A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT N0. 1 TO THE AGREEMENT FOR
PROFESSIONAL SERVICES WITH MITCHELL B.
MALONE FOR DRAWINGS AND SPECIFICATIONS FOR
PARK DEVELOPMENT, IN THE CITY OF CAPE
GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1 . The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 1 to the Agreement for Professional Services with
Mitchell B. Malone for drawings and specifications for a
prototype toilet, pavilion and maintenance facility for future
park development, in the City of Cape Girardeau, Missouri . A
copy of said Amendment is attached to this Resolution and made a
part hereof.
PASSED AND ADOPTED THIS �f"" ' DAY OF , 20�.
Harry E. Rediger, Mayor
��__
ATTEST: � �,������
� ���
� G�
� � �� �
_�, �
� � , cA
r��., �
Gayle . Conrad, C ' C ���,` �
���
�.�� .., , X ��'
�, �
�_ ;,a ��.�'PIE UNION
•�"'; ��'!��t� �
��AL
_ ����ss,a
. �
2044 BROADWAY STREET
CAPE 61RARDEAU, MISSOURI 63701
PN: (573)335-'1473
FAX:(573)339-1483
smail: blakemalone�sbcglobal.nst
MITCHELL BLAKE MALONE, ARCHITECT
March 15, 2011
City of Cape Girardeau Parks and Recreation Department
Attn: Brock Davis
410 Kiwanis Drive
Cape Girardeau, Missouri 63701
Dear Mr. Davis,
This office appreciates the opportunity to present a proposal for architectural and engineering
services as related to the Prototype Toilet, Pavilion and Maintenance Facility.
After much consideration,this office will provide the necessary drawings and specifications to
the Parks and Recreation Department for a flat fee of$15,535.00. The architectural and
engineering fees for the proposed structure will include but not be limited to:
1. Architectural drawings and specifications.
2. Structural drawings and specifications.
3. MEP drawings and specifications.
4. Site Plan with an Owner supplied survey. This is a code requirement that all
construction be site specific (IBC 2003-106.2). I talked to Mr. Morgan at
Inspection Services on 03-15-11 and he informed me that the City of Cape
Girardeau Inspection Services will inform Parks and Recreation Deparkment if
site adaptation drawings are warranted.
5. Re-use fees are $1,500.00 for each structure plus hourly fees by the architect and
engineers for site specific adaptations. These fees should be minimal depending
on handicap accessibility issues and services(electrical and plumbing
connections)up to the new structure unless site specific drawings are waived by
Inspection Services per Item#4. If waived by Item#4, only the re-use fee will
apply.
Proposed Fee Schedule:
Upon Approval of Schematic Design $3107.00
Upon Approval of Design Development $4461.00
Upon Approval of Construction Drawings $7967.00
Hourly rates for Prototype Site Adaptation if required: Architect $100.00/hr.
MEP Engineer $125.00/hr
MEP Draftsman $85.00/hr
Structural Engineer $100.00/hr
1 of 2
. �
We hope you find this proposal reasonable and look forward to hearing from you.
Again,thanks for the opportunity to provide the City of Cape Girardeau, Parks and Recreation
Department with this proposal.
Respectfully You , /�(���%'��--
�
Mitchell Blake Malone(Architect)
2of2
4 v ♦
Amendment No 1 to the Professional Services Agreement Between Mitchell Blake
Malone, Architect and the City of Cape Girardeau dated July 21, 2009
This supplementary agreement amends the professional Services Agreement between
Mitchell Blake Malone, Architect, hereinafter referred to as "ArchitectfEngineer" and
the City of Cape Girardeau, hereinafter referred to as the "City". The Professional
Services Contract between the City and the Architect/Engineer was approved on the
22"a day of July 2009 by action of the City Council's Resolution No. 2380. This
amendment is of professional services relating to the City's plan for a Prototype Public
Toilet, Pavilion and Maintenance Facility Structure.
Whereas the City intends to construct these facilities, it will require the establishment of
a scope and a budget for the said prototype facility, and whereas the City will then
esta.blish needs and the funding level for the prototype. The Architect/ Engineer agrees
to provide the architectural and engineering services for the fees and provisions of the
revisions to the existing Agreement as enumerated below:
The Architect/Engineer shall develop Schematics, Design Development and
Construction drawings with Specifications as well as an estimated construction
cost for immediate and future implementation. The time from the Notice to
Proceed to completion shall not exceed a time agreed upon by the
Architect/Engineer and the City prior to project commencement. If conditions
outside of the control of the Architect/Engineer occur, or substantial changes to the
original scope of work required by the city, the Architect/Engineer reserves the
right to extend the time of the completion in an amount to be agreed by the
architect/Engineer and the City. The specific amendments to the existing
Agreement are as follows:
Exhibit B- Article B.8.3 — Fee Basis for Authorized Additional Service
Fee for the additional Service for a Prototype Public Toilet, Maintenance
Shed and Pavilion: The total fee for the design and construction drawings shall be
$15,535.00. This additional fee will bring the total contract amount under this
Agreement to $114,235.00 including normal expenses.
Exhibit B—Article B.9.2 —Additional Services
Professional Services—Prototype Public Toilet, Maintenance Shed and Pavilion
Structure: Mitchell Blake Malone, Architect shall provide Schematic Design,
Design Development, Construction Drawings and Specifications related to the
City's request for a Prototype Public Toilet, Maintenance Facility and Pavilion.
Page 1 of 2
w �f
See the attached proposal letter. This service shall be provided as an Additional
Service as provided for in E�ibit B of the Agreement and in Section 6.4 of the
Professional Services Agreement dated July 21 St 2009.
Executed by the Architect/Engineer the 25th day of March, 2011
_.
Executed by the City This�:�day of , 2011
For: City of Cape Girar a Q..S„ �������
°� �' �.,, �',�
By• City M ger o �-`;� r;�� �
� ?�° :�% '� \��\ �
, t....�, �`:
Attest: �� \�`::�.A '%. :������i ,��'
"�� �
, �E �;r����r
Clerk ' `"�a���;:�-����:,
\ _ ... . .h'.,�; :$f...
S`,''
For: Mitchell Blake Malone Architect
By:
Mitchell Blake Malone (Architect)
Page 2 of 2