HomeMy WebLinkAboutRES.759.10-05-1992 , �
BILL NO. 92-225 RESOLUTION NO. / � I
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ENTER INTO A CONTRACT WITH NIP KELLEY
EQUIPMENT CO. , INC. FOR THE EXTENSION OF
WHITENER STREET
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU,
MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City of
Cape Girardeau, Missouri, is hereby authorized to enter into a
Contract with Nip Kelley Equipment Co. , Inc. for the extension of
Whitener Street. A copy of said Contract is attached to this
Resolution and made a part hereof.
�- �� /
PASSED AND ADOPTED THIS --�{%�- DAY OF ���i'.�Gf L'�..- , 19 ��
;,,t� t:t`� " �/'���f/�, �
���'cK�}��X.X�t�,X��, � �
ATTEST: David S. Limbaugh, Mayor Pro Tem
�L.C.(.�/
Julie . Dale, Deputy City Clerk
CITY OF CAPE GIRARDEAII
WHITENER STREET EXTENSION
STANDARD FORM OF AGREEMENT
BETWFEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPIILATED PRICE
THIS AGREEMENT is dated as of the � 77-f day of !V 6'u�i-n��>
in the year 19� by and between the City of Cape Girardeau, Missouri
(hereinafter called OWNER) and NIP KELLEY E4UIPMENT CO. , INC.
(hereinafter called CONTRACTOR) .
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
Article l. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
CONSTRUCT A 300' P.C.C. EXTENSION OF WHITENER STREET, 30' WIDE, FROM
EXISTING WHITENER STREET TO SILVER SPRINGS ROAD, INCLUDING ALL STORM
. WATER INLETS, PIPES, AND BOX CULVERTS AS SPECIFIED IN THE PLAN
SHEETS AND SPECIFICATIONS
Article 2. ENGINEER_
The City Engineer or his designee is to act as OWNER's representative, assume all
duties and responsibilities and have the rights and authority assigned to
ENGINEER in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents.
Article 3. CONTRACT TIl�s.
3.1 The work will be substantially completed within FIFTY-FIVE calendar days
after the date when the Contract Times commence to run as provided in paragraph
2.3 of the General Conditions, and competed and ready for final payment in
accordance with paragraph 14.13 of the General Conditions within SIXTY
days after the date when the Contract Times commence to run.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work
is not completed within the times specified in paragraph 3.1 above, plus any
extensions ther.eof allowed in accordance with Article 12 of the General
1
Conditions. They also recognize the delays, expense and difficulties involved
in proving the actual loss suffered by OWNER if the Work is not competed on time.
Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER
ONE HUNDRED FIFTY AND NO/100--- (5150.00) for each day that expires after the
time specified in paragraph 3.1 for Substantial Completion until the Work is
substantially complete. After Substantial Completion, if CONTRACTOR shall
neglect, refuse or fail to complete the remaining Work within the time specified
in paragraph 3.1 for completion and readiness for final payment or any proper
extension thereof granted by OWNER, CONTRACTOR shall pay OWNER TWO HUNDRED AND
NO/100--- (5200.001 for each day that expires after the time specified in
paragraph 3.1 for completion and readiness for final payment.
Article 4. CONTRACT PRICB.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts
determined pursuant to paragraphs 4.1 and 4.2 below:
4.2 for all Unit Price Work, an amount equal to the sum of the established
unit price for each separately identified item of Unit Price Work times
the estimated quantity of that item as indicated in this paragraph 4.2:
ESTIMATED TOTAL
NO. ITEM UNIT QUANTITY UNIT PRICE PRICE
1. Clearing & Grnbbing Acre .32 S 2,000.00 S 640.00
2. Excavation Class B Cu. Yd. 951 S 4.00 S 3,804.00
3. Pavement Removal S.Y. 76 S 12.00 • S 912.00
4. P.C.C. Concrete, .
6" thick S.Y. 928 S 18.69 5 17,344.32 .
5. 6" Integral Curb L.F. 556.6 S 2.10 S 1,168.86
6. Seed & Straw Acre .14 5 3,000.00 5 420.00
7. Triple Inlets Each 2 S 1,886.00 5 3,773.00
8. Combination Znlets
Neenah ,�R-3260-A Each 2 S 2,370.00 S 4.740.00
9. 15" R.C.P. L.F. 26 S 23.14 S 601.64
10. 18" R.C.P. L.F. 21 S 24.68 S 518.28
11. 15.5" X 26" R.C.
Pipe Arch L.F. 32 $ 0.00 S 0.00
2
11A. 19"x30"
Eliptical RCP L.F. 32 � 40.52 S 1.296.64
12. 22.5 X 36.26" R.C.
Pipe Arch L.F. 7 S 0.00 S 0.00
12A. 24"x38"
Eliptical RCP L.F. 7 S 47.78 S 334.46
13. 3' X 10' Concrete
Culvert L.F. 65 S 335.00 S 21.775.00
14. Rip Rap C.Y. 100 5 23.00 S 2,300.00
TOTAL BID FOR ALL UNIT PRICES- Fiftv Seven Thousand Nine Hundred Ninetv-Six
Dollars and 10/100----------------------------------------------- fS57.996.10 l .
As provided in paragraph 11.9 of the General Conditions estimated quantities are
not guaranteed, and determinations of actual guantities and classification are
to be made by ENGINEER as provided in paragraph 9.10 of the General Conditions.
Unit prices have been computed as provided in paragraph 11.9.2 of the General
Conditions.
Article 5. PAYMENT PROCEDIIRES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14
_ of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions. .
5.1 Progress payments; Retainage. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application foz Payment as
recommended by ENGINEER, on or about the lOth day of each month during
construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments
will be measured by the schedule of values established in paragraph 2.9 of the
General Conditions (and in the case of Unit Price Work based on the number of
units completed) or, in the event there is no schedule of values, as provided in
the General Requirements.
5.1.1 Prior to Substantial Completion, progress payments will be made in an
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
General Conditions.
90$ of Work completed (with the balance being retainage) . If
Work has been 50� completed as determined by ENGINEER, and if the
character and progress of the Work have been satisfactory to OWNER
and ENGINEER, OWNER, on recommendation of ENGINEER, may determine
that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on
account of Work completed, in which case, the remaining progress
3
payments prior to Substantial Completion will be an amount equal to
100$ of the Work completed.
90$ (with the balance being retainage) of materials and
equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentations satisfactory to OWNER as
provided in paragraph 14.2 of the General Conditions) .
5.1.2 Upon Substantial Completion, in an amount sufficient to increase total
payments to CONTRACTOR to 95$ of the Contract Price (with the balance being
retainage), less such amounts as ENGINEER shall determine, or OWNER may withhold,
in accordance with paragraph 14.7 of the General Conditions.
5.2 Fina1 Payment. Upon final completion and acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
Article 6. INTEREST.
All moneys not paid when due as provided in Article 14 of the General Conditions
shall bear interest at the maximum rate allowed by law at the place of the
Project.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the
following representations:
7.1 CONTRACTOR has examined and carefully studied the Contract Documents
(including the Addenda listed in paragraph 8) and the other related data
identified in the Bidding Documents, including "technical data".
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied
as to the general, local and site conditions that may affect cost, progress,
performance and furnishing of the Work.
7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and
local Laws and Regulations that may affect cost, progress, performance and
furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical
conditions in or relating to existing surface or subsurface structures at or
contiguous to the site (except Underground Facilities) which have been identified
in the Supplementary Conditions as provided in paragraph 4.2.1 of the General
Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2
of the Supplementary Conditions of the extent of the "technical data" contained
in such reports and drawings upon which CONTRACTOR is entitled to rely as
provided in paragraph 4.2 of the General conditions. CONTRACTOR acknowledges
that such reports and drawings are not Contract Documents and may not be complete
4
for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do
not assume responsibility for the accuracy or completeness of infcrmation and
data shown or indicated in the Contract Documents with respect to Underground
Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully
studied (or assumes responsibility for having done so) all such additional
supplementary examinations, investigations, explorations, tests, studies and data
concerning conditions (surface, subsurface and Underground Facilities) at or
contiguous tot he site or otherwise which may affect cost, progress, performance
or furnishing of the Work or which relate to any aspect of the means, methods,
techniques, sequences and procedures of construction to be employed by CONTRACTOR
and safety precautions and programs incident thereto. CONTRACTOR does not
consider that any additional examinations, investigations, explorations, tests,
studies or data are necessary for the performance and furnishing of the Work at
the Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents.
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract
Documents.
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information
and observation obtained from visits to the site, reports and drawings identified
in the Contract documents and all additional examinations, investigations,
explorations, tests, studies and data with the Contract Documents.
7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors,
ambiguities or discrepancies that CONTRACTOR has discovered in the Contract
Documents and the written resolution thereof by ENGINEER is acceptable to
CONTRACTOR, and the Contract Documents are generally sufficient to indicate and
convey understanding of all terms and conditions for performance and furnishing
of the Work.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement (pages 1 to 6, inclusive) .
8.2 Exhibits to this Agreement (pages _ to _, inclusive) .
8.3 Performance, Payment, and other Bonds, identified as_exhibits and
consisting of pages.
8.4 Notice to Proceed.
8.5 General Conditions (pages to , inclusive) .
8.6 Supplementary Conditions (pages to , inclusive) .
8.7 Specifications bearing the title and consisting
of divisions and pages, as listed in table of contents thereof.
5
�
8.8 Drawings consisting of a cover sheet and sheets numbered through
, inclusive with each sheet bearing the following general title:
Drawings not attached hereto.
8.9 Addenda numbers 1 to 2 , inclusive.
8.10 CONTRACT�R's Bid (pages to , inclusive) marked exhibit
8.11 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _
to , inclusive) .
8.12 The following which may be delivered or issued after the Effective Date of
the Agreement and are not attached hereto: All Written Amendments and other
documents amending, modifying or supplementing the Contract Documents pursuant
to paragraphs 3.5 and 3.6 of the General Conditions.
The documents listed in paragraphs 8.2 et seq. above are attached to this
Agreement (except as expressly noted otherwise above) .
There are no Contract Documents other than those listed above in the Article 8.
The Contract Documents may only be amended, modified or supplemented as provided
in paragraphs 3.5 and 3.6 of the General Conditions.
Article 9. MISCELLANEOUS.
9.1 Terms used in this Agreement which are defined in Article 1 of the General
Conditions will have the meanings indicated in the General Conditions.
9.2 No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the written
consent of the party sought to be bound; and, specifically but without
limitation, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by law) , and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge the assignor from any duty or responsibility under the Contract
Documents.
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns
and legal representatives to the other party hereto, its partners, successors,
assigns and legal representatives in respect to all covenants, agreements and
obligations contained in the Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or
unenforceable under any Law or Regulation shall be deemed stricken, and all
remaining provi,sions shall continue to be valid and binding upon OWNER and
CONTRACTOR, who agree that the Contract Documents shall be reformed to replace
such stricken provision or part thereof with a valid and enforceable provision
that comes as close as possible to expressing the intention of the stricken
provision.
6
9.5 OTHER PROVISIONS.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in multiple
copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and
two counterparts to the OWNER. All portions of the Contract Documents have been
signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER
on their behalf.
This Agreement will be effective on /V�������J � , 19��(which is the
Effective Date of the Agreement) .
OWNER �i rY 0�= �'F}P� l'o/Rf�R��..4 L(� CONTRACTOR�,,;_,�� I!l="J t ���c�v1tiQr(,�
(T
� � _ "
.
/��
By: '` f' ' ` By.
v� [CORPORATE SEAL] [CORP6�,TE, SE�L;
�i n
Attest Attest ��,.�;,,. `l� G` ,��-
��
Address for giving notices Address for giving notices
�D� �AlIJc.PEAJD��tic::c •�/ /� :��r i r�a �l .
����'� �i���eo�yu�vtc ��'7D/ l�i<<a���� �a,�f wu� �3�0/
(If OWNER is a public body, attach License No.
evidence of authority to sign and
resolution or other documents Agent for service of process:
authorizing execution of Agreement.
(If CONTRACTOR is corporation,
attach evidence of authority to
sign. ) �
7
� _ CITY OF CAPE GIRARDEAU
WHITENER STREET EXTENSION �
BID FORM
: (EJCDC 1910-18) (1990) - -
�IIS BID IS SUH1�iiIT'I�D TO: CITY OF CAPE GIREIRDFAU, M� _
4 O 1 Il�DEPII�DII�C� STREET
CAPE GIRARDFAU, ND 6370I-6244
l. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter
- into an agreement with OWNER in the form included in the Contract Documents to
perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Bid Times indicated in this Bid and in
accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or
Invitation to Bid and Instructions to Bidders, includinq without limitation those
dealing with the disposition of Bid security. This Bid will remain subject to
acceptance for thirty-five days after the day of Bid opening. BIDDER will sign
and deliver the required number of counterparts of the Agreement with the Bonds
and other documents required by the Biddinq Requirements within fifteen days
after the date of OWNER'S notice of Award.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the
Agreement, that:
(a) BIDDER has examined and carefully studied the Bidding Documents and the
following Addenda, receipt of a11 which is hereby acknowledqed: �ListAddenda by
Addendum Number and Date)
�a��.��-�� �e„�'�'e'�t"}�'a�' �-, 1rg..Q� -
��o-f— l5 ,� !�l�Z
(b) BIDDER has visited the site and become familiar with and is satisfied . _
as to the general, local and site conditions that may affect .cost, progress�� .__
performance and furnishing of the Work; _
(c) BIDDER is familiar with and is satisfied as to all federal, state aad =; -
. local Laws and Regulations that may affect cost, progress, performance .and ���:.
furnishing of the Work. -
(d) BZDDER has carefully studied all reports of expTorations and tests of -` ��
. subsurface conditions at.or contiguous to the site and a11 drawings of physical.,.:::, � �
1 _
:: ... .
.
. _. :;. :,._.
.ir. . . . - . . . . . � .. .
' � � _ . . . � � � . �? .
..v �. . . . .�.. �- ' .�-� .. �..::: ::�.
���_._ ' . .... _', ...-..
L'd;...-. � . . . � � . � . . . . .. . . . . . .. ..
� : -- - conditions in or rel.ating to existing surface or subsurface structures at or� :
contiguous to the site (except Underground Facilities) which have been identified _
in the Supplementary Conditions as provided in paragraph 4.2.I of the General
Conditions. BIDDER accepts the determination set forth in paraqraph SC-4.2 of _
the Supplementary Conditions of the extent of the "technical data"
contained in such reparts and drawings upon which BIDDER is entitled to rely as.`'
' provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that ��"-
such reports and drawinqs are not Contract Documents and may not be complete for :�
BIDDER'S purposes. BIDDER acknowledges that OWNER and Engineer do not assume • :: •
. responsibility for accuracy or completeness of information and data shown or '
indicated in the Bidding Documents with respect to Underground Facilities at or
contiguous to the site. BIDDER has obtained and carefully studied (or assumes :
responsibility for having done so) all such additional or supplementary
examinations, investigations, explorations, tests, studies and data concerninq
conditions (surface, subsurface and Underground Facilities) at or contiguous to
the site or otherwise which may affect cost proqress, performance or furnishing
� of the Work or which relate to any aspect of the means, methods, techniques, _
. sequences and procedures of construction to be employed by BIDDER and safety
precautions and programs incident thereto. BIDDER does not consider that any
additional examinations, investigations, explorations, tests, studies or data are
necessary for the determination of this Bid for performance and furnishing of the
Work in accordance with the times, price and other terms and conditions
of the Contract Documents.
(e) BIDDER is aware of the general nature of Work to be performed by Owner
and others at the site that relates to Work for which this Bid is submitted as
indicated in the Contract Documents.
(f) BIDDER has correlated the information known to BIDDER, information and
observations obtained from visits to the site, reports and drawings identified
in the Contract Documents and all additicnal examinations, investigations,
explorations, tests, studies and data with the Contract Documents.
(g) BIDDER has given Engineer written notice of all conflicts, errors,
ambiguities or discrepancies that BIDDER has discovered in the Contract Documents
and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the
Contract Documents are generally sufficient to indicate and convey understanding
of all terms and conditions for performing and furnishing the Work for which this
� Bid is submitted.
' (h) This Bid is genuine and not made in the interest of or on behalf of any :
- _ undisclosed person, firm or corporation and is not submitted i.n conforsnity with _ `
- any agreement or rules of any group association, organization or corporation; . . :
BIDDER has not directly or indirectly induced or solicited any other Bidder to :`
submit a false or sham Bid; BIDDER has not solicited or induced any .person, fi.ria " .-
or corporation to refrain from bidding; and BIDDER has not sought. by collusionµ;;;; ;.
to obtain for itself any advantage over any other Bidder or over OWNER. ' '- - -
-- �i� �Arry other representarion required by Laws and Regulations.J � .
_ 2
:��
__�:Y't._. _� . . �
. _,T , .
y.:,.t �.' . . � . . .
, ...3�'�.�.�;..: - . � � . :..'. _
� - - =4�_ BIDDER will complete the Work in accordance with the Ccntract Documents for`
- the following price(s): � _ _ _
IINIT PRIC� BID _
_ ESTIMATED TOTAL
NO. ITEM IINZT `` QIIANTZTY IINIT PRICE PRICE
- 1_ Clearing & Grubbinq Acre " �32 S � . nnn _ pp 5 Fan _nn � -
2. Excavation Class B Cu_ Yd. 951 . S 4. 00 5 � . ti�4.00
3. Pavement Removal S.Y. ' 7fi � 12 .00 5 Al2 .00
4. P.C.C� Cancrete,
6~ thick S.Y. 928 - - 5 I 8 .69 517 ,344.32
�5. 6" Integral Curb L.F. 556.6 � S_2.10 S 1 ,168�86
6. Seed & Straw Acre .14 S 3 ,000 .00 5 420.00
7. Triple Inlets Each 2 S 1 , 886 .00 S 3 ,772 .00
8. Combination Inlets '
Neenah �R-3260-A Each 2 5 2, 370 .00 5 4,740. 00
9. 15" R.C.P. L.F. 26 S 23 . 14 S 601 .64
10. 18" R.C.P. L.F. 21 5 24. 68 S 518 .28
_��
I1. 15.5" X 26" R_C_
Pipe Arch L_F_ 32 S 00�.00 5 � �00'. 00'
12. 22.5 X 36.26" R.C.
Pipe Arch L.E'. 7 5 '00.-00 S "�`00�.0�0 -
13. 3' X 10' Concrete -
culvert L.F.. 65 5 335 .00 S21 ,775 .00
. __-
TOTAL BID FOR ALL IINIT' PRICES- See Total on Addendum #1 �g ) .
� � IInit Prices have beea computed in accordance with paragraph II_9.2 of the Generai , ` ._
Conditions. �
BIDDER acknowledges that quantities are not:guaranteed and final payment wiTZ be :` -
� :
based on actual quantities dete=mined as provided in the Contract Documents � - -
�5. BIDDER aqrees that the Work. will be. substantially complete withiri 55 ' �.
;-calendar days after the date whert the Contract Times commences:to run as provided �'�� ;:
in. paragraph 2.3 o£ _the General Conditions,: -and completed and ready for fina�=�
�. payment in accordance with paraqraph I4..13 of the General Conditions within 60' .
� calendar days after the date when"the Contraat Times commences to run.
.• =.: _ . : .. . . =,� � - ':3 _ - _ - .
:',_, � .,.. ,: . : . ',. ,- :� - �e ti � -
..; , ._ :._ _.__
._ ,
`_,:.. ,': :-::. • ,�� :. ._ ,�.:; . _ -
< F
,. -.: .
} _ _
.- --- ... .` - ` - -
: ,:
_ _ _ _ .. �,... _ _
' _ - _ - � _ -> _-
.'_ :
L..-;') ..��..:�.:. .��::�. � � .. - ... _' .. .-..:�' �'�. . .�:._...__� .r k... �'r'�'4i ..�__.. . � _ ._ _ .. . . .. naat.�.'k.,. ._ .
t �
. _ . . . .__. _
� September 8, 1992 � �
AD D E. N. D UM #1 .
- TO =
WHITENER STREET EXTENSION _ , . -,. ..
The following revision has been made to the abave named
Proposal: _
The following iteat has been added to the Bid Form and
Standard Form of Agreement: �
� Estimated Total
No. tem IInit Quantitv IInit Price Price
� . -.`,
14. Rip Rap Cu. Yd. 100 � $ 2� _ nn $ � �3��_��
Total Bid For All IInit Prices �'ifity Seven Thousand �Nin�e•��.Hundred :: -
I�inetY�-:S�x Dollars-----�0�IQ0----------_ (S 57 996 10 1
This addendum must be attached to your bid proposal.
,
- - -. , .:. : :.:: � ::
-__ ... � .- _ �:�
. . � -
, �. :� ,... _ - _ - _
_ ...
. .
. ,. -
T".::. � '. � .. . �. . :. . ' .. . ..' . . . ��..:' ..'�.' �� �..'." . '.
. . -... -.� . .. - .. ' - - ..'.. .. . � � . .
Y.. : . � � . . . ' - ' . . ' . . .. �. � . � . . .. . T '
� : � -.�.. � . , -;.. ..' .y . -. .
� � . ._ .,: -_ � ._ ^t -.
• _ .. . � . .. . .. . _ .. ._:
. .��a:r.._..• ,. . � ,.. .. . . .. . . �� . .__ . . , ..�. . _ ... . . � � _. . _ . .. ._ .. . , ,._.. � __. ... .
September 11, 19 9 2 ° _ -'-� -�
. _ . A D D E N D U M _#2 _
TO _-
--- � :� - -
� �2 �
__ WHSTENER STREET EXTENSZON _ ��;�, -
- -. - : .�.:.:,:;;:Y=:�
� The fcllowing revisions have bean made to the above namect�,r?_
Proposal: -
. ::::a�°-':,:. :
Z. The following items may be bid as an alternate to Items�
11 & 12 on the Bid Form and Standard Form of Agreement:
Estimated Total `-
�To. Item IInit Ouantitv IInit Price Price _
11A. 19"x30" LF 32 LF $ 4.0.52 $ 1 , 296.64
_ : Eliptical-RCP :
12A. 24"x38" LF 7 LF $ �47:78 $ 334.46
Eliptical RCP
Total Bid For All IInit Prices ._ Fiftv Nine Thousand Six Hundr•ed
.
. _ . �j'want� �PVPn Do11a ----------20/100----------- ($ 59, 627. 20 )
II. Two {2) days will be added to the bid time as a result of
the addendum. The Bid Opening will be scheduled at 10: 00 A.M. on
SEPTEMBER 17, 1992.
� - This addendum must be attached to your bid proposal.. _ �
� - x
:�_ _�; -
_ . . . . rS� 3.:'
. .. .. . . �'� .... .._
.. . . . ' . . � , . ' _' _ M���
.. . �� • . ' . . . . .. .-.�. . : . . . _.� �.—v....:..
� " - . . . . . .. ..
. . . . . ... . ... -.. .� . . :.
. - . . . . : '�'Z
_ . _ . . . . . . . . . � . � . . - . . \ �-k� � .
�t .
. . �� . - . . � C . _
_ . � . . _ � � . . . . . . . � � . � -. � M�i+w
� � .. , . . . . . . � .. . ' _ .2� +Y
. . ' . . . ., - ' �n'w�•w�
" . . . . . .. . . . . � . - � t V �.
' . . , ' . _ . . . .. . .;. .. �� �
�:
' � . . . . . ' . '' . � . _ .3' tiy*.�� .
_ . , . . . � . . - . . _ . _ ... � - - .. . r�. : _ .
. . .. . . . . .. . � . . � - � � a
� . � - _ . . . . . � ... � - . . .. ... . • . _ .. ,} 'r .'
_. _
_
.....�.. . � �� . . : _ . .. .
� ..:_.�.... .. .
., �:...�.-r- .,_._
., � .. . . . .. �. . . .:
.'.'`'—�_ .... . .. .. :. � � . . . ••--
. .".... . ' :�'
� � ,,.
��� �- • - BIDDER accepts the provisions of the Agreement• as to liquidated 'damagea in the
� event of failure to complete the Work within the times specified in the
Agreement. �
6. The followinq documents are attached to and made a condition of this Bid: �
(a) Required Bid Secutity in the form of g;,� Rnnrl `
(b) A ,tabulation of Subcontractors, Suppliers and other persons '�and �
organizations required to be identified in this Bid.
(c) Required BIDDER'S Qualification Statement with supporting data.
-. (a) (Add other docwnents as pertinent)
. 7. Communications concerning this Bid shall be addressed to:
Name vince Kelley
Address 41 North SBriqg St. , CaAe Gir. , MO
8. Terms used in the Bid which are defined ia the General conditions or
Instructions will have the meanings indicated in the General Conditions or
Instructions.
SUBMITTED on September 15 • . , 19 92 .
• State Contractor License No.
IF BIDDER is:
An Individual .
sY (sF.A7•j
(Individual's Name) - _
doing business as
• Business address: . -
_ . - � � . . . � _ . . �. . .. .. . . .... '.F -�:
�. . ' ' ' - . � ... . . ' . . t - �� �
_ .. . � . � . � � . - � =� v
- Phone No.. �,� _ _
- - t -
. - ;;�
- ' . � ' ' . � . � . . ..h =
.. . ..� '.� ...:: .. . .�
, - . . .. . . . ,. .' ' w .
_ 4 . _ _:
:.:.. . - -
,,.- : . . -. �
; :_ :.
_ , ; ,.,�
-. . ,� _
_ _ . .. _ -:T.. _ � .
� _ . .} .
�a ._ _ - , -
... _
� :_�- . . _ ._ ... .�>`. ...
..�
._; .: _ _.._ . . . . _. _:.. . _ :: _ :.,:
___.._:.: .
A Partnershio - -
----- - - -
B _---.___ . _> - =- --. _...
, Y (.S�) .:: .. ..
(Firm Name) _ __
(general partner) . _ ...:.,.
-- -
Business address: � -
Phone No. :
.. A Corfloration � . .
. By (SEAL)
� Corporation Name) � • - .
Missouri
(state of incorp r ion)
By .•°";-.r�`;J'``'�rr,. �...Claude Kelley III (/�i�i� �,�
-J�'�` •`j•�--`��` �- name of erson authorized to si n
-,,�.: �r' "'�� P g )
_ =�;,..��,ti - .�," .�:��
� r.,_ ._.
_ - ,.'`� . ...• .���
_ _ - : ,� : '"�;:a��r3e�.�.
- .- ,:� �' '-� �" - - (Title)
' � ;(�c��ate Ssal;� _
� `> ,+o �
.. . ' �� i.. . -.:� +t�� � ' . .
. �;,�N_..� •. �eJ� ��l��_'S s` . .
. . .. ' �../� -. o ��•s...•��� .7''>>� . . . .
' ��'~�� �� Q�!01�4 . ' .
J�.e}� a
�'J'''��f3�3�isas�'s�
Attest
- Vince Kelley (secretary)
� Business address: -
' Cape Girardeau, MO 63701 -
'. . Phone No. : � 314-334-6i caT - . :.. .
_ , ,. ..
. . . �-: - .. .�- . .- .. - _ -.• �.':' _..:5. .,'_-
' Date of Qualification to do business is ' '
, -
� - 5 - _
� . . - . ,�;
. .. . _
. . _. . , _..
,.
. . . . . . . _ _ _ .T:
. . . � - ' . � j...� h
•..�._ �.... . . .. . ... ' ' . '. � . _ .. .... ... �Lr�.:.,iT..�...
!i �
- PREVAILING WAGE DETERMINATION
State Agency or Sub-Division Determination No.
City of Cape Girardeau Engineering Div. 93-016-0009
Location of Project Date of Issue
City County
Cape Girardeau Cape Girardeau County
� `' August 17, 1992
Description of Work:
Whitener Street Extension
Determinatlon No. 93-016-0009 is provided upon the request of
Mark A. Lester
City of Cape Girardeau .
401 Independence
Cape Girardeau, MO 63701
In accordance with Section 290.260 RSMo (1986), within thirty (30) days atter a certified copy.of this
determinatlon has been filed with the Secretary of State as Indicated below,any person who may be affected
by this deternnl�ation may object by filing an objecUon In trtplicate with the�Labor and IndustMal R�lattons
Commisston, P.O. Box 598,Jetferson Clty, MO 65102 Such objections must set forth trt writin� th�spedfic
grounds of objectlon. Each obJection ahali ce�tify that a copy has been fumished to the Dlvisbn of Labo�
Standards, P.O. Box 449, JeHerson City, MO 65102, and to the party which nquested thls debnnlnatton,
pursuant to 8 CSR 20-5.010(1). '�_� �_%����T� �`_ �
� FOR OFFICE USE ONLY
_ - �s-.
Filed With Secretary Of State: � � ��� �� ���� `
Last Date Objections May Be Filed:
SEP 16 1992 '�'��
MO E25-0149(3-92) �
4 `
' STATE OF MISSOURI
DONNA M.WFIITE
DEPARTMENT OF IJIBOR AND INDUSTRIAL RELATIONS ���
DIVISION OF LABOR STANDARDS ��
` = 'r ..o..ox..a
JEFFERSON GITY.MISSOURI 631 O2 LTIMOTFIY WiL30N
JOHN ASMGROFT atarfstssos �
� � ��aNO1 ewrcrow
CERTIFICATE
- The Division of Labor Standards, having duly ascertained and considered
the applicable wage rates for and within the locality, pursuaat to
- Sections 290.210 to 290.340, RSMo 1986, issues herein its determination
and certifies to you as follows:
1. This wage determination identifies the applicable
prevailing hourly rate of wages, as defined in
Section 290.210(5), RSMo 1986.
2. This wage determination recognizes that the
proposed public works pro,ject may involve
� . building construction and/Ar highway and hpavp
construction. See. 8 CSFZ 30-3.040.
3. The prevailing hourly rate of wages applicable
to an individual workman is determined bq the
type of work performed by the individual, taking
into consideration whether the public works .
construction involved is building construction
and/or highway and heavy construction. See.
Section 290.210, RSMo 1986; 8 CSR 30-3.040.
4. The term "building construction" is defined in
8 CSR 30-3.040(2). (A copy of this rule is
attached. )
5. The term "highway and heavp construction" is
defined in 8 CSR 30-3.040(3). (A copy of this
rule is attached. ) f�
6. A certified copy of this wage determination will
be filed immediately with the Missouri Secretary
of State and in the files of this department.
The law provides that not less than the prevailing hourly rate of wages �
determined by the Division shall be paid by a contractor or subcontrac-
tor. However, a higher wags rate may be lawfully paid. See, Section
290.270, RSMo 1986. - -
Should objections be filed to any portion of this determination,"such `
objection or objections must be specific and filed in accordaace with� :;`
� Section 290.260 of the Missouri Prevailing Wage Law. -
Gc_J
. Timot Wilson, Director _
' a CSR 30-1.040 Cta»if�atioaa of Con• fH) Sidcrall�s othu than tbose that ue
atrue�on Worl� Oo�red ia aQanecaon witb a st�es or road
�oiKs;
PURPOSE: fl�e Dspsrtment ot Lsbor (I) Dri�er��a that are �ailt to �ave a
snd Indasrrial Relationt Aas ehe b���;
niponsi6ility widsr ttctio� t90.?60, � Pu�iaj�ot�aoan�cied co a b�ldi:sj aad
RSMo m dctcrnsine tlup►e�nilin j lw�r! all:trnaara bailt as pukiat taeilices;
ratr ot +��e: to bc paid to ioonkm (K� Retaiain� walL bailt ia aajnaccoa
a+[a jed in ivork o/a timilar eharaetes. *ssh a busldint prot�cs;
l� ►�k asablish�: ela�ii�iratians o( � �moliaoa of a b�din�(t)�s part of tbe .
sor�stTucsion�vo,k(or the depamnrar to . �°�p�P�tion for ae�bnildin�constrserion;
sse in detemeiniri,�tlu ynuaili Aor�il (�'� Lad:capia� of baildin� tites or the
rate of �+n�a /or ivor� o/ u'�nilar ��[of all ahr9bbezy tbas u iaodmtal ta
eharsrsc�. �a���oa as deSned ia�eesioa(�:
. (1) All pobli� �orl�s ooastrnerion, fot wbieh (� work oa �rater and waste�asa trat-
tbe prevai�ia�bourly rau of wa�n of workers meai pLast rithia t6e feaa liaa
att co bt decamiaed, shtll be elassi5ed as � � H.i�hwty aad haq' e�osttive�oa =ha11
dther— meta the follow'ia�
(A) Buildia=cons�verioa:or (A) Work ia coanec�on.itb raads,str+eecs,
(B? N.i;b�ay and ha�Z ooas��oa. ��"'�Yc,alleys��3 hiQ�wayi iacludia=,bui
noz limited to,tradinP,Davia�.earbia�,ti�ns,
(� Bnildia� eanttrvctioa thall mean the ���Nardnils,brid�es,li��ssia�.i,esaiaiaj
tollowin� •�Is aad landscY�inr
� (A) BuiIdiat�actara,iae3ndia�modi5a- B) Work oa tidncts, o.erAa�a. aader-
tioa, �ddirioat tad/or repaiss y� be wed for ��, �a�t p�iKss, aqneducts. nri��.
tbelter, yroteetion, eemtort, eonveaienee. tion proje�c7i, flood eona�ol projecLc,tKj�m=.
eatrrtainmeat or ree�ea�o or foz tion Droieetc, reservoir �l�aCon aad snPD�Y
of a' �� . P�1�.�akr w
D�PIe or eqnipment; Do tr,dua liaes,disiribuIIoa
(B) Buildia�s at aa �irport proiecs,snth� liaa. PiP� liaes, laki, dika, kvees, rtvet-
ttmiiaal buildia��,frei�ht buildinp aad aay menu arojecta, escludint �rork tpecfiesllY
otheuonstruction necasary for tbt o defined u bui]di,ne eonstructioa;
of tbe D�aon (C1 R'ork in eonneerion .ith nnder�roaad
airpoct facilitia; eoasBvcpon on tunaels and�afts;
(C) Stadiams, athletic Seldi, dre:siaj (D) Riilro�d.ozk ia its ea '
toomi, bleachers and aIl otha bnildiap de��ted nilroads; �Y�iar3ndia�
aecded ia �onnecaon viih aa athlebc oz
mtrrtainmens fadlisy; �) M+�iad ude Kwer�;
(D) Enare buildinp tbas are bn�t abo� l� �''ork ia conaecrion�eith aitports,=nch
�toand in oonaecIIoa wii�hithwa�,tabwa� a� tva��ys,roads aad ttmts,bat ac3adin�
or tunnel Proiects, �neh at bol sta�ea� ac i�at which u lisud�a bnildi.n�eonsQacrioa;
housia`;or mechaninl eQaipmmt (G) Work in tonnection with telephoae,
(E) E:ca.ation for the bnildiat itielf, ���'�a�� °�tis or fuel tiaes,or aay
iactndiat bacl�fil.liat iasidt aad oatside the otba ntiliry or eommnaicarion liaa frem tbe
baildia� tarb liae;
(� Storm tad tanisiry �e�►es smsidt tbe � Sideralb w�ea poured iaddmtal to e
buildias and to the e�rb�iae; +�'iet or raad projec�
(G} Work � �anection �iib teleDhone, m Pujda�lots aot iaddmsal to a ba�dias
eJectrieal,wttez,oil,�u or fnel liaes,�otba �0a�vcaon D�i�;aad
ntilicY or commuaicitioa lian ia:ide a bai7d• (� Demolition of sIl bsul4�inl=is part adrite
ias and to the carrb liar, PnDuatioa for an� hitblqy �d bea�
eonss�urrioa ai is othtt�;�e deSaed ia�on
pl-
(� Oa pnbfie wor�s eoatraets t6at ia.ohe
botb elisci5earions of eonstrvcaaa u de5aed `..::.: ._„::.. : :
in •eetioa: (2) and (3) of tbii rule. tbe '�� '=
�P�ment of Lbor aad Iadus�ial Relations —
�ha1l iuee a determia�tion iac3ndia�both of -
tbae elaasi5ution�.
AYsh: uttioR l90.?I0, RSMo (19861. _
Ori jinalr,�le filsd At�.?(.1990,effa�ti,u _
AP�29,1991. _
. -�
�0 40 T
' Y Y Y Y 41 q�
�r ' N � m OON mnl � �� a� �
�o m d ,� ,+ m .� a d o m m � m .
V `�L1 Y Y 6 Y �6� ,Z y y r a,m
T �
ti m� O O G O� m eY Y� RC O vf(�
0 �i � 0 •�-1 • �tl a VJ rl Y W y
.� Y m m.y a t q u ,y �
� rl CI Y �0 Y 1 +d Y C K •W � •
e0 w ti �U{ N�(t VN Y q Y O L w O �
'� �t Y Y m �I O a O 7 m f� m � y N
� .�i a m G C i� C'O� w.y m m ami C Q+
L Y m �.1 r1 q �.1 C O Y T V N
.�Z o S x k m y .+t.qi y p.~+ a 3� a a� � �s�+-.Ci
�E E tq F Y 7 b M.d M Y C M r1 'O (y yd
u ,. o 0 0 o 9t � m.� c a t k,
V�y M M O � �C �F � C 7 L Y�
"'f�Z E # �c'� ..r+ .�i�° � T �.t w y M Y� �in ty
ZvEiE� � o c � ° r 4 e.�o � m o z W �� �n
- �,{ (y � 4 M Y O Y O.i O T C ?� .i N �
'� G O O t7 O'O.r O.-1 � q.+
Q r.��i7 O r-1 YO W w O w rl O i v'O r1.ti N �y 1
►7 U C N +a .-1 T 7 M t r C q �
. M C.7� � • �0 'O 'O N 'O W C 7 M I �
'J�+ O 'O M rl �i W Y Y fA rl M Sa 1
W'�C. • M Y C O q . O 7 • Y i0 O Ol Y
Y O � O. 0.m 6 M O M ro W w �
ZWk�FW O wy Y Y m Ya=+ q W t0+�1 1+'O O N U �
O S 47 W v . a A o � v w�o a. Y.� y. b p
W s m .� m w a.e er..i � m a• . a+ w
m w x u) c m a. . .� .r o .-� m 7 r u..r a a w ao e a�
.� a m � .ti .N u .-�'O v1 w+ V u u,l
E�UNC7 � �e ro o m e e m ew e d � 1O U O +�i
u � o c t vi .e o rt.+ o da
�S W z E o � � w m • 0 7C o .+ B � U y
a ,D�ya1 w .r m d w . u. m w am. w �.�e u w.�r � a ,C • .0
Y .-�N g .�1 A r/ i.u .y T m W O Y i0 vd i0
'Zdf CE 6 m .i al m a � O m m�a .�W�c 4 7L W W UL • .N1,
OE W UZ .e .+ r�o tv � t�o w o � Qm�i b �n . ev . • y U ••`ou�my
M� '.7O Y m . 1 1 1 7 L7 O W Y Y N ���� •O .N E y p p..� •y
F W(�C.M W i�L NJL YJi gY Yit u 1 G 9 a M.-. L �f`1 .ri •O�ON01 F. �p . •N G
USOFE M 69 a O O O O vd C,Y O Y Y >(` 7 •f�'1 .Nv •l� .ri 10dM �
r�l 5 fA U N .� 7 � f.M•�P'�=y u O A Y y B•�y U7 V'rl lD rl .O .O �0.M ��ri N
a u a z� Y JL O 'O S 'O Q � 10 7 01 �v M �t?"1 f?i-1 r-i r�l�-1 i� �0 .-1�N �
E+a�7 Q 4,' Y M'O G M G r CI C 4 O M d 9 O.�1 7 y. O Li K N ►1 N'i N�0 L �
� W E C U E O L O W L O Y�1 • W M t A C.-� a 0) 1 I N f? i� O 1 I ' O
.Z E Z �lI '�^ � C� a a� a X C� o w 7 .� b �O I I 1 t �J I .
Q a,.N�.Z � C NB Y 7 eo M 9 B M1. I+ O St b ,
U �'�O Y O Y y �7 M v�i Lmi 7 �.i M a i+ at t� Y S 9 O 000 f • ' •.-1 • CO�-i�.�lp
`F��V � C Su Y 7 Y 7 Y 7 e0�+ OJ � C 0000 •r-1 .i-1•.i.d 00..{,��
'N 01 O O Y 0..1 01 m O t ' O m y0 .O ..i+i.i•.I�•.1 O
1. m m m t m t t e,�.r'r C � ,d, �
MM� Z u C 1+7 C C Y F 4A m s..� y Wv 7 � 'O .O+/E•.1$ E `�� .
m q �.d a.-. b.� O.-. � d t Y h. O O
O O(Y 2H w d o ro mm dia .+ mm o o y u� m : m,c �+ou�iu�in v vxix o�n��rp
i7 W('.M O M SL 6 Sv =v 0 �`�'N'C 0i(I V}l�Nvt/)a'VfNr1 1l1VfMyy
r����I-1 a .. � r�i f? (? N V} V? � t/}
a s+ s+ N s+ w . � r.o
61 H a�'.E a=1 � •i e�i i.i .a �: u E S+ Cl w Ol 4 � s. Cl d W u ►+ d N GI
� ,. w wb v�o w�o m�v�o vo �v vro.�
viaEHz " o 0 0 0 o e > G > e > e > ee >o� > c > a,e
_ a�ea�ao ; = z z z z „ .. a � o � o � ooao � o = o ��
u Fe Ft F< F4 Fe F< O+�+�++�+�+i+�L+� ti+ 1+ �+J�17 J��J E
M oG cL aC OC a4 ac � d N C7 Ol N Gl Cl � 3 3� G1 W O/ d rl
� �y W {f� � i0-n-n•n�n•n•n•n•n 7'�'r+r�•np.
�i U000•00000�'+ C 00 OOG�
Y H N M h�1 M M �O Yi IM F/ b1 L/ IM SI bl r/r/ C Si M Id N'� �
d N F E F F E-. >aao.ao.aaa;a¢aaaaau�
� o 0 0 0 0 o r?f? � � ?� � v'� � �
� N I N�
L��' fV v 1^' � NI T Tyy N N •
�T'�� . . . .
� G G � G C 1
� � � �0
tn Cn N
.. ^ N � O.-1 O m ,O� ,..�,..� .
� • Cf CO C1m ri O O O O O O�-1�C O O �
� � � .i O t'1 .IO , e�1 r1 t^f�1 O r-1.��-{.y.-� O N.-1 i N ^ -ry j..� O O
y . .1
� a � ! :
M I .�.••
m
� � 1N O ro 4{� O� O � � O�
� l� W C� C
„' • , C
. � . '�' N �1 �,.
G.� t' r`a
� N,� � � p� �O O.O O�/ ��v1 L�1 i!1 U1 u1 �l1 v1I u1 Ifl •O � 'O uY u1 U1
� � �+ � � I .�.y 'O O�O O y' N C�N N N M �� rl� . 1!1 N N f�
W ,�,y.i �N �f�f en mE i ��.r.�.y .a �I � E . e�.a.i.-�
- a � . :... -. � _�.��.�_�. . _..
� �n m i m
� N N[`�tD1 1A Q I .tA U1 L.U1f� O C O G 0�1 1I1 Q O O' 1�I 'U1 �N u1 O
M �7I � . . tl1 m' O�01.01 Q� • r�l r r"1"V e�i�O �Ifl��l 4'1 � rI �.^�t�!�1fl
��'
� � ry N.-1.�1� � PI M N N NN""' �N N cV N N •.i N.N N r N � .-1.i
a � $ � -—�-- , "�' . . , � . (v �.
V �, d. vvvv C.� vvvv•�e� - �nin'nin�nev�vGm�G v.i aa�Cr�IevN
��w`� J _ w Y I GW„'"'+w �� , w
�g I : . ; T�� , V
W V'•Aj m N;Q �1f7�U1 ` �I N N t�O��L1 f„ O N N IV.N N 1!1 .O O O V1�CI C�rl O W
� W�(G '�f�1 I''�rl N N O�OY�� V F�P t�.l�1"1"1 Q�I��D�1� �A1 P I�-I ry��N 01 O�Il1
+.+ ;r,o •� � • ,I . . . ,� � . . . . . . .� . .� . . . .i
M �N N v\O�V� N N n in vN� �ri ri rl.�i.ri�O�O e,�.�D rl I q N��'i�y O Q
d ei^'�"'1 _ "'�N: 1-i ri.i-1�RV�..� ri rl�.�i rF�i rl.'1lr�i i-1..1 r-1 N��"1 r�l�..�N r-1.-I
� � �
� T'� .,�----^ ,dv^��m�,^ s ,a,;, i- �
M ( 1 `{ U
� � � ` ti
� � .�
� , � �� ' �
°° � �d � w
� o� d� �+ ° .x
� � � � � � q
� m$ � � �� ^ � �� � � � ��
QS �"[3� m � mm �1y,
i m � �h hqNh~+� � n�i.q �N��7 M � � � �i m i d�
�� � � �� � �� �� �m ��� � � � � �
C� C7C7�C. � �� 0.� ~~.~+ � � � �� .+ .
►+
�� - Heavy Construction Rates for CAPE GIR.ARDEAU County (s)
Basic Fringe Benefit Payments
' Crafts Hourly
Rates H & W Pen. Vac. App.Zhg. Others
CA.RPENTERS
(See attached sheet for anre infonr$.tio )
Journeymen 18 .50 1 .65 .75 .33
Millwrights 18 .50 1 .65 .75 .33
Pile Driver Workez 18 .50 1 .65 .75 .33
OPERATING ENGINEERS
(See attached sheet for Classifica.tions �
Group I _ 16.40 2.95 3 .00 .36
Group II 16.05 2. 95 3 .00 .36 !
Group III 15.85 2.95 3. 00 .36
Group IV 15.00 2.95 3 . 00 .36
LABORERS
(See attached sheet f�r Classifica,tions
General Laborers 15 .00 2 . 10 1. 75 .10
Skilled Laborers 15 .60 2 . 10 1.75 .10
TRUCK DRIVERS-TEAMSTERS 2 .25 2 .00
Teamsters - (See below for Rates) ;
CLASSIFICATIONS RATE Q.ASSIFICATIONS RATE
Flat Bed T�ucks - Single Axle 1�L8 Tank on - en le 1�'�
Flat Bed Trucks - Taadgn Axle 15. 3 3 Tank Wagon - Seai-�ailer 15 .4 5
Station wagons 15.18 Insley Wagnns, Din�sters, Half-
Pickup T�vcks 15 .18 T�acks, S��eedace, E�clids &
Material Trucis - Single Axle 15.18 other similar.equipment 15.45
Material 'I�ucks - Tandem Axle 15.3 3 A-FYame & Derrick T�ucks 15 .4 5
Seni and /or Pole Trailers 15.4 5 Float or Iaw Boy 15.4 5
Winch, Fork & Steel ZYucks 15.4 5 W���� 15 .0 8
Distributor Drivers & Operators 15.45 *�Tirsaan, Oiler & Greaser
Ag�tator & T�-ansit Mix-ZYucks 1 5.34 Station Attendant on Const.
T�ank Wagon - Single Axle 15.18 **��i�
*The w�age rate for Tirsnan, Oiler & Greaser,. Station Attendant on Construction shall be the
s.�me as tre Wage ra.te for ti�e oiler in �che ope�a.ting engineers schedule, except vperating
�gineer fringe benefits over a.nd above aay applica.ble tearnster benefits sha11 be a.dded to
t�ter Wages.
**The wage rate for Mechanics in the teamsters schedule shall be the same as 116echanics in
the operating engineers schedule, except that opezating engineer fring+e benefits over and
above any applicable tear�ster benefits shall be added to teamster wages.
The shift pay differential - swing shiit t�eaty-five cents (25�) per hoar, graveYard shift
2ifty cents (50�) per hour, above regular rates, i
OVERTII� RATE: Worl�en ahall be paid one i one half (1�) times the .reguLr rate of vages �
for all hcurs worked in exceas of eight (8) haurs per day (if vorkin,� S-8's), or ten (10)
hours per day (if vorking 4-10's), or forty (40) hours per week, Mondaq through Friday. �
For all time worked on Saturday (unless Saturday is used ae a• make-up day) or Sunday,
time 6 one-half (1�) shall be paid. �