Loading...
HomeMy WebLinkAboutRES.1560.05-01-2000 , BILL NO. 2000-� 0'� RESOLUTION NO. �5 tp (� A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH LAPPE CEMENT FINISHING, INC. , FOR THE SILVER SPRINGS ROAD IMPROVEMENT BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement with Lappe Cement Finishing, Inc. , for the Silver Springs Road Improvement. A copy of said Agreement is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS S� DAY OF , 20 �� . A. ., Sprad ing, III, M ATTEST: ,��+g CAp,� •, ti. � 1 4�q � Gayle' L. Conrad, City Clerk �' `�� �(,� :�`., ; : ,�,.�d : � `, �,,`= :, ,,. ',�,a� .°�/� � � ` ,�j�� :, �, ��4q� ��. ':,.- ' ,�. CITY OF CAPE GIRARDEAU Silver Springs Road STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the�day of A in the year 20� by and between the City of Cape Girardeau, Missouri (herein fter called OWNER) and Lappe Cement Finishina� znc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The work to be performed under these Contract Documents shall consist of Furnish and installation of all requirements according to the improvement plans titled "Improvement Plans for Silver Springs Road, New Pavement Construction from Route K North to Existing Pavement and Improvements to Gordonville Road from St. Francis Drive East, in the City of Cape Girardeau", and also as described herein: Clear and grade the proposed Silver Springs Road, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans, for approximately 2100 linear feet; Demolish existing street and entrance pavement and related facilities along Gordonville Road from St. Francis Drive eastward approximately 1625 feet, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans; Install islands and related improvements for a round-about intersection at Silver Springs Road and Gordonville Road; Install a signalized intersection at the intersection of Silver Springs Road and William Street; Install a new detention basin with related grading and piping, and all other related improvements indicated on the plans. ... for the City of Cape Girardeau, Missouri. 00505:A-1 . •,,, ' ,� Article 2. ENGINEER. The Project has been designed by Koehler Engineering & Land Surveying, Inc., who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. SCHEDULE 3.1 The work will be substantially completed within rn�_t�n.mc�e� eighty t f 180 ) calendar days after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions, and competed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within _ '� �� f�� - (240 ) days after the date when the Contract Times commence to run. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not competed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER 2rNo_�ux,c�e� fl�, 1 $ 250.00 ) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or anp proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER � tu.�re� fifty $ 350.00 for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 4.1 below: 4.1 For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in the bidding documents. TOTAL OF ALL UNIT PRICES: �� � Six}wrr.3�d �ixty�-� thctzsa�-X, fcx�r hur_Yed fifty caollar� arXi eic�:�teFn oents ($ cE1,4F0.18) 00505:A-2 i � � . As provided in paragraph 11.9 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have been computed as provided in paragraph 11.9.2 of the General Conditions. Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress payments; Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, on or about the 10th day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of Work completed (with the balance being retainage). If Work has been 50% completed as determined by ENGINEER, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed, in which case, the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work completed. 90% (with the balance being retainage) of materials and equipment not incorporated in the Work(but delivered, suitably stored and accompanied by documentations satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions). 5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 95°/a of the Contract Price (with the balance being retainage), less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 00505:A-3 ' L � . f 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. Article 6. INTEREST. 6.1 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. 6.2 If the OWNER fails to make payment thirty (30) days after receipt of the CONTRACTOR'S application for payment, in addition to other remedies available to the CONTRACTOR, there shall be added to each such payment interest in accordance with Section 34.057RSMo as amended. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the following representations: , 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents, including "technical data". 7.2 CONTRACTOR has visited the site and become familiar with and is satis�ed as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to 00505:A-4 S, • t " Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurFace and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, . techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observation obtained from visits to the site, reports and drawings identified in the Contract documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficientto indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1 This Agreement (pages 1 to 7 inclusive). 8.2 Exhibits to this Agreement (pages _ to _, inclusive). 8.3 Performance, Payment, and other Bonds, identified as exhibits and consisting of_ pages. 8.4 Notice to Proceed. 8.5 General Conditions (pages 1 to 45 , inclusive). 00505:A-5 ' � ,1 , 8.6 Supplementary Conditions (pages SC-1 to SC-6 , inclusive). 8.7 Specifications bearing the titie Contract Documents and Specifications for the Citv of Ca�e Girardeau. Silver Sprinqs Road from Route K North and Gordonville Road from St Franc►s Dr�ve East. Roadwav Construction and Related Improvements 8.8 Drawings. 8.9 Addenda numbers 1 to?, inclusive. 8.10 CONTRACTOR's Bid (pages 1 to 9 , inclusive) marked exhibit A 8.11 Documentation submitted by CONTRACTOR prior to Notice of Award (pages_to , inclusive). � 8.12 The following which may be delivered or issued after the Effective Date of the � Agreement and are not attached hereto: All Written Amendments and other documents - amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). � There are no Contract Documents other than those listed above in the Article 8. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. Article 9. MISCELLANEOUS. 9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent(except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 00505:A-6 , � , • 9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in muttiple copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This A ent ill be effective on �� , 20� (which is the Effective Date of greeme OWN Citv of Cape Girardeau CONTRACTORLappe Cement Finishing, znc. . Miller- - 't Mana er Russell Lappe Owner - -` - y; By: � [CORPORATE SEAL] [CORPORATE SEAL] Attest Attest � Address for giving notices Address for giving notices 401 Independence Street 8064 xWy B Cape Girardeau, MO 63701 PPYY�t=;,,P, rrn h'i775 (If OWNER is a public body, attach License No. 814 evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement. Lappe Cement Finishin�, Inc. (If CONTRACTOR is corporation, attach evidence of authority to sign.) 00505:A-7 r , • • Silver Springs Road Route K North Exhibit A March 26,2000 CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD FROM ROUTE K NORTH AND GORDONVILLE ROAD FROM ST. FRANCIS DRIVE EAST, ROADWAY CONSTRUCTION AND RELATED IMPROVEMENTS BID FORM (EJCDC 1910-18) (1990) PROJECT IDENTIFICATION: The work to be perFormed under these Contract Documents consists of the construction of . . . Furnish and installation of all requirements according to the improvement plans titled "Improvement Plans for Silver Springs Road, New Pavement Construction from Route K North to Existing Pavement and Improvements to Gordonville Road from St. Francis Drive East, in the City of Cape Girardeau", and also as described herein: Clear and grade the proposed Silver Springs Road, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans, for approximately 2150 linear feet; Demolish existing street and entrance pavement and related facilities along Gordonville Road from St. Francis Drive eastward approximately 1625 feet, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans; Install isJands and related improvements for a round-about intersection at Silver Springs Road and Gordonville Road; Install a signalized intersection at the intersection of Silver Springs Road and William Street; Install a new detention basin with related grading and piping, and all other related improvements indicated on the plans. . . . for the City of Cape Girardeau, Missouri. THIS BID IS SUBMITTED TO: CITY OF CAPE GIRARDEAU, MO 401 INDEPENDENCE STREET CAPE GIRARDEAU, MO 63701-6244 Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#1 r Silver Springs Road Route K North March 26,2000 1. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for thirty-five days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER'S notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined and carefully studied the Bidding Documents and the following Addenda, receipt of all which is hereby acknowledged: ���scadde�da bYAaae�d�m n,umbe� and Date) ��.�� A��i�Mv �� -� ���L+�K� �-� 7 �D D o ,I � Q.D t� .E'� _3 �� O O _ � (b) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work;. (c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. (d) BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER'S purposes. BIDDER acknowledges that OWNER and Engineer do not assume Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#2 ' ! ' Silver Springs Road Route K North March 26,2000 responsibility for accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface,subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) BIDDER is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. (fl BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and data with the Contract Documents. (g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (I) (Any other representation required by Laws and Regulations.) 4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s): Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#3 , r . Silver Springs Road Route K North March 26,2000 UNIT PRICE SCHEDULE Item No. Item Description Unit Est. Quantity Unit Price Item Total Removal of Ex.lmprovements(excluding �`_�� 02$ /�50 on � improvements on MO-Dot R/w) LS 1 l i�vr�.- 2 Clearing& Grubbing LS 1 Qo °C' ��ao, o..o 3 Temporary Erosion Control LS 1 00`-". ��5'00. � 4 Class A(Rock) Excavation CY 0 j�o o° �_ 5 Compacted Fill On-Site CY 9,355 $ 3"'-� . 0299 �. � 6 Excess Cut Mat.to be disposed on site. CY 9,770 $ /, �` . /$ i��G�.50 7 Single Offset Inlet EA 9 $ 75�� tLD 05 .00 8 Double Offset Inlet EA 2 $ /�v°o -�bso . ao 9 Triple Offset Inlet EA 1 /$ 57v' .°� $ /575• ao 10 Single Grated Inlet EA 5 7S� �i��7�S:n.o 11 Double Grated Inlet EA 1 ,� �S�S�° $ /��5".ao 12 Storm Basin Discharge Structure EA 1 /$ G�o`�° /$ G 4��•ao 13 Re-Construct 2 Sec.of ex. Triple inlet EA 1 �t� $ /•3�0 .a.o 14 Rip-Rap Energy Dissipater SY 73 $ �9�o $ /�,23 . �So 15 15"Class III RCP LF 990 $ /� �� . $/79/9 •°-� 16 18"Class III RCP LF 270 $ -�- . $ -o- . 17 24"Class III RCP LF 196 $ - � - . $ ` � - . 18 19"x30"Class III Elliptical RCP LF 94 $ - o - $ - o -. 19 15" RCP Flared End Sec. EA 1 � $ �55•20 20 18" RCP Flared End Sec. EA 1 �l0 °`�. /O .ao 21 24" RCP Flared End Sec. EA 2 �5°u $ 730 • do 22 3' Drainage Flume LF 5 $ 5S�°. � d275• v.o 23 18"Class III RCP LF 270 $ �O� 5 �7. � 24 24"Class III RCP LF 196 $ �'�a . $ ��3 0� Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#4 • r , Silver Springs Road Route K North March 26,2000 25 19"x30"Class III Elliptical RCP LF 94 $ �. �b . 377 . io 26 7" P.C. Concrete Pavement SY 14,960 $ ao � . $,�2I�. o.o 27 4" Granular Base Under 7" Pvmt. SY 15,404 $ � `�° . $(p���7. av �s 28 6" P.C. Conc. Entrances& Drives SY 753 � .P,S /. y5 29 10" P.C. Conc;Textured 8�Pigmented SY 185 �'�� $ 1�33�. � 30 6"Vertical Curb LF 7,994 � /`� . $ 79�i� do 31 8"Vertical Curb LF 126 $ / �° . $ /�9 . at, 32 6" Raised Conc. Islands SY 107 � �� �o 33 Adjust Valve Covers EA 3 � $ �/ . ao so 34 4"Schedule 40 PVC Utility Conduit LF 700 $ � — . � o0 35 New Signs EA 26 /$ �5"/ s�• $ 39�. ao 36 Segmental Concrete Block Wall SF 93 �$ 5� °� . $ �-�. o0 37 Adjust Manhole Rim EA 1 $ i�2O`�. $ �QO . ao 38 New Manhole Structure EA 1 /� /� . Qo 39 New Manhole Structure w/Outside Drop EA 1 /5 00�`� $ /So,v- ao 40 8"SDR35 PVC Sewer Main LF 79.4 $ 027 `�'. $ o2/y�3 . �o Pavement Marking (excluding work on � 41 William Street) LS 1 /O.�o:- /� a .sa Qo 42 Seeding&Mulching AC 3.6 �� �.��o 43 Removal of Improvements on Mo-dot LS 1 � $ �5"Qo. ao R/V1l � Pavement Marking&Signing on William LS 1 5�$ �7u".� � cz-o Street 45 150 Watt Sodium Luminaire EA 2 � 3�o e� $ �o`�C% . o0 46 Lightpole at 30' EA 2 �$ 900 � Q-o. a� 47 Pole Foundation for 30' Pole EA 2 $ �Qo � /$ l�40. e� 48 15' Bracket Arms EA 2 $ v'�So�`. /$ /Q�i . o0 o� 49 Class I Pull Box EA 4 $ 7�"0 - $ 3.a�v. �v 50 Type I Trench LF 300 $ � c�. �Q-�. ac� � 51 3" Rigid Steel Conduit Pushed LF 110 $ /9— . 02/�5. �� Koehler Engineering 8 Land Surveying,Inc. Bid Form 00410-Page#5 ' I' Silver Springs Road Route K North March 26,2000 52 1 '/." Cable Conduit w/3C#2 1-NEU LF 50 $ �5�� . �p ,op 53 1"Cable Conduit w/2C#8 1-NEU LF 440 �`'O, $ /l�5�, o-� 54 Cable 10AWG 1C (Light Pole& Brakt) LF 180 $ � . ��. � 55 Signal Pole Base EA 4 /�4�v�o a.—c ;ScPQO, ov 56 Signal Pole EA 4 /��,5=o°`.' 7�Oo, oc� 57 ClaSs 2 Pull BOx EA 2 �50°`,' /QO-fJ. o0 58 Class 3 Pull Box EA 2 /��-`:" 02 p, � 59 29' Mast Arm EA 1 /$ �70:°`' /$ ��o: pp 60 30' Mast Arm EA 1 �.�So°- $ �2So. O� 61 35' Mast Arm EA 1 �`.� $ 02�500. � 62 39' Mast Arm EA 1 .2750� o27'c5- . Qm 63 Signal Head Assemblies w/type I I Brakt EA 12 $ (v�o`� 7 �o. � 64 1 '/,"Conduit Trenched LF 33 $ �S`�e• $ l!o s . Qo 65 1 %"Conduit Trenched LF 45 $ �o `�. $ �70 • ao 66 3"Conduit Trenched LF 91 $ ���. $ 7� . p-0 67 3"Conduit Pushed LF 214 $ /���• �$ �S� . o�o 68 4" Conduit Trenched LF 140' $ 9 �. $ /��. Qo 69 1 C#8 Power Cable LF 130' � f 35 $ �T�. �o 70 7C#12 Control Wire LF 2292 � $ �._30�• ao 71 1 C#14 Detector Cable in Duct LF 3655 $ �. /�oz. Qo 72 1 C#14 Detector Lead In Cable LF 2030 $ �. $ 7/O . ;S"o 73 Detector Loops Install EA 10 ��O �n �Qoo . �o 74 Furnish & Install Signal Power Supply LS 1 ��QO� �Q�, av Furnish & Install Controller Cabinet w/ ��� 75 Equipment LS 1 7� 7�5�.� 7$ 7��. �.� TOTAL BID FOR ALL SECTIONS: �� ` -tz .� �u � ($G�/ �.4so. �� ) (Written fi ure) f� Q,� ���Qo . (Numerical figure) �D � Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#6 •. i . Silver Springs Road Route K North March 26,2000 Unit Prices have been computed in accordance with paragraph 11.9.2 of the General Conditions. BIDDER acknowledges that quantities are not guaranteed and final paymentwill be based on actual quantities determined as provided in the Contract Documents. Any specific items or labor required to complete the project in accordance with the plans and construction documents which is not explicitly identified above shall be considered incidental to the total project cost, no additional compensation shall be paid forsaid item or labor. 5. BIDDER agrees that the Work will be will be substantially complete within 180 calendar days after the date when the Contract Times commences to run as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 240 calendar days after the date when the Contract Times commences to run. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of bid bond or cashiers check. (b) Required BIDDER'S Qualification Statement with supporting data. 7. Communications concerning this Bid shall be addressed to: Name � C� � Address D �� lc-'� -5 / (a) Performance and Payment Bonding Com ny Name Address Agent\Power of Attorney Name (if used) Address Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#7 . r Silver Springs Road ' Route K North March 26,2000 8. Terms used in the Bid which are defined in the General conditions or Instructions will have the meanings indicated in the General Conditions or Instructions. SUBMITTED on , 2000. State Contractor License No. �/� IF BIDDER is: An Individual By (SEAL) (Individual's Name) doing business as Business address: Phone No.: A Partnershiq By (SEAL) (Firm Name) (General Partner) Business address: Phone No.: Koehler Engineering 8� Land Surveying,Inc. Bid Form 00410-Page#8 , , Silver Springs Road Route K North March 26,2000 A Corporation n � j By /' �i`�ti� (SEAL) (Corporation N e -�-� ;:��.. ?;,' L�Y) �.ne �,u - �.5k`:::... . r� �� ` - (State of Incorporation) -�a'�� .��� By �� `� .:�- _ �-- (�E.��L� � . ( ame of Person Authorized to Sign) -_ __ --, - --: ��.P�a ��r� ,:L � 5 : 3 (Title) �� ;.,,,-� (Corporate Seal). . ���'� Attest 4 ��-�-� (Sec etary - Business address �o �O � � 0 , � 5' i Phone No.: � � - � - Date of Qualification to do business is �,(J�L. �,L� � <o A Joint Venture By (s�) (Name) (Address) By (S�) (Name) (Address) Phone Number and Address for receipt of official communications: (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.) Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#9 r ,f ' � CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD From Route K North and Gordonville Road from St. Francis Drive ADDENDUM#1 March 27, 2000 The following revisions have been made to the above named Contract Documents: The Bid Opening date will be changed to April 11, 2000 at 10:30 A.M. in the Office of the City Engineer. This addendum must be signed and attached to your Bid Documents. �` Date ' // Doo • r � CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD From Route K North and Gordonville Road from St. Francis Drive ADDENDUM#2 Apri13, 2000 The following revisions have been made to the above named Contract Documents: 1. Three items were duplicated on the bid tab. Lines 16, 17,and 18 are to be deleted. These three items are now identified in lines 23,24, and 25. 2. Article 3.1 of the Standard Form of Agreement(page OOSOS:A-2) should read: 3.1 The work will be substantially completed within One hundred eighty (180) calendar days after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with pazagraph 14.13 of the General Conditions within Two hundred forty (240) days after the date when the Contxact Times commence to run. 3. Article 3.2 of the Standard Form of Agreement(page OOSOS:A-2)should read: 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Two Hundred Fifly Dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Complerion until the Work is substantially complete. After Substantial Completion,if CONTRACTOR shall neglect,refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTACTOR shall pay OWNER Three Hundred Fifty Dollars ($350) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. This addendum must be signed and attached to your Bid Documents. Date C�D�,.�Q_� l/ �Dao , •r . UNTTED FIRE & CASUALTY CONII'ANY CEDAR RAPIDS,IOWA B� B�� fLpprr�v�d by The American Institute of�4rrhiterts,AIA Document No.A 310 February 1970 Edition KNOWALLMEN BYTHESEPRESENI'S,that we Lappe Cement Finishing, Inc. , 8064 Highway B, Perryville, MO 63775 as Principal,hereinafter called the Principal, and the UNTTED FIRE & CASUALTY COMPANY, a corporarion duly organized under the laws of the State of IOW�, as Surety,hereinafter called the Surety,aze held and fimt?y bound unto the City of Cape Girardeau, MO i as Obligee, hereinafter called the Obligee. in the sum of 57 of bid amount �ll� �$ 5� ),for the payment of which sum well and huly to be made,the said principal arid the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS,the Principal has submitted a bid for Improvement of Silver Sprin� Road from Route K North and Gordonville from St. Francis East Now,TH�oa£ if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance �tizth the teans of such bid, and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient sumty for the faithfiil performance of such contract and for the prompt payment of labor and material fumished in the prosecution thereo£ or in the event of the failure of the Principal to enter such con�act and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof bet�veen the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void otherwise to remain in,�ull•forte,and effiect. ••`�,;g'r., d�, . Signed and sealed this l lth da of A ril :��'•.� .. L�,:`���� y p _,; ��;�-��- _ - ^ ��vi . - • 't�. LAPPE CEMENT FINISHING INC � ' � � `� �=� �. <,`�t ., mxav�,�a - > '� (Seall:;'� � ) ��r" , _ � . '�,>,� _ ..._•• ��-. . � � �A1f1�L�.� P�,�r� rKA,. -j�1�� e - Russell Lappe, c'nn.�� `"��Ex�E�iti'ent _. c ;.� . �; . `. `� � 'UNI�'ED IRE &CASUALTY CONII'AIVY (Seai) c > . ' cs � �'�f� � 10-3073b(11-9� BY! �ORN�Y-QV•FACI') Y � LJNITF�FIRE&CASL..IALTY COMPAIVY O UNITED LIFE INSUF�NCE COMPANY 118 Second Avenue, S.E., Post Office Box 73909 Cedar Ra�ids, Iowa 52407 NOTICE TO MISSOURI SURETY BOND HOLDERS Should you have a question about your bond or policy, please contact your insurance agent first. If you are unable to contact or obtain information from your agent, you may contact our company at the address and phone number below: United Fire & Casualty Company � ATTENTION: Bond Department P.O. Box 73909 Cedar Rapids, Iowa 52407 800-343-9130 PH: 319-399-5700 FAX:319 399-5499 . , 'r . ACKNOWLEDGMEMT OF SURETY State of ____ ILLINOIS_ ss. County of __ JACKSON_ On th�s_ llth_day of______ April________ 2000 personally appeared be[c�re me ________Sharon Glasco � ------------------------------------------------------- who being duly sworn did depose and say that he is the attorney-in-fact of the United Fire & Casualty Com- pany of Cedar Rapids, lowa, that the seal af[ixed to the auached instrument is the Corporate Seal of said Cor- poration, and that said instrument was signed and sealed on behalf of said Corporation by authority of its Board of Directors and the said________Sharon Glasco_____________ � ' instru- men( as such attorney-in-fact and as the [ree act and deed s ' Corporati�q J.L ley Notar ic,S linoi M 11 UND-2031 b M ,� . � UNITED FIRE & CASUALTY COMPANY HOME OFFICE - CEDAR R,4PIDS, IOWA CERTIFIED COPY OF POWER OF A'FTORNEY (Original on file at Home Office of Company - See Certification) KNOW ALL MEN BY THESE PRESENTS, That the UNITED FIRE & CASUALTY COMPANY, a corporation duly organized and existing under the laws of the State of lowa, and having its principal office in Cedar Rapids, State of lowa, does make, constitute and appoint CHARLES W. DECKER, OR SHARON GLASCO, OR ALAN H. RAUSENBERGER, OR WILLIAM TALLMAN, CARBONDALE, IL, OR TODD A. WARD, OR MARK A. GOODMAN, OR PRISCILLA B. HUNTER, OR CHRISTIE ADAMS, CAPE GIRARDEAIJ, MO, ALL INDIVIDUALLY of P. O BOX 849 CARBONDALE IL 62903 its true and lawful Attorney(s)-in-Fact with power and authority hereby coi�ferred to sign, seaf and execute in its behalf all lawful bonds, undertakings and other obligatory instruments of similar nature as toilows: ANY AND ALL BONDS and to bind UNITED FIRE & CASUALTY COMPANY thereby as fully and to the same extent as lf such insVuments we�e signed by the duly authorized officers of UNITED FIRE & CASUALTY COMPANY and all the acts of said Attorney, pursuant to tha authoritY hereby given are hereby rotified and confirmed The Authority hereby granted shall expire MA Y 6 t h 2 0 O 1 unless sooner revoked. This power of AttorneY is made and executed pursuant to and by authoritY of the following By-Law dufy adopted by the Board of Directors of the Company on April 18, 1973. "A�ticle V - Su�aty Bonds and Undertakings." Sacllon 2,Appolntment al Altorney-In•Fact.'The Prasldant w any Ylco presldent,w any other ollice►ol tha Company,may,(rom tfma to Itme,appoint by wrltten certlfiwtes attorneys•In-taet to act In behalt ot ths Company fn 1he txoculbn ol pollcles ol Insurance,bpnds,unde�taklnys snd othar obllpatory Instruments of Ilke natura.The stynalure ol any oflker aulhorized husby,and the Corpopt�aal,may be afltxad by tacsim7l�to any powerol attornay or spocial power ol attornay u cartNlcation ol either authoriz�d heraby;such elpnatun and saal,whan w uud,bainp adoptad by tha Company as the orlginal signatun ol sueh ollfcer and th�orlyinal s�al ol th�Company,Io M valld and bi�ding upon th�Company wflh th�tam�lorc� and eflect as Ihough manually slllxed.Such attwneya•ln•tact,subject to ihe Ilmltations aet lorth In thetr respective certificales ol authalty ahall fwve lull power to bind Ihe Company by thelr sl9nature and executlon of any such Instruments and to attaCh the feal ol tAe Compaoy thereta The P�esident �or a�y Y�ce President,tha Board of Directors o�any olher oflicer ol Ihe Company may at any tfine revoka all powar and aulho�(ty prevlously piven fo any atrorneyIn-fact. . IN WITNESS WHEREOF, the UNITED F1RE & CASUALTY COMPANY has caused these presents �ou�n�,� to be signed by its assistant vice president and its corporate seal to be hereto affixed this ����k��k 6th day of MAY ,AD. 1999 � COttOfAiE� � ...��. �a ?, S=�L � UNITED FIRE & CASUALTY COMPANY ���`'+ao` � �a��` l ey ` State of lowa, County of Llnn, ss: Assistant V' e President O� this MAY 1999. before me personally came Jeffrey A. Chapin to me known, who being by me duly sworn, did depose and say: that he resides in Cedar Rapids, State of lowa; that he is an Assistant Vice President of the UNITED FIRE & CASUALTY COMPANY, the corporation described in and which execuied the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporated seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation :nd that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corp ration. "Notary P lic�� � ��y SHERYL q,MCVAY � ° MYCOMMISSIONEXPIqEg My CommiSsion expires March 4 X� 2��� Mareh q,�pp CERTIFICATION I, the undersigned officer of the UNITED FIRE & CASUALTY COMPANY, do hereby certifY that I have compared the fore9oing copy of the Power of AttorneY and affidavit, and the copy of the Section of the By-Laws of snid CompanV as set forth in said Power of Attorney, with the OFIGINALS ON FILE IN THE HOME OFFICE OF SAID COMPANY, and that the same are cor�ect transcripts thereof, and of the whole of the said originals, and that the said Power of AttorneY has not been revoked and is now i� full force and effecL �'��«�un�, In testimony whereof 1 have hereunto subscribed my name and a ' ed the corporate seal of the said ����� Company this llth day of April X�9 2000 � COl/O�ATE�� � _._ � � � iY�L �; G�.."" � ,a . �;,;�;��`�r ecretary . . • Silver Springs Road Route K North EXhibit A March 26,2000 CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD FROM ROUTE K NORTH AND GORDONVILLE ROAD FROM ST. FRANCIS DRIVE EAST, ROADWAY CONSTRUCTION AND RELATED IMPROVEMENTS BID FORM (EJCDC 1910-18) (1990) PROJECT IDENTIFICATION: The work to be performed under these Contract Documents consists of the construction of . . . Furnish and installation of all requirements according to the improvement plans titled "Improvement Plans for Silver Springs Road, New Pavement Construction from Route K North to Existing Pavement and Improvements to Gordonville Road from St. Francis Drive East, in the City of Cape Girardeau°, and also as described herein: Clear and grade the proposed Silver Springs Road, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans, for approximately 2150 linear feet; Demolish existing street and entrance pavement and related facilities along Gordonville Road from St. Francis Drive eastward approximately 1625 feet, install new concrete pavement, together with associated entrances, install all storm water piping and structures, all signage and painting, and other miscellaneous improvements as indicated on the plans; Install islands and related improvements for a round-about intersection at Silver Springs Road and Gordonville Road; Install a signalized intersection at the intersection of Silver Springs Road and William Street; Install a new detention basin with related grading and piping, and all other related improvements indicated on the plans. . . . for the City of Cape Girardeau, Missouri. THIS BID IS SUBMITTED TO: CITY OF CAPE GIRARDEAU, MO 401 INDEPENDENCE STREET CAPE GIRARDEAU, MO 63701-6244 Koehler Engineering 8� Land Surveying,Inc. Bid Form 00410-Page#1 � � Silver Springs Road Route K North March 26,2000 1. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for thirty-five days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER'S notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined and carefully studied the Bidding Documents and the following Addenda, receipt of all which is hereby acknowledged: ���5ca,dde�da byadde�d�m n,�mbe� and Date) �����,v �l -- ��C��.X� �-� � �doo (� � �2 �� �� _3 ��00 � � (b) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work;. (c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. (d) BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER'S purposes. BIDDER acknowledges that OWNER and Engineer do not assume Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#2 . ' . Silver Springs Road Route K North March 26,2000 responsibility for accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and fumishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. (e) BIDDER is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. (fl BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations,tests,studies and data with the Contract Documents. (g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. (h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. (I) (Any other representation required by Laws and Regulations.) 4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s): Koehter Engineering& Land Surveying,Inc. Bid Form 00410-Page#3 Silver Springs Road Route K North March 26,2000 UNIT PRICE SCHEDULE Item No. Item Description Unit Est. Quantity Unit Price Item Total � Removal of Ex.improvements(excluding LS 1 o7I �5"�O4 �$ /�so oa improvements on MO-Dot R/w) 2 Clearing�Grubbing LS 1 ao °`� S��ao Q-o 3 Temporary Erosion Control LS 1 00`". 5��5'00. Qo 4 Class A(Rock) Excavation CY 0 j�o o" � 5 Compacted Fill On-Site CY 9,355 $ 3`'° . 02993�. � 6 Excess Cut Mat.to be disposed on site. CY 9,770 � /, �` . /$ ��G�.50 7 Single Offset Inlet EA 9 �, r°�° $ �705.00 8 Double Offset Inlet EA 2 $ /�S°° .�Gso. o.� 9 Triple Offset Inlet EA 1 /$ 575 •� $ /575. ao 10 Single Grated Inlet EA 5 75�� ����5.ao 11 Double Grated Inlet EA 1 /$ f�� `= $ /t��5". ao 12 Storm Basin Discharge Structure EA 1 /� /$ G�o•ao 13 Re-Construct 2 Sec.of ex.Triple inlet EA 1 $ /�°�' $ /3�0 .a.o 14 Rip-Rap Energy Dissipater SY 73 $ �9�o $ /�a3 -�So 15 15"Class III RCP LF 990 $ /� �� . $/79/9 •°-� 16 18"Class III RCP LF 270 $ "�- . $ - o - . 17 24"Class III RCP LF 196 $ - �- . $ - O - 18 19"x30"Class III Elliptical RCP LF 94 $ _ o _ $ ` O -. 19 15" RCP Flared End Sec. EA 1 $�55 ou $ �255•o_o 20 18" RCP Flared End Sec. EA 1 �!D °r. /O .Qo 21 24" RCP Flared End Sec. EA 2 3$ l�S°`' $ 730 . do 22 3' Drainage Flume LF 5 $ .5��°. $ v2 75• vq 23 18"Class III RCP LF 270 $ �� 5 �7. � 24 24"Class III RCP LF 196 $ ��a . �,�� o�P Koehler Engineering 8 Land Surveying,Inc. Bid Form 00410-Page#4 Silver Springs Road Route K North March 26,2000 25 19"x30"Class III Elliptical RCP LF 94 . �6 . 377 . io 26 7" P.C. Concrete Pavement SY 14,960 $ ao �° . � ,�I�, o0 27 4"Granular Base Under 7" Pvmt. SY 15,404 � `�� � ���Z � �s 28 6" P.C. Conc. Entrances & Drives SY 753 $ ���" . .P,S /. y5 29 10"P.C. Conc; Textured & Pigmented SY 185 �5�� $ 1�33�. a� 30 6"Vertical Curb LF 7,994 $ /"' . $ 79�i� ¢o 31 8"Vertical Curb LF 126 � $ /�� . �, 32 6" Raised Conc. Islands SY 107 � $ oz 7/Z �o 33 Adjust Valve Covers EA 3 � $ �/ . ao 34 4"Schedule 40 PVC Utility Conduit LF 700 $ � �O . $ 59�5"O Qo 35 New Signs EA 26 !$ �S"/ s�• $ �3'9�. ao 36 Segmental Concrete Block Wall SF 93 �$ 5� �� . �, �-�. o0 37 Adjust Manhole Rim EA 1 $ `�O`�. $ �Qo . Qc, 38 New Manhole Structure EA 1 /$ ��O �.` /� . ao 39 New Manhole Structure w/Outside Drop EA 1 /.5 00`�`� $ /So-o• a.o 40 8"SDR35 PVC Sewer Main LF 79.4 $ 027 `�. $ �/5�3 . �o 41 Pavement Marking (excluding work on LS 1 /O.a�o� $/dacSa Qo William Street) 42 Seeding& Mulching AC 3.6 /��o �� �Q�o 43 Removal of Improvements on Mo-dot LS 1 �S"oo�' $ 02.5'¢0. ao R/V1/ � Pavement Marking 8�Signing on Wi�liam LS 1 5�$ �7v'.� � �o Street 45 150 Watt Sodium Luminaire EA 2 $ 3�0 °" $ loS�C . o0 46 Lightpole at 30' EA 2 /$ 900 `" Q-�. o� 47 Pole Foundation for 30' Pole EA 2 ��Qo �. /$ la�o. a� 48 15' Bracket Arms EA 2 $ v�so`'. /$ �Q� . ao o� 49 Class I Pull Box EA 4 � 75� � $-34c1c�. dv 50 Type I Trench LF 300 � � e�. �aQ-� . o0 51 3" Rigid Steel Conduit Pushed LF 110 $ /9 `'b . 02/�5. �� Koehler Engineering 8� Land Surveying,Inc. Bid Form 00410-Page#5 Silver Springs Road Route K North March 26,2000 52 1 '/"Cable Conduit w/3C#2 1-NEU LF 50 $ �5�� • �S"o .oa 53 1"Cable Conduit w/2C#8 1-NEU LF 440 $ �2 �'`' . $ /l��, a.o 54 Cable 10AWG 1C (Light Pole& Brakt) LF 180 $ '� . $ /��. o� 55 Signal Pole Base EA 4 $ /�5"p_°C 5"�Qp, p� 56 Signal Pole EA 4 /P,5"O p`,' 7�Oo. oc� 57 Class 2 PUII Box EA 2 950 a' /QO-O, o0 58 Class 3 Pull Box EA 2 ���c5_v" a2 p. � 59 29' Mast Arm EA 1 /$ �70:°`' /$ ,�70: p.C� 60 30' Mast Arm EA 1 e2,�Sp°° $ v1,�-o. � 61 35'Mast Arm EA 1 $�Spp°b $ �2500. � 62 39' Mast Arm EA 1 .27c5'O ro o27c�o. Qm 63 Signal Head Assemblies w/type II Brakt EA 12 $ !o�o `� 7 �o. � 64 1 '/."Conduit Trenched LF 33 � �Ob• $ /�� . � 65 1 %Z"Conduit Trenched LF 45 �(� $ �Z70 • ao 66 3"Conduit Trenched LF 91 � $ 7� . � 67 3"Conduit Pushed LF 214 $ /���• �$ �Sa,2 . � 68 4"Conduit Trenched LF 140' $ 9 �. $ /��. Qv 69 1 C#8 Power Cable LF 130' � /35 $ �T�S . �o 70 7C#12 Control W ire LF 2292 ��7S $ l030�• c�o 71 1C#14 Detector Cable in Duct LF 3655 $ �. /$ 5��02. �o 72 1C#14 Detector Lead In Cable LF 2030 $ �. 7/O . ;So 73 Detector Loops Install EA 10 ��-O �n �l'Qvo , Qo 74 Furnish & Install Signal Power Supply LS 1 �PQO� �Qo, dv Furnish& Install Controller Cabinet w/ ��> 75 Equipment LS 1 7$ 7'�Sr.- 7$ 7��: �t, TOTAL BID FOR ALL SECTIONS: L� 6Cc -tz �f Lu � . ($G�/ 5�45-0. /� ) (Written fi ure)���� Q,� ���Qo (Numerical figure) c7 Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#6 � �� Silver Springs Road Route K North March 26,2000 Unit Prices have been computed in accordance with paragraph 11.9.2 of the General Conditions. BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents. Any specific items or labor required to complete the project in accordance with the plans and construction documents which is not explicitly identified above shall be considered incidental to the total project cost, no additional compensation shall be paid for said item or labor. 5. BIDDER agrees that the Work will be will be substantially complete within 180 calendar days after the date when the Contract Times commences to run as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within 240 calendar days after the date when the Contract Times commences to run. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. The following documents are attached to and made a condition of this Bid: (a) Required Bid Security in the form of bid bond or cashiers check. (b) Required BIDDER'S Qualification Statement with supporting data. 7. Communications concerning this Bid shall be addressed to: Name � C% � Address o �J• � --5 / (a) Performance and Payment Bonding Com ny Name Address Agent\Power of Attorney Name (if used) Address Koehler Engineering 8 Land Surveying,Inc. Bid Form 00410-Page#7 , , Silver Springs Road ' Route K North March 26,2000 8. Terms used in the Bid which are defined in the General conditions or Instructions will have the meanings indicated in the General Conditions or Instructions. SUBMITTED on , 20 00. State Contractor License No. �/� IF BIDDER is: An Individual By (SEAL) (Individual's Name) doing business as Business address: Phone No.: A Partnership By (SEAL) (Firm Name) (General Partner) Business address: Phone No.: Koehler Engineering& Land Surveying,Inc. Bid Form 00410-Page#8 Silver Springs Road Route K North March 26,2000 A Corporation n � - gy J �i'�ti��� (SEAL) , . (Corporation N e -� � ;;�.. t;; � L � :=�5k,.:.-- : �' �� L.tl� vuz!-c�' -.,, ' -J=�� ��' (State of Incorporation) - �'' .: ;._.,:��r By �� `� x �`= (�lJ^��;. ' . = W^ • -:.i ! �.-� � ( ame of Person Authorized to Sign) - - - / /�.P�a.�P�r - " ', .•. .": i;�.. (Title) -;'�,�.. � �,..;,�e (Corporate Seal). . ���'� Attest 4 ��-�-� (Sec etary - Business address: �o �O � c � 0 . � 5" / Phone No.: � � - � - Date of Qualification to do business is : .1��.�'��� ��o A Joint Venture By (s�) (Name) (Address) By (S�) (Name) (Address) Phone Number and Address for receipt of official communications: (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.) Koehler Engineering 8� Land Surveying,Inc. Bid Form 00410.Page#9 � . CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD From Route K North and Gordonville Road from St. Francis Drive ADDENDUM#1 March 27, 2000 The following revisions have been made to the above named Contract Documents: The Bid Opening date will be changed to April ll, 2000 at 10:30 A.M. in the Office of the City Engineer. This addendum must be signed and attached to your Bid Documents. Date // o00 i , CITY OF CAPE GIRARDEAU SILVER SPRINGS ROAD From Route K North and Gordonville Road from St. Francis Drive ADDENDUM#2 Apri13, 2000 The following revisions have been made to the above named Contract Documents: 1. Three items were duplicated on the bid tab. Lines 16, 17,and 18 are to be deleted. These three items are now idenrified in lines 23,24,and 25. 2. Article 3.1 of the Standard Form of Agreement(page OOSOS:A-2) should read: 3.1 The work will be substantially completed within One hundred eighty (180) calendar days after the date when the Contract Times commence to run as provided in paragraph 23 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions within Two hundred forty (240) days after the date when the Contract Times commence to run. 3. Article 3.2 of the Standard Form of Agreement(page OOSOS:A-2)should read: 3.2 Liquidated Damages. OWNER and CONTR.ACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Two Hundred Fifty Dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Complerion until the Work is substantially complete. After Substantial Completion,if CONTRACTOR shall neglect,refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by OWNER, CONTACTOR shall pay OWNER Three Hundred Fifty Dollars ($350) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. This addendum must be signed and attached to your Bid Documents. Date C[Dr,�� l/. �Oc�o UNITED FIIZE & CASUALTY CONII'ANY CEDAR RAPIDS,IOWA sro BorrD Approved by The American Institute of A�rhitects,AIA Document No.A 310 February 1970 Editiort KNOW ALL MEN BY THFSE PRESENTS,that we Lappe Cement Finishing, Inc. , 8064 Highway B, Perryville, MO 63775 as Principal,hereinafter called the PrincipaL and the UNTTED FIRE & G4.SUALTY COMPANY, a corporaHon duly organized under the laws of the State of IOW�1, as Surety,hereinafter called the Surety,are held and firml_y bound unto the City of Cape Girardeau, MO i, as Obligee, hereinafter called the Obligee. in the sum of 5� of bid amount �ll� ($ 5' ),for the payment of which sum well and truly to be made,the said principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, fiimly by these presents. WHERF.AS,the Principal has submitted a bid for Improvement of Silver Sprin� Road from Route K North and Gordonville from St. Francis East Now,TH�oa� if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance �tizth tha temis of such bici, and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient sumty for the faithful performance of such contract and for the prompt payment of ]abur and material fiunished in the prosecution thereo� or in the event of the failure of the Principal to enter such con�act and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof behveen the amount specified in said bid and such larger aznount for which the Obligee may in good faith contract with another pam� to pe:form the work covered by said bid, then this obligation shall be null and void, otherwise to remain in,�ull•force and effect. ;`�g c+�� d l,��,'' �.\� `.... �: ��;., Signed and sealed this 11 th �y of April =�,�',�,�,�bo�r,�" _ � " �'� - • �"' "' LAPPE CEP3ENT FINISHING INC.' � - �. � `� ��'($eajj�` (, Vc j t} , ] tPRIIN�'Ai.) ` "�_ . > � ',,- �( � � _ .7.._;r� •;. � �� r�.,c/��' . �� ,� - Ru�s�ll Lappe, ('rrn.�� '��E�esiti'ent __ � � :;, . . ��`. `� "� ' 1��'ED IRE &CASUALTY COMPANY (�ai) � �$ . / ( ) ' ' � By, , 1M0-3073b(17-90� ! (ATTORNEY-iN•FACn , , , UlVI7 FD FIRE&CASLIALTY COMPANY � UNITED LIFE INSURANCE COMPANY 118 Second Avenue, S.E., Post Office Box 73909 Cedar Rapids, Iowa 52407 NOTICE TO MISSOURI SURETY BOND HOLDERS Should you have a question about your bond or policy, please contact your insurance agent first. If you are unable to contact or obtain information from your agent, you may contact our company at the address and phone number below: United Fire & Casualty Company ATTENTION: Bond Department P.O. Box 73909 Cedar Rapids, Iowa 52401 800-343-9130 PH: 319-399-5700 FAX:319 399-5499 < , ' . ACKNOWLEDGMEMT OF SURETY State of ____ ILLINOIS_____________ ss. County o[ __ JACKS_ON On th�s_ llth_�ay of______ April________ 2000 Sharon Glasco __ personally appeared befc�re me --------------------------------------------------------- who being duly sworn did depose and say that he is the attorney-in-fact of the United Fire & Casualty Com- pany of Cedar Rapids, lowa, that the seal a[fixed to the attached instrument is the Corporate Seal of said Cor- poration, and that said instrument was signed and sealed on behalf of said Corporation hy authority of its Board of Directors and the said________Sharon Glasco_____________ � ' instru- ment as such attorney-imfact and as the free act �and deed o s ' Corporati�q J.L le Notar ic,S linoi M �1 UND-203 t b , • . . � UNITED FIRE & CASUALTY COMPANY HOME OFFICE - CEDAR RAPIDS, IOWA CERTIFIED COPY OF POWER OF AFfOfiNEY (Original on file at Home Office of Company - See Certification) KNOW ALL MEN BY THESE PRESENTS, That the UNITED FIRE & CASUALTY COMPANY, a corporation duly organized and existing under the laws of the State of lowa, and having its principal office fn Cedar Raplds, State of lowa, does make, constitute and appoint CHARLES W. DECKER, OR SHARON GLASCO, OR ALAN H. RAUSENBERGER, OR WILLIAM TALLMAN, CARBONDALE, IL, OR TODD A. WARD, OR MARK A. GOODMAN, OR PRISCILLA B. HUNTER, OR CHRISTIE ADAMS, CAPE GIRARDEAU, MO, ALL INDIVIDUALLY of P. O BOX 849 CARBONDALE IL 62903 its true and lawful Attorney(s)-in-Fact with power and authority hereby coiiferred to si9n, seaf and execute in its behalf all lawful bonds, undertakings and other obligatory instruments of similar nature as follows: ANY AND ALL BONDS and to bind UNITED FIRE & CASUALTY COMPANY thereby as fully and to the same extent as !f such insVuments were si9ned by the duly autho�ized officers of UNITED FIRE & CASUALTY COMPANY and all the acts of said Attorney, pursuant to the authoritY hereby given are hereby ratified and confirmed The Authority hereby granted shall expire MA Y 6 t h 2 0 O 1 unless sooner revoked. This power of Attorney is made and executed pursuant to and by authoritY of the following By-Law duly adopted by the Board of Directors of the Company on April 18, 1973. "Article V - Surety Bonds and Undertakings." Secllon 2,Appolntment ol Attor�ey-In-Fact.`The Prasfdant or any Llca Presldant,w sny othar o(licar ol lhe Company,may,lrom I(ma to tlms,�ppufnt by written certlficates attorneys•In-laet to sct In behalt ol the Company In tl�e exocutbn oi pollclea ot Insurance,bonds,underlaklnqs a�d otAar obllpatory Instruments of Ilke nature.The slpnature ol any oNker authwlzod Mnby,and th�Cprporat�seal,may bs alft�wd by lacsiml(�to aoy powerol attorney o�spocial power ol attornay or cartlllwtlon ol�ithar authorizad Aenby;such cipnaturs and aal,whrn w usad,bainQ adoptad by lM Compe�y as Ih�orlginal slgnatun ol such ollloar and th�wlpinal s�al ol tM Company,to M valfd and binding upon th�Company wlth th�pm�lorc� and eHecl as though manually a111xed.Such attwneys-ln-lact,subJect to the Omltstions iet lorlh In thelr respactive certilicates ol authorlty:half have full power to bind the Company by thelr si�nature and executlon of any such Instruments end to aUach the seal ol the Company therela The P�esldenl 'or any Vice Prastdant,tha Board ol Diraclors or any olher otticer ol the Company may at any tima revoke alt powar and aulhorily prev(ously pivan to any atlornayIn•lact. . IN WITNESS WHEREOF, the UNITED FIRE & CASUALTY COMPANY has caused thesa prasents �x�uti,�,� to be signed by its assistant vice president and its corporate seal to be hereto affixed this `������� 6th day of MAY ,A.D. 1999 � COtt01ATE� �•... �. � �=�L � UNITED FIRE & CASUALTY COMPANY . ^ •r.4�.+`, / ' � M/MN��, / / By i i . State of lowa, County of Llnn, ss: Assistant V' e President On this 6th day of MAY 1999. betore me personally came Jeffrey A. Chapin to me known, who being by me duly sworn, did depose and say: that he resides in Cedar Rapids, SUte of lowa; that he is an Assistant Vice President of the UNITED FIRE & CASUALTY COMPANY, the corporation described in and whtch executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the s�id instrument is such corporated seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation :nd that ha signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corp ration. "Notar�c�/ 1't =�l/ ��: SHERY�A.MCVAY � : MYCOMMISSIONEXPIqES My commission expires March 4 X� 20�� March 4,2opp CERTIFICATION I, the undersi9ned officer of the UNITED FIRE & CASUALTY COMPANY, do hereby certify that 1 have compared the fore9oing copy of the Power of AttorneY and affidavit, and the coPy of the Section of the 8y-Laws of said Company as set forih !n said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID COMPANY, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effecL �„���n�, In testimony whereot 1 have hereunto subscribed my name and a ' ed the corporate seal of the said l�'�������� Company this llth day of April X�9 2000 � COt10t41E�� � ....•�. � � iY�L �; G�"-`"' � � ,: v'�w a��'r` ecretar wN�� Y � j" � Bond No. 54-111998 UNITED FIRE & CASUALTY COMPANY 118 Second Avenue SE Cedar Rapids, Iowa 52401 319-399-5700 (A Stock Company) PERFORMANCE BOND Approved by The American Institule uf Architects, AI.A.Ch�cument No.A-31 I February 1970 Edition KNow A[.� BY T►��sr P[zESEtv'rs,that — __Lappe Cement Finishing, Inc., _ __ __— -, (1 Iere insert Ihi•name�nd.id�iress ur legal title uf the Cuntnctor) 8064 Highway B, Perryville, MO 63775 -- ____ _. -- -- as Pnncipal, hereulafter called Contractor, and UNITED I�IRE & CASUAL'I1' COMPANY, a corporation organized under the laws of the State of lowa,as Surety, hereinafter called Surety,are heid and firn�ly bound unto City of Cape Girardeau__ _ _ __ _ , 401 Independence, Cape Girardeau, MO 63701 __ _ (Here inser[the name and address or legal title of the Owner) as Obligee, hereu�after called Owner, in the amount of ..__S�_gundred Sixty One Thoudand Four Hundred Fifty and 18/lOQ poll�.S�� 661,450.18 _� for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns jointly and severally,firmly by dlese presents. WHEREAS,Contractor has by written agreement dated __ ����� entered into a co�ttract with Owner for _Improvement Plans fo ver Springs Road, New Pavement Construction from Route R North to Existing Pavement and Improvements to Gordonville Road from St. Francis Drive �ast, in the City of Cape_Girardeau in accordance with drawings and specifications prepared by _City_ E_ngineering Department _ Q lere insert full name,title and address) which cc�ntrart is by refcre�ice made a E�art here��f,and is hereinafter refcrred to as the Cvntract. NOW,THEREFORE,THE CONDI'I'ION OP'I'filS OBLIGATION is such for a cuntract between such bidder and Owner,and make available as work that, if Contractor shall promptly and faithfully perform said contract, then progresses(even though there should be a default or a succession of defaults this obligation shall be mdl and vuid; otherwise it shall remain in full furm wider the contract or contracts of completion arranged under this paragraph) and effect. sufficient funds to pay the cost of completion less the balance of the contract price; but not exceeding including other costs and damages for which the The Surety hereby waives notice of a�y alteration or extension of time made Surety may be liable hereunder, the amount set k�rth in the first paragraph by the Owner. hereoE The term "balance of the contract price," as used in this paragraph, Whenever Contractor shall be,and declared by Owner to be in default under shall mean the total amount payable by Owner to Contractor under the Contract the Contract, the Owner having performed Owner's ubligations thereunder, and any amend�nents thereto, less the amount properly paid by Owner to the Surety may promptly remedy the default,or shall prompHy Contractor. 1) Complete the Contract in accordance with its terms and conditions,or Any suit under this bond must be instituted before the expiration of two 2) Obtain a bid or bids for completing the Contract in accordance with its �Z�Years from the date on which final payment under the contract falls due. terms and conditions, and upon determination by Surety of the lowest No right of action shall accrue on this bond to or for the use of any }�erson - responsible bidder, or, if the Owner elects, upon determination by the or corporation other than the Owner named herein.:: the heirs; ex�utors, Owner and the Surety jointly of the lowest responsible bidder, arran};e administrators or successors of Owner. SiKned and sealed this ____- 4th--__-_ ___--�{�y c�f __May --- �D.,�ccj 2000 >__ In the presence uf _LAPPE CEMENT FINISHING� INC. (Seal) • - - —--- - � (Principal) _ _ (�• �_ _� _ " -- -- —----_= - -- ( it ��5.�) ussel Lappe, (T�t�e) Pres3.dent UNITED FIRE&CASUALTY COMPANY �5,,��� ------ -- - � - _ ------- — - - - __ [3y _ _ _ — ( ���,��s�) Priscilla B. HuII�P'�ney-in-fact) V ACKNOWLEDGMENT OF SURETY State of Missouri County of Cape Girardeau _ On this 4th day of MaY , 2000 Personally appeared before me Priscilla B. Hunter �vho being duly sworn did depose and say that he/she is the attorney-in-fact of the United Fire & Casualty Company of Cedar Rapids, Iowa,tliat tlie seal affixed to the attached instrument is the Corporate Seal of said Corporation, and that said instrument was signed and sealed on behalf of said Corporation by authority of its Board of Directors and the said Priscilla B. Hunter acknowledged that he/slle executed said instrument as such attorney-in-fact and as the free act and deed of said Corporation. �� NANCY STRAUS6Z Notary Public-Not�y Seal State of Missouri Cape Gtr�deau County Notnr blic My Commission Fxpires Jun 20,2003 UND-2031 b � UNITED FIRE & CASUALTY COMPANY . HOME OFFICE — CEDAR RAPIDS, IOWA ' CERTIFIED COPY OF POWER OF ATTORNEY (Ori9inal on file at Ilome Office of ComPany — See Certification) KNOW ALL MEN BY TIISSatePoESlowas andahav,ingUNSTP�inc�ipal office�inLCedarO�t�A�NY.Slaterofrlowa, ddoes makeeeons�titutes'and under the laws of the appoint Cf;ARLES W . DECKER , OR SfiARON GC�ASCO , OR ALAN II . RAUSENBERGER, 0 WILLIAM TALLMAN , CARHONDALG , IL , OR `1'ODD A . WARll , UR MARK A . GOODMAN , OR PRISCILLA H . IiUN`PER , OR CIIRIS`1'IE ADAMS , CAPE GIRARDEAU , MO, ALL INDIVIDUALLY of P 0 BOX 849 CARBONDIILE IL 62903 its true and lawf��takin�s and'o'theraobligattory ustrurr�ier�itsa`of��sirnilarerat�ure as'followso S���NYeaI�Np ALLteSIONDgbehalf all lawful bonds, under 9 and to bind UNITED Fff ces of SUNIIED Flf EP&NCASUlLI�lYaCO`MPl�NY ar�idtlall tiie, aclstoft sa dlfAt orneysPu suant oetheSlauthorbV the duly authorized o hereby given are hereby ratified and confirrned. Z 0 O l ��nless sooner revoked. The Authority hereby granted sliall expire M n y 6 L ti This power of AttorneY is made and executed {�ursuant lo and by aulhoriry of the followin9 BY—Law duly adopted by t e Board of Directors of the CompanY on April 1II, 1973. "Article V — Surety Uonds and Undertakings." bycwr�llten cePlillc1ales'attorii ysi�-1�I��o acl�b�tnha�l'�ol(�Ilae Coinpany,lnelhe eHecutloo ot'policles'o11 Insurance, b�ondsroonde takoigs a�dPother obllgalory lomeu1or�s��eco'.inll�nwer�I�Ir.11nnny"�I�'r�ceiilll�I��llu�uilo�iil�ci1nuihwl�edthe�ol y,su:h'signoiwo a'�ulss�J.whnn so osexl,(bbn9 a lurpled'by Ihe powerol al Y and1elfec�as1lhoug�l�i1manua111y'alllxed$1Such'aiiorney's!i�rlacll�'suli�ect lo Ihe Iln�dia�lio�s1sel�lorlh�In�Iheirlrespecllve,oerll Icates ol aulhorllysshael'have lull power to bind ihe Company by their siynature and execu��o°o����Y suc��Instnimenis and to auach Ihe seal ol Ihe Company�herelo.The PresideM or any Vice Presldenl,the Bn�rd ol Dl�e�:tu�s or any olher nllicer ol Ihe Company may al nny lime revoke all power and uuthorily prevlously given lo any attorneyin-lact. IN WITNESS W{IEREOF, the UNITED Flfi[ & CASUALTY COMPANY has caused these presents `����»��� to be signed by its assistant vice president and its corporate seal to be hereto affixed this ,A.D. 1 9 9 9 a�'�' ► k1j.s�. 61-11 day o f M A Y ` COIf0141E� •... UNITED FIRE & CASUALTY COMPANY � lls�L �3 - �� �•,= n/ �j ti��+.vr �t �� ` wuw�nN`` BY l Assistant V e President State of lowa, County of Llnn, ss: On this 6th daY of MAY 1999, before me personallY came JefErey A. Chapin to me known, who being bY `rT'e UNITED FIfiF d& CASU/�LTY�COMPtl�NY'1etI�Q s oePc,i�tC�e'd�eRcPbed Snatand fwh chl executeds the Assistant Vice President o above instrument; that he kno`i`�rsua1nt toalaolhos ry gi�ven�hyl�t��,e `rF��artdeof eDirectors�of said cor�Porat on and I thatU he s 9ned th s seal; that it was so affixed p C name thereto pursuant to like authoriry, and acknowledyes san�e to be tlie acl and deed of said co�ration. � �� �-� -v Notary P lic My commission expires riarch 4 xt,� 2000 SfIERY�A.MCVAY ��[ MY COA1A1iSSION EXPIFlES C[f171PICATION Rlan:h 4.2000 I, the undersigned offfc�ito neY,andNaf(dav t`�and ll e cloPYlo< <�OMSeN o��dof `the F3y LawsYofl said Company asesett forthr�95Iad coPY of ttie Power o Power of Attorney, with the ORIGINALS UN FILE W TF1E FIOME OFFICE OF SAID COMPANY, and that the same are correc transcripts thereof, and of the whole of lhe said origir�als, and lhat the said Power of AttorneY has not been revoked and is now in full force and effect. �;,�n��� In testimony wf,ereof I have hereunto suUscribed my name and a F' ed the corporate seal of the sai � ic9 2000 �,� ► '�1}+�; Company lhis 4tt1 day of May �COIt01A1E�� � � af►L �; ecretary � �r��+•��c: �''�uwua�� , U�TI�'�I� �I�Z� � ���U�1�`���1NI(�'�e�l� U�IIT�,iI� LI�� I�IS�U�1G��. ��1���1� 11� ��,���II� �1�`�lU�, 5����, ���1� $�� ���0�� ��,I���R. �a��II��, I��``� ���d'� NOTICE TO MISSOURI SURETY BOND HOLDERS Should you have a questions about your bond or policy, please contact your insurance agent tirst. If you are unable to contact or obtain information tirom your agent, you may contact our company at address and phone number below: UNITED FIRE & CASUALTY COMPANY ATTENTiON: BOND DEPARTMENT P.O. BOX 73909 CEDAR RAPIDS, IOWA 52407 1-800-343-9130 � BOND NO. 54-111998 UNITED FIRE & CASUALTY COMPANY 118 Second Avenue SE Cedar Rapids, Iowa 52401 319-399-5700 (A Stock Company) LABOR AND MATERIAL PAYMENT BOND Approved by The American lnstitute of Architects THIS BOND IS ISSUED S1MUL"I'ANEOUSLY W1TH PERE�OIZMANCE BOND 1N FAVOR OF THE OWN[?1Z CON[�I'f1C�NGl�ON "1'I II? I�UI.L ANI)I�nrrt n�Ul, I'L?RI�ORMANCL;O��Tl IE CONTRACI' AIA DOC.A311 FEB. 1970 ED. KNOW ALL BY THESE PItESENTS: That Lappe Cement Finishing, Inc., (here insert the name and address or IeKal title of the Contractor) � 8Q64 Highway B, Perryville, MO 63775 -- ---- ' as Principal, hereinafter called Principal, and UNITED F1RE & CASUALTY COMPANY, a corporation organized under the laws of the State of Iowa,as Surety, hereinafter called Surety,are held and firmly bound unto City of Cape Girardeau _ __ ____ __--- --- ---- —.._ , 401 Independence, Cape Girardeau, M0_63701 _ , (here insert lhe name and address or le�al tiNe of the Owner) as Obligee, hereinafter called Owner, for the use and benefit of claimants as here'vlbelow defined,in the amount of Sig flundred Sisty One Thousand Four flundred Fifty and 18/10(���ars($ 661,450.18 � for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and seve"r-:lly,firmly by these presents. WHEREAS�Principal has by written agreement dated _. _ - �� aDO� � Im rovement Plans for Sil� Springs Road, New Pavement entered into a contract with Owner for _ P Construction from Route K North to Existing Pavement and Improvements to Gordonville Road from St. Francis Drive East, in the City of Cape Girardeau in accordance with drawings and specifications prepared by City Engineering Department _ -- --- ------ (here inscrt full name,tiNe and address) which contract is t�y reference made a part heree>f, and is hrreinafier referred tc>as Nle Contract. Now, THEREFC�RE� Tt�s CONDITIOIV Or Ttt�s OBLIGAl'ION is such that if the Principal shall promptly make payment to all claimants as hereinafter de6ned, for all labc>r ancl material ust�d or reasunably required for use in the performance of the Contract, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions: 1. A claimant is defined as one having a direct cemtract with the I'rincipal or with a subcontractar of the Principal for labor, material,or both, used or reasonably ree�uired for use�in the prrformance of the contract,labor and material being UND-2091b(9-94) construed to include that part of water, gas, power, light, heat, oi� gasoline, telephone service or rental of equipment directly applicable to the Contract. 2. The above named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such cl�umant, prosecute the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon. The Owner shall not be liable for the payment of any costs or expenses of any such suit. 3. No suit or action shall be commenced hereunder by any claimant, (a) Unless claunant, other than one having a direct contract with the Principal, shall have given written notice to any two of the Eollowing: The Principal, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to the Principal, Owner or Surety, at any place where an office is regulazly maintained for the transaction of business, or serveci in any manner in which legal process may be served in the state in which the aforesaid project is located,save that such service need not be made by a public officer. (b)After the expiration of one(1) year following the date on which Principal ceased work on said Contract, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended so as to be equ�il to the cnulimum period of limitation pernlitted by such law. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any plrt thereof, is situated, or in the United States District Court Eor the district in which the project,or any part thereof, is situated, and not eLsewhere. 4. The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payirient by Surety of inechanics' Gens which may be filed of record against said 'unprovement, whether or not claim for the amount of such lien be presented under and against this bund. Signed and sealed this 4th day of May �,D. � 2000 , LZ the presence oE LAPPE CII�iENT FINISHING, INC. �5�� (Principal) - (witness) Russell Lappe, (Title) president UNTTED FIRE &CASUALTY COMPANY (Seal) , , (Witness) By Priscilla B. Huntei��"'-�"� ACKNOWL�DGMENT OF SURETY State of Missouri County of Cape Girardeau _ On this 4th day of MaY , 2000 Personally appeared before�ne priscilla B. Hunter wllo being duly sworn did depose and say that he/she is the attorney-in-fact of the United Fire & Casualty Company of Cedar Rapids, Iowa,that the seal affixed to the attached instrument is the Corporate Seal of said Corporation, and that said instrument was signed and sealed on behalf of said Corparation by authority of its Board of Directors and the said Priscilla B. Hunter acknowledged that he/she executed said instrument as such attorvey-iu-fact and as the free act a��d deed of said Corporation. �tJC1f STRAUSHi Nof pry PubiiC-NotQy Sed � State of Mi,ssourt Cope Girardeau County My Commission bcpires 1un 20.2003 Notary Pu lic UND-2031 b UNITED FIRE & CASUALTY COMPANY i-10ME OFFICE - CEDAR RAPIDS, IOWA CERTIFIED COPY Of POWER OF ATTORNEY (Original on file at Flome Office of Company — See Certificalion) KNOW ALL MEN BY TIIESE PRESENTS, That the UNII ED FIRE & CASUI�LTY COMPANY, a corporation duly or9anized and existing under ihe laws of the Slate of lowa, and having its principal o(fice in Cedar Rapids, Stale of lowa, does make, cOo�nstitute and appoint CHARLES W . DECKER , OR SfIARON GI�ASCO, OR I1L11N II . RAUSENBERGER, WILLIAM TALLMAN , CARF30NDALG , IL , OR 'PODD A . WARD , OR MARK A . GOODMAN , OR PRISCILLA S . IIUNTER , OR C[IRI5'PIE ADAMS , CAPE GIRARDE�IU , MO, ALL INDIVIDUALLY of p 0 BOX 849 CARBONDALE IL 62903 its true and lawful A'f°S and'oltrheFaobliga'to,ry outrumer�itsa`of�sinilarerature asf followso si�NYeaI�ND ALLteB'ONDSbehalf all lawful bonds, undertak 9 and to bind UNITED FIRE & CASUALTY COMPANY lhereby as fully and to the same extent as if such i�struments were si9ned by the duly authorized officers of UNITED FIRE & CASUALIY COMPANY and all tt,e acis of said Atlorney, Pursuant to the authority hereby given are hereby ratified and confirrned. Z��� uniess sooner revoked. The Authority hereby granted shall expire M]�y 6 l lt This power of Attorney is made and executed pursuant to and by auUiority of the followin9 BY—Law duly adoPted by t e Board of Directors of the Company on April 18, 1973• "Article V — Surety Uonds a�id UnJertakings." SecUon 2,Appoinlmenl ol Allorney-In•Fact."Ihe Presidr.nl or ai�y Vico PiesiJenl,or any o��ror o��icer ol Ihe CoinpanY,����Y��rouod'erlak'��ii'ts andPolher by wrltten cer111icales atlorneys�in-lacl to ar.l In bohall ol I��e CumPa°Y �° ��'e exer.ullon ul pollcles ol Insur.nce, bonds, 9 obllgatory �o�ieuoe1sso°InIl�e�wur1nl�.11ornny<I�'r1cr.illllr:��uu u�'o(lihc�1:�uthwlred1l eiclYy s'w:h'S1gColu'ro a��J snuJ.wl�n so u'sed(bc n5�adopled'by the powcrol all Y f Company ps Ihe o�lglnnl slgna�u�n ol sui:h oIlL:nr.nd Ihr.uilellnnl snul ul Iho Cumpmiy,lu be valld ond bhullny upon�he Compauy wllh Ihe smne lorce lull�power lo bi d 9he TCompe�Y bY Ihelss'9nature.��d execu'lion`oll any sach lusirua eli is a1nd io1a'tiaehl�he seal ol IlreeCompar y ihe e11o�rTt eSP elsiden/ or any Vice P�esldenl,Ihe��»rd nl Dhecluis or any olher ollicm ol Ilu�Comp;u�y i���y�1 a��y lime revoke all power and nutl�ority prevlously given lo any allomey-In-lac�. IN WITNESS WFIEREOF, the UNITED FIRE & CASUALTY COMPANY has caused these presents �����nn� to be signed by its assistant vice president arid its corporate seal to be hereto affixed this ,A.D. 1 9 9 9 ���k�.�'*� 6L11 dav of M11Y '` COIt01A1E� � •� UNITED FIRE & CASUALTY COMPANY as►L ;�, - .. � `-'( °�v��4�!; . wuwuu�`� BY Assistant V e President State of lowa, County of Unn, ss: On this 6 t h day of MAY 1999, before me Personally came .teffrey A. Chapin to me known, who be`9 o Y �me UNIIED FIRE d& CASUAI_1 Yd COMPtt\NYhetho S oePo at ond descPbed Snatand fwh chI execu eds the Assistant Vice Preside above instrument; thaaff xed Pursualnl toalauolfior ty� gi�en�hYlo�1e `�oartdeof eDirectorsdof staid cor�porat on and IthatUhe s 9Pedathis seal; that it was so �� 5� �-� C' vCL�- name thereto pursuant to like authority, and acknowledges same lo be the acl and deed of said co�ra[ion. Notary P lic � My commission expires March 4 x� 2000 SFIERYL A.MCVAY •� MYCOMAtISSIONF.XPI(lES ci-nriricnTioN Ma��:n�.2noo I, the undersi9� eroorfcAllor�eY,andNaf(dav t�and ti e copYl�f ��OMSeN���d°� '�he By LawsYofl said ComP ny asese[t forihr n9slaid copV of ttie Po Power of Attorney, wilh the ORIGINALS UN FILE IN 1 F1E FIOME OFFICE OF SAID COMPANY, and that the same are correc transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect. �;;,�R��� In teslimonY whereof I have hereunto subscribed mY name and a t' ed the corporate seal of the sai �. ► �l�y,y,, ComPany this �+th day of May k9 2��� � C01101ATE� � � �=�L �� cretary �,, e r�v��,`��. �''ruuuu��� U�iI`��I� �I�� � C��U�L��a1M[��hl� U�11T�D� LI�� I�IS�U�1G�� G�4�1M(�'�ti� 11� �����II� ��+`�IU�, ����, ���� $�� �39�0�9� �����Z �Z��II�S�, I��� ���(�'� NOTICE TO MISSOURi SURETY BOND HOLDERS Should you have a questions about your bond or policy, please contact your insurance agent first. If you are unable to contact or obtain information from your agent, you may contact our company at address and phone number below: UNiTED FIRE & CASUALTY COMPANY ATTENTION: BOND DEPARTMENT P.O. BOX 73909 CEDAR RAPIDS, iOWA 52407 1-800-343-9130 KLI3ECCA �9cD0�'1'ELL COOK, Secreiary Of State c�iii�;ch �r: 1998 ANNUAL RECISTRATION REPORT nn�c�un�r: (6usiness) '1'IIIS ItGPOlt7' IS t)UI: IiY: 07/IS�9R No�rl.: ��c� ctinNci: itt:cis�ri:ut�n nceh�r ou or•r•ici� siio���� nntt;c•ri,v isi:i,o��°, ItI:QUI•;ti'I' i'U11�1 #SR ruc�n� •rim.sr:cisi:�rnicv or• s•rn�ri•:. �1'I�. SIIn11' 1'OUIt I�ISCAI. 'I',�� l�l:,�lt AS: Rl:c:. �t0\fll 1:111 1101'fll 00208985 04/O1 03/31 LAPPE CEMENT FINISHING, INC. 1 I1� 1 Ut11t I�Iti(',�L 'I';1X % RUSSELL J. LAPPE t�l•::��t Is I��I�I�I�.Itt�.n'�': --Rp���- 8064 HWY 4 it�:c:. �to��rii �:���nton�rii PERRYVILLE MO 63775 1'f)l'K I.,�S'1' A\',VUA1. RI:POK'I' �1'AS 111,Uth1?1) ��I;S rc�sardim� If'this tax lia6ilih• has 2 ��hcthcr cour curporation is liablc ti►r franchisc t�x. ( A curporatinn is chan�cd 1i�r tlii� ��car, liablc fur 1�anchisc t:u if linc 6a ur Gh on thc francl�i�c tux rcpurt is mark „X•, � morc thun $21111,111111. ) in this liox. riti�cir,�i. i�i,,�cc ��r 8064 HIJY B 3 lil_til\I:�S �)It CUltl'oIL�'I�I: s��t�:�'� perryvi 11P MO 63775 III•::U)QI;,Ut'1'I:KS: c;lll slnll: iIP \.1�11:5 ;\\I) Itl:�l11•:ti� OIt I�I:till)1:1('I•:Al)UILl:titil;ti OI' I�AMI'.S AnU RUtiINI•:titi OR IZI�:SII)I��I�CP,Al1UItI�;tiSl�:ti OP (1111('I'.Itti: (�II;S'I' IL��'I: A 1'121':SI111?1'I' A^I) A ISOAItU OI� 1)Iltl:C'I'Oltti: (�IUti'I' IL�\'I•: O\I' IIIIII:C'1'OIt; tiE('RI''1'A121'; Nll,l.AStiI:\11: 1'RI:tiIUI;\'I' IS ALSO IP I�O'I' I,Iti'I'1•:I). 11'll,l, A�tiU�11? UII�I:C'I'OItS Altl:'1'IIP. til'('Itl:'fAlll'. 11'SI'('Itl"I'Altl' IS 10'I' I,Iti'I'I•:I).) SA1111•: Ati OI�I�ICI:ItS) i�tti:s ..........................RUSSEI��.: J '_�PPE RUSSFLL J �l!PPE ...... ............................................................. nnn�t;..................................-................ ................................................. s�rFii:�,r;irr...............3�64...HL.JY Q ...................... s�rrzia,r;irr............£30h4...HVJY...3...................................................... ..................................... crr�•s�r,��ri:�ii� PERRYVI�LE MO 63775 crr��;s�rn�rt:;rii� PERRYVI�LE MO 63775 �-i�itis........................................................................................................ �;n�i:........................................................................................................ . sritia:r irr................CAROL...E...�:.APPE ...................... s-ritia:r;irr.............................................................................................. . . ............................ crr�� srr��rt:rii� 8�64 NWY a crr�•;srn�ri::rii� SI�.C'1'.......................................................................................................... N/�M1:........................................................................................................ s�i�iti:cr,it�r............................................................................................... s�rizr.�:r;ii�r.............................................................................................. crr�� s-rn�ri:rii> crr��rs•rn-ri::rii� 'IItI::�S......................................................................................................... f�/�MI:........................................................................................................ s�r�i;:i:r ;;��............................................................................................... s�rc;ri:;�;;:��.:..1...�.................................................................................... - crr�'s�rn�rt:.zir I C�"I�l',S'I�nl'L,iii ATTACH NA�'IES AND ADDItESSES OI� ALL OTI-IER Of�ICCItS ANU DIItLC'TORS 'I'hc undcrxigncd undcrstands th.lt �BISI' Sf:lfl'Illl`I1�S madc in this rcpurt arc punish:ihlc for thc crimc uf mal:ing � a f.�lsc d�•c�aration undcr Scctiui .>7i.I1G0 IZS!1lo 19RG ' 'UI'fICLR S1GN IIL•'NL•: > > > �J�� r - Offlcer slgning must Ee li 1 box N4 above or on attached list. :����r�C���'.�� �� ����M. �l�'.�r����Zr����)� �'�:�; ��': n�����}3�)}�J (������i<<)}�J � $a�.11ll II'lilcd on or bcTore duc datc y7 1132G979 �1 1�7�!.OU II'��ithin GO da�s aflcr duc datc ,1G 117159NG �911.1111 If��iU�in 9U da}• uttcr duc datc AG UGIR997 Curporation �rill bc administrati�cl� dissohcd il'rcpurt i� not tilcd. CO�'IPLETC Tl-IE 130XES OR FORI��I `�'ILL I3E RLTUIZNEll , i;oai�:s �, a. ,��i� � nitr•, isc(���iiir.��� RETURN AND l��iAKE CHECti PAYAI3LE TO SECRETARY O� STA1'E sos spRM�r�ceRo�.� l�•e I'.O. ISO\ 17(xi. II'I�I`I�.IZSO1 C'I�I�I'. �1O 1i51(1'_ ACORD,� CERTIFICATE OF LIABILITY INSURANCE 4!24��0 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Enenendorfer Insurance Agency I ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 27 W. St. Joseph 3treet HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Perryville, MO 63775 P:573-547-6513 F:573-547-6515 INSURERS AFFORDING COVERAGE INSURED INSURER A: HdWk2]�@ Securi ty Ins. Company T•nvPE CEMENT FINISHING,IN, INSURERB: INSURER C: 6064 HWY B INSURER D: PERRYVILLE MO 63775- �INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POL�CY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POIICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS OENERAL LIABILITY EACH OCCURRENCE S 1�O00�000 A � COMMERCIALGENERALLIABILITY PP 031724 04�22�ZOOO OR�Z2�2O01 FIREDAMAGE(Anyonefire) $ ZOO,OOO � CLAIMS MADE �OCCUR MED EXP(Any one person) $ 5,000 � PERSONAL 8 ADV INJURY $ 1�000�000 � i GENER4l AGGREGATE $ Z,OOO,O00 GENL AGGREGATE LIMITAPPLIES PER: ' PR� ODUCTS-COMP/OP AGG $ Z�OOO�OOO ❑ POLtCY ❑ P� ❑ LOC I � AUTOMOBILE LIABILITY I, COMBINED SINGLE LIMIT � ANY AUTO i I (Ea axidenq 3 1�000,000 � A�L OWNED AUT0.S Ii A PP 031724 04/22/2000 04/22/2001 �a�YlN.iuRY S � SCHEDULED AUTOS I (Per person) ❑ HIRED AUTOS I BODILY INJURY ❑ NON-0WNED AUTOS , I �ef eCp��� a i I ❑ �� �PROPERTY DAMAGE a � (Per acdderR) GARACiE LIA&LITY AUTO ONLY-EA ACCI�NT $ ❑ ANY AUTO OTHER THAN EA ACC $ � AUTfl ONLY: qGG $ EXCE55 LIABILITY EACH OCCURRENCE $ 1�000�000 � OCCUR �CLAIMS MADE i AGGREGATE S 1,OOO�OOO A PP 031724 OS/04/2000 04/22/2001 �$ ❑ DEDUCTIBLE $ � RETENTION $ � $ WC STATU- OTH-' NqRKERS COMPENSATION AND �(�e ENIPLOYERS'LWBtLITY A PP 031724 04/22/ZO00 04/22/2001 E.L.EACHAccIDENT $ 1,000,000 E.L.DISEASE-EA EMPLOYE 3 1�000�000 E.L.DISEASE-POLJCY LIMIT'$ 1,000�000 OTHER i �SCRIPTION OF OPERATIONS/LOCATIONSIVEHICLESIEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Listed As Additional Insured for Silver Springs Road, Cape Girardeau, MO job: City of Cape Girardeau City Hall, 401 Independence, P.O. Bos 617 Cape Gir. , MO and Koehler Engineer � Land surveying, Inc. 2023 State Rt W, Cape Gir. , MO CERTIFICATE HOLDER ❑ ADpITIONAL INSURED�INSURER LETTER: CANCELLATION SNOULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE EXPIRATION City of Cape Girardeau 030 DATE THEREOF,THE ISSUINCi INSURER WILL ENDEAVOR TO NWl DAYS WRITTEN City Hall NOTICE TO TNE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL 401 Independence IMPOSE 9LIOATION OR LIABILITY OF ANY 10 THE INSURER,ITS AOENTS OR P.O. Box 617 Cape Girardesu MO 63702-0617 �� An�g' R RE NT IVE `�/ ' 1 . K IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED,subject to the tenns and conditions of the policy,certain policies may require an endorsement.A statement on this certificate dces not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s),authorized representative or producer,and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the poliaes listed thereon. �o,. INSURANCE BINDER DATE 05/04/2000 THIS BINDER IS A TEMPORARY INSURANCE CONTRAGT,SUBJECT TO THE CONDITIONS SHOWN ON THE REVERSE SIDE OF THIS FORM. PRODUCER �No Ext. C�P� BINDER# CGU - HaNkoya Ina_ Co. Etcrtieendorfer Insurance Agency I EFFECTNE EXPIRATION 27 W. St. Joseph Street DATE TIME DATE TIME Perryville, MO 63775 05/04/2000 12:01 AM 05/04/2001 �2:01AM FM NOON P:573-547-6513 F:573-547-6515 ❑ THIS BINDER IS ISSUED TO EXTEND CAVERAGE IN THE ABOVE NAMED COMPANY CODE: SUB CODE: PER EXPIRING POLICY#: AtiENCY DESCRIPTION OF OPERATIONS/VEHICLESIPROPERTY Includin Location CUSTOMERID: T84 ( g � INSURED City of Cape Girard�eau City Hall, 401 Independence P.O. Box 617 IMpR�VE�NT PLANS FOR SILVER SPRINGS ROAD CAPE CsIRARDEAU, MO Cape Girardeau MO 63702-0617 COVERAGES LIMITS TYPE OF INSURANCE COVERA(iFJFORMS DEDUCTIBLE COIt�X AMOUNT ��E� CAUSES OF LOSS BASIC �9ROAD�SPEC ❑ ���V�n'�TM EACH OCCURRENCE S 1,000,000 ❑ COMMERCIAL GENERAL LIABIl1TY FlRE DAMAGE(My one fire) $ 100,000 CLAIMS MADE �OCClN2 MED EXP(A+ry one Person) S 5,000 � �sP PERSONALBADVIWURY S 1,000,000 GENERALAGG�GATE 3 2,000,000 ❑ RETRO DATE FOR CW MS MADE: PRODUCTS-COMP/OP AGG f 2,000,000 AUTOMOBILE LIABILITY COMBINED SINGLE LJMIT i �'A�� BODILY INJLIRY er (P person) S ALL OWt�D AUTOS BOpIIY IN,IURY(Per accidert) $ SCFIEDULEDAUT0.S PROPERTYDAMAGE i ���A�� MEDICALPAYMENTS i NON-OWNEDAUTOS PERSONAL INJURY PROT f ❑ UMNSURED MOTORIST i S /WTO PHYSICAL DAMAOE ��nBLE ALL VEHICLES SCHEDULED VEHICLES AClUAL CASH VALUE ❑ COLLISION: � STATED AMOIXJT = OTF�R THAN WL: ❑ OTHER fARAOE LU181LITY AUTO ONLY-EA ACCIOENT S ANY AUTO OTHER TIiAN AUTO ONLY: EACH ACCIDENT i AGGREGATE $ EXCE35 LIABILITY EACH OCCURRENCE S IR�ABRELLA FORM AGGREGATE i OTHER THAN I�ABRELLA FORM RETRO DATE FOR CLAIMS MADE: SELF-INSURED RETENTION S ❑ WC STANTORY LIN9TS NfORKER'g COMPENSATION E.L EACH ACqDENT S AND ENIPI.OYER'S LIA8ILITY E.L.DISEASE-EA EMPLOYEE 3 E.L.�SEASE-POIJCY UMIT $ SpEqq� FEES S COMqTIONS/ OTFIER TAXES ; COVERAOES ES7IMATED TOTAL PREMUpA S NAME 8 ADDRESS ❑ MORTGAGEE ❑ ADDIl10NAL INSURED ❑ LOSS PAYEE ❑ LOAN�F REP SENTATIVE i r � � .� y CONDITIONS This Company binds the kind(s)of insurance stipulated on the reverse side.The Insurance is subject to the terms, conditions and limitations of the policy(ies)in current use by the Company. This binder may be cancelled by the Insured by surrender of this binder or by written notice to the Company stating when cancellation will be effeetive.This binder may be cancelled by the Company by notice to the Insured in accordance with the policy conditions.This binder is cancelled when replaced by a policy. If this binder is not replaced by a policy,the Company is entiUed to charge a premium for the binder according to the Rules and Rates in use by the Company. Applicable in Califomia When this form is used to provide insurance in the amount of one million dollars($1,000,000)or more,the title of the form is changed from"Insurance Binder"to"Cover Note". Appficable in Delaware The mortgagee or Obligee of any mortgage or other instrumerrt given for the purpose of creating a lien on real property shalt accept as evidence of insurance a written binder issued by an authorized insurer or its agent if the binder includes or is accompanied by:the name and address of the borrow�er;the name and address of the lender as loss payee;a description of the insured real property; a provision that the binder may not be canceled within the terrn of the binder unless the lender and the insured borrower receive written notice of the canoel- lation at least ten(10)days prior to the cancellation;except in the case of a renewal of a policy subsequent to the closing of the loan, a paid receipt of the full amount of the applicable premium,and the amount of insurance coverage. Chapter 21 Title 25 Paragraph 2119 Applicable in Florida F�ccept for Auto Insurance coverage, no notice of cancellation or nonrenewal of a binder is required unless the duration of the binder exceeds 60 days. For auto insurance,the insurer must give 5 days prior notice, unless the binder is replaced by a policy or another binder in the same company. Applicable in Nevada Any person who refuses to acoept a binder which provides coverage of less than$1,000,000.00 when proof is required: (A)Shall be fined not more than$500.00, and(B)is liable to the party presenting the binder as proof of insurance for actual damages sustained therefrom. � CHANGE ORDER#1 PROJECT TITLE Silver Springs Road—William Street (Rt. K) to Independence CONTRACT DATE May 15, 2000 CONTRACTOR Lappe Cement Finishing, Inc. The following changes are hereby made to the Contract Documents: Item No.l: Changes to bid items Changed from: No. Item Unit Qty. Unit Price Price 26. 7" P.C. Concrete Pavement SY 14,960 $20.20 $302,192.00 27. 4" Granular Base Under 7"Pvmt. SY 15,404 $4.30 $66,237.20 Changed to: No. Item Unit Qty. Unit Price Price 26. 7"P.C. Concrete Pavement SY 14,997.5 $20.20 .._, �' $302,949.50 27. 4" Granular Base Under 7"Pvmt. SY 15,443.8 $4.30 $66,408.34 Item No. 2: Additional contract items No. Item Unit Qty. Unit Price Price 76. Pavement Removal SY 37.5 $15.74 $590.25 77. Removal of Existing Manhole EA 1 $200.00 $200.00 78. Temporary Driveway LS 1 $460.00 $460.00 79. '/z"Reinforcing Steel Bars EA 4 $2.75 $11.00 JUSTIFICATION The existing pavement where the new pavement abuts cracked when the inlet was rebuilt and needed to be removed and replaced to have a smooth transition. No provisions were made in the initial contract documents for removal of the existing manhole. The need for a temporary driveway to the emergency entrance of Saint Francis Hospital arose and the contract did not include a bid item for a temporary driveway. Additional reinforcement was needed in the pavement due to a shallow storm sewer pipe on Gordonville Road. Change Order#1 Silver Springs Rd. Page Two CHANGE TO CONTRACT PRICE Original contract price: $661,450.18 Current contract price as adjusted by previous change orders: $661,450.18 Current contract price due to this change order will be increased by: $2,189.89 The new contract price due to this change order will be: $663,640.07 CHANGE TO CONTRACT TIME No adjustment to the contract time will be made. APPROVALS REQUIRED: .,.., --�°'� To be effective, this Change Order must be approved by the Owner if it changes the scope or objective of the project, or may otherwise be required under the terms of the Supplementary General Conditions to the Contract. Recommended by - - - Date ��- 3 � "�' Mark Lest� , City ngineer / ; � � ' ; � -��) Date /G/� OG ela �e rtis,Project Manager � ` �r' _ ____ � '' / --. Approved b Date I� �/�'� � Michael G. Miller, City Manager � Accepted by Date // �- O,d Lappe Cement Fimshi , Inc. �� ,, � ' CHANGE ORDER#2 PROJECT TITLE Silver Springs Road—William Street(Rt. K) to Independence CONTRACT DATE May 15, 2000 CONTRACTOR Lappe Cement Finishing, Inc. The following changes are hereby made to the Contract Documents: Item No. 1: Additional contract items No. Item Unit Qty. Unit Price Price 80. Replace conduit and wiring for LS 1 $4,350.50 $4,350.50 lighting at Route K 81. Install new conduit to recircuit LS 1 $4,290.00 $4,290.00 lighting and replace Cobra Head lights 82. Downspout connection LS 1 $ 150.00 $ 150.00 JUSTIFICATION The existing wiring setup for the lighting along Route K includes an electrical junction box that lies in the middle of the new Silver Springs Road pavement. The existing box is in poor condition and would need to be replaced on any account and this new setup would eliminate a splice in the wiring. The proposal includes labor and material to construct approximately 750 feet of conduit and the necessary wiring. Item 81 must be done to have two existing lights at the Route K/Silver Springs intersection on the new 120-volt lighting control and to maintain the 480- volt circuit for lights to the East. The downspout connection needs to be done in order to prevent washouts from apartment building on Silver Springs Road. CHANGE TO CONTRACT PRICE Original contract price: $661,450.18 Current contract price as adjusted by previous change orders: $663,640.07 _� Change Order#2 Silver Springs Rd. Page Two Current contract price due to this change order will be increased by: $8,790.50 The new contract price due to this change order will be: $672,430.57 CHANGE TO CONTRACT TIME Original contract time: Substantial completion time- 180 days,November 18, 2000 Final completion time—240 days, January 17, 2001 Current contract time as adjusted by previous change orders: No change Current contract time due to this change order will be increased by: Substantial completion—90 days Final completion— 140 days The new contact time due to this change order will be: Substantial completion time—February 16, 2001 Final completion time—April 17, 2001 APPROVALS REQUIRED: To be effective, this Change Order must be approved by the Owner if it changes the scope or objective of the project, or may otherwise be required under the terms of the Supplementary General Conditions to the Contract. �' �� 3 - � Z-� Recommended by �t.�^ �:`,�"-� Date � Mar A. Lester, City Engineer --� ��/ � Date .��9�0/ Mela ' Gertis,Project Manager � � ,.3�� --d� Approved by �� Date / Michael G. � r, City Manager E Accepted by �� Date � �� �� Lappe Cement Finishin , c. CHANGE ORDER#3 PROJECT TITLE Silver Springs Road—William Street (Rt. K) to Independence CONTRACT DATE May 15, 2000 CONTRACTOR Lappe Cement Finishing, Inc. The following changes are hereby made to the Contract Documents: Item No. 1: Additional contract items No. Item Unit Qty. Unit Price Price 83. Concrete Pattern Stamping SF 1602.2 $2.50 $4,005.50 84. Color for 8"vertical curb LS 1 $150.00 $150.00 85. Extra curb removal @ LS 1 $200.00 $200.00 driveway 86. Median work on William LS 1 $2,264.00 $2,264.00 Street 87. Adjust existing manhole LS 1 $600.00 $600.00 88. Joint sealing LF 3705 $0.80 $2,964.00 89. Curb & island LS 1 $15,941.00 $15,941.00 modifications Item No. 2: Changes to bid items Changed from: No. Item Unit Qty. Unit Price Price 42. Seeding & Mulching AC 3.6 $1,800.00 $6,480.00 Changed to: No. Item Unit Qty. Unit Price Price 42. Seeding &Mulching AC 4.271 $1,800.00 $7,687.80 JUSTIFICATION The contract documents did not provide for either the pattern stamping of the truck apron or the red tint for the inside curb on the roundabout. A section of curb had to be removed from a resident's driveway entrance to provide easier access to the property. The contract documents did not include quantities for removing and replacing a portion of the existing medians on William Street after installing new traffic signal bases. An existing manhole needed to be lowered to match grade of surrounding area. The contractor was asked to seal joints on the existing section of Silver Springs from Independence to the new portion constructed. The modifications to the curbs and islands in the roundabout were done per a City Council decision to make the driving lane two feet wider. Many of the joints no longer had tar in them and were , collecting dirt or had grass growing between the slabs. The additional seeding and mulching was to repair the ruts where citizens had driven around the barricades into a property owner's yard. CHANGE TO CONTRACT PRICE Original contract price: $661,450.18 Current contract price as adjusted by previous change orders: $672,430.57 Current contract price due to this change order will be increased by: $ 27,332.30 The new contract price due to this change order will be: $699,762.87 CHANGE TO CONTRACT TIME Original contract time: Substantial completion time— 180 days,November 18, 2000 Final completion time—240 days, January 17, 2001 Current contract time as adjusted by previous change orders: Substantial completion time—February 16, 2001 Final completion time—April 17, 2001 Current contract time due to this change order will be increased by: No change APPROVALS REQUIRED: To be effective, this Change Order must be approved by the Owner if it changes the scope or objective of the project, or may otherwise be required under the terms of the Supplementary General Conditions to the Contract. � � Recommended by � Date`7—��- �/ Mar A. Lester, City Engineer � Date � 0/ Melani G rtis, Project Manager . k . ~� � i Approved by �____..__.. .%.� Date f�Cj r� / Mi ael G. Miller, City Manager Accepted by Dat � ��' Lappe Cement inishin c. CHANGE ORDER#4 & FINAL PROJECT TITLE Silver Springs Road-William Street(Rt. K) to Independence CONTRACT DATE May 15, 2000 CONTRACTOR Lappe Cement Finishing, Inc. The following changes are hereby made to the Contract Documents: Item No. 1: Changes to bid items Changed from: No. Item Unit Qty. Unit Price Price 5. Compacted Fill On-Site CY 9,355 $3.20 $29,936.00 6. Excess Cut Material ... CY 9,770 $1.45 $14,166.50 23. 18" Class III RCP LF 270 $20.25 $ 5,467.50 24. 24"Class III RCP LF 196 $28.23 $ 5,533.08 28. 6"P.C. Concrete Entrances SY 753 $24.65 $18,561.45 &Drives 30. 6"Vertical Curb LF 7,994 $1.00 $ 7,994.00 32. 6"Raised Conc. Islands SY 107 $25.40 $ 2,717.80 34. 4" Schedule 40 PVC LF 700 $8.50 $ 5,950.00 Utility Conduit 35. New Signs EA 26 $151.50 $ 3,939.00 70. 7C #12 Control Wire LF 2,292 $2.75 $ 6,303.00 72. 1C #14 Detector Lead in LF 2,030 $0.35 $ 710.50 Cable Changed to: No. Item Unit Qty. Unit Price Price 5. Compacted Fill On-Site CY 16,609 $3.20 $53,148.80 6. Excess Cut Material ... CY 12,871 $1.45 $18,662.95 23. 18" Class III RCP LF 272.7 $20.25 $ 5,522.18 24. 24"Class III RCP LF 229 $28.23 $ 6,464.67 28. 6"P.C. Concrete Entrances SY 739.4 $24.65 $18,226.21 & Drives 30. 6"Vertical Curb LF 7,017.7 $1.00 $ 7,017.70 32. 6"Raised Conc. Islands SY 553.3 $25.40 $14,053.82 34. 4" Schedule 40 PVC LF 600 $8.50 $ 5,100.00 Utility Conduit 35. New Signs EA 28 $151.50 $ 4,242.00 70. 7C #12 Control Wire LF 2,374 $2.75 $ 6,528.50 72. 1C#14 Detector Lead in LF 2,093 $0.35 $ 732.55 Cable JUSTIFICATION The purpose of this change order is to bring the bid quantities up to actual constructed values. Changes were made to the islands dividing each of the four legs around the roundabout. The islands were initially to be a 6"curb with a dirt center and they were changed to a solid concrete island. CHANGE TO CONTRACT PRICE Original contract price: $661,450.18 Current contract price as adjusted by previous change orders: $699,762.87 Current contract price due to this change order will be increased by: $ 38,420.55 The new contract price due to this change order will be: $738,183.42 CHANGE TO CONTRACT TIME Original contract time: Substantial completion time— 180 days,November 18, 2000 Final completion time—240 days, January 17, 2001 Current contract time as adjusted by previous change orders: Substantial completion time—February 16, 2001 Final completion time—April 17, 2001 Current contract time due to this change order will be increased by: No change APPROVALS REQUIRED: To be effective, this Change Order must be approved by the Owner if it changes the scope or objective of the project, or may otherwise be required under the terms of the Supplementary General Conditions to the Contract. Recommended by 1 � Date �" 2�-0 ( Mar ester, ity ngineer , � Date g �.� Q J Mela ie Ge is, Project Manager Approved by Date�- y�f' Michael G. Miller, City Manager Accepted by Date �'p ���� Lappe Cement Fimshi nc.