HomeMy WebLinkAboutRES.2156.03-06-2006 BILL NO. 06-49 RESOLUTION NO. _;�I� A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTR.ACT WITH NIP KELLEY EQUIPMENT CO. , INC. , FOR THE BLOOMFIELD ROAD PHASE III IMPROVEMENTS, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIR.ARDEAU, MISSOURI, AS FOLLOWS : ARTICLE l . The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute a Contract with Nip Kelley Equipment Co. , Inc . , for the Bloomfield Road Phase III Improvements, in the City of Cape Girardeau, Missouri . A copy of said contract is attached to this Resolution and made a part hereof . �_... PASSED AND ADOPTED THIS �� DAY OF ���, 20_(�. 4 �. '3l� � ay . Knudtson, Mayor a, � � ':�. v ;;� ,* mm vxio�a °�` ��. �9$�a,,.�`` ` ����-���-- Gayle L Conrad, City Clerk . � , CITY OF CAPE GIRARDEAU Bloomfield Road Phase 111 Pavement Widening and Re-Construction from Siemers Drive To Stonebridge Subdivision, in the City of Cape Girardeau, Missouri STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the���day of ��,�rl in the year 200� by and befinreen the City of Cape Girardeau, Missouri (hereinafter called OWNER) and N i p Ke 11 ey Equ i pment co.(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The work to be performed under these Contract Documents shall consist of Furnish and installation of all requirements according to the improvement plans titled "Improvement Plans for �loomfield Road Phase III, New Pavement Construction from Siemers Drive to Stone Bridge Subdivision, in the City of Cape Girardeau, Missouri", and also as described herein: Removal of existing improvements, place and grade earthwork to bring the project to the proposed final grade, install storm sewer improvements, install new concrete pavement for street surfacing, drives, and sidewalks, provide complete erosion control measures, preparation of final grades and surfaces, and all other improvements as required for construction in accordance with the improvement plans, located along Bloomfield Road from Siemers Drive to west of the entrance of Stonebridge Subdivision,and all other related improvements indicated on the plans ... for the City of Cape Girardeau, Missouri. � - -� - '�-��'�� � �_..__.�_...__ =� t E�<-, -, ,�,�r j � t u`:�� = *�W� � - _- . .._ v. ...,.._�.� 00545:A-1 �, , , - �� Article 2. ENGINEER. The Project has been designed by Koehler Engineering & Land Surveying, Inc. The construction is being administered by the City Engineer of the City of Cape Girardeau, Missouri. For the purposes of this agreement and this project, The City Engineer of the City of Cape Girardeau, Missouri, or his designated representative, who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. SCHEDULE 3.1 The Work will be substantially completed within Ninetv ( 90 ) calendar days after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions; and all Phases of the Work shall be competed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within One Hundred Fortv-five( 145) days after the date when the Contract Times commence to run. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not competed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Three Thousand Dollars ( $ 3,000.00 ) for each day that expires after the time specified in paragraph 3.1 for the Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Three Thousand Dollars � $ 3,000.00 ) _for each day that expires after the time specified in � paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 4.1 below: 4.1 For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in the bidding documents. 00505:A-2 , . TOTAL OF ALL UNIT PRICES: Eight hundred one thousand one $�8$01 , 104. �9 hundred four dol�ars and 29/100 As provided in paragraph 11.9 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have been computed as provided in paragraph 11.9.2 of the General Conditions. Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress payments; Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, on or about the 10th day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions(and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such.amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of Work completed (with the balance being retainage). If Work has been 50%completed as determined by ENGINEER, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on recomrnendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed, in which case, the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work completed. 90% (with the balance being retainage) of materials and equipment not incorporated in the Work(but delivered, suitably stored and accompanied by documentations satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions). � 5.1.2 Upon Substantial Completion, in an amount sufficient to increase tc�tal payments to CONTRACTOR to 95%of the Contract Price(with the balance being retainage), less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 00505:A-3 ,� 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. Article 6. INTEREST. 6.1 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. 6.2 Contractor's Request for Payment shall be made no later than the 20"' of each month, in order to be considered for payment in the following month. If Contractor submits a Request for Payment prior to the 20th day of a given month, and if the OWNER fails to respond to said pay request within thirty (30) days after receipt of the CONTRACTOR'S application for payment, in addition to other remedies available to the CONTRACTOR, there shall be added to each such payment interest in accordance with Section 34.057RSMo as amended. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the following representations: 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8}and the other-related data identified in the Bidding Documents, including "technical data". 7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress,performance and furnishing of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2 0# the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General conditions. CONTRACTOR acknowledges that such 00505:A-4 '•` reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges tha# OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations,tests,studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observation obtained from visits to the site, reports and drawings identified in the Contract documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. � 7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for pertormance and furnishing of the Work. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1 This Agreement (pages 1 to 9 inclusive). 8.2 Exhibits to this Agreement (pages_to_, inclusive). 8.3 Performance, Payment, and other Bonds, identified as exhibits and consisting of_ pages. 00505:A-5 R 8.4 Notice to Proceed. 8.5 General Conditions (pages 1 to 45 , inclusive). 8.6 Supplementary Conditions (pages SC-1 to SC-5 , inclusive). 8.7 Specifications bearing the title Contract Documents and Specifications for the Citv of Cape Girardeau, Missouri, Bloornfield Road Phase lll• Pavement Wideninq and Re- Construction from Siemers Drive to Stonebrid4e Subdivision in the City of CaQe Girardeau Missouri. 8.8 Drawings. 8.9 Addenda numbers 1 to 2 , inclusive. 8.10 CONTRACTOR's Bid (pages 1 to 9 , inclusive) marked exhibit A 8.11 Documentation submitted by CONTRACTOR prior to Notice of Award (pages_to , inclusive). 8.12 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in the Article 8. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. Article 9. MISCELLANEOUS. , 9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any dury or responsibility under the Contract Documents. 00505:A-6 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legai representatives to the other party hereto, its partners,successors, assigns and legal r.epresentatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in multiple copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective on /y1/�,'�-.�f�l a�j 20�(which is the Effective Date of the Agreement). OWNER City of Cape Girardeau CONTRACTORNip Kelley Equipment co. Douqlas K. Leslie, Citv Manaqer i 7 By: � By: ___ _ _ r, _ . - - , '` '' � E;:�'. , ...� f, � �`� �" _ �i� 1 �� i , i ' , 1 � , i i . � �, i ��; \`, - �- [CORP�RATE SEAL] [CORPORATE SEAL] , - _ , ,; v. , . . �. i�._� �-, /� �` Attest � �' Attest ,-- - -��� Fs�v y,c� . c�.V�z�� G i� �tF.�i� r Address for giving notices Address for giving notices 00505:A-7 401 Independence Street 41 North Sqrlqq Street Cape Girardeau, MO 63701 Cape Girardeau, MO 63701 (If OWNER is a public body, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement. (If CONTRACTOR is corporation, attach evidence of authority to sign.) 00505:A-8 LIST OF SUBCONTRACTORS In compliance with the Instructions to Bidders and the Supplementary Conditions, the undersigned submits the following name of the Subcontractor to be used in performing the Work for Cape Girardeau, Missouri;for"Imqrovement Plans for Bloomfield Road Phase I11, Pavement Wideninq and Re-Construction from Siemers Drive to Stonebridqe Subdivision, in the Citv of Cape Girardeau, Missouri." . . The Bidder certifies that the Subcontractor listed is eligible to perform the Work. Subcontractor's Work Subcontractor's Name Concrete Kluesner Construction, Inc. Water Line Relocation Monroe Plumbing & Heating Striping Diebold Parking Lot Service Reflective Markers Park Mark Seeding & Sodding Foeste Nursery, Inc. Signage Road Runner Safety Services NOTE: This form must be submitted a r the bid opening. Bidde Signature 00505:A-9 , EXHIBIT A BLOOMFIELD ROAD PHASE III Jan.29,2006 CITY OF CAPE GIRARDEAU Bloomfield Road Phase 111 Pavement Widening and Re-Construction from Siemers Drive To Stonebridge Subdivision, in the City of Cape Girardeau, Missouri BID FORM (EJCDC 1910-18) (1990) PROJECT IDENTIFICATION: The work to be performed under these Contract Documents consists of the construction of the following: Furnish and installation of all requirements according to the improvement plans titled"Improvement Plans for Bloomfield Road Phase III, New Pavement Construction from Siemers Drive to Stone Bridge Subdivision, in the City of Cape Girardeau, Missouri", and also as described herein: Removal of existing improvements, place and grade earthwork to bring the project to the proposed final grade, install storm sewer improvements, install new concrete pavement for street surfacing, drives, and sidewalks, provide complete erosion control measures, preparation of final grades and surfaces, and all other improvements as required for construction in accordance with the improvement plans, located along Bloomfield Road from Siemers Drive to west of the entrance of Stonebridge Subdivision, and all other related improvements indicated on the plans for the City of Cape Girardeau, Missouri. THIS BID IS SUBMITTED TO: CITY OF CAPE GIRARDEAU, MO 401 INDEPENDENCE STREET CAPE GIRARDEAU, MO 63703 Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#1 . . • 1 _ BLOOMFIELD ROAD PHASE III Jan.29,2006 1. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty(60) days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER'S Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: - (a) BIDDER has examined and carefully studied the Bidding Documents and the following Addenda, receipt of all which is hereby acknowledged: (ListAddendabyAddendum Number and Date) Addendum #1 - 2/13/06 Addendum #2 - 2 16 6 (b) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work; (c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. - (d) BIDDER has carefully studied all reports of explorations and tests of subsurface � conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be compl�te for BIDDER'S purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for accuracy or completeness of information and data shown or indicated in Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#2 , . ' BLOOMFIELD ROAD PHASE III Jan.29,2006 the Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied(or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface,subsurface and Underground Facilities)at _ or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determina#ion of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) BIDDER is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. - (f) BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and data with the Contract Documents. (g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules � of any group association, organization or corporation; BIDDER has not directly or indirectly _ induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (I) (Any other representation required by Laws and Regulations.) 4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s): Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#3 ` BLOOMFIELD ROAD PHASE III Jan.29,2006 UNIT PRICE SCHEDULE � Item No. Item Description Unit Est. Quantity Unit Price Item Total 1 General Contract Requirements (Mobilization, Demobilization, etc.) LS 1 $49, 922 00 $49,922 00 2 Removal of Ex. Improvements(excluding trees) LS 1 $13, 370, 00 $13, 370 00 3 Clearing&Grubbing LS 1 $ 4,082 00 $ 4,082 00 4 Removal of Tree with Trunk 12"to 17.9" EA 2 $ 360. 00 $ 720, 00 5 Removal of Tree with Trunk 18"to 23.9" EA 2 $ 460. 00 $ 920. 00 6 Removal of Tree with Trunk 24"to 29.9" EA 4 $ 459, 50 $ 1 ,838, 00 7 Removal of Tree with Trunk>30" EA 3 $ 807. 33 $ 2,421. 99 8 Temporary Erosion Control LS 1 $ 2, 2 5 5. 00 $ 2, 2 5 5..00 9 Compacted Fill On Site CY 2664 $ 3. 60 $ 9,590, 40 10 Compacted Borrow � CY 1254 $ 3. 5 5 $ 4,4 51. 70 11 Area Inlet 3'x3' Inside Dimensions(ID) EA 1 $ 1 ,612. 00 $ 1 .612. 00 12 Single Grated Inlet(2'x3' ID) EA 17 $ 948. 30 $ 16, 121. 10 13 Single Grated Inlet(3'x3' ID) EA 8 $ 981. 88 $ 7,855. 04 14 Double Grated inlet (2'x6' ID) EA 1 $ � , q7'�. 00 $ � ,�7�. 00 15 Double Inlet(2'x8' ID)2-Grates EA 1 $ 1 , 981. 00 $ 1 ,981. 00 , 16 Double inlet(2'x8' ID) 1-Grate EA 1 $ 1 , 764. 00 $ 1 ,764. 00 17 Single Grated Iniet(4.5'x4.5' ID) EA 5 $ 2,�32. 00 $ 10, 160. 00 18 Pre-Cast Reinforced Conc. Box Cuivert LF 122.7 $ 282. 52 $34,665. 20 19 Box Cutvert Inlet Structure EA 1 $ 4. 311. 00 �$ 4,311. 00 20 Box Culvert Outlet Structure EA 1 $10,650. 00 $ 10,650. 00 21 Concrete Headwail on Pipe P40 EA 1 $ 2, 2 5 5. 00 $ 2,2 55. 00 22 Rip-Rap Blanket SY 250 $ 14. 06 $ 3,515. 00 23 12"Class III RCP LF 204.2 $ 23. 90 $ 4,880. 38 24 12"Class III Flared End Section EA 1 $ 342. 00 $ 342. 00 25 15"Class III RCP LF 937.7 $ 20. 50 $ 19.222.. 85 26 15"Class I II Flared End Section EA 1 $ 4 3 3. 00 $ 4 3 3. 00 27 18"�lass III RCP LF 89.0 $ 31. 46 $ 2,799. 94 28 24"Class Ili RCP LF 903.6 $ 26. 87 $24.279. 73 � 29 24"Class II I Flared End Section EA 1 $ 5 8 5. 00 $ 5 8 5. 00 30 30"Class I I I RCP LF 137.0 $ 3 9..0 9 $ 5,3 5 5. 3 3 31 30"Class III Flared End Section EA 4 $ ti��. �5 $ �,S�5- 00 32 36"Class III RCP LF 515.6 $ 50. 30 $25,934. 68 Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#4 , � BLOOMFIELD ROAD PHASE III Jan.29,2006 33 36"Class III Flared End Section Eq 2 $ 987. 50 $ 1 ,975• 00 Furnish Materials and Field Connect 34 roof Drains to Storm Sewer Inlets as indicated on the plans LS 1 $ 950. 00 $ 950. 00 35 12"C-900 PVC Waterline LF 944 $ 38. 54 $36.381. 76 36 Relocated Hydrant Assemblies Eq 4 $ 1 , 522. 50 $ 6.090. 00 37 Relocated Hydrant Only EA 1 $ 1 ,418. 00 $ 1 .418. 00 38 Field Connections of new 12"Waterline � 2 2$ ,461 00 4$ .922. 00 to Existing 12"Water Main. 39 Adjusted Waterline&Gas Valve Cover Eq 7 $ 74. 57 $ 521. 99 40 AdjustedSanitaryManholeRims EA 3 $ �qh. 67 $ �An. O1 41 7" P.C. Concrete Pavement SY 11481 $ �4. 68 �R 3, 3 S 1. 08 42 6" Granular Base Under 7" Pvmt. SY 12142 $ 2. 88 $34,968. 96 43 6" P.C. Conc. Entrances&Drives SY 918 $ 23. 57 $21 ,637. 26 _ 44 Concrete Curb as indicated on Plans LF 5901 $ 1 . 73 $10,208. 73 45 3'-0° Exposed Aggregate Curb&Gutter LF 96 $ 21 . 00 $ 2,016. 00 46 Handicapped Ramps for Sidewaiks EA 17 $ 63�0. 00 $10.710. 00 47 4'x 4°Thick Concrete Sidewalk SF 10907 $ 3. 15 $34,3�.7. 05•�� 48 4°Granular Base under Sidewalk SF 10907 $ 3. 15 $34,357. 05 49 Installation of New Signs EA 11 $ 241 . 36 $ 2,654. 96 50 Retocate Existing Signs EA 4 $ 178. 75 $ 715. 00 51 Reflective Pavement Markers EA 70 $ 89. 29 $ 6,250. 30 52 Pavement Marking (Striping) LS 1 $ 3, 507. 00 $ 3. 507. 00 53 Fertilizing, Seeding &Mulching AC 2 $ 3, 150. 00 $ 6,300.00 54 Sod SF 1600 $ . 48 $ 768. 00 55 Replacement of Sidewalk(4"Thick) SF 26 $ 10. 50 $ 273. 00 56 Barrels for Temporary Bypass Road EA 148 $ 37. 70 $ 3, 579. 60 57 Aggregate Base for Bypass Road Ton 1235 $ 7. 32 $ 9.040. 20 58 TemporaryTraffic Control,Excluding Line �S 1 � g,460. 00 $ 8.460. 00 Items 56&57 Above. TOTAL BID FOR ALL SECTIONS: Eictht hundred one thousand one hundred four dollar�$801 , 104.29 ) (Written figure) and twenty-nine cents (Numerical figure) (Total bid amount is to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. In case of error in extension, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly extended, shall constitute the Bid.) Koehler Engineering& Land Surveying,Inc. - Bid Form 00410-Page#5 BLOOMFIELD ROAD PHASE III Jan.29,2006 Unit Prices have been computed in accordance with paragraph 11.9.2 of the General Conditions. If rock excavation, as defined by Specification Section 02316, is required for the construction of the project, the Bldder shall be compensated according to the stipu/ated unit price of$125(one hundred twenty five dollars)per cubic yard. The quantity of rock shall be determined in accordance with the procedures outlined in � the prevfous/y mentioned Sectfon 02316. Submisslon of a Bid on the project utilizing the requfred form indicates the Bidders full acceptance of this stipulated price for rock excavation, if required. BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents. Any specific items or labor required to complete the project in accordance with the plans and - construction documents which is not explicitly identified above shall be considered incidental to the total project cost, no additional compensation shall be paid for said item or labor. 5. BIDDER agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Times commences to run as provided in paragraph 2.3 of the General Conditions, and all work will be completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 145 calendar days after the date when the Contract Times commences to run. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of bid bond or cashiers check. (b) Required BIDDER'S Qualification Statement with supporting data. (c) Any Addenda issued for the projec# 7. Communications concerning this Bid shall be addressed to: Name Vince Kelley Address 41 North Sprigg St. Cape Girardeau, MO 63701 Koehler Englneering& Land Surveying,Inc. Bid Form 00410-Page#6 BLOOMFIELD ROAD PHASE III Jan.29,2006 (a) Performance and Payment Bonding Company Name Merchants Bonding Company Address 2100 Fleur Drive Des Moines, IA 50321 Agent\Power of Attorney Name (if used) Donald L. Wasoba Address 22 Avocado Tree Circle St. Peters, M0 63376 8. Terms used in the Bid which are defined in the General conditions or Instructions will have the meanings indicated in the General Conditions or Instructions. SUBMITTED on February 21 � 20 06 State Contractor License No. 0010575 IF BIDDER is An lndividual BY (SEAL) (Individual's Name) doin� business as Business address: Phone No.: Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#7 . t BLOOMFIELD ROAD PHASE III Jan.29,2006 A Partnership BY (SEAL) (Firm Name) (General Partner) Business address: Phone No.: A Corporation By Ni Kelle E uipment Comp ny, Inc. (SEAL) - � (Corp atio �me) Missouri � ,�',�+ �r : - � �( . A..-A ��,. tIOCt ,•'�, r « �, \S, �� � ,; ' gy Vince Kelley �` �� 1. � ( � � (Name of erson�Aut ed to Sign) ��,�� � �,�� ������. President ;;a�' � ; a !r f r � r �� �.., � (Title) . _°.-��� :, �; :; ��4�1t�c���,�ea��` � ,�..k • .. � . , Attes# Frank Myers a-�.r/fj' � � (Secre ry) Business address: 41 North Sprigg S reet Cape Girardeau, MO 63701 Phone No.: (573) 334-0553 Date of Qualification to do business is � Koehler Engineering& Land Surveying,Ina Bid Form 00410-Page#8 BLOOMFIELD ROAD PHASE III Jan.29,2006 A Joint Venture BY (SEAL) (Name) (Address) BY (SEAL) (Name) (Address) Phone Number and Address for receipt of official communications: - (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.) Koehler Enginee�ing& . Land Surveying,Inc. Bid Form 00410-Page#9 I .�' , . ����.1�'V�.s� ���� BIDDSR�ItQ�re O�+d Jldd�t9): Ni.p kiel.I�tt Eatzi�eilt va�nv�?.nc. �#1 No�th Snricxr Street '�' . Cape Girarc'�eau, 1�90 63703 '�' ' 8ti��.'L'Y�ta�s asd�I,eia6,es�c o�'Fe�oet Pt�m�c��- - - . Meretian� �idinQ C�ny - 2i00 Fle�ar Drfve - Deg l�+bi�nea. IA 50321 Tel: 515-243-817i t1WlY�R/lYa��d'ad�Fi�sa3: City of Cape 6irarr�u_ City Hall, 4U1 Inde�eude�n+oe 5treet -___.___. Cape zrar u, A� 63 �1 . "�""�"�- ,�ID ---.-.�:.-.�...,�.. _,_._ . ��?UE DATE:_February 21,. 2006 FR�]BCT t8►'#ed'�tou Lach!�o).�A1: Blooanfi:eld �oad Phase III ..,.._...-._.,._..._ . ._.,�,,,_,...,�,_�. _. .. _ Bt11�D �� �, Bt}ND NTIA�BER: N/A Dr,to,.'Y'�;�t'pe t��t Bid Dvs t?�t: � -�-�_._, P}�iALS'i3�: Five Pez�ent � �he�Amotuzt i . , �'W�71'N�SS W�fiRE4F,Slnety snd Aid�ac.�to be kg�1Y bauad E�eby,�bject to tha lc�as � �aa ' s�ie 4er�of".�e�ch cause dsis BidBo�d t�bc �\� �a�tsdve. �Y e'�"'�d ae ite�Sifby its ,�����;,;�, `.,� w`s,�•`��M!7����,���i'M�/�,� 3 .J ', �i�s f� °' - . _ "' ''� � d^ ��'� C? .r�`� �YiC�Y . � \, �,������f � i�,/ .. ��� ���L-" C�O�II'ANY+ :iNC�� MER'l,.f�NTS �NDING CCk'IPANY ��`��,�����, F�.'c'r, � g � , .�:,'"'�r �y � � '�- Y�� • l �; ; �, � l+tw�a�CO�Ol�tC St!8�c��;•�,`�` _ `, �� � � '<' -�, . r a'� - r - p�7_J�� �� I�,`�+ � � /�:7 t�� �� . . . �l' �/�j�i �-.,. S J�l j I ���{�"�,.��� ��' &ignat�aad�AtdtClf Foavar'�,►�I�pq�y���$ . W�� D�aana].d I,. Wasoba Attorney-in-�t�a � ..... ',.�•} , �C WitileSs ^ ,p„j�� •r;,. :; �• ���m . � '�� �) ���' '�. '�a�d`t�e NDrIE: (�� Ai��at�o�t��od far givio��eq��� (� �]►�g�e to B�ld�t,�Y.(��+a�p�,y���o�d�+ad pta�i wb�e ��� _ .. �-1 �ada����Y.�Q t�chrq,� ' Boai�c����of�tY*IMP►�bls Owaee up�daP�ulc d�lbe pp�ai sma arx,fa�aa�A�oe �51M��e p�ti�ipa a�'�ri4�1�me�D���e or�h�Sana. �e.+leA�.t�isBead!�at6not fa e�tec+�W sh�1! ��a�i�t�f4a�ac��ed rBect. 2. Dafauic Of Hiddar,�hali nccur ppon pk�huC a�BiAd�s to t 1. 'f he talrei"6id"as used � deliva wi�Aia the titne rt�uiced ly tDe Bitt�Doa,�q�� � be�+��►ittetudes a bkl.ctAx e�pzvposat ��M�et►t roquir�cd 6y�Bidm�p��f aoy �abk. A�ti4oC artd PAi'�4dn�bort�tn9aired 6Y d�c$iddbqg �a ar.d Lbn�act Do�ls, 3• 7'bis c�bit�ahatt 6r mati aad raid iC: 3.1 Q.vq�yt�Hii&#�'s bid a�id$iddC1�deiiv�s witi�in �e p1'AC i'BQitired p►y tf�$idd'q1�japtuptent!(of�r1g ' e�cle�f[e0 tlC�mf��ro ia wroiDB by��11fe 'tte�►t��ente+�yy�� . . �ocuArtas�s urd asy p�a��ba� ����'���tanw!Co�aot Dosua+�na.ot 3.2 At1 bids an rcje�xed bp Q..�r.or 3.3 O�.ner iaiis m i�tue a�mtine af�v�ard to Hjdda v,�;t�a . thc tip�p gA�a6ed fil tI�8iddipg Dac�iae�(o��, �eaMea�ro ia`�bq�md.it i��*aph S hetoo� bY�Y�t��Y d, P•ymeM►an�tieis Buad rv111 DE doe a���t�d dtflut! of�Wder�d wj�ia 30 atc�d�days aQer eece;Pt 6y�d�r e�� S�ty of wri�rcn nntite otdel�wle frorn Ow�er.wGie�►nocies ar�t br given witb rcasana6k pma�,�y�8�sad �Prt�jeq m�d inclnd�ing i t�laDeaoa►e of ehe awuet�ne. S.Surcry waivaa Aotice of aetd may�ad�Aefensas 6ased en or ., ansing aue of any arnc exlention to issua t1�E�'aw�a�eea ou in wlicipg bY Owner aad Bittder pr�y�d c#�ccf+e tia�e I�inuing �otice af awad iAclmi�,8�:slnit nni in ebt�pn�� e�seQ t24�►Ya From�id Da�Da�e wi�ouc Sur�ty's wri�teu conaen� 6. Na suit ar actiqe ettsll be Gmtsnst�g yq��q gppd�p� 30 rate+�dar d►ps adtrr!1�ttatica oFdcisnh ceq�irrd$�q p�aoph q abPvo is t�sc.�i•ed by�Bid�lp'aud S+et�Y:and�no cact t�,x than one yp�atkr 9id Dne Daee. 7. MY strit oractiw�wdsr�ie B,oad ssat!bt w�mrencrd valy in #t�ut ot cpp�ent jucisdfc�i�bctftd i�tht sp�tt ie w�iCh We Pe+eject i�besead. S. Notica requ�rat ha►eunder shaA he ss�w�idn�s�d:�nt to Bid�r Sod 9nnty ne nc�r res�e�ti,r��ddtessrs�taw�t on the t+ux of Wia 800d-St��t uadce9 ri�1y ba�opt YY P�n1 drdivaey.coaiasarial oowier w by th�ieed Snu'as krig�,od os CaaSca bl�1.nwrA re- cci�t'ra9�.postye Pe�d.�nd�1pr11 be depned m be �edvo t►pm r�cCipt by tha pm4y�d, . .. A. Surots yh�1[auasa to d.am�lna tv q�g�a�ntreat�na �t�Ccuve Pawa ef�cioa,ey cr�g�hs wtl�r of thc ntf',ccr, b8a+t or ro�u�nt►'v+e wbo sxtcnted�ia 8oad ca�ebtf oFSu�h' b�Kad and�tivor auch Howd:ad bnrd tl�Su�ry th�by E�• �i$OJII�161f�11i��Cqq(bi7I1 ED i���k� - itiql�����i�01���C�EAflC inetode�hp�;n,r;i'eEt tLet6 ac 1ea�, �.,ry��otthe �coct�a�9��r�ac(t�r�aar,� .AL�-2 Merchants Bon�ding �ompany POWER OF` ATi'ORN�Y Know AN Peraohs By These PreseMs,thet the NIERCHANT3 BONDIN(9 COMPANY{MUTUAL).a corporation duly arganized unde� th�layrs oF the Stata pf IoNta,and having Ha p�indpal oflice in ihe City af Res Mpinea,County of Polk,Stats af lowa,hath mada, aonsUluted and appointed�and dves by these pcesents make.oonsdtute and eppoirrt nonata L.wasoba s� St,Peters �Rd�t�t�of Missouri i�trt���d l�!�At�m�t-!nfa�.wiih f�!I P.sw�r ana�!ttw�hr h��ir nw�.e.rred in�s ns..m�.p�e�r!d$�ea�l,to s�n.sx�sx!t�,+�s�s�edg��nd d��v.er+n ns neh��f�S�,r�tY�r and ali bonds,undertakinga,recognizenoes or olher written obNgatlons in the neture thereof,subject to the limitation that any such instrum�t shail not exc�ed the amount ofi orrE�rra,�oN(�l,�00,�999.00�no�.�ts an��o t�!rK!tha Ptt�RCHANT��QNQIN¢ .re_.�►._.PAPlY(M�lT41!►.�-�tharabY a$f�.+lb a(td��h��ma��tt��f�411�4«►.d.S� undertalcing wes signed by{he dulY s.u.t�c!�ed oifioers of 1t►e MERCFIANT8¢Q�IDIN¢COMPAN�(M�ITU�4L.�,��(��ay�Qf �i4 A�kR[r1RY-�R-F�!4'�.R4f�4la!(It�o t�!@�14lq?a!�!!h.e,f'�!R 9(�!,e,�l��'@ hQf�kY f�f�l.e,d�1 S<'o(!flf!ClRS�• T'h�P4Y�9!'-0f-AttoR!eY I�m.a.de end R?S�ted.pursl��t?��.d.bY auqxNliY 4��!e following Anler���4stltup�d�S�RestBtlx!RY- !.�i�.a.siRR14.d,bY th.e��n1 aF[�[�C?�4f the M�R�FlANT��ON�INQ�QM?ANY(!u!I�TUA�a 4�NQY�m!?�16�2QQ�. A4�TI�l��!.S�GTt�8-7ne��1.rman�f q����!��r P�kl�nt a�nY�!!�a��4dAnt a���Y e!�!�t!�m D��in� �Itlttl4l��f 40�pRRitlt�t4m4X$-hFF�.@�!#o�Vth4(�Z.e.q!�n!t4�x@�ltR�kBt!�if of 1.hB�t!'!R8[!X��tld att�l!1hR�I Qf 1he Compeny thereto,bonds and undertakings,reoopnizanoas,contrads of indemnity and other writlngs obligatory In ihs nature thereof. �t�t��t���.�CTIaN�-The�i9n�h�ra Qf a�tY auth��e�ana tt!���th.��«nP.enY rn�t.4.�affixed�t t�!!n!!e to any Power o( Attor�ey or �erdflcation thereof �uthorizing tAe exe�utiqn end delivery Qf any boncl, �k�g, 1�A�l1�.Qf Rt!!Sf 84lf4tY$hIR S2pl�@� .a.f th@ CRRtP.Bl1Y•�Rd$!�Ch$19�et�![S�!l.d.��1?Mt@!1�R 4�1$Il§N�!,a,�!4 thR sart�e to�ce�.n,d�(f�as#pY.�h mfl!�!�IlY X�!• IR W���V�Ihe�eaF,M�RCHANTS BQNP.IN,fz�RMPAhIY(M�1A�.)t�s�4.s.e.d the.s.�Rresent�to�e$igned bX its.P[�i.d.�tnt and �s cafporete s�al to be h.e.r�O affpced.thla 1s;d�y of^�ep�ernk�G�OQ4. �...-.... �'p�N.r�..CQ,y�• MERCHANTS BOPqIN(i COMPAMY(�uAL1 ���A�o�p�9. .aF. . , • �Er '��►:�c. :1�:2 -o- ���,: ;4�. :3• . 1933 :�• .y ,��: ey � .�a,� . . ••��+: •.�"� : STATE OF IOWA ••....•• �8 C�0lUMTY QF P�lI-�C ss• Qa th�!a�daY o(Sept.e.m�r�ZQQ4.be,(4fe!R.e.aP.R��d I.RtTY T�Y�Rf�to R!B P.e�Rellht k!!�!!l1.1�!ho b@ing by me duly swRt!!dfd s�y lhet. M i�Presidpnt of Me MERC.FIANTS BOM.PING COMP!4NY(M�T�1�!L�.p1B�(�R de�crW�d in the toregQing in�tr�!nent�end tl��1h.e Sea!�(�xed tq the sai.d in.sA4!�Bflt is tlte Cq�pQrate Se,�!)Qf 4h@�(d�orRor�o�l and ihet the sai�insU.ymetit v!��!9!!ed end�e_al�d i�pet!alF af said Cprporedon by at�o(1ty af it�Boa[d of pi!'�tot'�• In Testlmorry Whereof.l have hereur�to set my hend and alfixed my OFfldal Seal at the City of Des Mdnes.lowa,the dey and year Tirst aboKe written. C.INDY 8MYTH C��� � Commtsslon Number 173504 � � My Co��bn Euoins A1e1 B,�OOB NoferyPutrAq Podc�ty,!o� STATE OF IOWA COIJN7Y OF POLK ss. . I, WiMiam Wemar.Jr.,3ecretary of the MERCHANTS 80NDINO COMPANY(MUTUAL),do hereby certHy tl�et the above and toregolnp fa e i�e a�oomxc�4?�l 9f ihe P01�IV�R-�F-ATTQl�EY flxfl�44�d.t�Y aAk!I�I�ERCH�T3 BONaiNCi CdMPANY(�!���,�ich� stlN In ful force and eHect end has not been amended or revoked. In 1Mtness Whereof,I have hereunto set my hand and afPoced the seai ot the Campeny on this 218bY� Febrt]lry,, 2006. ��..,..�� ;�p11��. �4,y' . .....,, •, �p�R .e '''�'�: hl �/ q►e��p • � ' ' '�"a'�"t' �✓� W��•�..��J • f,,,, , d?:� r fi��.. -O- �•..►• . • :�,,e Secnetary '�� 1838 .�* ��. • v ��w: p�A QOU1 (8l04j �•:6'��.. ••�1�►�� . . �'i� �; ' '••..•• � , ' ' � - . CITY OF CAPE GIRARDEAU BLOOMFIELD ROAD PHASE III ADDENDUM#1 FEBRUARY 13, 2006 The following revision has been made to the above na.med Contract Documents: PART I CHANGES TO PLANS AND SPECIFICATIONS: :• Clarification of the requirement for Truncated Dome installation on handicapped ramps: Truncated domes shall be installed on all handicapped ramps where indicated on the plans. The truncated domes shall extend the full width of the depressed section of the ramp.- The truncated domes shall start at a distance from 6 inches to 8 inches back from the bottom of the ramp, and shall be a minimum of two feet long in the direction of the ramp. The truncated dome panes � sha11 be of one of the three following types, installed in accordance with the manufacturer's recommendations. NuWay Concrete Products: Pre-cast"CASTinTACT"truncated dome panels East Jordan Iron Works: EJIW Series 7005 Detectable Warning Plates Neenah Foundry Company: Cast Iron Detectable Warning Plates ❖ Acceptable MH Frame and Rims (To Supersede information on the plans and within the specifications): Where new manholes and where manhole rims are to be adjusted to grade, if replacement of the frame and grate are required, the manhole frame and lid shall be with the following: Neenah Model R-1642; Heavy Duty Frame &Lid; or approved equal. For any storm sewer junction manhole, the manhole frame and lid shall be the following: Neenah Model R-2501; Heavy Duty Frame&Lid; or approved equal. . , ' ' � � v. � ADDENDUM#1 BloomIIeld Road Phase III Page 2 of 2 For any storm sewer area inlet, offset inlet,or other type of inlet or structure where the design calls for a frame and lid to be cast into a concrete lid,the frame and lid shall be the following: Neenah Model R-5900-F; Heavy Duty Frame &Lid; or approved equal. ❖ Clari�cation regarding pavement marking(striping): The striping must be installed in accordance with the drawings and specifications, in regards to location, dixnension, and application thickness. This striping must be in good condition immediately prior to acceptance by the owner. If the contractor feels that this will require a second application of paint immediately prior to acceptance, they should price the work accordingly. PART II INFORMATION PURPOSES: ❖ Attached copy of the Pre-Bid Meeting Minutes-three pages. ❖ The bid opening date for Bloomfield Road Phase III will remain unchanged: February 21, 2006, at 2:00 P.M. in the Office of the City Engineer. This addendum must be signed and attached to your Bid Documents. " v Date d�– Z�—��� N (indivi al and co pan ; CITY OF CAPE GIRARDEAU BLOOMFIELD ROAD PHASE III ADDENDUM#2 � FEBRUARY 16,2006 The following revisions have been made to the above named Contract Documents: PART I--CLARIFICATIONS: Item A. Storm Sewer Structures: Attached is a copy of a letter from Rose Concrete Products, Inc. and the response from Katy Liley, Koehler Engineering, concerning the storm water structures. Please read both for the information contained in them regarding these shuctures. Item B. Rungs in Storm Water Structures and Manholes: Please disregard the answer to part b of number 1 in the Questions/Answer section of the Pre-bid Minutes provided in Addendum # l. Attached is a copy of a letter from Rose Concrete Products regarding the rung component of the MANHOLES AND STRUCTURES section of the Specifications. Also attached is a sheet on the specifications for rungs called ML-13 from the AMERICAN Step Company, Inc. The City will allow the ML-13 rungs as shown as well as the galvanized rungs originally specified. Item C. Responses to Questions from Nip Kelley's Office on Various Items: l. Rain days shown in the specifications have already been built into the 90 day schedule. 2. Leakage testing is not required for the storm sewer work. 3. '/Z" clean rock is not acceptable as a backfill material for the storm sewers. The material specified must be compacted--simply dropping the stone as allowed by MODOT is not acceptable. 4. Compaction tests will be made by the City of Cape at the inspector's discretion on the storm sewer pipe trench backfill,the base rock under the 7" pavement and the base rock under the 4" sidewalk pavement. 5. Base rock does have to be MODOT approved stone; however,the contractor may submit a variation for approval by the City before a�v rock that is a variafion is nlaced on the iob. Note: written approval must be obtained from the City Engineer or his Assistant prior to any variation of the rock being brought to the job site! 6. All aggregates in the concrete mixtures must be State approved. ,� . • . � ADDENDiTM#2 Bloomfield Road Phase III Page 2 of 2 7. The dimensions of the Pedestrian Crossing signs must be in accordance with the Manual on Uniform Traffic Control Devices, latest approved edition. 8. Labor Standards for cement masons: a) as no cement mason classification is given for Heavy Construction Rates,the rate for the cement mason on the Building Construction Rates must be used ' b)overtime pay will not be required to be paid if work begins before 8:00 AM provided the worker does not work any more than 8 hours in a given day c) cement masons are not allowed to work 4-10 hour days unless they are paid time and a half for the extra 2 hours per day d) any work by cement masons on Saturday is paid at the time and a half rate--there is no al�owance for Saturday as ama.ke-up day for rain 9. The construction sequence of Bloomfield must start with Phase One as it is shown; the contractor mav not change the order and start with Phase Two. However, should the contractor wish to vary a portion of the traffic control, approval in writing from the City Engineer or his Assistant prior to placing any traffic control on the site must be obtained. A written proposal for any traffic control variation needs to be submitted before an,�is started. Item D. Bid Date: The bid opening date for Bloomfield Road Phase III will remain unchanged: February 21, 2006, at 2:00 P.M. in the Office of the City Engineer. This addendum must be signed and attached to your Bid Documents. ` % � � �� Date �"� ��� e(indi idual and ompany) � .� t�Ivv vv�t� J i..iLV�LLLL 1 FYVI... f..11 �` . °"' - •�w j.3.r�3��f/ . Ro�� ��o�n�rete Produ�ts , ln+�. �. � � 733 Rose Con Road • Scott City, N1Ca 637$0 � .. � . OFFICE: 573-264-2162 FAX: 573-264-2222 � � www.rosecon crete.com To: Kafiie From: Jeff Lively Bloomfield Road I wanted to bring a few items on this prvject to your attention. Sheet Q4 Bedding detail for double run ofi 30" RCP. 30" RCP is a C wall pipe M�king o,d. 38.5 , That leaves very little of the 8' side walls. We normally nnake openings 4" larger to give 2" clearance: Qverali height wili be margina( because you wiil need a lid on top to hold up the castmgs. The castings shown are not over 8' overa(I so they cannot sit on top of the wa!(s. P1 pipe runs into side af box culvert. Connection detail shows hole for st�aight into side. Pipe is skewed heavily and normally takes a 5'8" wide by 36" tal) opening . If we precast a hole that big in a 8' (ay I�;ngth the sidew�ll is mostly gone. The North w�lf weir opening is 3'wi�de x 6"tatl. The detail shows it down 8.5" to top Edge of 6"t�ll opening. That puts it in the 8" haunch of the box. Can it be moved lower? We wouid precast either alf 7" walls or all 8"walis . Inlet ST15 is shown as 1.8' overall depth, If you deduct the 6" for the casting you only Have 15" af depth left of wali height. We normally put� 21",22" pipe opening in for a 12" RCP. ( pipe is 17.5" od.) Thanks , . ti " ���' ,y � . KOEHLER ENGINEERING & LAND SURVEYING, INC. 194 COKER LANE . CAPE GIRARDEAU,MO 63701 PH: (573)335-3026 FX:(573)335-3049 February 13,2006 Mr.Jeff Lively Rose Concrete Products,Inc. 733 Rose Con Road Scott City,MO 63780 573-264-2162 Fx: 573-264-2222 RE: Bloomfield Road Phase III Mr.Lively, This letter is in response to your fax concerning the construction of some of the storm sewer structures shown in the plans for the Bloomfield Road improvements. The 8' wide storm sewer . structures specifically ST 25 and ST26 and the shallow structure ST I S may have to be cast in place. There is limited space where the pipes enter these structures; however, the City has been made aware of these clearances. You are correct in noting there is a heavy skew on the connection of pipe P1 to the box culvert. Adequate space should be allowed for pipe Pl to enter the box culvert. Should you feel the box wall is not stable by leaving an opening large enough to accommodate the pipe to be cast into the box in the field,perhaps your company could pre-cast the pipe into a section of the box. The weir opening at the north side of the box culvert can be lowered to accommodate for the chamfer on the interior of the box wall. The main objective is to drain the surface water from the swale on the south side of the road into the box culvert. If you have any questions,please feel free to contact me. Sincerely, Katy . Liley,PE �Coehler Engineering&Land Surveying,Inc. .r.H�`/15/2096 14:13 5732642222 PAGE 91 � • Rose Cor��r�te �rc��ducts, In�� �. . � ��3 Rose �on Ro�d * Scc�tt �it�l, MC,� 637$U ��.. � . OFFIC�: 573-2fi4�21 G2 FAX: 5�3���-2�22 - � www.no.seconcr�te.com Ta:Aadul Alkadry Frorn: J�ff l,Ively Broar»fie�a Road F�roje�ct In the speC'tfica#ions for this project sec:tion 02081 (sheet 3) under 2.3 cx,mponen#s, The sk�ps are shown a� Forrned galvanized st�el rungs;a/4 inch diameter. We have Always used th�polypropytene coate+d steel steps on the enclosed specilication sheet. In the pre bid m�eting Chris Koehler was asked by�avid McMullin about the galvanized Rungs. i read this as the steps?? hle indicabed they had to be galvanized. �urs ar�e EpQxy a�ted %" �rade 60 fusion bonded with capolymer polYpropYlene coating. ASTM A 615 I do not have a sourc�for any type of�ahranized steps?? i would assume the steps w� have always supplied w�uld b�s�cc��ci , 1 just want�d To clariiy since specffic�tions app�ar #�want sdmething else. Thanks, � ,�;82J15/2006 14:13 5732642222 PAGE 04 . ' ,`' ` ��� �� • ".�---� 13"_ � 3�16" 6„ 9 9/lg' $��bdb��e�a°��,��,�b��q������������'� . .. �„ ��n � 1R • _i Copot�mcr �uly�roprUer�e NOTE:NDt to 3colc � ��_1� Fost Fahr.icntion,Pusion•Bo.nded, �Uf8C�C71 LOC$�iJ8tSllSt10��8th�dS: �/x i�iihASTMA6]�S �1��NC�ETB S'�'REN�NNST BE 3000 PSI G�ade 60 Steel Retafarcemeat F�f��„�e ' �7'wo pre.farmed holes on 13"ce�nters. " ��ioles must be paar�ll,e1, �Dismeters oF hales are 1.1"t�apertrtg to 7/8"�ln�3 IIZ"of deptt�. ��� _ •�l�cill two 1"ho�es mi 13"centcrs with a�tir�fmum depth ot 3 3/�k". ' •Use 1"��on�ry bit for drllling. �Holea m�at be parelle]. � � 9 � Drive step wi,t�sled$e�tammex,�t�both Iegs�re cobnp]et�ly seated. 80U-988•STEP - 77p��67-9a44 o!licc 770-4b7-$Ol i inx 99rlsstr.prneetsorrxteedtAS�AiG478,mdQSIiASta►edardswhennrom�riv�c,�11e� 630EaetBroadtasy •P.O.Bax�,37 -Gritftn.GA 30224•�p137