _ _ _ _ _6 ,n �% � ` _ �m _ „ _ _ _� �
- � 3 " i - E y _` � m c- E LL n;a 3 0 �L ,E,V ,_ ° _ E q
E _ _ ' O 3 _ � _ _ = E E,'� oc _ '=SLL_ _ - M Em �
�a" ' �a m _ - �a a
E E E E E E E E
� � � g � � _ _ � _ ' _ � _ _ _ _ o _ _ _ _ _ _ _ _ _
`u � � `a � � � � � � E ° � � � � � � E � �
� � � � � � � �
E e
>
E
E
- E
W - ¢ -
o E � � $ _
a _ 3 `� _
_ _ _ E
E 3 = - = Q Q ° ° D � 3 3 L _
z` i� o E _ � _ - .o o E 3 ; a � 3 � - '
eE
E ; 8 8 3 g � g
8 � 8 8 8 S S 8 0 8 � 8 8 � 8 � 8 8 $
8
8 3 8 8 8 8 S 8 8 8 8 8 8 8 8 8 0 8 $
�
aR
�
� o 0
O�u
� E a �
E Z ~
Q ? �
- - 'a
_ _ 3 _
. � e - E �
- E _ - o - �E
_ o E` c
_ _ _ - _ E._
E A c� � a -
E - q � � - E E L _ E E �
_ - o _ E� = E
p " m g _ � " a o o � = _ N E �-
U o. - - �
v - - r O ^ q E 3�- 1 E�a � E
a o - 3 r c - ry ` _y �3 L n r
aai , ; E _ '�V_ '3 v _ = 3 E � 3
A - c _ - � ° _ - -
N - m Q o - c �r - � _ -
w ; _ -_ ` - c � - _ 3 E 3 E
;O .` - _ _ O .. _ _ _ _ _
� t� _ _ - E - - - _
V - - _ _ _ 3 ____________
- a - - E E E - 3.� E ¢D 9 - d O o o O O O o r o O O G
E - � a _ � "
n a n?6
� � � � E � �
E
>°
E
_ � E `
E - E
G
_ � . _
E _ _ E _ _
E o _ _
8 8 8
� �
� ,
� � � �•, ���i�
�
O N N N N �� V
O N N N � ^ �� � N
o�n � � �
O N N N N O �
N �
O (np.NN N N 1�1� 7s
N � �
� � tn Ip N N � � J VJ
w U in co � � Ci
� WZ �a �''v R r�
Z � N
o Z � o � p
7� Z O p CU
o O W U � d L , .
� N I i xI �,�,,� �, ��, �,�,� o � '� r � —
~ � x�x� � N � T� �` U) LL '_ V
m U N
� N o , � � co � i w �,� � � N
C � V J � 0 N E � � � 4- �
m m � � � � N >.�n�° I Q z � � </j �
m � C � a �p C'� � �k
� � rn N w : a + a p'c LO � � �
a z N c . . :N j ' � N �U :6) �V �l- �� X .�
LL � o . r ; � c N �. � O o!1J c�
'V . . ' ' Z � � IL a� � _..t Q� -� � tA
V � C . . . Q : y Q � : @ H U-�p � � T e�,( :� 'y �(�
V . . . � (7 C Q' : �L„ d W f0 3 t C � �-' (17 S,.
c ' p : � � Q � p � U � -� N � z
:+ � � :W O c Z U F- : o ,OZ cca U � � ��
-a�i ; � W Q m U W U : m � a�i � ` C)
n � . � O m :Z � ,`o_ K � : � � r� � T
O r 3 � �'�-m n? uDi��Uo' j '^ NO � '� a aU � G E
z 0 N N�� Z `� + �F LL a�a � � ' � � c
O m c�a � �� ~ ��S tO �c �m i m ai m 3 ----_._..._.-------�
Q O � � Q 10� W O y O C J C U C W Z J N� ��O O : C � N O
� y � R' L F-_ (n � J fn J �� . � } S
J � Z T V Z T� J Y a Q N W N�F-}LL tn � � � a' ' � 01 C w
a K O m m O�rn a E mZ �OZ¢O d o yq : E � o
a a U a � U mF � pW �' c� �> WdF- M " yF. � m \ m
p N J �U O-Q V I '�9 W ��rL Z V C O� �a Z W 'C V C L Of
¢ �¢ U �Z o � d �a>WZ 3) '�f u. o N v �
R °�' f.��7 V� Q � ao I mFvtNifa�g v � oF � � m E c
o c o pZ� ��?� �� F�-� � Um a�i� EZ r n� � cm
�O � '-w xw o
Da v� Z � w �, Ti u
� � � o c�i Z`oug � �� U ..L°�
47 � Y �Q C (D 1� 6�m � N �p U J O (0 C:) N C.•�.f.,
`O Q �+ . � N(`') d' ln «6 j � T d rL �Z T L O G
� o o a o cncnZ�: Q aw mHU a
d � O � Q U
m d U � p
LL p a Z m �
� � � � ~ N
�O d� 47 0 Z �
N U� V Q o � rn
(� r � N N
� L � � � N N �
r �'
F_ U w Z U `� � u�°'i � � ,L�., � m@
Z w Z � °' � m -°
W o � W � �o �� � 3 � Y N c �
r2 � � � 3 � � L � N y d m
} d w Q m n' ° � m �{U m Z o 3 �� �
O m Y L N 3 � W (p �
a °' � fn M O � � N T � N O N 0 ,
� �= A ''E E n �' � °� '��° o -._.
� o amm d Q ou� ocW �
� Q Q o o�a � m � � 3 o LL a
� o a . w � o
� � W � O r N V Y.. O � ~ � W
Z �:_�
� . �
cR � � Z O OW N � F- 2'
a O Q N y na�i� v na. �L � Zv ; � F�-
a �
(� � wo E- ,�, a4 �� _ O L1J mC9 m �� Z
� w � T Q yY oN � U �„� � w o� Q �
�l. � � �p � � � F Q «
❑ � O a V $ >.� 0 3 p c « `° c� Y � q!
� U � S �
W �Z � U � M a � ma�`� oaO � I Il. c'� o c � c � -oa
p '- . m Q
vWoo o� � a ; wo;3a � t= � � �xE � �
o- Z � um0 � Q ° � " �Y y � � a�o � � ..
� Ua � ` '°'`g Y v� d °o � od p (JJ `� m°'� n � '
Z LLOC� � � N � � Q .� a p� �3� � U (� o � o « � W �
a � ? a U � � wa � � � � � �� m � �° � U y � Y o� ¢f'` w
Z UcU Y � N V O � oOQL� ~ � o a� �� � Y � L a@i�Z'� LL _L'm
� � V � a�O o � � U v a �� E � � Ll� 3 rn t Q� � � L
~ p w f0 �~ � c� m o ��O p W °� � � w o � �'
Q .. � � � d � N a oi m c U n 3 I- c c Q ^ � V: u
V � ~ �E� � � � c � � .� � U Z D a� � � �I �c
w U {- w p �o c a� �'� cca m � (? E �' � w-�.
J Z � Z c9m > > a� r c � d�� c �- 88o �V Z d
a � � F z �o oa v � € aa � � Z .. . Z m d � :o d 3
O 2 Q ¢ m > E y L � E'�a N a� � W c a � c t�„ O '�
Q O � � V UUo. QZ Z t- � � ayL U m
LL U
SS888o � 8oSo88S88, 8 $ 888 � 888 � $ $8SS $ � 888$S8So88888888S8SSSS8S
o s s � � s � � � � g $ � � � �� � �� sg�o�88�.���� s�s
� s � s8g�� � � � � � � o � �� ��.a�� a� � ����� . ���� � � �� �� � ���� ���
.� � �� �;�m d a � �
z ' �^
rri m o rv m o� rv ni o d m ni m rv �i N N ti m 'i `r �"r°� °° � a o `i °�M r+� a M
�'
�
Vf V�VI VI N N Vf N N U1 N VI'1?YT V�N VY Vf N Lf Vf N Vf N U/N i/�Ul N N UI N VI N N V1 Vf N VI VI�A N Vl VI vl VI V1�/f t/1 V1 N�/1 VI�A N�A V1
F d �
x �' E '
� V �
�
U!VI N N N�/I N N N N N V/N VI N N V�Vl U�N 1A N N�W��N�'�N��N N�/1 5/1'/�N N�/1�/I N N N N VI VY�A+/�N VI 4�N�/f V1 N
va� � � ���� � � � � � � � � � � � � s� � �� ����� $���� ��� ���$������� � ���� �����
�s � � � � � .. � .. � � �
a 88P88008 $ 8oSo8SS $ 8o $ $ oo8S8 °000P8888o88,oSo8opSoo $ o8p�q88o � 8 � 8� i
� g $ o $ gQg g � gQQ P5� Q � � 9�i gn8 �og'.�y``� � `� 8�8v' �8o � �$ b'oga $�b'�c0000� � �
0000o t525 0 0 � 7 g os���7y�n�`�ol�ul�-!M`? �yoo-io ai q �coocco o �o+cvi c��d
_ �ENmm � `� m � � r�ir�i � gm m � `r� u°0i N � � m � a � .=� � m �"vo� o� n n �a�iJ� rv �°.a� m� m��na�nn� av^i �
,.� .w m '�
u �
V1 i/1 N 1/�1A UI V1 Vl N Vl V1 N VI N N V)N N Vf V�V�VI VI N VI N VI VI 1A LI VI V1 VI N N Vl�A VI YI N VI Vl Vf VI N N IA N VI N Vf VI N H N Vl Vf �
9� � � � i � � � � � i i i i i � 1 � � � � i i i � i � � � i � � i � � 1 � i � � � � i i � i i i � � i
x o o � � � � � � � �
1
~� � 1/Y�A N N V/N N N Vl N�A ul IA N N N Vl VI N U!N VI�A N N uf N N Lf V1 u1 uf Uf u�u�N N N t/�V1 N iA N vl N V1 N V�t/1 U1 V!Vf�A V�V/VI N j
�4 � �
'U �q
c y
—� UI N N V,N N�A N Y1 N LI l/�Yl N VI N VF IA Vf N Vf U�N V�Vl N VI N UI�A V/�VI V�Vl N N U�i/��A V1�A VI V�N Yf VI N V�VI N VI N�/1 N Uf VI�/1 ��I
1
i
� �
yq ,
o c
3 -
N N N V/VI tM1 Vl N N�A N IA 1?N V1 VI�A�//H Uf N N VI i/�L/N N V/1A VI N 1/�1A�A 1A+/l�R N V!L/N VI N N VI V/�Ih Vl V�N VI VI Vf VI�R Vf VI
$ S8S888 $ $ $ 8 $ $ 8 $ $ $ 88g $ � $ a $ N $ 8888g � $ � �8�,$o$8885$S $8�,$$$ og88�,SS
s Q � Q �, � B � � S � �� � �� ����d���oo080�� 0� 0��
y`oTav $888 $$�uqSU� � � 25oowg�n25r{m �v�.Y �o �cc.-id `•" o c c o �o+ N�ric c�d
n3� �nm m �'AM � 2r�in �g m��i+ �"���^o�, $ �m � a� ,1D-� "�N�'�'�' ao ;�°.am '� ^rl`$"��va� `NS�a�gm$m ��na�^N�' �m,iJn
w 3 �� in
�a—
N t/�Vf V1 VI V�tR VI N VY N N V�V�Vf Ih N N YI VI N UV VY N N N Vl VY N N VI Vl VI VI N Vf U�Uf Vf N VI N VI N Vf Ul N V�N 1I�Vf VI N 1R t?+A N
a8a, S88 � SSQ8QSQ8gSg85� 8Q4g $ $ oSSQ8 $ $$ $ 88Sa8$8Q8888Sg8$S$oQ8o8$�QasSQoSSQS8QoQ8Q�8SQ
o d o � o g � 8 25 25 25 25 25 L` 25 � �� F�' 25 `r��g�.��,�� �•`�`?25 P� � a `� O O Z3 u���S Y S o b 25 g S t5 S� � S
888 � Soo �„ � � ����G� ��
� y o o✓� � `a m � $ N r�i e g m m r� `r� m o � �.m � o � .�i � � � a a�a�i � rv� o � ��H 00 m �i$�i rn a p o vi o
N M
O d
�' N
N VI N N�A N N 41 N N N N V1 N N 1/�V�N N VI�/1 V/�h N N N N N N 1A N V1 U/N�N N VI Vf N U1�/1 N Vf V1 N Vl�A�A N V1 N LI N VF(/,N N '
L
�
aO
O
.0
� `
� f
� C !
Z G f
� U u t
� O j
�
1
� �
" E i
O �
S = = N �
y Q N VI N V1 � �/1 VI YI N W W E E�5�W O l0 �D �O�D l0 N t0 �!1 1!1� C q N � E �'� ' � �
Q �g 3� � � a a v � v � � � � 3 � � �� ��n�' ._ �' �' � � J m E � d o d � v
c c c c c c c c c c c ,5 c c e � N N irv iv irv � �' ' d o. o� a a a � 3$ a a a E� � �' � w�
� v a a a a a ^b
� ° xsxx x xxx xz x x x xx �n v+ � g ��t W wEE ��s �srcda �r'- cda �� � �� �.`°i� � o v
� � � � � � � `e � � � � � � f � 'u� v� �i `a �n v� �n'v� �✓i w w w w u+
Z
0
� m y�
a '�
� .a rv ma �n �n raomo .� .r+-� � � ',� ..1Di .�i °� � r�v '� e7. "r�rvr`� Nr�iN°�Immm m �immmr°�' m �aaa�v`� a� o9iv�ivNiG^i�iinutOiL`i
� Q � d
z
S
(
888 $�� 8SS888� gS8o$S$88888 $$8,g $� gg$88$ �8S$ �g$�88o� 8oSSo � o� g8
_ry y ��s��o�p�$�p�y��y� ������p�8� gN���� � � �o � os��� 8����ry�o���y��ry $g��� 8� o�
�?V V� M l�W � N M rl '1 m � .-1 l0 r�1 ei M N M ti N
p N CC Ili O O h N vl�/1 N W�O�N OO O N Vf f� O H r1 l0 N 1� VI O O O rl -1� r H 00 lI1 vf d��O �O
�y rl N
��
H
N Vl N VI N V�V/�A�/1�A UI u1 N N 1/f 1A VI V1 VI N N V�U1 V!i/�N V!N N U1 Vf N VI N VI UI�A�A 1/�N V1�?V!N N Ul U�N 4i Vf VI Vl i/1 N N N N V�N
O
r y v
a �
u � u j
�
1A VI Vl 1/�Vf N N VY N N Vi N N UI N N V1 tA�//UI Uf N t/�41 V!VI V�Uf vl N N V1 N V1 V!N N V1 Ih V�Vl 1/��A VI N V!V)N N�/f N+/�Vf N il/N N V1 N
� d�����$� � ��� � � ����� ���� �,.,�������� ����������� ����� ���� � ����� �
� o�
�a� �� ., � � � � � � � � � ., I
do " ,
a �
Sg$o$ So8go8b', 000, 8Soo8888000g000SBo$ o8o8000S8o888o� ooS000lo088 �
vo$�os� ���,�� g �.g� o�sgl$ s�og�oo��� � �sgo� � ���g���ss�����$����5$� �
p oo d o� oo $ "aS��,'�go89in�'��.�"��n�o�+ oo� o�n o0
- o Ea a� mm��8 S � ��� ��BS na �� �� ,., ,-� .,m NN
V „ N � � � � I
N N N�N N N N N N N�/1�A�N t/�N V l V 1 N N V 1 V 1�H N������N V 1 N N N V I�H N N 1/��A 1 A�A h����N N V 1 N N V I V 1 N
� ` � i � � i i i i � i � � i � i i i � � i i i � � i � i i � � i � i � � i � i � � � i i � i i � � 'i
� i i i i � � � � i ' 1
�Z S O �
N VI VI N Vl U1 VI V1 Vf N N V1 N VI V�N�A N V1 V�V�VI�A N N N V�N N V�lR VI UY N Vf N VI 1A N N VI i/1 VI VI V�N N Vf VI YI N N Vf V1 a/�N Vl N VI N
�� a � � � � � � � � � � � � � � � � � � �
� �� _ ;
� L� ;
r V�V1 N N N N�n N�n V�VI�A V1�l N N�/!N VI IA V�ul u1 V1 VT Vf V/u1 Vf�n�n v�N V1 VI N V/V1 Vf Vf N N Vi VI V1 V/v1 N N V�N N vf vf v�uf U�N
r �
� Y
O C
3 -
Vf VI N U�N Vl VI�Ih VY N L1 L1 VI VF Vf Vf UI V!N VI N U�N N N N N N N�A Vf N 1A N N N Vf VI YI V�VI N V/VI VI V/VI N Vl UI V�1/�Vl 1Il N O O S S
So8$o$ oo888a88$$SS88� $ $$ S88o$gSga$ 8888o8$$, S $� $S888o$000 ,� . .
�so���s ��s � 8 �g��s��ss800s� � o���� s � �oo�ss�$� � � 80�o���� s� s�s�
o � Q � �� ��gs����$�����$�
o�� �� �Q aooag ��� �o ������s��a�ms�g��g� �$ � � �m .,
W 3 � ea � riAS� "•INm",-i ;Jmrv 'l � �n� 9i.�
v � � �N
a d-
N V'N N H N N N�/1 ln N N N N N N N�N N N N N V 1 H N N N V 1 N V 1 V 1 1/�N N 1/�N N N N Vr V 1 U1�/1 N M N'���N�N N�N Yl 1/�N
�S88a � 8 $$ $ 8 $5�888885$S888S $oo88$ o$ $8a$ $888oSS $$� 888SS8�8g8���Q
9 ������� �gos����,����s���o��g����� s� s�� ����� � sa � ����80���� ���
� ��� �m � g�$� �� � ���$$8�8��, �$��888��8��� ����88�g���^
a �- '° v .+N
U> ''
` N N N�A N N N N�N�N N 4)N V1 N N��������N N N IA M1//N�/1 V�N Vf V�N V1 N V1 N N N V1 N N�A✓?N N N N N V1 V1 N 1/�N Vl
�
pO
C
6
�
VI
Z 's
n
Q U N
2F b
Y
O
u
`' 1
$
F s o e� 8� �
t = p „ � ,, � I
� � � f�' ry
a � '� c � �, ���� c � �'S � Q�c.�a m w � 19 '� � o ,c;a � 'n o a �i �i 6 '3� � �� & � � c ,., �
� � � �- 3 � gg �
Q ry p � �o� � ' 6 � $ ° �' �" 0 3S1B83�m g � `e" goodx° u"� 's ' �xwwdf <B�4 � in3 f3so � �
= .j�y�[ 33 � 3 � x1° os�w +uSm �-3y�zy�Nwws� xy�sy�t� >? � �s � �� �������] � �� �
� � l7 W Im/1 Im/1 Vml N Vml vm1 Vml tm/1 U�1= �6 6 L 6 6�d 6 G�L 6��S S� 2 S 2 S S 2 S S i 2 2 2
� Q _ ._ _� �� � I
� '
O �
� m �'O_
� � �y��yy�.yy �y �y y��1 �
O t0 00 01 '1 N fIi t0 1� �-I N M JI 1� W OI � N �-1 �-1 '1 r1 r�i rl�1 f1 e�l M r-I rl �r-��ri I
a �u�i � C�oG' � �� �rn ��� n �'F'�•�^ nFn �.$ maao � � meo�$'S, mo� m�m `8�mo, oiSoo6^ � 'b'oo�S` I
. w ¢ °E' z I
� �
SS�$8888888oSS.88SS,88oS8S88888888SS888888o8S888o888S8 $ Soo888
_ � � �ggs���� og�oo�g����s� �$g �o�saa��� 8�g�s��ga�� s����g�,� ���a�
� _�d�� o a o � �N�d� ��'�H v N M d��n � �m m��rv � d v d� �N � ��m��ti ti N� o d m ��n d� ��
��
0
H
+A N N VI Vf Vf 1/�N iA VT N�//N V1 U!1/f VI UI VI�A UI N VI N N N 1A VI VI VI VI N N Vl N Vl LF N t/f N 1/1 VI UI VT VI L�N N Uf N UI N VI 1A Lf VI
O
F- y �
a
Y � s� �
�
N N�VI VI N VI V�i/��h 1IF VI VI N LI N VI N V�ll�N N N N N VI N N Vl VI t/�NI VY Vl N N H l/�Vf YI VI�/1 VI VI Vl N V1 N N VI�/!VI V1�/)�/1 V1 N V1 If�+A
�E��S�� ��$�����$�$�����$� $� �� �d�����$$���� ��������$ $ ��������5
ay
o �88S0008oSSo888888$ S8Soo88 $ oSogooS888SSo8SoSoS��$BoSo$$ So8
� ag�g�so� sss��� o�o� ��ss � ��o� sso ���a � gosso���aoosq000�gss� asg
000d odro,�oNdacoo dtioiS88�moo'"8 �� �
B= ���`A$ �8 ���u�io��9i�"��"�t �mg�9�� $�Quin rua a�8�n �n u' ^�' M " "� r' ,-„�+ .1 ^ i. q
� � ti :a
N r
t°- E
0
u
N N IA V1 V1 i//VI Vf a/�V�N Vf V1 N N t/�H N N VI VI N Vf N N VI Vl N N VI V�IA N V�UI 41 VI N i/1 VI N N N N VI V1 N N N IA Vf V�N V1 VI N N N N
$« � � i i � i � � i i � i � t � i � 1 i i i i � � i i � i i � i i � i � � � i i i � i i � � �
= OO� 1 � � � i i i i �
� N�A V�N N V1 N�A VI Vf V`N Uf VI VI Yf VI Vf VI VI N N 1A Vf N N N VY�/V t/F VI 1/l i/1 Ul N�l N lA N N i//�A 1A i/�N N N Vf N N N N�A�A VI V�Yf N V�
���� i � � � i i 1 � i i � � i � i � � i � i i i � i � i i � i � � � i i � i
� C
� � h
_�u�V/N N N tA�A N�A Vf t/1 VI N v��n u1 N L1 V�N Vf l/l ul�/r V��A�/1 VI VI VI N V)U�ul N VI N�/1 Vr N N iI1 tn uf N u1 VI v1 N Vf ul N�ul Vl VI U)ul VI
� � i � � i i � � i i I � � � i � i i � i � � � � � � i � � � i i � �
� �p
� >
O C
�
N v1 N Vl N N N v��n�n VI aM1 th N N N VI V!Vf�n u1 uf u1 VI+/�VI N M N Uf�n u�U�tI�Vr vV ul u1 N N U�N ul V�N u1 N N N N VI UI ur v1 V�u�N Uf N
oS8g888SSS88 $8008S`3,SS'o, SBSSoo88S88S88$ $BS�SQo88so8oQ�S88`bQ' o,000Q8p8
QgQ QQ gQsQ 5� QQ $o 0R og25 ��A8� S�ogoc�i,8o8i53'S
8p� �pS8oYgY25�oip5 �pYq�oy��p��'0v�,$25,opoYopb�2p5��gL',So� o�QaOccc�r1oNoy�cd o c o�np uiodry
W ? �� p� IA f� S�� � YOi 1�/1 Yf O O N 4�Ii� N V�N S 0] V1 1�N�S tfl N N �a V S � ✓1 N'i �It N e-I M �y ''1 rl S N S H rtl � �-1 I�O 1fi n ..1
q l�l IV P � �y
�i� C ~
a d�—
VI i/�N N N t/�N W H W�N���N Vf tl�VI Vf UI N N IR U�1/�VI�A N N V/LI N VI N Vf Vl VI V�i/1 UI N N l/�N V�VI N VI U�Vl�A N N N i/f N L�N
8$SS $$8 $88$$88 $$$888$$8$ 888$888888$$$$8$8aS8$ 888Q8SSSS� S888
, ����������s��s��� ������� �� �������s�s���go�� ss �s�o8����S�� �o
� d S�u�`�g� a va�n��n ^p ti mm �� �r � g g g� �
p o 0 0 O o N o o ufp vi v�O �N� p O C o p 0 C 0 o c o p m �n .1� �+ t�
3� O N V N M H f+O � O ul N N �� � O ut ut N 'i 1�1 ul(� tn � N .i h�-i
rl
p 9 q m r1
�>
N Y!Yl 1A VI N Vf Vt N 1?V�N VI N VI N�//N N VI N N N N VI VI V�VI N VI 1A N UI V�Uf N VI N N N 1A N V1�/f�/1 N N 1A N N VI VI�A V!Vf V�Yl U1 N
0
9O
'L'
1
�
N C
Z O
n
ZF V '�
Z
O
V
z a L � a L � �q � :Y w
F � � _ c z;, _ �e m a 3 a a a E � o �n .� Fi c $ ���
y � n f A ._ o .� c�" ,`o_u c �S f C af 2' o �� q�o,g �Sa m" ��n
tg E a �. 's �`S-e � � � � o " � e+ a°' a � « o . ',�u' '—� °�`Y�'g o $ = 2'= °1 � h �a
a ,`� � ic .� a '� c�s w � fl� " `� c n�i �' � �v 3 L^ � u�-
u �° � 'o f �'�SLL � � �F g000d � a�X a° � z � 000 �V'- aELL9
'¢ c in r � � �d3 'r$f 3� vawu�u'S 'rBs3 f �t`� '�
a c �w4� '��'4 � ���� � '���;� ��� c���'�'� ��'r �` 'F� �¢�`F� � c c c c c c c c c c c
F� = e 4 Q �4�vd ud va va� v� v� v�u�� E E�F E E E E E E E E E E E E E aE E E E
g g 0 0 0 `o g d
0. � = � � q 21 4 4 � c �d o o �' q b o o ;2 9 9 9 'O 9 9 C t 9'O 9 9 9 9 'O'O
� 7.�2�2� ?-�?.� .7� ?�m �.mmm 'mm;ommmmmmmm 'mi3eommic3333333333aa ¢ a a a ¢�aa aaa a a a ¢ aa�
a
� m °�G
� t� ry !� u� g y g q ?q � �nic �'o��c ��c� n n� �•n n
°g . .`� .'�� .� .� :7:�7.�:7 .� .7��:-1 "�"� ."� '!."�r ."� �7� �.`ti� N� r`ri� ,�-�� .�-�.'��".-� .h:7� ti .� r{ r� '+ .+ ti .� .�.� .y n N ti�.-�.� .+.i.1
' W 4 u Z
� _
, i
I
8 O Q o o O a p�N Q 9 p p p O O p O O p p O O p O O O I
O d O OO O O Nl�� l0 'V �� N P V rl ��1� O O N N O S m lO�O .
8088$ 88858$$888g� � 88 $88 $8$ F ��� ��� ,' a
� �s�$g�� �s$�go��� 8 �����g�88�8��5 „��e�� � ��oe � .,���m��$�,-�
p Il1 vi D VI N O�V1 ilt 'i V1 O�M M� O �l1 N N �-I M
K� �N O �r 1��O N O Vf �^-1 N ri N N �i O� �p ei �..
f�
��
F'
IA V/V�u1 u�V�U�v�VI V/�A Vf UI tn N V�U�N Vr VI Vf N N N VI Vf�n VI U1 In VI Vf N iA V�N iA v�u`v1 N Vf VI N N N N N v1�U�N Vl V/vF Vf UI�A N
I
O
1- a �
� a
Y = U;
m
VI N�//N N N N U�U1 J1 N Vf VI Uf N ih in Vl V�Yl N N N N N Ll N N Vf N V�N 1A VY VI N VI V�N V1 Vf V�V1 N N N VI Vf VF N�A YY�V�V�N VI VI N
d �������� ��$��������� �� ������ ����$����������$���������������
�_ 000 ,
au,� ti .i .� '+ .� .y H H .� .-� '+ .y.+ .+
S88a8F8SoS � o88$ 880 $ 8 $0oo8 � �ao� �o888oc888So8800coSS�,88q000d8800
v �-I m� n o 'c".� w g �'�°.�l
oo � 0000s � � � ��s�$as����3,���F�� m �� ns�o ��� a� o
v�g $��88 � 8g� ��o8g8o ooa anro .lti oe� r+ am�iL"i��� v�i��noo
NV1p u��i�rnm m m � � .�- ��n rv � ",a ti m
�— O O O O O O�I ry .1��l1 � O N V�I�N N O�M O�/1 Ji IVf � .
nogo� `{�' n�o � o�nn �
- o N '�
r E � ti �
u
N Vf t/�N VI N t/�N VI LI N N Vf VI N N+/1�A V1 UI V1 1/�N V/V1 VI UI VI N N N N V�Vf N V�N�A YI 1A tA Vf V�VI N N V1 N i/1 VI N Vl N N 4�VI N VI V�
= O�i� � i � � i i � � i i i � i i i i i i � i � i i � � � i � � � i � � � i r � i � � � � i .
N V1 N 1/��A N VI N VI N 1A N N N 1A�/1 N N N N N N UI VI N N VI V1 Vf VI N N LI U1 Vf N N N N Vr N V1 Vf N V�VI N N V!V1 Vf Vf N N Vf 1A V�V1 VI
V � I i i i � i i � � � i i � � � i � � � � � i � I
t� ' i � � � � � i � � i i i � 1 �
(� � (Q C
� G � uf N Uf�/f V�N N N Vf Uf VI Vf tn�/1 UI
C L
�N V�N N V/lA Vl N VI N N Vf V1 Ve N N t/�tA VI N�A VI N N VY t!�VI VI VI N</1 U!N N�/f VI Vr N N N iA IA VI
�u
LL � j
3 `
N N�/1 VI U1 VI N�/1 N u�N 1A N VI Vf VI VI VI V��R+/f VI V�tI1 Vl N N N VY V�u�Vr V�N N VY N N ul V�VI uf N�A VF N V/N�A�A�/!Vl N vf+A�A VI N N
a ic �n iJ�n m �o a ra �O1 m o`�o n n o�o d d �o vi $o�'w� `o�i N
o a o0 o ��g $$ $� � $$000
0 0
8$�8 $8$ d8$o$ 8Sa, 88 $8 $8 $8$ $$o88,S8S$SSBS$a$8 � � 8,� � � 8�",
Q Q5� goog$g��$,���000 �� ���g ����gg�a�m��.a�,��� �,� ,� � o �o �a � n��,�o
g � m��;�� ..�-
� 25 0 25 25 S�o d o 0 0 0 o m a g v�i N � ��i`.�uhi m M'eil � � `a e�n� i� 00 N'7'"�e a m .t e�n m o c a �r+o �
W ��v g��� n �m o in��n�`r���g �
�g �" �
c, a -
lM1 UI VI N Vl IA Vl N L1 N VI N N IA VI�A N VI VY VI N N N VI N i/�N 1/1 VI U/UI N Vf Uf V1�A N V�N 41 Vf VI�/1�A Vl 1/�N UI N N Vf N VI VI V,VI iA VI V4
^a 'a�rnm mn � � rric ri
888S8S $ 8888oS$ �a $ S8SSo8 $�oS��o,�o $8858888$S8$o$ 88�o,8S�8�g�� $8S88N
$ � S�n � r°� a w v,.�a ti�o �n o
g88 � g�g���� ����Q8����8��8 ���� 0 �����G���������'° �am�m�m� ����oo
> ; gSg � nv�i `APiv�iB � .�. `��yi$ � S�� gBiRi� �,9�'YL`i8�mm � m
� 9 q ^�~
L 7
� V I N N N V/�����N N N V 1�A N V I N�M1 h N�N H N N N N N i/1 N N N V 1 N N N N V 1 V 1�A N N N N�/1 V 1 V�N N�N V 1 N V I�R V 1 l/�V 1 '
� :
O
'C
a
I
�
N � i
Z a
a � o I
z
0� ��
� �jm � 3'g ' ua � � � �; °��� � _Q�
O '�' 6 a.a � � c 0.c �C _ � � c� v c � a�1+05 0 0 � x °� « � c= w� ¢ � � Omc o �Yn Ca
F �' •s `ry ' 3 9g '$ L��'� � " � a � - �o '° 2Sz '7'^°.c'� " gi °! ,� ta�.,x c¢ d ��ry P�
s V � � q❑ � � {' y N = �' � � .c N N 2 .. Q f � ° ` LL .��� <�9°—'.��_` t� " � $ L ?5� v `w `v'a, n 8 � �
'] � N N C '� � � 'C
a 9��Y � aL'oi33 vawm • � �� 'yy�� � upp���� °�pp4 0 0 '�°' �gsa <� o � vtOio ����te7 zdo oo`w` ��� �30
Y m a �w� ��j j �j�vE1 a li (:1 � N�6�"U �a y t � � �y u M N N N N N N N m tn m tn NI M M M M O << O <`< < 'd �i a
a c � � � � � � � � � �
� .r L � Y+ �e Z 3 C V U U V V U U U V
a ovva r .ti � .�� �•N e e e .e .e ''�' N � � � � ; a v v O 000 OOOOOOOOa a� s� �j ���0000
� a 4 Q Q Q � N N � N� �� � N N N � Z � ��• m ,� � Z V� t7 u V u u v V V u u u V u u u u I
L
� m °' � u� (� ryryry evN ryNtV�y ry�mt�
o�Qc � rV oopp pO� mG�maG�mo�O�p�O1 ��O--11 `a� p oo�$' �� �y `�->Iv�yf`�°-I� ,a.� mory.-i1� f� ay� �p � aoG�M �y rvm I�I
lY �����ti N ti�H.�-I 'i H� '+ .i .-1 .-1 �1 ei '1 �-i'1 N S rv N fV N N N N N N N N rv� N N N N N N N N rv rv N N N N(V N N fV N N
� Q W Z
a -
s
$ H �$� BS ��B �� SryB�n���� 80&� 8�, �$ ���v� � ��$ �� "� n ^o� ���
r $� �$R �9� m � � G�� �_� �
c � n� � ��� N a � ����g � �� � � m �n� $a��� r��� � � $�v ti � �rv � r n r � ti n m
m n m a �� N rv rv ro o m e M�e a ���N N� r d �
�� a� �ti� m rv o ���m � �
c—'
>
��
Ul Vl N N IA V1 VI VT V1 N N VI VI 4A VI t/�IA N Vf VI VI N N N Vf VI VI V�V,N VI N N i/I VI N N Vf U�N V�Vf N Vr N N VI N N 1A VI�A Vf N L�N N V1 V1
O �
h W v
Y � E? �
�s� �
�
1/�VI Vi V1 VI Vf UI UV UI N V�Vf N�A Uf N Vf V1 N N N V�1A UJ VI N N VI N N VI tA N LI N V/V1 N VI N V�VI N tA VI N N VV VI UI N V�Vl Vl V�VI Vr N tA
"_���$� � ��� g �� ���� ��$ $��$��������������������������� ��$��$����
� a., ��� � .,
E
a�
8o88oS,,7o`domSFi,Sg8 $RaBoSS��$ F���ggoeS�`8 � ' ��S�� g �8�8 �888�8SSN ��
u�����'+� � �r'�,v�e��ti gi,r��'�'l�'"�",�°l°1Olneolv`.�m v n.�oo ��ti $`� n �n �N�r+ `.�,n�n �c^;Mn o Nmn o�
"�NN�co.7^ �� � m qM d � ni r+ _,��oo�
_ o nnmr�mvr�'��nmroovoaN � nm $ rianN �J � � ..
�
F- E
u°
H h N N N�A N N V f N V f V 1 N�A N V 1 N�/1�//�/1 H H�N L f L 1 N N V 1 N V�N�/1 N N H����N��N N N 1 A V 1 N N�/1 N Y�N N N V l�/1 V�
S
�r � � � � i i i � � i i � � i � i i r i � � � i � i i i � i i � i � i � i � � � i r i
�� �N V1 N N V/lA N N N N V�UI N LI N V�1A N VI tR VI N VA tM1 N V/N V�N Vf V�Ul N i/�1A V1 VI N V�V�Vf Uf N V�VI tA N V1 N N N N VI YI�/1 N N�A N
t " O
� C � i i � � �
� ��V�N U�1/�N N N N Vf N�//UI VI N N Y1 VI VI VI Vf�A V1 VI 1n VI N 1A 1/�N N V1 Yl N N Vi Vf VI N N VI lA 1/1 N N V�VI VI Yf�A 4M1 Vf Uf Vl N Vf Vl H iR VI
i i � � i I i � � i � � i i i i � � i � � � � i i � i � i r � �
Lh
F.4
� O
O L
3 -
Vl 1A Uf Y1 N N VF U�N UI N�A N IA VI V1 UI VI N V�1/�Uf Vf N N IAVf VI VI VI l/�N V�UI 4)N N N N Vf N V�N V1 tn VI N N N N UI V�VI IA VI VI O O O
$SS $88800 $ S8 $oSS880000goo�S.8.888003FS $ 888 $, 000�80$ 800000 '0. �M
,,I v� Qy m � m ai a a�+ ,"a n� m od
9 ^� � � �' � � o �' mvO1i � vm oicv� "� � �m�� ���aaae�v .�-iwi�� g Y� nK �n�.00-i��� n �i"nri�dr�orv r.m
-L � ^l "1N '�°j^lhRv,�ry �I�n .`� �^��t^��u� m �
O� 1�Q�f 1` Ol��-1� � M N� O �� ��11 1mD h M � �M d N H r�N � O] �-1^N 4�� M ��ll Ivl��-I a M�N �N l�L ei���1�00�
IV IV
W �� � ~ ~
6�
Vf�/I N V�V1 l/�Vf N 4A N V!N Vl Vf Vf VI VI Ll V1 V1 N VI VY N N N�A VI N Vl N VI Vl VI�/f�A V�N IA V�VI N VI N N VI N V1 N N 1A VI V1 N V/V1 Vl N N
8888So$ $oo88o88Sg88 $o888S$ooSoSoSgq8S c`gi,Sgo8og8888!�ooS, o8SS8P88
Na `a� n� � ��aiO �i ����n°�$ � Y a�' �,°Sr,sl��".a 'lm ��e g'i "-�`i .a. n°��
� m w n � ao n o N r1 m
�o n in ry a ^!'^ �`��oo N
� � �� �i �'�'x��m`ry `t s e °°��n m`�' ��a N N`�rt rt nro ao.r n ��.� r.a'r.i � ti r. �rvi�n�.-t ri
p a—
.�y>
N N N�A V1 V/U1 1A i/�+/1 N N✓�VI N V1 N VI VI N N N N�A YI VY�A 1A N N�VI VI U�N N N VI V/N VI�A�A N Y�N Vf N N 4f V1 VI VI l/�N Vl 1/�Uf N Vr
�
V
�
O
L
a
�
N c
0
Z 'a
Q u g
� o i
�
O
� r �j _ W� n3
E E n.n a n� >y �� ovti� '� m — o = o°1c �X ri f m8 m9�3 0�� �C a n .?�'� c�
2 �'�ma � i^c .e a fls� g �� w E �, �o .IIma m nf c y .� a �eF,'+ io p'O �� �c u33z io' l7
0 8 a L° f a m �i ' 3� '" r E' a ' ,q� � $ �° a� '� u �a 6 3 � ° � f o ❑ z $' o $ v a w �" t � o
� �n 3 � g �� xwt 'o �au '2 vov�= � nn = v ��" �^ 'Kt7 h2 ti °' s ° " '3
s �� w'< d`° m'� `'^o,= � a u E� �c t �j •c�w LL ° �9 c °�'' � ._ E t9 `W'� 'Ji O a 3 .4 � �l,x ��a. � o G v� � 3 o v n. 3 — `w
$ y � O��C U� � o� �a 3 �
d aa9�d�f ,�,� 3 Y�� �n3 cFtgg ,o`mg � 3 a �� d «� ov °' z" � >� � �� �$ � �z L°i .9f � �nG� i�n°
°d �n v a U s t .S� �g' y�v ��' o � � P.4 �' o u � m a o J9 w m ��L� fii � � � � I
Q �8 a'a f z� �° 3 �E > r°'- O a's 3 � m m z�o 0 3 b � f a v �� � �a i
°' v a a a v < in �n �n ui vi�n ui�n vi in u �n io�o �o �n�n � �n n i. n n n�r�� �n n ao 0o w o0 00 00 0o m aa ao m co 00 00 0o ao m w m m
� o 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0� o 0 0 0 0 0 0 0�o 0 0 0 0 0 0 0 0 0 0� a o 0 0 0 0 0 0 3 0 o a o 0 0 0 0 0 0 0
r
0
u� m a � pp p y� tpp� op� O� p�
a � m M ry�p(Ip�M p a} ppp y� v1 u� v� y�1y�� C eV tY!y� ^ 1�
� . ry N !V N N 1�`I N N N N N� N N N� N N N �N N N��N N N�� ry N �N H env N N N N N N N N N N N N N f�`�� N N N N fV N N N
f�
1�i1 Q N Z
q _
V
�
� �� $��j�8Q��.j�,$o � ��SB� q$ �o�mpm�pg8� �� ���a ��� � � ggn� g�� ��,o�a � n
O O O O O Q CQ oq ((ry��111 p
C N O $ N n � �� � 10 ry �j 00�O O t`t�L� �V n ^l W ili OnO�ill!�Ol O R � m�� V�ti p M O�i� W N O'i I��N ��N V N �
� a .� N N V N� a Ql a �N eG V ry W .�1 a O �V�Ol� .� .1 d' �� 1
a ."1 m 'i �
� '
jg> 1
�
�N N N V l V 1�1 H�������N N V R N N V 1 V1�A V 1 N������������N N N 1 A V 1 N N N N N N N N V l V 1 N�N N
1
I- °' a
Y �
� O j
� u �p
VI i/��A Uf Yf VI N 1A+R N V1 N Vl Ll IA U}1/�V/iIl N N Vl VI VI UI b�b��N�V}1/}1A Vi N iA Y1�/1 Uf�A V1 V1 1A ill N 1/�V1 VI� O���� �
�E���$������ � �$ ���o��$�o���oaoo��������������������$ �� �
�
a�
00000088ggooSoS8S8mS888 $o88$�S�$o$o � � o n
$$ g o 0 8 S� $ $ o$Q 0 8 Ss S a 8 0 0 0 0 0 0g�o�ti �g N � ��a tr n� n����� ��$ ��n a � � � "l� `J
a �o � ��� ����o 0 25 `.� �r},�R��oo `�',�,�,o�°o g�o n .I"1^l d�i a d �n .
.-i a o rv r:r.J oW r �n n � �m ..++°�. ."J m � .^i"'1 a m��n ..`r7'" H
� �N N��y a p� v .�i r�i�� m �� ,_� �� p N Nn :
— �E a
u°
I A U l N N N l/�N V I N N N V I N N N N N N 1/�V 1 V 1 N
U�N V 1 N V 1 N N N N L I N N N N N�/1 N N N�U 1'A�F N N N�A V 1 V 1�A V 1 N H N N
= G�j� 1 , f � � 1 1 ' ' � r � ' � , ' ' � , � � N N t A V f V f N 1/�N V�V f V I V�V 1 N N N N N N N N V f N N V I U I N V f V�V 1 N V I N N V f N
� N N 1h i/1 Uf i/�N Vf N V1 IA V1 N VI�/1 N VI Ul V�N V1
� � i i i i i � � � i i � i � � � � � i i � �
� �- i i i � i i i
� � a
— �N N N N N N VI N�A i/f N N N V��/1 t/�VI 1A N Vf N N V�VI Uf N Ll V�N UI VI t/�V�N N�A N�A U/Vf N'N N Vf VI i/�N V�U��O�O��� N
g g �� �i��m� o �
� � y1 OO N d O q
y �`'� � a0 N O fa N 'O N a
L .Y � N r-I
t_ m
o �
3 _ �,
N�A VI v�N LI VI N N 1A N N Vf�n N N UI�n V�U/N u1 V1!/�N Vf VI V1 iI�V1 N N VI N v1 N V�VI N u�N V1 tM1 Vf 41 N N O l/�N Ll N VF VI�A V1 m
o Op � gPo888 �oS8 $$
S88 �
�+ O
�n�n�n o qQa� gm in o .-i �c rJ rri ai u� nni �a o o a �LS v"{ '1
O p SOOoOppO � �' $� $888$ $ 0
$ S $g O O� O O O O P O O O O O O O O O,O � �h��y 00 �r n ^ N
� � �cm N �m � �"' w `�',o,Ccmbto�ti�nlo",$n�i�,m� a `� ,•�^ l�`^Nt�
g�ogni. ��nf��' v� oo���i`�°l�"��wn�`° `�' °a,v'n a ��i��"„� "' ti�"��M ��� � F
3�� ,tiN rvgoa'cp aa�v.�iri�m.+ e �� m a .y .-i �
w �—r F1
�c 2
a a ry
N VI N N VI V1 VI Vl VY 1/�N V/N V1 N V1 N N VI VI N Ul N Vl t/�N Vf N N N N Vf Lf N Yl N VI N V/VI N�/I Vf tA 1A�A VI N V?V1 U�Vl N Vl N 1A
8 O O 10 H O O S O N
ooggog� �4u,�$8Sgg8$ ��8gggo � � � mao
8$88�$880 $ 80888�8888800 � � M� $���M � n n�M�Yo,d�8���:����� �
ad cc o � oN�v�t�o ���`° $ � o�m �i° :���� "���n' °��° �rv � �n��� ,'a- ^�' rv a"" n
�a��6��"����o $ ���nel�`loon v�w �cino�dvirmNe nman v
$i � tirvNSo� ^ov °�d N �'�`' � :7 � ati �'°
0 9� :=1
��
VI�A N N N VI Vl tA V��A V1 N N N VI N N N VI U/N U1 VI N N V�N VI�/1 UI N vf tn VI N Vf N Vf ul N Vr N VI V1 N�n V�VI�A N�n V�V�N N UI VI
�
� O I
� n
m �.-�
g � � "
°�J u
c "�a E c � Z' m � ,i
d � �, ovc�= ' v a '"
N y u = � 4 a c u Q'i ,
W Y c E �o. o o c ` `
H o `o o g d u a 3 8 g L �
Z .'h �' u u '�^, � E � �' a�i u
� u Q w m�
z � Et E �0b cmiJ� vs'im m c��C
C �°e � na E� o� � ���
� a � � � E E�'2 c c c" 9 � �± � o O
n . �� � —� c t.�" ,4.�4,ry � �`'$w»�- I
z y m w � � �� N�c N o''� ��o� 'e v n° e $v ���v� 3 �a B� � F� ��v v � 6 6 �� g n n„�. ° Q I
O 3d _ .2� y1 � ,�`o, �� � a eil� � � mc �3 cf N� v 9E .a.� a � t A ntg n,,10e� � �
o—' O � _ > n °n t7 dE c E � cFm v 5 E� �n �n aa ,e � �
F no � , � `�I U < a v n� v _
c $' c� = n coo m n��8 alr � o9 pc ^ x�' "3G � ,ny�� `g� z au �>>=�8 �' ��EB�
a t �. `l� 3 'a o � o � a '� � tL 1;.u` � m
Q g�d e��� E v � ��r au-'.�vr 3��'� �� ° $a�3 ,3„ °r' ¢�au� � f a w�� o ❑ �
E h o n �c -a ¢ �naza '�,Sxu t7a �n p �d � aaaea ., �
6 0" o � in s� 8 ¢3�� o 0 0 0 o r.'� ;.1:J '1 .f'i� .'� ',-I' `?. `,7 S7 ."'-i^rl ".1`.7`.�9 ,y .y .�,y .i.1 .+ `.`1"� "�`.�"�'.�"�.�+`° �`° n r,r,� ,.
o+ o,rn o� o� u, m m m a�m �+ � �" '"
v u u u u u u u u u u u � � v�u u u u u u u u u u v u � � u u u u u u �u u u u u u u � u u u u u u
a a a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o s o 0 0 0 0 0 0 o s� � „
� r
0 lp
w m �°�Q�� ry� y� �pq Nry� N�p (p �y p1vp1 ppy �} a yQp
� " op O�O�-I fV '1 N '1 'I N rl �-1 N N N N N N N 1�N M M M M� f��'1 �tb M m M M M M M��f!1 M(if �
� �p�nrn �p� mp�Op ep p p p �j M M M M M M M rt1 T M M M M M M M � ,
l7 E 0�� N N N N M M M M t�'� M M M M M M m M M M M M M fn M M r
6 Q Y 2
. s I
. �� ".
��� - �
10315 Lake Biu�Drive '
Si.Louis,Nl0 63123
(314)894-8888
Fax#(314)894-7418
wwwJ<ciconstruction.com
T�e�ernb�r 1�,2�1_5
.i a�s�b�
Pditi�:1!L.P.�.l�/3�ihai,�.�.
501 1�Ior�_h�roadtiv�y
5�.�oui5,�� 53i02
��: Job#12002
�ape Girardeau��lasieivat�r Treainent:aeiliiy � ,,.� ��� �
�,"'
Chang�Propcsal� 133 m ��°A�-.�A�` ,�'������� ���`�""��
� �
Dear Mr.P✓Iathai,
VVe propose tca furnish tbe necessary labor,rnaterial,taols and equipanQs�t to i'xavede DRYER
SYST�M IMPROVEMEllTTS PER RFP#51,for the increased I.tiMP SUIi�I mf FOU�-HUNDRED
EIGI-ITY-NINE'I'HOUS.��`dD,SEVEI\T-HUNDRED&TI-�IRTY-GEVEN DOI,LARS($489,737.00), �
AND A CONTINGENCY OF TWENTY THOUSAND DOLLARS($20,OOQ)FOI�FUTURE L(f P�; �1/, �('�f 7'a 6
ADDITIONS IF REQIIIRED FOIt A TOTAL OF FIVE-HUNDRED 1m1IPdE THOUSAND,SEVEPt �,n,�j� . g�,/�C�.Q�
HUNDRED&THIRTY SEVEN DOLLARS(�509,73�. T � l
Please note the iollowing clarifica4ions associated with this pricing:
S�E ATTACHED I�iCLUSION/EXCLUSION LISTING,INDIVIDUAL CHANGE PROP�SALS
SIIALL 13E GENERATED FOR USE OF COl\'TIN�Ei'�'CY lYdONIES T�ALLOW k'OR
AFPR(?PRIATE FEES
We have attached a copy of our change proposal estimaie sumr,iary and backup for your review.
If ihis pr�posal meets with your approval,please�ign ihe atiached copy li-�th�space provided and return
i_i i�r�ur:�cords. By sia ing ihis change praposal,you are authorizing us tfl proceed with th�wor?�and
a��eing zo ion✓ard ihL appr�priat��h�,-�ge d�ru,-�dnts��z:�aaym��t af ihe ab��,�d a:nauni;vit_h.i;�6t3:�ays
�f��ark�Lr`a�anc�.
�i y�u hay�any�uesiions or c�m���nis,ple�s��lo n��hesitat�ta cont��e us.
�incerel_y, A�ProUed
3Y: ,��-��`�,''��L�ff i���—
�icha�l�els /� /
Pr�ject 14ianager �at�: �✓'�l��,�s
E�ttachm�nt5
v z j
t � ., ��
�, �:��i�l�'..�L�Ly�4 i ��S�".,i�, -;�;
� "Illv` L�K:. :Jis �,3'.�F:
�'Y.. `L�'c.3i3,���O�32J
(3�aj�9�-��8s's
�a:;�{3 a j)�94-7d'i�
iiV?/J4fd.{ivl:`Jt?Sf;31�FlU:'7.�Of�
�`j2i�?�, �,i 1`3
d
�`�.v��"1�
r�',.�'s�, I�;', �.�, !�%i�i?:�+_"'_��, `:.�.
��37 �
i�l 1'�:JE��S : Y.�iG.4..i'�I.`�.��✓
v�.r.. ��:.?f� ��=�� �:3i�,�
9 —
��: Jc�L i 2�Jt?2
��,p��z�arde�.�� �V��tei�aLer i���t�n�nt.�acilit�y ,� � � , "� � �'l�i��°�
g P '� � �,� .�����'L� ��� �'���� � q.�: �
Ci��:� e P�o �sal ;� i�7 � 6 ��'`
i)e2r Mr. P�Iaiha�,
We propose to furnish the necessary labQr, rnaterial,toots and equiprneatt#o perforrri the work
assc�icated with RFP#54, fire sugpression system for baghouse and control of the l�adflut chute,for the
�ncreased luaaxp sum +�f Two Hundred,Thirty-�Jne Tht�usand,`I'w�Hundre€l and Eighty-Ssven Doflars
(�231,257,0�}, and a contingencY of Twenty Thousand Dotlars (�20,040.00) fvr f�ture additions if NQ��/ L1,5'P..d
requ�red for a total�f Two Hu�dr�d, Fi#'ty-One Thousand,T��� Hantlred a�nd Eight-Seven D�liars
���si,2s�.00>.
Ptease notv�IZe iol(o�ving cla:•ii caii�r�s ass�ciated wiir�this pricing:
P;ici�g�as�d upon email dated 5/�3/1$ from Perry Scl�nuck related to scope �larif�iation quesiions as weli�s
ema�l fro.n Perry Schnuck d�ted 5/i/18 vy?th Andritz pricing and sc�pe�larifcations. 'vVir�ng t� lo�al fire
ajarsn �anel vvithin the Bicsolids buildi�g fo�•syste�n tie-in�ritr� exisiing fi_re alarm ��ntr�l sys�e_rn. Syste���
We�tavP �2����1�ed a cop3� of�ur�'��nge pr�nc��al vst���±ate s�?r�-�mary a��d '�a�Ku��or y�ur revie�v.
��=�liG �3r�pnS3,� ���t� �v'_��a ;'; ��.��c:"� 17��.��a 51��xslG' �?�c1Cl'�� yJ`"�)� ' :'�'1� S�^z.�v �1'J�fli��� uI3� ��ili"'_3
it f�r�u���d�r��. I��I re��ests isau�n�e �f a Cl��a�g��r�l�r pr�c�a°�� ����g ������t�d �� rr����do
_if y��l��v�,�ny q��stions or��rn?rn�ris; pldase�3t� nc�t hesisa�e t� �an���t b�G.
Sinc�,re?y� ��P��y"�
`�� g�'� b,�,�,��ilo�._�
�,,
�
. � Br�,nt Krueg�r �
Pr�je�t M����e� ��iv:
A���h�er�ts
� s
r
Redecker, Cindy
From: Brunke, Casey L.
Sent: Friday, November 22, 2019 1:01 PM
To: Redecker, Cindy
Subject: FW: 3534 - Change Order#17 (Final) -- Numbers do not match.pdf
Hi Cindy!
I will be at City Hall later this afternoon, around 3;3Q ish. If you have these r�ady, I can sigr� them then. 9f not, I'll sigr�
them next week. Thank you!
Thank you,
Casey Brunke, P.E.
Assistant P��blic Works Director
City of Cape Girardeau
Phane: (573} 33�-6355
From: Mathai, PK [mailto:PK.MathaiCa�jacobs.com]
Sent: Friday, November 22, 2019 12:59 PM
To: Redecker, Cindy
Cc: Brunke, Casey L.
Subject: RE: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
Cindy,
Yes I see the typo in [Decrease] of this Change Order as $66,994.76. It should be corrected to $66,944.76. Please hand-
correct the number on all 6 originals and ley Casey initial the correction. And then she can sign the CO for processing.
Thanks,
PK
314-650-4412
From: Redecker, Cindy [CRedecker@cityofcapegirardeau.org]
Sent: Thursday, November 21, 2019 9:15 AM
To: Mathai, PK
Cc: Brunke, Casey L.; Redecker, Cindy
Subject: [EXTERNAL] FW: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
P K,
Casey asl< me to forward r�y questions to you. Piease direct as to t�ow you would like ta proceed wi2h this.
,I,�Il��1l�C}'Ot7,
Cindy Redecl.er
Pt�oject S��i.cialist
(."ity ofCape t.;irardeau
C)i;velo�»nent Sei-vices
�C)1 I��dependence Street:
Cape; Cit-arc�eau; Missouri 6�7{);
P1�one: 57:�-3��)-fi3?7
i
' ',
F��x: y?�-�3<)-(�3f)�
credeckerCa@citvofcape.org
From: Redecker, Cindy
Sent: Thursday, November 21, 2019 10:54 AM
To: Brunke, Casey L.
Cc: Redecker, Cindy
Subject: 3534 - Change Order #17 (Final) -- Numbers do not match.pdf
Casey,
How do you want to proceed? Change Order#17—has a typo on the front page.
Please see the attached and direct.
Thank you,
Cindy Redecker
Project Specialist
City of Cape Girardeau
Development Services
401 Independence Street
Cape Girardeau, Missouri 63703
Phone: 573-339-6327
Fax: 573-339-6303
credeckerCa�citvofcape.or�
� _ !�lt�;- fi':i��:.�s �����i,�,.. _..•� rt3��� ..sir;i , _. ?`�t.W�rtt€c�i :�€�.� ,.,r;€[t�..�: !r� �, t,t.a���,� � 2��:':i<,t�tr f:Pae� ��e, �..��;a�. taF t�ti���s�4.. ��at.�i' �.f,,�.��'��fit. ?•i��;�
t.�.•f�r�r,, �;��y�:s3� ,}�-tJ.s"tt��(.����io�� .;r, .,>•r: .�,r_r��;�r� �:��€s€�r�v 5s�.�r:)r�1_y-i.�r3iritc3.�(r�<9 re.t�,�:.r;_s €s ..�� i�;l� �� !=��?t,�cl. �.-F y,>t� i�3.��v� €... �•�:�7 1}:��;
€,t�..:.:..���: €.�� a.�r�����i�, �Y�����5,:: :�ot:i�fy� t�, r,���;�r��c ! tiC���l,f �;y rsxg�is�r����� t:r>tf�a. , �..�:>� e <�r��.�;i • 1£�ti€'�c; �� . i��..:�3 �Y,��r r,�::rr2�. �i��€�_
2
t � 4.
! ,
WASTEWATER TREATMENT FACILITY
CITY OF CAPE GIRARDEAU, MISSOURI
`� ��� EPA Project Control Number
`�� Cape Girardeau WWTF
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Washington,DC 2046Q
Certification Regarding
Debarment, Suspension, and Other Responsibility Matters
The prospective participant certifies to the best of is knowledge and belief that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily
excluded from covered transactions by any Federal department or agency;
(b) Have not within a three year period preceding this proposal been convicted of or had a civil judgment
rendered against them for commission of fraud or a criminat offense in connection with obtaining,
attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a
public transaction; violation of federal or State antitrust statutes or commission of embezz►ement,
theft, bribery, falsification or destruction of records, making false statements, or receiving
stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a government entiry(Federal,
State, or local) with commission of any of the offenses enumerated in paragraph (1) (b) of this
certification; and
(d) Have not within a three year period preceding this application/proposal had one or more public
transactions(Federal, State, or local)terminated for cause or default.
I understand that a false statement on this certification may be grounds for rejection of this proposal or
termination of the award. In addition, under 18 USC Sec. 1001, a false statement may result in a fine of up
to$10,000 or imprisonment for up to 5 years, or both.
�
ou J es President
7'yped N 3c"I'itic '_ed Representative
07-03-12
ignature of Authorized Representative D��e
❑ I am unable to certify to the above statements.My explanation is attached.
EPA Form 570U-49 (11-88)
CSX65101 004300-9 BID FORM SUPPLEMENTS
RO—4/l 6/2012
.
WASTEWAI'ER TREATMENT FACILITY
CITY OI�CAPE GIRARDEAU, MISSOURI
Instructions
Under Executive Order 12549, an individt�al or organizatioi� debarred or excluded from participation in
Federal assistance or benefit programs may not receive any assistance award under a Federal program,or a
subagreement thereunder for$25,000 or more.
Accordingly, each prospective recipient of an EPA grant, loan, or cooperative agreement and any
contract or subagreement participant thereunder must complete the attached certificatioii or provide an
explanation why they cannot. For further details, see 40 CFR 32.510,Participants'responsibilities, in the
attached regulation.
Where To Submit
The prospective EPA grant, loan, or cooperative agreement recipient must return the signed certification
or explanation with its application to the appropriate EPA I-leadquarters or Regional office, as reyuired
in the applicatio�i instructions.
A prospective prime contractor must submit a completed certification or explanation to the individual or
organization awarding the contract.
Each prospective subcontractor must submit a completed certification or explanation to the prime
contractor for the project.
How To Obtain Forms:
EPA includes the certification form,instructions,and a copy of its implementing regulation(40 CFR Part 32)
in each application kit. Applicants inay reproduce these materials as needed and provide them to their
prospective prime contractor,who,in turn,may reproduce and provide them to prospective subcontractors.
Additional copies/assistance may be requested from:
Compliance Branch
Grants Administration Division (PM-216F)
U. S. Environmental Protection Agency
401 M Street, SW
Washington,DC 20460
(Telephone: 2 Q2/47 5-8025)
EPA Form 5700-49 (11-88)
CSX65101 004300-10 BID FORM SUPPLEMENTS
RO—4/16/2012
4 •
WASTEWATER`I'REATMENT FACiLITY
C1TY OF CAPE GIRARDEAU, Iv1]SSOURI
LIST OF MAJOR SUBCONTRACTORS
The names of Siibcolitractors to be used for the Work shall be entered in the spaces provided below as
required by Paragraph 5C-6.06 of the 5upplementary Conditions. Upon award of a contract, the
�7amed Subcontractors shall be used.The completed List of Major Subcontractors shall become a part
of the Contract Documents.
Substitution of Subcontractors shall be as outlined by the provisions of the General Conditions.
Substitutions shall be subject to concurrence of the Owner and shall be confirmed by Cl�ange Order.
Faiiure to furnish all information requested in the listing may be cause for rejection of the Bid.
Area of Work Name of Subcontractor
1. Steel Pipe Piles {��I Sel� PEf�o rm
2. Concrete Work KCI self-perform
3. Mechanical 1�A�'dt� /'�a�-�+�^�c..��
4. Electrical Gc�ctrar►fe.e F1eL.�h-.'�.
CSX65101 0043Q0-3 BID FORM SUPPLEMENTS
RO—4/16/20I2
�
`,�,�ASTEWATER TREA"I'MENT FACILITY
CITY OF CAPE GIRA.RDEAU, i��IISSOUR]
L1S'T OF MAJOR EOUIPMENT MANUFACTURERS
Tl�e names of Equipmer.t Manufacturers,in addition to the base bid manufacturers listed in the Bid Fonn,to be
used for the Work slial] be entered in the spaces provided below as required by Paragraph SC-6.06 of the
Supplementary Conditions. Upon award of a contract,the named Manufacturers shall be used. The completed
List of Major Equipment Manufacturers shall become a part of the Contract Documents.
Preliminary acceptance of Equipment Manufacturers name shall not in any way constitute a waiver of the
specifications covering such equipment; final acceptance will be based on full conformity with the
Contract Documents.
Equipment substitutions will be permitted only if named manufacturer does not meet the requirements of the
Contract Documents; is unable to meet tl�e delivery requirements of the construction schedule; is dilatory
in complying with tl�e requirements of the Contract Documents; or for other reason specified in the
General Conditions. Substitutions shall be subject to concurrence of the Owner and shall be confirmed by
Change Order.
Failure to furnish alI infarmation requested in the listing may be cause for rejection of the Bid.
Specification
Equipment Items Section Name of Manufacturer
1. Hydraulic Gates 352016 iCodneu Nun'I"
2. Positive Displacement Blowers 431130 Gard ne.,- L7Enver
3. Vertical Turbine Pumps 432150 _�4fi on c.l Pc�,�d
4. Manual Strainer 432764 E ctfo n
5. Septage Receiving Equipment 462183 SC.�J C_
6. Polymer Blending and Feeding
Equipment 463033 En o�o
7. Composite Samplers 466672 YYl An rt:r� a _v
8. Floating Decanter Equipment 467180 �5�6�oc��:
9. Fine Bubble Disc Aeration
System for WAS Tanks 467620 S a.n ct'a�r �.
10. Standby Power Systems 263213 C u m rn�n s
CSX65101 004300-4 BID FORM SUPPLEMENTS
RO—4I16/2012
� � . . _ .. ,!��
j
il
�I
_ -.;il-i� -
� �
STAT'$OF:MtS5�lTRi` )ercmi�h W.(Jap)Nixon,Governor . Sara Pazkcr Pau[ry,Direccor
D,�P�.R�'11���TT 4F NATUR.AL RESOURCES ;
, , ,,
,= . �� - i
, '-'� r ,i � ' i ;
,, ji . ,__ wwwdnr.mo.gov
`:,,�.,__t %J �.,., _+ I
, �- <;.
kiil�'_�,`L.�� , I
�
February 6, 2013 �
Mr. Tim Gramling, P.E.,Public Works Director �'
City of Cape Girardeau
40I Independence Street
Cape Girardeau�MO 63703 I
RE: C295531-01 /C295531-02 City of Cape Girardeau,MO—Wastewater Treatment Plant ;
Upgrades, CP0001249, Change Order No. 2 '
Dear Mr. Crramling: 'I�
The Missouri Depaxtment of Natural Resources' Water Protection Program has approved the �
enclosed Change Order No.2 for your contract with KCI Construction Co., Inc. for the �
Wastewater Treatrnent Plant Upgrades to serve the city of Cape Girardeau. The project receives i
funding through the Clean Water State Revolving Fund Loan program. This change order has ;
been reviewed for compliance to 10 CSR 20-4.040 with regard to changes in contract price �
and/or time and 10 CSR 20-8 in regards to sanitary engineering features. This change order
modifies the plans and specifications approved on June 5, 2012 and decreases the eligible cost of �
construction by$116,065. i
Invoices from your engineer should clearly separate eligible and ineligible costs. We suggest the �
invoice refer to the date of this letter for eligibility purposes. Failure to clearly separate eligible
and ineligible costs may result in the disallowance of project costs should the project be audited �
after project closeout. !
Financial assistance on this project is limited to the amount of the loan and cannot be increased. '
This change order is for your official project records and should be maintained on file for a
minimum of four(4)years fallowing the completion of disbursement.
�
rth�<kd r,y,a
�../ Vr
Mr. Tim Crramling,P.E.,Public Works Director
February 6, 2013
Page 2
If you have any questions feel free to contact me at 573-751-1402 or Missouri Department of
Natural Resources, Water Protection Program, P.O. Box 176,Jefferson City,MO 65102-0176.
Thank you. .
Sincerely,
WATER PROTECTION PROGRAM
,� � � �'�:��-
, �
Byron F. Shaw,Jr.,P.E., SRF Engineering Unit Chief
Financial Assistance Center
BFS:cas
Enclosure
c: Mr. P.K. Mathai, P.E.,Jacobs Engineering Group, Inc.
Southeast Regional Office
Mr. Paul Dickerson,Water Protection Program, Compliance and Enforcement Section
Mr. David Potthast, Water Protection Program, Financial Assistance Center
^ �
Change Order
No. 2
Date of Issuance: JanuaPy 24, 2013 Effective Date: JanuaPy 24, 2013
P�oie�c: Wastewater Treatment Facility oW�e�: City of Cape Girardeau Owner's Contract No.: 3534
co�c�a�c: Wastewater Treatment Facility(SRF Project No. C295531-01) oate otco�tract: AuguSt 3, 2012
co�c�a�to�: KCI Construction Company, IC1C. Engineer'sProjectrvo.: C5XC51O�
The Contract Documents are modified as follows upon execution of this Change Order:
WCD No. 1 —Drilled Displacement Piles(Attached) Deduct($261,916.00)
WCD No.2—Probe Bedrock at UV/Effluent Structure(Attached) Add$1,774.00
WCD No.4—Revise Grating(Attached) Deduct($15,106.00)
WCD No.5—Dynamic Testing of Piles(Attached) Add$60,882.00
WCD No.6—Foundation Stabilization at UV/Effluent Structure(Attached) Add$57,355.00
Change Proposal No.3 from KCI—Probe Bedrock at Biosolids Bidg(Attached) Add$4,602.00
RFP No.3—Misc.Arch., Plumbing&Electrical Revisions(Attached) Add$27,855.00
RFP No.4—Crushed Stone Drive(Attached) Add$8,489.00
Total Cost This Chanqe Order Deduct($116 065.001
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days � Calendar days
Substantial completion(days or date): �UIy ZO, 2014
$55,674,000.00 Ready for final payment(days or date): AUgUSt 19, 2014
[Increase][Decrease]from previously approved Change (increase] [Decrease] from previously approved Change Orders
Orders No. 1 No._(NA) to No. (NA)
Substantial completion(days): Same as original
$0 Ready for final payment(days): Same as original
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): Same as original
$55,674,000.00 Ready for final payment(days or date): Same as ori inal � ��
9 '����r����n�of
(Decrease]of this Change Order: (Increase][Decrease]of this Change Order: �,��o �rG'es
Substantial completion(days or date): (NA) 6?013
($116,065.00) Ready for final payment(days or date): (NA) ����
����
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion(days or date): Same as original
$55,557,935.00 Ready for final payment(days or date): Same as original
RECOMMENDED: ACCEP�ED: ACCEPTED:
j ---_' ;
By:, ������,� ' BY: � ' ' �; By: l tuz��y �.-�_
Engineer(Authorized Signature) Owner(A horized Signature) Contractor(Authorized Signature)
l� �Z
Date: � � Date:���� �7 " j Date: �� Z�- I
Approved by Funding Agency(if applicable): Date:
EJCDC No.C-941(2002 Edition) Page 1 of 1
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the
Associated General Contractors of America and the Construction Specifications Institute.
__ . , . .______ _ __ __._ --- -- _ __--._ ._ _ . _ ____---_._._�,�_..�--- _____ _ ...,._ _..____.____.__._.__._ ___
t � �
�'��� �'������ ������'�
��o '�
:vateoitaa,� ,}.anuary;2,�[l9� ��!t��:��_�?,.2U°J�________ .-.-----
_..______. _,_ __ �_. __ _.___ _._ ___ -- _ -- .--
�ro�Y�l��t�vv3t�.t TTe�UT?6T�I���1�?�i� ,� _. C i� t;f Cdp�E. ',_..iF�t; E_.�.,..�. �>_•;r,. �`3+i
--- _ _ _ __ ____.,, ._.__..-- --- --- _ ._._ . ___ ____.__�__ ..
�o�,+�x�las3��3'���r3��l�y���R��ro�c��.�?A�`l���Q'J� �.��:��c�: A�g'�st�,�'�3
_,._ . ____�_.--.___ _ -- - --_—_.__-. _ _ _.�.__ u4_�. _.. _ �..__._---
e���: �C��e�ns�ctr�r�t�pa.nY, )�'�c. - ;a,�;rb. G:5'X�?tTj
YDA7 2o,Y!e t�}f8r.�.S'�?o g#?tDt',�i�d;�??Tyy73}.�, '�2)3 tji�A�q�.�0',1i.'}flp R�lT!S�:#�:
..._�__�____._.. �_.._.___„_"--__.-.- _.. . _,..�,.-�,-..--_.. ._--�__.—,-..--....�...,._,_'._. -_.. . . _....._ . _.
tn.,,-1n� i��it�riflt.c�
,_ ._....___ --' -�..._ __-...._ ___.. �- -�,... ..._- -- -- . . _. .. _ . _..
']. � �ir�statM���4' d1saT71t�r wN��'1'��ar Ci�-i"c,r� �.5�;iac�k..rr�.�.ie, �:r Q��.z��;, �F�g�.!� ��:n i�;�=:;es
j��s;ec���+a�St�c?�!p�)�t��S�]d�d�o�!'���,�3`�.'�'�3�!pI�a�cl
;r�=SpeC:i�rc:,9s',��1gT?����3�����?�Js�Jn 8r�t��ppl'�7y.�!T�+�►J��3}.e��p�"JY!!'?c.�.
f?'���r�y�r,a�+���3h��l��1�3yr�I p`�1�.;1
A�e'��J3�al�x�,.�abs�s+�3�i����
_�_.._._ _.._.___.____��_... _��_..._.__._ _-- --..__ : --______------
9_ �'�'�p�ai fi��ra�'sm'��3���SCI,�1aE��ho��n��,2fl'��
2�9, ��+p�i]*�����r�r]�`T�F���te71��1,�A �si��t'��i,�l`l�j��a�sj
07. ��T��'�3SJe 3 8������.5�3�7�
A. £�ra�i!�r�m`T��ra i�f���r���f,�3�����a 2�,3���,����d s��
�. �'r��1��m��n�,z�d��y�,�'����d°7��s��1������3
�u�o�e,a��r)s��a�.Saa��sit�e '�'���a�ak�f�s��an-�npl�n��s�
:n�9��bn 3�r'�!s�1a�dn�o F�����A1�c1_qae Y��s stvs kr.
�� 1�rr!!g�s��i�r��9 stl p+flp9���r�ge•
?5 �19�e Y�J�s A�a15��•��r�O�►�83�`.6��!9�zxa�rntr�91 P�!ss��":►�s��.
fi�•e�a�aA���9a+�►�ned��n4�ract�3?r�s�
�yrtlt��'�7ss 3�g��f��Jt3 3 '��'�) �'?r�7:rnre P� �!sr�s:sass9
_��.._��. -- __......
�
�1�e s�9'��nY91�9 an tr�,'9?g�s�n���u�aer�r�l���a+lUro��afl±�f�.
_�_ _._ ._ ..� _ __. .,.�.._ __ __.._.___
—
R�sc:.t�v7aae+s'�t'�ar A�r��v»t 8 f�r r.f� . . ���'' . .
�rA� i 2-Zoj_�+��'
�fffr' _� �"� --'--- _.—.,._ _.�...._____--^'^--�-- __,..,
�w�__..� _...� _ _`__.__ --_...__.�.,__._,._ _.
,a�a ta Owrt�r 4�r.,---�
! ` #
` j-G ._..�____.,._.. ______._—__._..-..�..y.�_. ���~���t,.�_..—
Asoa � -� � � .
_"'--�---� ' /r t_ (�� - i
f
, _�-.-._........-.,.._--.�--.._-,.-.a..�--_. --^ �'-_ _-.._._.___._._.+..—_._.._
A�d UYG���'xY. �dY�E ..._ ..
�s.�'S1S�a�,��!9�:�►?�D �,'?�]
;lr�������������������
.A�S:+n�,t+9��asl9�i19l�ssa3sA:���+�s:r���n�3
7
�,.,� ,.� i.�/'�� l
F��!'�3��7��1,�"a'
��` nnetr�-tinn -om�yaaY
`�m�`�°� ��Bs� �Oa��'J ��J��e
�d. ��ua�� l�m. �3a3�
�3'�A� B�A�����
F�x �q���' ���-�A7�
�rero,�.�rsason�r�xsa,�n.saan
��v��be��,2�t�32
��r.�.�5.P�7a�3P�ai
1�z�b�
�,�1�3�rt�a��s���i�ar��l
sa.��6as�,u�� ����2
��•. �����ira��le��'���gt�waterTreatment�a�ili3y
l�J�rk�P�ang��ir�c6iv�No.3
D��r P.�S.,
As�+�u ar�a�are,RFP Rlc�.1 included 2,472 e�ch 3� �e'+J�aai PiIQs a�ish�nE rein�orcing design�h�a w�s b�sgd on 9ri��nal
�� s
dt3igs�param�ter�provided by Jacob3. Up�n fur�h�r revie+�of the design by Jac�bg,it w�§dis��v�red th�t differen2 I�as!
ca���applied is�various areas ofi the proj�ct,ansi Marri�-Shea dQv�lop�d f�ur difi�rQnt pilg reini�rcing design33o
a��os�rno�iat�al8�fi thQ l�ad cas�s. Q�r s���r dis�s�ss's��as,t��3,47�s��a�n3i�y�r�g�Bs9 inac�+�r�te,and�her�are astsa�iiy
2,5SD7�il�e on the projec�. Foilowing is a s�smrraa�y Af th�shan�es that w�pro�se#rora RFP f��. �i�present:
- �agt r�f 2,�72 pil�s per original�egign ant RfP�1�.3 �2,�9�,9��{Iur�A�u�ruj
;A�tf�5 pole i�g�t 2,507 pil�s per grigin�l�7esign�S unB2 pric����1,��Si AC�i� $A�,659�t�+�ap su�a)
- I�asre�s�piJ�reir�#�rcin�qu�ntity far 4 n�ar�reini�r�ar�g�fegigr�s,
p��ataa�h���I�rris-Sh�a fetier dat�sl S1J�/12 A9D �257,����Is�np 3�rra)
- ��ncre��e�Ilir�g of aband�n�ed pile �2�l.JO per line�l f�t dun��Pea��)
� 5�s�iti�ia8 shoe in Q�ch abandone�i pile 539.99��sh(�ania prise�
- �d�fitaoraa!Pil��ypg A �a3,�92.9�e�sh(uni�price)
- Ads�idi9r��'Pilg`f�rp�6 avi�h�ut center b�r �3,�2&�.OS3 eash(�anit prise)
- a���it's�nal Pil�7yp�9�ntith senter bar �3,339.9fl�ea�h�uni�price)
- Addi6+or��l PiS�Type t $3.,��i�i.9Si�e�sh(l+nit prise)
- �el��es�P31�'�ry�e A 5�3��.9�D�a�h�6ar�46 prise�
- �el�t�esl Pal�7�+p�B yyi3h��d s�n'd�r��� 5427.��3��sh��anid pri��)
a ��9�d��Pile Typ��with��naer b�T ���.99��sh(�a�i3 pTis��
- ��9�t��3 Pi9s 7ypg C ���J.�D��sh�ur�id pris�e}
�9���8�*�e+9�1+3�Tt�C�i�i6a�i f�g�IFeri�td�l i��+£5"eI�D73 S)t's�t1iSSu�3'��9fit3£��. !'`ys�aa���in��r��rn��t�ai3h E�is s�+rr��+arY,P�����
i�S�rp���e�e i�at�a r�vis�d�1o�ls�han�e�ir�s�iag f�o. �,�J�llt�d 4N�9 OPI$If1s�II'j�ISSl1�6I��i F�L9�S1�S'6��,a�1�ku�hag r�At b�e��
��s�s�3e�J d�e��t�e�e ch�ng��.
Sir���P�t�',
�� �.���6�
`��t�'ms��C.�615'S�F�
ff�rvy�st fa��n���v
S�e �e���`� ��
e����q���ms�
��*l��
�.. ..
WWTF-Cape Girardeau
WCD No. 1- Drilled Displacement Piles(DeWaal Pilesj
Cost Estimate
Work Item Quantity Unit Unit Price Total Price
2,472 piles per original design 1 LS $2,900,000 $2,900,000
Add 35 piles to 2,507 piles per design 35 Each $1,190 $41,650
Increase pile reinforcing for 4 types of piles 1 LS $257,869 $257,869
Concrete filling of abandoned piles
Assume 25 piles at 58 LF each 1,450 LF $28 $40,600
Sacrificial shoe in ieach abandone pile
Assume 25 piles 25 Each $30 $750
Additional Pile Tpe A
Assume 10 piles 10 Each $1,492 $14,920
Additional Pile Tpye B without center bar
Assume 30 piles 30 Each $1,320 $39,600
Additional Pile Type B with center bar
Assume 5 piles 5 Each $1,339 $6,695
Additional Pile Type C
Assume 0 piles 0 Each $1,950 $0
Delete Pile Type A
Assume 0 piles 0 Each $456 $0
Delete Pile Type B without center bar
Assume 0 piles 0 Each $427 $0
Delete Pile Type B with center bar
Assume 0 pipes 0 Each $444 $0
Delete Pile Type C
Assume 0 piles 0 Each $669 $0
TOTAL ESTIMATED COST $3,302,084
Original Bid Price
Steel pipe pile shoes 2,800 Each $95 $266,000
Steel pipe piles 97,000 LF $34 $3,298,000
TOTAL BID PRICE $3,564,000
DIFFERENCE IN PRICE (SAVING) $261,916
� �
morris-shea bridge company, inc.
IdOfiR1S-9HEA �n
��E���C 609 sauth 20 street
uae��� Irondale,alabama 3521U-2025
(205)956-9518 fax(205)956-9579
November 4,2012
KCI Construction Company,lnc.
10315 Lake Bluff Drive
St.L.ouis,MO 63123
A[[ention:Tum Husler
RE:Capc Girardeau W WTP—Claim for Additional Pile Resteel
Gentlemen;
Our original scope of work included 2,472 each 14"Dewaal piles with one reinforcing dcsign for all piles based on original design
parameters fumished by Jaco6s when the altemate pile syslem was reviewed and approved in 1uly,2012.Upon further teview of our
original pile design submittal by Iacobs in September,2012,we were made aware by Jacobs that there are in Cact several different
]oad cases that we needed to review that Jacobs had not considercd in Tuly.In an effort to keep things simplified in Ihe field as much
as possible as well as remain economical,we consolidated load cases and submitted 4 different pile reinforcing designs to satisfy all
load cases.
In order to make apples to apples comparison of the original steel amount versus new steel amount,the total numbcr of piles has to he
increased from the original count of 2,472 piles to the cucrent count of 2,507 piles.At the ori��inal unit add price of$1,190 per pile,
this represents an increase in conhact value of$41,650.1'his also brings thc total amount ofpile steel based on the original design but
revised pile count to 897,5061bs.
The new pile steel amount for 2,507 piles is 1,100,446]bs,which represents an incrcascd pile steel amount of 202,94Q lbs.At
$1.10/lb,this represents an increased cost of 5223,234.We incurred$l0,OQ0 in design costs evaluating all of the load cascs and
detailing the ncw dcsigns and calculation packages.The total of[hese two items with ]5°/u markup Cot overhead and profit is
$257,869.
Therefore,we request a change order for the additional 35 piles at$4],650 plus the additional cost of steel and design plus 15%
markvp for overhead and profit at Sz57,869 for a grand total amount of 29$ 9.519.
Revised quantities for each new pilc type and respective unit prices are as follows:
Pile'Cype Quantity AddPrice DeductPrice
p q27 $I,492.00 $456.00
B(no c.b.) 1785 51,320.00 $427.00
B(w/c.b.) 233 51,339.00 $444.00
C 62 $1,950.U0 $669.0�
If pilcs arc dcleted after materia]has been fabricated,then the wsi of fabricated material will be deducted from the respec6ve pile
deductprice.
Sincerely,
MORRIS-SHEA ARIDGE COh4PANY,INC.
�i�Shea Pagc 1 of 1
� ^ ��.� �
��'�;�-��«� �-
N1��3�a�u, ��C
����s �'�� D-3�o�������a�a���r��(�CD��sia�i��.��
���a3e ���9����y, �i���r���er'J�, �S�'D2 3�9:�S�D�iJ
'�ae ����aa, F'�
��a �B�r9c, ��o��;&�J�Bt�����
�5����Se �l:'����9�. 'V ,��f�i3ao�aa6 �3�4����b�a��3e���8��.�{�3��
P K,
As requested in vur mesting last we�k, below is correspondence from Morris-Shea on how the quantity of additional
reinfiorcing steel for the DelNaal Pile was calculated. Please review and advise if you have questions or need additional
information. Thank you.
Tom Huster
KCI Construction Co.
314.894.88$8
3'I 4.894.741 S fax
314.220.3569 cell
rnvw.kciconstru cti o n.com
Frt��: Bill 5taea [maiito:bshea morrisshea.comi
Sent:?hursday, N��rernber 15, 2�D1� 10:3�AM
To:Tom Huster
�c: Davl�! F�s�gsfs
�b,�ect: F�e: ci�im for�dsfiti�onal pi�Qs a�d st��
T��,
Belo�v i�a m�����e��i���br�����a��������a:�����ds�i�i�������3�����������ts�3��u d�t��I����b�4,
2�12e
C)t'isLin�l Dc�it�t� (t�dCti�r4d t�p xo�f��Gi�t 4��ixtV+���l�es�rt 2�t?? �il�.}s?
2,�q7 ��ge��x�5�1��/��g�_��7,���1��
�i���� �ag+e���3��v�s 5m#5-����t��3 ��s��v�3�����i��9�0����a3 3,5°' �����a�f�r�����r 7°�� �" ��e�������
��lata��e��'d����� �.�'�ca������T�a�����������3�����, r'����,����g����;g�����������s�rne�l 3���erag�
3�°. �lo c�a3��ba�s�v���fi,g�r��fi���n� ,p������.���t��r����a]cl�e�i���r����'��a��������i�J�.�r��5��s���
�'�����3 all ���e����:��� 1�����
��vi��ec� iD����
�'�'P�e Ae ��7 ��g��a�42�l��J���e= 1��,9�2 ���
�'�a�c�,�e�c�z���3��of S Y��v���� ���,��a�� ��'���a���������3,�" �����:���u�p�7° �� 7°' ��e�3�r��s�
�,a�����������l a,�°�������r����3����ir�39�a�9���p, a9y��,���c��e��;g3�n;����e�ra�����������������
�3�D°, ����s� ��2 e����a����.v����, �������3�3�/��52�3��, ��2�������3�����a����. �1�����'�����
������t�b�s,
�'�'���� 2,�d� ���s x 4�����/����_ ���,�22���
�
� �
2�3 ���4�r�b��25,�3����/����►3���_ �;�3���
ii'�a����,���ct���n�t���f�-�r��S������3 ���e����-i3���a, ���1�������`�3,�°° �����s�r�f����r'�e��3�7'° ��.�3�r��'�z
�����c��o�'��,�3� a�c1 �,�'�°������3�s�,�E�#i�a�in�t�pa����r�+, s����r�g�������a��zn�� �s����e�����,�3 3�
���r���� �5'. '�'������� �,'7�i���e�������3�, ��i c�������a��t B������i-�1�, '�'��r��r�2�� ���h a3'��.�a���1 �� ����
a3�3i�s�la��3fi�t�s��s��t�i�#fi:� 1'�'c�3�r b�r.
�'�'��o �2 �����x'a56]b�/����e=��,�7� �k�s
`���� c,��;e����is3s�:���#��yi�#3 �i�e���y3S��e�a�uc���3�s) �,��.�" ��3�er� Fnr 3�p�r�'�ul?" ���t�rs���
�iil�ce ra�"l�e�gi��d 2,17'c��s���r:��e�3i�����������c�p. yi��er����g�7�n�h�n 33��p�����umei� ts�
�v��g� �1�'. T�i�er��r�52 ���� ��:�3����l��ls, i�1���s��ah�s���y���3�r b�r�,
�,i���o�����'��c�����3�y�r�aay���r�e 3 �dif�'��������s��i,��n��n�������1,av����a������ti�v�s�sE.��a����a�,�t��
��s�a�e���ngz�,�;�3h�����s1������fl ���oa���'�3������3��a��a�3�i�����f����s��a��1 a��3 3������r�����3�
o�a���,��e i���� ���� �� �t�y���3�1���v�e b�e��y�3�i a�i�a��i��7 �sss,�n s�f� �c��:s��r�31�i1e�, � i�i�,k�h�����:��i�
ass��ta�on ga��e����n�a�nt��'�,���l��g�h v���i���33�������i�y�e ������'ar�n�33��a�ids y�r����°�v��►3�3��
t��a�ag��phi�����el�������s�a���v��t���a�ri�g�,
Let��e���v�.��s��n:e�� ����c1�t��n�i�:f'��z�������a��3���s���am.
�'lc`1Sl�i"5.
Reg�rds,
Bil9 �hea
f�,llor�-i� ���� ��i��e �������, ir��.
�09 S�au#'� ���h �►t���et
Bir�ir��har�a, J�L 352'�� �1�A
+°� 205 95�6 951 S {vffice)
+1 2�05 807-�244 {rnobilej
bshea .morrisshea.com
www.morrisshea.com
���ov�, 2fl12, �3 Se�l PiiY�,Tc����a�t�<toznhuster(a�,kciconstruction.com>z���3�:
s;�i,
Jac4b�h�.s rQvjev�r�d rh�chang��rder r�que�t,�n�1 v�+��l�19k�mor��.nfarmation�.�h��y��:ar.�v.ed at�h�Auaniiry vf
r���r thai�v�s��d��, Al�a��f9rv,rar��d�i��J�d�r��kd9v�n of,�rigina9 v�,preser�t cig�i&n� Sh�nky��.
T�r� ���r�r
KCI Construction Co,
2
� �
314.894.8888
314.894.7418 fax
314.220.3569 cell
www.kciconstnaction.com
���a; �i�9�a [�a��t�;��aea�morrisshea.com�
��'iv P��s�ay, �s��r+a'ber�5, 2�312 9s3� ��
�'�v T�a �3�s���
��v ��as� ��g��
�a7�1j�c3; c�3rr�fD��'f��r��a��S a��t�9
�"•L�171,
�e��:ti�����3��t3er�l�ei�����uz��qa�es�f'�r��a�;�e���1�:��r��i�1:ii���,�1��]e��.1 p�]e rci��a��in��r�E10 `�k��
�����:�e���.nit��e� ������ci��+���������'�����:����'3�i,e n�����e°t3��s,
�.�����.��i�'y�������y�u�����,
��k�,
�������,
8�1� �'��a
��r�i� ���� �ri��e ���aapa�y, �ra��
��� ���ath 2��h �tr��#
'�i����gh�m, A�. ��2'�� �.J��
�3 2fl5 �5� 95'i 8 �c��fic�ej
-�'� 20� 807-3244 (mflbil�)
bshea(a�morrisshea.com
www.morrisshea.com
�
/"� ^
��� �
���,�������
a�����.� ��������,
�3��?�1sn3��Bro�J
�t.��s,9�3i���u7i>�'i92
�'J�.3�v.�A�9D �F�y�'J�.'1b3.�'J�'J
�`�ugta�t 2�,�03�
�:iT,'Ta���3��3�er
3���C]�L'�sti.�icr���C�mp��
1�33�7..�-ik,e Blz�:�'�rav�
�i.I�rnu�,Iv1D�i3723
��ibj��3: ��s�uQ����v��:aa��fla�l.����--������j 33r�17ex7 I]�;rpla�Qm��ri P��e3
➢�ar�o�e
':i�i�i�1er is�s�fc�r�aliz�e the���t��9 iri�t�11 �'�"�1i��i�r I>�l�Y�l I3ri]1��1�3i�p�����3�'i�e�i��i�i}�'s�ae
�iles, 'Th�p.����r�b���vn i�e i�ek3er gr��a�al frc�sa3�i�s�-n�-Shc:�t datE�i.tuiy 2�,2�12 and td�e�ci�i�
��1_c�7��n�3�teti�1�13�3�.2C��2��h�����e�h�'T�vi�+?,��.����i�u.r r�-asesi pr►ces�roposscl in y��r+er��i1
��t�d Ju7y 2�,2fl�2. PIE�e�s�n:��n th���i��s 13�����L��+�� �n TecLi�E Of;�vur zvri#teci�p���'val,��s,��s
�Cfi�:g�Dir�c�iy��i�l��pxsp�r�s1,
��si��2,�1�2 pil�s p�'�.i��xi��3: �2,�13f1�t�D.�(1�3n�+��)
�'�z�ac�ar��3�s.�x�3 p�l�: ��,1���t�3��i't�ic�e)
�'�o�each�€i�e�1 p�i�, ;5�3U{��1�rric�e)
���ritaci�:�sh��e������n�l�aesl pi��: �3D,l�9�u�3�ri��)
��r�e-fillix►g��'�b�n�d�n��1 pi:�e; �2���in�3:f4flt
�1�Ea�e��nta�3 m��i�1s1-33��4572�r pk.�°���i����bs,�fl�if�r��hay��y��������r����'y
a�1�c�it�san�►1 in#'�rmata�n.
�3n�erely,
��to��
�!/ .
�v
�',3��Ivl��i,P,£.
��j�c3l�i�v���r
.A3i��hm+�n2
�e K���:����
�G���y����
����31�1��9�2
��s9��'r,�br.���r�l����r�1�s.
/�'1 ''�
��'� �
�������� �
��3����, ��
���fla�o ��o� �a������3�a�a�aa�t�r���a�m�a�t�a�36a�.��a��
����; ��i���,����sd 2�4, 2fl'!2�1:�`d P�3
��_ �E�d�a6, F'�b
�C�, ���s�, ��i3�; �r�r�k�, ����L.
���b���3; E�E: ��F��v. '6 -�e'��I� ��36���d D�s�O���o�a�raa Fi���
P K,
We confirm that the pricing included on your letter for RFP No.1 dated 8/24/12, is correct. Please proceed with the R�P
issuance.
Yes, still waiting on the pile log example. I was supposed to have this week with their complete submittal packe#. Will
try ta expedite early next week. Sorry for the delays.
Tam Huster
KCl Construction Co.
314,894.8888
3'14.894.7418 fax
314.22D.35fi9 ceil
www.k ci construction.cc3m
Frora�: Mathaf, PK(mailto•PK MathaiCajjacobs.com1
��at: Froday,�A�g��t 24, 2fl�2 �2:15 P!�
'�'o: Toraa Nu�t�r
C�� Cla�k, Keiih, B��sroke, Ca�+ L.
�����ts F�FP 6��0 � - [��a3� f�dilles! Displa��rro�nt F�9�
�o�,
�3ta���� i�3hQ �FP A��.� ��a-t��DQ�aa�paa�s. �t is��s�f����l3ze�h�p�icPs°r�e agrQ��l��an�!a�t�r y�ur co�a�ir�a�ti��a,d��
ar,r�l��re��f�a'�J��,
Ai�s�, i n��si��a���33ta1 f�r� f��r�os-��ae�a reg�rdi�g���t��'sr��9e-�riving data r��ordia�g tr����cid��nrheiher i3 is s�fifii�a��t
a� 9��e��s��a�hisd �r3�+s�a��r�+is�v�a a�d data rez+��d6ng.
Th�nks,
PK M�thai, P,E, ��1ac�bs,3'14-3�-4572� �1�-��5-��i�� ��?s , ok.mathai a�,,�,jacobs:c9m
�Ji3T"s�E-��ig s�rnrr�ur�ic�:io�r+�y cs�raaai�confid�nti�4 ans�pTivi9es��d infiorm�tion t��3 is ior tt�e sot�u��04 th�in��;�osl�d r�sipiEn�.l�ny
vi��ir+�,�o�yis�s�o�sJi�i����si9n�t,�r r�li��ts�srr+�hi�ra��ge by u�i�d�ndg� retipi�nd�i�strictlq pr�hibii�d. i�you havQ rec�iv�d thi�
Gi1��5r7g��BfJ�:Ti�PTe p9��s2 r+m�l�fti us imm�di�gly 3sy r��lying�am ihp mess�g�ar+d dgleti�s� it�s�rn yo��comps�6er.
1
�-�. r►.
WG/)' �
A�l�u�hn�e��y'
morris-shea bridge company, inc.
� �h
MOfiR1S-9HEA 609 south 20 street
BRIDG�CA.,INC.
��i��,
�p� irondale,alabama 35210-2025
(205)956-9518 fax(205)956-9579
November 4,2012
KCI Construction Company,Inc.
10315 Lake Bluff Drive
St.Louis,MO 63123
Attention:Tom Huster
RE:Cape Girardeau W WTP—Claim for Additiona]Pile Resteel
Gentlemcn:
Our original scope of work included 2,472 each 14"Dewaal piles with one reinforcing design for all piles based on original design
parameters furnished by Jacobs when the alternate pile system was reviewed and approved in July,2012.Upon further review of our
original pile design submittal by Jacobs in September,2012,we were made aware by Jacobs that there are in fact several different
load cases that we needed to review that Jacobs had not considered in July.In an effort to keep things simplified in the field as much
as possible as well as remain economical,we consolidated load cases and submitted 4 different pile reinforcing designs to satisfy all
load cases.
In order to make apples to apples comparison of the original steel amount versus new steel amount,the total number of piles has to be
increased from the original count of 2,472 piles to the current count of 2,507 piles.At the original unit add price of$1,190 per pile,
this represents an increase in contract value of$41,650.This also brings the total amount of pile steel based on the original design but
revised pile count to 897,506 lbs.
Thc new pile steel amount for 2,507 piles is 1,100,446 lbs, which regresents an increased pile steel amount of 202,940 lbs. At
$1.10/lb, this represcnts an increased cost of$223,234. We incurred �10,000 in design costs evaluating all of the load cases and
detaiIing the new designs and calculation packages. The total of these two items with 15% markup for overhead and profit is
$257,869.
Therefore, we request a change order for the additionai 35 piles at$41,650 plus the additional cost of steel and design plus 15%
markup for overhead and profit at$257,869 for a grand total amount of 29$ 9.519.
Revised quantities for each new pile type and respective unit prices are as follows:
Pite Type Quantity Add Price Deduct Priee
p 42'7 $1,492.00 $456.00
B(no c.b.) 1785 $1,320.00 $427.00
B(w/c.b.) 233 $1,339.00 $444.00
C 62 $1,950.00 $669.00 ,
If piles aze deleted after material has been fabricated,then the cost of fabricated material will be deducted from the respective pile
deduct price.
3incerely,
MORRIS-SHEA BRIDGE COMPANY,INC.
BiCCShea Page 1 of 1
� �
morris-shea bridge company, inc.
. 609 south 20�h street
MOARt3-$HEA
g�p��Cp,��C, irondale,alabama 35210-2025
�g�� (205)956-951$fax(205)956-9579
July 20,2012
KCl Construction Company,Inc.
10315 Lake SluffDriva
St.Louis,MO 63123
Attention:Tom Huster
RE:Cape Girardeau W WTP—Dewaal Pile Proposal(rev.2)
Gentlemen:
We propose to fumish all labor, equipment, and materials required to design and install 2,472 each 14" Dewaal
drilled displacement piles as a one for one swap to the base bid 12.75"diameter x 0375"�vall pipe piles on the
referenced project for the►ump sum price of 53,088,762.00 according to the basis of proposal outlined below.
BasisofProvosal: �$ �k�
• These piles will be designed and installed according to the parame rs outlined in the Design Memo dated
lufy 17, 2012 and the Pile Reinforcement Designs dated July , 2012, both of which are prepared by
Richard Stone with SBE,LLC and are attached herein for reference.
• This price considers the usc of Pile Reinforcing Type PL14A (full-length cage) as sho�vn in the Pile
Reinforcement Designs d�cument. Rebar cages will be deli�ered to the jobsite already fied up and any
modifications to cage lengths(cutting or splicing)based on actual pile lengths to bedcock will be made by
pecsonnel in the drilling crew and not dedicated iron workers.
• We assume the risk of pile diameter and tength to achieve the required pile capacities.
• We have included one mobilization of one drill rig with support equipment for the continoous installation
of all production piles according to a standard schedula of one daytime shift from 7am ta 6pm,Monday
through Friday.
• We have assumed an average overburden length of 2' above pile cutoff for pile installation. The working
grade for pile installation shall be minimum of 6"above top of pile reinforcing steel.
• This price does not consider union wages and personnel but rather the published prevailing wages for this
project.
� We do not include surveying and as-builts af pile points.
• We do not include any pre-producrion or production pile load testing or integrity testing.
• We do not include third-party materials testing or production pile inspection/reports.
• We do not include preconstrucrion photographs.
• We do not include protection of adjacent structures or vibrationJsetttement monitoring of adjacent
structures(this pile system if vibration free so vibration monitoring should not be necessary).
If we ahandon a pi{e by extracting the driU tool from the ground in reverse mode to leave spoils in the ground and
leave behind the sacrificial shoe at the end of the drill tool,but not place concrele or reinforcing stee]into the pile,
then we will charge$30 for each sacrificial shoe and$22/LF for the abandoned piles, We wi11 charge an additional
$6/LF for concreting the abandoned piles. This price applies to any quantity of abandoned piles.
Unit prices far changes in the quoted quantity of pites as referenced above are as follows:
ADD: 51,190/pile DEDUCT': $430/pile
Page 1 of 5
� `�
'I'his proposfll is subjcct to tl�c attzchcd Morris-Shcn Bridsc Compaiiy,l�ie.Tcrms�nd Conditions of Pro��osal.
�Vc appreciate tlie opportunity ta subniit this proposal nnd nre availablc if you should liave any questians.
Sincercly,
MORRiS-SHEA[3R[DGE COM('ANY,INC.
�i�,�� (��----------'
a�u si,�a
�r�
Attnchments: f'ite Rcinforccment Design<iated luly 18,2012
Dcsig�i Memo dated July 18,2012
Page 2 of 5
� �
Morris-Shea Bridge Company,Inc.
Terms and Conditions of Proposal
Thc[ollo�ving itcros are excluQed and i[required shall be provided by othecs or provided by M1torris-Shea for en addtHonai cost:
Dipping nnd chipping piles below worl<ing grade.
Building piles up above working grade.
As-built drawings: Drafting,drawing,plotting,or other preparation of oew or edited drawings depicting as-built conditions.
Sales tax on permanent materials.
The follorring facilities and services shall be provided by the Cencral Contrector or thc O�vner at no cost to Morris-Shca:
Working Surface: The working surface at the site shall be prepared and maintained by the General Contractor such that it is traPficable
for our installation equipment,support equipment,end delivery vehicles at all pile locations. The sile und any access roads should 6e
firn�,(evel,Free draining,and unobstructed,��7th ramps no steeper than 6I-1:1 V,such that trucks cazrying materials can mal:e deliverics to
any point on the site under their o�m power and crawler mounted equipment can move about ihe site without the need ibt mats. Any
delays lhat result from inaccessibility caused by lack ofthese provisions witl be paid at the rate for standby time. Pcior to beginning lhe
work,MSB shall have an opportunity to examine the sile to verify its acceptability.
6
Drawings and specificetions: Ttuee copies of all appiicable released for conslruction drawings, specificntions, or other contract
documents as weil as any subsequent revisions. Any re�isions shall be issued a minimum of one�veek prior to scheduled installation of
the affected work�vith all ctia�ges cleazly identified by clouding and notation of revision. Additionaf costs such as removal andlor
replacement of previously installed�vork will be paid at contractprices or established time and material rates.
Inspection and lesting: Third perty inspection and documentation of instalintion and materials testina,
Surveying and layout:All surveying and staking oflocations and elevations for each structure end individuel foundation unit az well as
any as-built survey. Staking of pile locations must be done in sequence�vith installalion or re-stak:ing will be requfred. As-huilt survey
of in-place pi(es is to be performed on a daily basis with dula on any out of tolerance piles provided lo Morris-Shea immediately. Final
as-built survey infonnation is to be provided to Morris-Shea within;>.4 hours of installation of thc last pile,
Facavation: General site excavation and e+ceavation of specific structures or pile caps,
Dewatering and drainage_Control of ground and surface water as necessary to keep khe tvorking surface,including any exeavated areas,
sufficienUy dry.
Shoring: 5heeting,and bracing or ottier adequate maintenance of eacavation slopes.
TrafFe Conlrol: Detours,signs,flagmen,end bazricades required to maintain botl�vehiculaz and pedestrian trnFftc�hat is divened during
construction,
Barricedes�nd l�nndrails: Ins[allation and mainteaancn oEbarricndcs or handrails around excavated ereas.
Tire�+�ashing: Cleaning of tires of delivcry truc�:s when depaRing the si[e.
Mitigation of contamination: Handling,con�uinment,end disposal ofcontaminaled soil or ground�vater encountered on the pro}eci.
Dust wntrol: Wakzing,grading,or ground covering requircd to control ar limit airbome dust.
Pccmits: All permits required for the legaL performance oFthe work.
Utilities: Locetion,removal,relocatioit,replacement,and repair of underground or overtiead utilities.
Obstructions: Removal of atl overhead and underground obsWc4ions that restrict moveme�t a�d safe operation of equipment or
performancc oF the wock,
Vibtation end set[lement monitoring: Monitoring and measuring oFvibca[ion and/or settlement during�vork operations.
Thts propose{is[urther conditioucd on thc fotlowing:
All work will be perFocmed with u merit shop workforce.
Pilc loent{on toterance: Piles will be iasfalled in accordarace�vith the specificatian,starting in the correct location with►he propec
plumbness anNor 6aUcr. If e pile is not atarted on poinl,ti mus[be noted on the pile log by lhe inspeclor, If a pile is installed on an
incorrcctfy pinced poin�reme�ial costs wilf be bome by Ihe party responsible for surveying. If a pile devietes beyond the allowable
loteranee or is caused to be defeetive due to undetgronnd conditions,the installed pile or length of pile,as well u any replacemenc,will
be included in the quantity for payment.
Page 3 of 5
� �
Pile pay Icngth: Piles tivill be paid on a per pile basis on not per linear foot.
Working elevetion: lnstallation of uugered piles will 6e performed f'rom a�vorking elevntion that is no higher than the elevalions
referenced in the proposal and no lower than 6"foot ebovc top of pile reinforcing steel.
Pile elevation tolerance: Piles�vill be poared to the�vorking grade. [f dipping or below grade cut ofF is required,that work wil!be
performad by others. Upon completion oPeacli pile,the Otivner's inspector should document that the top ofpile conerete is et or nhave
lhe plan clevation. In the event lhat the grout subsidas belo�v plan cutoff clevation,corrective�vork q�il!be performed by others.
Shallow reNmt: lCa drillcd pile rcfuses at a depth shallower than planned,the engineer wil{he notified. Unless directed othenvise,that
pile wll be�couted to the depth dcilied and a replacement instalied at a location designated by ihe engineer and bolh the abandoned pite
and the rcplacemenl�vilt be included in the quantity for payment.
Pile to pile cap connecuons:Reinforcing bars lhat project&om cast in piace piles will 6e straight bazs with no hooks or bends. ]f hooks
or bends arc required,then they need to be cvonected by otUers wilh mechanical connectors at the time of pile cap construction. Our
price does not include connecting hnoks,bends,orotlier bar extensions tivith mechanical connectors.
Refusal: This proposal is based on installing piles to the speciPied criteria or refusal,whichevet occurs frst If not defined in the
specifications,the criteria for cefusal for s driUed pile will be the point at which the penetretion rete oF the auger or other drilling tool is
iess than one foot per minute.
Ownar provided insurance(OCIP): If an O�vner Con[roiled Insurance Program is implemented for this project,Morris-Shea will provide
a credit for insurance costs. We will nol however aecept tecros whereby we nre responsible For premium overruns unless there is a
similar provisioa for us to benefit From any savings in premiums. Any chacges for excess premiums tvill be based on rates no gteater
than tBe rates established in our original credit calculation. Morris-Shea Bcidge Cornpany, Inc. will not provide ony insurance
crediUdeduction for wverage that is purchased on a flat rate basis.
Schedule; Any schedule tl�at is provided with lhis propusat is based on optimum conditions and does not allow for contingencies of uny
kind. We do not guuan[ee oompletion any evlier than the completiUn mileslone date(s)stated in the bid documents.
Working hours: Morris-Shea will work 5—ten hour days per�veek and H•ork additional overtime ot weekend days at our discre[ion. In
any case, Monis-Shen will not be responsible for inspection, general contractor's supervision, or nny other consequential costs of
ovenime work.
Continuous Work This proposal is based upon our liaving sufficient access to the work ulong�vith released for construction drawings
such thal we can perform the entire scope of work in a con[inuous and uninterrupted operation witli no wniling and no mote than one
mobilization.
time: If Morzu-Shea's work is delayed more Ihan fit�een minutes during any wocking day due��n ra o cn orrisShca, ��jjy1
drawings,limitations on access,w e o�mcr o
standby time wiq be paid by the encr , . per rig per iour or i
Work sequence: Morris-Shea's�wrk will 6e performed in e rtiethodical manner whereby the work in each structure/arca is completed
prior to moving on lo thc ncxt,mosl adjacent,structurelarea to be�vorked. Rewming lo e previously worked stcucturelarea or adjacent
area due to added wotk or ptevious resldcuon on�vo�k will be considcred an out of sequence move and ivili be paid at the same rate as
standby time.
Confidenciality: All speci6cations, dcawings, pricing, or other technical data submitted by Morris-Shea tivith this proposal or in
conjunction with the performance of ihc�vork,�vill be treated as confidential and shall not be disclosed to any third pany�vithout tbe
express written consent of Morris-Shen Bridge Campany,!nc•
Performance and payment bonds: Thu proposal does not include providing performance and payment bonds und the cost of bond
premiums is not inc]udcd in the proposed price.
comp etion vithout a pr o�agc ehment tl latprovides an qm�valent banus for early compleiontual, or consequential damages due to late
Back charges: Morris-Shen rvill not accept back charges for cosls incuRed by tha general contracror unless we are notificd priot to any
cortcctive actions and also given sufficient opponunity to make such corrections or perforni the subject tvork.
Liability: Morris-Shea will not accept liability or responsibility for defects oe damages of any kind acising from a eause that is oulside
the immediate knowledge and control of Morris-Shea. Morris-Shea w�l in ao casc agree lo dcfcnJ,indcmnify,or hold hazmless others
from or agaiost their otvn nc6ligence,ercors,omissions,or a�rongdoing, Morris•Shea's linbifity for any aet thnt is subject to any claim
shatl bc►imitcd to Mortis-5he3's pro rata share of fautt or responsibility for any undertying aa,evcnt or omission giving rise to aay
claim. Morris-Shea�vill not accept tiability for daznages to adjacent propeAy or any stcuclures lhat�ce allegut to have 6een caused by
wotk�serformed hy Morris-Shea IIridge Company,lne.under the agrced upan contract tcrms and speeifieations.
Page 4 of S
� �
Yaymcnt tcrms: Nct 30 with�11 retainage due 30 dnys aflcr our wotk is complete. Under no circumstancc�vill thc perccntage of
relainage with hcld from subcontrector exaed that�vhich is being wilh held Gom contrnc�or by owner end at no time shnll exceed 10%.
Puymeni wili noi be contingent upon generul contractor's rcaipt ofpuymertt from tku ownec Payment aCour vendors�viU bc made per
dic tenns of our purchase orders enJ subcontrncts end lien rcicases from our vendors�vill bc provided with thc Coliowing month's billing.
\Ve will not accept tenns wltereby paymcnt lo Morris-Shea is depondent upon our providing relenses of licn from vandors Cor mattrials
Cumished or work perCormed during thc snme paymont period.
Contract: No commitment to mo6ilize will be made nor will any wod:be pe[formed until we have a Cully execuled conl�a�l in our
possession. Any conhact that results from this proposal will contain all terms and condilions of ihis proposal.
7'his proposal is not a contracl and�viit not form the basis for a contract or reliance untess and until(I)it is accepted in writing by the
other party;and(2)the pariics are able to enter into a wcitten contcactual agceement with terms and conditions acceptable to Moais-Shea
Bridge Co„Tnc.in Morris-Shea Bridge Co.,Inc.'s sole discretion and judgment.
Tl�is bid proposal is based upon ihe understanding tha�any con[ract arising from said bid will be an Associated Generat Conlractors
(AGC}ConsensusDoes 750:Contractor/Subcontractor Agreement coNract or contain substantially similar lerms and conditions as un
AGC ConsensusIIocs '7�0: Contrnctor/5ubconiraclor Agreement. Any deviations �vill be subjec[ ro revie��� end poteniiel curative
language.
This proposal is finn for acceptance within 30 days of submittal ��'ith the follo�ving exception, this proposal is contingent on th�
availability of resoucces.Eqc�ipment and manpower are Jistributed on a"first contract rcceived"basis.
Page 5 of 5
� �
4
SY.✓LLV
6 aeawatch ddv8
��� ��� aavannah,georgia 31411
9�2.Zb7.0633
July 18,2U12
Fil.e Reinfoxcement L�signs
C�pe �ixa�d�e�� WV�TP
Ca.pe Gua�d�au,M�
Pirepared for:
iVlorris-�Sh�a Bzidge Co.
so� s. ao�n st.
Irondal�, AL 3521U
Attn: Bill Shea
Frspared b�:
SBE, LLC
Richard Stor�e,Ph.�.,l'.E.
� �
APPENDICES
Appendix A Narrative
Appendix B Pile Type A Reinforcement Design
f l �
APPENDIX A
� ��
I)esign Process Camments
t. Th�designs herein include a detail for Pile type A.
�. '�`he pile type is designed for the loads as fai�ows:
Pile T e Com ression,tons Tension tons I.atcral tons
1'L14A 6U 0 5
3. All piles rec�uice�5 ksi concrete stre�gth.
�. Piles are design as fixed�ead.
�. tlltimate loads are dei�rmined asst�ming la�eral loads are primarily due io seismic loads
(4oad facior= 1.43).
� 1 �
APPENDIX B
4 1 �
14"
� �,_611 — —
3"clear
�+ See Structural Drawings
M �Don t Spece�s @120
Ud
� b
.Q
� �
m �
a
M
�
O
5#6
#3 ties/spiral w!3"
seismlchooks SECTION
18"lap
�
� Set of 3 Plastic ,
►- Donut Spacers @120
.�
�a
:�
�
Set of 3 Plastic ,
� 1--Donut Spacers @120
� SCOPE DESIGN LDADS
Thedeat8nqesenled Compression 60�ns
� heteinlefalherefnfercin9 Tenaion O lona
+ Pile length rewi,�atormea�aiea �tero+ s.o iaos
� determined by depth to Bedrock deslgnloads.The
—�or Bedrock 1ed 2 SUuctur+l Enginaerof fMTERiAtB
g Heoard b reaponat6le for Conaele 5000 psi
' verlying Ihal lha desipn is Reinfordng 60 ksi
Scale:Not to Scale ptopedyin�oryoroledtnta uNo
ihe vrork and for apecdying
and monRoring all FABRICATION
necessary inspecllons end
olt�rquaGly ess�tunce
measures.
NOTES rtkas�st�Ns
dr�rfnp tle
PileRefnforcingDetail CiNdesignedtorFl�edHead ForrevievrandAppravai
conapon.
a�v,,� wrtMd�le �ro"
�T� w�a� R.Stona 07/18/12 0
L Cape Girardeau WWlP R�� m°^'�''°'m"'
Cape G(rardeau,MO °"�°""OmDef d�°��pL14A
D00-2012
� ��
�, ��� L�C Pile Reinforcement Calculations
Generai ProjQct Information
Project Name: Cape Girardeau INWiP
Date: 7/1 8120 1 2
MSB Project No.
Project Engineer. RCS
Geotech�ical Engineer: Jacobs
Pife ID: PL14A Pile: PL14A
Pile Cuto(f Elevation: Q.0 Rc�vision: 0
Codes�&Standal'ds - Seismic Design Parameters
Building Code: IBC 2003 Seismic Site Class: C
Concrete Ref.Code: ACt 318-02 Ss see plans
SI
Occupancy Use Category see plans Fa ,
Fv
Sds "
Shc "
Seismic Desian Caleao SDC1 �
Geometry otamecer. Aro� Inaitia
{nches in"2 in"d
rtom?na1 Dimenslons used for concrele sirenglh 8laterel analysis
14.0 '154 1886
Destgn Dimenslons tor Reinlnrdng Calculailons
�4.0 154 1888
�ength: 46 ft. Tipped on Bedrock
ins eclWn Re d: es
A' �Iled Maximurr�SeNice l:oads DesT n Cate o D Conorete Stron tti Ra utremet�ts
Case Qest� tipn C ki s T ktns) Lalecel ki s} Max fc= 0.33 1'c
1 Max C 120 0 D C= 720 ki s
2 �T Q � p Min fc� 2362 51
3 L+C 120 0 1D USQfr,= 500q si
4 L+T Q 0 �0 Cover= 3.o fn
5 Moment,k-ft o Plie Caps: Use fc= ��0 osi
Soil Parameters for'La`teral Anal sTs
Depth of Layer,in. Botlom kh y m Cohesion e5o P-y
Soii Type ( de rees nst multlolier
Too Bottom Elevation,% t de�aull 1
Saod 0 -8.0 70 58 �4 ._ .
Cle 8 -22-0 58 700-1000 detaull �
C(a 22 - �s.o 5B 1500-a0o0 default 1
R ock
a5 -4a-o 75 100a si — ti
Load Feclors
Case �escription Factors
� T L
1 Max.Comoressfon �.4 0 0
2 Max.Tension � �•4 a
3 Lateral+Com ression �,4 � �'43
4 Lateraf+Tension 0 i.a 1.43
1
� '�
- pILE M4 •Rosulls
ortv r!a o�U
1padFactot i!3
�n� Fac1u od
InIleHlon IAa:Imuma
f2 372 IO.G 51.2 /4.]
Qa m oan.�na� Mnment Shear SonP•mnon 0¢ �h �oIICclb Mome�l Shwr Moment Sheat
Iti 1. lba.tn. lbt, fLsOn. H. 1n. k-R. k k-h. k
.pp O,S} -44��397� t0�00DU �.00 004 0.1J -37.2 7Q.0 -53-2 t4.3
g. 0.13 1847dfi3S 993728 -20.48 �.5� 013 �2.f 99 -A5B Id?
�227 Q1d -3237a9.19 g739.ZB �4.1C t 0 O 1J •7. 97 13.4
t840 0.72 -�A�B9.Q5 B39 21 -66.M 1.53 O.t2 - 9A -:1.5
Zd.53 O.f •206984.57 8930.09 �6 77 2.Od 012 •1 2 8.9 -�.1 12 9
30.87 0.4} -152Q?D_64 B35F.?5 -1�Q.95 2SfS 0,11 •�2T 8.d -�@2 1t9
3ggp 0.10 -10 57d.91 770?.64 -1QdB4 3.07 O10 -65 7.7 -122 11.0
<2.93 8.�9 -5630992 702I.D< -112.82 3.58 D.09 �.7 �A -0.7 1Q,C
�9_07 0.02 -t4250.01 6�434.15 -ti3.13 �.OB 008 .1.� 6 .�.? 41
@ 2D 0.07 'L?5530� b564.1D -t05.17 a.60 00? 20 5.7 2.8 t
8133 0.07 6/58747 5008-60 -YQ925 5.71_� 4.8 6.0 6-8 7.
74� O.DG 8708247 �32b531 -�12k6 563 008 T,3 43 10.4 6>
� .F,p D5 172agg_18 3620.06 •557.�9 8.1:f 005 4� 3G �34 51
73.73 Q.04 1334i2. 2 .80 -121.82 6 4 Q�1 .1 . 5.9 4.t
65-07 � 5497015.1 2132.34 -124_t0 T.76 D63 t2.5 2-1 5I,8 3U
�Q ,pp .47 l6l 3. 9 1372.91 -123.5d 76 O.W 1 6 14 192 0
98 43 Q.02 lF@pfii(14 6�2 6[ •�77 07 618 0.0 '1� 0 8 20.0 0 9
t04.27 OD2 170710_18 -BJW -t'1570 fi69 002 ��.2 -0.1 �� "�.1
�10_40 0 1 1687d5�� -78 75 -�172) 920 0. 1 1< A8 �00 4.1
118a.9 0.01 1fi1667.91 d456.5] •101.39 9.71 OA1 135 45 79.3 -2.1
1 .87 0.81 1570057d - .52 40075 t0.21 Oi t26 -21 76.0 -3.0
fY8.90 O.UO 198585�9 -?Fi8� 4 -91 64 /0.3 0 0 11 a . 7 ia 3 �8
13493 0. it?5^7. a205-99 -7a 50 112e aQ0 9.8 -32 �4.1 -46
tat07 O.OA 97 27 -358996 �1577 11.7G 000 8 38 11$ -51
14710 D GO 747 991 �35�5 61 64 47 1 ..7 0.00 0. •3.5 8. -5.1
753 33 0.00 b43E257 •3�OS d6 T5.7y 72 79 OAO iS +5./ 6.5 -4 4
159_47 0.00 �8I5T. -�628.SA 7412 1 20 0. 91 4.8 �d .3.8
i6560 000 22131.27 •2198.�0 BD 2 13.90 1 • '1 26 3.'I
/71.�J 0�0 1Q5�1.�� -185't�9 78.45 1d.31 Q .t.7 t.3 -2d
17L87 Q00 1B3T.41 -7187.01 7A.h6 tA.82 0.00 0 4.2 0.2 •1.7
18e.00 O.I,W 1Q17.6 .7'{5.36 7003 75.33 �.00 -0 -07 -05 -11
19Q.79 QDO -7 3S.t7 5.89 �S8? t-.B4 0.40 -0.6 -0.3 -49 -Q.S
�sr 2� o00 -eoso.�t a.3e ae.oe �a.a� o -0.r oo -�.o o.
2pY pq p0 .73 51 173.73 19A] 1 .67 0 0 1i fi 0 -A9 O�
20853 Q00 -593778 2d714 a92 1).fG 0. -0.5 0 -0.7 0
21<.47 0.00 -437J.6fi 23778 •3.41 t7.89 Ob] -0A 0.3 -0.5 Qd
220.80 000 •2855.5 Y18.� -744 1841 �QO ,(17 0.2 �.2 02
229.53 Q.00 -1855.87 169 a5 -8.`�9
.07 Ob0 -777.1i !SB.H7 - A 14.4 0. -0.t 0.'1 -0A 02
23A.90 OG •148.57 7�.73 -Bd6 19.4� 000 O.Q 1 D.0 0.7
;S_� pg� 1d1_i5 44A� �d73 VI 0.00 00 00 00 D.1
251.47 .bJ �Q0.79 1fi8 - 12 2t}.Q9 0. 0.0 4D QO OA
257.60 Q.�O 34275 1.20 -1.81 214T O. 8.0 0.0 QO 00
?5373 0,�0 �16-59 -7_27 -095 1.93 0 8.� OA 0.0 D
5 � ^g •1t43 •0.40 Y2dq 0�0 00 4.0 0.0 D.6
276 OC OAO 176 7P -1209 0.1 73,00 0. 0.0 -0 0.0 0.0
282.19 OM 1pB1B -�O.t6 0/t ?351 �00 0.0 0.0 00 Q.0
ygg 7 00 5219 -731 CtA9 2a.@ 000 OQ 4 0.0 00
294.40 0.00 18.5 �.53 0�� 4.53 OD .0 0.0 0.0
300.53 0 -34� -2,33� UJO 25.M 0 O.0 D.0 0. 0-O
906,g7 0.00 -12]3 -0.93 OtB 255i� 000 00 0.0 0.0 CD
]1280 0.06 -l:-6U 005 Q70 . 7 00 0 .0 0.0 OD
3t993 C,40 -11.61 0.45 OQJ �28.58 0.00 00 O.D 00
925D7 �M -�7d 054 000 764 OOSI 00 D9 OA DA
3�120 000 -0.9G 0.48 •UA2 27e U.W 00 0.0 00 0.0
337.33 Q,00 -2A1 09E -U.OZ 8.11 00� 0. .0 0. 0
3434? UO -0TB 924 -aD 6 . 0.0 00 0.0
�yg,pp 00 0.14 D.tD -0 1 ?9.13 0.0� 0.0 OA OA 00
3SS.JJ 0.00 03C� OA3 07 4.64 0. 00 -0
38LF7 007 �.5< -001 0.00 3016 D.0 Q.0 OD D� U.0
248.0+J D.P� 0.4� -0.02 0.00 JOb7 OL19 O.Q 00 QO OA
374.13 0.00 Q1'9 A.02 OOU i.t AO 00 0.4 0 00
y��27 ppp 1fi •0.02 0.00 31A4 060 a9 DO 0.0 0.0
388.40 040 �J-U7 -Q01 Qnn 3Z20 d. OD OA 0.0
392,SJ O.W OOt •OD 0 52.71 O.DO O.0 0.0 O.Q �A
�4867 �OAO -001 0.00 000 332R 0.00 O.0 0.4 .0
A04B0 OA6 -0.02 OOP 0.04 73.73 UA .6 0.0 D.0 0.0
a70-3 0. 0 3a.2A �� 0. 0 0.0
417.07 �4U0 -001 00� 000 .78 OOD 00 0.0 0.0 00
e23Z0 0. -0.05 OAO o00 3527 DW 0.9 0.0 DA 6.
429.» .06 0.00 0 35.7 -0. A.0 A OA f10
e35.d7 p�.60 0.00 0 O.Oo ' 29 0.� OA 0.0 00
dd1.60 06 0�0 O60 000 36&7 D.DO 0.0 00 O.D .0
417.3 0� 0.00 Q.00 0.00 37.31 00 RO f)4 00 00
453.B7 O.DO 0-00 000 006 t7. .00 0.0 60 0.0 OA
d6400 R�0 OAO Q60 O.IXI 98.�3 O.Q OQ OQ 0.0 ➢
�:� Q� o_o� o. o00 �r!_s6 aco no 00 oa o.a
2
� �
Cape Gitardeau WVYTP
Plle
PL14A
Deflection,in. Moment,k-ft
_� .ao -zo o zo ao
.o.o� o.000 o.o� o.too 0.�5o p �
o � i, 5 "---=+-�.:..
5
�• 1D I
�D l15•
�5 � 20•
� 2D � 25,
6
0 25 �p
� 35
35 40
40 45 ----
�,.-?Frlr.t —�a=wre! --Idcr --Idcr
45 "
Shear,kips Soil React7on,161fn.
•10 -5 0 5 10 16 20 0160 -100 -50 0 5� 10D
0
5 � 5
10 10
15 `� '15
� 20 k 20
� �5 0 25
O
30 30
35 35
40� �
t° _
._..�:ani:. —Fanorad --P\'U2 —�pYtl2 AS �— _—.__.___'_.
� `F �
Longitudlnal Relnforcement
actor,e os gn oa s rac ung ommi
oct on ata ase P(k�Ps) M( ' �1
Olameter 14.00 inches � � 8 0 L�;�;_3•;:,'�5i,,
c 0� PS 0
ovef incnes
Area 153.94 sq.m. 3 � 8 532 4,g Y.•tt.
ie rze
ar 4 0 5 ,2 Q��=_
Pile Cap fc 4 PS
sp o umn osu ts pac ng ec
Number Size rade Area(in^ ) RaUo Actual Min.
60 2.20 'I.h3lo 3. 'LZ Z. 5
pile Welght 0 kip5
Cage tenslon loed 0 kips
CeatnrBnrloed 0 kips aflo .anpt� n e
en er ar= eps on oa Mlnimum 10. t, iec ts�o
YP� � Flexura 15.0 . lec 2ooa
fade 60 t5 s� Y� v<,7(phUd2)
� Q k(aclore j hear .0 ft.
ension Load Crackin �4•
Maximum tress 54 67.5 120 ks^ Use: 9 45,0 Minimumcasa
eqd.Area �.000 0.000 . 0 ln 2
Bar ize 7 10 '1.25 In
ar D ameter 0.875 �•Z� �• 5 �n
o. 8fS 1� 1 IM1
raUe 5 �5 ksl
0.60 .2 1. in" Use: Mild 0.6o in"2
5- As(totat�= 2.80 In"2
A�ea Chack: a�e total= 1•82�0
Aac[uall reqd= �•a�
eve opmertt_ enp - ars n ens on
Davelopment len9th is based on ACI(12.2.3). Vanabies C�e���e i Center�Har Cage Bars�C nter Ba�r Units
� 1 ? ?
ld 3 .��' W r_ �,�--_� .'i' 9'� 1 1 1 j
da 40 ��( � + K ��� u,� oa i a.e i
t w�� .� 1 1 1
� dn � _
dy= 0_75 O.SB 0.75 Q.88 In
4.000 4.�00 4.000 4.000 sl
C+K,. pc- 60.000 60.OU0 60 000 60 OOD sl
<=2.5
C dl c= 1.63 1.6� 1.91 �.50 in
�Idb= 2.17 't.SB 2.50 2:50
Id= 97.1 33.5 17.1 24.9 In
No1e:KVassumoaasuro_HGI t2.2.3 UseLd� 17.1 33�5 '17.1 24.9 ln
Develo mont ten th-[iars wlth Hooks .
Variables Ca e Bar
For members subjected to axial tension: db_ p,75 In.
0.02 f� = 60400 sI
� - ���b fC= 4000 Si
dn '" f,�
J �J. _ 'I.0
noi less than 8db or 6") �+�__.` 142 fn.
ACI(12.5.2) � Use: t4.2 in.
4
� ��
SHEAR
7onolnn
For memtier w�jeUed fo s.�gni4canl tudal tcr�sbn; Vaie6les .
O lhs.
C N 1 �— � 75394 m"2
T��=2 1+SOOr�b jv1 `�b��d ew= u�oo �s�
ACI(11,32.3) d= 11.2 k�.
� = 0.75
Va a 222 k
�1', = t6.8 k
�t',!2= 0.3 k
Cotn i�6sWn
Fw mambers su6jeded to signlficanl axial rampression:
l'd �`"
V�= 1.9�+2500p, b,d 53S�b d �+SOO.f,
�(41i—d)
A!�—�`. 8
ACI(U.3.2.2) Variatrles
(C= rj000 DSI
h= 14 00 In.
ew= ta.00 u,.
d= ?t2 In.
!�� _— 2 ze m^2
P. _ .Q760
Nu= 0 �
Vu= verie5 165.
Mu= varies irv@5.
' Traosvrarss RelnfOrcemunt' .
Ral.IBC 1810
- It fCntanl �na als Paramotorn
�g�gebrmep.' �cn� O
� iKira�iv.ROi+d. 0 R. iBGfBtO (wnFn!dmNl��mm<nq
Min.Helnlottodle 23 fl.
. 7Tof3 �raf Par++metela -'
6ar S�za 3
dh Q.375 In
/�y 0.1� In^2
60000
�7nnevino RHnfo�erment5 �sln � HN n6I21,�A,ibC�810
S<:min 6 db 0,25•D soj, so=4(min)to 6(meK)inches
s mtn: 1.3 In
Tnnavorca Roinforcomvnt RaGa .
RaI.AC121.1!JBC1B70 variabies
r�� soao 5�
� � s0000 sT
P.t.0� 0.01
Pr = O.12 f`— p.n.5= oos
r
usu p, 0-005
•:.••oom. B in
notes: cwevd= 06a2 It!"3�R
lar Gass 0 siles,use 12 z p, �.�oe va� 3.0 N"3llt
for Gasa E,F sites use 4.0 x p, re d.Mn�� �7��
A 4.0 in
t aam= 105 M�
uN; 10 in
Lowar 7rancvcroo Ralntprcomont
sc�mkr f db 0.5'D 12 a•G�ec�eio
s min a 7 in
Use: No. s tkdcplraiat 9.5 In.fortap 7 fL
UCo:No. S tka1� r+l�t 7.0 In.taeonam 38 tt
5
� �
AG1316 Shbsr RofnF3rcln CalculaUon � ¢��f� shear
Depih ¢ ✓r ¢Y l 2 Ytt case Vs reqd. Reqd. Actuat Actual �9 1 s
fl. ki s Ki s kios no k[ s s Cn ,in S acin m Vs ki s v� s ki s check
0.0 17 8.3 14.30 7 0 5.� 2.00 ?3.920 55.44 72.07 4K
�6 18 6 g 3 �q.21 � 0 5.& 3.50 42240 31.68 48.31 OK
�,p 1g.g 8,3 13.93 1 0 5.6 3.50 42.240 31.68 aB.31 OK
1.5 16.8 8.3 '13.44 1 d 5.6 3.50 42.24D 31.68 d8,31 OK
2.0 16.6 8.3 12.77 1 0 5:6 3.50 42.240 31.88 48.31 OK
2.6 16.6 8.3 11_95 1 0 5.6 3.50 42.246 31.68 48.3� OK
3.1 16.6 8.3 11.02 i fl 5.8 3.50 42.240 31.88 A8.31 OK
3.6 18.8 8.3 i0.05 7 0 5.6 3.50 42.240 31.68 d8.31 OK
4.1 16.6 8.3 9.Q& 1 0 5.6 3.5� 42.24U 31.6f1 48.31 OK
4.6 18.6 8.3 8.10 0 0 0.0 3.50 42240 31.68 48.31 OK
5.1 t6.6 8.3 7.16 0 0 0.0 3.50 422A0 31:68 48.31 OK
g.6 76.6 B.3 6.19 0 0 D.0 3.5D 42240 31.6& 48.3t OK
6.'I 16.6 8.3 5.18 0 0 0.0 3.50 �k2.2A0 31.fi8 48_3i OK
6.6 t6.6 8.3 4.13 0 0 0.0 3.50 42.240 31.66 48.37 OK
7.2 16.6 8.3 3.4a 0 0 D.4 7.04 21.i20 15.84 32.A7 OK
7.7 16.6 B_3 1.96 0 0 0.0 7.00 21-120 15.84 32.47 OK
$2 t6.E 9.3 0.90 0 0 0.0 �.00 21.12Q 15� 32.47 OK
8.T t6.6 8.3 0.12 0 0 0.0 7.00 21.120 15.&1 32.47 OK
9.2 96.8 8.3 1.12 0 0 0.0 7.00 21.120 15.44 32.a7 OK
q.7 16.6 $.3 2.08 0 0 0.0 7.00 21.120 15.84 32.47 OK
ip,2 16.6 8.3 3.4D 0 0 �:0 7.OD 21.120 15.84 32.47 OK
10.7 16.6 D.3 3.84 0 0 0.0 7_QO 21•720 15.84 32.47 OK
112 �g.g g,3 A.58 0 Q 0.4 7.OQ 21.120 15.84 32.47 OK
11,8 16.6 8.3 5.13 Q 0 0_0 7_00 21.12Q 15.&► 32.47 OK
�Z g qg,g g,3 5.06 0 0 0.0 7.00 21.120 15.64 32.47 OK
12.8 16.8 8.3 a.� 0 0 0.0 i.QD 21.120 15.84 32.47 OK
13.3 16.6 8.3 3.76 0 0 0.0 7.QD 31.120 75.8d 32.47 OK
19,g 18.6 8.3 3.06 0 0 0.0 7.00 21.120 15.64 324� OK
14.3 16.6 8.3 2.36 0 0 0.0 7.OQ 21_120 15.84 32.47 OK
14.8 16.6 8.3 1.89 0 0 0.0 7.00 2i.120 16:84 32.47 OK
15.3 16.6 B_3 1.QS 0 0 0:0 7,00 21.12D 15.84 32.47 OK
15.8 16.6 8.3 0.47 0 0 O.P 7.00 21.920 15.8A 32.47 OK
16.4 18.6 8.3 O.Oi 0 0 0.0 7.U0 21.i20 15.94 32.47 OK
76.9 18.6 8.3 0.25 0 0 O.Q 7.00 21.12U 15.84 32.47 OK
17.4 16.6 8.3 d.35 0 0 0.0 7.00 21.120 15.84 32.47 �K
17.9 16.6 8.3 0.3B 0 0 0.0 7�0 21.129 15.84 32.47 OK
18.4 16.6 B.3 D_31 0 0 0.0 7.OU 21.520 75.84 32.47 OK
18.9 16.6 8.3 0.24 0 0 0.0 7.00 21.120 15.84 32.47 OK
19.4 16.6 8.3 0.17 0 0 0.0 7.00 21.120 15.84 32.47 OK
ti 9.g 16.6 8.3 0.11 0 0 0.0 7.00 21.120 15.BA 32.47 OK
20.4 i6.6 B.3 0.06 0 D D.0 7.00 2t_120 15.84 32-47 aK
21.0 16.6 8_3 0.02 0 0 OA 7.00 21.12D 1b,84 32.47 OK
21,5 16.6 8.3 0.00 0 0 0.0 7.00 21-120 15.84 32.47 OK
22.0 t6.8 8.3 0.01 0 0 0.0 7.00 21.120 15.84 32.a7 �K
22.5 16.6 8.3 0.02 0 0 0.0 7.00 21.120 15.84 3247 OK
23.0 '16.6 8.3 0.02 0 0 U.0 7.00 21•i20 15. 4 32.47 OK
23.5 16.6 6.3 O.Q1 0 0 0.0 7.00 2t.120 15.84 32.47 OK
24.0 16.6 B.3 0.01 0 0 0.0 7.00 21.120 15.8d 32.47 OK
2d.5 18.6 8.3 0.01 0 0 0.0 7.Q0 27.120 15.84 32.47 OK
25.0 18.8 6.3 0.00 0 0 0.0 7.�0 21.120 15.84 32 47 OK
25.6 t6.6 8.3 O.W 0 � 0.0 7.00 27.120 15.84 32.41 OK
26.i 16.6 8.3 0.00 U 0 0.0 7.0� 21.120 �5.8h 32.47 OK
26.6 'i6.6 8.3 0.00 0 0 0.0 7.00 21.120 15.84 32.47 OK
27.1 16.6 B.3 0.00 0 0 0.0 7.00 21.'120 f 5.84 32,47 OK
27.fi 16.8 8.3 0.00 0 4 0.0 7.OD 21.120 15.R4 32.47 OK
28.1 18.6 8.3 U.00 0 0 0.0 7.00 21.12� 15.84 32.47 OK
28.6 16.6 8.3 0.00 0 D 0.0 7.00 21.t20 15.84 32_47 OK
29.1 18.6 6.3 0.00 0 Q 0.9 7.00 2'1.120 15.84 32.47 OK
6
� �
600
(Pmax) (Pmax)
�
� y �
-�-x
� Q fs=o
fs=
fs={
14 in diam. fs=0.5fy �
Cotfe:ACi 316-02
Units:ErtglksM
Run axis:About X-axi�
Run optiott:�nve�tigation
Stendernsss;Not considered -
�atumn type:Structu�l
60
6ars:ASTM A676 -60
Mx(k-ft)
Date:O7/16112
�irrse: 13:26:�2
(Pmin) � (Pmin)
-200
..spColumn v4.S0.Llaensed to:Mortls Shea Bridge Co„License tD:59Q14-1029798-4�84CD-2B�1G
F'da: D:ldatalspColumnlGtradeau PL14.ca1
i�roJecr Cape Girardeau
Calumn:Plles Engineer.RCS
�c=5 ksi fy =60 ksI Ag=153.938 in^2 5#6 bars
Ec=403'1 ksi Es=29000 ksi As =2.20 in"2 rho = '1.43%
fc=4,�5 ks� Xo =0.00 in tx=1885.74 in^4
_ . .,.....,�_,r_
,. .. ..,. �
� �
r
Licensed to: Morris Shea Bridge Co. . License ID: 59019-1029796-4-284CD-289CD
D:\data�spColumn\Giradeau PL19.co1
000000 °
00 00 00
00000 000000 00 00000 ov o0 00 0 0000000000 0 00000
00 0 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00
00000 00 00 00 00 00 00 00 00 00 00 00 00 00
00 000000 00 00 00 00 00 00 00 00 00 00 00
0 00 00 00 00 00 00 00 0 00 00 00 00 00 00 00
000co 00 000000 00000 000 00000 0 00 00 00 00 00
'-__--_-_�_______-�a�-�se=====aa=�L__`�spColumn v9.60'lTM)
Cornputer proqram for the Strength Design of Reinforced Concrete Sections
Copyright O 1988-2010, STRUCTUREPOINT, LLC.
All rights reserved _ _ _ ___ �__�__Y^_
--___�---===—��.r==—�=_��=_=_�_=----=�_�___= -- —
�icensee stated above acknowledges that STRUGTUREPOINT (SP} is not and cannot be responsible
the accuracy or adequac}r ot the material supplied as input £or processing by the spColum
program. Fu�Lhermare, STRUCTUR�POI�7T neither makes any warranty Ar.pressed nor implied vfith resp
correctness of the output prepared by the spCalumn progr3m. �lttiough STRUCTGREPOINT has en
produce spCol.umn error free the program is noti and cannot be certified infallible. The fina
resgonsibility for analysis, design and enginee=ing documents is the licensee's. A
STRUCTURc^.POINT disalaims all responsibility in contract, negligence or other tort for any analy
or engineering docvments prepared in connecCion with the use of the spColumn program.
� �
Licensed to: Morris Shea Bridge Co. . I,icense TD: 59014-1029796-4-289CD-289CD
D:�data�spColumn\Giradeau PL14.co1
General In£ormati.on:
� File Name: D:�data\spColumn\Giradeau PL19.co1
Project: Cape Girardeau Engineer: RCS
Columq: Piles �nits: Enqlish
Code: ACI 318-02
Run Optionr Investig>tion Slenderness: Not considered
Run Axis: X-axis
Co3umn Type: Struciural
Material Properties:
f'c = S�ksi J Sy = 60 ksi
Ec
= 903D.51 ksi ES = 29000 ksi
Ultimate strain = 0.003 �n/�n
Batal = 0.8
Section:
Circular: Diametez = ]4 in
Gross section area, P.g = 153.938 in^2 Iy ` 1BB5 �q in^4
Zx = 1885.74 in^9 ry � 3.5 in
rx = 3.5 in yo � 0 in
xo = 0 in
Reinforcement:
_-=�=s��=-�
J Bar Set: ASTM A615
Sa.ze Diam (in) Area (.zn^2) Size Diam (in) P.rea_{in`2) 5ize Diam_(in� Asea_(in^2)
---- -�------
____- -------a'11 # �1 0.50 0.20 � 5 0.63 0.31
� 3 r r 0.38 0.60 # 8 J..00 0-79
� 6 0.75 0.99 �E 7 0.88
g 9 1.13 1.00 ,� 14 1.27 4.00 # 11 1.41 1.56
# 1� 1.69 2.25 # 18 2.�6
Confinement: Tied; #3 ties :�ith {�10 bars, #� with larger bars•
phi(a) = 0.6, phi(b} = 0.9, phi(c) = 0.65
Layout: Cir�ular
Pattern: All Sides Equal (Cover to transverse reinforcementl
Total steel area: As = 2-20 in^2 at rho � 1.43�5
Minimum clear spacing = 3.07 in
5 #6 Cover = 3 in
Factorsd Loads and Moments with Corresponding CapaciL•ies_
- --x ---�___�_=_ -
� � ^ pU Mux PhiMnr. P11iN,n/Mu NA dep�n Dt dep�� eps_t Phi
No. kip k-ft k-ft ______
______.._ _�_�-
---------
-------- -_�_--�_- ---------
-y� ---�--170 00 Y--- 53.00 5?.93 1.68�i 7.29 9.63 0.0�122 0.6
*** End of output �*#
� "�
Giradeau 14in
--------------------=_________—______==�__=__=_____
Pile Plus for windows, Version 2012-06.030
Analysis of zndividual Piles and nrilled shafts
subjected to �aceral l.oading using the p-y Method
9 1985-2012 by Ensoft, �nc.
All Rights Reserved
This copy of LPiie is licensed to:
R. Stone
SBE
Serial Number of security oevice: 358616610
Company Name stored in Security �evice: sBe, LLC
-------------------------
-------------------------
Files Used for Analysis
-------------------------------------------------------
Path to file locations: o:\data\�pile\work v6\
Name of input data file: �iradeau 14in.lp6d
Name of output report,file: Giradeau 14in.lp6o
Name of plot.output fi1e: Giradeau 14in.lp6p
Name of runtime messeage file: Giradeau 14in.lp6r
-----------------------
-----------------------__
�ate and Time of a.nalysis
---------------------------------------------------------
oate: 7uly 18, 2012 Time: 18:16:54
--------------------
--------------------------
r Problem Title
CaQe Girardeau WWTP
�ob Number:
client:
Engineer:
oescription: Full �ength cage
------------------------__--------------Page-i-
� ��
�iradeau 14in
Program options
--------------------—-----------------------l---___----------------------------
Engineering units are U5 Customary Units: pounds, inches, feet
easic Program options:
This analysis computes pile response to lateral loading and will compute noniinear
moment-curvature and nominal moment capacity for section types with nonlinear
properties.
Computation Opfiions:
- Analysis does not use p-y multipliers (individual pile or shafti only)
- Analysis assumes no shear resistance at pile tip
- �nalysis for fixed-7eng�h pile or shaft only
- No computation of foundat7on stiffness matrix values
- Report,pile response for fu11 len�th of pile
- Analysis assumes no loading by soil movements acting on.pile
- No p-y curves to be computed and reported for user-specSfied depths
Solution Control Parameters:
- Number of pile increments = 90
- Maximum number of iterations allowed = 200
- oeflection tolerance for convergence = 1.0000E-05 in
- Maximum allowable deflection = 100.0000 in
Pile Response output options:
- values ofi pile-head deflection. bending moment, shear force, and
soil reaction are printed for full length of pile.
- Printing zncrement (nodal spacing of output points) = 1
--------------------------------------------------------------------------------
Pile StruCtural Properties and Geometry
--------------------------------------------------------------------------------
Total Number of sections = 1
Total Pile Length = 46.00 ft
oepth of ground surface below top of piie = 0.00 ft
Pile dimensions used for p-y curve computations defined using 2 points.
p-y curves are computed using values of pile diarneter interpolated over
the iength of the pile.
Point �epth Pile
X Diameter
ft in
----- --------- -----------
1 0.00000 14.0000000
2 46.0OOOOQ 14.0000000
Ynput 5tructural Properties:
Pile 5ection No. 1:
section Type = �rilled shaft (Bored Pile)
section �ength = 46.00000000 ft
Section �iameter = 14.00000000 in
Page 2
� `� �
Giradeau 14in
----------------------------------
-------------------------------- -
Ground slope and Pile eatter Angles
----------------------------------------------------------
Ground slope Angle = 0.000 degrees
= 0.000 radians
Pile Batter Angle = 0.000 degrees
- 0.000 radians
------
--___---_ -------------------------------
! �5oi1 and Rock �ayering Ynformation
The soil profile is modelled using 4 layers
�ayer 1 is sand, p-y criteria by rteese et al. , 1974
oistance from top of pile to top of layer z 0.0000 ft
Distance from top.of pile to bottom of layer - 8.00000 ft
6ffective unit weight at top of layer - 58.00000 pcf
Effective unit weight at bottom of layer - 58.00000 pcf
Friction angle at top of layer - 34.OQ000 deg.
Friction angle at bottom of layer _ 34.00000 deg.
Subgrade k at top of layer _ 70.00000 pci
Subgrade k at bottom of layer - 70.00000 pci
Layer 2 is stiff clay without free water
oistance from top of pile to top of layer = 8.00000 ft
�istance from top.of pile to bottom of layer - 2Z•00000 ft
E�Ffiective unit weight at top of layer = 58.00000 pcf
Effective unit weight at bottom of layer = 58.00�00 pcf
Undrained cohesion at top of layer = 700.00000 psi
undrained cohesion at bottorn of layer - 1000.00000 psi
Epsilon-50 at top of layer _ 0.0000
Epsilon-50 at bottom of layer - 0.0000
NOTE: lnternal default values for epsilon-50 will be computed for
the above soil layer.
�ayer 3 is stiff clay without free water
�istance from top of pile to top of layer = 22.00000 ft
oistance from top,of pile to bottom of layer = 45.00ODO ft
Etfective unit weight at top of layer = 58.00040 pcf
Effective unit weight at bottom of layer = 58.00000 pcf
Undrained cohesian at top of layer = 1500.00000 psi
Undrained cohesion at bottom of layer - 4000.00000 psi
Epsilon-50 at top of layer = 0.0000
Epsilon-50 at bottom of layer - O.00DO
NOTE: znternal default values for epsilon-50 will be computed for
the abo�e soil layer. page 3
€ � �
Giradeau 14in
�aysr 4 is strong rock (vuggy limestone)
Distance �From top of pile to top of layer = 45.00000 ft
D7stance from tap.of pile to bottom of layer• = 46.00000 ft
Effective unit tveight at top of layer = 75.00000 pcf
Effective unit tiveight at bottom of layer = 75.00000 pcf
Uniaxial compressive strength at top of layer = 2400.00000 psi
Uniaxial compress�ve strength at bottom Qf layer - z000.00000 psi
(�epth of lowest soi1 layer extends 0.00 ft below pile tip)
----------------------- --------------------------
summary of soil Properties
---------------------------------------------------------------------------------
Layer Layer Effective undrained
Angle o� Uniaxial RQo % strain Rock
Mass zn-situ In-situ Elastic
�aXer Soil Type Depth Unit Wt. cohesion
Fr�ction qu or Factor 7 kpy Rock
E,nass krm Test Test subgrade
Num. (p-y.curve Criteria) ft pcf psf
deg. psi G5I Epsi'lon SQ Factor pci psi
rype Property Mod. pci
---------- ---------- ---------- ---------- ---------- ----------
---------- ---------- ---------- ---------- ----------
1 sand (rteese, et al.) 0.00 58.000 --
34.000 -- -- -- -- 70.000 --
' � 8.Q00 58.000 --
34.000 -- -- -- -- 70.000 --
Z stiff clay w/o Free water 8.000 58.000 700.000_^
__ __ -- default -- --
2Z.000 58.000 1000.000
__ __ __ default -- -- --
3 Stiff clay w/o Free Water 22.000 58.000 1500.000
__ __ -- default -- -- --
45.000 58.00Q 4000.000
__ __ -- default -- -- "
4 vuggy Limestone ^45.�D0 u 75.000__ -- _^
.-- 2aoo.000 -- -- -
� 46.000 75.000 --
-- 2000.000 -- -- '- -� "
--------------------------------------------------------
�oading 7ype
--------------------------------------------------------------------------- -
Page 4
� ��
�iradeau 14in
Static loading criteria were used when computing p-y curves for all analyses.
---------- ---------------------------------------------------
Pile-head Loading and Pile-head Fixity conditions
Number of loads specified = 1
Load �oad Condition Condition Axial Thrust
No. �ype 1 2 Force, lbs
----------------------- ----------------
�1 r2� v = 10000.00000 lbs 5 = 0.0000 in/i� 120000.
v = perpendicular shear force a��lied to pile head
M = bendi ng aiornent appl i ed to pi�e head
y � lateral deflection re1ative to pile axis
s = pile slope relative to original pile batter angle
R = rotational stiffness app7ie to pile.head
.4xia1 thrust is assumed to be acting axially for all pile batter angles.
---------------------------------------------------------------------------------
____Computations_of^Nominal^Moment capacity_and^Nonlinear_Bending_Stiffness_^_r_
Axial thrust force values were determined from pile-head loading conditions
Number of Pile Sections Analyzed = 1
Pile 5ection No. 1:
Dimensions and Properties of Drilled Shaft:
Length of Se'ction = 46.00000000 ft
shaft Diameter = 14.00000000 in
Concrete Cover Thickness = 3.37500000 in
Number of Reinforcinq Bars = 5 bars
Yield 5tress of Reintorcing.ears = 60.00000000 ksi
Modulus of Elasticity of Reinforcing sars = 29000. ksi
Gross Area of shaft = 153.93804003 sq. in.
Total Area of Reinforcing Steel = 2.20000000 sq. in.
Area Ratio of Steel Reinforcement - 1.43 percent
Edge-to-Edge Bar spacing = 3.07060414 in
Rebar offset = 0.0000000 in
Axial Structural capacities:
Nom. Axial structural Capacity = 0.85 Fc Ac + Fy As = 776.887 kips
Tensile �oad for cracking of Concrete = -77.653 kips
Nominal Axial Tensile capacity - -132.000 kips
Reinforcing Bar Dimensions and Positions Used in Computations:
Bar Bar Diam. Bar Area X Y
Number inches sq. in. inches inches__
---------- ------
^ 1 r� 0.75000 0 44000 3.25000 0.00000
Page 5
� �
Giradeau 14in
2 0.75000 0.44000 1.00431 3.09093
3 d.75000 0.44000 -2.62931 1.91030
4 0.75040 0.44000 -2.62931 -1.91030
5 Q.7500d 0.44000 1.00437. -3.09093
Concrete Properties:
Compressive Strength of Concrete - 5.00000000 ksi
Modulus of Elasticity of concrete = 4030.50865276 ksi
Modulus of rtupture of Concrete = -0.53033007 ksi
Compression 5train at Peak Stress = 0.00210892
Tenslle strain at Fracture of Concrete = -0.00011498
Maximum Coarse Aggregate Size = 0.75000000 in
Number of Axial 7hrust Force values �etermined from Pile-head Loadings = 1
Number Axial Thrust Force
kips
------ ------------------
1 izo.000
oefinitions af rtun Messages and Notes:
c = concrete in section has cracked in tension.
Y = stress in reinforcing steel has reached yield stress.
T = ACI 318-08 criteria for tension-controlled section met, tensile strain in
reinforcement exceeds 0.005 while simultaneously compressive strain in
concrete more than than 0.003. see A�i 318-OS 5ection 10.3.4.
z = depth of tensile zone in concrete section is �ess than J.0 percent of section
depth.
Bending stiffness �EI) = computed sending Moment / Curvature.
Position of neutral axis is measured from edge,of compression side of pile.
�ompressive stresses and strains are positive in sign.
Tensile stresses and strains are negative in sign.
Axial Thrust Force = 120.000 kips
sending eending aending Depth to Max Comp Max Tens
Max Concrete Max Steel Run
curvature Moment stiffness N axis strain strain
stress stress Msg
rad/in. in-kip kip-in2 in in/in in/in
ksi ksi
------------- ------------- ------------- ------------- ------------- -------------
------------- ------------- ---
O.O0OOO1Z50 10.7039130 8563130. 133.9475790 0.0001674 0.0001499
0.76Z0378 4.8530622
O.00DOOZ500 Z1.4012098 8560484. 70.4791795 0.0001762 0.0001412
0.7998282 5.1.046655
0.000003750 3z.0982224 8559526. 49.3254545 0.0001850 0.4001325
0.8374884 5.3565307
0.000005000 42.7948081 8558962. 38.75039B2 0.0001938 0.0001238
0.875Q179 5.6086578
0.000006Z50 53.4908241 8558532. 32.4068094 0.0002025 0,0001150
0.9124162 5.8610467
Page 6
� �
Giradeau 14in
0.000007500 64.1861277 8558150. 28.1789545 0.0002113 0.0001063
0.9496827 6.1136976
D.000008750 74.$805762 8557780. 25.1600903 0.0002202 0.0000977
0.9868170 6.3666104
0.0000100 85.5740267 8557403. 22.8968456 0.0002290 0.0000890
1.0238184 6.6197852
0.0000113 96.2663365 8557008. 21.1373471 0.0002378 0.0000803
1.0606864 6.87322Z0
0.0000125 106.95736Z8 8556589. 19.7304711 0.0002466 0.0000716
1.0974z06 7.126920$
0.0000138 117.6469627 8556143. 18.5800479 0.0002555 0.0000630
1.1340204 7.3808817
0.0000150 128.3349934 8555666. 17.6219644 0.0002643 0.0000543
1.1704853 7.6351Q46
0.0000163 139.0213119 8555158. 16.8118346 0.0002732 0.0000457
1.2068147 7.8895896
0.0000175 149.7057753 8554616. 16.1179542 0.0002821 0.0000371
1.2430082 8.1443368
0.0000188 160.388Z406 8554039. 15.5170734 O.00OZ909 0.0000284
1.2790651 8.3993462
0.0040z00 171.0685648 8553428. 14.9917549 0.0002998 0.0000198
1.3149849 8.6546179
0.0000213 181.746604$ 8552781. 14.5286641 0.0003087 0.0000112
1.3507672 8.9101518
0.0000225 19Z.4222175 8552099. 14.1174300 0.0003176 0.000002642
1.3864114 9.1659482
0.0000238 203.0951805 8551376. 13.7498640 0.0003266 -0.000005941
1.4219169 9.4220464
O.00OU250 Z13.7639826 8550559. 13.41940�48 0.0003355 -0.0000145
1.4572820 9.6783185
0.0000263 224.4256995 8549550. 13.1207285 0.0003444 -0,0000231
1.4925038 9.9348672
0.0000275 235.0772617 8546264. 12.8494775 0.0003534 -0.00003J.6
1.5275794 10.1916334
0.0000288 z45.7158463 8546638. 12.6020522 0.0003623 -0.0000402
1.5625057 10.4485986
0.0000300 Z56.33B9667 8544632. 12.3754549 0.0003713 -0.0000487
1.5972800 10.7057458
0.0000313 266.9444558 8542223. 12.1671692 0.0003802 -�.0000573
1.6316998 10.9630597
0,0000325 277.5344828 8539399. 11.9750678 0.0003892 -0.0000658
1.6663631 11.z205265
Q.flOD0338 28B.095469b 8536162. 11.7973400 0.0003982 -0.0000743
1.7006678 11.4781341
0.000035Q 298.6380516 8532516. 11.6324350 0.0004071 -0.0000829
1.7348123 11.7358716
0.0000363 309.J.570855 852847].. 11.4790173 0.0004161 -0.0000914
1.7687950 11.9937295
0.0000375 319.6515855 6524042. 11.3359303 0.000425Z -0.0004999
1.8026146 12.2516993
0.0000388 330.1207034 8519244. 11.2021677 a.0004341 -0.0001084
1.8362698 12.5097735
0.0000400 330.1207034 8253018. 10.6641756 0.0004346 -0.0001254
1.8377615 12.5212438 C
0.0000413 330.1207034 8002926. 10.7223662 0.0004423 -0.0001352
1.8665177 12.7428932 c
0.00004Z5 330.1207034 7767546. 10.5872540 0.0004500 -0.0001450
1.8948813 12.9625156 C
0.0000438 330.1207034 7545616. 10.4583324 0.0004576 -0.0001549
1.922867U 13.1801968 C
0.0000450 330.�207034 73360J.6. 10.3351898 0.0004651 -0.0001649
1.9504955 13.3960728 C
0.0000463 334.2190861 7226359. 10.2174744 0.0004726 -0.0001749
aage 7
� `�
Giradeau 14in
1.9777899 13.6103002 c
0.0000475 339.2040969 7141139. 10.1048619 0.0004800 -0.0001850
2.0047710 13.8230225 C
0.0000468 344.0611600 7057665. 9.9970590 0.0004874 -0.0001951
2.0314593 14.0343798 C
0.0000513 353.3405853 6894450. 9.7939034 0.0005019 -0.0002156
2.0838602 14.4521516 C
0.0000538 362.1806108 6738244. 9.6063945 0.0005163 -0.0002362
z.1351673 14.8648551 C
0.0000563 370.5680571 6587877. 9.4321450 O.Q005306 -0.0002569
2.1853370 15.2719990 c
0.0000588 378.5549039 6443488. 9.2697132 0.0005446 -0.0002779
2.2344395 15.6740116 C
0.0000613 386.2060624 6305405. 9.118Q504 0.0005585 -0.0002990
2.2825767 16.0715996 c
0.0000638 393.5596980 6173485. 8.9760931 0.0005722 -0.0003203
2.3z98076 16.4651399 c
0.0000663 400.6469543 6047501. 8.8429041 0.0005858 -O.OQ03417
2.3761$17 16.8549422 C
0.0000688 407.4956210 5927209. 8.7176756 0.0005993 -0.0003632
2.4217456 17.2413035 �
0.0000713 414.1313881 5812370. 8.5997174 0.0006127 -0.0003846�
2.4665454 17.6245268 C
0.0000738 420.5395114 5702231. 8.468Q837 0.0006260 -0.4004065
2.5105398 18.0041767 c
0.0000763 426.7423673 5596621. 8.38Z2593 0.0006391 -0.0004284
2.55376fi8 18.3804834 C
0.0000788 432.7874243 5495713. 8.2820495 0.0006522 -0.0404503
2.5963293 18.7542683 c
0.0000813 438.6994767 5399378. 8.1871297 0.0006652 -Q.0004723
2.63B2860 19.1259870 c
0.0000838 444.39677Z4 5306230. 8.0962394 0.0006781 -0.0004944
2,6794305 19.4937291 c
0.0000863 449.9896523 5217271. 8.0099418 0.0006909 -0.000516b
2.7200266 19.8597796 C
0.0000888 455.4651065 5132001. 7.9277276 0.0007036 -4.0005389
2.7600452 20.2238266 C
0.0000913 460.7838244 5049666. 7.848B503 0.0007162 -0.0005613
2.799374� 20.5847B28 c
0.0000938 466.0491600 4971191. 7.773955B 0.0007288 -0.0005837
2.838Z894 20.9451301 C
0.0000963 471.1368971 48949z9. 7.7015761 0.0007413 -0.0006062
2.B764482 21.3016369 �
0.0000988 476.2036877 4822316. 7.6329112 0.0007537 -0.0006Z$8
2.91428Z4 21.6582871 C
0.0001013 481.1016240 4751621. 7.5663189 0.0007661 -0.0006514
2.9513714 22.0110667 c
0.0001038 485.96Iz708 4684157. 7.5029967 0.0007784 -0.0006741
2.9861467 22.3640292 C
0.0001063 490.7284113 4618620. 7.4416471 0.0007907 -0.0006968
3.0242699 22.7138878 C
0.0001085 495.4321202 4555698. 7.38Z9385 0.00080Z9 -0.0007�96
3.0600081 23.0631$00 C
0,0001113 SOQ.0561095 4494976. 7.3264264 0.0008151 -0.0007424
3.0952762 23.411Q459 C
6.0001138 504.6072441 4436108. 7.27�7478 0.000B272 -0.0007653
3.1300063 23.7567660 C
O.00Olx63 509.1377766 4379680. 7.2195275 0.0008393 -0.000788Z
3.1644523 24.1028448 C
0.0001188 513.5545660 4324670. 7.1686352 0.0008513 -0.0008112
3.1982838 24.4459252 C
0.0001213 517.9372274 4271647. 7.1197212 0.0008633 -0.0008342
3.2317595 24.7885826 C
Page 8
� �
Giradeau 14in
0.0001238 522.3095051 4220683. 7.0728815 0.0008753 -0.0008572
3.264955Z 25.1315913 C
0.0001263 526.5629479 417Q796. 7.0269601 0.0008872 -0.0008803
3.2975090 25.4711704 c
0.0001288 530.7990082 4122711. 6.9828461 0.0008990 -0.0009035
3.3297631 -25.9389353 C
0.0001313 535.0249094 4076380. 6.9405033 0.0009109 -0.0009266
3.3617410 -26.6037716 C
0.0001338 539.1616991 4031116. 6.8990701 0.0009228 -0.0009497
3.3931678 -27.2712190 c
0.0001363 543.z616478 3987241. 6.8589877 0.0009345 -0.0009730
3.4242286 -z7.9393368 c
0.0001388 547.3516700 3944877. 5.8204339 0.0009463 -0.0009962
3.4550171 -28.6071162 C
0.0001413 551.4139762 3903816. 6.7631528 0.0009581 -0.0010194
3.4854679 -29.2752724 C
0.0001438 555.3871180 3863563. 6.7464600 0.0009698 -0.0010427
3.5153600 -29.9462985 C
0.0001463 559.3505727 3824619. 6.7111395 0.0009815 -0.0010660
3.5449834 -30.6169918 C
0.0001488 563.304Z865 3786920. 6.6770642 0.0009932 -0.0010893
3.5743375 -31.2873513 C
0.0001588 578.7361935 364558z. 6.5494903 0.0010397 -0.0011828
3.6879894 -33.9780z18 c
0.0001688 593.7247510 3518369. 6.4353280 0.0010860 -0.0012765
3.7962506 -35.6770510 C
0.0001788 608.3451391 3403329. 6.332B379 O.Q01132Q -0.0013705
3.8994130 -39.3817884 C
O.00Q1888 622.6347fi41 3298727. 6.2404050 0.0011779 -0.0014646
3.99�6329 -42.0909199 c
0.0001988 636.5543567 3202789. 6.1559254 0.0012235 -0.0015590
4.090721X -44.8078229 C
0.0002088 650.2675960 3115054. 6.0797915 0.0012692 -0.0016533
4.1793748 -47.5231940 C
0.0002188 663.6482604 30338z1. 6.0095155 0.0013146 -0.0017479
4.2630429 -50.2455732 c
0.0002288 676.8716525 2959002. 5.946�584 0.0013602 -O.Q018423
4.3424789 -52.9634717 C
0.0002388 669.7799666 2889131. 5.8868607 0.0014055 -0.001937�
4.4169778 -55.6886852 C
0.0002488 702.54Z7134 2824292. 5.8331781 0.0014510 -O.00Z0315
4,4872841 -58.4084480 C
O.00Q2588 715.0795496 2763592. 5.7834716 0.0014965 -0.0021260
4.5530111 -60.0000000 CY
0.0002688 727.4026294 2706614. 5.7374269 0.0015419 -0.0022206
4.614218Z -60.0000000 CY
0.000278$ 739.5771754 2653192. 5.6953933 0.0015876 -0.0023149
4.6711605 -60.0000000 CY
0.0002888 751.5618607 2602812. 5.6564784 0.0016333 -0.002409Z
4.7236250 -60.0000000 CY
0.0002988 763.3242865 2555060. 5.6199746 0.0016790 -0.0025035
4.7714741 -60.0000000 cY
0.0003088 774.9344911 2509909. 5.5865135 0.0017248 -0.0025977
4.8149694 -60.0000000 CY
0.0003188 786.3892400 2467103. 5.5558229 0.0017709 -0.0026916
4.8540507 -60.0000000 CY
0.0003288 797.6787287 2426399• 5.5275711 0.0018172 -0.0027853
4.8886343 -60.000000� CY
0.0003388 848.7404949 2387426. 5.5006914 0.0018634 -0.002879
4.9184879 -60.00OOOOQ CY
0.0003488 819.6416652 2350227. 5.4760149 0.0019098 -0.0029727
4.9438088 -60.0000000 CY
0.0003588 830.3785604 23146page 9 5.4533731 0.0019564 -0.0030661
� ` �
Giradeau 14in
4.9645282 -60.0000000 Cv
0.0003688 840.9473475 2280535. 5.4326169 0.0�20033 -D.0031592
4.9805745 -60.0000000 cY
0.0003788 851.3440287 2247773. 5.4136132 0.0020504 -0.0032521
4.9918734 -60.0000000 CY
0.0003888 861.5644304 2216243. 5.3962439 0.0020978 -0.0033447
4.9983476 60,OOQ0000 CY
O.Od03988 871.5782815 2185776. 5.3800053 0.0021453 -0.0034372
4.9974768 60.0�00000 CY
0.0604088 $81.3719758 215626Z. 5.3650095 0.0021929 -0.0035296
4.9999963 60.00OOD00 cY
0.0004188 890.6128161 2126837. 5.3507815 0.0022406 -O.OD36219
4.9997525 60.0000000 CY
0.0004288 898.8852240 2096525. 5.3362984 0.0022879 -0.0037146
4.99897.51 60.0000000 cY
0.0004388 906.1682194 2065341. 5.3213886 O.00z3348 -0.0038077
4,9971252 60.0000000 CY
0.0004488 912.5371840 2033509. 5.3061643 0.0023811 -0.0039014
4.9998764 60.0000000 CY
0.0004588 91B.1537006 2001425. 5.2909134 0.0024272 -0.0039953
4.9986271 60.0000000 CY
0.0004688 923.2974970 1969701. 5.2760674 0.0024732 -0.0040893
4.9985346 60.0000000 CY
0.0004788 928.1545836 1938704. 5.2621455 0.0025193 -0.0041832
4.9992790 60.0000000 CY
0.0004888 932.8916690 1908730. 5.2492416 0.0025656 -0.0042769
4.9964067 60.0000000 �Y
0.0004988 937.4652708 1879630. 5.2368083 0.002613.9 -0.0043706
4.9995162 60.0000000 CY
0.0005088 941.9111857 1851422. 5.2253212 0.0026584 -0.0044641
4.9964813 60.00OQ000 CY
0.0005188 946.1865453 1823974. 5.2146410 O.00Z7051 -0.0045574
4.9994979 60.0000000 c'r
0.0005288 950.0891190 1796859. 5.2041180 0.0027517 -0.0046508
, 4.9958885 60.0000000 CY
0.0005388 953.7J.$1453 1770242. 5.1940255 0.0027983 -0.0047442
4.9991700 60.0000000 CY
0.0005488 956.7454282 1743500. 5.1832709 0.0028443 -0.0048382
4.9975308 60.0000000 CY
0.0006088 968.2191954 1590504. 5.1201597 0.0�31169 -0.0054056
4.9963049 60.0000000 cv
0.0006688 974.4923875 1457185. 5.0672523 0.0033887 -0.0059738
4.9932036 60.0000000 c�rr
0.00072B8 979.2164393 1343693. 5.0304987 0.0036660 -0.0065365
4.9993347 60.00OOOOQ crr
0.0007888 979.2164393 1241479. 5.0419041 0.0039768 -0.0070657
4.9953156 60.0000000 CYT
_^_summary of_Results_for_Nominal^CUnfactored)_Moment capacity_for_section 1____
Momenz values interpoiated at maximum compressive strain = 0.003
or maximum developed mornent if pile fails at smaller strains.
Lqad Axial 7h�ust Nominal Mom. Cap. Max. Comp.
No. kips in-kip _ strain
---------------- -----------------
-�----------
�x 120.000 963.299 0.00300000
Note note that the values of moment capacity, in the table above are not
factored bv a strenath reduction factorPage�10 actor).
� �
Giradeau 14in
In A[T 318-�8, the value of the strength reduction factor depends on whether
the transverse reinforcing steel bars are spirals or tied hoops.
The above values should be multiplied by the appropriate strength reduction
factor to compute ultimate moment capac�ty according to.a,Cl 318-08, Section
g,3,2,2 vr the value required by the design standard be�ng followed.
--------------------------------------------
^� ! computed Values of Pile �oading and �eflec�ion
for �.ateral �oading for �oad Case Number 1
Pile-head conditions are Shear and Pile-head ttotation (�oading Type 2)
shear force at pile head = 10000.000 lbs
Rotation of pile head = O.O00E+00 radians
Axial load at pile head = 120000.000 lbs
(2ero slope for this load indicates fixed-head conditions)
aepth Deflect. Bending Shear Slope Total eending Soil
Res. soil spr. �istrib.
x y Moment Force 5 Stress Stiffness p
Es*h Lat. Load
inches inches in-lbs lbs radians psi{° lb-in�2 lb/in
lb/inch lb/inch
---------- ---------- ---------- ---------- ---------- -------
'0.00 Y0.1345 -446239. 10000.0000 0.000 0.000 6.331E+09
0.000 0.000 0.000
6.133 0.1332 -384746. 9937.2600 -0.000403 0.000 6.331E+09
-20.458T 942.1993 0.000
12.267 0.1296 -323749. 9739.Z927 -0.000746 0.000 6.331E+09
-44.0958 2087.3869 0.000
18.400 Q.1240 -264180. 9399.2071 -0.000997 0.000 8.543E+09
-66.8016 3303.3486 0.000
24.533 0.1173 -206984. 8930.0699 -0.001166 0.000 8.551E+09
-86.1714 4504.4586 0.000
3U.667 0.1097 -152921. 8356.2525 -0.001295 O.d00 8.554E+09
-100.9495 5642.9147 0.000
3&.800 0.1014 -102574. 7709.5362 -0.001387 0.000 8.557E+09
-109.9362 6646.9525 0.000
42.933 0.0927 -56309. 70Z7.0419 -0.001444 0.000 8.558E+09
-112.6163 7450.3598 0.000
49.067 0.0837 -14250. 6334.1537 -0.001469 0.000 8.562E+09
-113.3255 8301.3802 0.000
55.200 �.0747 23553. 5664.0973 -0.0�1466 0.0�0 8.560E+09
-105.1712 8636.8329 0.000
61.333 0.0657 57387. 5006.5976 -O.00ld37 0.000 8.558E+09
-109.2309 10190. 0.000
67.457 0.0571 87082. 43Z5.5302 -0.001385 0.000 8.557E+49
-112.8563 12131. 0.000
73.600 0.0488 112486. 3620.0637 -0.001314 0.000 8.556F+09
-117.1872 14742. 0.000
79.733 0.0409 13342Z. 2886.8030 -0.001225 0.000 8.555E+09
-121.9196 18262. 0.000
85.867 0.0337 149702. Z132.3356 -0.001124 0.000 8.555E+09
-124.1024 22571. 0.000
92.000 0.0272 161Z33. 137Z.Page ��0.001013 0.000 8.554e+09
� �
�iradeau 14in
-123.5353 27899. 0.000
98.133 0.0213 168033. 632.6171 -0.000894 0.000 8.554E+09
-117.8656 33935. 0.000
104.267 0.0162 170310. -83.6412 -0.000773 0.000 6.553E+09
-115.6969 43840. Q.000
110.400 O.OX18 168145. -782.7497 -0.000652 0.000 8.554E+09
-112.2733 58265. 0.000
116.533 0.008191 161668. -145&.3723 -O.00Q534 0.000 8.554E+09
-107.3863 80414. 0.000
122.667 0.005273 151066. -z094.5236 -0.000421 0.000 8.555E+09
-100.7066 117129. 0.000
128.800 0.003021 136595. -2684.2947 -0.000318 0.000 8.555E+09
-91.6101 186018. O.OQO
134.933 0.001368 116607. -3205.9787 -0.0002Z7 0.000 8.556E+09
-78.5043 351886. 0.000
141.067 0.000238 97603. -3589.9790 -0.000149 0.000 8.557E+09
-46.7132 1206029. 0.000
147.200 -0.000464 74790. -3535.5329 -8.760E-05 0.000 8.558E+09
64.4674 851938. 0.000
153.333 -0.000837 54363. -3�.05.4551 -4.132E-05 4.000 8.558E+09
75.7754 555235. 0.000
159.467 -0.000971 36757. -2628.5932 -8.675E-06 0.000 8.559E+09
79.7231 503560. 0.000
165.600 -0.000943 22131. -2138.0988 1.242E-05 0.000 8.560E+09
80.2207 521508. 0.000
7.71.733 -0.000819 io��i. -1651.4928 2.412E-OS 0.000 8.563E+09
78.4551 587795. 0.000
177.857 -0.000648 1837.4073 -1181.0115 2.854E-05 0.000 8.563E+09
74.9627 709915. 0.000
184.00d -0.000469 -4017.6534 -736.3627 2.776e-U5 0.000 8.563E+09
70.0315 916666. 0,000
190.133 -0.000307 -7236.1668 -325.8860 2.373E-05 0.000 8.563E+09
63.8196 1274357. 0.000
196.z67 -0.000178 -8�50.1137 -7.3758 1.825E-05 0.000 8.563E+09
40.0424 1383418. 0.000
Z02.400 -8.326E-05 -7353.5103 173.7309 1.Z74E-05 0.000 8.563E+09
19.0141 1400654. 0.000
208.533 -2.130E-05 -5937.7622 247.140B 7.976E-06 0.000 8.563E+09
4.9239 1417891. 0.000
214.667 1.458E-05 -4333.6575 251.7801 4.298E-06 0.000 8.563E+09
-3.4111 1A35127. 0.000
220.800 3.142E-05 -2855.5851 218.5048 1.723E-06 0.000 8.563E+09
-7.4396 1452364. 0.000
226.933 3.571E-OS -1655.8684 169.4486 1.07ZE-07 0.000 8.563E+09
-8.5570 1469600. 0.000
233.067 3.273E-OS -777.1734 118.8729 -7.641�-07 0.000 8.563E+09
-7.4351 1486837. 0.000
239.200 2.634E-05 -196.5693 74.7303 -1.113E-06 0.000 8.563E+09
-6.4592 1504073. 0.000
245.333 1.908E-05 141.1569 40.4068 -1.133E-06 0.000 8.563E+09
-4.7332 1521310. 0.000
251.467 1.245E-05 300.7551 16.3175 -4.744E-07 0.000 8.563e+09
-3.1220 1538546. 0.000
257.600 7.130E-U6 342.7523 1.1970 -7.439E-07 0.000 8.563E+09
-1.8086 1555783. 0.000
263.733 3.320E-06 316.5334 -7.2730 -5.078E-07 0.000 8.563E+09
-0.9534 1761196. 0.000
269.867 9.006E-07 254.2644 -11.4290 -3.034E-07 0.000 8.563E+09
-0.4419 2736688. 0.000
276.000 -4.017E-07 176.7844 -12.09Z0 -1.a90E-07 0.000 8.563E+09
0.1857 2834576. 0.000
282.133 -9.275E-07 106.1753 -10.1627 -4.769E-08 0.000 8.563E+09
0.4434 2932469. 0.000 Page 1Z
� �
Gi radeau 7.4i n
288.267 -9.868E-07 52.1916 -7.3077 9.020E-09 0.000 8.563E+09
0.4875 3030360. 0.000
294.400 -8.168E-07 J.6.5209 -4.5349 3.363E-08 0.000 8.563E+09
0.4166 3128251. 0.000
300.533 -5.743E-07 -3.4866 -2.3310 3.830E-08 0.000 8.563E+09
0.3021 3226142. 0.000
306.667 -3.471E-47 -12.1289 -0.8278 3.270E-OS 0.000 8.563E+09
0.1881 3324033. 0.000
312.800 -1.731E-07 -13.6893 0.0452 2.346E-OS 0.000 8.563E+09
0.0966 3421923. 0.000
318.933 -5.931E-08 -11.6092 0.4458 1.440E-08 0.000 8.563E+09
0.0340 3519814. 0.000
325.067 3.493E-09 -8.2425 0.5433 7.288E-09 0.000 8.563E+09
-D.00Z241 3935185. 0.000
331.200 3.009E-08 -4.9558 0.4756 2.561E-09 0.000 8.563E+09
-0.0198 40a1667. 0.000
337.333 3.491E-48 -2.4123 0.3424 -7.726E-1]. 0.000 8.563E+09
-0.0236 4148148. 0.000
343.467 2.914E-08 -0.7558 0.2080 -1.212E-09 0.000 8.563E+09
-0.0202 4254630. 0.000
349.600 2.005E-OB 0.1406 0.1023 -I.432E-09 0.000 8,563E+09
-0.0143 4361111. 0.000
355.733 1.157E-OS 0.5007 0.0327 -1.202E-09 0.000 8.563E+09
-0.008430 4467593. 0.000
361.867 5.298E-09 0.5435 -0.005271 -8.286E-10 0.000 8.563E+09
-0.003951 4574074. 0.000
368.000 1.409E-09 0.4373 -0.0207 -4.773E-10 0.000 8.563E+09
-O.OU1076 4680556. 0.000
374.133 -5.577E-10 0.2904 -0.0226 -z.167E-10 0.000 8.563E+09
0.000435 4787037. 0.000
380.267 -1.249E-09 0.1598 -0.0183 -5.549E-11 0.000 8.563E+09
0.000997 4893519. 0.000
386.400 -1.238E-09 0.0665 -0.07.21 2.556E-1i 4.000 8.563E+09
0.001010 5400000. 0.000
392.533 -9.355E-10 0.0113 -0.006620 5.342E-1i 0.000 8.563E+09
0.000779 5106482. 0.000
398.667 -5.831E-10 -0.0147 -O.00Z712 5.218E-11 0.000 8.563E+09
�.000496 521Z963. 0.400
404.800 -2.955E-10 -0.0221. -0.000406 3.899E-11 0.000 8.563E+09
0.000256 5319444. 0.000
410.933 -1.049E-10 -d.0198 0.000664 2.400E-7.1 D.000 8.563E+09
9.276E-05 54259z6. 0.000
a17.067 -1.105E-1z -0.0140 0.000952 1.191E-11 0.000 8.563E+09
9.971E-07 5532407. 0.000
423.200 4.128E-11 -0.008117 0.000839 4.003E-12 0.000 8.563E+09
-3.795E-05 5638889. 0.000
429.333 4.SOOE-11 -0.003688 0.000584 0.000 0.000 8.563E+09
-4.497E-05 5745370. 0.000
435.467 3.853E-11 -0.000948 0.000334 -1.884E-12 0.000 8.563E+09
-3.676E-05 5851852. 0.000
441.600 2.489E-11 0.000409 0.000147 -2.078E-12 0.000 8.563E+09
-2.418E-05 5958333. 0.000
447.733 1.304E-11 0.000856 3.317E-05 -1.625E-12 0.000 8.563E+D9
-1.289E-05 6064815. 0.000
453.867 4.954E-12 0.000818 -2.166E-05 -1.025E-12 0.000 8.563E+09
-4.985E-06 6171Z96. 0.000
460.400 0.000 0.000592 -3.840E-OS 0.000 0.00� 8.563E+09
-4.720E-07 6277778. 0.000
466.133 -1.43ZE-12 0.000348 -3.527E-05 0.000 0.000 8.563E+09
1.491E-06 6384259. �.000
472.267 -1.798E-12 0.000159 -2.A86E-05 a.000 0.000 8.563E+09
1.903E-06 6490741. 0.000
478.400 -1.464E-12 4.263E-05 -1.420P-y0e �3 0.000 0.000 8.563E+09
� �
�iradeau 14in
1.575E-06 6597222. 0.000
484.533 0.000 -1.489E-05 -6.207E-06 0.000 0.000 8.563E+09
1.031E-06 6703704. 0.000
490.667 0.000 -3.363E-05 -1.386E-06 0.�00 0.000 8.563E+09
5.411E-07 6810185. 0.000
496.800 0.000 -3.199E-05 8.926E-07 0.000 0.000 8.563E+09
2.021E-07 6916667. O.Q00
502.933 0.000 -2.273E-05 1.553E-06 0.000 0.000 8.563E+09
1.330E-08 7023148. 0.00�
509.067 0.000 -1.297E-05 1.394E-06 0.000 O.OQO 8.563E+09
-6.520E-08 7129630. 0.000
515.200 0.000 -5.643E-06 9.522E-07 0.000 0.000 8.563E+09
-7.886E-08 7236111. 0.000
521.333 0.000 -1.Z84E-06 5.166E-07 O.d00 0.000 8.563E+09
-6.321E-08 7342593. 0.000
527.467 0.000 6.976E-07 1.993E-07 0.000 0.000 8.563E+09
-4.023E-08 7449074. 0.000
533.600 0.000 1.165E-06 1.358E-08 0.000 0.000 8.563E+09
-2.034E-08 7555556. 0.000
539.733 0.000 8.675E-07 -6.800E-08 0.000 0.000 8.563E+09
-6.266E-09 7662037. 0.000
545.867 0.000 3.335E-07 -7.086E-08 0.000 0.000 8.563E+09
5.335E-09 12Z66667. 0.000
552.000 0.000 0.000 0.000 0.000 O.00Q 8.563E+09
1.777E-08 6133333. 0.000
* This analysis makes computations of pile response using nonlinear moment-curvature
relationships.
The above values of total stress are computed for combined axial and bending
stress in elastiC
sections and do not equal actual stresses in con�rete and steel in the range of
nonlinear bending.
output verification: computed forces and moments are within specified convergence
limits.
output 5ummary for Load Case No. 1:
Pile-head deflection = 0.1345035 inches
Computed slope at pile head = 04060090 ;ncha1bs
Maximum bending moment =
Maximum shear force = 10000.0000000 lbs
�epth of maximum bending moment = 0.000000 inches below pile head
oepth of maximum shear force = O.00OOi� inches below pile head
Number of iterations = 9
Number of zero deflection points =
---------------------------------------
-------------------------
summary of Pile ttesponseCs)
----------------------------------------------------------
befinitions of Pile-head �oading conditions:
Load Type 1: Load 1 = shear, lbs, and �oad Z = Moment, in-lbs
�oad Type 2: �oad 1 = shear, lbs, and Load 2 = Slope, radians
�oad 7ype 3: l.oad 1 = shear, lbs, and l.oad 2 = ttotatlonal stiffnesss in-lbs/radian
�oad Tvpe 4: �oad 1 = 7ov oeflection. iP�ge 14 and Load 2 = Moment, in-'Ibs
t � �
Giradeau 14in
�oad ry"pe S: �oad 1 = Top .fleflection, inches, a+�d �..o�d 2 � slo�xe, radians
pile-head Pilg-head
t�oad LUad Condition J. condition Z �xia1 Pile-head t�taximum
Maximum Pile-head
case 'type v(lbs) or in-lb, rad., �oading �eflection Moment
Shear Ro�ation
No. No. y(inches) fl r �in-lbjrad. lbs inches in-lbs
1 bs ratdl ans
1� ~�^2 V = 10000.0000^ 5 = �0.000 120000. 0.134503�18
-A46239. 10000.00Q0 0.00000000
The ana'lysis ent#ed normally.
Page 1.5
� �
SBE r.�.c
Design Memo 6 seawatch drive
savannah,georgia 31411
912.257.0633
To: Bill Shea,MSB
From: Rick Stone
Date: 7/18/12
Re: Cape Girardeau WWTP Pile Reinforcement Design
This memo provides our response to the design team's comments(bold italics)provided to us by KC1.
According to IBC 2003,a cost-irr plrrce carcrete pile in Seismic Category D has!o knve a minin:run of
0.5%/ortgitudi�in!stee!a►id 4 bars. This is very mi�iin:al;l:owever,we►vnrtt 4 l0 6 No.6 bars that will
give n:ore fliart I%.
Sheet S-01 indicates the applicable oode is the 2004 IBC. The pile as designed has 5#6 bars.
Spira!nee�ls lo b e a No.3 or larger.
Ties/spirals are#3 bars.
Prelrntinary L pile rtuts on tice pipe pile sho►vs fle.a ciral tengtlr to be nt leasf ZS jf. IBC defines flte
f[cxurallengili ns the lengfle of tlee pile to tr poi�rt w/tere tlte corccrete sectio�t crackiug momenf stretigtlr
�nultiplied by 0.4 exceerTs tlie required nro�nent slrengil[at that poirt� Irrespective of tlte flex�ira!
lengl/t reqtriren�en[s,t/te rebar cage ta be j�rll lengtlt of tlte piJe fii order to have n ductile plle for tlee
fi�l!lertgflt.
A design with a full-length cage is provided for evaluation.
Followirig are the design requtremenlsfar theDeWaal Dri!!erlDisplacemex[piles:
.(, 77re mreximun:lrrteral pile load: 10 klps service nud 14.3 kips tr/timate.
Piles are designed for the moment and shear distributivn detertnined by LPILE for a service lateral load of
10 kips.The structural design utilizes a load faator of 1.43 to determine the ultimate load.
2. Seisnei�Design Category: D
Piles meet the requirements of IBC seismic design category D.
3. The rebar cage(sized by tGe coutracror)sl:all be tlte fult length of t/ie pile.
� �
A design with a full-lengtt�cage is provided for evaluation.
4. Spiral sltall be No.3 or farger witl�spacirig noi to exceed 121ongiturli+errl bnr dismeters o�7
inches.
The pile design satisfies these and ACI 318 requirements.
S. Rebrtr cage sliall be embedder!in tlre cnp per IBC 18.3.11.
Rebar cage will be embedded in pile cap per IBC and structural requirements.
Latera!Londs--Free Head rrssumptio►�;
Service Loud:IO kips mnx lateral deflection '/.i�rch
Ultin:ate Lond: 19.3 kips,n:ax latera!delleclio�e '/:inch
The DeWaal pile is designed for 10 kips lateral service load as noted above.The LPILE analysis indicates
the free head design exceeds the listed maximum deflection value,however a fixed head design meets this
requirement.Note that the base bid pipe pile option also does not meet these criteria for a free head design
with a load of 10 kips.The pile top free head deftection for the pipe pile and the DeWaal piles ara very
similar at about 0.55-0.65 inches.
Conrpressron:
Servrce Laad:60 toris—nwx vertica!deJlection'/a indt
Extrenie Loadir�g:80 torts-rnax defleclion 3/8 inc%
This is not expected to be an issue since the piles will be terminated on bedrock or a bedrock]edge as
required by Jacobs. Piles are structurally designed to meet both loads.
Tensile:
Not sure wha[11ee londs are Getr Il slcould rtot be an issue.
Tension load of zero assumed for design.
We►vnrtt al!accepted piles termi�tatecl ott a bedrack or a bedrock ledge. We do not want tf:e piles
terminated in so�l no matter�uhut ihe capacity.
All piles will�e terniinated on bedrock or a bedrock]edge as requested.
We trust that the above responses raeet the requirements of the design team.Please feel free to contact me
should you have any questions.
� `- :�
Sincerely,
� �. / I �
`li'1?tt%r1 ���£)12;'
Richard Stone,Ph.D,,P.�.
� ________�._. --___T_,..._._.__.____._._.-----_________--
- - _ ._ _._ _
��91"� '�.�;+�1'���8 '�'��'��J�l'�
� ���, �
�a��J i3:�an:v�: CQst�Fr.r;�.`�0`)'� �?�s��Aa� �?�Zt��'�,�'1�
_- - __ _ —. _ __ ___— _ _ _ _ ._ - -----__
�m�'ar2�,'���?;3�'S3;''�a'��';��fl:?'?,1j^j �-e- `•Yic1��:2:SP�f'cr���i: �n�aya�7�.1'f*s.: '� `�3C�•�
- ---- ' — _
_ _ . __.
�;�n.,�a Y������3�d a.::�trr>>r:'r�c�J3��'�:�,�"°n1�;1`��.�`���.3'J-�`i > �:�.���.A;uz,�a,s��,���.2
p� M1..� ) _-- __. _. __ _ __.__.. ..,r�,-�M.. �f�y�+ c� 7
- �_._ _
.Y:�l.aU�ITv U�. J"1�4+� �J�YW'i1�L1f�t.i:�>��`.'-.il J�l 9 ���' .. . - ":'+�d�+'1']Y.:��SidJ'l��U�Q7
Y�as�rs�a�rs'3�d9�s�s��sl�A��+l�J arl5�Y��R�1'Q��T.�:s3.
�_ _._._..__ _--- _ __._.....__.____ _.._ _..__ �
„�,,., __" � _. ,.
; - - —— ,_.____ _._ . _._
_...
�.. .___._ ____..�__�f�A�a'�9�S�3�1'��`��A7,�IJ�S�Y��S3'�9�Ad7]�'�il'b"�dn i`.: :5�!'?�1.G�Ui 9,
i�'�TG4''.5 A��y�:'it`�'i tl:tl'*i's�?cS�.'•s"3�'�iT;�s�'.�:�G 7CIw}S YYs'-#�:�^rt�?t�£'�P£'E�i�'JE
�4t7V<��U��3?J6��'3��`��TJQ!P�?�!�T1y P�6'N�7m33�i 3���1�3����P�it7T�d.
T�Qf@fO!��IS�'��l�'r3S�3J��'��7'�3r'3S��9113����,��73'�t�f�
,.1t?��tias�t�f 3�'�1a�3����n�l3�d�y'3����ag3?J96f 6�'t��3�. "��i�'�9fJs��aA Pr�
���r'o�r�z: �-�:a;#m��3�J�rn�z,�r'���:��is.
�;3asl�m�rnta;l)3a3 3a�.'uma�7tao 3�a;�.sa�a�3ir�ehsrs��
..�..�.
_....___..__,-�� _�—- _�.,_._
'I.
�,,�p��q�„�y.���,�-�a a���tr�o �v da3�rm1�T??s t�.dr��1�v.�;i�a unr3�i��lT����c3un�»�a�.
�utT?�r?��L'as�3�;�ij?ark)�c�+#�l��tn tc y7oea_sc9�?h�La�ks;ai�sI�M'�v'r'�vrk fia��:
�)eA 1�1S��o��nd:t+�?A�I�t�l�?a��s�d.a�?�'n,xr➢e.
7S `+�x�43y�a�roQ#1e Y?�x's�ctR�s�4�rsfn nt}�?��$t��t����.rn��n.t�tc j P�a��on4�ci 7?r��.
£�31m�1�7 slrflr.;go.n�Tn?�s15'r}sv:a�?d�srntras3 7lmxa;
;���5se.�a�:;3���l�3erl,�l i:r�.���� v�,��� t���aa.�-�o)
���I�__ _ _-�_..
__�. _ __��.•,
1'�7+a�at;g.��r.���1���5s,S���3�fA:atzr�r,ar.3����03���se��ded��:xal h�Y:?�t.au:�1:w��.
_ _._.,_ T..,:_ _. _,_,. � --^ �
.._... ...�. ___.___ _ ._,.._ .,_.,. � ...— . _.�.q,�tp-_ .
REc6Rt�tpi"f�t�.�a(:•�r g!g�e E�ttj+�aM� . ' �� `�
.����`�r��bt�'�- . �
_�_. �-, _._ � . .
�.__
� -
� �"� '� f� _,_� �� �.y'l � �....
: `�;���-�. �-�-° ._ __
�,-____-- .. _,...
�..�� ,�_ . __�_.._�. w�....
��. _ /�, 4 I z-
_--�`�_ (J,�-�. - _-�_�.�_ _____.___.�...�.. '!�.:�_;��__. ____.._.
AaGr vcn tri?'�°d,^V Agqru.l'4N x.i'�e�dt+. >-- _ __-�.. ('tkn�
1
._�.�. -------��..._......_._. ___�._..........
_,._t-r_.__.,_ ..
___.____�:--- _ _ _��.�.,..�.
__ __,.._.__ _ .� _ _...�.._ ?��sJ�
�lS���fi����� ..__..>.
���6�s 39�'���i�mir�sl��r5lil��33�H�7►�1'!j 3�
���t�J�.s�,T�ars�i��.�r►s��s!��3�s!�nsd�a�as�� _,.._ _.. __ ._,...-._�.
� �
KCt Construction Company
'U3 b Lak� lu'n nv�
S4.Louis,MO 63123
(314)89�-8888
Fa;c#(31n)894-7418
www.l<ciconstrucfion.com
]�Tov����er 1�,2��2
�a���i�
���aa:IYda.�.�.lY���i�a�i,�'.�.
50& l�T�st�h�3��as�dv�y
`�$.�.OdA15,�� �����
��: Job#12002
�ape('sira�d��u�a�r��vat�a�Treatrnen4 Facili�y
Cha�ge Pr�po5a1# �2 ,��' ?^.d'�°i� ,��
Dear IY�,r.1\iIat�►►ai,
We propose to fumish the necessary labor,material,tools and equiprr►ent to perform exploratory drillir�g at
the UV Structure per Work Change Directive No.2 dated October 9,2012,far th� i�acr�asezl lump surn of
9n�-Tt�flus�►nd S�e�en-H���l���l S�e��fi�-�'9�r D�ll��s 4�1,779,q9�o
Plea�e note the following clar�fications a5�ocia4ed dvith thi�pricin�:
�e hade at�ach�d a copy of our change proposal estimzte sumrnafly and backup�or your r�vi�dv.
If this groposal m�ets with your approval,pleas�sign the a4tached copy in 4he space provid�d�nd returr�
i1 fos our rec�rd�. �3y signing this ch�nge propo�al,y�u are aut$�orizing u�t�proce�d dvith th�udork and
agre�na�g tm fo�e��re�t�e approp�i�te chang�d�cur�aean4��rn�l payrra�r�3 o,f Y3�e ab�e���moe��e vdiihi�60 d�y5
of vva�k p�rfor,r��nc�.
If y��a h�y�e��;�q�a�5ta�sn5 r��cOm�n�nt5,n1_�a5�dc�not h�e�Iltar�40 Cc�ra����,15.
�incerely, Approv�cd
� ��I�i'�! ��' �- �
�
T�1a3dls'35�.�b152e9' . - / , _
Proje�a l���ager Da4e:Q,.�_�f/// y�
.�'.'
�t8acfiarnenas
� l �
N
>
�
V
�" u
O � Q
� �
0. W
W F-
� ¢
�
x � .
U W
i,
U
A
C
�
�
a
X
O
�, 3
- o
� >,
w �
� � o
� � �
� � C
y s
o � � 3
N � U 'a
� � ro
3 °"
� ;; o
o � _
V
� � �
� � O
N '� y O
� � 0..
p � �". W c) b�0
Z' aa', F OF � .�
> U E-� Z ,� •.
� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o w a M v � y
N O O O W O O O O O O O O O O O '/'1 '/� �O V? M l� U
N O O O � O O O C O O O O O O O N N GO �/t f� � "J � '�
Q � CA F � �° � c^ Q= U �
= z � z � 3 ° � o
� � � � � o � N
�
v ` � � c� � �, a +„
X a. a � � c � ro E
3 0 0 = � y .
0 o Q � � 0.
� � � F �
� °' ° � Z
;? '0 3
� Ud � � a' F o I a
�
v� o
> '' aa'i
� � �
� o� �. n
o '� � U
`° � # o U3 Np � �
on �
❑ oo � �- p Ca
^ o o. e� a�i -� Q
� o
� o .�O � N �n V N ¢ � � Q 69
O � �v'�\ ^ .� N xk 3L ,itl � cM 0. W � A w
y z b V O � # cC c�tl :: � C b4 y � G ¢ �
; � a o � � � � � ' a a A � � � � �' o o a ¢. y c.W7
m O x 0.. � � G � cJ �l a�i 6�i N � �e G j Vj ;? U a ^ W W p, �
� �, � .-y 6 P. O F V i6 i0 F F �p y ~O G. � C � � '' � � V a x
y CG 0„ N 7 T � a. P.
, o w V�i D 9 � .0 C u �C iy 7 7 7 j � c�j p y 7 7 C C Q '� C�
O y
, a o O � •.�a O ci; U v� � � w w `" O `s' O F- w `" � �7 m U rs.` � ¢
___ � ;? .c a.
� U W
— � C7 � Q
:� y .� H a
°
M O O �
.:..4. .. O C'
: o a cv a� .-. o
� � � a� '� � � � vF-i O � � co
�
a � v o � O O
� �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a F,
F �
O �
F V
W �
� � o 0 0 0 0 0 0 0 0 0 0 0 0
� a ,c, v
�-- E o
W Z R k. I
� y �
Q � w '3 i
cn 0
O �
� � i
W J � F
Q Z � �
,� w
U � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� W
� x
'^� F
F y
¢
� 3
F :'-�
� � �
O
o r"
0 0 0 0 0 0 0 0 0 0 0 0 0 0 o Q
w
a
m �
J
�
O
�
N F W O
o K",�-, E" W
� a � a
a `�
o U
�
w `"
O �
� �
N
O
� � n �, y �, �, h � �, � a a � c,. �
°" x � s` � .c .� .c �o �` s .c — .c �� �C .c 'C — .�
U
n
>. �
'C fO
z � 3 �
° � � • b
a ;o � � c o o .�
� == 'x � ° 3 cf0i
� e w° � ° �>y m0 y ° °' � �
C �p V y
� � 'O � � �� W 3 ro � � `�
m a°�i � � � � c � C :° a s C � o ;o
� C ,� � o � F y c0 0 � � ro C] E V R ^' E >
� co � ❑ c�i � � Z' o .�. y U ev ° v o v � � �
O � � � ¢ v U � �e ti a' � " o � Q '-'- ,`� r°'.n c '" ao Q � � `°
F .G v� o u u � �a a A � W c (--� �.
O �,p_ s: v .ai °' .'�' �o o `�° E E '3 E �° ro A � E � R �° a; " p � o
a. p � >, a� o o � a� A � n � a� F � � �
p -- � y ri a. v: :: U F F a` 0.9 c. Q U x � � A C7 U F w z a
a '.� : ^�':M
� 'p '�. W O O O O N O O O O O O O O O N t'�1 O O O Vl O
W 'N O O O O O O O O N d' d' V � �D �O � �O �D �D [� l� W T ^' N M
W :, � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� , G'
� �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0
� �
a �
Q F
F `°'
O �
�, U
N O O
F" �O v� �o
�`[ U �
Q L�.
a �
0
F p
¢ �
� �
o �o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �o 0 0 0 'o 0 0 0
�' � � ��
`� W o
`�' � �:
�
0
O � 3
O
�
a
Ccl F �
� � �
� �
Q
x
U
J W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q x
w �
F �
¢ ..
� �3
o F E-W-
� z
� � �
�
0
o � o 0 0 � o 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0
x
0
ro
¢
a
F `^'�
� �
N
O7t
y O
v w �'
O �
� cn
� `a
a
u
W
� a
�
F � p
%y � V
U b �
w
� � o
W U
Q � OD
� C
y� �
7 b
� � �
ay+
F
� � O
,- `� �
^� � w
,.� �
� O O
',�, U U
_ _ � _ _ _._ __ _ ___.�_�____.___._...—_.__...__.._.____�____�._______.____.
1No�k G:���$e Dir�a�iv+�
�. �
De18�;r��.a: D�toDat�,24`l:2 �3!xu��atw. �eto2�cr�_20'?2
-- ---- _. . ____ _--_—_._
-- --__.. ._ �.__� _ _ _ ------ -
��s�1�9d��t?'t��t F�3)�:u�-�r Caty�:ane�ir�rdeau ��a�;:�+r!v: 3�
----� -- - --
: _ -------. __ __._ _ _ _ _ _
��„�yV��te�ra�es'7reatrnne�2��1}�ty{8RF Pto�ec3 Nv.G2'�b,53`�-�31 ��8��r��r�e�7ac,}�;�?3,�0`72
_ __ ___ _. ____ _.._... _ __
_.--- . -_ _ _ _ .
c��cr K'C3��.3xt�ction�;ampatr`,�a�n�. •:,:,;. .•;P,�c�.:'��3�i`��
'���r�a{1���:b�09���v�J��'J�Alt�aM��rkag shs��:
....._._ _�___._.__ _.__. __. __.---- _ . __.
__---- _.._ __ .. _ _.w_. _.
HRT M � ..
"'" . . .'__ ...... . ..._..�__' .._.._......__.____..., .... .,......
... . "_'""_' -_ __...
ro.:. .... ..____. —_.-��ed�on 3t�figld��ra�n u�eas��t�ra��3s���t al���3:`.� :�;w,:struc�.are;
��d;�c?*,�t�vaUar�+ander ihe slab v�1�a�e no sc�s w:aa�rtco�ar,t:�yred;?�l�a b.�
cofa=�ed��a 9td�t��t�rrnl�a6�ar�Y t�+����3+n 3�e l��s�a3��r�ua��d.
Th�efo��e pr�ihs Deslr�k usirag't�e�lr t�k p�rsa�aas�n�f�a'39,t����er�s1
loca�an c�dr�li�a't��dsierrn��s1 by i�a���agi�aeer��#'i�ld. `d'��tk��saA 3�S
aerta�me��r a 3)m�-an�matert�l baai$,
.�cAmsnia{l)s3 dAeumsnts axPAoTii�sV��)�
�-
__.__._ �._ -s - _.
_,�.as,T ...�
7.
Pu�rtoaa}or YVath Cha_Tqie AirecStva: �9 dfl�Blfd�3?i8 I�T@ b6dfOGc�6at�liW1 lllld�'t��lIV$�T4tGtt1le 81db.
Au�aCun dcr��ark�as5r!A�d haeln�a psoc�ead vn A�e�Sla of�si�e Y�Iv�1s slue Mo:
ll/, �VVo!!r•rA�Jte�+e�t�a p�fi9 oi ota.n9s�rf�nge.
X 'Fdsrassally b ew44fS6 YVaSt��eA�lfbld AsYd71 pt10!•'A a9t�r?9���4A(.3tA1}F�c1 P�e dP.d�A.ta�t'i:ime.
Fatlmdt9d sha�s in Cv+Krael P.*1s9�nd Co�Jts�ct Tlm�s;
cc�;a.�s�ir�:a?lr:r�e�N!aler��l �y,�,.��e�.aa�,) e��s�r+�..q c��)
��s.__ _ _�_ -_.�.. �� -�_
Jf V?a r,�+e,ttge j�s�}�ae eat i�s�ee,7ha es�n1�3v9�rr!c�rr.ce ase?ta�!Av�o�ueedad.�?t!w�Sur�r�gr9�?�a�or+.
w_ _..__�-- _ _.._..._. _,-,.._.T._ _.�__ ------��
�_.�. _.
__._. _- p,�
�tecocrvrante:'�a�cra•.�tyE++qNrv . �v r�---`^e^'
�-�r�'�_t�_F�.___�.�,.._�____ �y, __ ___ �___.._.��, �._.._._
ta�,�� �-�
,�
. - !1 -c_�t .,s�..
�
t��c'u �..i____._._.�_���_...�._____,�__ _------- ---------------- -._.
"�____._������. � ' I�. ( 4� 12--� __ ____.
�_t�►._._ ---....___�.-�.___.._.--,. �-r--
�rrovca o.,st.vl�,p.A�a� r i
,.._...._.....>.�{._.__�_—_�.�_.�_-----____._ __�._--_�1�.�...-.--._.--- —
__._ _ ._.__._.
_ _-�-. _.
_______��_ J+�Tl
__ ._.._,..._ ._.__ _ p�q�.
�"J3F��Srl�'{��R+�k�,l �y�
I������y�Js��!.�i ry���f� g���/���y���7.�NT�:�}y�y�
JSilfTlfb.4s1��!1l.��3������6�uM!(�fs#n�1!l+J.lif�s .....__ ...._.... . . .. . ....._--�__._.._.
�� ��0 �m����a����� ��o �
�i�D�1� ��k�� �BB.�'� ��, � � � �� � � � � � � � � �
���� �.����, ��9�����a�� ��'J�3
■� 3�a����������� �!? �6� 1
��� ��, ����� �������
----------�_ .. __.__---..__ .__ _
. -. �,
������� ��n��; �-� � �c_:�:�.�� .____. ������c�r�: .� ��c� � ����; _l�T-I. _���-
����c ����o����� ���, �._._.. ��� ����������� �� ����; s � � �
,
::
_ ; f:
.__�. _____—____--_ _ - --.. ---_______ __ . ___..�._- �._�--� � . �._.�w . _..� _ ._: _ ____�.. .._ __�_--
�
��. `°� ��
_�� _� ,
_ ..__.___m_.._�W__ ,_._ _. ...___.____--- -__ _.---.�T..�_-_ �.__._.__�, __.___._----_,�_.�_______—�
��e��
�a���� ��'� ����r ������°
_�_�--_-_- - ____v _ _----F__�- _ ___� -- — - -
__.___ - -- --- -_..
� �'� , ' i � � ''�.�,,, '�' , i 4' � � w ,:�,��' - - __.._____ ,_.__._ __.._ _
��_.e�...__�.__.... - � __._�_,..—_. ____ . . __.._...___ ..T.�__���..__..�c._. _...__r _ ;__ _::..
I 4 �
1 _-._—__ .r_'�. _.._.r_�.�-..-- __'_ -_--_._'_�"""y
i.,<_..________�� ---_.��.-_�,.�.�__...—_.. =�..s._.__ ��. ,
I
�__ ___ .,._ __ _ -__._.... _ _ . _— __ .., __._ __., _ _.--- _ _—_ __
____._ -_--
{ �
i ___. �______ ^ _�..____ _._ .Y.�_....._____ ,._.___� :
, ' �
+ i
__.._�__---.,-.-�_.,_...._-------_.�_..._.-.�_—.�__�_.. T_�__�.,.__________��_!---------�_...__ ; _--�-----,
t �
j i ; i __. .._j
;.��._._�.__ _..___ ___.��.....-,.-.,_, _.___._.�__ .,_�___ _,.___--_.......f.._�_...... ._._�._,._�...._.____.j. .
....
4
� �
j_�_.. �
_._
:.._W.._..�,.__-____.__.. . _,,_-------.,.�_..___.�..______..__._.___._._.-__--.�._._._--- �--•- __:_._. ,—�---. ___._
� i �
__ ___.,_ __ -. ..__...,..�_._ ___.�_. ..____.___._.___._._.__-___ .�_______.—._..._...__. ` - --------�
aUP�F�`�i�i��J: � ' �
. ,
,
__ _. --._.___..___-_----_..,_._.__._.�-------__�.,.T ..��___,_�.__._._..�.__�:.__._ ---.__�._ �._._._. _ _____�___._,�� � :
; �U���'�AL LA��3�A
'�JJa�°�E�31A� � E��Sl��l���'� __ _._�__ ._.._ _v__y_ ...__ _.._..�._ _..._�__-- -._.r_,
_ - __...-^ --- -- ---- __ �- _ _ �
__�. __._. �_.�
. , ,
� i � : � ; ___
,
� ' � ' '
' �L .�`t! _„� �. ,�—, f� , , 1 'I �, , �,,, �__...�._.�—�a� �J --�
,� - ...._______.._.._...___._ .._. ,.__�...___._._�..____.__._.____.___..�. . _.�_______t
� '
, s ;
, . � �
�--�:�P —�,_.�,__...._�,.T.�__....�_._w.______.__._.��_�_�.,�___ .-- � --__.�_..�_._.+ _ '
� � � .
9 ; `
u.._..,_�'.- ....,..e„�......,...._...._._.-,,.:-�--n-a.._.-._...._—�,._.._,.._.-,--�..-......s..,.�. .-a.._.____ ��-�._......�.. .. .
k �
, ,
� , � , :
�.__..n.....��......__.,-� .......-�...o._.--.�..._...-�....�.-..... ,.__t�.... ��...._e._...-. .-,-.-�-�,�-m.--•--�-¢`�.}+•--�•--,-. ...�,.�.......-.�....1 � �t
5..�-�.w�.�»..-.�-.-�.-_� ....-.—.-.�.-.e-.... .-.��_._..+r..�.�.__�.�.�....,_.�.��.��...�.....--._.�.,..�..-..._.�.��-... � ...-...-�..�.....a..�..,_.�...�. ,
� �
5
�—,...-.v..-....�.,�..�.,��..-_�----a-.•-,..-...—..,..__,.__.__...�. __ _—'=_...ta-..�e.,�.,��.�..-.-..e....`-•---��-+,�,�.t+-.._.�-�-_��.�...........����...
I
�.-+.-�.-....-...-�a.a---�.�....`...,.-....�..�.... ..---•��„.� ...�.+.........m...�......�..�-..+-�.�--. ,._.�.-..e."__.. ......._.._.�__.....�.�.�.,—�:-.�.�..>....�.-.�e.-...
KC�Construction Company COMPAfdY: ' ��������' ��� `� ����� `
� �
.. , � �9�'A�; ---_�__,.._..__._..; ._._v
.c=:
.r.._t iti�-_r. ....-
_-.._.:.__._,..,,.....y.,..r�-�......�^-�_....,.___'_...."__'_._-.-..�.
��ls APP'�OV ��' �9'�E�M�A� � P���9'i'e __�_...._____�..�.�
� ��E� ��
�� .
.-. -- �._.-
�
_._���_..... � ,..,_._._._-s--_-�__�__._,.._ .�.4e -—_. ��A�1�'����°
_._._ ____ __. _
�, ^ '�
� � � �s � ` �<' �� `; f , � � '� `�. '{` [-� 4 # ' � � � i '�� ! : i ) � "`+, !
�s` -
t�l: :' 7 3.=�'D1 � u . J ) 1 ].�J?i� :'l i 1 J 9 r'�y'.v'fY.�7))7Z?'uPiJS/1.1�1);S]
�3p�LL
����;�.� ;
i,�st�bez 31,.2�11� �23�}G .
i
�
�
���:t����:� ;
��t �'C'Tl;'i}3Z1C�iD1"t �D �
:�U.:�:;J i.s�}�E��:�11:�:� �:�'.i'Je �
Sr� :�.n���,�I� b31 e3
T1-�,e foll��v1��inyoic�is fc�.r V:ctrs�yy�.rh�e.r.��:r.zx�ecl�i C.A�'� fi�iRt�.R�:E.,�1:U �vr�Y�[°.F,
�l0?'1�172 � €,�1 L}��Rr�i Cr�ONLY $8.a9 �r� ��0.9fl
79�93,'�l� 'l6 HP UP�R�I?0�C�°T 38.�� HR ��3$.{39
8 }-3R LA��RER �`T � � �8.�7� HR 2�f8.Ofl
8 }-3R F�R:�M�IN 4T �8.�0 HR �f�.��3
'l01`��i�2 �� k313 �6`,�' }��l-_L.1�"i' �i�S.�3fl HR 740.�D0
;2 }-3R SKI��TEER ���.00 �3R 27fl.OS3
��8.�6 TN �" lu",�NI�S 9!�.6� �T3v °I2,1�°i.33
9�I��JI� �.5 NR DRI�.I, 300,Qt} �:R '��.0� ' ��;��'D ��
`l�l`I�J'�2 � NR SKIJ�`T��R 9��.II� NR .—_-27�.0�3
36B.i2 TN :2"N?NUS '14.6� TN �,372.�a
')��'?6i�i'Z S.� HR �}'�Fi:�,TQR O�'dLY 8+�.00 Nr'� �72.0�3
�Dl�?�J�:2 'l r�R SK1t�STEER �35.Q0 N� '�3a.9{�
.2.5 }-IR �QR�1�AN yV a`TR�JCK `i'20.flQ �iR 3�A�.9�D
�Q.8:2 T'N 2" M)NtJS `1�d.8� 7'N �l�a°l.�1
��,�:�1�:� E_3.� l-lR t�p�R�TQ�ONLY 88.�t} NR a72.�Dfl
`�U,;��?��?2 8.� i-)R 9P�R.l�Tn� 4N.L7 B�,OQ HR ---- 74$.�fl
R�V�OUNT DLI� �:��,8�6._2�
��. -- � ^,_
��
�`�R1��: i'��������a������3���
P9����������
��9�!4���`T�����3'�'d'�`�9���`�d'������J���P��9���9�033���������3����II�C9P1�9�CA�I�����I�`��
�9���l�R���'��0�f9'DP�°��9������'�1�9��£�����F��9J�������Jl�J��i�����!�(��I�.`��A��9��91�
�31���D��'J91��1�l�J��`������D����`3�33 '��� '�3E���f9����' F�A��,���P�'���9����9����8����7�i���1�'��E��9�f������`��f�P�
�E������!�9�����t�l���dl�, ��l��I��'�`��J���'�1����.7�J�����i3�AX'����1�,�!�1����3�AYI�l����3�D�A�]]�f��4`����1�1.`�fii9�C�Eo
�� �������..,a"��������.�� ��.l.i a,/��.:�l..� '.��..�.k��F�J �,��+P.f �IFf�K�,'�� .��������:�s�'�`R e� b � ` ..x�. fi� 1.• _.����..
�^ �
�"'� r�
�,�,��' i.-�i� :��.��^'a'=`,>�'�'�'.r n..,,�
�_��...Fr��-�""�`.
.
,w .. � � �ER ��10 ,�'T��S ' ,
E��w�RK-�
A �ON '`�-�' "r• CO-
J. 'K• $'F`RR- RUAD �
� 509t NEW BAUMGARTNER
� ST.LOUtS,MISSOVRI 63129
�, d87-5617
� td.-��"j -
� pp'TE
1��
� �
GON�RACYOR�„1 }, .>'-
....L ' ".
�OCASION ..F;'' pW? E
`� �qCHiNE K�'�T�
•F $TART
, OPENA7�F��
OPERA�OR'S Hp`�- --��~
t CON7AACSOp�s HHS.�---��� �
' _ � . .�...
SE NA110N � Fi
EXPIA .t j �.. i + . ��_�._
a �
,s
� ��}i; ,�"�"� ! '�r l �.� �Y
.\. .
�Y .
.�"r _
�i �`'- �
4
�4:
i
r
� I
i � ——--- - ---------- I
--� p,UTH�R1iE0 BY �
bove authot1zes 1he above extra
g�gnature e b���ed to co�ira�or.
work to be, _
� �
�Tork ��;aaa�� :�ir�����iv�
N�ao �
�3691��31ra7i�'.�: OcSQbe�.L�.��l's� ��J$.t�'%nR�35: VL1Abor'2�,�07�
_________.�.----____ _..�___ �_
_.__ ___.. __.__ _..__._____.
r�;.r��'9���lar'7ra�ir��nZ Fa�7��y� ,� Y e;aty o`Ga�:3�r�.��.:� �:..s z�,���-�..��
�
____..^.._._.��,._,._�......�__._�T____......_�.��_.�...__..,.._--------___� __..._��
_� _..._ _.__.._..__
���,�?�17����'`T��rlrrvn��a�i�Li,Y��F3��v3a.�s 13�. G:2���`d-01) 'r.a�A�;��:�c �4v�st�,2D°?2
�__ _ __ .,._...�._�_._ __,_._..�___.___.._�_. ;-- ._..
---- —•------
��„a�T HGl�s�.�t��;»n�srr.r,�;ry,3r�. ���.� kr..��,�s�a.; ���6���`J
s
�av a�a dS��c4ss7 39 PJnS�ft�p�t�AR�i,y'.NS?b 1ha 19�i]a'a'e1r+r�g�3�
uamNa:;Gaicd[�Sori �---_�..... - - - - _..�....__._.._._--.�_._..__.._--_.._._.._,..._._.___ . ._._-
�__�......_____._.._._'�evase the gsaCing per 1he v�ue�er�g±nesring�fop�s�l�aquest�RFP N4.2t date."
September iD.2D�2 And tize prap�al fram KCt dated Ocipber 12:.'t412:both arF:
�itsChed.
I
Astachmnnt��!M sl4skn»r�ls sv�parUU�cta��);
`�. ptQj799s#��Tt�3'i1��'1�i`Lfl����bBT��2'°+��'�'2 s"171(����Isi.'a�Ll�iR(��9���ZJ87'�Q�,'2���2, ...._....4.
Pvspvs+lsr rra�ts C�nene+��,.•s�.e; TO AsoY"]II8��S�;9&'Ya+.Qts�j1T}}���38T9 AC7$��J�!:e�T�fEt�41�9 G4�'j.
�!ulhWrtzaCon�vr�IYor?�d�saltrAd 1�)n'�A�o9ood pn 4�baata ui�s3:01 V�a?h'��S si�,�toe
�� tivfl•+T�asr,3ant�n�s?�sf arvco�ssi shar�e.
J�.A �sca�t(Sy��er,�iSa�"!��k��c;Ybe9 hnrl3fi�1ss S9�6feeinq 19 cT�et.�vn�a�h+�E�tic��n9 Grntr�e!7t!�o.
�9t)ma�arcl�3aa►nW►M Canir+t€!3'iJtv�nsl Cwnlr.acl7Jmvss
esr.�;�;�r�,.�$`t g,9 9H.CIO��3T�rsr��) � �sr�,as1��+9_ � �(�rsrs�r�+st�ssq
��
d'J bh��fl�n�N�vslvan�ra 9��r�e�n��e+�i�+'n���a��sd'��s sxs•�Js9�J9hsyd?ytAicr�aos�oriaa�n.
A�ecw.,+.'...-a,."�cr_�",A6`f.�'+lts�. ' _.�_...__.�___..�,. . � . �k
,il?/� c��► ��_���,��'.,/1/�__�,_._.
• m�,� ___,.�. �_
Mn �c'r ��+ )
� f ' l� �. �
.i ' ���c'1`�_LI�(,��.._.�.���..�z� ._.____...�__�1��_�.___
«.
a, � :spv,x. t: -____....�_���_._ �...��...;,�_.`�' ZS'�y' �,.
_...,_.r._.�.�.,.,..a.�.�.....__.^—_,—,..,_a-___� V.�_.._._—.__.. ,.._1�.�.,P...�__..,e.a.a..... .....
�3i1.S'!'�9,�.'•�������9�� "_-'._'_�--_,--,�.......-....m.-,.__ ------^...���31gT1
�3���'�!��l9�Fl�d74�7'L'f997JM��'�-9911�5�l3��51�97JS��'dA!
!�!ld.�idd�����9A'�M�i f)9�A.�S�IA 1l79�A�!^.�'3�93�1�'J�9?lq:�.�1�03�,,�._._.-.- .� - —
� �
KCI Construction Company
'u3'�Lal« lut� riv�
St.Louis,MO 63123
(314)89n-8888
Fau#(31�)894-7418
wwwJ<ciconsfruction.com
�,�
��aob���2,20fl2
�ac��5
��Y,�:1��.�'.�.lY��g�a�i,�'.1�'..
50� I�To�t���o��lvy�y
�R.Loa�iS,IbI� 6�&02
I�e: �ob#12002
Cape S'airard�au�iYa�iewat�s�"Y'reat��nt F�cility
Change Pro�osal# O1 �/� �.�� � �
Dear 1dIr.1Vlathai,
V�e propose to fiamish the necessary labor,rnaterial,tools and eqtiiprnent to Revi�e grating from pressure-
locked type to I-bar type and revise thickness in various areas,per Reyuest For Proposal l�o. 2 dated
5�ptember 10,2012,for ih� de�rfas$�lump sum of Fif3��a��T��a����d On�-���������.��➢o�l�rs
(�15,106.003,
Please note th�following clarifications a5sociated with this pr�cing:
r�/a
�Ve hav�att��h�c�a eopy of our change proposal estirrtaie�i�rnr,reary anci backup for your review.
If this proposal meet�with your approval,please sign 4h�atta�h�cl copy in th�space providdd an�l re�urn
it for o�r re�ord�. �y�igni�g thi5 change pr�po5a1,yoea ar�au7horizing us to proc�ed dbi4h�ka�dvork and
agreeing to foa-ward Rhe ap�a�opriat�cha�ag�do�uments and pay�en¢of Yh�abov�amo�n4 vviFhir�60 day5
of work�erfo�a�a��.
If�a;a hav�an�s�a�e�t:o�is or�osns��nts,pl�as�d�s n�i hes�t�rP t��o�qf�s7�a5,
�incerely, .�Pproved
,,�,-..,,.—,�,-� j t
�
���� ��,.�.�� ��:�� v��_'
�h����c.���5z��
Proj��t 1�✓✓I�n,aag�r Dad�: �'"
Attz�c�iim�nt�
� �
r�
U
�
N
�] � N
O � Q
� �
� W
� Q
� � l
x � ',
� w �
� N
O:.
N
O'
9
� �
� U
C'v
N �
Ul �O
� Y
� �
� �
N O
z �' "o
cU � T
O La' .O
a
o � � o
�i � � `°
w° '° U s
�
F s 3
°� � U v
�i `� c.
� � o
�'' � =
3
� a f6
� �
a
�v � a
;� a
� � c.
o � �
� x W � c
� �' c O �= s
y U F z
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �o ^ ` N
� o 0 o r,q o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o w �
� hi o 0 0 7 0 0 0 � o o � o �o 0 0 0 �o 0 0 0 " � �
� E y, Q o 0 0 0 `^ - U Q
s m CW F � `"' - =% ,,
2 -o vi �i �n vi cs � � ,-,
N : �a 3 ° � e
..�. o a�i � U c ° a N
'� a. a ¢ � c � � E
� o a e a e f.l c .a °'
� ,n o v, vi y c �u�
?� o � �
� o a � �
O �/ � \J `J � �I N
� � �
G
� O
G
� e �
� y
a o � F F
_ p � F � V
°' � N o O 4. �
� .-� � o � E' O C]
� w � o e
o � c» a�i
E c °v\i � a a ia v, � a`� W � �. Q v9
o a� — " �
c �, z � � � o a � � R °' .`�. = v`^s � p � nQ o
N
G � G9 O 3i 3� � � y e e'1'v "f2 A 0 'C' O y � � o Q. � W
? �° � F r � ^a _o a a � a Z � -o ,� r, `� C�
� � � � � � p `� � � <c � � � o ac�i o o cn � o � � � � � o �
G � V
a ' oi U a 9°�.9 v�i �' N � .'-'� .�' .9 � � 0. C � � � . 0.. "s'
_ _o � v� � _$ �3 .� o �`c �c `" c c cn > cn � o a rn N a�i o y o � U
N W � a o � c� v, � � :Ia w o O F- c,. � c� w � c� C0 a�
rX� o O � s �
� � a� U W
_.._ � °� '= �
� � .;� F .¢.l
`�^, 4 0 �
o sa � a� o
y -s U �L +^� V] G1 � .-u'+ GO
��' � � " o s O O
� 0.
� �
o n o o a o o d o 0 0 0 0 0 0 0 0 0 0 0
a
� �
o °
F V
W �
FQ � o 0 0 0 0 0 0 0 0 0 0 0 0
� a y O i
� � �
W z � �" �
¢ ° w 3 i
O
O �
cL U
ts. a E, W
�v Q
4 z � c�
V C7
— o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a
Q �
G: �
W a
F F
d s
2 3
F w
� �
¢
u �
z
0
� o � o o a o 0 0 0 0 0 0 0 �
o ¢
�
a �
o a
m ¢
a o'
�
- O
�
N F O
o � � W0.
� O
o �
w `"
O �a
0
# F c. a v N
°' � s` s` s` s` r � �' s` s — _ r — — s`
U
�
T �
� y �
� � �
z � a
° � � � �
� `� � ' � ° � �
5 x � y � > �
� �- � �
c�n e vo 2 ,� v c "' o � ..
� � � ` y �� a '3 �° � � N w
w � c a° o � 3 " �1 o u �aS L q E V m °`�' � i�
O � ryCj v ¢ � � � � c p0. � y � a Ca �u -g � a� '� � 'o � ia
r� �
F � � 5 � cii � v' 'o `'U � cc�i ` � � ° sz, "-7 cs° � Gu c F `� o �
� g,,;,. 1 . . y . � a ¢ '�" �i '� - � t'O�J' T « u O
P'r ks_ i`1 p O 'S O �"'al >' y �` y0„ cJ � � � � d O O
p -: -�"'.� a. a v, a. v, .�-7 U F E= a Ga a Q U ,.T Ga � Ga C7 U F F rs � a
U `� ;r
a M
¢ ' � F,. [� p p p p (4 O O O O O O O O O N M O O O ut O
� ';` N � ,-. CO M N '� OS O ^' O �D l� l� GO 1� J` .. N N1
O O o 0 0 0 `� o ^ � � �' �o �o �n � �o �o i r w ^
' '° � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � j0.
� �
0 0 0 0 0 0 0 0 0 0 � � o 0 0 0 � o 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0
a F, ;,, `^
F �
O �
F, V
rV �
�.. O
Q �
0.
W � i
U
¢ �
'� �
� �
� � � O O O O O '',O O O O O O .O O O O O O O O O O O O O O O O O O O O O O O O O
I
�y � O I !
� '
� :� o �
a d 3
O
a
v � F
z � ¢
a �
x
U
� � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
`.WG' �' ^
� �
W Q
F F"
¢ s
� 3
0
N � �
o E..
0
� 4
x CC
�
0
n
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O
�
O
CI7
¢
a
� �
0
y o
U �
O �x
� a
�
v
�
a y
� �
� U
a Y
O � V
�
F :a "d "�
p�, � � a
a � � a
� � �
Q 9 ET 3
�
Q c �
� � r
� � c
CJ �
� � N Q
d � U �.'
� F
-�, .� � � o
s
� � � � � o
ar c.� v �
.�.
� �
IMPERIAL
RNAMENTAL
ETAL CO., INC.
635 S. Old Hwy. 141 P.O. Box 733 Fenton, MO 63026
Phone: (636) 343-8825 Fax: (636) 343-4920
TO: KCI CONSTRUCTION CO. DATE. OCTOBER 11,2012
ATTN: TOM HUSTER �F� CAPE GIRARDEAU WWTP
FROM: JASON REINBOLD CAPE GIRARDEAU,MO.
QUOTE#JR-12-8652D1
We propose to furnish shop drawings,material, fabrication, and delivery for the following:
Request for Proposal No.2-Revisions to Grating
This deduct to revise grating from pressure-locked type to I-bar grating and to revise the thickness as specified
on drawings.
Original Grating Price: $67,450.00
Revised Grating Price: $52,344.00
Price Difference: $15,106.00
Material Deduct: $ <15,106.00>
MO Sales Tax 6.6%: EXCLUDED
Erection Price: EXCLUDED
TOTAL DEDUCT: � <15.106.00>
PLEASE SIGN IF ACCEPTED: DATE:
STANDARD NOTES AND EXCLUSIONS TO APPLY.
Thank you for the opportunity to quote this project. �E9f:�EE��
�� `'a �CERTIFIED
.,��.
= Q FABRICATOR
� �
MPERIAL
RNAMENTAL
ETAL CO., INC.
635 S. Old Hwy. 141 P.O. Box 733 Fenton, MO 63026
Phone: (636) 343-8825 Fax: (636) 343-4920
PROJECT: CAPE GIRARDEAU WWTP
STANDARD NOTES AND EXCLUSIONS
1. ALL BIDS ARE SUBJECT TO REVIEW AFTER SEVEN (7)DAYS FOR CURRENT
MARKET VALUE OF RAW MATERIALS.
2. No engineering-calculations, and sealed shop drawings.
3. No penalty clauses or liquidated damages.
4. No "SHOTGLJN" clauses. (As required or as necessary, etc.)
5. No testing or surveying.
6. No overtime or premium time.
7. Bid is based on using our standard insurance coverage. (Information upon request)
8. No light gauge studs C's or Z's, etc.
9. No grout or concrete fills.
10. No bolts for wood and other trades.
11. No shoring.
12. No cost performance or payment bonds.
13. Holes for other trades.
14. No field touch up paint or painting.
15. No pernuts, licenses or inspection costs.
16. No anchor bolts for equipment or other trades.
17. No back charges will be accepted by I.O.M.unless prior written authorization is
obtained from I.O.M.
18. Standard exclusions by vendors supplying materials or services to I.O.M. are
included as I.O.M. exclusions.
19. NO PRIMARY INSURED, "our" standard insurance only. (NON-NEGOTIABLE)
20. PER POLICY aggregate insurance provided.
21. This proposal is based on NO RETENTION being held unless mutually agreed upon.
OTHER NOTES:
�E ov srE�
� � �`'� �CERTIFIED
� Q FABRICATOR
Y��'1
� �
����� �O�s�s Ea�aaa�a����mn��f�as,
JO1 P�f3�C+1�PsraiSlNlay
�d.Lma�i�,9U3i��o�ri,6�a�D2
399.�3�.A�fl� �aY 31�.333.5943
������r iS3,2�12
�r,"����-�a��i�
�������4�a��i���s��p�y
�03�j�,���3��a��'�v�
��.L���S,���3�23
��d�j�c�: �3����s���ar�r���s�l�flo����Y��a��v 3+��r����
���r�'��:
�����p�������p����o����vi2�d�3������b����s�s���������,�������s���a�i���t��������r�������Z��
�ca�t�i�3��e����tm tfi���+�1�-�,g��e�i�������s�l t�����������a�g fro�p��5�i-u��-ls�k�s�ty�e�a�-3���
�;����d t9;�vas�2��z�i�����������y�a�3��aaa���es�����i��������s���������i�1��y:
7. I3���ing 5-15—iz�fla�����}ri�g 53�3��z�: ��yis�;��2"�t����ces�i9 1-1/2"th������.
C�a��k�res�plad�reqi;ir���t p�r 1'��3�5���aa��.
2. �ra�ing 5-24—Hea��var�s g3�l�ing: ��������1,���ses��s�i��yn ia�t�e att��he�.dr��v'sng. I�o�e
th�t ihe 7'-fl"dvide char��+�l a�vill r�c�uire i-�/2" l 1�����d f;r��ang tcs aita�a 3}�e'/"m�x defl�ciian at
1 Q�psf.
3. �rawings�-39�40—S��u��cia3g��t��Re��t�: 1������g�,r�ai��as 2"t3�ickn��5.
�, Dr��i�g 5-41 —S�alit2� iBa;x: I��v���fr��2"�?�k�e��t� �-l/2".
5. �3�a�ing�-52—�Di��f��3i�n: `��a�oa��3�����s����sh���u t�s��tia����l s3r��v�r�g.
f. Dra�ving�-61 —Bi���lid��3uild�zag: ���h���,����5 ag�"t��kt���5.
'�'��a�ainimt�m thi�cls�iess 9f the gr�3i�����li b� �-fl/2"��r����st�ve�f t$��la���l�g�ap��i3�o#'the gra�i�g,
�1�����s�r�iiz��►�t��es�g�-�r����������+b���fs��g������-�s��t��t�c�e����.
�'1��5��fl�t�ct rne�3 31Q-335-�5'72 sa�p�.ar�7a���Lj�����.���if vmg����'���t���5ta�n�������d a��
���1'ati��al i�f��a�i��a.
�i�c�rel�,
����u��
--'U I'-"'"����G����.�
P.�,l��t��i,P.E.
Pr�j��a�����r
��3����a��
�: �����1���
����y��aa�ke
�5;��5���-932
J�s��Er,�ins�rin��r�a+p 1ns.
�, ^
��_. _.__....___ _�. _ ._.._�...�.�..._� --
� .,.. _.__„� _ __
----___ __.__..------
�� >.__.._.. -��-- . . _�, -.�:�--- ._� ----- ��--- � �� i� � �
�-�
����� � I � � �(�-- - -- - �� a
��� � � �'`'��..�- �:.,�`-4-:�,.� ; -- ��� `�� �
� � �� � � �s i ,-- � i� -
7 .•
_ _
;
*,'��y.... �.�:J';...:.,r; . .__ __._., . �.: _...-..�; ._f .�'. � -., .,.,_ ,,y �""�-"--�_= , � •5.�,'.---I,
_� �,i, �---,��-
�-5--.�;.�r ; . ��� ! �` � . � ,F^'_ �' ,� ,, ,.. I�; I pp
�.:��._ t �.:z» � .z-�y�..ws,�.•"" '_'�-_ ' '=S'�e./.� � �'_� ! " s � ( 'q
-�-- "'��'�-�' �
I : '--'-'-- � �— ' ..—sse i � oz �-!Y I ! �
y:,;�,��� � 9 Ys � 3 �� :<� � �� g I��g���� �
�
�� �z�� } y� �� �� � x._ ,,
Y ;
_: -- � - _ ��-. j
_ _ ___ _ ,,_ �-- — . -
_ -- �- � __.� � � � �� ��3�.
�'�_. �':ia __ � , - , � ----- :_� , '' . +C--�-,�- =I �� �,
�; '—' �� �` �� 3 ', �I �i_.� j
� iI� ,'� � �'�.-�. ,:� � � ` �
� i i � � �
I,�, ';�� 1 � A� i i � �#.� 3.t,F � S� � i
II r:r- y3 .t`�._c=c' .r-'
R ���4 1�=�,i,� ��C �{-� x �<" �.: A j
� I�1; i � ' f �; a � ."" I�, � �'��r
�' � ����I � �>:�il �4 �__ ��4 'h�` .r ����
-�.'04� t��� . �
_.1 �f�` - �'��'
� �
� �! � _ � �
� � �
��' �� ;�_� - -- ° �� �' �� �i .; � , ���
,�� f--�� � : { � � 1
i��� �u� � �"i � ^p' / ` j� ��
� ��� ; ; � � i _,i
�--�- : � �
;�: � — --.�.3 --�� ..:r~rr— — _=_. � .:i _:. �—= — _
� �—;�.._
j`l':� _ � ' , r } � `l' � r. ,
_ 4,.+.�� �� �c,V ' d *, � r I , I � ' � � � �.
I .�; I�� i ,{ `�1�=-- �i ` � ' ...,. -_—� , �.._.. . _ _,._-��M � �� �
I -�[� � � -
`�' '�IA;e.'.I I► : �.�, , 1 �. ' . �� i I _—'.. .• � � .y:
, j I zJl j:al �?---�- h sti.�-_.,.�: :.�-.u— � i ��, 13.� �
I . ,�� � � � �� ; �;� �
�,;, ��,i � �_� �� � � � -,��-� ,�:¢� � �
� � � _ .��� �- � ��� �� �3� � �
� I �� E / 1 �
�
� �j� ,� p .� � � � �� �� �� — _' �
4� � �;�� �r� ��� R����� ��a��� �I " '+� f} � '�
- �—{•--��� - �. ������ �'s����� � ��� �� •,� i � � I
A .. �� -1:`.,� � �`, .���gg �� 9�� �d '�� .C., �� i f
� ���� dpa fi '� � � �������Q���a�� It',��''� ��9 �" � i
% . �
� � �� ., � �.—.� � �
. - ---..�--,. �_��- ---_ � � � ����5���������� �' _ i � � o
._ �
�fI � `, •n d . -�.�
'�!I I � ��` V
�' 1 '_aa.a. •� . . . . . .. � V
� .. ___., ,'._-_:._.__ p,�.. �".� -.....-r � � �
1 � � ��-` .. �,,`� At:,. ...._. _ ...A. •-..�•� .r�'
�V ; : � �31t' .. S
� � �r�j= gr � �-- —:. - �, ar .,�, � i� Ur
� a,��� 1, ��' 1 , � �� ar��,�s--i- �rh" '` i � � � 1
i��51 " �
�t+�{[ --� � �' ���4'� ��� ��y' �� 2��j�`�. � .�� � ��, 1f � � ��I
��.. . i? �� �� . � � � � 4�Y �`'��� R+7 �`� —'� t iM �i.
,
. �
i .�— ..._..._. � , � 4 �
'� !• 1 i� .�_—. �- ��--= � � _+--� . "
/4 � I � �' ��y//� �
� � ��/ ;:„ .._�_ I ��' ._-_M L- 1. ,yyk � � �:��'r-'- '��.. � � "
I , �'� � . ._ � '` ;�f�v,` .` ~l 4 l4 ;����� ~ i '� �� � �
,. �-
(� ,k,. II�:�f � � � � /�— y-'t .
I.. I� �� •�r � q -� '� FY � I
s
� � a° ' � `' >
.- ____ r--- ��--__
'. � : g� �� � . �'4':^ _'�- --,�.s....__.-r -i ....,
� �..F.�.. � �.�2 �.. - r--Y'r,�.. 4 � i—,_
�� ` f��; , ; ;� ��� � � r; ; �-{ �,y n I
k �� _m�:.—� ' �� �� �� � '�� �
�':�,,_ -� --, �� .. � . ' i � � i � ,d ° � .
f� � �
, --��-`� _ � ,_ � � ;-:-1 �a� �#�,�� �`�i ��-r--: ,�1�, �F
{—� ' ,` !` � 3
f �� � 4� �� �� �r d A' . __` . �'_sS� �-. .irl � �it� ! '
�����; I j� =—cAC�� _�_ " i'�- - -L`'r�`, � t 3
'� '_f�'�!�� � "��_ � ' ��`� ff .`.._..� � �., .,�;I � � ��� .i �� ��
.� � l.i
'�I ����� � �� .. I�� ,:�! � � �� ��E� �I#� E ' �7� � :; I � ���.��� ���t�
�4� . 1 i e 1 yN.�h�1 i � i r� ,�
'. �„4, y _� „ � .
t� y .��'I� r—..— —!R��i I fi l I I / "( � I 1� i��l � I .��: f �t'I��i
p�{ � � � f��. .l - .fi 4 .� � ` •_t-
{ 4. " ��—'- ._, _fi .. .", ,y�-_ - �ih ,_ ..'ry ' r - ..E7, -
� i�; -_ �'•��l_.. �=-�� �-��„ �� �, � - :,,n,,, .,r,� r ��� ���.
����
� � � � �� �; � I � �� ,s►a��'Y �✓±+►�y �� ' _y�,w��.l a „'i� � : S
` I �j .��_ f � ,ej., �� rr r.��x ��- ar;, .r�3� i , i
�� � � � �.� ���� d � i �i i � � b� 1
. . .
k � ,, ; , � , < <� �,�
' � � � ��� ,' �+ � I ; ' �` � � � I, '
� --=a�` �rf�4``=_� j ,� _�:- � ��' �..� ''� � �, ' ; �� _ _ � � � �' � `
,y + �� �,—__—. .�._.. ' �a >.��-�.n:_ -'�;-""�-' � "� i � �,�
�•� ( { G ' �a ,. �_ � � f .
;�'t �� � ���� a; '� .�� ' �� �_ ___�--_��� . - ����...... ,--��--�— � �� s,�: �
i j�� .b,.ry� I.� ;� �1. y�� �� '�'�� ..
-��..a� 'i� �4- /��;I �d`� �' i I� ��.i~ �.; � y j �� p � � I�' 1
+�� J� r�'3 �s,�y�� '-- ._�_ �� � � 4 I�;
.� {
• c.-�__ I
y* � `�' ., �,ti,,� _-3r __�. � -tw .T�� /`� � I I� :
�^� .. d '� � . :. _ .._-----lNt`�'_ �'—--- 1 .y,��'�4's� 1 I.I.E .
� St�' i� �� +
��� _�._ _= 4
_. �. _ __ �,�. _.. -�,��A...��„��
_ . M .. _ . .. .._ ._ .
,•� n
_—_ _��..,.���__ ..
-- _____—_ _��_.._� i �f i I, �+'I � �
. � �! u � p
�
— -----�—__ ____ __- - --- �� a �
; i � �f � �'
' ��;�� _s_ $;� ',�—� � j �M
�y; I' � ;�`� ����p� <;�' r. i i ,' ,i�^_� � � �
4 !L _...� �- - - -�- -� � ..-1� ��1��,.- � I'l`
i.-- . ._._ . _ �. ._.,-.. _ . , •
9-- ' ---`�` ' �
I� -- >- .._.___,. �— , � �' ��4 � ��
:�,r�—� --- .
� � __� _ _ ___ �_
_.._
'I� i
, l
' � ;
+ ; � , a
.....�__-.. .. --
A,�� .. .. . _.�N�-... !Av . !� Y a 1 � �
i I � �I � ���� � ��� �� �
I� �W� e1
� � �
� d � `� I � �
` i 1 — �� � �s � ������� ������°� t �
E � � �� �� '� � �� ����c d �3a�� ;� �
� ' �� : It�� � ��a �� � ��J y�`� '' ` �
t}:. �' :,:;CG^'r?X:'"?'.7-[\'f�X�l+,f$1;T,4;S:'!.'F,.'ti::'.GZC�Ct<�� � �; 'I ����� �`d �i���y,�F� {I ��
���_' '1 q � I ..�� � ���Y�����+��`,y�y�i7 � III ��� '�.
�C 2�d `� 1 �� �� y pr]ij�{yy p (I f/A
'.J ` �1 i ��t����`�.7� WI�H��� �1 V- � ..
_ � � ' �y��a�����'��R�F`��� � � �
` i a-M�, i�
��. 1"�_ �:.r r�=.•.::a�� i
,,,�� � �.. � 2�
I� �(i �y�l. �� $r�; � ���� ..� � �
i
i � ry .� ` ..I� � �
»
' y _' `q v . ,.!'.u. 3;. . .� .�� -- �
i '� �:� � 1 a �
�1 �� I �� � ` Y __r1 f: � f r ;1�•�� ��' I
�I � L.... _ : f d � � ' _
I ! `i i a; � -_ �' �� � ��� �
� '�,
�_.___.___� ------ ____.__ __.__.____- i-- -- _;-,
� �� � ; � �
� A ��� ��� �
,
_��_. i� � � � � �
�� ,,� '��� ��� a
;� � � � �
� �,�,����`� y
� �
��� �;.-- � �:
��� ,j � ij vi�1a !
�'ir� � ��,�a
���, �
���� ~ �.�����ii.�i �
■�•y � '
�vT.�� :.C��p; �
��:. -� ;;� �i�l�� � i� �1� •J � �1
1
�
N .t.��3 :� . ,� .. . ._ . . f� . � �. ..._ .�_-_, v�t��1 ..i.�. !
��-1-` _ tl �� ... . ___._ _ __. .��..
�� ��'/` � � R(
tiY,� ��,���L�.i7 ��� �( r4��.._..�.�.�`. . .. � .L .� �._ . .__i�.. � ?"� � A
: �4 ��� � 4� � � �
� _f` � I+ Y'�Dr � � .�� � ��
I y 4
I � .���S� �� T � ��+ ��Y�
I � ,�� � '� ' •� �. ����
� i $, f
,: �� � ,� � `
�� � ; ��,� ��
��.
� ,� ' *`` � I; a�
< I ! ' �`� L� �. " # S ;� � v�� i
i .2�s,, � �} a �� :. �
� ! f �i !; i _7 � �
� � �
, .. �� �
��,��� -�,
�' :.._ �._._{%r; ' � ��--� � i ;
--i � i � �.�; � ,,
i i �� i�� � 11 �,t� i '�.�r
I � �''� s � �` � � ' � .
, �
��' � �; ���# �w ` ' �� 1 � t �l � �
�� � r ! �4 j 1 ' !! I I �i �
; I ��� i ��a � ��. � :�� I � � t�
, j � o = ' '� �1 ' ���� �r' ---+ � � �
� �� � �.� �� � ��' ��� � � �
i-- — '
�
I � � ;`,n� ,oa� �
�/ _'_'.��4 ���t� -....Ai`� -, - - -_ � �, � � , .:__-:._� � : �f�� � . ^
..
x`K � � � i t'
p.�_.�..� - L . S'. f, __._..a_�, ��_� i � � i
�}'��f�'� :. ' � ;..t�:.� __ ,..•-.� _r.---..:___.___�_��'� , r-- �q � � i
� .� � �
`y� - y 4�,w � f� � �'y'`� �` ��. � � � 1
��� � �I i a��' � �` ��"� �d ���A j., �� � � � i
$,.._..._.._�_ _t �i, (�
I �k� i h
� �� ;� ��� �� 5—c���� �fa � � a I
5 t �_._ '4� �! � } `I ' � �
\
� �i B1 • i%F I �LI 1i�
C�h,� .�..� } T�♦ „ .r 1 � t . ... Y � �
( �- �
i�j �! . ', f ,� \ � � � � � �
I � t y 4 t \V �� ;. �� ( � � �
, ,
k ! t __a � C � � � �.. ` -,� �' � y G
� ; ---- � � �� +"�',� __ 4 4� � ;
i� i "� � � ' �� ;� � '� '��, I+�
, � �I - � �� � �9 '��#� ���
_�, �� � ` „�,
� .� , __ �._ _ �
���r ��� ; � � � r� �� { �fS.F
�9� ��� �{�ar � � �;; � � ; ,�.l-i-��rL.�
� � ! }� 1 � � F _ j�� � I
, � a�.�i � ' � �'I { ...a""r- � � �r`���
���—� � � '�� { � �t�_k1� � ��__
� � ;,( ,(
.�j ` ��f"' � _�;! _..1 _� � ` li' S.�
�_._._ __ ', '
" 1 _ �jt ,{ I
� � ' �A���` �� ..._. ��.++. ..t`~- { �� �`�� I �t� I�1 C�
. {..{ __._._ � ` _.�..�. .p.-.�_� �� ., .,
"_'" "__. '"" .,_..
r __.. .�,s..l�`_ �:" z .:- _ ..,. _ �i"._ _ �Y L_ , ���1--�- � � fil �
� 1 t� � i > ;'� � ' li
� "� �� � l � �z � ;:� ;f
� ! �� �d � ! �� � 'I �
d �� �x� � �A ��; ��, ,
: ,_! ' _----__:--_' - k _'_ __ ---;___�%�,s--,z'�,�. � ;
�
.cr',�s�' a�r---...� �. ,r ►a�--�-',r�; I �N � , �
� ��[ j����a; I � �
C�� 3 ' I
Y�♦
;�� ,
, �.,
._______.. _ _. . _ E� ��s J
. . .. . . ___. .. ._ , :+.f TM..* ... . . .. ..� t+aMts�!!if!ilJu•••�e'Of i+f ,
r"1 �'1
r�_._._---- �_ _ �_ � - �—._ __ _,I
� � a...�l � ��
�
�� (�y1� � � �
�� �L:� ��'` �� �� � .��
�- - ,
�:� I ��f� ��� 9 `i
a��� ���.-�.�� � � � ;� I
���� � rl � t �'' C �
��, � ,;--;__- �. a��!ej � i,
�
����; - ,��,l��13�s
� � ��—;��d—,
����W �'�
-.,� `�i! '�� ":
� � �� _! ��} �i�l�1l�:E,����� , �
� w �i �
r" ,� : _� -�- � -�-� t � -
, ,
....y,. _ ._... _ �... . .___v .._4__�•.._��-_.t�.�. .ss.__4.. � ....m.�1 � �.i,�, e�C I
.° �q
�" S �' � ♦ — �'s ��ti.: � - �' �� �i
i ,� I wA ��D � I 1 �> �
� �� 1 �c
r, � i � ' ' � . ���� �
�:;� ; � � ; � � ����,
, � � �{ _��
i !
� .a I i � ' ���d'
, �
i 4 I �� �i ` � o�
r : �$
; �-_. i ,� �; � � ��a
,{ : ,"L"� a� �
,. .� �—.—�( ! � � �
��I�il ;I I i
; ij ;� /, aa-�`A();� I I
i �` 'j � _ ��I
� j � � � � �`.
I � i ; �a i�;
�;' h �' J �
� � �� � ' ,' �
' � � ^ �a I ' �. �
� c� �1
�V i �� � �'�'"� ��� al� �I � , �
� �� �� ` � } .� , �
�.i ? �� � ,.� ; � �
�
i �;�� � �,r `-, � � ' `� � � �i
�� � `� i i�---� Z �
� � ' �� t � l ` '� � �`�' " I � �
� f �`�, r �� � �+�y � �d a� � k
� ; •��``� � . ti ,� .� -.� � � �
� ���a <<..___._._� _ ,},: �_ �._..�� �,x�•_�, — � '� � � l
; �f�� � � �' ��S° j �� �,� � :"si � � � 9
X,L7 d �i i � �� `„ I .Ar� � �_ .....t I � � �
F . ,�*+'-.�� �f t `� �-A,w' �I7
�
� i:�ia�_1� ` X�' i,{..,:. R� , ~ � �
� �� � . �� � � � � � ;
I� & `�� i I � ,,d F� ' � � j
yt �� `�, / ,�i �1 �, � �
4` { �� � � (� ( ��y �: ! � � �
E � ' �� `\ � a, �y � � � �
� � � X @ I � ' � �
� � ' � � � � �
. .�( �� � I
} j �_� '�i� I ��I €I � _ �,� ���a
� I � �ti + �
t � 1�
' f I � —_ j �'a ( t�.
i � I �� �+�--'- � ;��i;'' � ! -- 1,
,�� ��
�- � � ; $ rt
� �; � ,�.� �}-��
� l ,� �a , : � ;� � ` i
' s`,�f( 1 ' �� 3..a,�-=' , .�.ty i�
� �.:; C i1 ' .... 4� � ��.(._L
s
S � il I �`4 � �� -'<<.`_.�T.lk
in � � � 'f
� '-l+Y� i � ��+-'',�;w3�--- �, kI. l
�� � .� r L�} !qi �I � t �. �
z 1 `� � . + __. _ _._ �.._ � k�' —�. t�i�_ �'L � ' ' ' � �y
in .. � ..... . ... �a � 4 � T 3
s� �� 'k �,. .. s , � , i
!,i.� Fi-..�,ll .._-�.�z_�� ..�.±.�.��.....�-"' - �`I. ._.� .1,?_ _----�- � � I =i i j
� 4 � � ��� � F
� � ��� � i;E ;
� �� � �d �- ;';,E;; � : ;,
I - � ._. I �}f � � ,
�� ; I �� g 4F�I ��
a�: � " -_` _... '_ ___ _ --------� __(� 10�"j-�� �.l,
� sn r� -�.�-. i
- — _-
.Sira . �._..4�_ .f. �
--�� -� -.�.._.._�. rw.rr _. - _� .
!`�n��-�' � .
a..�.�. +rtw►+ ..�i r+wT,�.. ..... . a�tl: �w�!7Ms�e
� r.
�._ _ —�__.� .
�� _...__- - — � i ` '�'I I} i 1 „�� �
t"� � , , '°,� y� m
�u�� � � ! ,.�.; . , ��j� ; .,�
I �
� � �yj� `i =5 � :
� � (�
� ;�._
�� � , �'
� r
` {� 'r' a
���� �\ , y \� : ' d N � I:
V.�.._JJ K �� -�.-Cr xI
���� l~
���� ;`,� �� �_; � ��_��,_n_;3�_j_
�_�,,3 v `♦`' aj�',yl .`-i; �i
\ ; �.�� ��
�� P �
i `, -
\ \
I
.�%, � � �/ - �_ ;.�:,.1-.�` i.
\ ` l.• �
�
/�' �` �c�.
/ r ��.�,./��� !j� � !a:':.� � e�lr� �i
��f l w4 � � /�" \� !,l � r �� �, a�
�� �T ,•V% !��`� . /� �� �� �i ��� ;
� � � ' / i
� 'j]_l.L.� %�i�.���, '. � i ��; � a �
I 3� r. i ! �� �
r 1 I.i C° r' ' $^ ' �� E iq� � ���
l > > � / � `Y �-�{�; � lM,�
l ,� 1�3 ';l�✓,,,,,;;. , ��,� �'�i'` ' i � ,
�+ .f�� ��� t /i , f� ,�� � " �� �
- .�,� � ,; i ;� `'�� �-."+ "a
,:� � r, �
i
�`,.•. � 'y .• �` � � ��
.. �3
�3 �r: t, _� � �
:%� r ' �:
�� ��`_ _� ;,
�_ �- ��
�"�_,'a"�--i: ��S
� _t-.�� qy
� ��::1.r_vAs_.-_..I �
i � �
l �
�
a � � �
.--,�. � � v�i
ri.i�ar�
# :� �� —_ 1 i �� � �
: d � ' ! ' ��` i
i �^� /�' �� � � �
� v. .� c�J af � ���� � F� � I
� I �.�f! "I 1 ,�,k � � �
�� � ��' ��s� � e ,;� � �-: � � i
� # ` f �
+ �/,� � r �
-��'- �� :` ,� _. ���Y� �i '/`� ��'� ! �� `'�7 '�' z � � d9 j
,— �.i. ,� � `� f.! .;�� �'�< � W i
. � ' � �, �a
. . �4 <.d � 1� � � ' 8 � �
4 ' , }�
I(� __"-' c,ia 'X �y��� ' $` � .- ,' % I
'�-•t`_. "-- . '�C ..c:. ,, '�.__. � � I
.,._ ��� �. .�._.1,�,: ,,�._ � C9
a {�5� �� �,,yj. x , ( � .- Itl 1� ,.
`� ,�,, } ;, ,�`,_ ,�- � + h- � ;
J �` \ � �
� /�`f����,, _ f�� /'� �� �4 4
`� ' x''!C\, ���� � � �• ��b � �
� '�"`j �*���' �fi �~�� ��� 9 1
�� � * �"��`'.�\�t', ~ ! f 3+ �� �f !
�
��' �_} { '�t ��� 7� �� � f l � � �{]� `:�
\ ,•� �
� .�.6. .rL y h
� � �� � ^ ��_ 1 t
�I� � � �' � �`�� 3� �. �� I i �t {" _,.J
1� '���----•.�r�-�!i�`��-�'f-�=�i;�! .'p .. . �:iA�- ���..>' ���.�
.., F: � kr� � :���� <_ .'1_k_ ..�f
_,
� - � ��. -- �. ,• � ���� i, � t
__. • • �-=- � � .... -j
,
s ;� �:� � f � �, , ,�. , , j ;�I ti
�' +� >- } � � ( " w ��%-�--' x _ !t I
' � L,'• � � �' f�
I� �� g � ��� ���i : � -. �% �� �K� � �'�,� g �` �t�:��� ��.I
I'�� ;� 7 � ..�`._. P:�"`�-�-- .— � � � �:�.. �.; -. , f � � f
�� ` i.: =-�,_.. .�,��' . ��`-i � — •~.. � �l� ..�._ '�/ ..� ;�: ��I.
i � � ' ,r' -i� f} �'` / ,�� ^7 �' '� ; {
i �
f ' .1 �' f a� t�
: ;: � � � � ;
� k ai '"".i1'�' < —eH .. �—��4�-- � �: ��Il',� ��:�.1 �.� y ,, I ''
4� ^r7..,-r "r;� �aia'7`�._ �r r �I ��S I
—j=' - � �iµ II �i d
I — �� [ �
� i ,� �� ° � �.�c% � .� i�{ } �
� ,�'� � �
� � � � �1� � � <i �1��,�.
f ...:_. ' _"_____ /// �- M 4 I`
. . _..��.'._.ti�.__,".�1- �-.�"___� /�� ��� 1��f ��.� �I �.I.n..
\ 3 i � ' z
� f� ,
�� ._..._ ,�14�'y�'r'.M'Rl��.."f.M'R43_�4Li�!+�lA!l�:iJI�+ANl'/�fk411/f Ai�fM PM�3
f
� "'�•'
��___� -- _ ----
,�..�._�
--_�.____._ =
� I �
_ ._ __ _---_____. _ ; �` t, i � �
� ;< _. _ .__�—_— '.�s;`____.�a_ �, �y., t'n��I, +�' �' �ii
a
� �''— Fr __{.—��.�-[t-_"t` i .y.�Y� �_'sy�it �. �� � ���� � w
N
1� � � C �`� �s . ; ' � � — ���?'' E� -- �
, � ; �
� : � � � � j �
�' -�- -- -_t __ 7 _.—_.�......-.�_�I_ I .-. ��'`.._�,� � i �
.� ...._ _ ... _..__`_• �{9� �' , _l �
� _..... '` .. � ,l . _ .. 3 g
•y;.--.' "'_�'""..'1 � �.� �"' __. � I .\� � 7 � 91. +
` • d
� � I �+ I ._ _,` �/ � s�� a.+s-� I r -_ a�^ �i i �,, _ -� , �; i �.
4 [�t � i�}i �� 3' �'�. . .. � _ z=�: 1 3�1
x� i _� ` j-�4 t.- � ;-,— P g ._.__— _.. __ .-- � I ,t ��9 :�la
, 0. Y
� �� I i .:`, X� �.. _ ��!
��.a�.rl 9 �.. "ef --__.....---r" i( . f
3, 1
r� -—,_-�—_- t{a�� „I,
' ----' ' -.�_ ........�.... _..�_
�� g z. .
;,} � �' �I ,'�� ..� i ;� _ i— --- �1 E �V/ �
� !d •d -�v~ i .... . ;I � . ^ �� f �� ` �
-- � __._ — i�_
i� :�I ._ � � - � � ti
!i"� �d � �. ��. .-4 I�——'�- . .--- � I� . ���y�� � en
l •. �_ - -�`-- ... .._r.' . _
I.k � . �.n +�i ` �i ._.. ._. � � Gi l.� 3� . 1� � �
�. .._,:.... __ � �
Ix' `
!ti ' -:; _�_ ��I`' ' _ ;-- � .._ . —i � �������a�� ' �
� � n �, `� .nS� g.�"� �i
� a
� I ; � :: 1 �� � ��`i`Y� � �� '�'I- -- _ �i a�'�����?�� ���
; � s3 � � �
, � _ _ - � = - _ — - � � ��;� w�
� �. ,�`ta 't,Tc'+.s.. y �ca �.a.� u.sh •� - #_ '_ _ 3 �������d`� �� ��O �
, - '_
, � ,_1 � � — _� } � - . a� ��� �� ��o ;
� i � �� : � �� : � ; �������������� I
i �� � �^� �� _ —�# - �
� , ; ' �� ; , = i�l ��, I
�'.' �.. 1
I II . Yi� I- �1._.... �N..`_�� �.. �`�— .i/.li :•.j 4 ,' *� ,j �� � I �� ` d i ( � I
( , �: ; � , f� '' f�� - _�___�-—='-� � d 3
j ' ; � _ _ ' -- , �,;_ � ,
I Y�. i ,. .£.w� .�a�.� �, � ..,Ya.__ �i.t ' ! � '
; I,: "_�'__
�, i d :p
�� i L ' ' 1 ; f� `'' ' I� � �,`� � I � �, �3 � t ��---
I + i � � ; .sr i .� t3 � i �d ' � : 9� � � �
� ' �a�� ' �a $ ' i: �`a� � 1 1
i � � ':
I �.� . 1� ��.'�1 � � ? . F\ � � � � + � I
F I A �
�r � T t s. 7��' �
i �1
y i�1I ����`7�-':��t�\ �� �� ��t � , ���j(�� � � I � �w �
� � ��1..�� i�+�- . ~r /� I-1 '""vS*J f �A+' I \ �
' �+ ft r�`i�:�- ��: �� �-i§ �� � (.%� ��� �'' '� ' � � d/a
. f y � 3� � �' ' j �
` �: , 4 ���1� I ��� ''�b�S . I �', i�� `� �
� �� ,�'� . , �L.L� ' .r-- t! l!_.,.., •i �si, L.—., : �� �
__
lVfi,_._-___1 �,.' --���._ j � � � : .� , � � � k s� � �
� ' -�'� � ° � ; � ��� � � �
1 _ --__ R 1.-s �':r,<st :t;- [ � � ' ` tt� � 4 � s� a'
� s:�� � �� ! �� � �d ; � � �
;
� ' i `�� + �ta ' "- , � ' � 1 � c.7 I
��_.._....,_...".____ .... .;. j '�/ �. �Al �-'�F � .��+ I � i ` W 1
�.iC-- i�✓ �v (
; � r� ;.
.., _ ! ' � ' � �
1_4. " �' I ' �
'v'. _{ � t'T�',.i J_ ' _ ' . ._ �
�f i r � �
� I��(I�. � u ��I� ll I �. ��., � �
� ,,�I'
�� 1_ �I.��.II��i I p 1 `�4 �� ��,'.:U: I f 1`'�, ---_'_` I �/'li �
it__. � � j • ,- I ___—�y � °q �
` ,.
� ; —�:., 1 ��;�� ; ; ,�. ,: , � �
�� � t a� � � � � ' j ��Y Y � �s
v � '� _ �I �._.- � " k .
-r T
�j'+ `� i� j � k." � ,� r � � � ',4 4
i t'y �� _ ___ —,_� I ...ar-1-�- � �
.�� � � � �.. �'�� ��' '��` ' `1��� ��y .{
� li� �����' � I
i 6
o � �'.JS ��..;.i,',=�•�7�i� � , �� I . I
^ ` j �, a „ �,. k � l L.yj�,
` y \" � � ��'—I��r+a• ' � �[ t � �I a!; �_I��146
�� � " ��� f � � ! a .L
� , ;.
°� � ,N � �.•�w�-�,:jl __.,,� �� � � ��1�� � t
�� ,
t
� ._._. :s s i ' �,._
� � . ������ ��� � � I � ��;��� i ,I
, , � l;
� ���`���� ���'' � ` �� i���
I. -..::.���'1�.� . _, __.y ,S �I'y �
I I i y�/ � �
I � II�-wl��l�I 4I! � �'-��_J ...--�1 % A �
t E
h � � � :,_� ,, �.a �sz i ( ( �
��. _ �1 ` � I
� fx s � �
�wj.i
� x��. . ��t��
i: �I� ��. ��
• � .I
_._.�-�,—__,.�.> �1 �- �, I�
�`- ---:�— _ (l����
.. ._._.._._ __" . . .Jt:':} f+R��
. --_ . ..._ . N. �w!"Fsah91S22�9Mwf!+wN91
/."� �
____.___--_._ __ -- -�—
1�—��� ___-_..�.�___ �� � ��_.. � �
� �
. ,
- ��
� =� �
�a� __ __:�a ---__ .
:- �! � y__r—_ _—�.� I�
; —�--,
..,_ ---- ---- - --------_,
r a�
i i__ , � ,.-_,�s-,�R � ... _ � _____ ;�-
�!_ _ jt:��,� _.r1 -� ,,.�:� E L � � -�;�-,- -
�=-�' :� � .-- � '
�`� , �� �,, � ,I________ � ; ; � �i
� � d
._ .=-4� �la � d ' � H,9 I�I��I? �
�� ��� � ;
����,, � �� � �
�� � �
� '� ;- � -
p,, ��� ; a�� � �;:: m
,
: .
„ '� � ,� � �
, �
� — ,_ � _ � ---- _�. , �
-.....___".._-:........ ... . _ _—�'-Cy_;: � .c `. '.iA( __—'—.____ ._. �
_.
_�..�
1 �
,
, �.i •1 �.` .�_ .:--- ��" ��� ��
� i� z3 l+� ... � L� �,,I �„�
, � n I :�. s ; c�
r i ��-,� - � � �-� - =- ��.� ���
,
� j `-n�"*� ,��� ji.� � g,� �. ���
1 ,� w��
�� � � ; ;` ,,.. I (
` , � � �e �. ' �R.,A,��.�...�«��-u,� � t,
I :,.. _ . __ �� ' .. / �� � . .. �� � '. � I
�
i � ��. � i � E
i �
� �,'c-- t , s �fi
' � f/ I�� �� ='�(� ��� ����� �
`� i�_ ', �•�4,/ � --' ��'N ��..�..�. I
� � l-- ,v'� I 3� ;-':! � � � � ��� � '�'`�: � ` j.�.�l
' - � _ ,. :- ' '
� � � �
�3 , ,.
� v�' � �� �F �E '�------ � �i -=-� �--_ �h � ! '�
� � ;, _ ; - a�; � - ,;
� , j _ � 'a ` �,� � i _ �' I �
'�' � ', �� ' �� r` i � �,i � f-'�s,�-�i i � t
�� f� � ': � 1. s''r/ ~. R � �` � � ' '"'�_"�, � � � � � �
1 ', j, ' � �;�¢ �fy � ' � � ,
6 � k%-- , � s"__,_f-' 1 ;-. �i.r., � _ k � �
��s-- � � � � s� � � ��� fA I
; � (i ;,`� �� �'`-� �' �c�1�S', ` � ���;J t_�: �,� '�i � � !
' � ( C' � � � , }gy � � r ` —�_ (�i» ., , ,- k u�1 � I
� !- i�,�i : i 3 �}'��` �' �rr �l,� _L�� � � ',,'s. �' � �
� j � f r � `a �l�-:,_. � � �— - i � • F�
ti ! t.l ,� 'yl�! �� � \�u' f�` ` L 4 � �b
� � �
�4 �
' �, j � " � ' aamn•.sr _ . ;��'__.. � a I}°` �� :���. �
' "s��_� �d ,�1 j. '`.' - - t-..F-�?'. �.�.-� -:, i�,._ . i. �
.
' �r , _ :�` � ":� - - i�Y /'� _
. _
. , ,� x � ,�h,_ � ,, `r '�.� p j o ' �� � W +t7
. , F.__...,._ - ...-,.�.._..._...._ . � r 4 .L � � 9 �'- '3/�� ,� �K � W.r.i� ' II
�� , W
� ; � ��i - � ���r 6 ---- -
i; .�i�ti, —
: ; i
I �'�� y ! i + , i'� � .��,� i �
� � � �
, � f
; �'� ' + •' , � w-
' +---1... - . �� . . ...__ . - .c __a.�l ; �
'� ���� � ` 'D.�� '.t�: � � �r .,.._� � j � SL�
�i �.� �•; "-1 � �-.'i. � it—�-�r i� a�,� I � '�
, •
�i �,�'� ' I .� ��� ,-' ' ' � -'" �,��� E �� -- ---- �'
I,
I .�.�_ ^ -, '� �•r . �
� 6 --�,_—��w; �� �"- � �.� � �� ' � �
. __ I � '�� ..1.. l '' ... � ..' �t I
1 � � • �V�_
,
.�} ��_ . -�� ,_ �,�.� _ , _ _ ,.
; ��___. ____ --- ;- _._..�_ � � ,,��,;_-�'� �...� � � � ��� �
��. i 1�� �� �� �,'.� ��`�� a�, .�, ��(� ' �
,
, , ..
f �_, __,..--- --i-- ��� �i� �� �( ,1 � � ; �: ,� ��' ; , r;,_ �4 j = 's
I - ---�� '� �,�9� � �f 7r�,�� y � � 9 lrt j� �x'� ,i �i��; �
' �� ��.i���� s... '�� �� ��� .►.f" a5{ � TI� /i ` a �t. na+
J` � ��� �e��� �2 � � ;`' ��. � ''� _ i a --
I � � �,a� � ]�3M1��$� '� �r �"�- ! �� ,� 'no� �- �'J+.`� �t � �0
� i ` � �I a:� ! `
' s ����� a�l`! ��������� � � ! � � + �j ��� �!'c
� '�r w �, ��n , � a� , .,,, 1 6�:i I �i€���
l�� Y ������ �������tg������ - .�• �� ` t � - �,, f, ' j=� � � �;._
t �
1 � I fA�" ry'S� � �� �Im ��Q� � x..L: /,-`j`;( r.. � . S 'CJ 0,9� f + 1.S' I I
`' � ���"cu �y,�� � � ' � �+ � � :I
; � � �����i �� ���5������ �� I � �� ; �., d l� 'I k � i
1 s�������!��!����������� i�� I;� �'�!� `�I ' H:� M, � � f � � ! C
'�, ��'�.,.,_ �, �,d�,o�� ,��-��' �� �" �� � 1 �
'` � j f .�� ��,� F � �� I ` i
i. ; ; �.�� .
. .
� :. , ��� ,_���� � . � ____ � . �. __ : � ,�� ,
,�liAR �4 � c�
. t
. '� L� _. _. . ,._,.._�__S - �-.T—" _...___ .— .-._. ` __ . }- � . .
, . ��. ___ -.... � � �. _... �....� .��._ . 1
. ��—
�
` " ' .>_..r��+..e...-.,,.. , i
l
6 ft_ . ,_:a._:_."'__' � �
�
fi � ;� � ,�,� l _ ._— �: --�!� �� ��'� � � �
h t _-.—,- I'�.
- —� �-- ,,�� �--- ; 4 s , �:
�
s I� .:_�.�,�- _,�,��.�.,,--�_ .�� - % a�,� ��A� ;
, — ------ ,a� � . �
t1-�'�—.--- .l5xar .sl ._.. •�r�._...., .__.___',r t 1 � •,$
, .�__ � ��� ��
. ' _ .M r:�sf/A .._.q..a.. - .. . . .� . � I
_ _ -
� -_ _ __ ___. _ �
�
�
i
I
��T�S '�����'� ���'����� �
,
�o, � ;
�
;
�s��m�s��: ,�3��_�9•��—__ _� �a,t�a�� �C���r�9.�D`�S _.____._._. ;
— ___ �
_..._____ _ ---- -- _ -—--._ _
�se�'�3�'�`�'���3����y f- '_"�t' cf��_., ��� `�-- -.. <�s�,,,��: ��
__ — --- --
--- --- _ _____ �...__
r��,-�re��;�'�Ta��rn�I��J'�'����'�N�.������9�J) �--�=��a�9r.��1�,��`J:�
___ .__ _____.�_ . ..
—._..�.-- -_ _ _ . _ _ _ - .,--c��3�r�v.:��`J9'3
���P ��9��ar��,�3�r����0 9�a�. ---
°f���s��J'i�����J a3t?��,T��9�a�
*` _._ _i,.:,.�. _. _ _..�.._ —
( ,._ . __._. . _. _
1 _ `P�+�or�r� h'tg?'��s;ta'n�y.4��� :�st ny t�t1 e Pc+;�vv`ng 1�iJ�'+'Jaa!piles ai Et�c�f,it:s
f are�a�l'Ha;�re rot ce-�Is;y on rocic�.;t��ve`�ii=tengtr c3�;r,s�2!ie�t�det�trsi.r,e t�b
�loa0 bearing ca�tacir�r af thc3s�Pite�. Gost o#test;.ng strai2!�i2 S55.Q{)0 prnpase�o�i
`:1ti+�vtt�s S�o-aS(C�(enra:i frOm Trarr Hus�er da:�d C}daber 2B, 2012j and nt'r,er / /�
' i�e C1r�4r��'or'r YF;`��?3r '. ��r r�s+i<a c�xcrs��e��'f,Bll �!'�
jar.ci�e��a+ �,sJe:�=F s�;-y, r f: ° �"
�rF��������a������a�����a,���o�a�,���,22��,���,��o�� �D't/ao4
;��,������'�►�������a���r�. -��''!
������������a�
�a������ ������a�r������������e
�9����s�����������r������
�� ��-�������.
�S E�s����'/N�r#�a+��r as�rs�9��m�a��ca��9�!3'��.
,�1�s�av��a���s.3�k,�*�avaJ!��sas3`JJr�
�sr+t�s3�a��`������l��1 gi.�.��an.�� �_v�a�t�'dsr� :� �rata'�+'�n"—"��
.._.,�._..—.: _ _ _
��1� _.. _ ;:;�
S'v 11���7dN9�YC9 aRf..�'��1T3��3��U:�S Ll9�J�l7fS99�9!�hl�29�7d�!�17f�'��J•
. __ _ .._. _ . . . .-.�._ _ _. ..___
...�„�.. _ .�,.- ...`_ .. _. .. ..
Ly' retsFtrf.f'�A(�.+�vs�^.r�'�+na�' � �
�'u'���J'_r.�'�'`�^- � r�J'�/Z- _�.
�.. , __.-..-�,� - --- — .
._�._.. _._ �
# ��:�4��� -� ,�E c�. � Iti__�-._,r�� _
.. . _. _---- ��:. -- _ .
- �---�_ -
i�e ,so,c� _� ! _ .___�_�__ - --- k .�Z.. j B t�--
.
A17�CTI�bt�VI�A�Q�'K� j "� ..,- �_-... _.., �._�„_... '.:�v
�._._. ,.. _. �.._.. y...�..._.�. �-,......
..�_.__..,. . ' '
�-�—. _ _-----______.._,:__._._. . ,___._— �3 sSJ
��l'Ss���9+l��3 3���J
���3�����J S�'�3���3a���'Dj�i
e�3� '�T��S9�s�03 P1�S9�:�3�l��'9�_��"ar� _. .,
� �
KCI Construction Company
us'b Lal« luti r�v�
S2.Louis,I�TO 63123
(314)89�-8888
Fax#(314)894-7a18
www.Kciconsfrucfion.com
vx =,;��$
;, , � �:
��naIla�y 3,2�1�
7�a�o�b�
���trn:��.�.�.l���ha�i,�.�.
50fl No�������jrizy
�8.Lo��s,TYI� 63&02
IZe: Job#Y2002
Cap��arardeau�astevvat�s Trea2ment Facili3y
�h�ng�Propa�al# 04-Revi�ion 1 �� ,I�J�,�J ;�''�
----- — �
I3ear IVdr.lYiath�i,
We propose to fumi5h the necessary]abor,material,tools and eq�aipment to I3ynamic'Testing of 10
DeVdaal pile at�iosolids�uilding,per Work Change Directive 1,To.5 dated 10/30/12,for th�ar��sa'ea�ecl
lurnp 5�arn oi S��i��T�man��a�s�E���t-�Iaanc������g�a�-�'a��I�c��l�����6�,���.0�'v
Pl�as�not�th�follodding clarifi�ation5 a5soci�tezl ivith this pri�in�:
�e hav�atta�hed a�opy of our chang�propo�al e5timate sum�ary and backeip for your r�vn�w.
If thi�propo�al meet��vith your approval,please 5ign the attached copy ira the 5pac�provi�ed and r�tum
ia fo�ous r����d5. ��5igni�ag thi5�hang�proposa@,yo�a are authos�izaang u5 to pro���d with the evork and
ag����ng t�foa�yarcl th�a�propriat�chang�do���ner�ts a�d p�yr�a��c o�'th�a�ov�a�ounB wiY�ir�60 day�
of wosk perfo�tnaa�c�e.
�'f j�fldA i1�V2 r"dZi'y's',�d.1���3i?II�d3a�e'31iLi�e,I3�3���ys1��C�O 73�"i�lo.�l�$v ti'i COi78's�o^,t Ll�.
�ir��ereiy, �PP�'�v�d
.�..-_-- ��-'� fJ����� ��. .
�.� �'"T�
�'hoa;�a�C.I���ter
Proj��t�an�g�a I�ate: ) 7
�ate�chgne�t�
� �
M
C
ti
M
a � N
O � Q
a �
�i G/1
a W
� Q
Q �
x �
v W
U
G
�
G
O
�
R
�
O
�, 3
0
ci �
b
� .o �
N � y�j C
� � s
U
O � � 3
o y U :o
m �
� 3 c''
� � o
.p � c
'^ 3 '
o �
z � o
� b � o
>
y N �+
� V � � N OD
x Cc7
� � c
Q � o � � �
� U "r- �Z � .-.
� O O O O O O O O O O O O O 1� GO �� O �/l N ` y
U p p p [y p O O O O O O O O O M 1� O N -^ �'1 co �
� T O O O 7 O O O O O �/'t �/1 O �n O �/t V �/1 l� '/1 � � � p �
m �O �D O� O� vi O� M O� O p
V cd CYa f^ O l� [� [� co t� C' N v1 v� �D y U ^
3 z � � ¢ ^ N �^ 3 0 � o
� N
a 'o a��i � U � j, °' a+i
on a c. � z' c �a � E
� � N .
� o 0 0 0 o Q _
c .c aj'
._ � N � N � �
C4 v o F cv�G
`� 0 3
� JC ^�ju V � V � O M
O 7) � �
V
P� O
� a
°� o �
Q o � � F
U
� �° N o � O e.�-. :7
�y 7t � v, w
Q t.. c�y �^ ❑ '"a � Q
O 0 ¢ � � � O
O c �n c�_a .-, x � _s � � fl. W O v pp `�
u � � z ^ �O '� o � � � ro P? ` c �s, � � c Q °
o � � N n° � � a a ro c o � v W
�, ❑ O xt s� �o � v o �a ro � ° 9 �' ° o °' c'' � C7
� � o F .. .. ,.� 9 � o. a c c � � a� � ^ w X o rL
m o F ' c,,, m :a ❑ � �a v a� � � � ° 3 w � u W a
g `-' 'a�i � a a n.o u � �' c� � a a. � � p � � °o o `�° � v� � y ° x
� = F � U o o =p :: °' . -o i� a � � ❑ c M a U
�'o� � W � � `o .5 0 � `° " o' a� cr�i � v� n' o a°�i cn y a� o ° � �
� v; O o C] -a •� O u:. U cn � � t_7 W O O !-� v. C7 W �j r� a ¢
� ,� a.
�-_�{ = v w
� �� ti � [-s- a
,���� o ..
�'x. a,
,r� C N O
ft ` M O O a
#° c., O
- �- O O. N N .-. O
� „ 'U � o=n F. W O ^ M
�r � � � Q �
� �,.+ � ° v o � O O �'
- a
� �
0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a �.
� �
o °
F U
� �
Q, � o 0 0 0 0 0 0 0 0 0 0 0 0
� a � �
� � � O i
w � n. ci
.� O � �
� F= � 3
O Q
O O
� U�
� `� � F�-
Z � � �
Q �
x �
U � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 �
� X
'� F
F s
E ..
� �
F �
� F
� z
0
� � � o 0 0 0 0 0 0 0 � o 0 0 � <
�
� w
a�i Q
� �
�
0
3
� F F �
o � � cc:
a �
� O
o �
c
o � v�
n O F
> �� �
v
0
a F' h � �, �., �, � h � � � � fl. a �, a. �,
°' � s` _`c .`c s .L �` .t �o � .c s .c �� �� .`c �� — s
U
ro
� .°�.
G m
z �n � b
O �" -° = c
� � x � ° � 3 �
� � ,o � ,� �a', [ a� o u � ''
L :° -d � v� m � 3 �a Uoq m w°
❑ � � s ^ o �v
� a°�i C � � 9 � c � a. ie
� m c c� o ° 3 N Cq o y °�i .� Ca E U A °? °' ia
OZ b c � u .. `' .�. Z' c a:. °� U c a. � v 9 v .� .�,7 -vo �C ^cy
� 'W C ¢ v� U `�' � W � � w � ' � wL�, —�'� A � [i7 c F � a�
--� <a > p
� a�i .a�i a�i .� �v o � � � :: � ou �o � � E -o � �a � �, � v o ti.
�o o a o a� T � � � � R � �o co 3 A � v F � � �
p _ c. c. cn' a` u. .� U F F-� a`. W a. � U S Ll >- O C7 U F w z a
U
. �
W O O O O N O O O O O O O O O N �'1 O O O �/t O
�. �,
C O � Q N r�l �O �D � r'1 N M 01 O ^-' O �D l� [� CO .-. l� d' v� . •
� �� ` � O Q o 0 0 0 0 o c� v v v v, .o � .o � �o �o � r m o� -: cv rn
_ � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
W '. C,
C'J =,
� 1 �
0 0 0 0 � � � o 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �
J o a r �°
¢ F `^ `^
O O �
F U
N � M
E-. o 0 0. 'n
a � rn
Q ` � ' �
d c '^
0
�7 p , I
¢ �
� O O O o O � O O O O O o -o 0 0 o O o O O O o O 'O O o O O O o O O O O o ��
� W U � r
W o
`] �- �
r¢i�- '�7 0.
O, d 3
� rn
a
ctt F �
� � �
U
� � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q `il
� X
� �
¢ F
� 3
F
o � �
a
�
0
0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
�
O
0]
a
❑
0
.� F W
� � �
v
0
� o 0 0
� o o �n
U � ^ c°
O F
a ]
� .�] J 'x
�
b �
Z v �
O q � `o
R
C `a Q �
�, � � �,y O
W � o a��r tO c
t �
� m a � � 3
� 'co s
E � x �
w �
a N i �j rn
o a
� - � �, g �-Q-
� N � N !"'
.� � Q � O
_: O � y O M
V �r� � �
�.
. o
� � o0
�„ � U U
a
--- - _ __, _.
� ---. __.
���5 '���r�i�� ���'����1� �
��, �
�
�s�ar1 a�v��: Q��J,_2f��9�_. ___ _ �a�sc�+n�3a�+: ��r�v,�1�� ..__ _ �
_ ..... y .� ..p . .. � .._...._ ._._..__._... ..... . ..__..._..._ . � :
- ._._.. .._.. ._....._ ._ . p ' ^ ..
�����`�r�e�3��caJ°x3y .�� 'y�t, f^aa 3z�a.����: ,..,.���s�.�sa�n::�3�
_.._: ___ ��__ _ _. _,___._`..__.__
�vm���'3���`�T�tv�n�1��1B�3y��RF���.��i53`��9`�� ;:.:�+.r�s�.��,2Da�
�
_ _ .. _ _ ___.,_x......._.__.._._ ______-
��acs�r $S�C9����'3rtu���,��. I�s�-�=�iss�a,:�+X6a�`3�'�1
i
y9v���ao d�rw.:�s��a��1,��D���
_��___ _. _ __._.
--_._- ----- _ .�._ ;
rem^:., �t,_ ..s:���., r
� ______ - - _._._._._--. --__� 4
__-- -_ -- _ _..Y..
�� !��arn, i��<�r:-s:ra�n dyn�m�c{esting gf the fo�lowing l0 De►�taa!pil�at BFusoiids `
�8f���Ys3;��e rOt ETBaTi��Qtl/OCIc blit�V8`ui!-I�Pttgtl'•CS$2S�+1S�ii�GBd tD[�8�8(i!IIR@�^6 �
�3aad bearing ca�acity af those Ailes. Cost nf iesUng si�a�ae 555.000 ptaposed by �
�MaRis Sh��lKC�(emaki fro!r Tc�r+H�ster da:eG�.2dciber 2�.2�312)and qir.er
lincidenta�E?X�Efl��3 .hi}I'sNE�CyC1CT£�C36t`t��hE rvk: CI'tE`.0lSa!'c)r x0 a:KLi9eC���:��fi ;
a
��t'E��9�9��'�'�'��$'�`f 7�,2°�i��,�`��,���.��'�a'1��7�a���,Z������1 j
k237���d����tt���1tie�r'ir�ih�f�d. r
s
' _,�__._. __________ __ _`—__._ _ ___,. ,
!
�a�sra�{�ia1�yfdl�liS3s a��9�3° .
..�_._.�..._�__.:. __....,. __---_�,.____...T,.-----� _...�__,_.._ ___��___ `
--- -------- _-- 3
t
��fx'���a�,��ros�ri+s 3�9��+1�'���d�ta�s.��r��iiss�aqS��g��15. ?
�
f�s�59rJ�1�Y�tJs����rsr�h3���7�b�h►9t�9sa v!31a.�sr��90� ;
i
�
�� ���������� �
x �f���'�sr1s�aa4�l�+s�W����I�o c3�s���ra�a�a�4��r#�s.
��3�a�.d�D�v�g�3���ka��s�aaa���r�S`� j
�',sr�nrs�s�a+�3�����l�� �v,�r�3 �r�t`��nn' S�'�D ,
" ;
'�8�� .__._ _. - �
�_��.—,-_ __. _ --:ars �
�
I�'��k7+JS7�3��!2Mi @5�61�9��4,STJ9�11AJ�R3SI�C�Jli�l�f0 fJ9S @0�0�+144s0 7ld�a9�wJ a5+►ET!!��91�J1A9l�. j
_ _ ,__._,_..,..-.--,- ----- _.�
� `. __.___;�
,_,�
_.�.. ,- � ,,/
_,,.
��u�.����� f�-}�'��' .. ��
. ,
;
� �- _..���.__ ..__,._� .__.. .__ -_._,�.�..�.,V:
,� .� _ �
_ . �� _,_ _ � _ E
,�«,��c��.. - ► !c- ltt.��� ! �
3,._L ___---__�___.__ _-.-._ --------_�_,._.� __,..� �.-.�-.,,.�,.
_, _ _,—__ - c,�,
_�
.
; iz� r�� �y
_____.m.__ ___ _ ____. ._,�,,s�-__�.�.._. z�=_ �
.���. _ ,
t�.une��ro p9�+K'rrr � � _.___----_ _____...__�..._�.�-.
�,-_..,.---__._..� .-:.,.-. �
._____...._..,_---____._-__ ---- ---------�- �
__�,._. ___ __..__
_ _ _,_.�._._._. ..._. ._ . �
��9Ss,���'3��m� ��el�
����+7�����S��'s��sn��Cs�+���llsas��4�
��r���lJ�apA�t��as49,���irtinn��,---____ _____._ _ � _ __ �
.�R4.�....�. �
�
,�'� r�
Tom Huster
From: Mathai, PK <PK.Mathai@jacobs.com>
Sent: Monday, October 29,2012 2:31 PM
To: Tom Huster
��; Clark, Keith; Michael Opels; Reinfurt,John; Stein,Anthony; Sloey, Michae)
Subject: RE:Cape WWTF - Dynamic Testing of DeWaal Piles at Biosolids
Tom: In the listing of piles to load-tested, please replace 2182 with 2168.
Thanks,
PK Mathai, P.E. � Jacobs � 314-335-4572 � 314-335-5141 fax � pk mathaiCa�iacobs.com
From: Mathai, PK
Sent: Monday, October 29, 2012 2:15 PM
To: Tom Huster'
Cc: Clark, Keith; Michael Opels; Reinfurt, ]ohn; Stein, Anthony; Sicey, Michael
Subject: RE: Cape WWTF - Qynamic Testing of DeWaal Piles at Biosolids
Tom,
Yes,we want the foflowing piles that are not bearing on rock(but have reinforcing cages installed)to be load-tested:
2116,2121, 2182, 2184,2247,2249, 2255, 2264,2324, &2375
Thanks.
PK Mathai, P.E. � Jacobs � 314-335-4572 � 314-335-5141 fax� pk.mathai(cDjacobs.com
From: Tom Huster[mailto•tomhusterC�KCIConstruction.com]
Sent: Friday, October 26, 2012 3:09 PM
To: Mathai, PK
Cc: Clark, Keith; Michael Opels
Subject: FW: Cape WWTF -Dynamic Testing of DeWaal Piles at Biosolids
P K,
Per our discussion earlier today, please find below pricing from Morris Shea to provide dynamic testing of abandoned
pile or�this project. As noted,they would stop production pile for 2 days while this testing would be occurring. A better
option,in our opinion,would be to provide a KCI crane for hoisting of rebar cages,so that they can continue production
pile while testing is taking place. This would add $1,500 per day,or$3,000 total assuming a two day duration. If
additional pile beyond the initial 10 need to be tested,they have provided a unit price for those pile.
Although not stated in his e-mail, Bill Shea feels that the abandoned pile will be in excess of the 60 kip design load, but
of course this would only be proven by testing. Please review and advise if this is of interest to Jacobs,and we can get
coordinated to test these pile as soon as possible. If you have additional questions or would like to discuss, please do
not hesitate to contact us.Thank you.
Tom Huster
KCI Construction Ca.
314.894.8888
314.894.7418 fax
314.220.3569 cell
i
^ '".,
www kciconstruction.com
From: Bili Shea [mailto:bsheaC�morrisshea.com]
Sent: Friday, October 26, 2012 2:15 PM
To: Tom Huster
Subject: dynamic testing of piles at Biosolids
Tom,
We propose to furnish high-strain dynamic testing of 10 each production piles at Biosolids area that have not
rocked out but that have full-length cages installed for the lump sum price of$55,000. We will need about half
day to prep these piles for testing and the testing will take about 2 days to perform. We will need to use our
crawler crane to perform the testing, so either drilling will need to stop during this time or you will need to
furnish us with your crane to set cages while we drill. Or we can schedule this testing for the weekend. It's
possible that we could get all testing done in one day if we start early enough. We will provide a stamped
report on the findings of the testing.
Piles need to cure about one week before commencing with this testing. We have a drop hammer sitting at our
yard in AL so with a couple days notice and subject to our trucking schedule,we can mobilize the drop weight
within a couple days of notification. This pricing assumes that all 10 piles will be tested over a 1-2 day period
during the same trip since we have to fly in the technician to monitor this testing. If you would like to test
additional piles during the same trip, add$5,500 per pile.
Let me know if you have any questions.
Thanks.
Regards,
Bill Shea
Morris Shea Bridge Company, lnc.
609 South 20th Street
Birmingham, AL 35210 USA
+1 205 956 9518 (office)
+1 205 807-3244 (mobile)
bshea(u�morrisshea.com
www.morrisshea.com
n;�_�TT�: -�Tlii>com�iu!rra�!cn may^c�;ta�n c:nnfidenti�l �nd •�E ri e i�'i:rmat.rn� tna!is fr�r th� ,�c :s� ct <<Y: rt ^"'-�r� ��t:E'r• �.
�="
v ewin.^„ c:u;�y�rq s;r d:stributi�,;�of, ��r re6�nte qn f:nis�ne55agc.�hy uni;ite�nded r�c:ii;ient�>is s`r�c*ly � .:"��t +t d. '( � ��� ���.�^ ' _= . ��
m�:..,s<,gs��in rrror, p��a=�:� nc�t:fy;i� ��n-ned!ate�y t�p r,^ply�ra C�n tnn t`�<:..� ��';F_and c�cletlnn ,t frc�m vvu;�..�r-�ni�t::�.
2
r� ^
Tom Huster
From: Tom Huster
Sent: Friday, October 26, 2d12 3:09 PM
To: P.K. Mathai
��; 'Keith Clark'; Michael Opels
Subject: FW:Cape WWTF- Dynamic Testing of DeWaal Piles at Biosolids
P K,
Per our discussion earlier today, please find below pricing from Morris Shea to provide dynamic testing of abandoned
pile on this project. As noted, they would stop production pile for 2 days while this testing would be occurring. A better
option, in our opinion,would be to provide a KCI crane for hoisting of rebar cages,so that they can continue production
pile while testing is taking place. This would add$1,500 per day,or$3,000 total assuming a two day duration. if
additional pile beyond the initial 10 need to be tested,they have provided a unit price for those pile.
Although not stated in his e-mail, Bill Shea feels that the abandoned pile wi{I be in excess of the 60 kip design load, but
of course this woutd only be proven by testing. Please review and advise if this is of interest to Jacobs,and we can get
coordinated to test these pile as soon as possible. If you have additional questions or would like to discuss,please do
not hesitate to contact us.Thank you.
Tom Huster
KCI Construction Co.
314.894.8888
314.894.7418 fax
314.220.3569 celf
www kciconstruction-com
From: Bill Shea [mailto�bshea morrisshea.coml
Sent: Friday,October 26, 2012 2:15 PM
To:Tom Huster
Subject: dynamic testing of piles at Biosolids
Tom,
We propose to furnish high-strain dynamic testing of 10 each production piles at Biosolids area that have not
rocked out but that have full-length cages installed for the lump sum price of$55,000. We will need about half
day to prep these piles for testing and the testing will take about 2 days to perform. We will need to use our
crawler crane to perform the testing, so either drilling will need to stop during this time or you will need to
furnish us with your crane to set cages while we drill. Or we can schedule this testing for the weekend. It's
possible that we could get all testing done in one day if we start early enough. We will provide a stamped
report on the findings of the testing.
Piles need to cure about one week before commencing with this testing. We have a drop hammer sitting at our
yard in AL so with a couple days notice and subject to our trucking schedule,we can mobilize the drop weight
within a couple days of notification. This pricing assumes that all 10 piles will be tested over a 1-2 day period
during the same trip since we have to fly in the technician to monitor this testing. If you would like to test
additional piles during the same trip, add$5,500 per pile.
Let me know if you have any questions. �
i
..•. ^
Thanks.
Regards,
Bill Shea
Morris Shea Bridge Company, Inc.
609 South 20th Street
Birmingham, AL 35210 USA
+1 205 956 9518 (office)
+1 205 807-3244 (mobile)
bshea _morrisshea.com
www.morrisshea.com
z
.-. ..�
.... KCi Construc��on Co. X T R A W 0 R K 0 R D E R
10315 Lake Bluff Dr. E
St. Louis, Missouri 63123
�- (314) 894-8888 �';�� 2 6 2 2
Fax No. (314) 894-7418
PROJECT NAME: .� �-�� �1�'` ! � PROJECT#: DATE: ��t �"
WORK PERFORMED FOR: 'J�C O,J; DESCRIPTION OF WORK: 1 ���viD��
�E.1= ��C��-� C���e ..9-,vd n>D-�t�-lo(' I�vr►��
,
P� i� �o�p ��s� �;�� ����,���-
P�r��,� �.M
LABOR
HOURS UNIT COST AMOUNT
1 �V Lv� �, 1 A-'�1 S `' �'f�-TO�' i /�
_ � :
SUPERVISION:
SUBTOTAL LABOR
MATERIAL & EQUIPMENT
I v �fc�v� G%f�--v �
KCI Construction Company COMPANY:
SUBTOTAL MAT & EQUIP
\ TOTAL:
�Ac�
BY: APPROVED: OVERHEAD & PROFIT:
GRAND TOTAL:
� �
���'�«,� �'�"��� ��=
��� vvox� o���.
J. H. BERRA. CC3�"�1ST. CO.
S4gt NEW BAtTl�GA.RTI�ER ROAi)
ST, LOUiS,iYtIS5f3Uitt b3125�
487-55 E 7
�
ClATg �t'�'��' �d �
COPtTA/ICTOft
�OCAT101'1
fiTAft7 OUi T
UPERATOR MdtCNiNE NO.
CQNTRACTOR'5 HRS. OPERAYOR'S tiR&
EXPtAN/4TlQN �-- —
/tUTHORlZEO 9Y
Signature above authorizes the abare extra
v��rk to be�ifled to caniractor.
�
�
1
,�'1 ,"`,
� ,_ _ - - - - - :
, . � -� �. �+ -. a s �.s - �� a�_ = r r e'� �_�
l�r� , =_�s =�, , -:� �� � �' � �v �� . '� 4, 1 :k �} �'v X�,; #,��, � F� � n
� y"t, _ . �"` r) .Y I .( } 1 4 L t#i S� 1 e� 1�E3 4'�r ` (s ot s `d�' ''4,�t �.x i ;3 r _
�,r'a � -�; - �`��' � t�-` �f3 r x 7
� � 'u y _ ' ` n".?
'Ts.c �:.. � „ � _. T>r..�t��: i � � . ., f . t,> > .�.. ,�7 n .., ,i �ti �.� 13 �,.-�,.A. . �A;
� '_� n/j�.�.J/'�'J�
� {_ �:;
...�.,,_...✓.. � .G�J J���
�IUVe7nb�r 25�2�12 �i234�
I��i�:C�2
d�C��:c�n�[�v��,i�n�o
1 C�l:5�,c�:s�i3��tii??i�vs;
�t. .i.ouis,t�JS�5�3123
"d'he foll�,�vin�s�yoi�e is for e;it�a,�ork�..r�ar�aeci a's�'A�F�1,RA:F��7Fr1U 4Y'�"V'�P.
�1102/12 S.� i-iR OPERAT�Df� 3c 07' -- - 103.33 HR --595,3I '
� $ F�iR 20D BAC�C}i0E 200.Ofl H� 1,6�0.00
8 �ii� LABORER 56.54 FIR 45Z.32
IO Fift D-400 300.00 HR 3,000.00
2 EA MOVE COST-Z�a�r�CK�IOE 25�.U4 EA 5�0.�0
50.5 HR OPERf�T�R OT 35.36 HIt (,82G.08
15.5 �3f� LABORER 07' 2�0,03 tiR 33Q.50
l]/93/t2 a.5 H� 4PE�AT��t&�'T 1�5�3 }il� A73.99
i]!�5(12 3 HR 2S9$C3BCAT 135.Ofl �-II�. 405.0�
l I/06/12 10 HI� 20fl BA.CKHOE 24q.00 HR 2,OQ0.00
a p �� �_¢pp 340.0;3 HR 3,000.00
1 HR BREAKEf� 223.Ofl HK 223.00
�t NR LA,BOREI3 56.5�} HR �}52.3Z
i 1I07/12 4,5 F-��t 200 B�4CKHOE �U0.00 Hht 900A�
4.5 HR D-h00 300.00 HR 1,350.00
3 HF[ 34S�IOE 310.09 HR 93�.00
I 1/lU/12 10 HR OPEt�i'I"f)F�t�"t' 35.Ib �3� 361.64
10 Hkl Lf1BQI��OT 2�.Q3 HH 2O030
10 HFi FQRElY1f1Id OT 35.16 H� 3$1.60
la 1-LR, L.1�1BOR.,�h� 56.54 HR 565.A0
1267 'Ci�t 2"E�]I7d�J5 J.4.b5 Ti`�( 38,561.55
AM�iJA1'�'��lE 3 38,414.97
1'�.IZM3: �I�t i�lt�U]9031 I�gCC7j1I
77�Y�i�i� I�Y�7l{'7��
��LU�f�i�T�lI�C�D��A��'�H i�f�A�f T?�D�E PEA�tlJ����iPP��'l�l��iAl'E�IA�.UA 9.��Y�CE�TQ COMP�.ET��119 C��1�Pi�A�'i'CA��E�ULT I�!7?!�
P��,��1���A P����AMa�'�11E?!Q�,i�F�E P�t�'�P£F�°f�l 1��1��!�TH����C�4!f°tti�C�3t�'TAAC'�P�J�lJAt�7 Ti��N������3��Nbo.T�A�tpITD 7l�i�
; ����T�f�D���f A��S�t�C���RAC70�Fii3# °L1��1 INA1�►���' ��1�1�3 J�.k�'�3����a��t1P�Ll't���IJA?EA1�AA���Y)���FD�i 7�l��O��i
���t��)����!'��Nl����'�A�'T �J3}�..tJfl�TA�ff:i9���.1��1"�1A1�1����i'��Fl�4l�l°�����J11�'a P�1Y�?'IU'�fl�lA�3iDR A�7�`AAT�FI�A�.T11!J3�',�.
; , ;
_ ,
�- �.��.��... ��.�.�.�.�� .� - .;, - �.�_
� > .,.;r( /�� y' �.� -�.
�r�a y���•�r ".-F,,,�z 4 9d"����! `y',fi^�y'q�{,r,�{ t�Y ctf•y�`.r�f4.i,/v!� jf ;s�.� T���;�. � �I,i� ���� VY� :v'�� �!-�� ,�y� .P4 L �-r�'d �"� :s� .
� r°3 -� ,s' .'9#� �� � �'���d�� A SA i-�.1?Z'1 '-1 k !t 3./.f l`i � �1 yG ti ( �4 � i xr. � $,�'.,1 ,� �'
� �"`� 7,h i �e� '� S i< - '}
� ,h:i= _ ,_ '�.. � .r�r�-�... _ , . ,,�. . . ,_ _ . _. , . ___ . .. - _.. .._. . . 9�;n ...
. ' ,' ```"d ' � .
. „
.�. .. � ,_ . �a�
. . . . �� -. ��� � - �.�'� .,..i.
� , , y
. � � , .u,. ,. , -. �� - .,
-_.-<++tn_ . _ ..
� �
� c� � ��
C � �,. pr r- _ �8y� 'j7L�* �
m c d � � � � D 'J r_ ' ��.9 �j' � o �
� \ w��5 � � � � C6 � ' ��. S� � �:,,r � J �
� � -- —•- -^ 1,� J ` � °7
�p ��j � �p n
� � f i W
p --�. � E � � C� ll� U � (� ,f� � 7 � 9 C
� �-( o s- d fi . 1: tY� - � f�- ;Y• ,Fj. � � �' vi o
� ~ w m� � � � � � � -- � - `v "". o u.
4� r � F' a '_ ` A
�, � '`�- o g�.� cn � � r c� _ (6 �:� �j � � � E �
� � � {- � � �
w n� � � V 1 �r� - ..N.. �
`�! �� � lX1 � ' ;�� . } r C� C `� v �
� V '' (7° � `�'�.-.� U � o rn
��� �:�i � �n � � ° o
tu'i. � � t�(j dJ (" ' ' � tin C 7 ln v!`1 � � �
w tsl L c1'� 7 � W � � . "� - , t�o �° o o �0 C =
0
M�LL ,� � � _ � cT r c �`� � � o mv � � c � a�
a� - - � °' � t0 �
.., c v �°
� � � � 9 �{ �o � � L� �� �- E�o o c� �
� a � � � � � � - � C� . �25 �°` a d O �
�/{ cS �
� �LL. n �' L1J i � b o a � ��
�"' i��
Q �W. _... �} U m 7 �
O Y �. CS� J 1� � J ..r �" �� '� '3 � "` �U R' V A1 O
� R 9 (� �° f-' ("�l O . ?j �° 1C �
�� �y ' tn - � F' 4' :n `" � `m w a�i �� M�v�, a�'i
, � '1 �' 6 �V..� �� :: �,+ Np N O
� V
N 6f Gl p. f/1 ,...�
� � � � r r 9 � � �� �J� 3 O aaa c�� . �a w
... .� � c ui �,
m E � c�l C6 tx' r' 0 �'- 6 �.� ' i.y � E 3
. - ('� h�� �i} �, i� -' � CT "' a_u °'� a�i �
� � �
!� lC1 � _. . - (� � C., w� � � ° c
g -g Cb f5 ' � '.1.1 y � -,-,, c75 2 � >,r ° �
� f- � � � � � �•' j' � � � :fi C1 0 �� 2 � ,� z .
� � �� � � � I � � ,� � d o �� N � a c
d � �
c) �/7 '�. � ` (� u(1 ''� '.�- � ` � � O i7 47 '�J' � 'O
� a � � 9 � � � � 0 _ -� . °� s � � �~ � 3
� � �� 6 r r a- r- � i'�1 �. � � E � N � �y a v
� � � � � � �� rn.� � �
� � o m ro� a�
� � � � �Q N N � o
� ( o
� r � 9 0, �a � � � �
4 � � � L � � � �
�
u� ° .,, � � � �, � � o� �a � U w
� � n � l � � � N 3 N � � C7 t
� r � d ° � .n 6 L �� v�° � :° c�a
� c c . 1 � ".N C V C C U
W u c ; {�'d co N
o C
�� A � � o ��' ,c c 7 � ; P ` � . . �C.��� t� ro (p �
j Q � � � � 3 � �? m O � � 0 � � US.N G7 y � .
� �� LL ✓ C N C C O � �� .� U � � �� � � Y.
�� � a m m 10 � p, c c � � 7 `p,.L L '� � `
W O = LL �n � 8 3 > a a o o � N y y � > o°'i V '
; � � � � � a �bCOu. S
� U � � C i s � � ` 11J
q � r- i � �.C1 -c� � � ; O
� 9 O � t� ° � • , ,
Q � � � rJ O U , ` Z
� ,_„i ° m r
i
�
�
� �"o� o �
; �
� r ly -
;
i
�
� �
N U
� �'O
` �' +� I s W � �.( o a 3
A n U � fX C3 I .g .
m � � J�: �s�'n �Y' �" � ,, �
0
N O
tt� � c7� � � _9 � f� i�' � � u � rxa
bd `� � `� �
r r — —• — � a�
� F _J C V�
�� i� � �
� �� � F � ►� f� � 1 D � o � � �
� � � p 9 . t,A' �j a c
'N �Cb w �`` li� � •� � r _ ' �.t� do ('1� 6 T
�' (�-.... �.. � � - � L
c� a � � � _9 ,,� � � �L1 � �s � � �
c� � _
V'�
> �� �' � � � � ° -� `� m � `� � �
�1j' U ' i Z -� — ' t' " � ,tl° Q�' U c o rn
� � L Q
Q ll. �O. 4� � � "�O � N
LL u"'i � E � � t� �' �. � � Q M L� �o o � � {
r
ttl(�j p v� �} � � i ['- " � � N U N � V � y
F- k '�' 1 � �-� .�s �J C � fA
� — _ .' `' � ,., ro ro
LL �O G�p � � O � a li .
c C� {� � C�I `7 �.' r- ��[4 U .C o� �
O � E � eh 7 r � i` � O �9 C ��� ° a�i O c
o � +� o o .-� x �o
z LL J ° ° C _R„ . O
Q Q � ,. � m � �'
O
0 � T� � '�' � ('n .9 � � � �J � �� V �y U � J
~ � w C� � I" 0 d -g ,y ,�p "C'C c ��n �.� vf
�� '� � �' � � }-- � 1� � �., v U V :a �' w N O
� � aaa �'' �a n
ma
� p �" �f .r.�- �S � � � 0 p _'� a � � �
e E � �' 0° t- � J � " C�f1 T� ... E �
���o q �. t� _ . I` ti� �(J � a•� o'� � E
y � s. �� . _ w�'� �� ° z
0 �
� J � � .�9 C` _ 00 (y � 9 � -- 9 p � >:� °c o
# $ � x,� � � cr� r � r - ,S� � trp ° •H� ° o � �
� � �' �a c.a yti c
C� � � _ 'f�1 � � a�„�-� U c3� � -°�
� U v�'i � r' -- c{� r�1 J 0 iY � � 1(� �S � o �`�a a�U E v
� � � � � � r a -? ° ,9 � .� � � �� � �
� �� C� `� �' �' r � � � g x� �,; = w
� � � �� � a ~ �
I C1 ° � � y � Q �
L w � G � � '�
�, ° o ° °� n
� �
Q �' c 'ZS ' �d � E � 3
x N� U 'O
W 'O � �, �
f- '"� �. l9 ,OM N.�,�,C V �
�/ U c � E y3ydo' m ,c
m � �' E � � � � UU � } A ro
7 c = � � � _ � V N C U
Z C m. : . f0 N U rC.. IU D U
� � � o " 'p �3 � '�{J � . .C•,G._ � � .�j.
• � m � � � � u '��' ia W 1� � p 7 Q�i� ai n � ,
a �- R � � � o v U t7 vi t � ro d y�
� a�/ vi � Q � � � � ° .� a m � � '�- � � � � °'N a
Z {i. a U � a -y � a y e y �' � � n.� v'�._ U
� ° "� � � � > a a o �n O ` �� ro y a�
� � a� LL N � �' � �OQatt.. 'S
. U � � � T o i i � ` W
J
Q F"' z �.C� � � (l F � . O
� � a O A '� � O o. a U . . : . Z
; d ,,,� � m �
�rao
�o � °
r �` � �y
__ _- - .___ _ � —
_ _ _._.._.,.____.
-- �--- ___
1�,�r� ����a:���� �'lr����i�v�
�o, �
37�'0:^,i.�����° '�a.^.,2c��';�''J�.�'?°� 1�8�s 3��15�'�9,�Sl`��
_ _.__ __-.
�. r ..
�:
3 � _ �_
F;^3J.�..'r'��'��!'i_�_.'d"32fTi;�t17P9t3�����e�' . .,?� ,., ��r.c .�:tas.,t;d�. ,. =���
__ __,.. K__,._
������t�r`d't�'�m.�3��iJA�����Pr��s+3g.'��`�p9^) � _._-, =�.1,u;�?�2�`)�
ss : .�i � .. V�Y,' n� 9 ,,,.� __'_—.._.. _'_._..._ ._.. .._ . ..._ .q—__.__._. ..
.r.':r,�r x ?''5�,1�"�.7'L1L'_.t]"li "`7")�Q�.�,iFs'�. [��^ce?�;�'+:s„T.3�'?a.: Z.+'���,J�O`3
7rnq a:�a:�zt.2.ac�.��r.fle.�e��ag�S1;/�i�3t3s�31�n��s?�3i�j.'�i
i2�"- __ -- _
:rc.,,.
_ _ _ _ _ _. _ _ -.___. �
.� __.. -.. _ .._�--------- — �;.-�tr.� `__ — • .�•�'����J
3. BasQc:�r�b���r.�v�� , ,�37��s _•s"t:�;�n 9�3a�
,;���3.�b sr�3��������3��,��������,����
�:;:�sr,itawaf��J��'S������l�J�g���rn������3t+s�.
;Pe;fiar�:t��°3?�rrk�ts��iD�i ��a4�c:�?a�d�k���. "�T;��r�3��9n�.cA 1��
;wor�i��l��P3s.3�si����t�'��9�1�.��s��. `���Js�1��kaQ
;�e�or�?�,����ra��-���4�a
J!�l��,n3a�a ti�c�r���!i��1�Ta,�}:
------_ _ _-___._.._�.._ � �.,.�.
_�.� �'f�'1 m#3��S-��aaj���r`a�a
�. �;�2—��t3san��
�,��pmre a����,k���:o�_a���; `f'c�����z�S���;�suii��l������nd�;2��°!1;�?su�.�i.��a.
�u���faa?kn�l9s�srk tln�ri'r��'W;�?xa Aro 3��1�ot�cs��1�a�atk��;
N� 1!ior,�gfs�r>t.Pn?_^�?Qs°fk�g c�;�r��en��.
3S `�7eE'A#el',y'i��d"a?e Y!W97!s 9e�C,�+t�ec�1?z4Q1r ar�t*'��'�'�"�'a�'�'.'�'?j$e`��3 2'N��r3ci t''7ae��R9�?d:srt§.
�:�1trr.�3s�eTar�a 3n�v�ra�3 FY!e,afxt�o!a;sr:+�i�"�+��'
4�i�:��:�?`�n�:�'r��ter�) ;r�-�:�-o� �s-r:ans �g d���.zcr+�,
._- ._. _._..__...______.__�_.
�S?�__ _— :�
i?'d�6��ar�s��'�1��tt��,'��+�3Ad��+ls�r�3�l4���ad�rsuS��i a�'9as�ai�,
.—.�.._� - -___..w ,_ _.__ _... __.,.._ _
..___ �_.._ _._..,_ _._- z�� /
�R9c;+�s �e:t fo�+AFursai<rf Ees3aan�* ��O��,.,���
!A/
_���ln.�'�___.—._...,,�.__.�...,._..__•--__ _...____�. __... L.�.
�ihar�a�3�� �°
P �1c.1���- ._ _,...:_. ._...._.--- _.���.w,��,..�`�'-.' /Z
L �__�_..._
________---_ -
Acrt tor bY �
• Z,,.
____.---.___., ____. ..��,..�1�- !� r ___. ___
�� ��
na;,,,:�,:,�e:��s.+�a,,`•�,xy{N+eo� . - �
i __ . .
... -_..._-.--- .__. ,_,...-. >_.__,_._ _....._. _- _. . ._V__
_, _.__ .-----.�_--
___..�
���.C•�33999�� Pa�:3.
�'►J ikJ��'�t�si�����e���a+�l4��
;P�i'�3�'G���l,�!!�1���9�'�9�l�J.'���_ _._._ _.._,.... ,______.____���-
� � �
,/�,/� �.►w �� -�?R�Pf�!✓ 1�c3�T.� �:�a �---��'-S��6 S/U/
��OSY.�' �VK--- ��`���n� .TGv�°Sf+a.�71__ �ase�y _ � ul .[
e+�rnma�, __tq'nA . ._ --�s"hld�.�.i,_. �.s�i -` ;
(-_J�';`,t;�t',.i„�=:�
l:� 1i� o ^�}:�-�,R7��tY �<r�,/U?..".�r
�'-�Gr .� a�.i c�
iYC��
�';SL�''I.�'�E 59�.rl�Y��';'�95�
��.R�L�'�S��L�YA73i3;h�7�13 F y.
, �d.�+.y?i�'�S73E��£s'33'�td�sY
BdTR�A�373&`P9�7A�v3>T�OLS
,�'737�:4bIYd3a':95£�r�iR,A5
A.FP,RS7�e3dA�.
7j a��a,�DSF�i H��3S 31�3iY�33
P3.q�!'AiB���.(�P�Rs'si'�D:C
- �a�t�'d��3639).�.i3�5',+�S.��ILL
�:'��r;, � ,..�.�� *, ������S�}1�P 2:30
• �+`x�' �I As 733AY5
� �
'�' • s7�3S�.3�,iFi3�'l�Z�,�°1�'+173�iRiJ�Pd'
— �iE�df7t°`�'Y3�..�r Ti'�TO T}�
= �� ��3i�lS.R£$A7i 7t3
3 � �v4�' r�*�• `:� " ,�� �3 F3'.3:Q1'Kl���3�i3�I3 7.3 F C.
r � ��i)�1P�3�S3C3�LJd3 2 3�S�3'E335.
��
�� ;_' � �'d7R`����1'B�!'.��
� �Tf��'��'�"£�L1,9 AT
� ���3��. a��;�ats��,�a
3�r7E��►St�i"����'3 3�i�#i�5
¢ : F331�N1�'9�/y'I���fl'�S,�t1�3
�L��L'�`s�.
��,o- ;.
� -,° �A �A�fii.i.�7S�J�'S�A�19�i A�9��
F, �;A � �C7t'7S3�T�'�1I.��'��,�E�l�33S7t�
, , ,' , `�;_ �34�T.�TS��'i F�.�}A9�F73.L.
� ��� .
" . � '�
j< '7� �£F�R T33 A?�'��£I�37�]LI�T��I 2
�� 'Sff'.,�S:33S7f�T A-A°.
�
�:t
��
_. - _ -- =✓
�,...r
�:i ��o C '�i I '-• . .� E.���'�
f
���14'
�+ ','�'4'_' i J t '�{1�3't3 V P_�1j,1 C'°��J )���
'�°'�:
�` �'���
i `.. �r � f.�J�c!� V;I�}�.<!� �; 4�J a:� .
.�.�r�.f,�.�� `�z'.. 1�n.r,i
V
�V�-�"��'1,. S`�R u�'�'u..��` �t�,t.��✓.�.�`r`,/�'�tt .�'°�A� �l.A�
, fl�1 � R.�G'!�'::So�����v.�`��:s���
� �
, ;�,�� �P� �. i!L�T F' r�,.-„�� C.,��'�S I � !
J��O� . '✓ V ._�� ��(J�`� .S^sat Nn _..----_ ' � �
f
,� .���+-:l.9awi Y�.'S� �=1ta )..�j?�R�i7,�� h:E....wj,h,� _ _ ='t�?£
� ��l �
� j'�" �
� t�+ �
-� y ',�,�
1 1
�
�
� _ ,
.r� _
� ..- _—•• A.... .�
. t �i� ;
� i , ` ' i
� � E � ' �
, ; � , '� � �1 �
� � � � ; L-} � r' T ,�
n i � '' C,'
� � �� � �' � � �
G � t ' ,�,, t-�
,,,.� � t'' �" i ,' ; :� �' cn
`� � tn rf5 � � � � �i
�' --� � � , � ,�' �' �
,�:_^ r�,{ ;� � a
�, � .
:ti � f .
N'
� � � `�
»T•' t \/
'„\ . . . '' i:
I:
{ �i
N � �,' �
i` � a.,' �
`+� � ', �� ,�
� �� � �
�$. f
Q � �� � i
� � °� �
a fl � �
� � .� �
r � �
� � �
�
� �
KCI Construction Company
� 'UJ'b LBk� luit nve
St.Louis,MO 63123
(314)894-8888
Fa;c#(394)894-7418
www.hciconstruction.com
d��➢�A�ry�,2013
�a�m1b5
A���r:lY�[a�.�.�.�a�➢�a�,�'.�.
SOY i�o�h�a�o��vv�y
�t.L,oafle�,l�� 63g02
�e: Job#Y2002
Cape�'si�rde�aa�Ia�i��vate�T'reatrri�nt F'acility
�h��g��roposal# 05 I3evi��on 1 �,�r� ��� ��
�r�e.-
I�e�r l�a�.lYda�hai,
We pr�pose to fiirr�ish the nece5sary labor,material,tools and equipYnent to Provide Sub-Foundaiian
installation under the LTV/Effluent 5tructbare,per Work Change d�irective I�To. 06 dated 10/30/12,for the
iracreasecl lump suPn of F'ifty-��v�a�-T�o��a�d Tt��sQ-i_3�nsl���l Fa�'�-�'���i�911��s�j�57,355,9�D)e
Plea§e note th�followi�g clarifi�ation5 as�ociated with this pti�ing:
�e have at�ached�cop;�o�our cha�g�propo��l�5tirnat�sa�mmary and backup for your r��i�v✓.
If this proposal m��ts vvi4h yoaar approval,plea�e sign th�atdached copy in the sp�c�provided ans3 re4urn
ie for osar r��ord5. �y 5igning t�i�change p�o�osal,y�u a�e audhorazing u�t�proceerl with Q$��vdosk and
a�r��i�ag to fo�vard tfi��a�spampa�at�change do�aaan�nt5 and payrn�n&of t��ab�v�a�ounR vvathira 60 d�y�
�#'�vo��p�rfoa-a�anc�.
If votfl hav���ay�que�timns og co�rr�ent5,z�lea��do not h�e5�tate t�contac2 a�s.
5incerell', �PProv�d
,,,.�.....-�.�
�d��� ��� ���, �y:,����� '
�������.���5���
��oj��t l��n�g�a� I7at�: �J7
r—
l�4tz��ern�ni5
�,
� �
M
C
�
M
� V
O � ❑
�i �
a W
wU ¢
� � .
:; F '
U r��i
U
�
C
c�
�
a
O
T 3
- o
�
k. �
N C �
T O
� .D �O
O E � �
��1 � y .�
� L �
,� 4 F 3
" a� U �
c° � a
�O 3
� a� o
o ❑
M w
z 3 �
� v a
� �v � o
� a`
Q �7 x w F c
� � � � ✓ �
UU F- Z o �, _, o 0 o v, o o .o o .o c� :� - c� �o o -- �n ^ F Uv,
O O � W '/� M O 7 O O � O c� M –� � ^ O ^ ^ M � O y
p � O O �'i 7 ^ � O N O v1 f� O l� l� � ^ � O � O ^
F �. v � O � O cp � v� �n [� CMo W O N � v�i v�1 U �
..�+
3y z � z � ¢ N M � "' `° ° 3 ' p ^
O, '_ � U o
"' °J °' � U � o °� �i
� a`. a` � z c � �a 6
� o 0 0 0 0 �j cn - c`.
c .c ��
�%] � v� v� C N
y O �
N ^ p 3 �
[iw] V �/ � � O� <t
C l:�l � �j �/t
L/
� �
�-�- X
� a �
� o
� � �
� O � `� E-"
�
� s�° N o °� O �.�-. �
o ,cd� � o � F' p O
'� w c`d e9 V � � Q
O P. Q O
� o A .- N v� i) N X O Q fA
v G � ��\ ^ � N � � '� i � � W n' N w
� � V O � # cd cd � G bq V O `n � �
� e � � O �t � � p a� o �o �v °' a � 0 9 �v" o o a a y CW7
ic C "' � .fl �\ Q' fl'' C G b � � 7 � 6. "�_' (j �
m � C '� � 6. R. p � G V R cd � F p N p � ' � � C c� V � V p
� ' t ']. � � F � .~+.
7 �' .fl' .p' wy A . 0..
� �= w° a�i U o o a c c .,;; � °� � � � � � � a�i � v�, a�i o -a�r � � V
_ �n v� o Q .�.7 ..c°� O c% U rn � � uai � 's' O `n O 'co- ri `r' � C7 N U p, oCn }
� s G
'•;_ 3 � U W
� VI F'
� � F �
N
..��.���.. � �
a
c.: c N �o
v� o 0
°r �,.., r, o
E; O f1 N � W � � O
• ; . N �.V• � 3t C � Q � rA
#,� " � � N � L � Q
�.,',A P`+1`: �
� �
� o 0 0 0 0 � � o � o 0 0 � o 0 0 0 0 0 0 0
a
F �
O �
F V
[cl �
F" � o 0 0 0 0 'o 0 0 0 o c o 0
¢
� � � C7
F- c� O I
c�x� z ,a r_ �
.� O o- � � �
Q �. w 3 I
o Q -
O O
a a F W
� W � � �
¢ �
x r�
U C7
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q W
� X
w ¢
r- �'
a �
� 3
F F
� � v:
Z
O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ¢
U
c u.
0.l J
� �
a
�
�
0
3
o F"' F O
o z � ,�
� �7 G
� O
.n U
o v�
a � F
� � �
0.'
�
O
� � �n v� �n v� rn �n m T �n � �n �n R. 6. �i G1 v�
V � .� .`c .� s` s` s .t �o s` .c .`c - s` �� �� s� �� - s
>, y
C �`a
7 .i T
U
o � 3 �
� � S � �
C
� S = � o � 3 �
� � � V � �� � � O � � �
W C ❑ � _ � c :� V c�i r'�i. o
� � 'o � v� 'ia 3 A � A �...
°° � c p � 3 y m � � � � ` a' U c " � -o
� ° "a � '� F .e�. � ° F a' "° Q 7 `° cn c�i E >
� � W .�v. Q u U i ro c a. � h c a C.] a°'i � v .� ..7 -o �r
c� o w @ ,�°',u c �n Q c v �°
� - a�i a�i ai � � o ro n. �. v E �n �o � 3 E � '' m W " O a°�i ° o
<, o �o `-i �o v T � � � a �a � �o � A � R fO � W � F o
G ._....� � C� C`� cn a`. .i. .�-7 U i^ F a. C� 0. ¢ U .i Ca 'Y� 0 C7 U F [i Z 0..
Ci
vi
�^ ',p '�-� W O O O O N O O O O O O O O O N �t O O O �n O
�I .;� �N V] G ^ N t1 �O �D W M N M O� O .-. O �O h l� C .-. [� V vl . .
' U O Q O O O O O O N d' V V Vt �O �D �O �O �D �D l� h Go O� .� N t�1
� : � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
W a
C7 ,
� r 7
O O rl ^ O O O � N O O O � [� O O O N d' M �D �O O 1� �n O O O f� Co O� h �O O` �n !�
y� N � y� v� � M I� O Q� 1� �n V O h �n N ^ O �/1 O V
a v� �p (V ri M N N �O ^ N N N V �
� �, � vi N N �
E"' �
� O
F V
F O N N � �
� U N I� N .T
a � Vl r �
N �
Q' O vl �/1 �
CLl' U
F- �
Q �' I ' �
� �
F. o O � O O o O� O O O c O O O O o� O O o O O o� O O'� o O O o O O O o o � � o O
�- z � � �
w
j � �
� O, o
c. w 3
O o
� �
a
[z7 F F
z � �
¢
x
c�
a � o 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 � � o 0 0 0 0 0 0 0 0 0 �
Q X � ry N
a
U �
Q 'rC
� 5
� �
7 O
r
o � F � N
o `o
� z
� � �
0
0 o co cv o 0 o m o 0 0 0 00 0 0 0 o r cv �n a� o 0 0 0 0 0 0� v w ? �o o ^
O� N O� O� 7 d' O vi V V ^ � N y� � '"'
CK N .- 7 V N V M �n �D f� m O� ^ O � �
O v� N V1 v� N � O N I� [� vl N N N
�
�
'-' d' �D 7 V V O �O .-• d' V O � � N C
� � o r r r o� o o� �o r rn �.-, r �n r
o F F t, �o r h t� t� �o �n c� t� � v �n
� � �
�
0
� a o o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
p., o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �n �n o �n �n
U � N N N � N rl �O �i '�1 N R 7 N V 7
� �
g � � � � x �, � � x x ^� � ;� � x � x x -' x a
� ..� � ..� � � � � � ..� ..� a g � � � � � x
�
� C t
� o � o „ m
m m
5 0'� d
° M s � � x � .o x �
� � � c � ❑ t A s
� �a V o `-' u O � u '_ � u
u
O r E « A a�i .�. io v .�. =° a�i v r v
F ° Q °�' � Q � � @ ° fl, � � Q, �
a � a� a � v � . .
�a +%� 4° o o. v o Q. � ..�v, o- °' v O ;_' c
� � U �S �O W P�9\9 .O W N .�^.0 W � A N P �cd
W m s y Vi L L c � � ¢ ,� L N v
Ll a d v �v a; a '` � F
'� 3 � ti �° `e �a p � ,o a� c��o � � .ytOo � > .°� a� � � .'�^.0
o > ° A o „� � a� � � � �
� c � .D a� A �
� � � � ..� � � � v � c ,� o cG � r. o :n y x
� .-1 � .�.. � K ca vi y X �v n y �J p � N �- � a. �y A O � C� C
a � �a o ry u o o W � o o cC � � � � a� o a. >, ° v S � >, ? U
� � `� � � a� . r � ;V c �n
x � � L j ^ cG � � � � y � c in ` o �a � � rL v � � o .]
_ '.-.;� m `^ R � � aci L1 y �O � � $ � `.! �2 � C� � 0 � '�Z y� q � � G CGi � C7 V p
OF W � o � -�, � `� � O � � y�r. ,� F,
� -� cn Ll
V,� � 0 1
,� v �
�
� �
O O M � O O O O f� � r'i �O M O O O O f� M �'1 co �O N �O 'N O O O O O O O O O
vl O� h vt [� V vi O �n � l� t+l O [� -- O [� O� N
� � � C' V M t�l N N �O
Q �
Q O
�., U
N O r
F � v �
� @ N �
Q N
Q. G
O
LIl c�
F' �
� �
� z U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �o, o c o o c o 0 0� o; o 0 0 0 0 0 0 0, o 0 0
r �
N V
LS] W �
`-� C LL
� � 7
� W� 3
O o 0
� � �
�
� � FW-
� z �
Z �
Q
x
� � � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0
¢ � � '�
� x
w �.Q_,
F �
� 3
0
�
� z �
� �� �
p
0
O O l� C O� O O O O O� N [� Co [� �D O O O O O� � '/1 N � V F'+ � O O O O O O O O O
N �p � 7 vi O� V �D �O N � 7 N N
o Vl �/1 �O h M vNi O vNi V f� � tN+l � � l� � O t��l
O� l� l� 7 � � M c.l
m
._7
� � � � p Q� O� O� � � � � ,-� �' V O v1
CO N O O O N
o F � � � � � � �n v, � r �n �., o� v, � o� v,
� � r r � vi t� �n v� c� t�
a � �
�
O
� O O O O O O O O O O O O O O O O O O O O O
❑., O O O O O O O O O O O O �/t �n O O O O O O O
U � N1 N �'1 M N Nt N N � � N N r'1 V V M
� �
� � � � -�-� � '� � � � � � � � � � � � � � x a
a
� �
� m
� � m @, �
a � � � � "
V R m
z � �
° � � � � � �
a eC � " �o °� ° � a'
� r � U �
G � Y N � � � � c W
� � c � �9 � 'e� � a �� ..
t-� a� '„ _ N a. t o o y a�
O u u � � Yi F °' .. :o F- `o
o d °� c ❑ y t d "m .�. J � E � �
�` ° � r °� � at0i � .. ` 'n � a ., y ° R � �y � -�
� a`°i a� c >' i °� F � o N o .� � � o � :m N � o
� o � x U � � � p � � o c � o —
:: � A ' °� � � a� 7 @ '� � � `n
� U � a rn tx�'7 � � � � � E�' �' U o �i � L� 0] � .9 F' � y � o A .�
� � c .. � u =° F c u Eg y� T> > i— y �
�r�,�-_ '' m � � � � 'x K � � � W � � C� v x � � W � C] � V 5 � V O O
....� �� x � � F
6il
-0
r � � �
�r'.:�.� -4.
� �
0 0 �n — v, a� o� r v — o o �n a o 0 0 o N o� rn o� o� co 0 o v o 0 0 o c o 0 0 �n
�n rn � o o co rn �n �o a� r � �n o o �n v �o �+
J N h �/1 N �l V V d -� N �/1 �/1 N N �
¢ �"' � M N
E"� �
O �
F V
N y� v1
f. O �D �
[`(. U CJ CO
C L
�' C
� O
F• P
� �
F � � o 0 0 0 0 0 0 o c� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0' o 0 0. o 0 0 0 0 0' o 0 00
�
� � O
� � �
¢ �
o � 3
� O�+ N
C
W � F
U
z = �
¢
x
U
a � o 0 0 0 0 0 0 0 0 0 0 0 0 � � o 0 0 0 0 0 0 0 � o o � o 0 0 0 0 0 0 0 0�
¢ X �. ,�v.� c" �
� Q
F �'
Q 'r
� 3
� � � �
v o;
' N
p .r F � Vi
� � �
�
P
O
O O W �O Vi O� O� V �n 'n O O O O O O O O l� f� O� O� O O O O O O O O O O O O �
O� c�l � O O � � O V � O O �--� �
v'� vl O� N N V� O�
Q V�i Q� N N � ^ N � �
W vl V
Q
�
c+ v o� a� o� co � r o� o� a� rn —
� d. � N O O � � � � N O O �
� F W � � �n �n v� r O� � � vl v� v� O�
�> � C
�
O
2t O O O O O O O O O O O O O O O O O O O O
6. O O O O O O �/1 �/t O O O O O O O O O O O O
U Uj N C' �/1 O O �n �O �O �n N N O M M O O �O
w F �° N
O �
� x '" x x x Z z x c' � v� S �. �. S S 'x x Y� .�_7
a � � � � � � � � x x a � U � � � � � U
�
�
U
..�.
�
�g � 'O N
d y y U
� � � p
Q « � 9 c4 �
e
o. Y � � ^
� � �o L° � a i.i � �
�C � f0 U a, a� � 3
G �
c� N E � ` °G° e� 3 o e�.� Z
�� o �
L] a p °� c a�i `� ° " � v
'� .O y r O o N � B L[. � y `y :.;
r � E Lon v � ;? 7 :: ` 5 ` � v'
� y � .^`O.n o � v � '� o fl, � Lj � � ° A °�° � � � c s �
U N CC £ O � � U � cJ O 9 �
� ' � a � � � s � 3 ❑ o p a� U cv °' ' � � 'c J ° .`i'-1
� � u: °� r' q V w o U co �a � 'Li F' _, q . A °Zi
4� �a � .c F
c .. _ � °° � j F a a� R � U ❑ ❑ CC
- i � � R �
,y> .. R G S7 . a) F �n � Ly o� a� tO m 'C �s, e)
'� � x � r�° � � w c7 3 C v �' w � C� Y � � � w ,� O
� F; ;�] F
0
� O O
�.J,��:=-� v U
� �
00 .--i O O O a M I� l0 N O Onl � �
C N t0 I� O �O N C1 a N lfl
� d � N I� I� Vl O O f+1 N O N � O N ^
-'� E m v+
_ `o �
� c �
Q1 ° o
>
� � VT tA N V? tA N iA 4A Vf N VT Vf VT V? 4A tA tA iA N
�
d 1� O O o0 N 1� .�-1 M tA 01 Vl M O
� 00 O O � �O �D N N N T tn N O1
y O
� � 00 t� VI O O � N O N m O O1 O
�
G/ �- N
7 v
m p
U �
w ..�i tA lA N V? lA LT tA lA Ll tA vT N Vf �/? VT aA iA Vf N
p O I� 7 e-1 Ol 1� 00 00
p O N N (h O ul V' �
p �--� pp OC rV O N V' O 01 1�
v @ O. V V Vf
� �
U G1 O
� � �
N
� Vf 4A N Vl V1 VT tn lA aA iA Vf tR V1 N YA iA 4A iA aA
� Q .-1 c+l vl 01 V1 M O
� 00 O O � � � N N N 01 Vf N Q1
� � O I� Vl O O K1 N O N f+l O Ol �
m � M a
c
� � N
" `O
io �
� J V? N 4A tA tA V1 VT N Vf lA V1 N Vl V1 N iA lA N N
Z fl- .-1 O O 00 N �-1 .ti fY) Vl Ql V1 M a
3 L 0 00 O O .� � �D N N N Ol In N 00
Q G1 � N ^ �/j O O m N O N M O Oi a
Y �
W � � N
m � � �
� � J iA VT tn V? 4A tA tA tA V1 VT N N tA �A tA tA tA N N £
¢ fl- n o 0 0o c� n .-i m �n m u� m o E
� N � 00 O O e-1 l0 lD N N N Ol V1 N Q1 '7
� O
O `� � 00 I� VI O O a N O N M O Q1 V�1 r1
O
g � " N �
� o a
(a � c
O � J lA lA aA t/T tA t/T aA aA iA Vf V1 N tA tA tA LT ah V1 t? �
~ frl VI Lfl O O O M lA o0 O 00 I� �0 �"� y
U l0 �A f� N � .--1 l0 l0 N I� 1� O O � �
� � � lD l� O O O � N O N � O O � u
c m
N � v @ c
Z � E —
� c �,
�U � n c
u @ �
Y �C C� O
� �
O p aA N Vf t/? V? N V? VT aA tA V? 4A tA tA tA VT tA N N
O � .--i O O O �t M 1� tD N O Q1 a 1�
Z C � t0 1� O l0 N 01 V N l!1 .-� I� 'i O
w � OJ �
� Y E y� 1� I� lll O O �D N O N l� O N GI
� O � m V1 �-I N 1�
�i x 3 �
�+' ar c
� � o �
o „ — o ,
w 3 -' Vf 4/T tA LT aA tA V? VY N N tA tA tA t/T LT V? tA aA Vf
Z C M VI 00 O 00 1� 00 r1
Q tc `"� VI n �N V � r1 tD N I� I� O C �O
= fp +.�, � �O lD l0 O O O � N O N V O � �
U � c �, m
Y = Q d
� ` C
� � � 7
3 °1 " °
O � VT tA V1 lA VT V? lA V? N V1 tA N VT V? V? V1 tA N VT
C .�-I v1 V7 O O O O O lD 00 O a0 O �T a
� �p O V1 1� N V
C C � � l0 tD O O O � � N O N �7 O � ^
N �
i,v, N N
N � �
� >
fa V O
� � an �A a/? N an LT VT Lf tA V1 lA N N lA V1 N Vf N N
� .� �n �n o 0 0 0 0 � � � �n°, o a a
� �p O Vl 1� N V
op tD l0 O O O � � N O N V O O ^
f`p C j M
U d G1
N 0- `
C �
c V p
� -� Vf a/f VT V? tA V? tA tA V1 an Vf Vf tA Vf tA V? tA VF Vr
Y
N
�
� �
_
� y � LL q'f 61 a U
C
F � d O � � F C O t � � a
w '
� T � C C Q � � .` � � T � C M Y
�, 0 3 a Q u � a H u > � ., � « � �
o = c c c c c c c c c a o Q Q Y � �
a, a� o 0 0 0 0 0 0 0 0 £ � ¢ r. � � � �? �
'c 'c c c c c c c c o � u � � � fa � o �n
W [n � � � � � � � � � U N li LL V1 � J V1 F' N
� C�
N V
` ,�, � �p� p T" T`" _ ($ ly'� t� �' C.�* � �v
(Ll a E T_ �' '6' (� � rJ r"' � , ,�. � O �
� � �� _- � � _; (ZS � ` �-g�. t�� �,� � ��
�"' `; W Q� __. ..�.
� �, F- _J �_ � J G '�O A
m �"1 � e C'n f �.`t t� m 1 � i�f �� d0 V C
J �
� �
�.. r(�� � o � � r- � � � �- �` t�1' � c� .�` vi p
. � ��. � W �u. �s .1 Ip � F d - " \' "r' Q u.
� �t �O " a. Cn � � r"' CT � I v l:� � � �1 � N
�� � ; � � �n � � U r -� �,? � � y� �
� �.. ;� � s � = � �' `�� ...... � c o �
�w � � � a o
� � v
�� ; � � � r —" -- � �.� h�c 7 v� �� 4 � � �
61" � � �. � � CP � � r" til , . � y� O p � j r
C� � � CT U � c6 O u R � � nt
Y�Y� �� � �' -.. .c c� � � � E cn
� _ _ � � � � � � .
� _ -- � 9 �{ � � � �5� `� �- c�o � � r n
� � � u� �, � � � _ �- � �� �- � 4 0�. o �o �
� � ^ �
3 p � o ,9 tn � � e c a c �.c
p E- �� � � p.., M c°fi m � a
� Q � y. dJ 9 � j' ,S --' (� � 9 _ �!j *'� °' �� o
� � . �� "`°' �
c� o
� � � �� � c� � r � 6 �" � � � � � � � T� NN �
� � i 1- �
= � o
�-I � iS1 d�u� `m ' 0 v�i
pq � n aa.a Aa . �� ;
�
�{ s� t. 3 � ca W
� � a �,.. (7q r �'- 9 r"" 1� ^' � � w J p C W h
� o E � M C1S �p r. �. �- �- ..;� � ` >,y r o E a
• a _ � F�� c�} � � -- _ � _ _ . � �� � m > �
iia � � - � c. � n o �
,,n � � W.� �n � Q r
� � � � -9 (b �- f6 = O � `.� .� `~ �S o c�a �+� c o
O Z r m �? �c} r tp r. . f— • CCh o 'iv�' o � ° � '
! � Q � �u, � � C�1 _ _ � ' �- ,� �� �.. � t° a�i ro � .° � c
�d � � ° w'� � c��a � -°�
? � ,�-- � u. �o E- �
� � fl'U � � � 9 � � ��-- � O j�-- �� �� : �`j �. u i y c �ro �' 3
` �-I � O �� �' n( c� � �- �' ' i� [� `� ...J � o �t� o,y y W
I N tG � U � � � N
� � u� � o m '�n. �
. � O O �A � � � O
t 4- '� o C � �
` ' O � E O �
x � � w � �
� .,
F � ; `p a � � �, °' � �
4 � � .� �, ; � Q � � ,3�
�' � ° � E � i� � � o� ��� U ;,
� � a z � � � E � � � �:� A �
�1 � E � r n 6 � `� � v� � «. �
W� F- � _ � .' o ..•- af � �' Q U
Z � o ' n . rt�4 � � wc-cc"aac � �
� � Q � ° C ro c u�. c : P ` � • • �C�'�� N v � �
� � m p' f7 C 7 p � G � t„ N.� N N �L
� Q CD o °J � � u. � �� v O � N vi .• .
� V- « � LL �C �C C � y' � V � N L � R3 Q1 x
� � O ,Cy "ry``- � y C N tU n N
Z� GL �, � � U � N � a y � y 3 7 p,� V L y �
� �/ Q I � � v� � O � > ¢ a b O � m a� d
vL U
a � � o �n ¢oti �
� = c :t .° T � � � ro ti.l
. U � � , � � 5� � � r
¢ Q o � 9 � � � ° � , . i z
Q J U m I'
i �Q ��
j �O � o
� t�y ,
�
�
�
� �
N U
� �
1 � � � �
A m � u� �I)t1 � �p C3 ! � d .9 . � �
m {y� � � f- �`' ('; �`r,' � �. t J � m .�n ro
i° � w�" 9 � � l � ` hn � O � -' �
-... �
r
� � S'. � � .�. � G "6�
� �,(�6 � a �' C��Jt� (�'' �(` � {�( � � (ti U W
U
,,,., 4 C'{� '�z� a �t tt1 ff T` �7 � S ° l,/J � a c
'°�'� `�ct� w m LL 1�i� � `� _ � r ' e� «9� ('1� a �.
a� �� r � o �
� W „ C � �, J i,� � 4 � .!'9 rU (S^` `�' �° .�� o
t� _ � m ' c ,� v
�, U �� � � 9 r- r �do Q� � � o �
� � a� L o
� �
V" y '' � p v`
ti
.9 �" ry Q f� O M '�v� �+
C: � c
�� � E � � � � o � v � � �uo Q � � �
,� 5��o S� � �' _' ,' �-- � `g �` �U � � c � cn
� 7 - �- ::� c ``° �
� u. � D r D �-( � O�-' �° E v� U � �'� � '
` � 6 c�ts
� � E * � � � o O y U o a ,,. � y x a
C�D o
p O Q� � c�? Z � � i` '� �°J C o o� c cXa O o
� ¢ � � .. � '.y 3 CL
f� O � „- t{y �ij ,9 p f6 � �. J J J ~n' ? y �
� J ~ � W � (� �t�. I` O O ,9 `� � � •• C C �N c � N
}-I �'s� .� � � � ! j=- ' t� � C' �� � ;��• '�' c�i a
� � � o°'.n.a A= � " v
ma �
� J � •
� � E C� � r3' f6 � C� J O � ��v, ? � � �
� t� � � � �- " Ul � � �N o�� � E
!y �u u°. �j C�S 4� _ a.� � � m
7 r — • - � �W �v o U
m o
� � 'Q� � � .9 ��.j ; 0° (� O � O {�.,�, w. � t° c a� � x
� # y � z � 6 ,.,I c�i � �, r . � � � W �; � �� NO � y
U' ��' Ci( �` '� o m� �, � � G
� ` � •f'F1
� a'-� u io � �
� • U �i �.c � — c� r� rJ D CY Q � � as c �j y � U E �
� � � a r . � s � :� y � � � �
� � °� � cs � r " r � �— t!� � 3 x� � � m w
�. fA 7 L y
: Q � � tV O m � G' �' N
� � O � �A Ul .N.. p �O
I .'`. f � � O C � �p �-'r
x t� � o ° � og �, �
r a �� y °� � i°
� � �
� � �� c � X V N ��� V �
j,j„[ � � � ca o a�.��:s c{°i �
(�/ d � �. E d � ,� dQ' m
;6r� � � � '� .N ro� �y R y �Ls �
m � � p t .. C u � y o U
��� �
Q Y•� �
� o : � ca� Groc c u
W Q � o � c � � ; `� � - •C��c� � � m �
�•r Rl m � � $ LL �j c ia W � CV o 7 N� t�iS A � .
� f� � � � � �' gN 'd o ' � �.�'^- � � �y a�i � b X
Z � � a u a `� c7 C c G. � �i � 7 n,t. � ,`,y (�
W � o m ,� y � n � > a d o v, o W N Nr � } v �
� �- � a`� �-' o a O Q O u. �r
r„ � U¢ � a: o � � � � {Vp ltl
K,t �""` �- L ��a � � (1 F�- p : ��f
' F Q � N J. I O O. O U • • I • c.
' F � Q � � ,
i �
1
!
<Frdo
�a � o
� ' ►1
_._________ ,--. __. � � _.
-■ KC! Construction Co.
10315LakeBiuffDr. �EXTRA � o � � ORDER
St. Louis, Missouri 63123
�— (314} 894-8888 -
�'
- Fax No. (314) 894-7418 �0 2 6 0 3
PROJECT NAME: C���� W� � � PROJECT #: — DATE: 1�� `��-
WORK PERFORMED FOR: ����5 DESCRIPTION OF WORK: ���'��� o�
.�D i�- G���.1 i(l�f/ J'�D��S �v
.�59 , s1���
LABOR
HOURS UNIT COST AMOUNT
�t-I r' i� �F�P �- - -
�i � ��(P � -
;
SUPERVISION:
MATERIAL & EQUIPMENT SUBTOTAL LABOR
, KCI Construction Company C MPANY: SUBTOTAL MAT & EQUIP
��� .�c�� TOTAL:
BY; � APP OVED: OVERHEAD & PROFIT:
9 GRAND TOTAL:
� � . ._ _ ' \ ..... _..... . ._'_"__"" ' .I.
■ KCI Construction Co.
10315LakeBluffDr. � � TR�I� UIIORK ORDER
St. Louis, Missouri 63123
�� (314) 894-8888 �� 2 6 21
— Fax No. (314) 894-7418
(
. �
PROJECT NAME: G.�Q-P� �� � P PROJECT #: ��-���' DATE: � ' � �-
Q �X G.�v�-12
WORK PERFORMED FOR: �k� S DESCRIPTION OF WORK:
�c� Wc��� .So��— ovl d� U�, �5 9
S ��' � 1 i M�:M/��'1�-f f' ��>u i`v.u.�.
LABOR
HOURS UNIT COST AMOUNT
�e � 2 - -
C J�'1 I P'����r�G f -
� �I � O I � �� _
- �-i I ( �. � rj c J N. F�e�,.�, � _ _
Z. �I ,� � �� , ^ .r
SUPERVISION: � }
SUBTOTAL LABOR -
MATERIAL & EQUIPMENT
�' �. d��c' )r�G /-I - -
D � c �
1 c vc.f� � -
' r" . � �-� � -
KCI Construction Company COMPANY:
SUBTOTAL MAT & EQUIP
�,„ ' � � TOTAL:
�i� '�
BY: APP OVED: OVERHEAD & PROFIT: �
GRAND TOTAL:
/"\ /"*
. ' ;
�` F'�. � -'r ' - ..Ci 'L-- � . r .,, ,
� '�ti:l
_. .:�: T .. ; �`' �. �,' .;� �, ' � � ,
; . .� . .� ,.. '
�: Ex:TRA'�VORK ORDER . ,'t'_ : ��3;�� . .
;` A J H .�BERRA CONST. CO
Sq _. , '. . � . :' . .� . �.. .. . .
` , y'" 5091 NEW.BAUMGARTN.ER ROAD
• .ST. CQUIS,MISSOURI.63129 .
:487=5617 •
r' DATE��-� �.^�17 �I�v+ '
' CONTRACTOR S C� �, �``� ' •
�" � , . ,f� - �
'LOCATION,'l �, x`�,.+z , tFis� +i .
. >
. � • .
�START QUtT .
�; , OPERATOR MAC.HINE NO: �
� r'CONTRACTOR S HRS OPERATOR'S HRS. ' , �
� EXPLANAT.ION -
• �.?CCc,..wa::l .�., . i1�' t��;/ 4-.r3, ��..-� ,
ii:>� �j �
; (')'�4.,1;.�- ..r./•:�r-� L�S J�lvr?� C'i.V .� ; .
i, •.�- - ca ' .
��:.��ra�.;�' �'�ln�r� ,
`_` - -
f h'��1I(i':��'y�^����"[�e1L��L ry�' ��1.'!�1 d"Y .��-n�•t� t�. .. , .
.
r' —i.
,
� .. , . . • :,.. ;. - ' �.
�..
� `� {'��,�., �.��� �:,r�.�-� 1 .
.� ��r' . . .
�� ; j .
, ,.: , . � .
� . l,`� '�.�.�' ' , -J . . .
�-, -�-�-� .
;
' AUTHOR;IZED BY r
:' .- ; ;; r .: ,_
,.. <. , �
� -:
i. r
•: .; . .. , , . :
Signature�bove authorize�s�the above extra ;, .
`�,, work to be:billed to contr.actor .
� 1. �� .�-7 ` i� i�{ �. ,� f v], f4. � .i.
I .
� �
�., ::.. -- -; ¢�_ _ . _. , . �.. _ ._
�... -
° ..1.' � i. �i �°s I,. !� <� . _ _
° . ,.�= - - - �
� .�,,. � 'i t3 xt 3 b E 41 �i'�t::�1 6; -
fi��a�'�i*�L�K.a.?s.,.�..��•�.�.�`s5�: �z:c
. ; .,,.,,....�ca�e.n,,.. . �a.-__ . . .. . . ___ . . _ . ...
�+�,,..� : . �. . �... .. . . . � .- .
, . � ...... . . . , .
F�_. - • . .. . .' � , _ �.. . �' �- _ . . . _ . � .. , . , . .
, ��r,"' �,
_�. .�a.r �'.. _ ._
..,��t'. ..
{!L�'1�1??�£i%'��.zQ�'..� - -
K�3�'�2
K�T G���7�i,ct���_C�
3�3?5 7.�5��3Ju:f.�'�v�
�t,Lo�a3�,�t4�332�
T.��sq�1ilY.+i.�"i�17]YS)7GE 1S'f9i E;S�i�1?t�S�{�B3'�D3�."li.E`� .,i s-..� _•:.z1�s'.:`� -� � _ --,
Z 10�1�J12 $.� 'r� _ Q�'_�R�1'(7i�4�T �_�..'. _
�''� 4-:1 '+'�i F3,-1�:k t-J<?,:, , ,. ._, ".,':_ .� ,
�
$ :Ei.dt L.r'IBORER _...._
.l� �� :C�9��J . , . _.-, , „_.�.
�� , - �,�.�
2 :E.t� �SL)�E�C�`� �i fi - -_ - - " -
��.; k� U:E'ER�1T4R U'C ., .__ —- - - �- .
3�.5 F� :L,.��4RER a�:._� _r._. ._�.._._
11l93,�32 �1.� I-:IR fl�'ERr�1�'t?R C�'!" : �,:�; _.__ _. _.,
1ll��/1� � :EIR 2$9:F]�?:#�G�1T __ ._� �.�� ..�...,_
�1lS�fil1� ]� :F[K 2OQ:�.�C:It,.��iS�E �- - =_• ,.
]9 :t�ZR t�-��9 ":_..: _.... , .
7 �-�E� :�73.�.�:f�.ER %�;: .� . :��. ._.,._.,_
� :I�.R 1..Rl�3OR�R .,�,.. � __= -�_• -
11/971'l� s?.� k� .29�J�3r�C3�.:1-1�`I.E s LL. ;:" '._ _.. ._ :
_ -,
si,� k:iR :t�3D0 .,�_.y.; .:._:.. ,d:.,'..,�
:3 :F�� 3�35}14:� .._::.__ -�_ :�...__
�l/7�J1_i� :1 D :KR i��:E;R�1`CQR�T -' � _ " _. .,
�0 }iR i,.rt�30:RER9'C .�,.__ -_. .�__...
l0 :F�K :�'i�R�ti�,��,:�0'T �:���", .-_.: :`��.��
1ti }IR :L.r'1.f3c��� y.,.,.. __._ :'��..?;:
�'�4`� "�'"`1 .2":��±1.Ts'ii r� _ a, "_'�i _ --"� ��-u_
.,�'����7'�7' _ -'�', — ��'= __ . -
'T��i:til�: �Y�t usae�.P�J��K.�ccipx
B�; �� � ��
'����'�����a������������������a�4�a���.�.�fl��� ,�,.� r` ` i' �._ .;�: .L.�� Ic i � �i i ;, � � , � � L `.ti
�lN�0����i�9�'�Ls��9`�P�������°�D�E���.��Gd 6�' u�a0����G��e����u �'���9"��u up�6�����C�E�`��€���G e� ��� ���vuG� ��=a6�
���4��`��'�1a;1���l�yJS`���'���9�d�����1 F�W� °Z�E�'����i�' �G��i��a C���G'GGu�;�6����9��C�OC���C"����;��e�G��[,�d�0(����C�C� d����,�;�3C�
"` ��`��.���� i�4�1.1�.1�� 467�1T1/SSrJ: �'.�lSi��l77��1Y���4�JJ�����!',l1dS1����cs kdd3�dU i";��_.��+.1i_� �� �li_T:'• ;.�.�a�:.-��j r'S_'�l 9� � ��� s�r�Ll (f���l.rilr.n. .�;i�'I��
�._.�..l�,✓� . . . �.. ...... .._ _ _ .
� . . .... , ..._. _ .... . - ..
� u , :. ' � - . , _ , �
, �.. _ . . . . .
� , .,y --. ;° � � ... .. �., �'k . , . .
� ��� :.
'�,�� . `��. �` � ��,��:.� �,��,.�. '�� �� '`.z - � — - - - — �
,••�, i,..� --- ,
�■ KCI Construction Co. /► �A' 0 � � 0 R D E R
10315 Lake Bluff Dr. E X T R/1 lell
St. Louis, Missouri 63123
�� (314) 894-8888 �� 2 6 0 4 '
',�,l
Fax No. (314) 894-7418
PROJECT NAME: C�P�P �� I P PROJECT#: ��-��-- DATE: ��'06�I�-
WORK PERFORMED FOR: �'¢GG�S DESCRIPTION OF WORK: ��`C��'���
/3�--/� �<x 1.t --5��� r�v 3.5 `�
�t'�-�- 5��� W G� ��
LABOR
HOURS UNIT COST AMOUNT
- -��(/ �--P C�� �' -
la�Y"i� W11"�'� " O v..'��'c7`�
,� utc� �_
A �. �- 4,
� „ �.� . �¢�J�, � _
_ SI�,�. �no —
L7o �ak. Sc��� s t � �� �
� ���- — • �
SUPERVISION: -
SUBTOTAL LABOR
.. _
MATERIAL & EQUIPMENT
'l� � � -
� '' ).t�. �r�
'�O6 -
O �e �
ISUBTOTAL MAT & EQUIP
I KCI Construction Company COMPANY:
( j TOTAL:
J���s
BY: AP ROVED: OVERHEAD & PROFIT:
GRAND TOTAL:
� A`
_�._,,.r.,.,..._. —. �--- � - -- ..rr,.--. . . ' ,.... . �
. �,: r . ,
� �:: '_. . . . �".,x� �" .�0.9.�i� .
EXrJ['RA_WORK ORDER _ ,
-�: � . .
J:..IH BERRA. CONST. CO.;,�y� . • � �
5091 NEW BAUMGARTNER ROAD
; ST.LOUIS,MISSOURI 63129 �'
487-5617 • - ` •
� :� -�^ --...•
� ,2 G�7"�-Lj�Z,,, I l.•.n.�"h
DATE 11� '
N. .. ; . . . . . .
��� ����\� �f..11,/�U�L".� , ; �
,•'.' CONTRACTOK .
'.. :l.'OCATION �`-�.�u�� ;�✓..l�.r.�L� ' . -� .
� nU1T ' '
� S7ART ,
.:. MACHiNE N0. — _
�(4' bPERATOR ' . .. .
` ` OPERATOR'S HRS. _____------ •
� :� CONTHACTOR S HRS. — .
EXPLANATION , I , �.,;,
��V. �t �� `A .
� Cs:,•:�.J.., a
'�' � � �,.�.���"��.�.r^r�.:�.�r`., ��'j t�� �, .
r
. �; "
�' � ''E�,��� `,��.,� v .��,� t:�s� �
} .�; �:.:_.
� .,
,; : �
, , ,
a. �1::%'> >sx...^.�'r�'�C�i=�' �t.�:��'r' 4�I� ;
'' ' ^� ' _
a, ` _ . � ��"�'��,, ` ' � '
�r.;..�J��'f
�: `(�_ .
� `'��.,c� r`=1 . . .
r , '�' ;} `�,:�'.�'`-`- _
:
: ' . AUTHORIZED 8Y
•, : ,
. , . .
,:� •
Signature above autY�o'rizes the'above.extra �
{5 work to be billed to contractor ,
k ,` �,: �..� ,��;; �
� ; �--_,=`�
.-. --..
:� -'� `; .��., l�. f� �ix �� 4�',;.� -. 1.: �) � .�_'�` �� �� �`��T' � t�, '�i- :. t� �. ; �"a4 (��',
� �.5.�'' � �.stl!i i ° € s 6 %.i �X< '� f "`;� K, ��}a1�3r 5 r � -,`y`T '.A"»{:� �+ �': YlIE �t�'i��'.� .,
�r� . .._ _ k . . �... ......_ �... _..,......_. .,. __�'�`T' ^�'{s�,,..,., ...:_... '�arG �;�`"�„r'�'''
s�.,�,.e,r.,ae- : �,,...-,.�.- . . . . . .. . �.
� . . . . . . _ _ , ' F . . �. . .- ... -. .. . . .. , r s s F��.F:`r; . _�r t r - ..
� �����'�_�.
���v�a��e,i�,�D32 �1;c36��
�;�1�„?:b
�r��,j r..�r33Zi31�'s3"��wL'
.���>>;�.=1�5: ��1�;i�.�.T]Y`+
��3.�,��a�,�xi�L���3 J�3
�h;:E'�33v�yir���oace;�.�'ar e�G���y�rk p�r.�crrr.uatl�t;��\�'E C;1��R:'�EF\1J tiy�v'TF,
13J�;'�12 �,:5 :FIR �PER,�1Tt�R C�' 1D�:170 :�:f_R 85�.49
� �-IA ,2�O:H.�C:4�FT�:� .2�O.�D :�LR 1,5i�.f19
� :EZK .L.�1.BOR�R 55.�� }71? •99D.�1�
:l0 :ECR I�-�39� 3�0,00 �IR �,p90.OD
2 �.�1 �S4Y.E�S�ST-�OQ���1�K.��4:E 2�9.9� E.� �t�9:09
SQ,S ��i t��E�ir1TC1RflT ?8.S)[) �iR 1,9I�.Q9
]5.3 �iR L.�I�ORER 2b,09 �IR �92�,t10
31t'fl3.�7� 4.S :�� OF'EF���'L?R�' 3�,�4 HR 1�1.g9
i l�i) !�2..._ ___:s _ FIR__?�9�f3�3�:.tT 135.4i1 IiI� �!D5.0(i
1�'�V�t!l�t� �� �.A.4\ .�6��J\JSt�S�.AS1�Sl.Ci .__—_-.--_-v_.`�..'- �40.174 �S1S bjV1�47.�l47 \���..
1p HR J��AUO 3QQe40 �II; �,94D,D�J �
1 :EIR �tAE,,�K��t 2��,D0 :E1R 22S.Q9 `
$ �� .�,a�caR�:� 5t�.s3 -s.�-eo" �tA �a�;ea��¢sZ.z4
1 ; r: � =1..i IiR 2t.?r)F3A�KNf)�; ,. . Ei� 9A�l.4�}
��3,a k�it :D-?9� 3�U9.99 F�ft 3,35�9.09
3 T-:�R 34S�-1�� ?10.94 :�I� �39.9Q -
.11/70J12 :l�J H�3 flPEKr13'�JRO'T' 38.99 }IK 384.04
10 �L� _L_�inR�R C�T 26.�D� }IR 4b9.99
�9 T-� �'QRE?Y1��s�?�7`� �lO.iJi1 :E'iR 999.09
1Q :�1.R t,.���34��R �sg.� ECR :S5D,�9
1:47 �s� ?"�v--�1J� .l�ob� T3`d i�,:Sfi1.SS
.r11YI��s'Y�'�'U�', �:ID,SS ��
7'�:_Ri�'3�: s'��t d��e�n Recea�t
1!�'S��`d�Q�l�3
�,���1���9���' � ��3`��P�1�°�`tf���P��a�������f�f�l 0������i'�C�'!��Ns��i�i��9�.'����`�f
F�i�Sa���8�i�9�'�L���t�!i�P��D��►�!�s���$�B�C�Q�`�9��!9�'P�Ii�U�'�'�fl��ldl��4���,°�dJ�l1���3�'�
�:������'t�'�'�9�7,��4��3���J�9a'�.A����F�A�9 `���19`�J�Y��I�' ����1!,�L1��33�T���'��A����9���°������������J�����'�Z������5
IJ��CP,iB p 1i9,T,-�l�'�U�`TF3A�?, '��1�,��i�T(J'���U�E�,1�������1�l�7����1�°�d�9�f�i�i�A'�T�1��fl��.A�O�A�li��N����ik1`�/4��E.
- = � _ -
. , r � . � �
_ . ,�� _. :,-
� ,.
� � �f t . _ .
_, ; _ .. . , , � . .: . �
_ ,,"1 _ . ,� - _
�.. KCI Construction Co. E X T R A W 0 R K 0 R D E R
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
■— (314) 894-8888 �� 2 6�6
�,_ Fax No. (314) 89�#-7418
� ';
PROJECT NAME: �,�r 'L �� � � PROJECT #: �L� DATE: f'��I2'
. ����� DESCRIPTION OF WORK: r✓�"� �d�'�
WORK PERFORMED FOR.
�ix �-1 J� �3��I s�-.�-�
��e�2 �c fl ��
LABOR
HOURS UNIT COST AMOUNT
�C� C� 3 -
G�A�Q-�, l-)o iu e�' ��O,v r 1��� 6 � -
,, 7'o e �l�- tr e �PP,v��' -Fn+� -� _
. � .�;� �v�.�4�`�d G � i�r �
7� s�'�; e�-r P{ i�f - FM � �
��r I .��, ; �► P-��'�-i��" !�� ,� �a .5
l-�e�e ��-I�-v-�o� a�`�-1 a� l��rre � �-h� 5
SUPERVISION: � '�
SUBTOTAL LABOR
MATERIAL & EQUIPMENT
1�2'b � A-av GG �o( �� S �/�- ��G{�e�/rll .(K� -
1� T �,�s �J � 1 0 Pox" �v �� �r _
�4� ��,� D���' ��c ►� Ha-� �'S �
� Q � v�1� �
,,,� -
COMPANY: SUBTOTAL MAT & EQUIP -
KCI Construction Company �
l� _-� �A.e.��.S TOTAL:
BY: APP OVED: OVERHEAD & PROFIT:
/ —"` ����fi�'`- GRAND TOTAL:
.-., .+�.
�� rco � rs�xetiori�Products � � ����0('�
Ma C���'
824 S. Kingshighway Date Invoice#
Cape Girardeau,MO 63703 4597
11/9/2012
r'"�"���C� 573-837-4347
,..Gf'-'T=-oJC"�"iJi 1 PRCQUC"TS,lL�
www.marcocp.com
Bill To � Ship To —
�-- �.��
KCI Construction Coompany � �
9907 Sappington Road
Saint Louis, M063128-1644
---,
_.. -�. - � ---r—., _____—.-�. F.O.B.
._......._...,._.._.._.._.._�..___.__.._.__ Via
� P.O.#/Project Ordered By Rep S.O.No. Terms Ship
i
' 11/9/2012 CPU
� 12002 Wade H TM SO-3958
Descri tion UIM Price Each Amount
� Quantity item Code p �
� SG 29.32 527.76T
18 HILTI-3412766 Hilti HY 150 Max Anchoring Adhesive
, (11.1oz)
' 119.686 119.69T
� 1 HILTI-2029270 Hilti HDM 500 Adhesive Manual Dispenser EA
;
, �
{
i
i
�
i
,
; �
� 1
I
i I
�
I
I
�
�
I
�
�
�
i
� � .
! ,
;
, �
;
�
�
� -
� ,Tl�ank you for your Business! $UbtO�� $647.45 Sales Tax ��.�%� $0.00
! Please remit payment to:
Marco Construction Products " T.OtaI DUG $647.4�
� 82�t.S:i�ingshighway
��j�iu,jVtO 63703
I
^ �
� NU WAY CONCRETE FORMS S.E.,LLC
4788 OLD CAPE ROAD EAST
' � JACKSON,MISSOURI 63755-3816
���,�����������,����������v9 (573)204-0100 .
(573)204-0411 (FAX)
(800)599-9854(TOLL FREE)
(800)542-1214(BILLING INQ) Invoice: 340538
Date: 11/07/12
• Page: 1 C
Bill To: 4140 • Ship-to: TEMP �'�
KCI CONSTRUCTION COMPANY CAPE WASTE WATER TREATMENT �
10315 LAKE BLUFF DRIVE PLANT OFF SOUTHERN EXPRESSWAY.
ST.LOUIS,MO 63123 KEN 314-568-9718
CAPE GIRARDEAU,MO
, •"�:�'"• ..�„' - ;r�C.` ' ' Sale�'s�O,rde�Nu�beri `
s � e'r ber P�frehaser�ID,kName ��;�' � . :�� ,.?�?$ :�p
" 683574�
KEN M ' Jim Gunther KEITH VANDEVEN
'.���;�s � Ta���od`e �i ;a�St�liP �)ate • a�r�� ��;i °'nt�Ty�,e ., ,Ship,.�'i/ia,. �� .y.
NET 30 MOJACK 6.975% 11/05/12 ADD&PP .NUWAY TRUCK
�. .� �:es�r,.�ti�� S .ippe� '� -il1�M; 4 �'P�' e ,�P�r�. , -,T��.�� '.
NOF,132 , #3 X 5'4"BENT 12"X 14"X 12" 30 .EA 1.050 EA 31.50
14"X 12"STANDEE
BUIL 132080300D-60 #8 X 30' DOMESTIC REBAR GR60 50 EA 35.800 EA 1790.00
(METRIC#25-GR.420)
UNIV SBU-030 3"SLAB BOLSTER UPPER 100 MF 535.000 FT 53.50
"COLOR CODE ORANGE"
- UNIV SBU-020 2"SLAB BOLSTER UPPER 50d MF 450.000 FT 225.00
"COLOR CODE GREEN"
NUWA DC DELIVERY CHARGE 1 EA 5.000 EA 5.00
.r
I� �� �� �
Ul� �
�p� D�_2c�2-
Thank you,Jim Gunther,for your patronagel
u '� F�',r• �' ���'Gt��'�'Y�' `k 1�7�����' ` � '"� Char e,� �iseelia'�eous ; ��ota ue
� ece�v�'�clB._�,jl, �tMerchantlises� ,� � ax ..Sb)P.P',;y 9:
�... :��.�,qsa�!a.�:.�' �3�<��.s�, + ��� �� � �
210� 1 .00 5.00 •
RETURN POLICY
'Refunds&exchanges must be made within,30 days. Nu Way your concrete tool and supply headquarters.
"Refunds must be accompanied bY sales receipt.
*Restocking and/or handling charge may apply.
� �
.. _._._.. _ ._ ..__� _.. _ . --- _
_ -
_ _...:
, , ,: : -:�
E ,; .,:: .. . ,.. . . .
� �4 . .. . . , , .
E��TR�►. wQ�'-:�RDER �z ;:.; �-�:�v�� .
, �
.
: , , . .
�- :, . .
x ;_ J. H .B]ERRA CONST. CO.
, �.; 5091 NEW.BA[3MGARTNER ROAD
-� ST.LOUIS,MISSOURI 63129
� ` 487-5617 . - , .
f ,
w _
DATE �q��:'c?.i:.J1`Z. .
� .
,�'`t`'�' !'., �r-:;�- --
c CONTHACTOR
.� �-i:�;;1 • •
� ;LOCATION t_.'" �' 1 , -- � _. .
_ ;
:START UU IT .
;OP,ERATOR MACHINE NO. -- ..
'<CONT..RACTOR'S HHS. OPERATOR'S HRS. — �
�. 'r
.'EXPLANAT,ION .� z ` ,
� �� v� ���) � 3�e 'v3 e'J.W '-�.\. ���r...'�ir`�� - .
. f . . ' " . ' "_'� , . , ,
i�`•��' � � . � �
{, 7 tF'J h F ; :::� �''ty� a f.d�r..��.:.r' .. . t—��. ` �l<'�''^ � , .
� � f # :�
� ��.��s., � �n;�;��.�- .��;a;r �-� .� f., �, ; .
--�'
f
, ; � �
e; ;
�_ - .
�, ` � .
-, `
t _ , .
'��.�,., ���:�,,�� � . . . .
" ,'.` AUTHORIZED BY � • •
R14� - ' . . . .
i y, '� ....'.. . . :•. .. .. . " • . .
' Signature above authorizes the above.extra
�� ` � work to be biiled to contractor. �
�,t Y� ��.+.�.,:.�......t,.�:a�. . �. . .�—�i-._�.. i�L,:.,,f� .
^ ...,
�, � ,L. '� ` � '
�
� i 1. 1� .. a i_�� �� � `'`� F ' x ro":� .,lC x ��� C �• � s- i � .
i
,�' ���� �� .' y� t �.
�.��. � - ae�� ��.��,as����'���'r �c'���,�7��.�...�� ��4 S ,� �s� �'zL3n�i��ar`�'��'kt��{�}5 �� a °lJ �f,�z `�� 'a.
tir �� .t5� ��,�1�i , �-� �{�'t� v �"
� �,m .,ST.''�`�#"�}�; 4 4a y„^"i �' �'� � J.�-S��.�t�..�b���d� �,.� t..,i"a a� as ����9�'� �.Z�:t 5�� � �
r
� �x�F
}a`�" � s,.s �' u'Sy"{x�i ,r �� '� ;.-t�c'i,"� s�t" �R�' +�-��a 'Sr`c.n.Sta�C�"`t�"a F �r�rj^ask�..+ti�rY�S�. ''�' a�,`. � tF �a
�j' d 'X ��S3u�,'�'�`d't�TMy1' 'L�1.F s'S y _.�,5 V l �'_ 1 ).. I',s�
.;.� -�. '**;e �t�,: � -: T� _ = ro -. .� ..� .�� t t� i-.r , t
•+ 3 ._ ,. ,._ - ._�., . . --i . � ...
� ` i :��- � � . .
,�;: >„� , ' PEI: 314.487.06]�7` � E h. .�14.487.5II17 ��'�';«'.JHEEKRA.COI�I
0
. `4 ��� �== ��� 29956A
�
November 25,2012 4234G
KCICO2
KCI Construction Co
10315 Lake B1uffDrive
� St.Louis,MO 63123
The following invoice is for extra work performed at CAPE GIRARDEAiJ WWTP.
11/02/12 8.5 HR OPERATOR OT 100.00 HIt 850.00
8 HR 200 BACKHOE 200.00 HR 1,600.00
. g HR LABORER 55.00 HR 440.00
10 HR D-400 300.00 HR 3,00�.00
• 2 EA MOVE COST-200 BACKHOE 250.00 EA 500.00 ,
50.5 HR OPERATOROT 38.00 HR 1,919.00
16.5 HR LABORER 26.00 HR 429.00 •
11/03/12 • 4.5 HR OPERATOR OT 38.00 HR 171.00
� 11/OS/12 3 HR 289 BOBCAT 135.00 HR 405.00
11/06/12 10 HR 200 BACKHOE . 200.00 HR 2,000.00
• 10 HR D-400 300.00. HR 3,000.00
1 HR BREAICER 225.00 HR 225.00
8 HR LABORER 55.00 HR 440.00 .
� 11/07/12 4.� HR 200 BACI{HO"E� ' 200.00 HR 900.00
• . 4.5 HR D-400 300.00 HR 1,350.00
'3 HR 345�-IOE . 310.00 HR 930.00 • .
� 11/YO/12 . 10 HR � OPERATOROT � 38.00 • HR ' 380.00 . : � . '
' 10 HR LABORER OT 26.00 HR 260.00
' � 10 HR FOREMAN OT � 40.00 HR 400.00 �
� �, 10 HR LABORER � 55.00 HR �SSO.OQ '. - .
� . • 1267 T'N ..2"MINUS � .. � ' � : 14.65 TN . 18,561.55 ; .� �
� ' . : - • AMOUNT DUE � .• $'38,3X0.55 �rc� . . . ' •
TERNis: Net•due upon Receipt - • . � • . ' � ' � �
NOTICE TO OWNER � �
FAILIIRE DF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLEfE HIS CONTRACT CAN RESULT IN THE
FILING OF A MECHANIC'S LIEN ON THE PRDPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PUSUANT TO CHAPTER 429 RSMo.TO AVOID THIS
RESULT YOU MAY ASK TH15 CONTRACTOR FOR `LIEN WAIVERS' FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK
DESCRIBED,IN THIS CONTRACT. FAILURE TO SECURE LIEN WAIVERS MAY RESULT IN YOUR PAYING FDR LABOR`AND MATERIAL TWICE
- �e:.ti,•: , ;,,,,. ,v � _:..� :� j' A�- '--.r � l: .
-' . . �v, w{-. .'.i Lz_,,�3E��i �f, �'L Jr ..4 _ ..�'�Pf,,.�...:5 x"+ _,.S_ vr .C. �:t _^���e�Yt�..,'f... i'�-
r��.N�S�_^'�'F..f�4�' ��:-°�,�27`-S t.xiv'. - _
.ry_ y
Il
--� ,•... _--
-■ KCI Construction Co.
10315LakeBluffDr. EXTRA o � ORDER
St. Louis, Missouri 63123
� (314) 894-8888 - - -
- Fax No. (314) 894-7418 �0 2 6 0 7 �
i
PROJECT NAME: C�P-� (.�/lal� PROJECT#: I �Q�^ DATE: � � r���12
WORK PERFORMED FOR: ���v DESCRIPTION OF WORK: -��J�aG�'l
�_�x v� ��� P�f ��.� �G
LABOR
HOURS UNIT COST AMOUNT
�fi/�-� -� f�a5 I l,e�l' -�W F.M• �.. -
I�C �'�(a��e ��- _ d�e� C� �'r2 '� _
o ,v-e 'f t�� e (�y 2..��'i t-�� �I�2
� ^li�� �}-� - Lq� �•/�• � �-
-� �, �.—e � �' s �
G r�G C . ���f�laf
� �
SUPERVISION: � �' I
MATERIAL & EQUIPMENT SUBTOTAL LABOR
I
�l 0 � �v r ti I�l /3,e. I � ,v2. �'l = _ I
i
- i
�
i
� KCI Construction Company COMPANY: SUBTOTAL MAT & EQUIP
�._ ' ;
- � �cc� � TOTAL: i
i
BY: ����- APP VED: OVERHEAD & PROFIT: `
�'"'"� �
GRAND TOTAL:
i
I
� ✓"� - -
�. KCI Construction Co. � � T �� � 0 R K 0 R D E R
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
� (314) 894-8888 �� 2 6 0 8 '
;' �',
Fax No. (314) 894-7418
PROJECT NAME: ��'�C ��Tl" PROJECT #: .�,���– DATE: �l��'�
WORK PERFORM
ED FOR: ��— DESCRIPTION OF WORK: � � �
uv �5� s��-D Q�r �c.� �6
P�P�,� �.�, P�- �
LABOR
HOURS UNIT COST AMOUNT
,�- �� p�{'� - �A i3 �
R � 12� tis - �ac� �
� - r1T- s�► � ' ���v� � P -
SUPERVISION:
.
SUBTOTAL LABOR
MATERIAL & EQUIPMENT '
. �C �� �-t., � �► I��J = �' �
� � ( y � ,c.�-e.c Qc; (I Q ' - -
;,.f:.
KCI Construction Company
COMPANY: SUBTOTAL MAT & EQUIP
( ) \ � TOTAL:
- �1 AC.c.,�� _
gy; APP O,VED: OVERHEAD & PROFIT:
�`�'�, � ,
1-���
� GRAND TOTAL:
�� __�^'------ __ .... --.__ _ - r
- - �■ KCI Construction Co.
10315LakeStuffDr. EXTRA 1NORK ORDER
St. Louis, Missouri 63123
�� (314) 894-8888 �0 2 6 2 0
, Fax No. (314) 894-7418
i"
PROJECT NAME: ��-6 e c�cv-�P PROJECT#: ���- DATE: ��"��~I .—
WORK PERFORMED FOR: � DESCRIPTION OF WORK: v�c'�-�;'��--
� �P�U� U�e�9 s 1�-
��r LuGo `��v
LABOR
HOURS UNIT COST AMOUNT
�o .v�� R�e��rv� Y 3 - -
" ; � ,�f; ,� 0 1 r �
i i
� �f/ll/ r� fS- �� F M• � �
�� o f� .2� 3
e � er.�of �-- -
�e c�� �- �
SUPERVISION: -
SUBTOTAL LABOR -
MATERIAL & EQUIPMENT
� �a.� ; Nr� i� cc.A.tv�e 2.
- . KCI Construction Company COMPANY: SUBTOTAL MAT & EQUIP
��! � \ TOTAL:
�–s..n`e-.�
BY: APP VED: OVERHEAD & PROFIT:
�� GRAND TOTAL:
� �
.�. KCI Construction Co. E X T R A W 0 R K 0 R E R
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
(314) 894-8888 - -
�--,�- Fax No. (314) 894-7418 �0 2 6 0 9
PROJECT NAME: ��OP �PJf-r/I � PROJECT#: - DATE: �1��Lz
WORK PERFORMED FOR: ����S DESCRIPTION OF WORK: j�� 35�
nJ�R-I� �C l� � �x l�('J n ��
LABOR
HOURS UNIT COST AMOUNT
��� �
��I C� -P f i ,�-.,�.. a r�� %2 -
, -.
� L�l.l� Gi �t� A� �2� ��1 -
`-- ' �► .�1 c ,�►. �.�-(�''� G,a. i P .�-
? ''� ,� �-e �-/� {� �.n�. 2
�G � -�f�iof .� �
� A v v 4 I�.�r l�a-v c� ��L P� �.,�. �t -
��ve v� �l � �.5 �I �o.� c�,�r�Pr . �
SUPERVISION: �� �f�,p..�
SUBTOTAL LABOR
MATERIAL & EQUIPIVIENT
� G i ,L -E' � � � � � - -
�- � �o-1�.� 0-�Pt t�►-c1� �0�2 �' Re�T� .
0��. 2'4 J ,v 1�e ef f�cb� b�-l�� -
- �KCI Construction Company COMPANY: SUBTOTAL MAT & EQUIP
� � TOTAL:
-- �,� o�s
BY: /� AP VED: OVERHEAD & PROFIT:
i �t.
GRAND TOTAL:
.-. +� -. - _ ,.
-■ KCI Construction Co. E � T R� qi� 0 R K 0 R D E R
10315 Lake Bluff Dr.
St. Louis, M�ssouri 63123
■� (314) 894-8888 �� 2 612 '
-. Fax No. (314) 894-7418
%" ;
PROJECT NAME: C'�� ww� r PROJECT#: ��D(��— DATE: ��"� r��
WORK PERFORMED FOR:
��'CCaS DESCRIPTION OF WORK: �U `3'� �
{�,e-.0 �o��1 �i rc I,tl G.l� ��v
LABOR
HOURS UNIT COST AMOUNT
�a�-�Fy �l a�►��5'0-�,� �
,��I �8�� � Qo�z6 �--
�
SUPERVISION:
SUBTOTAL LABOR
_
MATERIAL & EQUIPMENT
;
_ �
SUBTOTAL MAT & EQUIP
KCI Construction Company COMPANY:
` �.._.i ` = � TOTAL:
��Aed S
gy. , 1 AP OVED: OVERHEAD & PROFIT:
��"� `
GRAND TOTAL:
.. ^ �
�
� ' I
i
� -- . - ,.:�,r-�� . �
.--�--.� , __ .,_-. . . -. ,�;. ., ... ,. .... . _ ..
,=,;:.;�,..,. . .
` ;
�� E�I�R.A WORK ORDER ,�>:� �%�:�� . - �
�;. - - .
�,, IEtRA CONST. CO. •
Es �J. II. BE
� , `. 5091 NEW BAUMGARTNER ROAD . •
R •: ST.LOUIS,MISSOURI 63129
487-5617
D'A7E
a�- V� `ZCJI Z. �12.1.;.� ; � � �
, , .. .
: . ,, ,
CONTRACTOR ,
'��� �r�v'1r�'�t- ,
LQCA'fION l i'_,:.�'�'�..' �_�3���� . .
p .
' QU1T
START ' .
`OPERATOfl • MACHINE NO. — �
' OPERATOR'S HRS. — '
, CONTRACTOR'S H�HS. i ar�v ; ' •
6�.�'C..��.i d" `'ll.�..�'r'� `'1' Y�-"�„L'„^.�.,�,.-�= .
� EXPLANA,l'ION „P n
'��+ ;°: :..�. : i�
�.s;�x..ti:.��., '�, . �.
',� .
��;�;�,(� �-^ � ���,,���� �� `f'��:�.1,c Ct'
' �l.�i '� 3 ..� � "' �.:.�:r � _:`', .
..i:.,V'uY�.
� / . . . , '� �,q;�•'�-",7. � , . .
v .f,.,+�.,�.�C.J�t�. .�c!{:r:� . � .
' } '
.. �� ..;,,,. <<...�r�•.t r'��, .
. v i-ti i1 v � ..
= ji':'�,�i;%;c}`.+', 4�'t:_r,_t,- _
:5�. J
Jt ..�.': .:�.� . . .
i . .
y/;, 11;�,,�r,,,�� .
/ •�r'\
AUTHORIZEU BY, ' ' : -
� Signature above authoriies the above extra . ' �
: work to,be billed to contractor. •
, � ,:
-._„� ��?����
.�.�,. -<<:, ,,�_ .� --..
� S�
� � !. �:r 1'. �' t4; :� � � i ! ;:"� ;. `{' �•, �, 'R � '6� � � } :`c, �. � �., # '� �,_
� <:`�... � .':��.+ i ��;f-;t�. f� ;. t �ckt> ,il:7"....#-:i�5 6't• ?.!� �. �.�t . l.i<� �t.. ;.;v�. .��:z3 ::'x
`�' � , :?!9.'173 3.:3�u�3 • , . :=]J=1_s}�;it 7.5:'3 7 � � �Y tiv'��_,; r, �1
7J.t3�?iiT�i�.. 1)t,
., �VIJV�J_t�
i��ti�;a:��•..�:s�7,:Zr):t_2 432.J.a�;
;�CI��2
�,�,:.�L:Q,7,1�tTL1t;i:l�_L1 1:0
�fl���:�,+�.:C��s3.1'.��.�}.i'1 i�£
.r'`�'�. �..t):2�3,.tiv�� �J�7�.���
'��e fs�il��g in��������'A��ar�r��s��Y a������:���A�1�'�'P,
.l.l>A�i�r.i! ;S •�1� �L.17j7tif]R.ta�a]�13J� _'t.} 1�.�1:> Sl[1 ,i.,j.i.�.j `I�:
K �-i 11. �S?�EI3t�.T�� 6�, t y .�.;,.� H�, .�� Z?�O,t.t
� �-I 1? ��� ;Zo.5� �r*;� � ..i-��0 I 13.o b
:' �� �5���53�'�' 2�;J.t+t� �A S�fl,UO
���'�'��� '��
�<.__�
� �,#�17� �
`����e �3�3 s����a���'3e��i�a
�7��������
�8�.�41�����?����!`���D�`�31��J 7���������1.x1'�9���.�������`���9V���C�.������?�19�
����'���P9�'�����5��9`���S� � � �0���`���0�9��`d'�a���O�JJ�.'i'��1�'°�dJ C����.�!l���T�JIi�
����.`�'Y,9�1����S`������it�9��3�A�;�� °�L�F�'S�J4�33�' �����Li�3�d�������.�'��'i�1���3a�41�������F3�`�9�����5
����a���D��°�3�4�i9�SJ�,�1���1�°��D���A���F�9��I1P����i���������3 P���D��AB�I����!°���°���,
� c� t� t�: �; �� �,i !' 1. 1%,"t' i�; :� d `1' 1�, t� t; i f: �. t► i` '�F ��. . 'i' �: c� �;# �`:� :'� `� .
�"�, __ ----__.
_---. ._ _ _..._ _. ..---. --_----
�. KCi Construction Co. � X T R A VI� 0 R K 0 R D E R
10315 Lake Bluff Dr.
St. Louis, Missouri 63123
(314) 894-8888 �
;-
__ �� Fax No. (314) 894-7418 �a 26�0 �
� ;
�: PROJECT NAME: Ci1�•P�G ��r PROJECT #: DATE: ^� r I�'
�
WORK PERFORMED FOR: �-f'� DESCRIPTION OF WORK: ��� ��
�OG� �i 1C G����� �o�ir.�►
��'rv e 7`vt-R-L 5?�-�J -
LABOR
HOURS UNIT COST AMOUNT
�� /�P 1 Q�lP/1!,rj _ �-/�4 4
M iT .cJ�O 9�r� .. LAt� F.r• 5 -
,�- �-r I� /�t o � � - I.na, � � -
' ' I0'
. - � f�u.�r;�� _ ��
� (� -e - oP � .S
.�-fl-2 H u5��1-�-e� - t� �,M• � �f�
fl,� .� ; Gl s �,s - �w � ��- -
/'�o�µ �� i�yT��� -2
SUPERVISION: • e.,�/ (��C�� - �v►P'c 2-
SUBTOTAL LABOR
MATERIAL & EQUIPMENT
�D TON �.,,�►� ��e.I ,�,v.� 5
�3 Z G .vc reT �. �I'o.t�' �6 c e r
(� �rOs c-�� ` D `t�5�-7 _
� 185 Co,µ ��.sso�r 2-
, KCI Construction Company
COMPANY: SUBTOTAL MAT & EQUIP
�_., _1���J � TOTAL:
v
gY. �j��"�'I APP OVED: OVERHEAD & PROFIT:
G�� u,
GRAND TOTAL:
� -- ,—., � ., . _ < , – �
,;...,.. :,.,:. ;: :,,.. .. ., ., , .,,, _. , .. .�,,.. , . .. ,. . .,. _ . ,. . ,. ,
. . . . ,..�. --�.
� � .
� � .� ,�-:�,
, �w o Q�i
,. " Conveying, Inc.
TO: �..r`� '�" f'y � .{ ��;��� DATE TO POU R: � � �
'"} �i L e' '?'��!
� �e�.�/r�
YOUR ORDER NO.: �
JOB NAME: OPERAT.OR:
�'s �P't j�
(�,�,.,�.r.�,�'.. ~,�'�..c�� v'laL1� ���[� � j��(j(.�4"",�0, C,.:, tt t���b�'�
JOB PHONE: TIME STARTED:
LOCATION: � ARRIVED ON JOB:
� '` t' . `� f
C_G ED`� `!7�Or�t f�A�r c.Na �
-,•- f, ..}C.:►
� TIME IXPECTED ON JOB: STARTED PUMPING:
� �)�.�1� � �,�� �''�'�.
� AMOUNT OF PIPE NEEDED: STOPPED PUMPING:
.��.aY'1'"!
� DIRECTIONS AND/OR COMMENTS: LEFf JOB: U .
i L '
. /`.v
` ' �,�� TIME ENDS:
' . �. l.T�. � .M 1 �ra �I'. I� _Y y�..-�,,.4
�� .��'
� ' � ��'� ��1� ROCK HOPPER: YES NO
�
, . � ���-k
�I ���, READY MIX COMPANY:
I � � �.L.�,.?"' 1�.:���,.� ..
- , l �') I`• ���/\ .
, UNIT#:1 t
Quantity Description` ,`,� Price Amount �-p
9
s� hours Travel:Time }� ;; �ti��j"' �%���� EQUIPMENT USED:
i �t � a,[J �� �
�-� hours Job:Time �-� ',y,! ,d �;�'�; � ���>��� ,�"°�,
� t.;,�j yards Yards of concrete placed f�(j j., �j °c �.;��=+
i tons Tons of rock or sand placed TOTAL YARDAGE PUMPED:
� � Bags of prime �� ��"" N,, `�-" �
� � � ��,�� �
�
i
�
1
� •
I 3 hour minimum on all jobs. TOTAL DUE � �°�'�
,a ��i.
..�.-
NOTICE TO OWNER ,
� FAILURE OF THIS CONTAACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO �,�:��, ��: �
COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MATERIAL OR MECHANICS LIEN ON THE ��-._-",�t� �a �,��.�
PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO LAW. TO AVOID THIS RESULT
! WE MAY ASK lNIS CONTRACTOR FOR"LIEN WAIVERS"FROM ALL PERSONS SUPPLYING MATEflIAL OR CUSTOMER SIGNATURE
� SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT. FAILURE TO SECURE LIEN WAIVERS MAY We are not res onsible for an dela s
RESULT IN YOUA PAYING FOR LABOR AND MATERIAL 11NICE. P Y Y '
A DELINQUENT SERVICE CHARGE IS COMPUTED BY A"PERIODIC RATE"OF 1 1/2�o PER MONTIi."20�o Time based on portal to portal unless
PER ANNUM"APPLIED TO THE UNPAID BALANCE. STATE MECHANICS LIEN LAW APPLIES. OtF12YWIS@ tlOt@CI.
WE DO NOT GUARAN'fEE FINISHED RESULTS obtained from this load of concrete,as many important
' factors affecUng the ultfmate quality of the completed job are out of our control.
DELIVERIES MADE ON PRIVATE PREMISES ONLY AT PURCHASER'S RISK. We will not assume
� responsibllity for any damage caused by our trucks when requfred to make deltvery anywhere off a paved
' pubifc street or roadway.
' 3564 Hwy E • Oak Ridge, MO 63769 •573-450-7813 or 573-450-7814
�
' --------- ---- - � -- --�-- -�–�—
� �
� W N °s,,.,- �=;;'sa:'
� � C7 C i ., � ' ' �
O O �k� � �+ !,� �
z o o z z z z z �'� z �
� ,� � � a a a a a �: � ;�;
� �} , � h
� � A a � ` � ���� d �
� v -�
x a
H �<j,' � � v?; �
n x f
� � � ' 4 '� � i'��^ �
� y,�1.� � �,
� O O J� �',y. L' �`�'T ' �`
FC � � � t i t � � ?�` J �
O k �'' {d,: —�- 7 ,
O �
� � � �1f.'.`�.: � � �S�� J
� � � �i�; 1 `,.
O � '�"�� ' y .
v� y z '�'r �: i`Ft.;,
� �� �
� r{ j �
� � � t 7 Y�
LI
o � � a a a a a �„ ,:; � i<.i.; C
d � � ?'�:�',i�,�;- � :E`<'ws` �
� K� � 7� �° � �
� � Yj �' tr'`' S.
H t�i Z � �t � �r�.. ri �
�� � p � 4.t„rt�,, v '`'�s�.
z � � ' ,� :
0 k�t-n�` �' /� T�?i.��
H i�:r : , � t'�
z � .3..�F-;: �/� �:'�;
� �..3 1 x 3"f. \ � � ? r;
A' ���{r '
� fn '�? � �. � �tt
,�f r, '
^ � � 4.: 1 Z l �
�{ ll 1�".F . � O
ry ClJ ��(a�yr � � t' _�
�� � � 'r-t�y� (� � ty�' �\
y,..., r � � ; t�.
� 0 r�f� � E�+� �
O � �:s
� „ - . �' ji.':� ��
d ?,� � :��;"�
� H �:t":,.r�-' . ,4'r��_� �
� � � � � �t��= '�
���a � �
r� z � � � ���
� k a.. ,:; " ti����
� �� r� c�� �;���i�` rn
�� � �j E;f C� �y,:
C' � "":�-i�? � '1��� �
� y q��3.,,q; �.r;-y��; �
� � '�1�Yi'� �Lb�J
1, z � �l�
y ;�'��.K„ v�y .'�i;
O j+4 spL i.
tJ H z ,'�� ri' � ;.i �;
� O �f4 r.: '�ps�::
� � �, �
� , � � e �,�,,,,
H �Ff.F.,� � h.y�k•
� H �
;�,� r,; � x+;��.;
� '��:;:;Wr
v, k }-� �
t� � ,,�; � ,:,
� �,{��t; °' :,:��:=�:'.;
i��:�:�,�; �'
j Y:
� � ,Z XA yr.�
Q ^ �'
� � r m
'A y .`),s';.:,.
� �'y � 4 i
w � f i' C
v�i y f4; � ',
� � � �� ,
�, � ��
� 0 i; �
� O
� � l,
- .:Z`:!v��
„,,� �"*
-�
.,�onsUucUon InVuln�i1Uiqli�P �BdG �
Project 34811 KCI Construction-Testing Servlces-Capo Girardonu Waetowato�T�enlntant PaUll ��IA -: ,���l�j�d��._ •,
� _ t
QC Testing and Inspection Services ' ;
Professional Fees ' ��
�(il�t� ' :E
. ��Ig . ; HiQ�r� 'f��l� , �1n�n�ni ` <;
_--.._.---------- —--- -
_. ,:,
__ -- —— -- --- ---
Sr.Materials Technician ;�
9:�I1��124�� ��dQ . �19,90 : ��,QD ,j
Concrete lnspection and P�paration of Test Spoclrilotls �`r '' :'�t
�'��o�i�e�� � ` _�;�� . �a,�� : a�o��� -.
Inspection ofDrilled Piers
1il��l�01� . �A�v� � �a,aa e���oo. .
Inspection of Drilled Pie►s '
Generate Reports
Concrefe Inspection and Preparation of Test SpecJmons;Spaclmon Rotrloval
11/13/2012 12.BD 49,00 "812,60
Inspection of Drilled Pieis
Generafe Reports
Concrefe Inspeefion and Preparation of Test Specimens
• 11/14/2012 9.50 49.00 465.50
Inspection of Drilled Piers;Concrete Inspectlon and Preparatlon of Test Specimens
Generate Reporfs �
11/15/2012 13.25 49.00 649.25
lnspectlon of Drflled Plers
Generate Reports
ConcrBfe Inspectlon and Preparatlon of Tesf Speclmons
11I1812012 2.00 49.00 98.00
Compaction Testing
11118/2012 10.00 60.00 600.00
Inspecfion ofDrilled Piers;Concrete Inspectlon and Pl�patatlon of Test SpeC!»1e►is;Soll Density Test with
Nuclear Gauge
Generate Reports
11/19/2012 12.50 49.00 612.50
Inspection of Dril/ed Piers
Generate Reports
Concrefe Inspection and Pr�paration of Test Speclmens;SoI!Denslty Test wlth Nuclear Gauge
11/20/2012 9.50 49.00 465.50
lnspection of Drilled Piers;Concrete lnspection and Preparation of Test Specimens;Soil Density Tesf wifh
NuclearGauge
Generafe Reports
11/21/2012 5.00 49.00 245.00
Compaction Tesfing at New Plant and Old Pfant;Concr�te Inspectlon and PrepaCatlon of Test 5peclmens
Specimen Retrieva! - -
.
����a�zo�z �,oa:: .. �io,00 - ���oo
Specimen Retrieval . ` ' ;
; _ __ _ �
� �.�l��1��1� ��49 �9�(�9 . 9��� i
Specimen Retrievai,�Sofl Denslty 7'ost wftll NuotottP Onugg _ ; ;�
. �:�1�71����. : ���B:t �:����,: ; ������ : :�,1
Concrete Inspection and Preparallon oITOHf SpOUlfi1B118 � _
Generate Reporfs • . ' .
9�I�Ql�t��� ���9 ���� .,.:��f� �
- _;3
Specimen Retrieval -• ; - ° ;
, __ -
�4��9��69� . .,, ' ����� . ;���� �; ��� 'x_
SoilDensify Test with NucleorCauao;CA11pl�Jlti 111l1pUp�1011 H11d Iaf�1�1�11'�1N�If�1I��'��r��1��1��11�1IR ;
Soil Density Test wifh Nuclear Gaupo;Spaolmon Rafr�evAl �-
. ����oi�o�� ����� . ��,� _�_ � ����
__. —
KCI ConsWction Involca nunibar o��A IfiV��_���1� � °
� `�% F����f5r ”
� ^
l L:�.l.�L L L L D�L-r� co�c���r�, e�c.
� Dellnquenl accounts are sub)ect lo a linance c harge o l 1�l2%per
` . . � � ' .� moMh(78/)Annual Percenta9e Rate),or mazlmum rete allowed 6y
� law,plus any associaled Iegal or colleclion lees incurretl lo collecl
QUALITY READY NIIX CONCRETE relerence account.
DELTA CONCRETE DUE DATE:12/25/2012
P.O. BOX 1838
CAPE GIRARDEAU, MO 63702-1838 DATE: 11/15/2012 PAGE 1
LIST OF TICKETS BY ORDER NLTMSER: 2110
CUSTOMER ID: 10139592 INVOICE # 21011297
KCI CONSTRUCTION COMPANY SHIP TO : WASTE WATER
10315 LAKE BLUFF DRIVE PO # .
ST. LOUIS MOr 63123 JOB # .
PROJECT :
LOT $� . USAGE
TICKET TICKET PLANT PRODUCT QTY/UOM PRICE EXTENDED
DATE CODE DESCRIPTION PRICE
11/15/12 21025170 CAPE GIR.ARDEA 6 SACK 25`s FLY ASH 8.00Cy 51.50 412.00
11/15/12 21025170 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/15/12 21025173 CAPE GIRARDEA 6 SACK 25a FLY ASH 8.00cy 51.50 412.00
11/15/12 21025173 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00Cy 18.00 144.00
11/15/12 21025175 CAPE GIRARDEA 6 SACK 25o FLY ASH 9.00Cy 51.50 463.50
11/15/12 21025175 CAPE GIRARDEA DELIVERY CAPE ZONE 9.00cy 18.00 162.00
11/15/12 21025177 CAPE GIRARDEA 6 SACK 25% FLY ASH 9.00cy 51.50 463.50
11/15/12 21025177 CAPE GIRARDEA DELIVERY CAPE ZONE 9.00cy 18.00 162.00
11/15/12 21025179 CAPE GIRARDEA 6 SACK 2�o FLY ASH 9.00cy 51.50 463.50
11/15/12 21�25179 CAPE GIRARDEA DELIVERY CAPE ZONE 9.00Cy 18.00 162.00
11(15/12 21025181 CAPE GIRARDEA 6 SACK 25a FLY ASH 9.00cy 51.50 463.50
11/15/12 21025181" CAPE GIRARDEA DELIVERY _CAPE ZONE 9.00cy 18.00 162.00
11/15/12 21025183 CAPE GIRARDEA 6 SACK 2'5o FLY ASH B.00cy 51.50 412.00
11/15/12 21025183 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
TOTAL TP;�{ABLE NON-TAXABLE SALES INVOICE
YARDS SALES SALES . SUB-TOTAL TAX TOTAL
60.00 0.00 4,170.00 4,170.00 0.00 4,170.00
TITLE TO MATERIAL PASSES TO PURCHASER AT PI,ANT
n*�-�'�'�^-,�-^r"-�-!n f f;,-,,, mpl.ci�ce� - '
Delta Companies,Inc.is an Equal Opportunity,M/F,Affirmative Action Employer.
IT IS THE EXPRESS INTEN'C OF THE PARTIES TO TIiIS SALE THAT llELIVERY SEE REVERSE SIDE
CI-FhRCES CONSTITUTE SEPARATE SERVICE APART FROM THB SAI.E. FnR NnTI�:F Tn nWNFR
_ _ . /"'� . '"'�
■ KCI Construction Co. X T R� VI10 R K 0 R D E R
10315 Lake Bluff Dr. �
St. Louis, Missouri 63123
s (314) 894-8888 �0 2 611
�-, Fax No. (314} 894-7418
�
PROJECT NAME: G.4-re (,vlr� 1 l PROJECT #: ���� DATE: ��� 9 r��
WORK PERFORMED FOR: �)'��a�S DESCRIPTION OF WORK: ��U� �IO�����
�1 �� v i� ��� s!�� P�� �v c o-�G
LABOR
HOURS UNIT COST AMOUNT
��-i � ��e � r �.n�. 3
1 �e t�f I D
-- r Q -
, - � r+� �f�� (�L d �f�r
' __ p �.�� a.. � � rP*�i�r- I ` - ..:
SUPERVISION: Py ,��,y�� .3 �
SUBTOTAL LABOR
MATERIAL & EQUIPMENT `. ' : .�:-
�-�� 5 ��o-w�- �. ' ��0 Y�5 --
; .
KCI Construction Company COMPANY: SUBTOTAL MAT & EQUIP
� � �'� J ac�s TOTAL:
� gy; APP VED: OVERHEAD & PROFIT:
J� f''�-���'�-
. GRAND TOTAL:
i
_ �..� ..-.
- ��ti`i`��� ��,L ���.-r� co�vc�E-r�, i�c.
Delinquenl accounts are subJect lo a tinance charge ol 1�/2%per
i� , � ... . .. � monlh(18%)Annual Percenlage Rale),or maximum rate allowed by
� - " " " � " �aw,plus any associated legal or collectlon tees inwrred to collecf
QU,4LTTY READY�CONCRE'TE relerence account.
DELTA CONCRETE DIIE DATE:12/25/2012
P.O. BOX 1838
CAPE GIRARDEAU, MO 63702-1838 DATE: 11/19/2012 PAGE 1
LIST OF TICKETS BY ORDER NUMB�ER: 2105
CUSTOMER ID: 10139592 INVOICE # 21011404
KCT CONSTRUCTION COMPANY SHIP TO : NEW WWTP
10315 LAKE BLUFF DRIVE PD # •
ST. LOUIS MO 63123 JOB # -
PROJECT : CITY OF CAPE GIRARDEAU WAS't'E WATE
LOT # . USAGE .
TICKET TICKET PLANT PRODUCT QTY/IIOM PRICE EXTENDED
UATE CO�r. DESCR�P^tION PRl"(:E
11/19/12 21025234� CAPE GIRARDEA FLOWABLE FILL 8.00cy 33.75 270_00
il/19/12 21025234 CAPE GIRARDEA DELIVERY CAPE ZONE B.00cy 18.00 144.00
11/19/12 21025235' CAPE GIRARDEA FLOWABLE FILL 8.00Cy 33.75 270.00
11/19/12 21025235 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025236� CAPE GIRARDEA FLOWABLE FILL 8.�Ocy 33.75 270.00
11/19/12 21025236 CAPE GIRAFLDEA DELIVERY CAPE ZONE 8.UOCy 18.00 144.00
21/19/12 21025237� CAPE GIRARDEA FLOWABLE FILL 8.00cy 33.75 270.00
11/19/12 21025237 CAPE GIRARDEA DELIVERY CAPE ZONE 8.a0cy 18.00 144.00
11/19/12 21025238✓ CAPE GIRARDEA FLOWABLE FILL 8.O�cy 33.75 270.00
11/19/12 21025238 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00Cy 18.00 144.00
11/19/12 21025241✓ CAPE GIRARDE�: FLOWABLE FILL B.0'?cy 33.75 270.00
11/19/12 21025241 ' CAPE GIRARDEA DELIVERY CAPE ZONE B.00cy 18.00 144.00
11/19/12 21025244� CAPE GIRAFtDEA FLOWASLE FILL B.00Cy 33.75 270.00
11/19/12 21025244 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025245y CAPE GIRAEtDEA FLOWABLE FILL B.00`Cy 33.75 270.00
11/19/12 21025245 CAPE GIRARDEA DELIVERY CAPE ZONE B.OQ�Cy 18.00 144.00
11/19/12 21025251� CAPE GIRARDEA FLOWABLE FILL 8.00�cy 33.75 270.00
11/19/12 21025251 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00�y 18.00 144.00
11/19/12 21025252✓ CAPE GIRARDEA FLOWABLE FILL S.00Cy 33.75 270.00
11/19�12 21025252 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00Cx 18.00 144.00
11/19/12 21025254✓ CAPE GIRARDEA FLOWABLE FILL 8.00Cy 33.75 270.00
11/19/12 21025254 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00�X 18.00 144.00
11/19/12 21025255✓ CAPE GIRARDEA FLOWABLE FILL 8.00Cy 33.75 270.00
11/19/12 21025255 CAPE GIRARDEA DELIVERY CAPE ZONE 8.ODCy 18.,00 144.00
11/19/12 21025256� CAPE GIRARDEA FLOWABLE FILL 8.00�y 33.75 270.00
11/19/.12 21025256 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00�y 18.00 144.00
11/19/12 21025258� CAPE GIRARDEA FLOWABLE FILL 8.00'�y
33.75 270.00
11/19/12 21025258 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00�•y 18.00 144.00
***CONTINUED ON NEXT PAGE***
��
;l
�,
r
�
Delta Companies,Inc.is an Equal Opportunity,M/F',Afiirmative Action Employer.
IT IS THE EXPRESS INTENT OF THE PARTIES TO TH1S SAI,L THAT DELIVERY FOR NOTICET O OWNER
CHARGES CONSTITUTE SEPARATE SERVICE APART rROM THE SALE.
..� .-.
� e / � � DELT'�► COIVCREl'E, INC.
[ l�:`i., �. L C�: L
.
Delinquenl accounts are subjecl fo a linance charge of 1�/z%per
_ month(18%)Annual Percentage Rale),a mazlmum rate allowed by
� ` � law,plus any associated legal or collec�lon tees incurred ro collecf
QjJAI,TTY READX A�CONCRETE reterence acwun�.
DELTA CONCRETE DUE DATE:12/25/2012
P.O. BOX 1838
CAPE GIRARDEAU, MO 63702-183B DATE: 11/19/2012 PAGE 2
LIST OF TICKETS BY ORDER NIIMBER: 2105
INVOICE # 21011404
CUSTOMER ID: 10139592
KCI CONSTRUCTION COMPANY SHIP TO : NEW WWTP
10315 LAKE BLUFF DRIVE PO # •
ST. LOUIS MO 63123 JOB # •
PROJECT : CITY OF CAPE GIRARDEAU WASTE WATE
LOT # - USAGE .
TICKET TICKET PLANT PRODUCT QTY�UOM PRICE EXTENDED
DA^lE CODE Dr�SCRIPTION PRICE
11/19/12 21025259� CAPE GIRARDEA FLOWABLE FILL 8.00cy 33.75 270.00
11/19/12. 21025259 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025261r CAPE GIRARDEA FLOWABLE FILL B.00cy 33.75 270.00
11/19/12 21025261 CAPE GIRARDEA DELIVERY CAPE ZONE B.00cy 18.00 144.00
11/19/12 2102526� CAPE GIRARDEA FLOWABLE FILL S.00Cy 33 .75 270.00
11/19/12 21025262 'CAPE GIRARDEA DELl'VERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025266� CAPE GIR.ARDEA FLOWABLE FILL 8.00cy 33.75 270.00
11/19/12 21025266 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025267� CAPE GIRARDEA FLODL�,BLE FILL 8.00Cy 33.75 270.00
11/19/12 21025267 CAPE GIRARDEA DELIVERY CAPE ZONE B.00cy 18.00 144.00
11/19/12 21025270� CAPE GIRARDEA FLOWABLE FILL 8.00Cy 33.75 270.00
11/19/12 21025270' CAPE GIR.ARDEA DELIVERY CAPE ZONE 8.00Cy 18.00 144.00
11/19/12 21025271� CAPE GIR.ARDEA FLOWABLE FILL B.00cy 33.75 270.00
11/19/12 21025271 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00Cy 18.00 144.00
11/19/12 21025272 CAPE GIRARDEA FLOWABLE FILL B.00Cy 33.75 270.00
11/19/12 21025272 CAPE GIRARDEA DELI'J�RY CAPE ZONE 8.00Cy 18.00 144.00
11�19/12 21025274 CAPE GIRARDEA FLOWt�BLE FILL 8.00Cy 18.00 144.00
11/19/12 21025274 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00Cy
11/19/12 21025276 CAPE GIRARDEA FLOWABLE FILL 8.00Cy 33.75 270.00
11/19/12 21025276 CAPE GIRARDEA DELIVERY: CAPE ZONE S.00Cy 18.00 144.00
11/19/12 21025278� CAPE GIRARDEA FLOWA�LE FILL 8.OQC]� 33.75 270.00
11/19/12 21025278 CAPE GIRARDEA DELIV�RY CAPE ZONE B.00by 18.00 144.00
11/19/12 21025280� CAPE GIRARDEA FLOWABLE FILL 8.00cy 33.75 270.00
' 11/19/12 21025280 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
11/19/12 21025281Y CAPE GIRARDEA FLOWABLE FILL 8.00cy 33.75 270.00
11/19/12 21025281 CAPE GIRARDEA DELIVERY CAPE ZONE B.00cy 16.00 144.00
11/19/12 21025282 r CAPE GIRARDEA FLOWABLE FZLL 8.00Cy 33.75 270.00
11/19�12 21025262 CAPE GIRARDEA DELIVERY CAPE ZONE 8.00cy 18.00 144.00
***CONTINUED ON NEXT PAGE***
Delta Companies,Inc.is an Equal Opportunity;NIIF,Affirmative Action Employer. SEE REVERSE SIDE
IT IS THE EXPRESS 1NTENT OF THL PARTIES TO THIS SALE THAT llELIVERY FOR NOTICE TO OWNER
CHARGES CONSTITUTE SEPARATE SERVICE APART FROM THE SALE.
-.�. .,..
L l�`���C� L C�L ���.-r� co�c��-r�, o�vc.
Delinquent accounls are subJect lo e finance charge of 1V2%per
�� ` � �� ' ' ' � � month(18/)Annual Perceniage Rate),or mazimum rafe allowed by
law,.plus any associated legal or colleclion lees incurred to collect
QUALITY READY NIDC CONCRETE reference accounl.
/
DELTA CONCRETE DUE DATE:12/25/2012
P.O. BOX 1838
CAPE GIRARDEAU, MO 63702-1838 DATE: 11/19/2012 PAGE 3
LIST OF TICKETS BY ORDER NUMBER: 2105
CUSTOMER ID: 10139592 INVOICE # 21011404
KCI CONSTRUCTION COMPANY SHIP TO : NEW WWTP
10315 LAKE BLUFF DRIVE PO # . '
5T. LOUIS MO 63123 JOB # .
PROJECT : CITY OF CAPE GIRARDEAU WASTE WATE
LOT �$ - USAGE .
TICKET TICKET PLANT PRODUCT QTY/UOM PRICE EXTENDED
DATE CODE DESCRIPTION PRICE
11/19/12 24002678'� PORTABLE PLAN FLOWABLE FILL B.00cy 33.75 270.00
11/19/12 24002678 PORTABLE PLAN DELIVERY P�RTABLE P S.00cy 7.8.00 144.00
11/19/12 24002681f PORTABLE PLAN FLOWABLE FILL 8.00cy 33.75 270.00
11�19/12 24002681 PORTABLE PLAN DELIVERY PORTABLE P B.00Cy 18.00 144.00
11/19/12 25020986�' SIKESTON FLOWABI;E FILL S.00Cy 33.75 270.00
11/19/12 25020986 SIKESTON DELIVERY SIKESTON Z B.00cy 18.00 144.00
11/19/12 25020987� SIKESTON FLOWABLE FILL; B.00Cy 33.75 270.00
11/19/12 25020987� SIKESTON DELIVERY SIKESTON Z B.00cy 18.00 144.00
TOTAI, TAXABLE NON-�rAXABLE SALES INVOICE
YARDS SALES SP.:I,ES SUB-TOTAL TAX TOTAL
256.00 0.00 13,248.00 13,248.00 0.00 13,248.00
TITLE TO MATERIAL PASSES TO PURCHASER P_T PLANT
An F.F.Q.�M�F f Aff i rmat i irP A�+t i nn F.m,�l r•,�;•ar
Delta Companies,Inc.is an Equal Opportunity,M/F,Affirmative Action Ernployer.
IT IS THE EXPRESS INTENT OF THE PARTI6S TO THIS SALE THAT DELIVERY SEE REVERSE SIDE
CHARGES CONSTITUTE SEPARATE SERVICE APART FROM TNE SALE. �OR NOTICE TO OWNER
.-. ...
�� KCI Constructivn Ga. ,
103151..akeBiuffDr. ��� �Q � � � � a � D � �
St. Louls, Missouri �5123
�� (st�}�sa�s$ss � Nn 261 a �
� Fax Na. (314) 694-7418 � . ,
Pl�OJECT i�AlUIE: C'�� �.lGr1�P PR4J�CT#: I�:��� DATE: ��''�7 j�
'W'ORK RERF�RMED FI�R: ��-���s DESCRIPT101d OF�WO�K: ��`�'� �� �
1.�#R4R
� HbURS UNfT C�S'C kMOUNT
SUPERV'tSION:
NIATERIAL & EQUIPRAENT s�gTOTAL #.ABOR
� ~ �� r3 �' . �, Q � -
i;c�e i n ' �
�
o �t�.... �o
� � '�'C �bo� ---- �. R� �1ac
� i
. KCI Constructlon Company CpNIpAiVYt $UBTOTAL. MA7 & EQU��'
�
� ��t���. � � TOT'AL: '
BY: AP 4VED: � - 01f��H�Ab & PR0�1T
�� GRAND TOTAL: �
� �
' `,. " ' - . , , . . �
" ' NU WAY COMCRETE FORMS�S.E.,L�C � � �+� �
��� �� 4788 QLD CAPE ROAQ�AST � , a7/1LES OR!>�'R
� JACKSON,MISSQUk!69755-3618 .
� kYe�lr�hl'Rg'/ortl��C,am�crorr ' cs�s�zoa-o,00 . . . , . , .
. (573)20+t-0471(FAXJ .
: , , ' {88p)586-4@64(TOLL FREE} • , : , ' ' '
' Customer ' 41A0 � �a����4F�rojec�ei T�MP� . Order. � 700065 R#D2
KCf CONS7RUCTION COMPANY � C1TY 4F CAPE�GI�ARQEAU � � '
103'15 LAKE BL(JFF bRIV��• WASTE 1NATER ALANT • � •
S7. LOtJIS, MO 63923 '• . . , , . , � � . � Psge: 1 ' .
' � � • • . . ' Date: 12l27/12
,� ,, _ � .
.. 'WADE ROB$l�ROBERTS � OJACK 6.975% -
.�� �, , 70006� - #D2 �
� _ Y, �
�2/27/12 ^� 7Q2,44 � , - RDDlPP � • �
, . CPU
. '` :�
KLEi 8�317 . KLelr�u6 REBaR t�ICKEY � � . 1 E , �Rcvd)� RR 355.50o Ea '�55.50
• B�NDS#6 REBi4R 40"HANDL� �
BUIL 13ZOB0300D-5D #e X 30' DOMESTfC REBAR GR80 ` 8 J Yaa No 44,U00 EA 284,OQ
� , ' 'METRIC#25-GR.�t20) • . (�� �� • �
4.
BUIL1S2060340D•60 #S.X3D' DOMESTIC REBqRGR60 • 4 E � /� Yes No 22.530 Eq ., 9D..72
� • (�VtETRIC#99-GR.420) � . �.( i ��J
I pIAM 147901 i 5 BUCKLE ftUBBER 800T 5Z 11 , 3, E„ (ficvc!] RR 21.950 EA ' � 65.85 '
+ DIAM 1�i79012 �BUCKLE RUBBER BOb7 SZ t2 • 3 , eA � [Rcvd� RR . 21,950 f11 � 65.85
I . : . , .
�� � � . . � ' .' . � , ' .
�� , Gri�c,� ��� �� . �� . � �
. . � . ;
� �� � . . �� � � � � � : . � . .� -
� .� � � . �
' _ Nu Wa ou�concretetool.en auppy h�aQ u� crs, � .
p, � � -
:tl T - fJ.
i i �! .
���� sa�.32 44.r3 � ,00 � ' .
� � . , . . ..00 . 686:05 ' � 686.05'
RBTURPt POLfC ' . � � .. ' • '
•Refunda 8�eXcrqtlpb4 musf 6e made W��In 30 daYf, � � � �
•Refundg muat bs aocompanied by 6eles teoaiDt � ' � • ' . � , ("��,��,,,�y�,�Y \,}�,;�^�,��,
�Restocktng aqd/or handlinp eherge.may appiy, , ' ' • ' �� �v r
� • . . . ' . . 12/27/12 1Q:12 M-RDR� . �
^ ��,� � �,��''���� �
-------�
KCI Construction Company
' S'b Lal« lu i rive
S4.Louis,MO 63123
(314)894-8888
Fa:c#(314)894-7418
www.kciconsPruction.com
lyov��a��� fl�l,20Il2
�a��m�
A�¢r�: 1�1�s.�.�.l�/I��h�i,P.�.
5�1 l�s��¢fii�a�a���uvvay
��.�,���i�,1Mi� �3 Y02
��: �ob#�i200�
�a��Giraagd�au�'Y��t�wager T'reatatqent�'a�ility
�h�r�g�I'r�po��b# 03
Deas idlr.l�dla4hai,
�e'e propose to fumish the nece�sary labor,material,tool�and�qui�me�t to Perform exploratory drilling at
�iosolids Proces�ing�uilding,ta determine actual top of rock elevations and aid Jacobs in evaluation of
rem�di�l a�tion for the abar�doned�e�Vaai Pile,for the in�r�asec�lurnp sum o�f ��ear-'I'ho�a�antl Sa:�-
�I�nslr�sl'Tvs�o I➢ol�ars(��3,602000),
Pleas�z�ot�tt�e follodving clarification5 a�5o�iated with thi5 p�-ica�g:
�Ie have a�a�heei a copy af o�ar��ange propo5al e�eimate�usiun�ary a�d backbap for your redi�dv.
If thi5 propo��l ra���t��ith your�pproval,please sign the a4ta��n�d copy in the�p�cs provided ancl ret�arra
it foa�oa�r r�e����. �y 5ig�ang t�e�chang�propa��l,you ar�autho�izia��u�to pro���d vvith th�dv�rk and
ag���ir��go f�a�vb�rs3 th�a��s�op�ia���t�ang�el�ca���nt5 a�d payrnemt of t$�e above amoun?vyithin 60 day5
of dvosk per�fo���a��.
If yo�a h�v���v�a��stiorrs os�ognzn�nt�,pl�ase do noi h��itaE�t�coni�a�,d u�.
5i�c�rely, APProved
,6.=..� � r� _
�,{� �.� �f�Y' �Y� �fl�'�il(,11�,�T� �
�'horna�C.�Tu�4er
Proj���ib��a��g�� I�at�: �
�tt�6hm�nt�
� �
N
>
z
�
¢ � �
o � °
�.
b
o � �
a W o
cWa ¢ �
� � �
x � s.
U W
u�
0
U
N
�
�'
�
� U
4-. C
O �
O
— w0
� �
7 Q
� �
> —�
� O
G � 3
y r O
� V
N
� w �
�
� F '9 �
�o � a�i c
� � U t
� �
L
o � U .,3j
ro
> 3 n.
� �
� o
U � �
O � �
w � O
O ,� Q
O � i O
7 � O.
� � T. CL� N .^.D
� F �
� U F O ^ � �
�� O O O O O O O O O O O O O O O O [� v1 V N cVy y
O O O [x; O O O O O O O O O O O O O V V � O V
F T O O O � O O O O O O O O O O O V' 7 N O �i � � G L
y � N N d' N V V' V' � U �
ro cC F
o z � _ � � � 3 � � �
0
� � O �--� pp Q V (V
00 u � Q +
G O Q
'd a. a � z � � � F
� o 0 0 0 o Q 'D � _
�, �, 5 ,� a
cn �, � � �
c =
'� ?? `o � �
a� a\ 0 3 � �
� V �J Ll � V Qy^ �� M
'C7 �
O �` �
O o
CYY °�' � F" F
0
a\ �
d0 � N p V `Q U '"7
'.� .,] � O y `�-' Q -nW-
.a O O. Hi N Qa � Ca
a � '� R' V] -� V�
u 0 G in c��O .-. 3t � id � � p, L j Q �-' Q tA
�y Z �. 'd �G p 3L 3k �y N � '�-' C � � Q v�i Q p
° ' o O 3t u 7 �n � C a a �a c o � � y ¢ �
� � o, ?? ... .. � m � _ �, a, � � � �' � o a a. �a
m o � �n, � ca :`a c �i ro a°i a�i � � � � � �, � c°�i °' �a � �v N �
� � � a a o N F_ Uc' � �y � � o y o ao, v' � o ❑ L z �.
� y y � rUn � .°o � r.� �, �°'. " " .°' .°' � a� 9 � :a � a � c c Q °' a U
o � �
- ._1 � � M '. [.0 ca cC �� p cd � ro O"' O' VI > fn O 4J Cn � N O '� �
� ��� o. C] o C'a ..� •a O w C� cn � � �w m O O [-� w �C'7 m U � A- c
F � �
s
4�� zt � U W
N v F a
�,� � ..
r, o o �°
0
`o a cv � W o _,
0
�; - a� -�' �u it c � q �n � r^
� '� '"� � o ai o .� O O "' a'
� � �
. ,, a
� �
0 0 0 0 0 0 0 0 0 � o 0 0 � o 0 0 0 0 0 0 0
a
F � I
Q O
F, U
V.] �
¢ � o 0 0 0 0 0 0 0 0 0 0 0 0
� a � C7
F � C �
� �
W �, c�. ca. i
..a O 6 .c
� F- `y 3
� O
W �--� F �
Q Z
�Z W � �
¢ z
x �
� �
0 0 0 0 0 0 0 0 � o 0 0 � o 0 0 �
� W
¢ x
,s�j C
� F
¢ L
� 3
� F
� � ,•;
z
c
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o F'
Q
U
x w
m `�
.�a �
a
�
�
3
F u_'
o Z F O
0
N � 4 G
Gx
� Q
O �
Ls. �
O F
x �
M
O
� F" �, � �, � �, y � T �, �, � � a a � a y
0. � .0 � .L .L .L .L t 'q t L � .� � ..�. L � .L
U
T y
'G �c
� " T
U
Q � 3 �
F � s � R
y � C
'C x � ? O O 3 ia
C/] CO p V G �> C.L Y O y � f�
� � c w � � � ❑ � U � y
C7 � 'd � .� 'ro �3 A � � 04
.�,�D U C 7 �+ �7 3 G � � +�.� fl. '� C � O 'CJ
❑
o �0 3 y c� � �y R O E v a� � '
`n c � a � � y o ,� m �a
� � cx�7 .Ca�. Q u U � � c e, °' h c a. � a°�i 9° a°'i .� ,.�'.1 � '� >
� c °� rn w � .0 7 0 �'`' � � e �n Q c a� iO
u i� .0 � `/� 7 c o. a i� c� 4 .. q a ca y :.il c F. ca > o
N N � � 27 O � 'n T ': N 0 R.
Q n`. � v� � ii T " °' °' � � ° �o °� �'o ' A L° 7 �: � � :' o 0
.� U F F ct L c- ¢ U � C ?� � U U F- u- '� a
� V . .
� ,,�.
C ,.��N � W� O O O O N O O O O O O O O O N M O O O �n O
N t�l �O �D C9 r�l N �'rl Q� O � O �D l� l� CO ^ l� d' �
" O O O O O O N V V d' '/1 �O �O �O �O �O �O [� r �0 O� ^' (V �'1
W { � O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V *.n'. �0.
� �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �
�
a F � �
F �
O �
F U
N 0 O
�-' YO pp co
� � VN, R
a c
0
� �
a °
� �' -
�. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
F � C�
W � O
-� a �
O O' �
c. w 3
O
�
�
W � F
� � �
z ]
a
U
J � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q W
� ¢
Ltl F,
F �
� �3
F-
o � �
�
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
w'
O
Co
a
F �
� �
_
0
a o
U �
w F.
O �a
� a
a
�
d
�
�
z � o
o � �
� � o
a � �,
v �
� b N
W� bo, O
A �
,�, c
a -
e
� a
> � .�.1
w a
�`� _� � a o
� � � o
� _ � o o �
; �� `�R U U cv
� �•*
Explosive Contractors, Inc.
131 Industrial Park Dr., Ste. 3
Hollister,MO 65672
(41?)337-760Q * fax (417)339-7499
Bill To �j���t'���
KCI Construction Company, Inc Ul'�� M
. 10315 Lalce Bluff Dr
St Louis, MO 63123
Date Invoice #
10/30/2012 9438
P.O. No. Terms Praject
I2002 30 days Cape Gixaxdeau waste...
Quantity Description � Rate Amount
8 hours of test drilling; 30/29/12 �' 200.00 1,600.Q0
3.4 houra; 10/30/12 200.00 680.00
mobilization 2,000.00 2,000.00
Z'Ot�,l $4,280.00
� �
�m� ������
����uo Maihai, F�K <pK.Maihai@jacobs.com>
g���; Mond�y, Ociober 29, 2012 3:16 PM
'��e Husi�r,I om
��e Ken Recar; Rein�urt,John; Si�in,,�nihony; Slo�y, Micha�l; Clark, Keit�
������3e RE: Ciiy oi Cap�Girardeau, M� - Wasiew�i�r I r�aimeni F�ciliiy / E>cOloraiory Drilliny
Tom.
As i notezi below,please perfiorm rock surface exp9or�t�ry drillings at the following addi#ional]ocations:
East af 2116
�'�Jest n�2�21
Betwveer�2�83&2�84
Betw�een 2209&2210
'B.etwe�n 2324&2337
Between 22�1&z252
Be�tvveen 2252&226�
Between 21;81&2282
�etweQn 2282&2297
Between 2326&2339
��tw�een 2339�+.234fl
8�tvweer�2356&�357
Between 2357&2358
Betrveen 2374&237�
�driJl�ngs near 17�$,177D, 18a3��.$0��nort�west carr�er ofi WAS�anic�)
Than k�,
PK Mathai, P.E. a Jacobs J �'��--�3��4�72 � 39�'�-ti35-53�'i ��;t J pk.mathai(a�iacobs.com
�r��ae M�thau, PK
���e Monday, �3ctober 29, 2012 1:53 PN9
��e �i�ark, 9(ei�h
��e �I���, I�s��a�99; F�us�er,Tor�; '��n@!kciconstru�tio�u.cor�a°
�a�����to ��: Ce�o��ape�i�arde�aa, f��- �tl�s'�eewat���r���r�aeni Facili�// �x�1o��tory Drilli�g
K�rth,
;tr�addision tfl th�1..oe�tions b€low,o�ar�n�a;neer:s vy�nt s�ve.ral mQr�loc�tions ta b�prob�d, i wi11 send an email
d.escribar�g thE a�di�ta:vnal�oe�tlons�n a#�w minute�. �o,do nat d€mobiliz�th��lrillin�ri�,
Thanks,
P'K Mathai,'P.E. J J;acob�1 ���-��������i)31�_33�-���� ;�� j pk.mathaiCa�jacobs.com
lF�mmt�v �B��E�, P��i3h
��to N��red�y, �ctobe�29, 2012 11:0�Af�
��o M�th�i, P�
��o �i�o P�ach��l; �Reinfu�,Jo�ra; F3��tg��, 6Cu�Q; ���a�, ��+t��r��+
������3o RE; City o�f�a��ir�rcle�u, Ni�- �Uast��r�ter�"re�tm�n� �aci(i�r/ E;<plora't�ry �rilling
1
� 1 �
PK,
KCl is proposing to drill a[these locations:
Betwsen 2182 and 2202
2205 & 220b
22�}6 & 2247
224$ & 2z�49
2249 & 225D
zz�o & zzs�
2264 & 228D
2370 & 237�,
2351 & 237�
�hey also propose to clrill or�e in the center of the sguare defi�ne�by�hese four piles 2337,2338, 23��and 23�2.
Keith
F�a�a�ae Mathai, P9�
��a��o Monday, 9ctober 2�, 2012 9:1��i�
`�o: �lark, Keith
��e 51oey, N�ichael; Reinfurt, John; 8et�g��, Kurt; Sfein, Anthony, Elbert, Kevin
S�bje�e RE: Ci'ty of Cape�irardeau, MO - Wastewater Treatment Facility/ Exploratory ��illing
Keit�,
1 ha�l discussed this exploratory drilling with Tom HustQr and agreed�n tt�e r�eed#or it. The cost af this�xplorat�ry
drilling�s abo�t$4,000,which intludes mo.bJdemob and ab�ut$20O1'�1r. � �alked to Tom Fiuster abaut who pays fiar
��, He wasr�'z s,ure. Let zhe work be done,and considering rhe srraall cost ofi it,iet us keep xrack of the T�iYI cos't,and
�rgue aboux who pays fior it later,
Thanks,
RK Mathai, P.�, j Jacobs j �°���3�-ga7� J 31?-33�-�d�3 iax j pk.mathai(c�iacobs.com
Fra�rae Clark, Keith
����e Mond�y, Octobe�2�, 2012 �;20 AM
�'aa MEath�i, PK
��e 5io�y, V�i�h�el, F��in��ar�, John; ��dg�r, I�urt; �tefn, Anttaony; Elb�rt, �C�vi�a
������o City of Cap�S�Ir��c����, f�0 -�ll�s�evvater�re�tr��nt�acili�y/ �x�lo���ory��iliir��
g�,
�drili ri�ha� b��r� deli�✓ered�t�p�r'forr� exploratory dreliang�t ih� Bi��olic�s �uilding r��;st to th��bansl���d
pile�. Exa�tly�ahat h�de er�e��r�ed to d�+h�re?
B 4s�m���h�i PS�a pr�p�5��9 t�bri�g �Paa�irv af�t�r ys��+�e-r�u�il a�o�at th��ku�ns�v��d pil��, b�.��I al��h��rs� th���r��y be�
sa3t�rop�g�l�t�t��P��sd. ��9 n���i a�b�e�r�d��uin����/9 h�r��
C�id yo�a and��r�diss��s��e I�c�tion��f thE eacplor�t�ry hol�g���II? 85 it OUP�i1�glZlti�Pl�Plr�t��Pil3�9f���g�i�PC��'�t�
��r��18�? !�lPa��c�����+�r��t t�g��s�rrr�vut����h"sg:�
�6e�th R. Cl�rk
z
� f �
Jacobs
Project Representative
(314)378-9944-Cell
keith.clark(a�Jacobs.com
NOTICE-This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any
viewing, copying or distribution of, or reliance on this message by u�intended recipients is strictly prohibited. If you have received this
message in error, please notify us immediately by replying to the message and deleting it from your computer.
3
� �
r�P �o. 3
;y KCI Construction Company
"U3'�L�kC lun f�VG
Si.Louis,MO 63123
(31�)8�J11-8888
Fax#(31a)894-7418
www.kciconsPruction.com
�a�a�d��a��,���3
���o��
�ad;�:1��.�.�.1�a4�n��,�'.�.
50 fl IYm�3$a��o�d�yay
��.�,��.�n5,1�� 63102
&�e: do�#12002
�ap�Girar���a��YaSt�wa�t���'a�eatra�e�t Faciiity
�h�aag��ra�osafl# OC �� ��,� �/,�, ��
I�eaa�l�r.lb�athai,
Z3'e propo�e t�fiarnish the necessary labor,material,tool�and equipment to Provid�revi�ions as a re�ult of
cod�compliance review by the City,per R� u�r Prog.to�a1.�L�.3;dated 10/16/12,for th�aaasreased
lur���urn af '�'syeaa3y-5���r�-'Thaa�sa�d E���a3��I���r�s3 F�f3��Fay�D�L9ar���2�,�35.99),
I'l�ase r��t�tt��followgng�lari��ation�a��o�iated with thi�pricing:
�'Ye ha��a�ta�$��d a copy of our chang�propo��l��Eimat�sa��aa�nary a�nd backaap fo�yoaar��vi�w.
Yf thi5 proposal m�et�with your approval,pleas��ign the attach�d copy in the spac�provid�d and reriarag
it fo�o�s r�c�gs��. ��5agni�g thi��han��propos�l,yoea ar�autho�u�iaag u�t�pro�€���ith th�vvork and
�g���i�g t��ma�v�aa�s1 g��a�+�ro��iat�ch�nge daeua��n��ans3 p�g+me�3 of the abod��anount vvi�}�in 60 day�
of wa��p�r�'o�rr�aa���.
I.�'y��a ha��a�;�qu��ti�n5����r�m��i�,pleaas��n r�:�t he�it�4�4��on?��t u5.
�iarc�rely, �PProved
� ���,�� ��: .� ��� .
��o���c.��fl��� � �
�roje�t l�t��aa��r �➢a2�: /� 7 �
��
�ttachrn�nt�
� �
M
C
�
�
� �
o � Q
Q �
a W
V Q
Q �
x � ' �
c� �
U
�F
O
N
4
O
7+ 4.
O
V T
w b
0
F � c
N tV X y
•--� �
� F, � 3
� �
o � U �
ia tL
� y O
� C
'p yN w'
M 7 cd
� 7 O
� N Q
c3 � :) G.i
OV � W � b�0
6. p, F F" � L
ctl O � y
wU F � o 0 0 0 0 00 00 0 0 � o � o o c�o rn o w o v'^i ci � �='
� O O vt W ^ � � ,_,,, b � C '.�..'
y O � O O O O W' � W' � � � � � N O �
O O M V f� l�
� � � F.. �M M M O M N � N � � N O M N N N N y U
m Vl Co Co N �O N � � A
L� � � � h1 ¢ p '�
n.
U � GU � v N
� o, O U c v, fl *y
y a`. a`. C 2 � � `� �
� o 0 0 0 o q o�n � a
� N v� �n y - C v
T ?? O � 'Yi
s' 0 3
� � � � � � F �I N
� �
U �
� n Q.
^ o �
�. �
F O Q' r F-'
O o � o (a\ O V ]
\J
b � O v�i � � Q
a z w
° �.. � � 9 �
`•• o �' `� o• vai ° in
N v. N
� c 'v�i cp_a � �t 3t .� � .c�. c'' W � N Q �..
� � � p 'O LJ p # � itl N � �"' C � � Q C � �
0 _ � O 3t �i P 7 0 � � Q. �. c3 O O � .O o � � � W
y cJ a1 � p 'V
� � N E"' N N � � � � �n-• N QGJ rd c�'J ..�. G � � „�., V � ^ W W � �
m g � � a a o � �'' y m � E o � o ° � c g ` :° Uc' C7 � ° Q
� y N a� y ai � >, ' 'C o. a � �" o y, � 'a � .°� a. x
� � .°o � � c c w � � � � � � 7 �23 o a°�i cn N a°i o x ° c°�u �
r � rL o CS •-�7 .�.1 O u: U cn � � W W `'" O v' O F 6t. .c C7 c0 � r� ❑
� � � a
c � W
._.._ � a y� F'
� � H �
�� N
�
M O O �
O .O. �N � F � 0 ^ O
a s ,� �
� � aNi o .t°c O O
� �
o � � � o 0 0 0 0 0 0 � � � o 0 0 � a o 0 0
�,
a
� �
o °
F V
W �
Q � o 0 0 0 0 0 0 'o 0 0 0 0 0
� y � C7
F � O il I �
W � a ci
a O a, s I
� F, w 3 � i
o � -- --
O O
-� F �
z � ] a
¢ z
x w
c� �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Q t'1
W ¢
F� �
¢ s
� 3
� F
� � v:
z
0
o �, �, � a o 0 0 0 0 0 � o 0 0 0 ¢
o � � M v
a w
Q ...1
07 ¢
Q �
.] p�
J
x
o �., �n � 3
o t� h
N F W r [:.
� � � O
o �
N C
O �
Cr. �
� �
� ]
�
O
aF v� vi vi vi v� �n �n �n Ln rn vi 4 S1 �i L1. v.
V � ..c .� .0 .i' � .� s �v s .� .0 .t 'C G ,.c C s`
T N
.� � ,
z � 3 `°
b
o � „ �
H � • �
� �
� ro x 7 y � 3 �
S�.r �, � U
� C w � �[ N G � o V � r
(� �a 'O � V] �tl � 3 <0 pp � w
C�p � W G 7 �' 7 � y C � C � L]. s G O '9
G y O �p �j `n .r� N �^ �0 [� Cy V � y
'� R n��n c c`�i .a�. .°�. F Z, -c°� v � � 7 y � y £ v� u E >
'-' � � •C � � � � o W � � v �a 7 Q a. � c°qa A W c ¢ � > o
�_ _ a� a, a� � �o o � a a � � :o A � E A � O
� 'o 'o ,� 'o a� T � y y o ro ° �o °� � � c�`a `° � a v F � o 0
p - r.� rn a` ii � U E- F r� m � Q U .., O � La C7 U F r.t. 2 a
�
� M
�C �. O F W O O O O N O O O O O O O O O N Nt O O O �n O
� ,. N .� N M �O �O CO t�1 N t�t O� O ^ O �O r r Co .- h V Vt
O p o 0 0 0 0 o cv v v v v� � � � �o �o �o c� r co a, -� c�i �-i
Z, . � U U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6'a rv G.
C7 '"^�
� ► 1
o �o 0 0 0 0 o d- co o �n co o v m o 0 0 0 0 o r w o o � o o co 0 o c o o M
o •o v rn v l� v �n c� — co a� v �
a � N ^ M � �"i ^ N �/1 V N l� l�
¢ 'r. v� O N t+l � N
O � �
�
Z
N l� C.� � W �O
�, O .--. Co Q� �'i ^
�n C N l� O
Q � O N M '�.. �O
C" C VJ
�
� ° U
¢ � I i O
� �-. o 0 0 0� o 0 0 0 0 0 0 0 0 0 0 0 0� o 0 0 0 0' o 0 0 0 0 0 0. o 0 0 0 0 0 0
F. � �j � o�. rn rn N
L•7
� � O
,� � ci
¢ �
� W 3
� o 0 0
� � � �
� F F
� z �
z �
¢
x
�
a � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �
Q W ^. N ^
� x � �
`-'� F
Q 'S
� 3
0 0 0
0
N N
O F (-+ �
� r�- �
9
O
O O O O O O O 7 � O �/1 Co O V Go O O O O O O O O O O O O O O O O O O O O l�
�O �n O� �n f� �n O
� N M V N
�
�
Q
�-.7
� � �1 C!J O� �
r �n r v, l� �n
F W
� �
0
a o 0 0 0 0 0 0 0 0 0 0 0 0 0
p, o 0 0 0 0 0 0 0 0 0 0 0 0 0
U � � vi �o -
0 �
� J � x � x � x .�] .�-1 .] .�-1 .�.7 .�-1 .�.7
�
� �
.� w O
� 4" O '�y "' v� �
O �+ G O ,�
�y � T7 ia O � O 'O U � � �
F �u o � v � c� s s
o F � c rx � � �° G0 �o .�A. �° �
Oa 'ti ro W :o N � X L �v -o ° � � c
� 3 �° � A � 'e t °�y .UR.. m s � � o _° �o A vFi
a' � ° �cS � d o o .°c s o ti N '� � o m v o 5 o O
� � � � v N �j ,� o� �n � .L o a �o y n[:.., A � o G o O
v`'�i � � � u co �i on �+ u a ¢ � °'a C ° -o n. E a. �
� ,:° x f° ;, c x v ° c n' :° � �o
W � '� '� s 's A � c. ' o � v � � a�
Q G -o v � ❑ :° a`°i :' acOi a� 1O � = o fl. G. � ^ � .y nn
� y c
E � � A g c c" c c" Y' `� o � 3 °- c a. ,.� O C U �
� � � � � o ,� � .� y t
p � � � 2 4. �' on = x co a � '9 ia v� � � ° 'D o, c.b °' 3 °' �
� `o � � o � o � y ° °� � � � .� �n
A y � A o � 3 � cv 3 N c� 3 N E 5 . w W ❑ 5 -a
-�- - � � 7 b V A o o A o o f9 � ° � a � � !� r1 ❑ K� �a ¢ a W F
--� : � � w c,. ¢ U � 2 � x u �n .°� A O
,S � � ¢ C7 � C7 F-
o � W
,� � „_, o o �n o 0
'' v� O � � o co �n o 0
:� O O v o 0
-;� :J U �n v� �o o v� �o
� 1 �
IMPERIAL
RNAMENTAL
ETAL CO., INC.
635 S. Old Hwy. 141 P.O. Box 733 Fenton,MO 63026
Phone: (636) 343-8825 Fax: (636) 343-4920
To: KCI CONSTRUCTION CO. DATE: OCTOBER 23, 2012
ATTN: TOM HLJSTER �F� CAPE GIRARDEAU WWTP
FROM: JASON REINBOLD RFP NO. 3
QUo'rE#JR-12-8652X1
We propose to furnish shop drawings, material, fabrication, and delivery for the following:
Request for Proposal No. 3
Item#1. We include to furnish stainless steel tube handrail at UV Disinfection and Service Water Pumping
Station Building as shown in Attachment No. 1.
Item#2.We include to furnish stainless steel tube handrail at Biosolids Processing Building as shown in
Attachment No. 1.
Item#7.We include to add(2) 3'-0 x 3'-0 hinged aluminum plank hatches with additional support beams as
shown in Attachment No. 4.
Cost Breakdown
Material Costs: $ 7,200.00
Labor Costs: $ 5,000.00 (100hrs x $50.00/hr)
Detail Costs: $ 880.00 (16hrs x $55.00/hr)
Frei�ht Costs• $ 650.00 (lOhrs x $65.00/hr)
Subtotal: $13,730.00
O.H. &Profit: $ 1.370.00
Total Price: $15,100.00
Material Price: $ 15,100.00
MO Sales Tax 6.6%: EXCLUDED
Erection Price: EXCLUDED
TOTAL PRICE: � 15�100.00
STANDARD NOTES AND EXCLUSIONS TO APPLY.
Thank you for the opportunity to quote this project.
���E OF St[E�Co�i
� � � �CERTIFIED
r�,�•
= Q FABRICATOR
� 1 �
MPERIAL
RNAMENTAL
ETAL CO., INC.
635 S. Old Hwy. 141 P.O. Box 733 Fenton, MO 63026
Phone: (636) 343-8825 Fax: (636) 343-4920
PROJECT: CAPE GIRARDEAU WWTP
STANDARD NOTES AND EXCLUSIONS
1. ALL BIDS ARE SUBJECT TO REVIEW AFTER SEVEN (7) DAYS FOR CURRENT
MA�tIIFT VALUE OF RAW MATERIALS.
2. No engineering-calculations, and sealed shop drawings.
3. No penalty clauses or liquidated damages.
4. No "SHOTGL7N" clauses. (As required or as necessary, etc.)
5. No testing or surveying.
6. No overtime or premium time.
7. Bid is based on using our standard insurance coverage. (Information upon request)
8. No light gauge studs C's or Z's, etc.
9. No grout or concrete fills.
10. No bolts for wood and other trades.
11. No shoring.
12. No cost performance or payment bonds.
13. Holes for other trades.
14. No field touch up paint or painting.
15. No permits, licenses or inspection costs.
16. No anchor bolts for equipment or other trades.
17. No back charges will be accepted by I.O.M.unless prior written authorization is
obtained from I.O.M.
18. Standard exclusions by vendors supplying materials or services to I.O.M. are
included as I.O.M. exclusions.
19. NO PRIMARY INSURED, "our" standard insurance only. (NON-NEGOTIABLE)
20. PER POLICY aggregate insurance provided.
21. This proposal is based on NO RETENTION being held unless mutually agreed upon.
JOB SPECIFIC NOTES:
��ECF ST[F�Co
�� �� �CERTIFIED
.,��•
= Q FABRICATOR
� �
� .�lP.Ch'TcCTL'RdL t�'OODb}'ORtY
I ° . � � :1 RCHITL-CI L'P4I,Si'ODD L�OORS
�� " � ,� � � � � ��'�'�'9�;1��.
i Fl,�`I.SH�'-I.�rZD�:-IREFON.�UORS �
i � � � � � � �' ) � '� HOLLOdYiblET�L1 /300RS�zi'e�Fld�S
_ ._ ---— —
_ ___
__ _..
,_ __ - _ �,1 41'�3 FAX131�;)23]3�3�3
#1 C'C?�'ION�VOiDU ll�D�JSTs�9EtL.PA�Z�i.GL¢N('AR�fl�T.L�l.'v2031 i�.1633)2&'0 3000 VIO(374)_' -- —.... ._
-- _ - ,
—------ - -- - i
�'�J53'����I�Ro�GI���i`�5'�'RdJ��I�ri�l �sJ.
�?�7TEa %�-I?vcu7.��2',
�'R�J��'T;��F�--l�Jf35'3'���It����--�,�'�'n�
mFlY.1}3��'0�=��IID"Y�I�'T"�'I�u�s-�,%;?'.?�S
_ ____._ T r ���+ �7. �7+
_. --r_
- --
hlj��„1�17_f�J� :t��Sl.�il�Ss� .7���F�� �i���9L]�U�ic�1�.�1_����.
'�3i���:1 e '�.3�7V.���j'
�;���p�� �,�;,f17���yt ivi0�3F3�t�i3t�i`i
�i
' �Y.��...�.k'�'�
,I
, i
i �
�
��'��i�'�'�ZJ.570��1�A_AI�.�,Y�L'LU5�f�1'?���'7�33Y
This t�opos�is subje�a do u�e i��a�as anr�rondiiions
as listed beaow,ane7 ou�t?�e�1 P�t�Ti3A'RD�'E�VIS�CfJNL'�IONS ----.--.------�.
---- / 3 i /��
_.___— —
�------._...____-__—....—. l�.�i.�iJ,���.1`N� .
''„ —__ ____._.. '
--- a; ��).�'�'� ���.>'LAS:��'�FilY_IPTt1T'�' �7i^I��3r'�5E�f��Ti`�!�"T
' ao A�� ;�a.�r�5"3'3�L�P�Ii7�lA"i'B E����A��3���S��iY��.Y ,
i '
i
�
i
i _..__ ----- — --
;
' --------__---
-- ---
=----. -.—.--- _
; �'��,�����J��_�_ __ _ ----- — __-----:
, __.. _.__—_
,___ ------ ---- —_—..
1: �1'�15�El�.�..�1'�'�t��Y
�o �',1,���5��i���L_�i�3�
3e '���_li�'�'�,Ti3�,��Y�IP�I�,,�R�1tf1��-3Ti'j.�
�o ��3�'���?���;s i��'�?5������y� '
:
.. . . _ � :��.4 .� � � �l1� . �. .. ,.�
� �
1F����� .. _ ., r�-j �J � � .. '�G�3/'� " :.t"
.� . ��fk i; r -.:;�_J; � N }. ���. / � ���
Y r I
i:li'f.�+#I(����.'�i!�+t�i
.n;.^,4ZYi� ,':i `.�:+4�i11(p��i,%h.:i;lr�.i � . • . .
�.!1 C:'o 4.•l;ll,s }
� , �;�;. r���v i� . ,f�+'ty��� '�_ ��'.i.��'��_ �'r�
`cii`i9 .,.�..;i t,:ti�.;C- ;t�i?L,y�� trozs'c:�r;'r' ti=_�s�n?;t`���jnl�,,
. _:����:i�:i f'a-:.�;Y�j (�i'I.i�:�c1:.'.(,j��+
'}:,'�::i �_��.0 � ,.i'.`t�;�}�.
%�.ii,., ... ���
!':
_ . _ _... ... .._. ___. .. ... _r. . _. ......_..., ... '___. _ ..._ .__._ .. __ .. . . . ._ . .__. — ..
��uo1G 1.SI1'I� i yi ff}f�:��1'� ;i�-i;,514�ti�J!2 i����_�e fi I'� 'i.>Ci�:. j�ic�lll.1�, .::� �i L... ....^�J
.(?,P, 1�6;i1f�l2i`C,. �:'.'I's??li::l i �Ill!J;:)a�`9: �,.,[�i�a �7ri ?'C)rili:i�6 , '��
�^'ac'i.i7;? i �'a;'t2e:'U
_�_._...�.._�._.._'—'-_.,-. -_"--»'—.._. ... . __.,..�.�'--'---- .._....—___.�...--.-'_'�',".- - "
' - '--
i;�J. ).�',T 4'RSFiI,�'ih�_,i�. �1i9 !.14�� J?�7;i�`{;.> 'tii?R�!f1A
.,_R� 'y4t'_�'_�__�.".___.....o.-.._._lI;4���lV. G�-�7�.�Tt��)i..y5 �) i�5l.��,I>.1U1�1n1'��l��C: . '�J,� .��i�i(� i...��i
�Q7ti�'P S^Ciil;icS13;'_'21L'I�?r,:!i(?.,�:,1�� lei,�.!t:iN:;��;.tis�(i,�.h�[J:i�11'�'��
iF''t".Dk„�i:i;��,<')Y�Ci:�1)7�i.''dfri ir !;;'v,"ii� �t""_zS(t`S
��G!ayii;'e;)'i:l F:tf��.�'S7nr?�.??.'v+_.)f.::� .
„ �Ar'I`i�iii3`<'�_°:i°!.; �:us;2,�.�^3��kl�Ii;�s.�.,ii:;l;S:tt�i3^t-:��:z:U; i-C�:1 g.+,1i�.:2?i.,� ' iC' �I.'•$C�i" , :G��
�)Sifi'�){V1i5i ��.�3Ct:'v���3i.1E�;ssi:r�n,f°,��5et"i�i�Li;IC't'(�;CdLc�S
, •i^(liii.t^,�4:nilfi;(i'�!G'�d:r�JL'.3?9it'il!` l�i'g�,
�!�"5}ii:
�'i.AJ4�ft;C?� J.'r
..i��ii P'.y:^Eriit;',i.:}'}
�'a34i'�.,'t)+':a:��t�.5�i'��7G�;17iJI;E�.i;�"a
;.�7C:�?:I a I t1�:)f���yQ'�
Ni'?'!tsl�?.'.�E'I+CiS?�':�:',1i:.
#p.`�.-�.3���'�yr,Z"�,'���I'F;?Cllii.���.��
i�1'/r���'�f
,.�YF ii'.j.:1,'ifii.��J SG"}
y. �...�,11l�ufvi?;Y��'s. .'�is,.s b"n.ti.'a'9 :±'l'�;'9?aP�a�'9�1`:'i��ao��rG<id��J��v �!t�>;�,%r'i�:7' ' ''�'' s?1,;�E 2�7::a
?'I?i�;?y:9')�,�fY,?e ii$:'�s"�'i'i dflJtff.i�v�P:�ri Itc,"iy�:.."'�;.�:�J�j;a:i)f
?i,�?�S iC�ii'�1;±.�7i�'i$i)7`'ff'`A�fl(�Il�5;lh_. ..�t�''JS�`�?J5:..:ij;tft.�
}�f o^1,:
'��9'S:'�`�'ul�!J1���+'„�41.�,5
�;�.+�h";3=:7):i:1�i���sii�:J����.i.�:'�K:i
��i)�'�ic�7�t���;�i G9�., ,iq��, ,�:�t'dcr+�.�r.�'sv� .,s a>i,fa.a:�fi,.�s�.r.'i�f��, i,��ri�c�y,i'i;.at, +�c: t�... '177,'?x i,i�:,;{a
'i:�J1''I;I':Cl ti'Lf 3�ti%`�:�n�7 otf.l?:y fi9,r'i�:;3giCTngf f[li°k�Sa' 1;?.:�I'i;(�J'S .
�:b5'f,r;;5';�5�xi �s'c�c � ?.;'�,.c:��,+� r�� ,�t:`), �f ��-:
�r�j�aB'.diia:qi�tiv':t!��`'A. .�Ij:'I:,j9:uf!:8 A"T��Y�:<!f�lsfid,`l;L��:;i?�
�.",�g��fES;�Y�:ti'I�,`iin?.
S i4.11 P�`:"?i16 ri?�i�31;1;i!��h .. oX',iJf:'i,"Yl�^�8��1i3'.S:C i�"G��SLS�^':I�:'�+;!11L''> ` � ,:'7Ct? ti!ii ::T
[�)�1?ii?�!.7.•"'7'3t9(`v?`!i:4q�:;
:�.a�sv���in:d'S�vu�Ti��,_�ai'x�, s„�b.ir!;i�b;-3:�ti'a?rk�i?i.Lc. '��ti� ,:i�•'i'-•'=,':�_'t•E,T'.a- 31n1�i:!�'11 •.�ti�?9s`"�y S'.3�ia�
e . ieJ.:R?Jh!i�,
� - .�. ,� �
E
'�G`s�!Y ���. .JT;�J-�1��'��_t;"
P�r'�4slJ � � �
_ "'�>Yi:' ,?�ii;'r,_.J�:'niin;,... .��;`i ,<;i?
. .. . ., 'C:,t,^'.'v I.�?:?i�U<.
�,:3:„ ,';., ;
.. ., .. , `y.. ..
,. _..,..,.... .__. _. _... — _. _ _. . ... ... ... ,_-'. ..
_ _�._ . ._..,....._,....___... - _ _--.. ...._� ._ . . .. .
1Y0. '�Y�cJ� C:i'S�1��s4ii _ . _ . . ,� :. � .�.: .,:.?'�-��i'.
- - � .._ —' --.�_�.�
-- �---- - --' -- ._..___— ---�' .. �_ — --
b. ��tJ���hA�lfag°�!7'�6�
- 1'+0•69 790.�^
'r. Coni�a:�Ea��s3 r�� �75.9�i 3"3:50
3. iea�:,�l�i:�'1 "_ , ;,?i6.�9 ;,176.5C
a, Pa,!cin?�5�ianc%�r�a ' 330.�' 3.i191
;
`=i:�,,,.,�C�4; }-{m�
�u9de He3�LsaSuf: atto44a�,�9�i�
_ _ ____. . ,..___.___.__ _ _.�_.r . . .
0y se3itim�Ceia�n;I aFps�Me�c4���thcsaaa tfiis�o��nd�sso�o�n9zC�Ch�t f n�i��a��nC�}fe2 to th�)P.?G�ed t2i�s�u9 cam3itio�s.
!° _ � ---- -- --- -------- — �
__ _ — —
5� �i�aed�v . �g�Areys�by Da��
�e3ev� ���� � Ptin3 M���t __._` __.__�. _-�------
,,�/'�ALt , i/���0 C` �S' SiGv�ti.�t. Cow�
J
aan�rus�a e�.a�xr�ag�
Rr�lff;s�t36"iyTe�u)�SssCi�.;sp�na,�a a�.� 1��,�r,o�are��b���'a�3;Z t(��s)aa'•33a3 j 6:(7'Je;�1a-7��ro���•^�:�►,a�m�5n�a.an�a
,���
�"1 /",
h
�
�������fi�������7������1���� �� ���
Page'1 of 3 5ignag�e I�nouaiions
ASI Revised Quote w/o Plaque anua n ao�3
Co�pany B(CI Corasdruction tompany �� ) H �
lo�atiai� Primary location
Re�esenc� Signage 6ud �
` �- ���
�ai9 te 9�C�cons�r�arivan Cor�pam/ 3�ai,��� Cape Gir�rdeau hyastewater ireatment Plani
1i�315 la6ce 66ufi�ri:�� �or�ora�e Ciacpe
St.�Auis.DrIO�31a7 Caoe vi�ard�au,Atl0
�� l�5
Q��de Ref. STIQ-16613 DuQ Date 04/36/2013 Insiall Date SR 6rian 821ko
F.0.4. Desiinaiian Sli4nd P9 contracf#i2002 Ship�ate 04/30/2013 PN� Debbee Klein
ierms Net 30 days Ship fMetEtod Install�d
Mo. Item D�scription Qty UOM Unit Price Extension
1. Dimensional Letter5 tast aluminum(etters,sans serif font-all caps.Clear anodized fiinish. 1 Lot 3,905.59 3,905.59 '
Concealed stud mounting into metal siding panels.
io read:
HEADNIORKS (6")
UV DISINFECTION (6")
Bi0501ID5 PROCESSING BU►LDING(b")
ADMINISTRAiIQN(6")
�Ob1 (5") ;
Ntonument letters to read:
V�ASIEWATER TP,E�ITMENT FACfLiTT(6"}
CITY OF(3")
{APE GIP,AP,DEAU (b")
2. Aluminum Panels wiih Text b"w�.OSO"thlck aluminum panels painted standard colors(vertical 1 Set 217.�3 217•28
orientation),Includes 2-1/2"h applied vinyl text in contrastong colar.
Panels ta mo�nt above overhead coiling door on Biosalids IIuiEding.
io read:
(S�"h;c 6"w):U1KE LOADING
(73"h x 6"�i):BIOSOIIDS�UIIGf�iG
3. ADA Co�tplianf Door Si9ns A51 Horizon�eries room signs witn anodized aluminum�ccent bar, 24 Each 11796 �,�31.OA
aluminum end caps and etched photopolymer inserts. Insert colors are
to be from A51 st�nd�rd color chart selection. Frame size for a!I to be
approximately S"h x 8°w. All signs are to be maunted with vonyl ta�e
�nd silicone adhesive.
__ . _
4. Ra�om Signs in'touch Seri��2"h x 3"�AbA P.00m Signs 7 EacFo 17.13 119,91
EackgrAund color:5�1-�}611 Cirrus Nlhite
lmprint color:I?ovvmark 901 �lack
�icyn adhesive rnounts to glass
coneinued an ne:c3 p�ge
,�rc��6eur�t s��s��:�5asoaces,M+�.dba A31�z2�9 Otiva Str��t 5t.Coui3 P;1(!631Q3� i:(�i�t)n2�i�az��� �:()T�}�31•39b�f�v�w�r.asisignage.eon - -- --
.� �
. �
Change Order No. STLO-13765 �* ���
Page 2 of 3 Signage Innovations
Company KCI Construction Company )anuary 4,2013
location Primary Location
Reference Signage Bid
No. Item Description Qty UOM Unit Price Extension
Includes vinyl glass backer
5. Sign Permit fr Acquisition "'`Monument permits to be obtained by others.""° 1 Each 0,00 0.00
continued on next page
Architectural Signing Associates,Inc.tlba ASI�2200 Olive Street St.Louis MO 63103� T:(314)A21-2288� F:(314)42i•3164�www.asisignage.com
s'� �
t
Change Order No. STLO-137b5 �� ��j
Page 3 of 3 5ignage Innovatlons
Company KCI Consfruction Company )anuary 4,2013
Location Primary Location
Reference Signage Bid
No. Item Description Qty UOM Unit Price Extension
6. Project Management 3 Each 160.60 1b0,60
7. Contra�t Processing 1 Each 375.00 375.00
8. Installation 1 Each 2,988.04 2,988.00
9. Packing Fr Handling 1 Each 333.98 333.98
Subtotal 10,931.40
5ales Tax(0 a,5) 0.00
Total 10,931.40
less Deposit �.Q�
Balance Due 10,931.40
1 affirm that I have reviewed the above and foregoing prices,quantities and days required for the changed or additionai work,and 1 agree to the quantities and prices �
and any extension of time to perform the changed or additional work listed herein.This change request will automatically become an amendment to any existing
purchases orders submitted by the customer,related to this order. �
Debbie Klein
Submitted by Date Approved by Date
Print Name
Architectural Signing Associates,Inc.dba ASI�2200 Olive Street St.Louls MO b3143� T:(314}421•2288� F:(3t4)421•3t64�www,asisignage,com
/'\ �"`�
�G<������������'��`,���' s
a Y . . �.__�._..,� �.�..- . �''� ���
" f�age 1 0�1 �ASI revised quote - plaque oniy� #
Signag�Iruaovatio�s
to�npany ;(CI Construction Comp�ny )anuary 4,�oi3
�o�ation Primary lacation ���
Aefi�r�r�c� ��d
�ill tq KCI Consiruc�io�Comp�ny 5hi�s i9 Cape Gir�rdeau Ufaste},vaier Zreatnent Plant
10315 Lalc�Bsuf�Dr'sve Corporai�Circle
5f.lauis,A�10 6�1�3 Cape Gir�rdeau,I�0
U� U5
;ia�adilnti� U6If�6I���I� e��yisivi'�ai� �ia/D�+j2"v13 Terr�s �det3C�ays Sp 3rian3all<c
F.O.�. DesClnation Revisoon Pio SBaip Meth9d Insialle�J Pbl Debbie Kleln
tead Tine �-6 Weeks
A9o. lie� D�s�ripYion Qty �i9i41 Uni�Prise �x6ensiAn
1. Cast Plaque 1�"h r 12"w cast aluminum plaque,raised satin brushed double line 1 Each 75A.�0 754.30
bordec Intludes raised city emblem and list of names.5tandard stipple
texture bacicground painted siandard color TBD.Concealed stud
mounting into exterior stone facade.
2. Installatian 1 Each 762.Ofl 76Z.00
3. Packing S�Plandling 1 Ezch 40.10 40.10
Su�total 1,556.90
Sales Tax(0�la) 0.00
Tota! "i,S56.90
�uote Yalid Until: April�,ao1�
By signing below,I appreve and authoriae this quote and acknowledge that I have read and agree to the attached terms and conditions.
Submitted by Daie �ipprovec3 by Qa��
Print PJamp ��T
coatin�ecJ o�r neRt pag�
�rbhiteitural5ic�ning f�ssaciat�s,Inc.�1�a a151 f�2D0 Ofive 5tre�i gi.Loui9 MO 63963 I 7:(394)�Z I•283�� F:(31h)Al1•)ib�a:���wv�.asisignage.som . ....
/"\ ^
e �
.Quote No. STLO-17504 �� ���
•• Page 2 of 1 �
Signage Innovations
Company KCI Construction Company January 4,2013
location Primary locatlon
Reference
tonditions
• `OELIVERY IS SCHEDULED FROM RECEIPT OF APPROVAL OF QUOTE,SH4P DRAWINGS,SAMPLES,SUBMITTALS,AND DEPOSIT,AND 15 SUBJECT TO PROOUCTfON
—�Ckl E9 UL-E-f�-T—�kI��T IM
Prices are based on using A51 standard typestyles,calors,and finishes unless otherwise noted.
At the efection of ASI,graphic product will remain in the possession of ASI until paid in full.
A51 daes not guarantee size or quantities as correct,if shown in this quotation.If requirements vary from those shown,this quotation is subject to revision to conform to
the final requirements.
ey actepting this order in any manner,buyer agrees to the terms and conditions shown an this quotation.These terms and conditions supersede all others and therefo�e
are made an integral part of any contract between the customer and ASI.
Terms and conditions contrary to those shown in this quotation must be agreed to in writing. ,
All implied warranties of fitness or merchantability are specifically excluded and tf�ere are no warranties which extend beyond those spe�ifically included on the warranry
form.Purchasers'damages are limited in any event with the provisions of this paragraph in regard to replacement or repair of defective work or material.
In no event shall consequential damages be awarded purchaser or any other person for either personal injury,property loss or loss of profits,business,trade,customers,
late delivery of instaliation or the like.
Client agrees to authorize any person receiving delivery to sign de(ivery receipt for purchaser.If purchaser is unable to accept delivery,then an additiona!delivery
surcharge will be added before re-delivery.
Customer is responsibfe for all return shipping charges.Are returned items should be properly insured when shipped.A51 wifl be held harmless in the event that returns
are lost in transit.Client is responsible for inspecting all shipments for any shortage or damage before items leave their dock.Purchaser will note all loss or damage on
the delivery receipt before signing for the shipment.If concealed damage is discovered,dient must save all cartons and packaging and request an inspection from UPS,
Federa{Express,or the appropriate tru�king carrier immediately.DAMAGE MUST BE REPORTED WITHIN SEVENTY-TWO(72}HOURS.
ASI assumes no responsibility of safe delivery of goods by carrier other than our own.Customer should carefully inspe�t all crates and/or packages.All daims ta be filed
by customer in accordance with ICC regulations.
li installation is inciuded on this quote,it indudes a single instaliation trip charge,during regular hours of operation,by non-union installers unless otherwise specified,
Penalties and other charges may result if additiona(trips are required due fo premises not being ready for install and/or additional work or equipment being required to
compiete installation.Installation over weekends,hoEidays and non-standard hours are also subject to additional charges.
Purchaser must supply a tax exempt certificate,otherwise sales tax will be added to the final invoice.
In accordance with state laws,Sales Tax will be tharged at the rate that is in force at the kime oE invoicing and delivery of the product or service.
Afchitectural Signing Associates,Inc,dba ASI�2Z9U Olive Street St.Louis MO 63103 f T;(31b)421-2288� F:{31Q)421•3164�www.asisignage.com
� �
GLEN ALSPAUGI-� 9808 Gnyton rto:�a
St. Louis,NIO G3124
COMPANY,L.L.P. 31A-993-GG�I�t
314-993-5138 FAX
October 22, 2012
I<CI Constructian
10315 Lal<e Bluff Dr.
St. Lauis, Mo. 63123
Att; Tom Huster RE: Cape Girardeau WTP
RFP#3
To m,
Per RFP #3, we can provide a 32"h or 34"h countertop far an ADD of 297.00.
This covers the cost to make non-standard cabinets.
Another option, at no additional cost, is to shim the cabinet a %" off the floor to get 31%" (%"
shim+30"h cab't+ 1" countertop =31%").
Vinyl cove base wifl hide the shim space at the flaor.
These changes wil) not be made without signed authorization to proceed.
Sincerefy,
�__._�.�.��
Glen Alspaugh Co.
Bryan Willie
Quality Casework and Fcrme Hoods for
HOSPITALS g INDUSTR�Y • LABORATORIES ` SCH04L5
� �
'
Raider Mechanical,Inc.
December 17,2012
To: KCI
Attn: Tom Huster
Re: Cape WWTP
PROPOSAL - RFP No. - 01
RMI offers the cost for labor and material for the addition of one EWC-1 in the Admin Bldg. A
breakdown for items related to our scope of work is as follows:
Operator/Equip(Omh@$115/hr) $ 0.00
Pipefitter Labor(12mh@$78/hr) $ 936.00
Laborer(Omh@$53/hr) $ 1,272.00
Material $ 1,200.00
Original Subtotal $ 3,408.00
OH&P(10%) $ 340.00
TOTAL for RFP $ 3,748.00
EXCLUSIONS:
Exclusions in force for this contract remain in effect for this proposal except as noted othervvise.
Sincerely,
Raider Mechanical, Inc.
Tony Morrow
103 Industrial Drive Park Hills,Missouri 63601 (573)518-1444•Fax:(573)431-9688
rfp01-rfp3
� �
��� �a�����
��mu�oao john.hriizkowin@g�co.corn
S��o3o I hursday, Ociob�r 1S, 2012 1:31 °M
"��e Tom Nusier
�a��g�Q�o R�: Ca��WVUUi F - R�P f�lo. 3
���
`��o�Hvo���.�� o"����a����3��'��sat i�s�s�r��rt��r`i�. Bd����d�s��r� i� r������a�i�����P2��� 's�d�u��€�����rad 14��t�'i9��i�v+�¢��
��e��u �����r����u�cP���s���i�a��1�1��c��r�r�
.,,,� ' ���a� �����S���b�a
�� �� �, , DirecPor-Indusirial
� ��X.
� Dir�cC: 314 678-8033
� ���•--�; ti1obile: 31n-267-4a77
��f Main: 314-772-5400
�'`"�+�� � �a;c 31A-678-8333
��iqftl}i.�i�T£L�'; W�b: w,v�rw.sa,s�cs�.�c:om
, >e =._T ;..i ;
E-mail:iohn.hritrkowinCcDqeco.com
� 3415 Bent Ave,Si.Louis,MO 63116 Y9EV1��3JA?
From: Tom Huster<iomhusterla?KCiC�nstructioo,corro
To: John Hritzkowin<iohn.hritzkowin(cD.,geco.eorrv
Date: 10/17/2012 10:26 AM
Subject: Cape WWTF-RFP No.3
,�O�f f3,
Piease provids det�9led pricing fvr th��h.anges in the attached RFP No.3. Specifically,we se�lt�ems�and 10 as affecting your
�ricing. �et me knov�a�you 9�ave questions or need to dis�us�. i'hank you.
`��� ���3eT
KCI Construction Co.
39 4,894.8888
314.894,7A�8 fax
394.220:3569 ce11
iNY✓�N.�G�.��� ��?J
F���ao N9�th�i, �PC [mailto:PK.MathaiCa)jacobs.coml
���'�o dUed�esday, OctobeP 17, 2012 9:01 /�f�
`��o "V'or�c F9�aster
��e �g���, g��o��; ��u���, ���y �„o gramling�ciryofca�eairardeau.ora
������30 ���'��. 3
iorri: ��ii��h�ci is RFP�90.3 is�r miscellan�ous archii�ctural,plumbing and eleciric�l r�visi�rns�s�resui2 oi ihe cod�cv�plianc�
r�vi�ev by th�Ciiy. Ple�s�subrr�ii�pri�e pr�p�s�l.
Thanks,
PK Mathai, P.E.� Jacpbs� �`J�`������ 3`d�-3�5-51�� ��x � pk.mathai(a�iacobs.cam
1
� �
J�COBS ��'���oas�a���avay t4����90��0
50� P�at�h���a�w�y
�a'1.�CV�l15��J195'�tlWPI,6�'�02
314.33a.�§�JD� �ax 31�t.335.�1�'�
0�3��7�5,2�a�2
1�I�.'�I'r�3n�-S���s�r
K����s�����cs�r��������y
��fl3�5 L�]���1]b�f:��'Jr�v�
�s.�,����,Iv3��3:�2�
��s����ca: 3���y��3�'�r�r������iY�a 3—9Y�ns�e��l����aa�as�r��aa��e�1�a��7,��w��iia��n��3�s����
����9�a���
����°T��a:
�'ly����a��cvici��p����s��a�aa�d��i���1 brea�k�s�����f���a,������������.��n��+t c�s3s f�r t��fr�llc�avi��
�r��t��tv�r�����1�l��i��1�A evi�a������r�5�z1�mf�������c��p��a����-�v3��v b�th�e Ci�:
fl. d�3 t�ae ! � �i5��'����sa��za�l Se�ic����er�j�p�g Siati�s��3�ilz�zag,�d�1�1������t��1 guarc�r�il
ts��e��i�des�f th�bu��d°a�g r�a#°as shv���i�a Att��h�rri�a�t I�d�, 1.
2. .�'�t tta��3i�sz�l�si��'r�ce5�ing Builslin�,s�t�S�S$c�3?i�#:5J S'k���,�d�3�i'�3�3'��d'����2S'�SAt�������UiIC�S
roaf as�h�am in Atta�ht�►�nt l�Ta. 1.
3. Ad�i 6"high ca�i alurnanu�addr�ss n�m'o�r oz�Site Entry�igri as sho�v�in�ttac�rrt�:nt No. 1.
4. R�vis�t��m�l�vork ir�t��;.�dminissration�uil�ing breakraam#�pr�vide a 32"high counter as part
of th�kit�h��tt�as s��avn ia�t?achrn�ni I�To.2. I�TTot�4hai th�ba��ca�ainet�are��rnaved�o allow
f���€�.�DA-ca�n�liant knee�uard to be a�ded b�l��v th�sink.
5< ��'�iS�E 3�1�Is°1�3�i15�l3�9T�1�3 t�]��'9�f1��T(353�1 O�$�i��3�SO�i��PT�����17.��,��1�L�3i1�Z�3���37���2"high
�v�r��-�rfa���s sho�v�i��1tta�h��.a�N�. �.
fi. Pr�vis���c�s�ati�nal�i�5 p�r the x�e�a�3��������s��l���msuks�t�S�s s��rvn an P�ttachm�i T��. 3
�r�a�����dra�ia�g.�-�i 1 j.
7. ���t��3';�3' ��es��li�rr���m p1aa�ha��h�s(��5�bl��i ryat��laami��m pl��ansl�vit�
�sls�i4i�a����p�va�b�am�a5��r�avn i��ttac�rr��a�3�s�.4.
8a .���3/"����i3�a�v�t�r)�o�n���i�oa�a�s�2"��ii��r;�lr��-�8�E��-1 ���s�x�inist�atia�Buil�ir�g as
s�s��v����tac�a�n�I�1�. �.
9e O���yg. E-f34(t�p�g�t��m�r�,T�'NiS�Z�l��3'���d1?3'�II$P?�$�C�1�L�4��Y1�Ce9 a����ls���f�'4��lt�l T�/I.��
�r���35f�j��o(��D�D1, a��-�ig�i'�10/�''3 fr���15a9 t�(175),
i_�13. ��y�.E-�fi,�r��s�t�����'ra��r�'�g�o����n��➢��t�s������i��ca��f���tr����'i t�#1/0��13��.
P1����9a�aa�3���3 31��33�-���72���i�.�i���a����9��.c�i:�'y�����v���y s�b�����n�oz za����3�
ad�7�i�n�l�f��rria����.
�in����y�
������
,��/Cir/�G�`�z�- .
�'o�.l5'1�3���,�'.�.
�'��j��:3 lY�����
�tc����a
�: ��32a�1���
�a��y 8���
��XS���9�-��Z
Jac90��ar�ine�?���r���p lns.
� �
T+I
Z
��Sg�S�Y' �i'� � I O � O � �
E���s�g �� � ��� .� �I � �
� a 4`a'Nc U
•� � ��w � i �
I � v! ° ' �Ve � ���� -� a�� �
,�.1�`� --f� ' �„���� Q Y�3�� z�"o � I ��, �
u—� --�lQ— 1� ��f f ° - i ��w
� I � I � ,I��III w : `_ ~ i i 3��� M �
I i: o w ����
I I i�itn o4 6 � i i °_ � �
� ��h�
I "§ W i.� ���` � Z
--k,i'�.��'—" 8 ' 3 � - _ �-:T� H Q
x .ri—.'� Aiin3n�i.is�.—a�- 2 Q � i , �
� 1 I
�i Y v � ___ I I �
r✓'w'o-a� .�' • w i I 1 y„
� '�34� '� r � ; Z �L.
��a?go�x��� � � ' � ' � SL�
-`��s����� ��Q 0 � s , �� --i �
� ` o y , •:
1 � � � o�c W
�
i Q
� �-; ;' ' i Q -- y� � ��
� .T.0 � .P.b I .C.t
`y — f � 1 I Z q �_
I O 4 414 N=
I I w
c NIW U
�9 I_.v ' V e .Y1
� I I
! r r z�
.. .11+ A-FL .11 e
���� �
w� ypa�-' W 4
' ��� �y o ��� � : e�''s
� ��- _ ���o � a = e
� � ���n ��e �� o�'- �
" �o �,<<�� k��
� �w
j f°-- -- — — o � ��<
I �� �g� - ���� �Y
' �i:. :7: �, W� �5� �(
� '? «��i�• � � &o �� ~ O �L --- �- �� H�I
0 y ''. M�
i ,�" , s a �� , �
� " �� �- -__ �.
( � ° y `�
� � .�.� �
� � f
� � T
i z .�..
� �
-� _
i I oy 9
�. •: I �c� m
ow z � y c�
> �� •^F-:;i 4 � � z
� =�� � f w
0 d U
� � -�j V � T �t a
� z
Sw �a�
a� Qgo�
I o�'� 4�"
� �� l <
I � " -� F �
i
i ; .
/"� �"�
N
��� �1 �
o � - � � �
� w -- °� �
,�� '%'�� �
Q — H 1§ `
` I`�i�/ ��1•' 1'
�y, 7 t 1 ?� er�� �
_ „�, �1 �
_ _'__ v � q� � M
O _=____ n �
- '_r- v � �`� J
_ _--- n\ / �I N f�
_ - _ � N �
- �� y � iiiii r �` � i �
I �
o' p� �� � i i ,i .� o �
_ __i � �
, � Z
N I�i o a"�i Q.
a 4
_ >V
I� ,I at � w� �
. ��
� O �
I �� � O �W WO
��
Om€� �
� 'Ul-'Z U <
�g,y� .t.t� .4/Etr.t
� �
k�
�.�
—�
-_- � � �
1�--. '_' -_ `� �
�
�"�` � � 4 �� �-i
r
- \`n' O � ` � - �g� M
/p�` \ 2q.
� � II O q `L.i W �o �
4 �
��1� Ol'Z b� Z rrr���S �
�p` '( 1 I 1 I � ! O� �� ��.1/.
' ¢Y V°`� ��"
\W, h_..f � W� ��
- 'o �r
�
O Y s.
- K a
�m� � 0
� �
��
� ^
' i � ' ' I � � � ( i � I
i � � �
I � I I � � ; � a *
� � N rv i ��
e wm- �g rLL r :Idm:;' - .�o x x�jxY d xu �r��e> x.�r
<dlm m''�.Ya _ ___ dl<<odYm Ya_ -zYY _z,x'� _ YOYYY�Y��x iYY� M M
Y 3� d m(fJ=I^' _ — __I Y:. .I�m __ r R= _ R�� a�L r 1 p m_ I F A p. I _ F R� _ � � � 4
� ; f Niu � p e � f �
�� ��Lrv - I-- - - - - �'~
I� �� I�-�� � -- - �x � � � � � � � �uI � „ � � � i y � � � � „ i O
�� �1y- �I� y�r, »�s aiR:;a� ��K _��"�a�hi :;���Y :�.:" �aa`�x3�@�xx �
3 � !- -- --����--�I�N----1i=�zl� K'��az� �'x:�"���.:�� _ xxwcS a�x�1'��R;SRR�R9a'2�a��§�j ��IS
� � �' " '-I=1J�== -=��,� '�j�',.�� _ =I� ����� i�i��p�� ��o�� x�j::s'�m _ K���li i �w l)
¢ � i � � � � i ' i �� �
� _ �� �_�- � � , <<�_�����la a� �� � _,,��� =1� � ��3����a E �,si<��I��_�. �w h
a 71Y'�Y`� '�i���Y Y ��Y�i <s� I 3_33 ��33 3 i ��� � �> > ,
�7YIY�2z1<6 227�Y77 ���2<�.< Y� 7I72Y 17YYYYI�Y' VU I�
r i �_i I =�
� � , �1' � ' _L �
� Ir =��- � � �_ -�- � � _ ;����--�- --��_ - - ---i� ��,1-- -i � Qo ,
0
� ' If' � ' I � �- � j�9 � I � , � r �
! � � '�e � I i � ' ' i �b� a=§�� I � I � �sr la � �alb '�_ � Z
� � � � i�,, I �4 0 � ��h §a N 4� 4 e� ��I§� �_I�',�� �n 4° �?°� _�b b��� Q.
$� I��I� � _- -; �_i���- „��- �-- - - - � i _ - � �
� , � �
� �=`�=�' -- -- =�'�' - - ''� - -- �;
- - -- - i
ryo I r
�
�._ � � -
(�$ - - - - t-a-� ��
_�I�`5 ��5 ��I3�3����`55>>i�5�i�. ��'�� �jY7Y �7YY�,.Y1 ?Y7I `J,Y�Y���7 �2YY<Y��I7Y�
� �3�m.I Z<�;Y�7�3 2 Y< <7 7 7:7�Y<Y I*�.7 Y Y�Y 2 _� Q< � I � I f
i o I I � � °' _ � LL I � i I
� ��<7' � I 7.ee � � � ! .� �y��se7�o a � � :�LL_ - � i Q��o�c��� � ,.:��,�We�� � �
o - - - - ��Qff
� o o� �a���o���s�_',_3?�_I_e�o_�erpa-���'�a I�sl��siHRa� S!sL�Ra � �ssa:sssa"s�!a�����g�$ � (�
U = �
�e�w�� a��W € > ! � � � �� �� o� �� =� a��a � LL O
e���� ;p�� ` Y � � � 5� Q q � ��� �� � �� �` ���� e� � vNi
�K��?� G .a � g =y � � " e" �� �g �� �_�" ��
f-�'� � ° � � � � g � o �� 8 € � ��s a� �� �� �� ���� �� W �a
o�o �� � � e � w $ � � � �g � g ��a �F �" €=W Q� ���$ �� � ul
�I� ���� 8��g � I Y � � � � � $ � �� g 9 � �g� .� �� ��� �� �� �w �� Q
� .-.='�t= � � � � � g � � �� � � � c�� �� �� `-�W �� ����� �- � �'
��NKo���>K I w e � y a � �� � �
� � � � g � g � � z� � � ��` r�� W� �e ����¢ � �
_ � � " _'0 � �� � � � d G w 7� � � �'�S �y �o �W" �� ���"y ��
g�e� c "��-�t= z_ ;�' _ � �� � � � � e n� . � � �__ $� �� ��o �� �o��� �� W C9
�oa3 � � �`- j ��ty N �� �a� � � s $ � �� � �g `� �� �€� �F` g LL ���e� 6� F- a
z�a,rioawsoin3r� g �= �� � � x � � €5 � £ �� �� ��� �'s� ��� �7 �"s��� �� Q Q
�� � m �+ o w u. u' Y + Y � i i' o n C � U
� � g N W �
�'� G ���� � I 6 S � �� � Q �
' � � U
��-----�( -'� � � � � � � � ��� �lt
31f1034J50!Y3i3M I �' J � � �.I � � � ��W �
y b bl h �� i -� E � y 5 � �� pc �1
`�j�w z�� j �= 4..� e F � e � � j � o �' � �b�1 � I
�$.�LL. 3�� � ff � � �w ��" � M
`�? _o � I z 3vw�+xoLemnu ^� � e � $ w � . � � a4 N� � §��y� � O
� 3 s g y � � � � � w �� : �$� � Z
��� � �Y C w a' 3 o x � � o g c� �- .. �Z�` �
'n� � LL��a $ > g � s � �5 � � � � � � `d ��� � � ,� 3
k3�naaH�soiirrye� ���o� g o � i � i x �*y z�( � s �� 4 ��� i � �
W I � e � � aYl �S �i �F = � � G F N �� � �'� N � � � I
' � � � � � : � � �'< g�� z � I
�»� �wP �� ��8� o .. .. ��� g <� � ��� g g � i
o K��� � �a , � do � � � ,� � � ,� �� � K � � 7zs
��� ��eW � ¢�z I� � �
��ff =��$ ��" k
"� � ,,�� � �y..-----5 a� � w� g
3-na3N�scia3iaa n� �
s�«- I ��� � ao �t��� �p�� LL
.e y sr ' � _
�_�_'__�_i. ���� " o � i �CyW4 '�� �e`��`�� �'S� I
rraaw�so a.i3n ���: � �o�� � w— l I 5 SE ��wi c � I
a� o� y �I
<:w� � �"_�'� �� � �; � � � 9
�S Y n I �, O m e." s O � o � ��
GSoo � w � O M� � i � � O �
y ��� � / � � �,�,.� ' � 8 6
� / � b 1� - ¢ - qµ
.IroS��'-'� � �qe F
i H
W � � � tM34US Ol t13i3tl s A.t z -tS .t�o.L Si1ftA� hl �"�
� �oiu-�n -'^
g � o .ri'�'� �mx3doaua�wmr�.o-�a� f aa�s
0 o y o'
w<rw�a t�rnwLaroi�ruwxm�PnmmrmU�'4:"'++�+Iwiaxasu:mr�rwmv+�'a'�You+am aS.cwEuti.m a�raim�4
� ''�`
4 u8-�69E�l3
�� `�� JNIQN�Ul -' r
�cL--'f�•' , y �
� --- --- ----------� � u
------ --
� �
�, N i i � i � u
o Q � i "�, Z i 3
� o i � � arn a � Q
i� �y �j
II .0 i£ u�i� � Q �m Y I � `
M J
� �� .k a ? I I � ~ � � I _' t�
� � � X � � � ��c.i
� � ¢ r \ o�
�
O N W � Z � ¢� � C � I � G
N ¢`" �� � � � �'Wf1lV)L�ObX8�M I I �'Wfllb)L'06X8�M � ¢ I J �
¢ � � '� � f— �`
o � ,K �J I I _ 'K __—_M j Z r
_ _—— _ �—Ci¢ _ _ _ t�taZt Q Q
o � :,'��`^( ����:z o � �
<V �(�
� i�k-2 u�-i�. at� �1�V w ~ m Z �
� � z
o � �
M � � �
� o �
00 0
�� � �
Y rn w �
<i J O Q`�' �9'�Z .£'�9L J
rwz � Q
H
,9-� u0-�££ •9-� �
, .0-�9£
Q
/� �
���� g \\, � 5
�
/ `' s ti
_ �[.�� \ 3 �
N� � `\ _ �
� �� c " �r-----" w
� W` °° � ' �
L� g � � �{ � � � 'Q
3 ' �� / N C �
� � w `V Q
N
T 'Yd / � H I
�� _ 431 / z"' �
-'_" � �s' M O
\ /� \ �� O Z
�, ( . m Z
zw �
¢o� � ��
- ��\ / - � �tt \ � �� �
,-� /� 6 ���
--� �/ � = ��
�� = j� �� -
�\� � � � --_:
.���: �
�� .�
.�� �� _ � ��p�
� �� �o�_
�_�._� -a�
m�- __�
� �-,�_v .�'��--",..�1 - - -�— ��" -�'
__ �.. ��
��.
� ;.:
�__ � ��� .} ^�._��� ,I ` _ . _
o d o o \ \
0 6�j � � L �
�.Y'i 3i« 4y �._, �Y' I
rv iC.�C•l��."aC� ���S I�1 � I �
:
� k�� I —�
�
S � �, �ul � �
_
, ��
�= • ---
� I �
o ._
� , �.�_,: I� - -- -�
<
,
� . �: �I�u�'����b. �F I � ` �l h��.��6`��� ' �� � �
.i�- � �_ �� � � � Wa� , Y' �, ,rj-r� �� �� �S
� ' � � ��� n� � 1 :w � �� �0 0
�� .� �� ���.;1:�3��1 � � N o�� �� ���� �� �� ��P n
I U U f �
I ,�' � � e
� , � ��� , f � � - -
�� �� � 1 x� .�� � i '��. I �u �
►., �.,� �I �� r'" . o � �.
; � o o���.�� 4.., � ��' � ���1 ,..,�
j � � �i�� ,, , �f� _ - _ — Q
ao c
� .
i h i � � 1
- - ,�--
i��t _ ,._ K__ .. , _...--Ftl '�� -- _ ni^ .� i- _ g��'c ( �>��j � I' ^ � `'''
; �— ( �
�� I�p��;� � - I� a ' I� �, �� ,�a I• � � O
_ ,
� � � I �'j 3 .��=', .��,:1�I � � �Q
� � rv� ���� � I � ;a; .I _ o 0
�� � tl i ��. , - I '� & � � �
� �� �� � � ..� . - . � , ♦�� � o 0
�� �I' " i —__�' :o�--�--L_ _.1 �� _�� �� " � ����N � `
.
�� � � I -�,_��-- � � =�- �:�:__
� ,. I i�a�� �,����� ,> >.. � ] 'I �''�"�� ��a �
�u '" �`- � '�`��_- -- ''-�Y- � �
� � ,�_�s��.� > '� / � I Il�. � �
- li �. - 4 ��-
" r��:�rvti1r=,>�Sr , .
.:� � ���I ' 11�1 I�_ 1.
z�:I , ., !�C.�; ,�.. 1� -��� ; � � ►�
,� �1,� }. � o ,� u �� � �� � � II �
�' .8$.is i I �� _ ._.._.�� ..1. I� ° � Ir —
'.b'33= �..h�,. . .� '�'.� � I��I,
IiHIN j i`—••�. � �� f "� I � �
� �
R�� No� �`
KCI Construction Company
�u3'b La«e �u i nve
Sf.Louis,MO 63123
(314)89�4-8888
Fax#(314)894-7n18
www.kciconstrucPion.com
- --^,<::>
��� ,.�_ . ����;
]I�ruas���,2�fl�
�a�o��
��a:l�dr.�'.�.lY�z��$a�i,�'.�.
50� ��;�t�a�d�a�ivay.
�R.�,oui5,1�� 6�102
�e: �ob#12002
�a�e�i�ard�a�fl`�Ya58�vbat�a�B'���3r,���R�'a�al�t�
�ha�g�PrmpoSaY# 07
De�r lYIr.l�dathai,
We propose to fiamish the nec�essary labor,material,tools and equiprnent to Provide crushed stone drive
over Effluent Outfall Pipe,per RFP No.4 dated O1/03/13,for the ins�ease�l lump sum o�Eight-Tl�ou�an�l
F�ur-�'Iundre��ighiy-1�1ine T)oliar�(5�,4��,Odi�,
PfleaS�rao4�th�follovva�g cl�rificatiar�5 a5�o�iated v✓i�h this pricing:
1
�Ta�e have a�Yt��h��l a���y of�ur chzsseg�pr�posal�stira�at�surnmary and ba�kup for your r�view.
If this prop�sal rn��ts dvitk�yot►s approval,pleas�sign the atYached copy in th�sp�ace providec�ans�retum
it,for oua�r��o�d5. �y��ag�nng t�a5������pr�po:�al,y��a are autho�azfla�g ai�to proce�d dvizh the dvork and
agge�erag dm forvv�rd 4��e���go��a�g��fi�reg��o�uan���3s as�d�+ayrn�n4 of th�above aarnount wit�i�60 day5
mf�ark p�nfoaaaa�aa���.
If yo�h���arsy qbi���ion�oa�c�rr��r�e�,g9�ei15�dO IlOII 11�31Cd1�lv E:l1lld'sddl 1A9.
�in�er�l�, lApPgoved
.,e<.-.,.-..��r ,� ! f
����� �• �'�' � 4 ��' .
T'horra�g�.�Iu�3e�
���j�s2lY�an�ag�r I��a�: //
__...Te
��������a�
� �
�
G
ti
�
�- �
x
o � °
o �
a W
V Q
� �
x �
U W
U
N
G
�..�.
�
a
0
� w
� 0
w m
C j, 9
� D �
� a `�
� V �
F � '3
i� U �v
� �
y o
b c
� �
� ro
� o
�
M 9 � O
� ti G.
O C� � �
o a x W � �
a o � _ .c
� U �- Z
t0 O O O O �`i O O O O V O G` O O O V h � � � � y
'� O O �O W N N O O O O O O O O O � C? 7 �D O� � U
�'i � � �O M � ^' �O O O O O vl O Vl O �D '� O� V N � � � 'V
G T N O\ O� O M v1 vl � v1 C c`i l� Co Co ^ O
� �v W F- � pa c� c� rn c� y U
z z �o z " � �, � �
,� y ¢ Q ...7 OD � � N
O F � J � �
�;, a a � z' � a � E
°. � � � v, �n C� o�_n F a.
a � y F �
°' `o F �
w o 3
O � �' aU � Uo' F- �I �
�
a �
� '' a�''i
W � �
� Ui
� O Q r �-'
O O O� F" U U
.> J � O� �j O O Q
� � � A Q
� O ^ O, EA N
C � � �' � � �
� C �V,ll cD�d 7i � N V F fl. L j Q � �] Ff3
� � V O � � N c�pd, .�.. � G � � O � � �
'O � ^ N O
� � O 3t 3[ � 7 6J o N ca a `J � O � �C O o 0. 6 �d W
` ~' v' � � ._} � .-. R R. � U � ,_, � 'p V
m °g � F a a o °" � U�' �a �a � a°i �a c��a � o � �' `� c ro U�' � � o Q
a� � . . � o o � c o � u
y�' o .o a� �v a�
`' 'o � cUn �° a r'3 .C o � `° `° � o- v> > rn �' ��°, ri v� � C7 � x � � C.xJ
V, a; o C1 •�.� •� O r.r: U cn � � W w O O = U c �
Q
-`,� r � U a
a y ti FW-
v`�, � FL- ..¢.]
� �
M o o �
�.. .. o
o a ^ a� _
" o
' � � � Ca � � �
�: T"' � ° � o .� O O '�'
_ a
� t .�
0 0 � o 0 0 0 0 0 0 0 0 0 �-, o 0 0 0 0 0 0 �
� �
.�
F �
O �
F- �
W �
¢ � o 0 0 0 0 0 0 0 0 0 0 0 0
� G � O
w z a' u'
..� O c �
� F � 3
O �
OO
W a F F
z � a �`
x �
v o 0 0 0 0 0 0 0 � o o � o � � o 0 0
� �
¢ x
x ¢
� �'
a �
� 3
F F¢
� C� v:
z
0
0 0 � � o 0 0 0 0 0 0 � o � N ¢
�
o a
� �
a
�
o �, �, � o
� � � � 3
F-
w
o F"
it � � O
o vVi
w E.�'.
O .r.i
a -r�-
0
� F" �, y y � .� � �, y � �, y a a �, a �,
V ] s .� .� .c � r .� v-�' .t s .`c .c �� �� � �� .�
� �
.G � ,
a � j�
z � � b
� � L � A
. �
� C
�-�y y N � p O � �
a x .�., 7 ,� y 3 �
� c w 2 �� �� c v o � '=^ r
u7 c �, . �o V s
O :° �o L �n � 3 �a ;,� A '°
c � .a
� e� c e°i o A 3 � 271 � v �j `�° Q � V C a��i � �
z @ c.n c � � � � � � � � a� o a� � �n u � >
C � ,,��j � Q � U ro � a, b V c n. Ll a, � a� � a .o 'C
r= c °' ci� cv m " o ? o �'"' ,tOj r°'.n e " w ¢ ❑ a� �°
._.._ � � 'C u � � c n. a. � o ;? •a C n. A � W c �-. �a > p
Z 'o '�o^ a 'o � °, v E E o � o � � � � �a :° 3 �: � � � o °
O a c`, v'� a w .� U F F a p7 a d U z � ?� Ll C7 U F- w z a
�
G ����� O F W O O O O N O O O O O O O O O N c�l O O O vt O . .
� . N O O .-. N Nt � �O GO M N r+t O� O ^ O �O l� f� '� •-., h V vt
O O O O O O N d' V � '/1 �O �O �O �D �O � I� r � Q` '"" N �"�
� _� @ U U � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C7 a
� �
o � o o � o 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �
� � �
a — v r
Q F �
O �
F U
N �
F o � �
¢ v r
�
a c
0
� A
F �
� �
� E-. � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
� � O
� � �
O G` �
c w 3
O
a
a
W F F
v
z ] �
¢
z
U '
a W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
¢ X
� ¢
c�''�-. F'
Q �
� 3
o F" F¢
� � 2'
�
0
�
0 0 0 0 �o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �
o� v
� �
�
�
�
F F
� �
0
o., o 0
U O � �
x �
� a �
a
O q„
F L
a "
�
� � y
U `�
� �a � o
po �'n -O
v
o ci K
L
0. � �
w �
i � � �
L C �
� A M� A E"i
_,.� � li V Y N O
=-Y �
0
� �
� oo
�� �� v v
.—. _
' � -' _�.3�:'�:._. `'�,--�� ��--�: �'3 `'' � � _�'-�,`.��, � � _$�i � £� �i � °�r {�
� ' ,
':�x v,"'�,�c� ;>f't'�S =4'�#':'R4t E3,��.?4���{> 4�'.�` �C.�L �k) ��� - °.k`�`. ��.t9�..,�� .� �� s, .t
�.
� ;s#� � -r �l� ��' � ��
a �
,�
.
. �"�
PFI: 374.�€3a.5637 + PY: 3 ➢ <I.487.5817 � WtiY�V..iHBrRKA.CUIYI
..�
January 8, 2013
KC! Construction Co
`�0315 Lakc B3uff Drive
�t. L+ouis, I�iC) �3'123
A�tn: To� Huste�
The foilowing proposal is for the outfiall access road at CAPf VI/WTP as per
your request.
8 963 - SUB GRADE 150.OQ HR 1,200.00
8 289 BOBCAT - DITCHES 140.00 HR 1,120.00
780 MIRAF1600X 0.95 SY 741.00
780 LABOR TO INSTALL M{RAF! 0.75 SY 585.00
215 MODOT TYPE 5 7.60 TN 1,634.00
4 HOURS TO KNOCK DOWN ROCK 'f40.00 HR 560.Q0
8 H4URS TO GOMPACT R(�CK 50.00 HR 400.OQ
S U B-TOTAL 6,240.00
1� % PROFIT $� O/H 936.04
TOTAL $7,1'76.00
Sincerely,
JH 8erra Con��ru�tion Ca 1nc
� �,
��� I/��K91
A�thony Berra
�lic� Presid�nt
�GJ Blkat
�.�% � "''.,""�.r`€.,�3:. ; x.�.' x-�--'�__:�Tx'�,:+� �z-,.� :� ,�"�',� w���"��`�"�'�""'�"`°e ,a•• ` � ,,�� �� ,._.._
-`^.'.,'. _ :..; � ` ,,;sn.x
.,:; . , .,. .
, _ . . _ � �� ._`:
...
'�` s`? �.' � t' ��"1 �� � '�. � °}' � � �`� � �,�' . '�:..� �. ("t.,.� '�'��` "�'�'. fu' ��'�'� ��:'� "��`: ;.
� �
J����� daccbs Es�gineerBr�g Groap Irac,
501 North Broadway
St.Louis,Missouri,631U2
314.335.4000 Fax 314.335.5141
Ja�uary 3,2013
Ndr. Tom Husier
��I Co�striacti��Coanp�ny
10315 Lak�Bi�aff I3riwe
St. L��zis,�/It3 b3123
Subject: ��qu��t f�a�P�������1'��,�—Cra�s�e��30���iv�Ove,r S4"Ef#��ent�fpe
ije�T Tom:
Pieas�prt�vide a��opc�sal�svi#h det�il�d breakd�a��n of labc��,material an�l equipment co�ts ior the following
work along the 54"efflu�nt pipe:
+ Construci a mfnimur�6"thick ar�d 12,' �+,vid�cru�hed sionr drive along the 54"effiuent pip�from
Cooper�tre�t to th�outfall structure using MODOT Ty�e 5 Aggregate.
Please note that ths remaining area between the levee ancl the flood wall of the existing plant shall be
reinstalled with rip rap per the notes on C-52&53. A drainage swale towards the river shall be maintained
on both sides of the drive(beiween the drive�nd the levee a�d the drive and the flood wall j. The top of the
levee shall also be restored to its original condition.
Please contact m�at 31�-335-4�72 or pk.mathai@jacobs.com if you hav�any questions or need any
additional information.
Sincerely,
,Tacobs
������
P.K.Mathai,P.E.
Pr�ject Manager
Attachment
c: Keith Clark
Casey Brunke
C5X65101-932
Jacoss Enginesring Graup lnc.