HomeMy WebLinkAboutRES.2498.12-07-2009 BILL NO. 0 9-18 9 RESOLUTION NO. o"�''�9�
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 1 TO AN AGREEMENT FOR
PROFESSIONAL ARCHITECTUR.AL AND ENGINEERING
SERVICES WITH MARKEY & ASSOCIATES, INC. , FOR
IMPROVEMENTS AT THE CENTRAL MUNICIPAL POOL,
IN THE CITY OF CAPE GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1 . The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 1 to an Agreement for Professional Architectural
and Engineering Services with Markey & Associates, Inc . , for
improvements at the Central Municipal Pool . A copy of said
Amendment is attached to this Resolution and made a part hereof .
PASSED AND ADOPTED THIS / DAY OF �...�C�/I1�'J�, 20 D /
Ll�..�,�.�..�...
Ja B. Knudtson, Mayor
ATTEST: _�������,�
�
��� � ,J G��
� �
, �� � �
� ,, �� �
�
�� �����\� �
ay L. Conrad, City Cle � '����� �
� �'' ; �,,
�
rv Tt�E �Ni� �
* S�y
. .
Amendment No 1 to the Professional Services Agreement Between Markey and
Associates, Inc. and the City of Cape Girardeau dated August 22, 2008
This supplementary agreement amends the Professional Services Agreement between
Markey & Associates, INC., hereinafter referred to as "Architect/Engineer", and the City
of Cape Girardeau, hereinafter referred to as the "City". The Professional Services
Contract between the City and the Architect/Engineer was approved on the 18th day of
August 2008 by action of the City Council's Resolution No. 2380. This amendment is for
professional services relating to the City's Central Pool.
Whereas the City intends to renovate the Central Pool, which requires the
establishment of a scope and budget for said renovations, and whereas the City will
then establish the priorities and initial funding levels for the renovations, and whereas
the ArchitecUEngineer agrees to provide the referenced scoping services for the fees
and provisions of the revisions to the existing Agreement as enumerated below:
The Architect/Engineer shall develop Phase 1 Schematic Design and Scoping services
and provide detailed scope descriptions, drawings, and budgets for the immediate and
future implementation. Phase II, the design of the selected improvements for immediate
implementation shall be as authorized after the determination of the scope and funding
following the completion of Phase I. The time from receipt of a Notice to Proceed to
completion shall not exceed a time agreed upon by the Architect/Engineer and the City
prior to project commencement. If conditions outside of the control of the
Architect/Engineer occur, or substantial changes to the original scope of work required
by the City, the Architect/Engineer reserves the right to extend the time of the
completion in an amount to be agreed by the Architect/Engineer and the City. The
specific amendments to the existing Agreement are as follows:
Exhibit B - Article B.8.3 — Fee Basis for Authorized Additional Service
Fee for the additional Service for "Central Pool Renovations Phase I": The total
fee for the Phase I scoping task shall be $10,000.00. This additional fee will bring the
total contract amount under this Agreement to $458,000.00 plus stipulated reimbursable
expenses.
Exhibit B -Article B.9.2 —Additional Services
Professional Services — Central Pool Renovations Phase 1: Markey and Associates
shall provide the Conceptual Planning Phase, hereafter called "Phase I - Schematic
Design and Scoping Services" related to the renovations to the City's existing Central
Pool. See the attached proposal letter. The services shall be provided as an Additional
Service as provided for in Exhibit B of Agreement and in Section 6.4 of the Professional
Services Agreement dated August 22, 2008.
Page 1 of 2
._; '
Executed by the Architect/Engineer this 25th day of November, 2009.
Executed by the City This �day of 1�'.a�vr� , 2009.
FOR: City of Ca Gir ea
� p��. `�..�.i;�
BY: '"� �.� `�P� \
City Ma ger ,� '�� ���� �"'r
- �i`�•^v-��'�A� V•
ATTEST: .� ,,�;`�` o
City Clerk '� � �� <�\� �
.�, � � , ,�-s�:?�� ti
:,,�, �,,�,,. ��
:�� \�''�'.UNI �
. �r1, ,�q3��F'�:�,►�t--
��,,,_�� �.�ti
FOR: MARKEY & ASSOCIATES, INC. �`-_~�=�
BY:
David N. Markey, PE, Pres.
Page 2 of 2
.
, ,• _.� —`
y���� ' I�iI�..�ke
:� y
������ �
�.. . ��.� }aF.:: au�.d Associates, Ii7c.
November 5,2009
Mr. Dan Muser, Director
Parks and Recreation
A.C. Brace Arena
410 Kiwanis Drive
Cape Girardeau, MO 63701
Reference: Planning and design of Renovations to Central Pool
Dear Mr. Muser:
As discussed, we are submitting our proposal for professional services for the design of the
renovations to the facilities at Central Pool. Since the total project budget has been very uncertain,and
is likely to continue to be until a specific menu of options is presented, we are proposing a two-stage
approach. The first will be a scope development and budget deternunation study. We are proposing a
fixed fee of$10,000 for refining the project"wish-list" and menu of components, along with assigning
a possible budget allocation for each major component of the work.The output of this analysis can be
used for finalizing the funding commitments and support of the user-groups as we proceed with the
second phase,the design of the improvements. Please be advised that 1/2 of this first-phase fee is for
Mitch Malone; and I am keeping my part to the bare bones; but I also will be working with the fabric-
enclosure vendor and heavily relying on him to refine that part of the scope and budget.
Various discussions have put the possible total project development budget at around$1,000,000,
depending on what funds finally get committed to the project. I have felt that$1,000,000 would cover
the highest priorities; but I am sure the identified needs may exceed that. At a total budget of
$1,000,0000, I feel certain that most of it would go to the priority of the bubble replacement and some
pool items. In that case, I would need minimal input from other consultants, and our fee for the second
phase design could be about 6% or 60,000. If the scope involves the bathhouse and other components,
we will need a little higher fee for those aspects. We are asking for authorization for the first phase
only at this time.
We will perform this work as an extension to our current contract with the City. The second phase will
require a separate authorization. I anticipate that we can reach some conclusions in 45 to 60 days of
proceeding as long as the holidays and the responsiveness of the enclosure vendor do not impair the
effort.
Sincerely,
Markey and Associates,Inc.
.siz�,
�2�53 Ed����vater C�«rt Iti'�T • Kenfiesaw; Cear�ia.�014:4 • (77f�) 424-13(�G
v��u�v.n7arl�ey-con�uit.cc�n1 * clinarkeyC markey-cc�ns�.lt.c�rr�