Loading...
HomeMy WebLinkAboutRes.1564.06-07-2000BILL NO. 2000-118 RESOLUTION NO. ),j (p A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN ADDENDUM TO AGREEMENT FOR ENGINEERING SERVICES WITH STRICKLAND ENGINEERING, FOR THE INDEPENDENCE STREET RECONSTRUCTION FROM PACIFIC STREET TO SPRIGG STREET BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Addendum to Agreement for Engineering Services dated November 16, 1999, with Strickland Engineering for the Independence Street Reconstruction from Pacific Street to Sprigg Street. A copy of said Addendum is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS ATTEST: Gayl L. Conrad, City Clerk DAY OF Ma4 20�. A. M. Spradling, III, Igor PROJECT SCOPE OF ENGINEERING SERVICES INDEPENDENCE STREET RECONSTRUCTION FROM PACIFIC STREET TO SPRIGG STREET THIS SC PEjOF ENGINEERING SERVICES for the Project described below is agreed to as of / eO between the City of Cape Girardeau, Missouri, hereinafter referred to as the CITY and Strickland Engineering, 626 West Main Street, Jackson, Missouri 63755, hereinafter referred to as the ENGINEER. THIS SCOPE OF ENGINEERING SERVICES is an addendum to the AGREEMENT FOR ENGINEERING SERVICES between the CITY and ENGINEER dated November 16, 1999. The Project is generally described as follows: Independence Street Reconstruction from Pacific Street to Sprigg Street. L SCOPE OF ENGINEERING SERVICES The scope of engineering services to be provided by the ENGINEER for the Project is as described below: The ENGINEER proposes to provide the engineering services required for the reconstruction of the existing pavement. The length of the project will be approximately 940 feet from the intersection of Pacific Street to Sprigg Street. Stormwater drainage, sidewalks, and reconstruction of the existing intersections at Pacific and Sprigg Streets will also be part of the Project. The engineering services shall include design phase services, limited right-of-way and easement acquisition assistance, and limited bid phase assistance. These services are further described below: A. Design Phase 1. General. The ENGINEER shall consult with the CITY in an informal meeting to clarify and define the requirements for the project, in particular: a) Typical pavement cross-section & thickness b) Stormwater drainage c) Sidewalk reconstruction d) Intersection reconstructions at Pacific and Sprigg Streets 2. Standards. The design of the Project will conform to the Standard Specifications of the City of Cape Girardeau. The ENGINEER shall prepare additional specifications, if required, to define the work more fully. Such specifications will be based on other generally accepted standards such as the latest version of the Missouri Standard Specifications for Highway Construction. 3. Field Surveys. The Engineer shall provide the services of a Missouri Registered Land Surveyor to perform the following: a) Conduct engineering survey to gather topographic and utility information for design of the Project b) Locate existing street right-of-way, property lines, and easements along route alignment c) All surveys based upon USGS vertical datum and State Plane Coordinates d) Establish horizontal and vertical controls sufficient for construction of the project 4. Bid Documents. The ENGINEER shall prepare documents for the purpose of obtaining competitive bids for construction by private contractors. The bid documents shall contain the following: a) Notice to Bid Page 1 of 3 b) Instruction to Bidders c) Standard Form of Agreement between Owner and Contractor d) Missouri Prevailing Wage Rate e) Standard General Conditions of the Construction Contract f) Supplementary Conditions g) Construction Plans. The engineering plans will be prepared at a scale suitable to clearly show the work to be performed. Plan and profile views of the proposed alignment will show the location and grades of the proposed improvements. Additional drawings will be provided to show details of intersections, drainage structures, traffic signals and other items specific to the project. Standard construction plans from the City of Cape Girardeau and Missouri Department of Transportation will be will be used, where applicable. h) Construction Specifications. Construction of the Project will conform to the Standard Specifications of the City of Cape Girardeau. The Engineer shall prepare additional specifications, if required, to define the work more fully. Such specifications will be based on other generally accepted standards such as the latest version of the Missouri Standard Specifications for Highway Construction. B. Right -of -Way and Easement Acquisition 1. The ENGINEER shall provide the services of a Missouri Registered Land Surveyor to perform the following: a) Secure adequate property title information b) Prepare plats and legal descriptions for obtaining right-of-way and easements C. Bidding Phase 1. The ENGINEER shall make final corrections to the contract documents upon receiving written review comments and construction authorization from the CITY. 2. The ENGINEER shall coordinate bid letting date, time, and place with CITY and prepare final Notice to Bid. 3. The ENGINEER shall provide the CITY with reproducibles of the project manual and construction plans and an estimate of construction cost for the purpose of soliciting bids from prospective bidders. 4. The ENGINEER shall interpret construction drawings and specifications; provide written responses to questions from bidders requiring clarification; and prepare for the CITY to issue addenda to the bid documents when required. 5. The ENGINEER shall assist the CITY in evaluating the bids and awarding a construction contract. D. Construction Phase The ENGINEER, if requested by the CITY, shall serve as the CITY'S representative for administering the construction contract between the CITY and their CONTRACTOR. The scope of construction phase services shall be determined at that time. II. ADDITIONAL SERVICES The CITY reserves the right to request additional work, if changed or unforeseen conditions occur beyond the scope of this agreement. In this event, a supplement to this agreement shall be executed prior to performing additional work or incurring any additional cost thereof. Any change in compensation will be covered in the supplemental agreement. Page 2 of 3 III. RESPONSIBILITIES OF THE CITY The CITY shall cooperate fully with the ENGINEER in the development of the project, including the following: A. Make available all information pertaining to the Project, which may be in the possession of the CITY. B. Provide the ENGINEER with the CITY'S requirements for the PROJECT. C. Designate a person in the CITY'S employ to act as CITY'S representative under this agreement. Said person shall have the authority to transmit instructions, interpret the CITY'S policies, and render decisions with respect to matters covered by this agreement. D. Perform appraisals and appraisal review, negotiate with the property owners, and otherwise provide all services in connection with acquiring right-of-way and easements needed to construct the project, except as provided in Section II.B. E. Reproduce and distribute bid documents to prospective bidders during the bid period. IV. FEES FOR ENGINEERING SERVICES The CITY shall reimburse the ENGINEER for the hours expended based upon the schedule of rates in Attachment A. For the services contained herein, reimbursement to the ENGINEER shall not exceed $26,600.00. Construction phase services are not included in this fee. V. SCHEDULE FOR PROVIDING ENGINEERING SERVICES The ENGINEER shall commence work within 2 weeks after receiving written notice to proceed from the CITY. The general phases of work shall be completed in accordance with the following schedule: A. Preliminary Design Phase - Within 75 calendar days after written receipt of notice to proceed. B. Final Design Phase - Within 45 calendar days after written review of preliminary plans by CITY. The above times are exclusive of review time by other agencies and exclusive of time needed to acquire right-of-way and easements. The CITY shall grant time extensions for unavoidable delays beyond the control of the ENGINEER. Requests for extensions of time shall be in writing by the ENGINEER, stating fully the reasons for the request. IN CITY City o , CITY and ENGINEER have executed this PROJECT SCOPE OF Missouri Michael G. Miller City Manager Date �J 2 - 66 Page 3 of 3 ENGINEER Strickland ngineer�infg B W. r'-4L4 Thomas H. Strickland Principal Engineer Date &7 °7/'0-0 ATTACHMENT A SCHEDULE OF RATES Principal Engineer Architect Project Engineer Drafting & AutoCAD Technician Computer Technician & Secretary Professional Consultants Mylar, 24 x 36 Blueprints, 24 x 36 Copies, 8-1/2 x 11 Long-distance phone calls & postage Auto travel Other expenses $65.00/hr 65.00/hr 50.00/hr 35.00/hr 15.00/hr ENGINEER cost + 10% 2.25/sheet 1.50/sheet .07/sheet at cost .30/mile at cost