HomeMy WebLinkAboutRES.1371.05-18-1998 : �,.
�
BILL N0. 98-100 RESOLUTION N0. i`�� �
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH NIP KELLEY EQUIPMENT
CO. , INC. FOR THE ISTEA RECREATION TRAIL,
PHASE IV
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIR.ARDEAU,
MISSOURI, AS FOLLOWS :
A.RTICLE l . The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement with Nip Kelley Equipment Co . , Inc. for the ISTEA
Recreation Trail, Phase IV. A copy of said Agreement is attached
to this Resolution and made a part hereof.
PASSED AND ADOPTED THIS ��,(,� UAY OF lg �f��
A. . Spradling, III, Ma
ATTEST:
�
Ga�le . Conrad
Deputy, C:ity Clerk
;�, � .
CITY OF CAPE GIRARDEAU
RECREATION TRAIL
ISTEA ENHANCEMENT FUNDS STP-9500 (002)
STANDARD FORM OF AGREEMENT
BETNEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the day of in the year
19_ by and between the City of Cape Girardeau, Missouri (hereinafter called OWNER)
and Nip Kellev Equipment Co Inc (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
The work to be performed under these Contract Documents shall consist of
but not limited to the construction of 1,180 lineal feet of recreational trail,
including concrete and asphalt trail sections, concrete slope protection, and
associated stormwater drainage from North Kingshighway to Lexington
Avenue along the Cape LaCroix Creek in the City of Cape Girardeau,
Missouri.
Article 2. ENGINEER.
The City Engineer or his designee is to act as OWNER's representative, assume all duties
and responsibilities and have the rights and authority assigned to ENGINEER in the
Contract Documents in connection with completion of the Work in accordance with the
Contract Documents.
Article 3. CONTRACT TIMES.
3.1 The work wi�l be substantially completed within Ninety (90) calendar days after the
date when the Contract Times commence to run as provided in paragraph 2.3 of the
General Conditions, and competed and ready for final payment in accordance with
paragraph 14.13 of the General Conditions within One Hundred-five (105) days after the
date when the Contract Times commence to run.
A-1
. a . .,.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
completed within the times specified in paragraph 3.1 above, plus any extensions thereof
alfowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expense and difficulties involved in proving the actual loss suffered by OWNER
if the Work is not competed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a
penalty) CONTRACTOR shall pay OWNER _ Two Hundred Fiftv dollars $ 250 00 for
each day that expires after the time specified in paragraph 3.1 for Substantial Completion
until the Work is substantially complete. After Substantial Completion, if CONTRACTOR
shall neglect, refuse or fail to complete the remaining Work within the time specified in
paragraph 3.1 for completion and readiness for final payment or any proper extension
thereof granted by OWNER, CONTRACTOR shall pay OWNER Three Hundred Dollars
$ 300.00 for each day that expires after the time specified in paragraph 3.1 for
completion and readiness for final payment.
Article 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts
determined pursuant to paragraphs 4.1 and 4.2 below:
4.1 for all Work other than Unit Price Work, a Lump Sum of:
Sixtv-six Thousand Six Hundred Seventv-four pollars and Fifty seven Cents--------------
($ 66,674.57 )
All specific cash allowances are included in the above price and have been computed in
accordance with paragraph 11.8 of the General Conditions.
As provided in paragraph 11.9 of the General Conditions estimated quantities are not
guaranteed, and determinations of actual quantities and classification are to be made by
ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have
been computed as provided in paragraph 11.9.2 of the General Conditions.
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1 Progress payments; Retainage. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for Payment as
A-2
�._. , . .
recommended by ENGINEER, on or about the 10th day of each month during construction
as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by
the schedule of values established in paragraph 2.9 of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is
no schedule of values, as provided in the General Requirements.
5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as ENGINEER shall determine, or OWNER may
withho�d, in accordance with paragraph 14.7 of the General Conditions.
90°/o of Work completed (with the balance being retainage). If Work has
been 50% completed as determined by ENGINEER, and if the character and
progress of the Work have been satisfactory to OWNER and ENGINEER,
OWNER, on recommendation of ENGINEER, may determine that as long as
the character and progress of the Work remain satisfactory to them, there
will be no additional retainage on account of Work completed, in which case,
the remaining progress payments prior to Substantial Completion will be an
amount equal to 100% of the Work completed.
90% (with the balance being retainage) of materials and equipment not
incorporated in the Work (but delivered, suitably stored and accompanied
by documentations satisfactory to OWNER as provided in paragraph 14.2
of the General Conditions).
5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to
CONTRACTOR to 95% of the Contract Price (with the balance being retainage), less such
amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with
paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the
Contract Price as recommended by ENGINEER as provided in said paragraph 14.13.
Article 6. INTEREST.
All moneys not paid when due as provided in Article 14 of the General Conditions shall
bear interest at the maximum rate allowed by law at the place of the Project.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the
following representations:
A-3
- ►� .-�
7.1 CONTRACTOR has examined and carefuliy studied the Contract Documents
(including the Addenda listed in paragraph 8) and the other related data identified in the
Bidding Documents, including "technical data".
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance and
furnishing of the Work.
7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance and furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical conditions
in or relating to existing surface or subsurface structures at or contiguous to the site
(except Underground Facilities) which have been identified in the Supp�ementary
Conditions as provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR
accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions
of the extent of the "technical data" contained in such reports and drawings upon which
CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General conditions.
CONTRACTOR acknowledges that such reports and drawings are not Contract
Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR
acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy
or completeness of information and data shown or indicated in the Contract Documents
with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has
obtained and carefully studied (or assumes responsibility for having done so) all such
additional supplementary examinations, investigations, explorations, tests, studies and
data concerning conditions (surFace, subsurface and Underground Facilities) at or
contiguous to the site or otherwise which may affect cost, progress, performance or
furnishing of the Work or which relate to any aspect of the means, methods, techniques,
sequences and procedures of construction to be employed by CONTRACTOR and safety
precautions and programs incident thereto. CONTRACTOR does not consider that any
additional examinations, investigations, explorations, tests, studies or data are necessary
for the performance and furnishing of the Work at the Contract Price, within the Contract
Times and in accordance with the other terms and conditions of the Contract Documents.
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract Documents.
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information
and observation obtained from visits to the site, reports and drawings identified in the
Contract documents and all additional examinations, investigations, explorations, tests,
studies and data with the Contract Documents.
7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors,
ambiguities or discrepancies that CONTRACTOR has discovered in the Contract
A-4
;_. � . ,.. _
Documents and the written resolution thereof by ENGINEER is acceptable to
CONTRACTOR, and the Contract Documents are generally sufficient to indicate and
convey understanding of all terms and conditions for performance and furnishing of the
Work.
7.8 CONTRACTOR is aware that no second-tier subcontracting will be permitted.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement (pages 1 to 7 inclusive).
8.2 Exhibits to this Agreement (pages BF-1 to BF-6, inclusive).
8.3 Performance, Payment, and other Bonds, identified as exhibits PB. CPB and
consisting of 4 pages.
8.4 Notice to Proceed.
8.5 General Conditions (pages 1 to 55 , inclusive).
8.6 Supplementary Conditions (pages SC-1 to SC- 5 , inclusive).
8.7 Specifications bearing the title _Cape Girardeau Recreation Trail Phase IV.
8.8 Drawings.
8.9 Addenda numbers_ to _, inclusive.
8.10 CONTRACTOR'S Bid (pages BF-1 to BF-6 , inclusive) marked exhibit A .
8.11 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _to
_, inclusive).
8.12 The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto: All Written Amendments and other documents
amending, modifying or supplementing the Contract Documents pursuant to paragraphs
3.5 and 3.6 of the General Conditions.
8.13 Anti-Collusion Certificate (Submittal 1).
8.14 Contractor's Affidavit (Submittal 2).
A-5
8.15 EEO Certification and Affirmative Action in Subcontracting (Submittal 3).
The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(except as expressly noted otherwise above).
There are no Contract Documents other than those listed above in the Article 8. The
Contract Documents may only be amended, modified or supplemented as provided in
paragraphs 3.5 and 3.6 of the General Conditions.
Articte 9. MISCELLANEOUS.
9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions
will have the meanings indicated in the General Conditions.
9.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and, specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent (except to the extent
that the effect of this restriction may be limited by law), and unless specifically stated to
the contrary in any written consent to an assignment no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the
Contract Documents shall be reformed to replace such stricken provision or part thereof
with a valid and enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
A-6
3-- � < �
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in
multiple copies, One counterpart each has been delivered to CONTRACTOR and
ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents
have been signed, initialed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
This Agreement will be effective on , 19_ (which is the Effective Date of the
Agreement).
OWNER _ Citv of Cape Girardeau CONTRACTOR Nip Kellev Equipment Co Inc
Michael G. Miller Citv Manaqer
ay: By.
[CORPORATE SEAL] [CORPORATE SEALj
Attest Attest
Address for giving notices Address for giving notices
(If OWNER is a public body, attach License No.
evidence of authority to sign and
resolution or other documents Agent for service of process:
authorizing execution of Agreement.
(If CONTRACTOR is corporation,
attach evidence of authority to sign.)
A-7