Loading...
HomeMy WebLinkAboutRes.898.02-24-1994BILL NO. 94-40 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT FOR PROFESSIONAL SERVICES WITH SVERDRUP CIVIL, INC. FOR TWIN LAKES WASTEWATER COLLECTION SYSTEM IMPROVEMENTS BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement for Professional Services for design and construction of Twin Lakes Wastewater Collection System Improvements. A copy of said Agreement is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS DAY OF � f rancis E. Rhodes, Mayor ATTEST: n Gayle Conrad Deputy City Clerk CITY OF CAPE GIRARDEAU, MISSOURI AGREEMENT FOR PROFESSIONAL SERVICES DESIGN AND CONSTRUCTION OF TWIN LAKES WASTEWATER COLLECTION SYSTEM IMPROVEMENTS This Agreement is made and entered into this day of , 1911, by and between the City of Cape Girardeau, (Owner), and Sverdrup Civil, Inc. (S(Vrdrup). ARTICLE 1 SVERDRUP'S SERVICES Sverdrup shall provide or furnish to Owner professional services for design and for specified construction overview in connection therewith, of wastewater collection system improvements, hereinafter referred to as "Project". These services are identified and described in the Scope of Services (APPENDIX A) attached to and made a part of this Agreement. ARTICLE 2 OWNER'S RESPONSIBILITIES A. Owner's Representative Owner shall designate in writing a person to act as Owner's Representative with respect to the services to be rendered under this Agreement. Such person shall have complete authority to transmit instructions, receive information, interpret and define Owner's policies and make decisions with respect to Sverdrup's services for the Project. B. Information Owner shall provide to Sverdrup in a timely manner information and services pertinent to the Project including: a. Provide copies of all special design and construction standards which the Owner will require to be included in the drawings and specifications. b. Provide all data and information available to the Owner relevant to the Project including but not limited to those items listed in Additional Owner Supplied Information (APPENDIX B). C. Apply for any grants loans or funding support required. d. Arrange for* reviews and approvals of regulatory agencies, and pay any applicable fees of the regulatory agencies for such reviews, with such assistance from Sverdrup as may be described in Appendix A. EPCY-193\130671 h. Owner agrees to comply with the "Hazard Communication Standard" of the Occupational Safety and Health Administration. i. Owner shall furnish to Sverdrup as required for performance of Sverdrup's services (except to the extent provided otherwise in the Scope of Work), data prepared by or services of others, including, without limitation, soil borings, probings and subsurface explorations, hydrographic surveys, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretation of all the foregoing; boundary, easement, right-of-way, topographic and utility surveys; property descriptions; zoning, deed and other land use restriction; and other special data, professional opinions or consultation; all of which Sverdrup may use and rely upon in performing its services. j. Owner shall provide such accounting, independent cost estimating and insurance counseling services as may be required for the Project, such legal services as Owner may require or Sverdrup may reasonably request with regard to legal issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service as Owner may require to ascertain how or for what purpose any Contractor has used the moneys paid under the construction contract, and such inspection services as Owner may require (except to the extent provided otherwise in the Scope of Work) to ascertain that Contractor(s) are complying with any law, rule, regulation, ordinance, code or order applicable to their furnishing and performing the work. Owner shall include in all construction contracts a requirement that Sverdrup be named either as: 1) an indemnitee under Contractor's indemnity obligation, and 2) an additional insured under Contractor's General Liability Insurance Policy. 2. Owner shall provide information and services not specifically included under Article 1 which are necessary to complete the Project, or authorize Sverdrup to finish such under provisions of Article 5. C. Access and Approvals Owner shall arrange for access to and make all provisions for Sverdrup to enter upon public and private property as required for Sverdrup to perform its services under this Agreement. 2. Owner shall furnish at its cost approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project except as stated in Appendix A. D. Notice Owner shall give pros otherwise becomes aw Sverdrup's services, or Contractor. ipt written notice to Sverdrup whenever Owner observes or ire of any development that affects the scope or timing of any defects or nonconformance in the work of Sverdrup or any EPcr-193\13WI 2 ARTICLE 3 COMPENSATION AND PAYMENT A. Cost Owner shall compensate Sverdrup for the performance of the services, described in the Scope of Work under Article 1, on a cost plus a fixed fee basis. The total cost (exclusive of fixed fee) is estimated to be $181,420. The fixed fee shall be $17,280. The total amount to be paid for design and construction services under this Agreement shall not exceed $198,700 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95% of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. A cost summary is presented in APPENDIX C. B. Cost Computation Definition of terms to be used in computation of payments are as follows: 1. Salary costs are defined as the salaries paid for regular time and overtime (including any premium overtime) worked, plus provision for applicable annual Salary Related Expenses, including sick leave, vacation pay, holiday pay, and other ordinary and customary paid time off, bonuses, the employer's portion of social security, unemployment, and other payroll taxes, Employee's Retirement and Benefit Plan contributions, employer's portion of the group hospitalization and medical insurance and the cost of worker's compensation insurance. The provisional Salary Related Expense overhead rate for 1994 is 0.428. At the end of each calendar year, the actual rate for the year will be applied and adjustment in the compensation made accordingly. The maximum Salary Related Expense overhead rate that shall be applied is 0.43. 2. Salary costs as defined above are multiplied by a provisional General and Administrative overhead factor for 1994 of 0.925 (0.435 for Resident Inspection services Phase II - Resident). Included in the General and Administrative overhead are: a. The salaries of officers, except for technical or advisory services directly applicable to the project. b. The salaries of employees doing general administrative work; also nonproductive professional and technical salaries, including maintenance of staff to provide readiness to serve. C. Rent and costs of light, heat and water; equipment depreciation and maintenance cost; costs of office supplies and reproduction of data for our internal use; general communications expense, including local telephone calls and postage; taxes; insurance premiums and license fees; automotive expense and other transportation and travel expense not chargeable to specific contracts; and other miscellaneous costs. -193\13W1 3 C. At the end of each calendar year, the actual General and Administrative overhead rate for that year will be applied and adjustment of the compensation made accordingly. The maximum General and Administrative overhead rate that shall be applied is 0.95 (0.45 for Resident Inspection Services, Phase H Resident). 3. In addition to salary costs, Sverdrup will be reimbursed for Other Reimbursable costs as follows: a. Travel, subsistence, and incidental expenses of personnel while traveling in connection with the work. b. Transportation by passenger automobiles that Sverdrup supplies intermittently in connection with the work. All costs of owned, leased, or rented passenger vehicles assigned to the work. Reimbursement for the cost of special types of vehicles when such vehicles are required. C. Reproduction of drawings, photographs, maps, charts and reports which are prepared for the Owner's periodic or interim review and also the cost of the reproductions which constitute the delivery of work. d. Wire and wireless communication of messages and data in connection with the work. Insurance required by the Owner in addition to the coverages or in excess of the limits normally carried. L Subcontracted services such as, but not limited to, borings, surveys, photogrammetry, testing and computing services, if required in the performance of the work. g. Technical support services provided from our own facilities, as required in the performance of the work. h. Special consultants, as approved by the Owner, if required in the performance of the work. i. Technical and advisory services of officers directly applicable to the project at the hourly rate of $100. 4. A fixed fee will constitute profit for the work described in Article 1. Terms of Payment Progress payments for services rendered shall be made monthly upon submission of an invoice for work performed during the previous month. For interim billings, the portion of the fixed fee payable shall be equal to the total fixed fee multiplied by the ratio of salary costs plus general and administrative overhead plus other reimbursable costs to date of billing divided by the estimated total cost listed under Article 3A above less the fixed fee billed to date. Invoices submitted to the Owner by the 20th of each month will be EPCY-193\IM671 4 A. 0 l� included in the Owner's normal payment cycle for payment by the 10th of the following month. If there are disputed items and/or amounts on any invoice, the balance of such invoice, after deducting any disputed items, shall be paid in full, and the disputed items and amounts shall be presented to Sverdrup for resolution as soon as such disputed items have been determined by Owner. Payments due but unpaid more than thirty (30) days after presentation of the invoice, excluding any amounts and items disputed by Owner, shall bear interest at one percent (1 %) interest per month (or any lesser legal limit applicable) until paid. ARTICLE 4 TIME FOR PERFORMANCE Commencement Sverdrup shall commence the performance of the services for the Project upon the date of this Agreement and complete the work in accordance with such schedule as may be mutually agreed to by the parties. A potential Schedule pending timely compilation of information, timely review by the Owner and Missouri Department of Natural Resources, and no changes in scope is listed in APPENDIX D. Delay If Sverdrup's services for the Project are delayed for reasons beyond its control, the compensation provided for elsewhere in this Agreement and the time for performance shall be subject to equitable adjustment. ARTICLE 5 CHANGES IN THE WORK Changes Owner reserves the right, without impairing this Agreement, to order changes or alterations in the work to be performed hereunder by Sverdrup. If changes or alterations ordered affect the cost or progress of the work, adjustment shall be made in the time for performance of the work and compensation owing to Sverdrup, as the case may be. Concealed Conditions Should concealed or unknown conditions be encountered in the performance of the work which present the risk of discharge, dispersal, release or escape of pollutants, asbestos, any hazardous substance or any hazardous waste, Sverdrup shall promptly suspend its performance of the Work for the protection of the parties and their employees and notify Owner of the conditions encountered. Owner and Sverdrup shall promptly investigate the conditions and, if warranted, equitable and necessary adjustments shall be made in the terms and conditions of this Agreement. It is agreed, however, that Article 5 above not EPCY-193u3WI 5 withstanding, Sverdrup shall have no duty to determine the existence of pollutants, asbestos or any other hazardous substance or hazardous waste at the site of the work or to provide response action or remedial services. ARTICLE 6 STANDARD OF CARE Sverdrup represents that its services shall be performed with the skill and care which would be exercised by comparable qualified design professionals performing similar services at the time and place such services are performed. If the failure to meet these standards results in deficiencies in the design, Sverdrup shall, furnish at its own cost and expense, the redesign necessary to correct such deficiencies. ARTICLE 7 INDEMNITY A. Sverdrup's Duty Sverdrup shall indemnify Owner against all claims and suits by third parties for loss of or damage to property, or personal injury, including death, to persons, and from all judgments recovered therefor, and from all expenses for defending such claim or suit, including court costs and attorney's fees, arising out of the negligent acts, errors, or omissions of Sverdrup in connection with Sverdrup's performance of this Agreement. In no event shall Sverdrup have any duty to indemnify Owner hereunder against claims arising as a result of Owner's sole or contributing negligence. In no event shall Sverdrup be liable under this paragraph or otherwise for indirect or consequential damages. B. Owner's DutX Upon and after final completion of the Project, Owner shall indemnify and hold Sverdrup harmless from all claims and suits for damages arising from personal injuries, including death to persons, or to property, and from all judgments recovered therefor, and from all expenses for defending such claim or suit, including court costs and attorney's fees, which result from Owner's negligent use, operation or maintenance of the facilities, equipment or materials designed or provided by Sverdrup under this Agreement. ARTICLE 8 INSURANCE Without limiting its liability hereunder, Sverdrup shall maintain during the life of this Agreement the following insurance and furnish Owner, in duplicate, certificates of insurance as evidence thereof. Such certificates shall provide that cancellation of said insurance shall not be effected without thirty (30) days prior written notice to Owner. The certificates shall plainly designate the name of the project for which the certificate is provided. EPCY-193\13WI 6 1. Workers' Compensation Insurance, providing coverage in compliance with the laws of the state in which any part of the work is to be performed, and Employer's Liability Coverage in the minimum amount of $100,000 for each occurrence. 2. Commercial General Liability Insurance written on an occurrence basis with the following limits of liability: General Aggregate $4,000,000 Products/Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $2,000,000 Each Occurrence $21000,000 Fire Damage $25,000 Medical Expense $1,000 3. Automobile Liability Insurance. Bodily injury and property damage combined single limit - $1 million each occurrence, $1 million aggregate. 4. Architect's and Engineer's Professional Liability Insurance. Bodily injury and property damage combined single limit - $1 million each claim, $5 million aggregate. The Commercial General Liability and Architect's and Engineer's Professional Liability Insurance shall include Contractual Liability Coverage for the liability assumed by Sverdrup in Article 7 herein. The Owner shall be named as an additional insured in the Certificate for Commercial General Liability. ARTICLE 9 TERMINATION A. Termination By Owner In the event Sverdrup fails to comply with any provisions of this Agreement, or if the progress or quality of the work is unsatisfactory, Owner may serve written notice thereof upon Sverdrup, and if Sverdrup neglects within a period of twenty (20) days thereafter to commence its efforts to correct such failure, Owner may terminate the Agreement upon written notice to Sverdrup. Upon such termination, Sverdrup shall cease its performance of this Agreement and shall deliver to Owner all completed or partially completed satisfactory work and Owner shall pay to Sverdrup costs incurred to effective date of termination. 2. Owner also reserves the right to terminate this Agreement in the event it shall abandon or indefinitely postpone the project. Such termination shall be accomplished by written notice to that effect delivered to Sverdrup. Upon receipt of such notice, Sverdrup shall immediately cease work and deliver to Owner all completed or partially completed work. Payment to Sverdrup shall be made for work performed prior to receipt by Sverdrup of such termination notice, together with Sverdrup's cost for closing down its work, and Sverdrup shall have no claim for loss of anticipated profits or any additional compensation. OPCY-M\13WI 7 B. Termination By Sverdrup In the event Owner fails to comply with any provisions of this Agreement, or if it fails to timely pay compensation due to Sverdrup, Sverdrup may serve written notice thereof upon Owner, and if Owner fails within a period of twenty (20) days thereafter to correct such failure, Sverdrup may terminate this Agreement upon written notice to Owner. Upon such termination, Sverdrup shall cease its performance of this Agreement and when paid the amount due for such work, shall deliver to Owner all completed or partially completed work for the project. ARTICLE 10 GENERAL CONSIDERATIONS A. Use of Documents All documents including Drawings, Specifications, and CADD discs prepared or furnished by Sverdrup pursuant to this Agreement shall become the property of the Owner. Such materials are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Sverdrup for the specific purpose intended will be at Owner's sole risk and without liability or legal exposure to Sverdrup, and Owner shall indemnify and hold harmless Sverdrup from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Sverdrup to further compensation at rates to be agreed upon by Owner and Sverdrup. B. Qpinions of Cost Since Sverdrup has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor(s)' methods of determining prices, or over competitive bidding or market conditions, Sverdrup's opinions of probable Total Project Costs and Construction Cost provided for herein are to be made on the basis of Sverdrup's experience and represent Sverdrup's best judgment as an experienced and qualified professional, familiar with the construction industry; but Sverdrup cannot and does not guarantee that proposals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by Sverdrup. If, prior to the construction phase of the Project, Owner wishes greater assurance as to Total Project or Construction Costs, Owner shall employ an independent cost estimator as provided in ARTICLE 2. C. Controlling Law This Agreement is to be governed by the law of the State of Missouri. D. Successors and Assigns 1. Owner and Sverdrup are each hereby bound and the partners, successors, executors, administrators and legal representatives of Owner and Sverdrup are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. EPCY•193U3%71 8 2. Neither Owner nor Sverdrup shall assign, sublet or transfer any rights under or interest in this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent Sverdrup from employing such independent professional associates and consultants as Sverdrup may deem appropriate to assist in the performance of services hereunder. 3. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Owner and Sverdrup, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Sverdrup and not for the benefit of any other party. ARTICLE 11 CONTRACT DOCUMENTS This Agreement consists of: 1. This Document - Agreement for Professional Services 2. APPENDIX A - Scope of Services 3. APPENDIX B - Additional Owner Supplied Information and Activities 4. APPENDIX C - Cost Estimate Summary 5. APPENDIX D - Schedule EPCY- -n\13WI 9 These documents constitute the entire agreement between the parties. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. CITY OF CAPE GIRARDEAU e BY: ATTEST: JyXonaid7l7ischer 4CiCerk - iity Manager SVERDRUP CIVIL, INCORPORATED James K. Van Buren, P. E. Vice President Attachments: APPENDIX A - Scope of Services APPENDIX B - Additional Owner Supplied Information and Activities APPENDIX C - Cost Estimate Summary APPENDIX D - Schedule EPCY-193\13WI 10 APPENDIX A SCOPE OF SERVICES JANUARY 1994 This project includes the improvements to the City's sanitary sewer system needed to provide service to the Twin Lakes Subdivision. The major components and estimated line lengths are summarized following: Klaus Park Trunk Sewer Rt. K Lift Station & Force Main Rt. K Gravity Sewer Twin Lakes Subdivision Lateral Sewers Twin Lakes Lift Station & Force Main Estimated Line Leneth 5,500 lineal feet 3,500 lineal feet 2,000 lineal feet 17,600 lineal feet 400 lineal feet The engineering services proposed for the design and construction phases of this project are listed below. Sverdrup will perform the major work for the project, but will use subcontractors for surveying and some geotechnical work. It is anticipated the work will be distributed as follows: - Survey and Utility Location Subdivision Sewers: Owner - Easement Descriptions - Soil Boring - Project Management - Design of Sanitary Sewer Improvements - Preparation of Plans and Specifications - Preparation of Construction Cost Estimate - Assistance with Construction Application - Construction Phase Services - Resident Engineer Ercr-193\APPEN6w.671 1 Trunk Sewers: Surveyor Contracted by Owner Subdivision Sewers: Owner Trunk Sewers: Surveyor Contracted by Owner Fill in the blank Sverdrup Sverdrup Sverdrup Sverdrup Sverdrup Sverdrup Subdivision Sewers: Owner Trunk Sewers: Sverdrup I. DESIGN PHASE SERVICES A. PRELIMINARY DESIGN Survev: Necessary surveys in the area of the new sewer right-of-way, including locating utilities, locating street right-of-way and easements, and locating existing manholes as needed will be provided by the Owner or a surveyor contracted by the Owner. Survey work contracted by the Owner will include the following: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer Survey for the Twin Lakes Subdivision lateral sewers, lift station and force main will be performed by the Owner. 2. Geologicallnvestigation: Perform geological investigations to evaluate soil conditions and depth to bedrock. An estimated twenty soil borings will be performed (borings approximately every 1,500 feet along center line). 3. Design Memorandum: Prepare design memorandum to summarize design basis and design criteria. Estimate future population served and wastewater flows. Develop size and preliminary design of sewers, lift stations and force mains. This document will serve as a basis for the bid documents. Scope of work is based on duplex submersible lift stations with precast concrete wet well and valve vault structures. 4. Line Routing: Confirm routing for trunk, gravity and subdivision lateral sewers and force mains following surveys. Confirm location for Rt. K Lift Station and Twin Lakes Lift Station. 5. Review Meeting with Owner: Review sewer routing, lift station location, and potential construction conditions with the Owner. Review sewer and lift station design basis with the City. OrY-193\APPFNDA.671 2 B. PREPARE BID DOCUMENTS Design Prepare detailed engineering design of new sanitary sewers and lift stations needed to provide sanitary sewer service to the Twin Lakes Subdivision as described in the Design Memorandum. 2. Plans and Specifications: Prepare bid documents, including plans, specifications and contract documents. Engineers Joint Contract Documents Committee upfront documents provided by the Owner and as used in the Wastewater Treatment Facility Lime project will be used. Three sets of the bid documents will be provided for review. 3. Construction Cost Estimate: Prepare construction cost estimate based on the construction documents produced. 4. Permit Applications: Assist the Owner with the submission of plans and specifications to Missouri Department of Natural Resources for construction permit application and the US Army Corps of Engineers for a "Section" 404 Permit for wetlands. As simple submission for the 404 permit including a location map and brief project description to receive a National Permit is anticipated. No other permits are anticipated. It is anticipated the Owner will handle any project funding activities and documents. 5. Easement Descriptions: Owner contracted surveyor will prepare legal descriptions and drawings for each necessary temporary construction and permanent easement for the following: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer Easement descriptions for the Twin Lakes Subdivision lateral sewers, lift station and force main will be performed by the Owner. Easement acquisition will be done by the Onwer. 6. Owner Review: Three sets of essentially complete contract documents will be provided to the Owner for review. It is anticipated that review comments can be handled by letter. EPCY-193\APPENIYA.671 3 II. CONSTRUCTION PHASE SERVICES Sverdrup will not begin work on construction phase services until the Owner directs in writing to proceed. The construction is estimated to continue for one -hundred and eighty (180) days. If the required construction period extends beyond one -hundred eighty (180) days, then it shall be an increase in the scope of work subject to renegotiation of this Agreement for both cost and fixed fee. The performance of services by Sverdrup during construction of the Project shall not relieve the construction Contractors of responsibility to execute the work in accordance with their contract and Contract Documents. Neither the Owner nor Sverdrup shall be responsible for construction means, methods, techniques, sequences and procedures employed by the Contractors in the performance of the construction work or the safety precautions and programs incident to the work of the Contractor. Neither the Owner nor Sverdrup shall be responsible for the failure of any Contractor to carry out its work in accordance with the drawings and technical specifications. A. CONSTRUCTION ADMINISTRATION SERVICES (BASIC SERVICES) 1. Bid Assistance: Assist during bid process, including coordination with the Owner for advertisement of bid, responding to technical questions raised during bid, preparing addenda, evaluating bids and providing recommendations of award to the Owner. Ten sets of the bid documents will be provided for bidding. Additional sets will be provided to the Owner at cost as an additional cost. 2. Construction Submittal Review: Review shop drawings and other Contractor submissions in response to the Contract Document requirements, for conformance with the design concept and the concept of the information given in the drawings and technical specifications. Sverdrup's review and recommendation shall not extend to means, methods, sequences, techniques or procedures of construction, or to safety precautions or programs incident thereto, as such these are the responsibility of the construction Contractor. Sverdrup's action shall be taken with such reasonable promptness as to cause no delay in the Work, while allowing sufficient time in Sverdrup's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation. Sverdrup's approval of a specific item shall not indicate an approval of an assembly of which the item is a component. When professional certification of performance characteristics of materials is required of the contractor by the drawings or technical specifications, Sverdrup shall be entitled to rely upon such certification. Sverdrup will not be liable for the results of interpretations or decisions rendered in good faith in connection with the referenced submittals. EPCY-193kAPPEND-A.671 4 Change Orders: Prepare any necessary working drawings or change orders, including recommendation and submittal of contract modifications for approval by the Owner and review and recommendation of time extension requests from contractor for approval by the Owner. 4. Coordinate Resident Inspector(s): Coordinate activities of the Resident Inspector(s) with the Owner. The Owner will provide resident inspection for the Twin Lakes Subdivision sewers, lift station and force main. The Owner will review all certified payroll submittals and review and process all pay requests. 5. Site Visits: Provide periodic visits to the project site and final inspections of construction noting deficiencies, if any. SIM Provide start-up assistance for the lift stations. 7. Record Drawings: Prepare "record drawings" of the completed project. The information submitted by the contractor and changes from the Contract Drawings made during progress of the work shall be used in preparing "record drawings" of the project. Submit to the Owner, upon completion of the "record drawings," one (1) set of mylar drawings. ercx-►gsurrExo-A.sn 5 B. RESIDENT ENGINEER SERVICES Resident Engineer services shall include on-site observation of the following portions of the project: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer The construction is estimated to be continuous for six (6) months. If the required construction extends beyond six months, then it shall be an increase in the scope of work subject to renegotiation of this Agreement for both cost and fixed fee. The Owner will provide resident inspection for the Twin Lakes Subdivision sewers, lift station and force main. Resident Engineering Services shall include: 1. Provide the on-site observation of the progress and quality of the construction work. Observation is intended to determine, in general, if the work is proceeding according to the Drawings, Technical Specifications, and Shop drawings. 2. Provide liaison between the Owner and the construction Contractor(s). 3. Conduct meetings with the Contractor(s) and the Owner on an as -needed basis to monitor and review the progress of the work. 4. Witness all tests. 5. Keep daily log recording construction activities. 6. Review Contractors' estimates for periodic payment for compliance with established procedures, noting particularly the work completed and material delivered to the construction site or at approved off site locations. 7. Initiate change orders and working drawings required to meet changed conditions. 8. Provide interim and final inspections for general conformance with the construction documents, and prepare recommendations on acceptance of the work. 9. Construction Contractor(s) will be responsible for surveys and layout. Owner will provide survey party if requested by the Resident Engineer for checking. EPCY-19RAPPE D-A.sn 6 APPENDIX B ADDITIONAL OWNER SUPPLIED INFORMATION AND ACTIVITIES Information and activities that are not in the Sverdrup scope or that have already been developed will be provided by the Owner. These include: 1. Survey for Twin Lakes Subdivision lateral sewers, lift station and force main. 2. Easement preparation for Twin Lakes Subdivision lateral sewers, lift station and force main. 3. Hold contract for surveying services including easement preparation for the Klause Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer 4. Easement acquisition for entire project. 5. Handling of any project funding activities and documents. 6. Request permits with technical assistance from Sverdrup 7. Distribution of construction bid documents, including addenda. 8. Review of Contractor certified payroll submittals. 9. Review and processing of all Contractor pay requests. 10. Resident inspection services for Twin Lakes Subdivision lateral sewers, lift station and force main. Fear-193urrFxue.671 1 APPENDIX C COST ESTIMATE SUMMARY EPCY-193/130671 DESIGN CONSTRUCTION Phase II Phase II Phase I Office Resident Labor Cost Estimate Estimated Manhours 1,322 352 1,040 Average Rate, $/hr 21.50 21.50 21 Salary Related Expense Factor 1.428 1.428 1.428 Salary Cost $40,590 $10,800 $31,200 G&A Overhead @ 92.5% $37,540 $10,000 G&A Overhead @ 43.5% $13,600 $78,130 $20,800 44,800 Subcontractors Borings $7,000 -- -- Other Reimbursable Cost Summary Auto Mileage 560 560 3,900 Lodging 300 -- 6,500 Travel Meals 180 70 3,300 Duplicating 1,250 1,370 Telephone 100 50 Miscellaneous 50 70 600 Word Processing 100 50 CADD Design 7,800 800 CADD Plotting 600 180 Micro Computer 250 250 1,800 Other Cost Total $11,190 $ 3,400 $ 16,100 Fixed Fee $9,380 $2,500 $5,400 Phase Total $105,700 $26,700 $66,300 EPCY-193/130671 Ail N � H � �O � r-+ 00 •-r M M N '--+ N M It V'1 � 00 � --� N • \�O �t ',o N O 00 00 U ao 00 F CN .--+ �o OC 0 0 W) v �t c W 00 N 00 O N 00 O N t O O O \O N �o WL W i, N N 00 00 00 �0 00 ct �o Rt N �C Ar to C 3 CD x a� 03 b W `u $ E pU cl a� CIO Q) otori tz 8 � a� o � on a� F" � an .• .• a� � � � F CA a C4e) N U PLO w a O F 11O 00 O N �O O N w 00 N kn M V t 110 00 U 00 C) A" E� Q) 00 00 w •O •� V� M �o 00 M 00 t w U � � 00 00 o o U E O � O F 3 -v O a tn r- � U F > a) -� v i -I z o •3 � u O � � U � � cli 0 a� o Ct F M 0 Initiate Project Easement Aquisition Begun Preliminary Desing Complete Bid Documents Complete Advertise for Bid Easement Acquisition Complete Receive Bids Award Contract* Construction Complete Project Closeout APPENDIX D SCHEDULE January 31, 1994 March 28, 1994 May 2, 1994 August 1, 1994 August 1994 September 1994 September 1994 October 1994 August 1995 November 1995 * The Appendix C Cost Estimate for Resident Engineering Services assumes the Sverdrup Resident Engineer will be on the site for one continuous 6 month period during the October 1994 to August 1995 construction. WY-193WPEND-D.671 1 AMENDMENT NO. 1 to AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI and SVERDRUP CIVIL, INC. Dated February 24, 1994 Note: All other terms of the original contract remain unchanged with the exception of the following: Article 3 - Compensation and Payment On page 3 under A. Cost - Replace the second paragraph with: The total cost (exclusive of fixed fee) is estimated to be $201,550.00. The fixed fee shall be $19,280.00. The total amount to be paid for design and construction services under this Agreement shall not exceed $220,830.00 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95 % of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. A cost summary is presented in APPENDIX C. Article 11 - Contract Documents On page 9 amend Article 11 to read: This Agreement consists of: 1. Agreement for Professional Services dated February 24, 1994 2. APPENDIX A - Scope of Services 3. AMENDMENT 1 to APPENDIX A 4. APPENDIX B - Additional Owner Supplied Information and Activities 5. AMENDMENT 1 to APPENDIX B 6. APPENDIX C - Cost Estimate Summary 7. AMENDMENT 1 to APPENDIX C 8. APPENDIX D - Schedule 9. AMENDMENT 1 to APPENDIX D 1 Amendment No. 1 Page 2 Proposed by Sverdrup Civil, Inc.: Date: St/ -Y Accepted by City>of Cape Girardeau: Robert B. Barbour, P.E. Vice President ATTEST: / J Michael G. Miller City Clerk City Manager Attachments: Amendment 1 to Appendix A Amendment 1 to Appendix B Amendment 1 to Appendix C Amendment 1 to Appendix D AMENDMENT 1 TO APPENDIX A SCOPE OF SERVICES JUNE 1996 Add: DESIGN REVISIONS RESULTING FROM EASEMENT NEGOTIATIONS A. Background and General Description Design documents were essentially complete and were transmitted to the owner for final review on July 14, 1995. Prior to completion, a meeting was held with Twin Lakes Subdivision property owners to review the proposed sewer routing. As a result of that meeting and in response to other comments received by the City Engineer's Office the drawings were modified at least twice prior to July 1995 to accommodate property owner requests. Subsequent to July 1995 additional property owner requested changes have been identified as the Owner negotiates easements for construction of the work. Amendment 1 modifies the bid documents to incorporate those changes as identified in Attachment 1 to Appendix A. The type of revisions vary, but in general consist of relocating the proposed lift stations, designing culverts where permanent easements cross ditches, shifting manholes and sewers to minimize property/tree damage, and shifting of temporary construction easements. All of the revisions occur in Twin Lakes Subdivision, the Lewis property betwern Route K and the subdivision, or on the property recently purchased by the Christian Faith Fellowship Church along Route K. B. Tasks 1. Coordinate with City surveyor to provide 1" = 50' scale ground surveys to supplement the original surveying along Route K. Four (4) manhours are allowed for this coordination effort. Relocation and redesign of the Lift Station No. 1 area and access road is required to accommodate the Christian Faith Fellowship Church. 2. Visit the Lift Station No. 1 site, to verify mapping and to finalize the new lift station location and sewer line routing along Route K. 3. Make minor revisions to the project specifications to address property owner concerns of removal and protection of existing improvements and landscaping. 4. Modify detailed engineering design of the sanitary sewer lines and Lift Station No. 1 as defined by the Owner in Attachment 1 to Appendix A. 1 Appendix A Page 2 5. Revise the previously prepared geotechnical investigation and report, to identify subsurface materials expected to be encountered during construction of Lift Station No. 1 at the new site. The effects of subsurface materials on trench excavation, temporary excavation support, backfill, and ground water control will be discussed. The boring cost in Appendix C is based on one boring drilled to a depth of 25 feet or auger refusal and sharing mobilization costs with another project in Cape Girardeau. 6. Revise the previously prepared construction cost estimate to incorporate the changes listed in Attachment 1 to Appendix A. 7. Provide limited technical support to negotiations. It is anticipated that negotiations over the Lift Station No. 1 site and access road will be required with the Missouri Highway and Transportation Department (MHTD), the Christian Faith Fellowship Church, Mr. Lewis, and Union Electric. The costs associated with this scope of work assume the City will take the lead in arranging, conducting and recording the results of the negotiations and contacts. Sverdrup, unless additional work is authorized, will attend one meeting, provide drawings showing the new location, and arrangement of Lift Station No. 1, and will modify the drawings one time to incorporate review comments. MHTD acceptance of the access road indicated in Attachment 1 to Appendix A is assumed. 12 manhours are also allowed for MHTD permit documents. No time has been included to coordinate with the U S Army Corps of Engineers as it is assumed that the existing Section 404 permit will not be affected by these revisions. No other permits are anticipated. C. Additional assumptions used to prepare the Scope of Services and Appendix C Cost Estimate 1. For Lift Station No. 1: • The configuration (size and arrangement) of the lift station as currently drawn will remain the same at the new location. Only minor revisions will be necessary such as stationing, elevations, coordinates, new grading plan, and new access plan. • The additional length of the force main will not affect pump sizing as currently planned. • The additional geotechnical investigation will not indicate modification of the structural design. 2. The four culverts requested in the permanent easement along Veterans Fork Creek will be designed for a 25 -year storm event. The Rational Method will be used for computing the discharge and the culverts will be sized based on inlet control charts by the Bureau of Public Roads. 3. Stationing of the gravity sewer trunk line along the Veterans Fork Creek will remain as currently numbered. Stationing of the force main will be modified only as considered Appendix A Page 3 necessary for construction contractor understanding. 4. Only the changes listed in Attachment 1 to Appendix A and an allowance of 16 manhours for two additional minor revisions related to easement negotiations, are included in the scope and cost. ATTACHMENT TO APPENDIX A '06/04/96 08:40 $311 770 5110 SVERDRUP SVE --- RVRPRT FOURTH Z001/005 TUN -03-1996 1E=12 CITY mRNAGER-CPPE GIR 1'10 1Z14.3J=-r740 r.ali� FACSIMILE COVER LETTER DIVISION OF PLANNING SERVICES P.O_ BOX 617, CAPE GIRARDEAU, MO 63702-0617 5�3 334-8326 FAX NO_ t4-1-4) 335-7946 513 Number of pages including this page: Date: TO: CL w# t" 60eyf' r ic.A FAX NO: (3t�-) 770-511f FROM: Q Kent H. Bratton, City Planner ❑ Ken Ettink, Development Services coordinator ❑ uilliam Vaughn, Technical Assistant Stephen H. Johnson, Technical ASSiszant Stephen S. Williams, Housing AaEistance COcrdinator Q Rebecca L. Figliclo, Project Assistant 0 John D. Goddard, GIS Technician Q Jill s. Goddard, Administrative Secretary NOTES: t e e� °t TG G// &YG / .0. 'itoW , f,� r�]�e, s1 Stdtio� 6 t �.s tico���t/y ends wy � Y t . � Tran rry wed p e: pLTrASE coNFlRtt RECEI2? OF T1iIs FAx sY IF YOU NEED TO RECONTACT US ON THIS MATTER, El_S�ONTACT a12 -- 06/04/96 08:40 'U314 770 5110 SVERDRUP S% -E RVRPRT FOURTH Q001/005 1'11`111r'r�v=­ .. ­­ - . 1.14 --- ___ . - _ . . _ _ A.- V. ; — cc < Ln tA ri 14 - ti L Nj q, LL) 1z LO U - 7z < n — ul UJ Z ul n' .......... i 13 1h j die 4f 1(3v ol .-e . 41 Wk.- Z1 - se nj ell/ 4 o C'I J.0 + 3 -4 0, i —i fA z w A 3 I r rz 06/04/96 08:41 2314 JUN -03-1996 18:12 770 5110 SVERDRliP SVE CITY MANFiGER--C_Rrt Uim nu i 41 w RVRPRT FOL-RTH Q003/005 lel �JJ�r�-.p r•.v�-c..... � 1 f E I� co O t o o L +ZI a•6z�+ 3ef5 ,4?TA,' 4•1Pl'6N t 1- 9 c c 0 Ln Q O O cn t N O 0 N 0 0 06/0.1/96 08:41 $31.1 770 5110 SVERDRUP SVE --- R�RPRT FOURTH Ia004/005 > cJ 1 J + � o Q 7t) :V Q � V • '~ .. 7i1'i - -..-CJ rn� .G� ��•r I'�.t� lu 0'1 G� w � ! ~ it �?.. •c•' ,'�..+ � � J `� � � J �� ` : •'oar r. , 11 -t�•;= . r ��,TjS � �' r.•' 4 ...:.%�+•j�':'� �` •t•;'\= ••� (� i �c W U iii 4 �i ` `! 1. f f _ r /u �' : �A >�T� •{. 41 •'C,,i,a r •�: ?rim " f' � ! / . Ol' .'� � : i / � ao �`..J{ y,'7�bJ 1• , r rt NH /,I �•„•' •L! I K. S. F ,. �, • rr , �L ... / t ~ -j Lm Z W a : 7 I i r I _•T- .1 LJ ATT*c M MFNT �'; �• 06/04/96 03:42 $314 770 5110 SVERDRUP SVE ---- RGRPRT FOURTH 0005/005 JUN -33-1996 L1 it o �! 00'09 ! _ aLJ- � ton z ma f UOL 4 ZI s-fs Art'AcHw,�+ /-s . TnTG! P . 05 05/29/96 08:36 $`314 770 3110 SI-ERDRUT S'�E --- MAY -2E-1396 1?:15 CIIY ��NACEK-c:w-C UI - (-I�, RtiRPRT-FOLI2TH Z 001/006 FACSIMILE COVER LETTER P. aAP, 2 TN DIVISION OF PLANNINCT SERVICoES7 P.O. BOX 61?, CAPE GIRARDEAU, MO 6 573 { ) 334-8326 FAX NO (5i ) 335 -7946 Number Of pages including this page: , v Date : 5-28~ ` )e/ FAX NO. TO: C.tc� Gil, �F o �K�K*Y$X.c**ac4%*�k#x�K#•=r-:ic*:ic�c*�:�1'��K*#.�Fa:t*�k�f-T.�tyc#i::k***:*�K�f*�k`}_*�F:i=yc�k*:�Ic*�k*f�K*� FROM: ❑ gent H. Bratton. City Planner Development Se:►vices Coordinator ❑ Ken Eftink, Vaughn, Technical Assistant ❑ William 'stStephen H. Johnson, Techni,Assistance coordinator O Stephen S. Williams. Housing Figliolo, project Assistant ❑ Rebecca ❑ Sohn p. L. Goddard, CIS Technician Administrative Secretary /2) ❑ Jill S. Goddard, 'q eiia ►an f�o L S-1 hea' .r lV NOTES : rrelio r ions to ti �Wlo �s s shy , �4.0�{ e- —6ir- 40 oil lork ako ASAI hLS P W if o a , ran 1 i►� Ppint. • 'f i�s�^�3' ^' n° icw_ ne.+it.)ujer folil {cam RECEIPT ECONTACT n F EPHONE OF THIS ( COF aCT PLEASE OR �— PLEASE CC IIS O;" TRIS MAT.E. R—�� IF YOU NED TO NEED 05/29/96 08:36 'a314 770 5110SVERDRUP 51t --- XVXrAl rULAill Q UU1 uuti C) 7 -7 . .......... .......... . . . ... . ..... ................... ...... .. .................. C, - ---------- ---------------------------- TRU s s TL -3 W.. 7 Ll 7.2 N---------------------- Cc3.24 S. .. V, 5-7 .. . .. . ................................................. .... . .................. .. ........... .. ... .... ....................... ............. LZ X. GROUND L I NE T 0. M A N H 0 . .. ..... ..... .. .... ...... ;loo.oc A-r%Y-Ae Li ft�A CA 03/29/96 08:36 '$314 770 3110 SVERDRUP SVE MAY -2E-1996 1?:16 C:7-, MHNHu=r--�.nrc R�RPRT FOURTH l�j00J 006 7 b _.. .. _ .... .... _._ .. _ . __..... ._._.... ....................................................... .. _ — _._..•, ........._....,._................._........_..._......._....... ... _ TRUit r.� • - S �•• ilk :•f j•. ' � •Y. ~ � 1 -_ - -_-_•- -__ .. _.._ _._`•___• 7+07.2 Q5� ZQ ---ate: ------ On Ell Qj p Ghu: 4112 Jam• j n . r F' •' ... ,. ............ .. . ... _........ ............................. rE.. .........•.. . • S�QO STD. ` EX. GROUND L I NE Tl MAi1HOL r c' ' - ... -- �,, --- a00.oc -05/29/96 08:37 Z314 770 5110 SVERDRUP SVE --- RVRPRT FOURTH 004/006 o ul co ....................................................... . ....... ......... . ..... ...... . ........ . ............ . . ....................... .. .. C.D RUN cf� T L -3 7 A7+07.2 -� is Ilk ---------- 3.24 -_j 7 lae; ........... . ............ ........... .. . . ....... . ..... . .... ..... ... ................. . ................ 4A, ca STOJ GRGUND LlIN TL -3 MANNOSEL -3- . ..... ... . 400.0 N'I-- .05/29/96 08:3; V314 770 5110 S4-ERDRCP S4E C1AY-26-1996 1'r 17 __ ��� R�RPRT FOURTH fa005/006 E 1,08 Q.. ;4or �r�fdfia� Pr30"e�fy J�*:, �or�9ira/ �eia i� XacafIoh �. T-' �' ���.�'•f SNE ... S- '_.� __�--- ---• '--- .. �� � `" __ ... _w.. Coo u NK l-- • .i,•.l,�l't•r�.. ���. TL -2 3+74 t 74.0 STA Irl : 15 K. T STATION NO, 538223 ROUT i IF 8 FOR E (082370.71 _SLS-i (SEE SE�EE I TL -CI INE NO -1 �1 1\ S-A(TRUNK L '� ! K�. ''•'r,- �� ! RCE MAIN N0. i I STA 04 -CO lF O N 5382 -29 -6c- SF - 38229.6E SEE D TA �, ,d82383.2 7 j ':yak Jo•; .J _ E TL -C2 0. MAIN N S�jEET TL E E �+ STA (TRUNK I NE N0. 1 �= • 3.59.-9 . STA 0+0 (FORCE M� I N r:0• l5 400,90- _ _ --•--- .. . i v ALvE CHAMBER— i FL.39 ..00 ' j 380.00 05/29/96 08:38 2314 770 5110 SVERDRUP SVE MPY-29-1'355 17:17 CITY rnaN�=GEk-cert ui K -;u R�RPRTyFOLRTH f 006 006 J N 89'39'1 1'* E L r 0 �j '- i ILI til 4 4.,.j W N r; SED DEAU a Y r z , J f 7 , TRACT IN 0. ACRLS , , i w SECTION .314- n ;4n � SECTION 3 � r , r h , o z NORTH LINE OF PROPOSED CITY OF CAPE GIRARDEAU PERMANENT SANITARY SEWER EASEMENT r- 7279.43 J N 89'39'11 " E 4'.7 4, OO' 0 N Z TRACT iv0. 2 o _ 0 0 6.00 ACRES rr 0 0 0 o S 89"39'11 w �3a.00 a 0 N N a cp 96 � OQ� RTH RIGHT OF WAY LINE MISSOURI STATE ROUTE "K" 42.07' N 72*19' 43' w POINT OF BEGINNING TRACT NO. 3, SET 1/2' IRON P1N C � A -r -T -AG H M ZrN "r l � f i i RM)L 7 •t��ai. G�c/!/?Y�S %Z - 7, 5ct�oi s r�a�r 15� e2`esx�nT_G-'1 U , '� l -lucks— Al�bye a�, eli�nihaf� M� �Z -�� rogizu�d�ru1�1 utfvee�� 40a(�w rmos-P 6U(dl;w ars Adl �, c��P r o atcez.� MH L4 — (5 In oh, MCV �6&t /IckJ �� � v_•. . Z) A 7-rAC-14MEOT- 1- 12- OaA 2+ (' Q , �Qix, Lz tv� n lv P� rr /Vl t1 I _ (o — l�� G -1Q — l 5 Y►t�I. P ��, cl %l 40 all�v rn.�-E __/_(-----/��`= '__�•,,, �.�� � 9�- P��t�i'l(.!/k.^..Z� �� C;ti, �G�L1k- �'-L t�' �� �" �.0��4�?,'2 f h11%'L. ?� c ¢.., �D l�loT KEVISEO L7-4 a i 0 Qo NoT 'CSE VIS E l�ca> M H L .SGHFARF SN/FT T E. 6iZ ehdVeWaV AD pi/piW 46nza fe- yo driyt6✓Ori i "e, .... .... .. • . . . . ......... OSV8CGN 2 _ _LZ: LQ4 Dd-.19v - I ArmcomENT 1-1+ QM 0 CO 'o fn tn uj ch In (A UA >i > W - - ------- 005 8f•SN 1_ --- - ............ L.U. ....x a 111 t,n + cs C) co i V) Z z w _ _LZ: LQ4 Dd-.19v - I ArmcomENT 1-1+ QM 0 Sq 500 �TA 1+92.8 i4.j N 543342.67 0, E--1 OJR 2 12 5 53 7.S. /S, N'&-.- - 8-A LATERAL; /STA. 3�19 is TA, O+bC N -543149 T68 2112' STA. 4+92,5 , {`` Ir_..y_.T_1543t249.2 AT-rAr- � m TENT L 6:r I S 2 -.4 J#TA:, _3*64 542868,3-6, C) f oz LIJ t I FZ 44 'I y F. t -23.6 ao-ok 61' A T-: 6) Z" %�n K (%p )0• 'n�e R. 18.37-- 71 p. V L 68 STA. '0+25.1 STA. 4+72.0 (LAT. 68)= N 542727.04 STA. 0+00 (LAT. 6C) E 1083720.25 N 542642.54 E 1084020.70 LATERAL:SE� H. f4 J Ii W..' 7' ---- - ------------ TT-4A CL I or ST N LATER/ 2+31.3 12429-58 i Gregory A. T bin, M.D. Diplornate, An ericaBoard of plastic Sur n�, I c. David N1. Deis , M.D. Candidate, American Board MIDWEST rg plastic Suenj, Inc. Walker A. Wynkoop, M.D. P H Y S I C I A N S Diploinate, American Board & of Orthopaedic Surgen/, Inc. S U R G E O N S February 16, 1996 Mr. Steve Johnson Engineer's Office City of Cape Girardeau 401 Independence Cape Girardeau, MO 63701 Dear Mr. Johnson: Michael L. Jones, CHE Executive Director/ Chief Operating Officer Sharon S. Newman, Administrator I am writing you to request a small change in the sewer line placement on my property in Twin Lakes, Cape Glrgxdeau. My address is 118 Pebble Lane and the present plans call for the sewer line easement to be within ,W feet from the southeast corner of my house. I have gone over the plans with Mr. Lester, the city engineer, and I feel a simple adjustment would be to move manhole L4-5 to the south 25 feet. I use this direction south in a general sense, expecting the present, general north south direction of that pipe to be maintained which would place it approximately 25 feet south and 2 or 3 feet east of its present location. This would significantly open up my back yard, allow me to put an addition on the back of our house which my wife and I have already verbally planned without worrying about the easement to the sewer system. Also, it would open up the back yard for possibility of a swimming pool or garage if myself or a future owner would like to utilize the yard in that way. Presently, the position of the sewer line splits the one acre lot into approximately a .6 and a .4 acre segment which I think you can see is basically cutting the yard in half and rendering a significant portion unusable. The other property owner involved is Keith Boelier at 164 Pebble Lane. He and 1 discussed the move, walked off the changes on his land and mine and he is in agreement that the change would be beneficial. He has countersigned this letter below to verify his understanding and agreement with the request. I await to hear your response. Thank you in anticipation of your expected cooperation. Respectfully, L,-A-tj /LV Walker A. Wynkoop, M.D. WAW:bjs Keith Boeller RECEIVED DIVIGION OF PLANNING SERVICES DATE 3 —144 — 9(- BY �1 A"t'tAcH?eIENT 1`17 300 South Mount Auburn, Suite 100 • Cape Girardeau, Missouri 63703-4920 • (314) 651-4488 • Fax: (314) 6;�,--44il� w � \ Y a— __ ' 'o r mr :•; x w O �zwaaz �I te t,fir „ f t \ \ , x ,_ .? .r :•:. W W (: ( i O ill C) LAJ 4 0 try J �•' e ' �, 'i .r �/ \ V j� 4, 4 _ �' �t,,! it v F- �,. Q F i } i t 1h 1 -r iA'^•M i __ ir♦. 1 i f ia� rx. , j Z �.• } `S r,�' ' 1 r S� �+`int; I__I__I r` 44 k ti � S. /rr .........`,.... of T' } i �• A �� i } 1s, , �• r C i frl a. ,',Y} �� �1 •t,^ Q Ln Z. jig .r1 - i r In c i t'� UU ;ilCD, }�> is : a. J c I 01 owl tV - :a: �' t_( tr. i ; i 1 1 ": ` d/ � �•'r/ ,N O - 4: 3 / Q W W•: � I } S O ' � ...r.•. .. .+}.....J__• Q ) } ,, In ~ f J 1 1 00 CO - v Q a I ! t O' .. K! _ Q W cx: If i_ J N Z W •• j } V1 Z W 1 • I Q . „ L(li go.Lco 0 eq to _. jj ERraa�•b� _.__ ._ ti un Cavl,f , \ 0—CM 111 :•� • / /�/ / `� 1� co In qO co Q F to _ {t. '•. •,j.,1 };_ v ,:\ :\iY Citi',. .t i Vi co I Q 1 06 , ? 1�•,•• �ir.s lam: �'� • : Al to Y ' i N vo ! i 1._ •i ' `� Y } ]f! •} ,�\ '. •p 'fir �. , 1 r , '80' 13_ 3 1• • ,.. N _ If • � rJ �; `?`` ' �C i )�, .._.. _._.____ ` ,� ~`.yeitc f.T '� ;,_J Vf c F. N +N� LLJ 1•v:. U.) of ft w EFrLLJ w _ U w I '-o= a.:r uj 0 VI �t 1 a z c -j o I � wora`E _j .. ...J. F— tO x — O O ',j•'r'� , _. .IN •zw;v,z -� Ls w-- . _......_ .. __ . LIJtCO w In .._........_...• M +: I .. ...� V I i.. _._..... U" J N I � , } r a J W :• . �. - -- * _._ � ..._. _ is •�, , r.. w r: -- ., _......._ ,.__.. _..., Z Z� C) + > (133HS SIHI) 3NI HDIVY4 T rll+ CO Vt 00 Cc + 0- Co tA z 0 zC) z I .. _... _ _...__.. -- .._._ __...----..}_..._...- - -1 t 4. tD (33 OZ+ AM 0 o LLJ LL, V) -1 , — . . ...- . . 0--., 1� -.- .- - . -.- .. I , - .- - - .-- - - - ---------- -------- m 5 Z6 �r-- + f + jC) > < 0 Z L, a_ C) CD Z'ZS+ C) (6 " ; ------ z + cj 98*07 'TJ cc 014 CD CD CD CD, o f I I a n. t's '.0 LO �Lx A ;0O I U1 0 C> + 9,09+ Tj W'. 0- a; 0 Y co 0 cli C) + 4-- + + C) :2 co .9,89+ Ln I Li LO + + 00 co ui >; ;0,0, i + � 1 ": t- C) 0 - ;- +--. I . ..... - + 00 co co C\j pd CD c) A. + Im LLJ z C) CD %00+ CD - NA 7 + Z (-%j C� < DO LZ x C) tAJ 1 C> 7 + CL < :3 LL C) + C) Ll co S94 (r ------ < u Lc - nos - n > ------- ------- Q. Ln c? -W v 9'SZ+ 91610 -4 NM. CD + cr LU I > 0 - CS T CD LC) CD LL Fj L HMENT' 1-19 > 00+ Ul _j x z D CD w x b-70 UJ w _j o _j z < a :j :3 LL z u < 99+ > ---------------- z ZO a 9*GZ+ zIP O w 91 61bj _j Oj C) 0: * -------- Ln V, z uj > OL LI, x f ........ —7' rL- OC+ 3),M! C> w LU O -A i Doz x < _j ;0 _j + C. 3NVI 31983d. + _j b70 w _j 0 z C) ;D C) + cli cl: _j _j eq > k z _W. + 000 0 'aa iNodAm,,-r:) o- ------- - ----- uj + Oli 00,800 rA v cx<:r+ + w 0 za, to > _j c mooGo �_ x 00 11 kn z > U > 0 tLT u Cu + _j L) a. U') 0 00 CX 0 to > IX M0 + 00 +a xoZ + + < ATTACNMENT t-2-0 00+ 49.485 TTCD _j Cl C) q 10 0 O CD z LnC5 O Orn N O O O w cli CD 0 / PPCI PERT'f L0 T L I NES tTYPi IA o UTILITIES ARE* -L �V�l !(':HI -OF -WAY ANE. SEE GENERAL I si SHEET TL-GOI. ,1 - 0 W _..._.. .................... ... .. N542 m ._ OOp o t0 • tea►' I -3' � � � ` `. ' L4-8 bol? V,(C1i7�t STA. 14+7'7`_8 \ N 541942.01, E 1083283.02 \I L4-7 \ \MAIoR STA_ 13+38.0 ' • \ N 541881.95 E 1083156.74 Ll 15 ° s` STA. 16+64.2 0'12 N 541848.53 48 / i�E 108344.7 -- Z-4 - (5 - - — - -- - -- -- r ��dl1c��erf__lor L`i�': i "=50' -- . _ cROLE: i "=50' HOR ! Z. 0;' VERT. ` �a4t.� 157yi A-rrac LA M E N T l- Z 1 •� .00 co CD SOLITI N 542937.29 E 108221--.37 NOTE' JS Ln LL� -__-� � |25 log - / cn 71 .�� . '~.' -,-'- ' ST� ]+44.] � � N 542739.6- ! E |U82(52'O � . NOTE: EXISTING UTILITIES ARE LOCATED W[TH|N RIGHT-OF-WAY OF :APmPT / ^mr* <cc rcmco^/ ! ( ' PROPERTY/LOT � i LINE (TYP) � � � . SEE � OF|LE F( ` LOCATIONS (TYP \ T- /-z��Q!iut ({ - � |25 log - / cn 71 .�� . '~.' -,-'- ' ST� ]+44.] � � N 542739.6- ! E |U82(52'O � . NOTE: EXISTING UTILITIES ARE LOCATED W[TH|N RIGHT-OF-WAY OF :APmPT / ^mr* <cc rcmco^/ ! ( ' PROPERTY/LOT � i LINE (TYP) � � � . SEE � OF|LE F( ` LOCATIONS (TYP \ T- /-z��Q!iut ({ - I LA -56 All of Lot 5 and the South 167 feet, of Lot 4 in Block 1 of the Resubdivision of Lots 27, 30, 31, 32 and 35 in Twin Lakes Subdivision in the County and City of Cape Girardeau in the State of Missourl J 23.67' S 89'03'17' E S 07.55'22' E 10.12'15,18'25.30' , A 7727' N c r? N 88'14'56' E o 0 31.6 ' N 88'14'56' E 101.15' �Ln W N 07.55'22' W S 88.14'56' w 101.7 ' N o fa 47 Nl 44_27' o M �I /88'14'56 W / S 37.2 112' Q v 3 32,22' n'' v I J 54'18'32' W r� ,32.05' D - m ONo 2Ic 15' Wide rf Sewer Easement ti 7,369 sq.ft. �— 5.00' 3 N 78'40'35' W b 15.00' Q N 78'40'35' W D o/Wti 5.00' S 78.40'35' E a Pnut and 5.00' Helen Hawkins N 78'40'35' W /N 21.43' ° Book 697 N 11'19'38' E saw, /' Page 590 epi Temporary Easement >n 13,409 sq.ft. �N /ti N 542386.3049,1'/'% U7 ti/3 E 1081739,2631 co 1 f-nIfn m 36.11' zl 'y A A � A J is 0 J GRAPHIC SCALE Sa 0 SD w 100 ( IN FEET ) I Inch - 50 ft. Drawing prepared by City of Cape Girardeau f Engineering Division 2-26-96 PE/TE TEH r 'TT'AC-HME'1vi 1-23 co _...__._..... __...._ --- co 009'Z80'13 _ ..._ t^ x p,'- =r C tL ,JI j w 10 x LO CL CD IS O > t 1; '•tfS tc'1 bL+n 04 QI ti M ..._. _ . .... _ .._- . - _» • lay _ �::•. _... M M U.1M.g + N tV { W CO o J t '.) ; +( _ # ~'.�� 1 �I ,'SI J N z W t~z tD 1 i 4} .. S ...j <, i . t lr) L Ln OSZ'Z80'13 �; a;���'% ,+'`• 'tl'- r~?-.}_...._.__,.__..........._.._.___ O 4- C4 Lr u o rah r ti' m ori x vjg CD rK _ LU Zo uj ::D --- O '1pp(� oo N - U :� r• ki J L.L ' Z O ' M co ._:in N o I tc s Z t� ' 1:ijF�.y �14; 1r M o � ,O 1 ZO J E'1� rn N �V W'S' �'tnl'A o �H11 I .�tnzw o, a ti � f r' • 1! � � i CL rn ko aj trot` cli C-1 U. rt.S �.q Ln x ,t 1 f -- - o '�1 y tai Q .• '� ' a' ' x } o+ •j IN+ � t ' ^ r1; � � 1 rn trot oi O <`S rQ • �...__ J ii A -- + + v N ti * �.. i i I: i< 1 W 1 co Q j 1-,- - 1 Wit 1- to to Z W t; _ i ,.i f_ A-A. 1 CD oN TTACHMEN T I` s m V� tD..n n .: :.^ tom. •� N Z O O W W u 1.11 h M J N Z W . N °� ^ M > W O 1 e�PL- tD � 3 N J Q .\ SS ray.?t. ., ✓t..., ..n t\ �'• J N Z W \ I Q t \ CO + a�` Yom'•. i' -,..r.:: _Ljf Ln \, •-.f V, J •�\'� S a \ ti M F- to \ rn V1 / f .i .. > .F.�.�' •a:♦♦ \ \* t \, Y it t ! 1 \J f � ` ' 'tly, . � , f.'� ` �' r `ilt'x 1�J { 1� •c � 4 � ` I J _.< L �' { 0� ZVI ;oINj RIGHT-OF-WAY LINE ITYPI-J' . r„ /Y 75' V iFi•�I� .{.``i`' {'` .� a J LL LU uj > w cv \ N M ao' Y t 10". tn Lo PL \ � 1 y w iZ Sx C5 VJ ..,.M G� pCG ' �, , 1 s? ��` ^vim I. .. `Z r' .NP-( ,..„i / .,�'t '� -�/� :, ,lay t\ /, 0 00 Ln 0. in if mw �. " d + N to r/ .. •'" tn.; '^ ! r- rn tn — 04c +zQ J N 2 W I \ v rr C N$ W -ol,. 1 �\ A LAMENT 2 ti i I z �j C AMENDMENT 1 TO APPENDIX B ADDITIONAL OWNER SUPPLIED INFORMATION AND ACTIVITIES June1996 ••• 11. Additional survey along Route K at the new location for Lift Station No. 1. New information to be located includes any new topographical changes, the new access road location, new power pole locations, and new church sign, etc. 12. Acquire any new easement documentation for the new power pole locations impacting the new location for Lift Station No. 1. 13. Coordination with utility company for approvals of revised lift station and sewers location as described in Attachment 1 to Appendix A. 14. Coordination with the Missouri Highway and Transportation Department (MHTD) to attain a permit for the new Lift Station No. 1 access road if required. 15. Coordination with property owners for approval of revisions described in Attachment 1 to Appendix A. AMENDMENT 1 TO APPENDIX C COST ESTIMATE SUMMARY JUNE 1996 MGM Labor Cost Estimate Estimated Manhours 252 Average Rate, $/hr 24.00 Salary Related Expense Factor 1.428 Salary Cost 8,640 G&A Overhead @ 92.5% 7,990 $16,630 Boring 300 Soil Tests s0 $380 Other Reimbursable Cost Summary Travel $80 Travel Meals 15 Duplicating 100 Miscellaneous 50 Package Shipment 50 CADD Design 2,600 CADD Plotting 175 Micro Computer 50 Other Cost Total $3,120 Fixed Fee $2,000 Totals 1 U X _ E w Z F - Ll a CL a� O N W r � H = Z O W = LU Z � Q Z W Q N co 00 (, (n N r� (N m Il- N co O O N Cl) N N — O H N �- O U d U C co N Co QD 00 O O "t N It co In O N N � U �s � U N (O N It O CO N It N N N N d — N d C i W N C O i d N�— U O)cc O d C Oc f0 L CL C ' � s N c o U 'y C. > O t U) 3 o � a LL O s a` R LL C O N Y C t9 .7 •> c0 J � i y c C n — -p cc N 17 s U_ U 3 ~ 0 J C E C N O cn U o > u U p C_ > N 3 0 w cc o co J m ~ _ N J N E O O =y E O co > a) — C m O a E n a) z p z O U LI) Q. to oZf O NO •— C (D LL E > a) L U) O > 0 o E Loc C) aD 3 c m cu c z cc_ ca CB m Q L Q U O 00 w L Q O v7 O 0 LO N V WO to (J] M L U L O > m z o p L ti CY) O � U 0O O U a) (n Q a) p �L) Q L � z a� > (3) cn U U U U « O y > LL 0E �._, 7 CU � V 4- L (f)L �-' L cn C U p U E L s= U` L U C O p '�., J C �--� Cl) C O Q _ 4) C Q Q)C W p Y rn U -C Ecc Y O N > 0 OCn O -O a) cn O = > O Cn a) to O .0L C O U C a) O >• . � co C7 Q rt U 0 N U X 0 w Z LU Q CL � ^ Q P: a O U 1— W c D C Z0 o W = �z � Q Z W Q C') N CD r- N O O CDc} W N LO �O N N N R U 4) U O N In CO N N O N c0 r C C .LML a7 U m y 0 � N N Cfl CD O O C C W c- N a) U a) � O m a) a) Y a o O a a C � _ � > cc 7 ca O O co co o L W > �m p a) U o m o a cn d a) >- 3 O Y m a� > L o m > > — o Z Q] N m � LO r � � � 0 O o_ E a' a O a>i o m O L + c y 7 o o o m O Y 3 (n LOa) O a'S j a) > m m 3 a`) a) Y O Z O L d3 o +� m > >. cc >, O a) a) O O O U) = U O W i S Y u) "O O dS (1)Y c1 — Q O N O L U a) N O .c W o)cc p _ cn y o _ rn p Uo U U U O U U U)U U c_ Ua) o?� v C -O U C � U coY U C n a) � m a) U i O Q y co — U a) _C O O O L CT m § 4) m C O Q) L to 41 - F- 2i § U H S J U) [o C') AMENDMENT 1 TO APPENDIX D SCHEDULE June 1996 The project schedule is updated to account for previous delays. Initiate Project Easement Aquisition Begun Preliminary Design Complete Originally Revised Bid Documents Submitted for Review January 31, 1994 March 28, 1994 May 2, 1994 July 14, 1995 The schedule on the items below reflect the cumulative number of weeks after Contract Amendment 1 is approved and Lift Station No. 1 third parry issues are resolved. Amendment 1 Modifications Submitted for Review 5 Owner Review Complete 7 DNR/MHTD Approval (4 weeks allowed) 9 Begin Advertising for Bid 11 Bids Received 15 Award Contract* 20 Construction Complete 72 Project Closeout 85 * The Appendix C Cost Estimate for Resident Engineering Services assumes the Sverdrup Resident Engineer will be on the site for one continuous 6 month period during the construction. CITY OF CAPE GIRARDEAU, MISSOURI AGREEMENT FOR PROFESSIONAL SERVICES DESIGN AND CONSTRUCTION OF TWIN LAKES WASTEWATER COLLECTION SYSTEM IMPROVEMENTS This Agreement is made and entered into this day of jp&graj 19L�, by and between the City of Cape Girardeau, (Owner), and Sverdrup Civil, Inc. (S erdrup). ARTICLE 1 SVERDRUP'S SERVICES Sverdrup shall provide or furnish to Owner professional services for design and for specified construction overview in connection therewith, of wastewater collection system improvements, hereinafter referred to as "Project". These services are identified and described in the Scope of Services (APPENDIX A) attached to and made a part of this Agreement. ARTICLE 2 OWNER'S RESPONSIBILITIES A. Owner's Representative Owner shall designate in writing a person to act as Owner's Representative with respect to the services to be rendered under this Agreement. Such person shall have complete authority to transmit instructions, receive information, interpret and define Owner's policies and make decisions with respect to Sverdrup's services for the Project. B. Information 1. Owner shall provide to Sverdrup in a timely manner information and services pertinent to the Project including: a. Provide copies of all special design and construction standards which the Owner will require to be included in the drawings and specifications. b. Provide all data and information available to the Owner relevant to the Project including but not limited to those items listed in Additional Owner Supplied Information (APPENDIX B). C. Apply for any grants loans or funding support required. d. Arrange for reviews and approvals of regulatory agencies, and pay any applicable fees of the regulatory agencies for such reviews, with such assistance from Sverdrup as may be described in Appendix A. EPCY-193\130671 h. Owner agrees to comply with the "Hazard Communication Standard" of the Occupational Safety and HealthAdministration. i. Owner shall furnish to Sverdrup as required for performance of Sverdrup's services (except to the extent provided otherwise in the Scope of Work), data prepared by or services of others, including, without limitation, soil borings, probings and subsurface explorations, hydrographic surveys, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretation of all the foregoing; boundary, easement, right-of-way, topographic and utility surveys; property descriptions; zoning, deed ;and other land use restriction; and other special data, professional opinions or consultation; all of which Sverdrup may use and rely upon in performing its services. j. Owner shall provide such accounting, independent cost estimating and insurance counseling services as may be required for the Project, such legal services as Owner may require or Sverdrup may reasonably request with regard to legal issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service as Owner may require to ascertain how or for what purpose any Contractor has used the moneys paid under the construction contract, and such inspection services as Owner may require (except to the extent provided otherwise in the Scope of Work) to ascertain that Contractor(s) are complying with any law, rule, regulation, ordinance, code or order applicable to their furnishing and performing the work. Owner shall include in all construction contracts a requirement that Sverdrup be named either as: 1) an indemnitee under Contractor's indemnity obligation, and 2) an additional insured under Contractor's General Liability Insurance Policy. 2. Owner shall provide information and services not specifically included under Article 1 which are necessary to complete the Project, or authorize Sverdrup to finish such under provisions of Article 5. C. Access and Approvals 1. Owner shall arrange for access to and make all provisions for Sverdrup to enter upon public and private property as required for Sverdrup to perform its services under this Agreement. 2. Owner shall furnish at its cost approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project except as stated in Appendix A. D. Notice Owner shall give prompt written notice to Sverdrup whenever Owner observes or otherwise becomes aware of any development that affects the scope or timing of Sverdrup's services, or any defects or nonconformance in the work of Sverdrup or any Contractor. EPCY-193\130671 2 ARTICLE 3 COMPENSATION AND PAYMENT A. Cost Owner shall compensate Sverdrup for the performance of the services, described in the Scope of Work under Article 1, on a cost plus a fixed fee basis. The total cost (exclusive of fixed fee) is estimated to be $181,420. The fixed fee shall be $17,280. The total amount to be paid for design and construction services under this Agreement shall not exceed $198,700 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95% of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. A cost summary is presented in APPENDIX C. B. Cost Computation Definition of terms to be used in computation of payments are as follows: 1. Salary costs are defined as the salaries paid for regular time and overtime (including any premium overtime) worked, plus provision for applicable annual Salary Related Expenses, including sick leave, vacation pay, holiday pay, and other ordinary and customary paid time off, bonuses, the employer's portion of social security, unemployment, and other payroll taxes, Employee's Retirement and Benefit Plan contributions, employer's portion of the group hospitalization and medical insurance and the cost of worker's compensation insurance. The provisional Salary Related Expense overhead rate for 1994 is 0.428. At the end of each calendar year, the actual rate for the year will be applied and adjustment in the compensation made accordingly. The maximum Salary Related Expense overhead rate that shall be applied is 0.43. 2. Salary costs as defined above are multiplied by a provisional General and Administrative overhead factor for 1994 of 0.925 (0.435 for Resident Inspection services Phase H - Resident). Included in the General and Administrative overhead are: a. The salaries of officers, except for technical or advisory services directly applicable to the project. b. The salaries of employees doing general administrative work; also nonproductive professional and technical salaries, including maintenance of staff to provide readiness to serve. C. Rent and costs of light, heat and water; equipment depreciation and maintenance cost; costs of office supplies and reproduction of data for our internal use; general communications expense, including local telephone calls and postage; taxes; insurance premiums and license fees; automotive expense and other transportation and travel expense not chargeable to specific contracts; and other miscellaneous costs. EPCY-193\130671 At the end of each calendar year, the actual General and Administrative overhead rate for that year will be applied and adjustment of the compensation made accordingly. The maximum General and Administrative overhead rate that shall be applied is 0.95 (0.45 for Resident Inspection Services, Phase II Resident). 3. In addition to salary costs, Sverdrup will be reimbursed for Other Reimbursable costs as follows: a. Travel, subsistence, and incidental expenses of personnel while traveling in connection with the work. b. Transportation by passenger automobiles that Sverdrup supplies intermittently in connection with the work. All costs of owned, leased, or rented passenger vehicles assigned to the work. Reimbursement for the cost of special types of vehicles when such vehicles are required. C. Reproduction of drawings, photographs, maps, charts and reports which are prepared for the Owner's periodic or interim review and also the cost of the reproductions which constitute the delivery of work. d. Wire and wireless communication of messages and data in connection with the work. e. Insurance required by the Owner in addition to the coverages or in excess of the limits normally carried. L Subcontracted services such as, but not limited to, borings, surveys, photogrammetry, testing and computing services, if required in the performance of the work. g. Technical support services provided from our own facilities, as required in the performance of the work. h. Special consultants, as approved by the Owner, if required in the performance of the work. L Technical and advisory services of officers directly applicable to the project at the hourly rate of $100. 4. A fixed fee will constitute profit for the work described in Article 1. C. Terms of Payment Progress payments for services rendered shall be made monthly upon submission of an invoice for work performed during the previous month. For interim billings, the portion of the fixed fee payable shall be equal to the total fixed fee multiplied by the ratio of salary costs plus general and administrative overhead plus other reimbursable costs to date of billing divided by the estimated total cost listed under Article 3A above less the fixed fee billed to date. Invoices submitted to the Owner by the 20th of each month will be Frcr-193\IX*71 4 included in the Owner's normal payment cycle for payment by the 10th of the following month. If there are disputed items and/or amounts on any invoice, the balance of such invoice, after deducting any disputed items, shall be paid in full, and the disputed items and amounts shall be presented to Sverdrup for resolution as soon as such disputed items have been determined by Owner. Payments due but unpaid more than thirty (30) days after presentation of the invoice, excluding any amounts and items disputed by Owner, shall bear interest at one percent (1 %) interest per month (or any lesser legal limit applicable) until paid. ARTICLE 4 TUAE FOR PERFORMANCE A. Commencement Sverdrup shall commence the performance of the services for the Project upon the date of this Agreement and complete the work in accordance with such schedule as may be mutually agreed to by the parties. A potential Schedule pending timely compilation of information, timely review by the Owner and Missouri Department of Natural Resources, and no changes in scope is listed in APPENDIX D. B. Delay If Sverdrup's services for the Project are delayed for reasons beyond its control, the compensation provided for elsewhere in this Agreement and the time for performance shall be subject to equitable adjustment. ARTICLE 5 CHANGES IN THE WORK A. Changes Owner reserves the right, without impairing this Agreement, to order changes or alterations in the work to be performed hereunder by Sverdrup. If changes or alterations ordered affect the cost or progress of the work, adjustment shall be made in the time for performance of the work and compensation owing to Sverdrup, as the case may be. B. Concealed Conditions Should concealed or unknown conditions be encountered in the performance of the work which present the risk of discharge, dispersal, release or escape of pollutants, asbestos, any hazardous substance or any hazardous waste, Sverdrup shall promptly suspend its performance of the Work for the protection of the parties and their employees and notify Owner of the conditions encountered. Owner and Sverdrup shall promptly investigate the conditions and, if warranted, equitable and necessary adjustments shall be made in the terms and conditions of this Agreement. It is agreed, however, that Article 5 above not EPcv-143\13MI 5 withstanding, Sverdrup shall have no duty to determine the existence of pollutants, asbestos or any other hazardous substance or hazardous waste at the site of the work or to provide response action or remedial services. ARTICLE 6 STANDARD OF CARE Sverdrup represents that its services shall be performed with the skill and care which would be exercised by comparable qualified design professionals performing similar services at the time and place such services are performed. If the failure to meet these standards results in deficiencies in the design, Sverdrup shall, furnish at its own cost and expense, the redesign necessary to correct such deficiencies. I-CMD1k63J0Vb1 A. Sverdrup's Du Sverdrup shall indemnify Owner against all claims and suits by third parties for loss of or damage to property, or personal injury, including death, to persons, and from all judgments recovered therefor, and from all expenses for defending such claim or suit, including court costs and attorney's fees, arising out of the negligent acts, errors, or omissions of Sverdrup in connection with Sverdrup's performance of this Agreement. In no event shall Sverdrup have any duty to indemnify Owner hereunder against claims arising as a result of Owner's sole or contributing negligence. In no event shall Sverdrup be liable under this paragraph or otherwise for indirect or consequential damages. B. Owner's Duty Upon and after final completion of the Project, Owner shall indemnify and hold Sverdrup harmless from all claims and suits for damages arising from personal injuries, including death to persons, or to property, and from all judgments recovered therefor, and from all expenses for defending such claim or suit, including court costs and attorney's fees, which result from Owner's negligent use, operation or maintenance of the facilities, equipment or materials designed or provided by Sverdrup under this Agreement. ARTICLE 8 INSURANCE Without limiting its liability hereunder, Sverdrup shall maintain during the life of this Agreement the following insurance and furnish Owner, in duplicate, certificates of insurance as evidence thereof. Such certificates shall provide that cancellation of said insurance shall not be effected without thirty (30) days prior written notice to Owner. The certificates shall plainly designate the name of the project for which the certificate is provided. EPcY-193u3Mi 6 1. Workers' Compensation Insurance, providing coverage in compliance with the laws of the state in which any part of the work is to be performed, and Employer's Liability Coverage in the minimum amount of $100,000 for each occurrence. 2. Commercial General Liability Insurance written on an occurrence basis with the following limits of liability: General Aggregate $4,000,000 Products/Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $2,000,000 Each Occurrence $2;000,000 Fire Damage $25,000 Medical Expense $1,000 3. Automobile Liability Insurance. Bodily injury and property damage combined single limit - $1 million each occurrence, $1 million aggregate. 4. Architect's and Engineer's Professional Liability Insurance. Bodily injury and property damage combined single limit - $1 million each claim, $5 million aggregate. The Commercial General Liability and Architect's and Engineer's Professional Liability Insurance shall include Contractual Liability Coverage for the liability assumed by Sverdrup in Article 7 herein. The Owner shall be named as an additional insured in the Certificate for Commercial General Liability. ARTICLE 9 TERMINATION A. Termination By Owner 1. In the event Sverdrup fails to comply with any provisions of this Agreement, or if the progress or quality of the work is unsatisfactory, Owner may serve written notice thereof upon Sverdrup, and if Sverdrup neglects within a period of twenty (20) days thereafter to commence its efforts to correct such failure, Owner may terminate the Agreement upon written notice to Sverdrup. Upon such termination, Sverdrup shall cease its performance of this Agreement and shall deliver to Owner all completed or partially completed satisfactory work and Owner shall pay to Sverdrup costs incurred to effective date of termination. 2. Owner also reserves the right to terminate this Agreement in the event it shall abandon or indefinitely postpone the project. Such termination shall be accomplished by written notice to that effect delivered to Sverdrup. Upon receipt of such notice, Sverdrup shall immediately cease work and deliver to Owner all completed or partially completed work. Payment to Sverdrup shall be made for work performed prior to receipt by Sverdrup of such termination notice, together with Sverdrup's cost for closing down its work, and Sverdrup shall have no claim for loss of anticipated profits or any additional compensation. E CY-193\13MI 7 B. Termination By Sverdrup In the event Owner fails to comply with any provisions of this Agreement, or if it fails to timely pay compensation due to Sverdrup, Sverdrup may serve written notice thereof upon Owner, and if Owner fails within a period of twenty (20) days thereafter to correct such failure, Sverdrup may terminate this Agreement upon written notice to Owner. Upon such termination, Sverdrup shall cease its performance of this Agreement and when paid the amount due for such work, shall deliver to Owner all completed or partially completed work for the project. ARTICLE 10 GENERAL CONSIDERATIONS A. Use of Documents All documents including Drawings, Specifications, and CADD discs prepared or furnished by Sverdrup pursuant to this Agreement shall become the property of the Owner. Such materials are not intended or represented to be suitable for reuse by Owner or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by Sverdrup for the specific purpose intended will be at Owner's sole risk and without liability or legal exposure to Sverdrup, and Owner shall indemnify and hold harmless Sverdrup from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Sverdrup to further compensation at rates to be agreed upon by Owner and Sverdrup. Since Sverdrup has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor(s)' methods of determining prices, or over competitive bidding or market conditions, Sverdrup's opinions of probable Total Project Costs and Construction Cost provided for herein are to be made on the basis of Sverdrup's experience and represent Sverdrup's best judgment as an experienced and qualified professional, familiar with the construction industry; but Sverdrup cannot and does not guarantee that proposals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by Sverdrup. If, prior to the construction phase of the Project, Owner wishes greater assurance as to Total Project or Construction Costs, Owner shall employ an independent cost estimator as provided in ARTICLE 2. C. Controlling Law This Agreement is to be governed by the law of the State of Missouri. D. Successors and Assigns 1. Owner and Sverdrup are each hereby bound and the partners, successors, executors, administrators and legal representatives of Owner and Sverdrup are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. EPcr.193U30671 2. Neither Owner nor Sverdrup shall assign, sublet or transfer any rights under or interest in this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent Sverdrup from employing such independent professional associates and consultants as Sverdrup may deem appropriate to assist in the performance of services hereunder. 3. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Owner and Sverdrup, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Owner and Sverdrup and not for the benefit of any other party. ARTICLE 11 CONTRACT DOCUMENTS This Agreement consists of: 1. This Document - Agreement for Professional Services 2. APPENDIX A - Scope of Services 3. APPENDIX B - Additional Owner Supplied Information and Activities 4. APPENDIX C - Cost Estimate Summary 5. APPENDIX D - Schedule EPCY-193\13MI 9 These documents constitute the entire agreement between the parties. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. CITY OF CAPE GIRARDEAU e BY: J onald Fischer ity Manager SVERDRUP CIVIL, INCORPORATED James K. Van Buren, P.E. Vice President ATTEST: i City erk Attachments: APPENDIX A - Scope of Services APPENDIX B - Additional Owner Supplied Information and Activities APPENDIX C - Cost Estimate Summary APPENDIX D - Schedule EPCY-193\130671 10 APPENDIX A SCOPE OF SERVICES JANUARY 1994 This project includes the improvements to the City's sanitary sewer system needed to provide service to the Twin Lakes Subdivision. The major components and estimated line lengths are summarized following: Klaus Park Trunk Sewer Rt. K Lift Station & Force Main Rt. K Gravity Sewer Twin Lakes Subdivision Lateral Sewers Twin Lakes Lift Station & Force Main Estimated Line Length 5,500 lineal feet 3,500 lineal feet 2,000 lineal feet 17,600 lineal feet 400 lineal feet The engineering services proposed for the design and construction phases of this project are listed below. Sverdrup will perform the major work for the project, but will use subcontractors for surveying and some geotechnical work. It is anticipated the work will be distributed as follows: - Survey and Utility Location Subdivision Sewers: Owner Trunk Sewers: Surveyor Contracted by Owner - Easement Descriptions - Soil Boring - Project Management - Design of Sanitary Sewer Improvements - Preparation of Plans and Specifications - Preparation of Construction Cost Estimate - Assistance with Construction Application - Construction Phase Services - Resident Engineer EPCY-193Ureeflae.671 1 Subdivision Sewers: Owner Trunk Sewers: Surveyor Contracted by Owner Fill in the blank Sverdrup Sverdrup Sverdrup Sverdrup Sverdrup Sverdrup Subdivision Sewers: Owner Trunk Sewers: Sverdrup I. DESIGN PHASE SERVICES A. PRELIMINARY DESIGN 1. Survev: Necessary surveys in the area of the new sewer right-of-way, including locating utilities, locating street right-of-way and easements, and locating existing manholes as needed will be provided by the Owner or a surveyor contracted by the Owner. Survey work contracted by the Owner will include the following: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer Survey for the Twin Lakes Subdivision lateral sewers, lift station and force main will be performed by the Owner. 2. Geological Investi ag tion: Perform geological investigations to evaluate soil conditions and depth to bedrock. An estimated twenty soil borings will be performed (borings approximately every 1,500 feet along center line). 3. Design Memorandum: Prepare design memorandum to summarize design basis and design criteria. Estimate future population served and wastewater flows. Develop size and preliminary design of sewers, lift stations and force mains. This document will serve as a basis for the bid documents. Scope of work is based on duplex submersible lift stations with precast concrete wet well and valve vault structures. 4. Line Routing: Confirm routing for trunk, gravity and subdivision lateral sewers and force mains following surveys. Confirm location for Rt. K Lift Station and Twin Lakes Lift Station. 5. Review Meeting with Owner: Review sewer routing, lift station location, and potential construction conditions with the Owner. Review sewer and lift station design basis with the City. EPCY-193MPPe4DDA.671 2 B. PREPARE BID DOCUMENTS 1. Design: Prepare detailed engineering design of new sanitary sewers and lift stations needed to provide sanitary sewer service to the Twin Lakes Subdivision as described in the Design Memorandum. 2. Plans and Specifications: Prepare bid documents, including plans, specifications and contract documents. Engineers Joint Contract Documents Committee upfront documents provided by the Owner and as used in the Wastewater Treatment Facility Lime project will be used. Three sets of the bid documents will be provided for review. 3. Construction Cost Estimate: Prepare construction cost estimate based on the construction documents produced. 4. Permit Applications: Assist the Owner with the submission of plans and specifications to Missouri Department of Natural Resources for construction permit application and the US Army Corps of Engineers for a "Section" 404 Permit for wetlands. As simple submission for the 404 permit including a location map and brief project description to receive a National Permit is anticipated. No other permits are anticipated. It is anticipated the Owner will handle any project funding activities and documents. 5. Easement Descriptions: Owner contracted surveyor will prepare legal descriptions and drawings for each necessary temporary construction and permanent easement for the following: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer Easement descriptions for the Twin Lakes Subdivision lateral sewers, lift station and force main will be performed by the Owner. Easement acquisition will be done by the Onwer. 6. Owner Review: Three sets of essentially complete contract documents will be provided to the Owner for review. It is anticipated that review comments can be handled by letter. H. CONSTRUCTION PHASE SERVICES Sverdrup will not begin work on construction phase services until the Owner directs in writing to proceed. The construction is estimated to continue for one -hundred and eighty (180) days. If the required construction period extends beyond one -hundred eighty (180) days, then it shall be an increase in the scope of work subject to renegotiation of this Agreement for both cost and fixed fee. The performance of services by Sverdrup during construction of the Project shall not relieve the construction Contractors of responsibility to execute the work in accordance with their contract and Contract Documents. Neither the Owner nor Sverdrup shall be responsible for construction means, methods, techniques, sequences and procedures employed by the Contractors in the performance of the construction work or the safety precautions and programs incident to the work of the Contractor. Neither the Owner nor Sverdrup shall be responsible for the failure of any Contractor to carry out its work in accordance with the drawings and technical specifications. A. CONSTRUCTION ADMINISTRATION SERVICES (BASIC SERVICES) 1. Bid Assistance: Assist during bid process, including coordination with the Owner for advertisement of bid, responding to technical questions raised during bid, preparing addenda, evaluating bids and providing recommendations of award to the Owner. Ten sets of the bid documents will be provided for bidding. Additional sets will be provided to the Owner at cost as an additional cost. 2. Construction Submittal Review: Review shop drawings and other Contractor submissions in response to the Contract Document requirements, for conformance with the design concept and the concept of the information given in the drawings and technical specifications. Sverdrup's review and recommendation shall not extend to means, methods, sequences, techniques or procedures of construction, or to safety precautions or programs incident thereto, as such these are the responsibility of the construction Contractor. Sverdrup's action shall be taken with such reasonable promptness as to cause no delay in the Work, while allowing sufficient time in Sverdrup's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation. Sverdrup's approval of a specific item shall not indicate an approval of an assembly of which the item is a component. When professional certification of performance characteristics of materials is required of the contractor by the drawings or technical specifications, Sverdrup shall be entitled to rely upon such certification. Sverdrup will not be liable for the results of interpretations or decisions rendered in good faith in connection with the referenced submittals. Ucr-19RAP D-A.sn 4 3. Change Orders: Prepare any necessary working drawings or change orders, including recommendation and submittal of contract modifications for approval by the Owner and review and recommendation of time extension requests from contractor for approval by the Owner. 4. Coordinate Resident Inspector(s): Coordinate activities of the Resident Inspector(s) with the Owner. The Owner will provide resident inspection for the Twin Lakes Subdivision sewers, lift station and force main. The Owner will review all certified payroll submittals and review and process all pay requests. 5. Site Visits: Provide periodic visits to the project site and final inspections of construction noting deficiencies, if any. 6. Start -Un: Provide start-up assistance for the lift stations. 7. Record Drawings: Prepare "record drawings" of the completed project. The information submitted by the contractor and changes from the Contract Drawings made during progress of the work shall be used in preparing "record drawings" of the project. Submit to the Owner, upon completion of the "record drawings," one (1) set of mylar drawings. ETCY-193\APPEND-A.671 5 B. RESIDENT ENGINEER SERVICES Resident Engineer services shall include on-site observation of the following portions of the project: Klaus Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer The construction is estimated to be continuous for six (6) months. If the required construction extends beyond six months, then it shall be an increase in the scope of work subject to renegotiation of this Agreement for both cost and fixed fee. The Owner will provide resident inspection for the Twin Lakes Subdivision sewers, lift station and force main. Resident Engineering Services shall include: 1. Provide the on-site observation of the progress and quality of the construction work. Observation is intended to determine, in general, if the work is proceeding according to the Drawings, Technical Specifications, and Shop drawings. 2. Provide liaison between the Owner and the construction Contractor(s). 3. Conduct meetings with the Contractor(s) and the Owner on an as -needed basis to monitor and review the progress of the work. 4. Witness all tests. 5. Keep daily log recording construction activities. 6. Review Contractors' estimates for periodic payment for compliance with established procedures, noting particularly the work completed and material delivered to the construction site or at approved off site locations. 7. Initiate change orders and working drawings required to meet changed conditions. 8. Provide interim and final inspections for general conformance with the construction documents, and prepare recommendations on acceptance of the work. 9. Construction Contractor(s) will be responsible for surveys and layout. Owner will provide survey party if requested by the Resident Engineer for checking. EPcx.19RArrFxaA.671 6 APPENDIX B ADDITIONAL OWNER SUPPLIED INFORMATION AND ACTIVITIES Information and activities that are not in the Sverdrup scope or that have already been developed will be provided by the Owner. These include: 1. Survey for Twin Lakes Subdivision lateral sewers, lift station and force main. 2. Easement preparation for Twin Lakes Subdivision lateral sewers, lift station and force main. 3. Hold contract for surveying services including easement preparation for the Klause Park Trunk Sewer Rt. K Lift Station and Force Main Rt. K Gravity Sewer 4. Easement acquisition for entire project. 5. Handling of any project funding activities and documents. 6. Request permits with technical assistance from Sverdrup 7. Distribution of construction bid documents, including addenda. 8. Review of Contractor certified payroll submittals. 9. Review and processing of all Contractor pay requests. 10. Resident inspection services for Twin Lakes Subdivision lateral sewers, lift station and force main. EPCY-193\APPEND-B.6/1 1 APPENDIX C COST ESTIMATE SUMMARY EPCY-193/130671 DESIGN CONSTRUCTION Phase II Phase II Phase I Office Resident Labor Cost Estimate Estimated Manhours 1,322 352 1,040 Average Rate, $/hr 21.50 21.50 21 Salary Related Expense Factor 1.428 1.428 1.428 Salary Cost $40,590 $10,800 $31,200 G&A Overhead @ 92.5% $37,540 $10,000 G&A Overhead @ 43.5% $13,600 $78,130 $20V800 44,800 Subcontractors Borings $7,000 -- -- Other Reimbursable Cost Summary Auto Mileage 560 560 3,900 Lodging 300 -- 6,500 Travel Meals 180 70 3,300 Duplicating 19250 1,370 Telephone 100 50 Miscellaneous 50 70 600 Word Processing 100 50 CADD Design 7,800 800 CADD Plotting 600 180 Micro Computer 250 250 1,800 Other Cost Total $11,190 $ 3,400 $ 16,100 Fixed Fee $9.380 2 500 $5,400 Phase Total $105,700 $26,700 $66,300 EPCY-193/130671 T PW U 00 et g F 00 W 00 00 O000O0 N M N •� �N N —4 W N N o0 00 N o0 �D 00 et �D d of b4rz w w � .3 4 A rz •b 3 �z Nbo w ba 0 ED -zl CIO Ei4.a obo ° w a v) C7 A a v� a, N O z O W d mw IV H 0000 9-4 Nt M • � kp 00 U c� 00 0 F .� 00 00 a W •p •� V1 M "O 00 cNn 00 "t Wr W 00 00 qt It o U E O O E U .x 3 b OGj ao bbo .6 cqs z U baU ti p U 3 � �.�.� cd GA U V a W rU N Initiate Project Easement Aquisition Begun Preliminary Desing Complete Bid Documents Complete Advertise for Bid Easement Acquisition Complete Receive Bids Award Contract* Construction Complete Project Closeout APPENDIX D SCHEDULE January 31, 1994 March 28, 1994 May 2, 1994 August 1, 1994 August 1994 September 1994 September 1994 October 1994 August 1995 November 1995 * The Appendix C Cost Estimate for Resident Engineering Services assumes the Sverdrup Resident Engineer will be on the site for one continuous 6 month period during the October 1994 to August 1995 construction. EPCY-19AAPPOO-n.671 1 AMENDMENT NO. 1 to AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI and SVERDRUP CIVIL, INC. Dated February 24, 1994 Note: All other terms of the original contract remain unchanged with the exception of the following: Article 3 - Compensation and Payment On page 3 under A. Cost - Replace the second paragraph with: The total cost (exclusive of fixed fee) is estimated to be $201,550.00. The fixed fee shall be $19,280.00. The total amount to be paid for design and construction services under this Agreement shall not exceed $220,830.00 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95 % of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. A cost summary is presented in APPENDIX C. Article 11 - Contract Documents On page 9 amend Article 11 to read: This Agreement consists of: 1. Agreement for Professional Services dated February 24, 1994 2. APPENDIX A - Scope of Services 3. AMENDMENT 1 to APPENDIX A 4. APPENDIX B - Additional Owner Supplied Information and Activities 5. AMENDMENT 1 to APPENDIX B 6. APPENDIX C - Cost Estimate Summary 7. AMENDMENT 1 to APPENDIX C 8. APPENDIX D - Schedule 9. AMENDMENT 1 to APPENDIX D 1 Amendment No. 1 Page 2 Proposed by Sverdrup Civil, Inc.: Date: J'WL Y Accepted by Ci of Cape Girardeau: Robert B. Barbour, P.E. Vice President ):?���ATTEST: Auv� rX 0� Michael G. Miller City Clerk City Manager Attachments: Amendment 1 to Appendix A Amendment 1 to Appendix B Amendment 1 to Appendix C Amendment 1 to Appendix D AMENDMENT 1 TO APPENDIX A SCOPE OF SERVICES JUNE 1996 Add: DESIGN REVISIONS RESULTING FROM EASEMENT NEGOTIATIONS A. Background and General Description Design documents were essentially complete and were transmitted to the owner for final review on July 14, 1995. Prior to completion, a meeting was held with Twin Lakes Subdivision property owners to review the proposed sewer routing. As a result of that meeting and in response to other comments received by the City Engineer's Office the drawings were modified at least twice prior to July 1995 to accommodate property owner requests. Subsequent to July 1995 additional property owner requested changes have been identified as the Owner negotiates easements for construction of the work. Amendment 1 modifies the bid documents to incorporate those changes as identified in Attachment 1 to Appendix A. The type of revisions vary, but in general consist of relocating the proposed lift stations, designing culverts where permanent easements cross ditches, shifting manholes and sewers to minimize property/tree damage, and shifting of temporary construction easements. All of the revisions occur in Twin Lakes Subdivision, the Lewis property between Route K and the subdivision, or on the property recently purchased by the Christian Faith Fellowship Church along Route K. B. Tasks 1. Coordinate with City surveyor to provide 1 " = 50' scale ground surveys to supplement the original surveying along Route K. Four (4) manhours are allowed for this coordination effort. Relocation and redesign of the Lift Station No. 1 area and access road is required to accommodate the Christian Faith Fellowship Church. 2. Visit the Lift Station No. 1 site, to verify mapping and to finalize the new lift station location and sewer line routing along Route K. 3. Make minor revisions to the project specifications to address property owner concerns of removal and protection of existing improvements and landscaping. 4. Modify detailed engineering design of the sanitary sewer lines and Lift Station No. 1 as defined by the Owner in Attachment 1 to Appendix A. 1 Appendix A Page 2 5. Revise the previously prepared geotechnical investigation and report, to identify subsurface materials expected to be encountered during construction of Lift Station No. 1 at the new site. The effects of subsurface materials on trench excavation, temporary excavation support, backfill, and ground water control will be discussed. The boring cost in Appendix C is based on one boring drilled to a depth of 25 feet or auger refusal and sharing mobilization costs with another project in Cape Girardeau. 6. Revise the previously prepared construction cost estimate to incorporate the changes listed in Attachment 1 to Appendix A. 7. Provide limited technical support to negotiations. It is anticipated that negotiations over the Lift Station No. 1 site and access road will be required with the Missouri Highway and Transportation Department (MHTD), the Christian Faith Fellowship Church, Mr. Lewis, and Union Electric. The costs associated with this scope of work assume the City will take the lead in arranging, conducting and recording the results of the negotiations and contacts. Sverdrup, unless additional work is authorized, will attend one meeting, provide drawings showing the new location, and arrangement of Lift Station No. 1, and will modify the drawings one time to incorporate review comments. MHTD acceptance of the access road indicated in Attachment 1 to Appendix A is assumed. 12 manhours are also allowed for MHTD permit documents. No time has been included to coordinate with the U S Army Corps of Engineers as it is assumed that the existing Section 404 permit will not be affected by these revisions. No other permits are anticipated. C. Additional assumptions used to prepare the Scope of Services and Appendix C Cost Estimate 1. For Lift Station No. 1: • The configuration (size and arrangement) of the lift station as currently drawn will remain the same at the new location. Only minor revisions will be necessary such as stationing, elevations, coordinates, new grading plan, and new access plan. • The additional length of the force main will not affect pump sizing as currently planned. • The additional geotechnical investigation will not indicate modification of the structural design. 2. The four culverts requested in the permanent easement along Veterans Fork Creek will be designed for a 25 -year storm event. The Rational Method will be used for computing the discharge and the culverts will be sized based on inlet control charts by the Bureau of Public Roads. 3. Stationing of the gravity sewer trunk line along the Veterans Fork Creek will remain as currently numbered. Stationing of the force main will be modified only as considered Appendix A Page 3 necessary for construction contractor understanding. 4. Only the changes listed in Attachment 1 to Appendix A and an allowance of 16 manhours for two additional minor revisions related to easement negotiations, are included in the scope and cost. ATTACHMENT TO APPENDIX A '06/04/96 03: 40 'C314 770 5110 SI-ERDRUP SVE --- Rl-RPRT FOURTH 2001/005 .` ?UN -03-1996 16:12 CITY MRNAGER-CAPE GIR MO 1z r.alia� FACSIMILE COVER LETTER �x;zAP r .•�` T1 'o ' �C � TMa U�� I Olh j DIVISION OF PLANNING RVIS P.O- BOX 617, CAPE GIRARDEAII, MoSERVICES 63702-0617 5?3 f3-) 334-8326 FAX NO_ �3 ) 335-7946 513 Number of pages including this page: Date: TO: Ctu'" lvesf r Bch FAX NO: FROM: a Rent M. Bratton, city Planner C3 Ren Sttink, Development Services Caordinator ❑ William Vaughn, Technical Assistant Stephen M. Johnson, Technical Assistant Stephen S. Williams, Housing Assistance COOrdi.natOr ❑ Rebecca L. Figlialo, project Assistant ❑ John D. Goddard, GIS Technician ❑ Jill S. Goddard, Administrative Secretary Na2ES-- ,._�- _� f �n tris V« L rcufe , %G d� �iG GtLy�JW. G �, 5fdtioo 6tG,S lirto�rut/y res wye +50. �`Yr. '�rlanfry area- pts- �., Ir -1... pLIrA E CONFIRM RECEIPT OF THIS FAX BY ( } PIiONE ( } FAX- OR -- IF YOU NEED TO RECONTACT US ON THIS MATTER• �PLEAASEE CONTACT ��. 1 r, A-T'r-AeLJI-►- 106/04/96 08:><0 'C314 770 5110 SVERDRUP SVE --- RVRPRT FOURTH ooq�/oos JUN -i= -1-=.o It; 14Z Lo co - co taco ce- z w LL) L u U- ro� 7Z NN " ku < z Ul -j w < j...... Z 759 4 4o 6Z Aa L JV•, 14.. J7 J V1 U-7 < Z uJ ATIT 06/04/96 03:11 %Y314 770 5110 SVERDRUP SVE JIJN-133-1996 16: 12 CITY MRNF40iER--CRt-t Uim rTu N Ol --- RVRPRT FOLRTH 0003/005 f 41 -�z LUC cc �al 7Z*;L7 00'09b 'T < w J � � � Q � � � Q�o ' Q•, j LJ c Z_* z ` od I f '6c co 0 o 0, oz 4- -2/ -t IF fy W CL "t uz gee-' + I cr G71 + L. +Z1 ;95-51111 Ame#04ENT 1- 3 106/04/96 08:41 V314 770 5110 SVERDRliP SVE ---- RVRPRT FOURTH 2004/005 oo CO J v Q UZ in cc r- 1-- �' t. � •` •` : >, i e��s� , r•+ate..;«'-' ` � .•.j fir••-= � � , K �;,� � - i• ' •. �, / •$: � . y. � 1 i . L. � l� ti J (•y / J „ /, Y ( f i 4 •-,'• tit r ` � ' frr>1(....•, ,� rn rn GO / • � ,U' �^- r• �' 77a11r 41 \� moi' : 1. � _ 1 �1 i t„W F f• r' � iS� ,r �•� .' M' tD j. % '•;F :rift`•; -irk j `/� t ; +:�'; i `'" - ' t.; t, S C, ' l �' J h•'Y 7 != r �'i = �-'•.. .ted -'� Ln 0 - t %I / ���. i�,;e �1 K f r ! ' t � f ? ° i i •i �' i,, j• f ,;l' .' �; ;' i i, ; ; i r>• Y df' s A-rr*c HMFNr `06/04/96 03: 4Z $314 770 5110 SVERDRUP SVE 1UN-433-1996 16= 1.J l-1 l T I'iM1�a-It�trc—�.r-IrC u src 1•N.i v t Ui U w c{ o o Q Ln Q� c-, Q- Aar lu 00'09 tp tc rill J NCE� - 1kitc o ZLu > 4Q a- -77& ! 1 ��• QN3 1 i --- RVRPRT FOURTH 0005/005 mklvii� �z �s -9w ,041/ OO'9S —'� 'OL 4 21 TI--IT01 � (71 05/19/96 08:36 V314 770 5110 SVERDRLiP SIVE --- MAY -2t-1996 17: 15 C 1 1 Y 'li= NAGEK—ca+r c u- --RV RPRT -FOURTH C 0 01! 0 0 6 FACSI MILE COVER LETTER ,aArq , `` of S' THIi Jf•a CN j J LZ OF PLANNING SERVIC p.o. BOX 617, S DIVISIONCAPEGIRARDEAU, MO 63702-0617 573 334-8326 FAX NO {5�� ) 335-7946 Date Nom= ,, Of pages including this page: _(o FAX NO: geed r or FROM: E3,ant H. Bratton, City Plsna ❑ Kers Eftink, Development Sezvjces ceordirsa`or C2 William Vaughn, Technical Assistant Stephen H. Johnson, Technical AAsista�e Coordinator ❑ Stephen S. Williams, Kousin4 ❑ Rebecca L. Figliolo• project Assistant ❑ John D. Goddard, GIs Technician 13 Jill S. Goddard, Administrative Secretary !2� • red is NOTES : �slid 0—S5. ions r_ -- A' pus shi �ss0 t_.+ fi.. P1t715-idY t ... ��� 6d l hC _ `O. �_ _►. Gs.�or }fG le. to��tcn'--� norm � ��� , - . )14ice NES pbulet' PH( t COFTACT �r OR �--- PLEASE CONFIRMS RECEIPT OF THIS FAX SY jq PLEASE IF you NEED TO gcCONTACT DS aN THIS LSAT:* r_/ \ 13wr4-...,...-, rr 1.-/ 05/29/96 08:36 '8314 770 5110 SVERDRUP S�r_ --- :(VArNi rULAitl 4j U U Z*./ U U tj MAY -?E; -199b V:� T 4. ............ . . ......... .................. . ... ........... .. . . ....... . . .................. ............ ct ----------- ------------_--- --------_-------------------- TRU N'K - - -------------- TL--) �3 ----------------- • • N ------------- Q2 Z) T- s. 4. .. .................................. .... . . .............. ... .. . ................ .. ...... ............. ... ........ . ............ ............... SyE F T) i-______T EX. LINE STC. L t T MANHOiF- .. . ..... .. ....... ..... ... 00.0c 05/29/96 03:36 '$311 770 5110 SVERDRUP SVE RVRPRT FOL-RTH 2003/006 MAY -2E-1996 17:16 C: MHNHUr_M-t-r't"c i NI b .... _........._ _............... 7 +07.2 '•Y• - .o-. 0 24 - --- _ ,:rrr: �;:•j�;= J _� ov �f-1?`c./�dfe �Z Fe/%vsh���ic�':�j Pr -o ............. ................ .. ........ LZ J 4 -on i i MANHOLE t ' t � _ -'-- Ex. GROuNO L ! NE 400 -OC -05/29/96 08:37 %Y314 770 5110 SVERDRUP SVE RVRPRT FORTH IaOO4/006 MAY—D�--11596 re; in — •' . - ••' " .. -- - -- - -- — Lr) Ln . . ........... ....... .............................. . .... .. ........................... .......... .. . . ........ . ........ - - - - - - - - - - - - - - - - - - - - - - - ----- - - - - TRU .............. T L A 7+07.2 .......... 3.24 A4 00 CL O ................... ... ......... .......... ..... .. .. .... . ...... .... .... ..... ... .......... FX. GROUND LIN S70. TL -3 MANHO�,E- -3 .05/29/96 08:37 V314 770 5110 SVERDRUP SVE C AY—c6-1990 1'e: 17 ---- RVRPRT FOURTH Z005/006 017 Cr �- q rC.:::� •; ;.�,;. ' � ire b:'� � ���` °�' �) T= _4" UNK F STA 3+74-0 T STATION NO. ';: it -yr•= j~ / N 538223.16 ROUTE K g FOR t 082370.71 _i LS -1 (SEE SFtEET TL -C[8 E NO -1 '�r, ` >t' , % ♦ STA 3+59.9 (TRUNK L INE - N 1) STA 0� OQ (FORCE M N 538229-6C- (SEE 38229.6E{SEE DETAIL, E IQs2383•27 sHEET TL -C-' t.K._�..�. [ RCE MA i N (S—EE S H E T T 1... STa j�59.9 (TRIiNK LjiNE NO ))= STA d+0 (FORCE MAIN rt0...` ;A 4007Qo ,. VALVE CHAMBER S t t F L 391 n0 7 390.00 y 380 _r— -- ; g✓ c ;� • 05/29/96 08:33 $`314 770 5110 SVERDRUP SVE MPy-28-1995 1?:1? CITY rn=titir'.GEK-c�r'� ULM I',u R�12PRT+FOURTH _-v 20061006 F J 3 N d9'39'11E OZ ,r i i 95.49 t t ILI��� J W cv 1 W � N rte; 1 _ SED ao N z DEAU J 0 0 y t N � rn J j 7 - t TRACT tiG. r 4.300 ACRES r r. J � , , ' a O ' O d r O O w SECTION 34 o 1 ; SECTION 3 r h , co r O NORTH LINE OF PROPOSED ' z CITY OF CAPE GIRARDEAU r PERMANENT SANITARY -_—SEWER EASEMENT 7279'43^ ` - W_ � J N 89'39 1, " E 47.7 4. J() TRACT NO. 2 0.00 S 89"39'11" w 434.00' JVA O O N N rri CD J ca 3 1 RTH RIGHT OF WAY LINE 7 42,07' MISSOURI STATE ROUTE "K- N 72'19'43" w POINT OF BEGINNING TRACT NO. 3, SET 1/2" IRON PlN�o o�lo A -f` ACH MEN'r 1-1( - _ W 7�1 dk t( a if iti/br(mkog-) i-oo A H in at, may, P -et t4i 46 M q U, A I a =lf -- -,4 t AA-V�� �kC", O,- P.t�f6 C �G! -y'� `/'' JOT- g�� EV/SE (5&M ATrAe-1#M&-JT 1-1 x(70 tYoT REVtSE 11uc �t (,ate-� �-7-2 �7- 4° 17 SctiFARF '�' SN/FT T E. o�� �rry�tJoc� � ovoi4� �gr_n � G �a dri vcwa� z of 2 �irt'C�1cr� MINT3 :; ___............ ..... :.......... ..............__..... .- ....... ......_. _...._.._ ....i OSL•@f SN r � N ` Q l 00 ; t azL', w z• Y Z. `1- , • 1 i__ Z. —t-. .OI 00s,gi' N •t I �t 1 � 1 i.. � _I. N I i r r z I I M _._., Nei �b i i � •,�•,.• ..^� �'--.------- - - -- - - - 8F h i Ir5 �r rf; I :n S I M lu I 1 I I I I Oil J O In O W N W N W Z LL Z O W: OJ ( cf t O U Z O N F? WLLJ cr ry W F to V, Ix!In LL W tD Y T O O> co W • O 4i ti L8A- 14 �TA 1+92.8 N 543342.67 �0' `j / E---1 08 2 12 5.5 3 7S,, S, LATERAL .......... I a ......... . ...... t8-3 /S T A. 3:4- 9.7 (LAT. NO. 8)= /STA. d+00 (LAT. NO. ; 8A) N '543149.91: E 1'082125 6 1 rn dv, 41 ............... L8-4 STA. 4+92.5 3 -4 A-TTAr- 14 M N ---E- T 5 ET1082298.29 oi ..-l-Kiifi STA. t64ALd ''— M 542868,3bv - /:E' ",S�c` =. Y\`•f �;5�� `. ` is ` l �•: � � c, xr-... � � •- , � �, ff �: � +� .r,� � S .� :•:iii � '.'Z�•� :`�[� > ;;. t te' ix =fir S r. _ J : y c �Ec :y. , -23.6,# Aj: 6)= = "fC,4'�! �''� ` T�':=;:o€. r: ` t8.3Z ��r:. ; < .�,•: STA. '0+25.7 STA. 4+72.0 (LAT.6B)= yx .` N 542727.04 STA. 0+00 (LAT. 6C) -✓' -� ;1$ ;!%'; E 1683720.25 N 542642.54 E 1 084020.70 i � v �..F„! :��-. y�'y �. r• i � � . „ - "' .�� t �« .,C% � 4 �c..i iy".>- f�.r„+:1.+ i,'t�,�%:•aa�2'.f;e.:....,�,. � f• • "' .—� W- 17 / r < . e=•1 v:•' � ..- �... _.;-. rc j,g .! �` ..• y r...�"�r-Afj''^.t'•"-�.�-� _-`- _ tp^ � r,.s•<" ;.. ?:..... .� .c '�� <.`�i -••%����,���SS-.ate' "`.rrfh}r `-j'. ♦t,�{..'._�`:.�,�e.:.,.......,,�,..asr..-sm'�' f X..a.� �''J'_��_ , , t x�.`Y �:c,v-v''�t \\�Y� ..�',: t ; r. ` >' .,yt' � �.i� t : r: :5---. r . � ..............•. �: i f ,�: l�t: , • �.i ! : . \�'`C"�` a.e [! � �r�'•. ' �''.:' . �. �'i.:",• :' c� =�;�, —.► S•a •-L• + r.....-.. e i �.yy...u' r t�,,•� ! i 4,, ..��r.: f .. ~�`• \```:c.: Y'�r. ♦ ., - , t:k •� '4 \w. �+ � ..... ..�..-•-�..C=:'S•'�'r i'i? ! j-�-/"_♦ f �. - .i ~• `��... '-. ��y� Z��.r' • . V .....-• «. u''��. �. y�� -.-- .-.-- �•-S� ,�........ `R',%.�""' ._.., ).rte', .�. � --rN ..., �" t' � .f `. ' - .+. 1 ..-^•„,.=� �• -� .....„.<; ��t'' "- l �• S X .�.-" �� �..........__...�v�' ; _ � _ ,..FW.'Yi-•+ ." �_ mow. �<,�,.;- ir`vlt,�.,y� � ..r ;r::'.�:'�`;'� ���.�•� � �-'tvv ""-...✓. ''t,! :�:;•�.,^•': i-'� r'_'� � � � � _ _ J � j�'�^ i `t`y� �,�-�'' '� ` `S',th"7c .LJ�+ ` :\ ,'9"; .,�•'-''" .,<:".: �w-cif„w'%Tri` --. _ :.f''^t” i t 5��.v, �,,,��' ,X`.�i•.-� - t .+t c J•... � }ate. � - a. A� " �, � "'�-"..'_'._'r•'f'` �. �J � < i .! ' .. �o � _�v`+-�,, :.'� � ,��•�'. i � \ .._.. ._ _.� _.. � X N "•r„r''' .,...••----« ' � ���, (. 1 ,� •Sc .• y . � ? • .s�.' j) _, Yt •� >� Y � ✓ i' 1 At `�',:c_�y `�0.-r:T''✓-'%'v..: •%r' • `+x.: ' t-♦ �; ! ^.-r' �j:.a�:�x.�� .�.-. ..., .-'`'."` r`."� �! �j! � t r �", r <��''/'v ,• .c, ��, yam• �.!i �.yJ.• rc�.° :,.`�-`�':.s:. �•----...._..t:,\ ,3-.. w• ' �\�,fy,� � .. ��-.itr' �'.,:..�\ \ :' ♦,: 'i ,�.:= ' ♦"' "- ^` ,,.-'' i ' ` �, . 7.' 1' 1-;-,,.: ' r ',` ...:r✓/. l::y y•-. i ': .1:'�.'�i ' ' ,�.. lei-],-f� .- i f-a"-`--�.,f.< .L.._. .•,.•� :.G;N.-ice .:: •/ i' ��. :VN . i '• .; � 1. ..r .. M ♦ '`.! �:-v -( •�. l % M. .j r`• f i ,V``� r� .` -, ' J r .;2K ,-�/r • .Fry;..`).'/' .'f�^:... :.t._ F _ __ /x' %'S! i,` i-�'�r �i ]fi.�Lr• .i L' r�'� - iJs ' �/ J'�f'/�,'yi,! i a�% !':R i.«.._.� j;'.G.._.. «.�/ .�17�y, b� •Gl^' { •�i «!'Y17«�.'�,�y�,}'•i1-'�'�' �y' -•' �,�---> Jif' J': .:�`. ..... J.�.�r �.- .....« .�...•..•.� `.,�:. �. �\�... � �'.. ^/• � :,j� .:�; �..y - A�...��..«•.'_� \T.t.�,,r..,: `^^ :r > ��R r� �•-�I / : i ', , < T 4.1 .3 ., :. `—" S - ---- -- TAS. 2+3 n4rte,`"� ` �� PI Sd7474 riR I +� Gregory A. T bin, l.D. Diplonmte, An ericaBoard of Plastic SurN 'ry, 1 c. David M. Deis M.D. Candidate, American Board of Plastic Surgery, Inc. Walker A. Wynkoop, M.D. Diplornate, American Board of Orthopaedic Surgenj, Inc. February 16, 1996 Mr. Steve Johnson Engineer's Office City of Cape Girardeau 401 Independence Cape Girardeau, MO 63701 Dear Mr. Johnson: MIDWEST PHYSICIANS CY S U R G E O N S Michael L. Jones, CHE Executive Director/ Chief Operating Officer Sharon S. Newman, Administrator I am writing you to request a small change in the sewer line placement on my property in Twin Lakes, Cape G,aFdir My address is 118 Pebble Lane and the present plans call for the sewer line easement to be within feet from the southeast corner of m house. I have one over the plans with Mr. Lester, the city engineer, %._ Y g P ty g , and I feel a simple adjustment would be to move manhole L4-5 to the south 25 feet. I use this direction south in a general sense, expecting the present, general north south direction of that pipe to be maintained which would place it approximately 25 feet south and 2 or 3 feet east of its present location. This would significantly open up my back yard, allow me to put an addition on the back of our house which my wife and I have already verbally planned without worrying about the easement to the sewer system. Also, it would open up the back yard for possibility of a swimming pool or garage if myself or a future owner would like to utilize the yard in that way. Presently, the position of the sewer line splits the one acre lot into approximately a .6 and a .4 acre segment which I think you can see is basically cutting the yard in half and rendering a significant portion unusable. The other property owner involved is Keith Boelier at 164 Pebbic Lane. He and I discussed the move, walked off the changes on his land and mine and he is in agreement that the change would be beneficial. He has countersigned this letter below to verify his understanding and agreement with the request. I await to hear your response. Thank you in anticipation of your expected cooperation. Respectfully, Walker A. Wynkoop, M.D. WAW:bjs 1� Keith Boeller RECEIVED DIViSlION OF PLANNING SERVICES DATE 3 — i4 — 9G 8Y lf5ii A i -w N MENT !-17 300 South Mount Auburn, Suite 100 • Cape Girardeau, Missouri 63703-4920 • (314) 651-4488 • Fax: (314) 651 \ ra A3� mw _o x w o .(- zwiaz ` • __ ' __ ... .... �� t 041 �* ��. id N -3- W 3 1 j ow ''i / it i pv,oN 01 1, I I Oj co ) a t a t �, r w . ggh " J ! ... ..._i ^__:. is •...�.-.��`__. l i 4l fai f." .Z co (0 CO f N ^, t K� r O co W l 1 a P 0 .. l .'til �Q'.. �+ P O ,, / ' :. y / un J V) Z W r' Y' J I I ( �y i / :w N Z W r .r t - t s f (f ,F— J tD MT '� At s' -''_._..... .. f 'Z80 113co to kD+ N 01 Llotco 2` Q...in.. - r� a i, N to Z .4J / *'."Wa LO Go V ro O v o i to J tnzw ,f v O #_ �^ 1 Vit' 1i .`\=L�-v �.+"•' 1'�. .;St h', J J N N i f i N 1 �` 'lJ _ .'( E'•` i` '..t O aD 0 LO :., 3 \\ ..................... :'Z20'1 M y \ n 4 lE G , , v � 1 c a v N c0 P + r_ \ { N N a t0 N W ♦ C: ! O �. n� i f% iw J Vl Z W V) �, rY J p J Z .. Z.� W _ U WHO W w O t p i I in QLn U w IT W w Q LU LU I.. a° I I �UW ^ r , — Y J , Q J a~ r ( o¢ az r. r z d , f xrw i J J. F— i — • jox oo ' Q, _ + ,Z W 3 Z cr LUP P / �cnr�q,CNME1�1T (-fig ;AP w 00 'nN N i + � N co :. Ln Li M M P O I I a _. - L iJ IN r I t (Tai 4-) (03HS S'IHI) 3NI I HDIVY4 "2 M co CD C5 < CL C, -j c Z) U- CD Z 14 CD I li Ln cr < Ln + no A M 00,+ uj Q- + i CD < > LL a- 0 , -: : <Z < z Z . _ o o i i._-.... �.� - - - - __ ___ + c1 98 O£t, I j ID >;, LJ (I, rT > CD V "0 a 0 ,z ;o + a, AM Ip/O7 n. -J CO C) < + + IO 9'99+ < Cr - Ln LIJ- Ln 00 I co >0 0 00 0 (D AM Lu it z C) �rl 0 + -j IL 00+ ..3 < 0 ck: x w 7 Ld oo (r -j _j z ::) L, -, Iia Cr z Lli C) -. _. —� a ----+- < 994 3A ), +2iQ. -3sxi nos n O w w z O 0 o v, z 81'61 b 41 0 C> -d C) C) Ln LO C, C) Ln co CD Ln --- c4- -- - ---. - I -- I IC' L HMENT 1- Iq a i ! A IA - W 2 t U 00+ O73J Am J o - N z P =O \ N 0i U LL o w W W 000 {{' 0 J 2 G CIOQ -� �9 r; II 0 3A - -Z, a vi - - - - ----- I Z I ', O9 JPW--- ---�, Bt•6tb 'j O Q p J .. ... .O .. N O O ' ._.--f Ln z a X W U > a W = J O _. _.. . _. ... _. -... O.O ...Ln_ Vl Z Qr 0£+' 3AM! Q - _Z'bI+ + O p W + - --- — Nv=-- - - -'� - ----- - v F z v U D p Q > O _ 0 J d \ �y Q J ap O 1 O LL o o Y _ J - --- Cr Q � 0 m — 1 3NV1 3199 d'T0 �- -- 59'9bb'� d ---- M -- ----- ----- ---- -i SL + W o O �•\ SAM — ~n z 0 \ B 3 CO 0 �. /QJ O n K J J —N Q J O LL _ U z LL > ' Q U tD- U en Nco — m AM m - 0 lKdH00-TO O---- ---� d 0M :2 W — J ` 170'800-. .i �O ZQ Q� ++ P d J i X00DO J V) Z LL p Q ----- - - - -.. ---1-- --- CO z1iP � Z S v O F+ U co Q > J , P J o_ o V _ v o a9 w 0 o a m -- N ---- - Oo0 •U "0 oM O o `+° M a o 0 0+ i ATTACHMENT !-ZO O O co 1 N ' 00+ O 00+ Z9'8Zb'1'd +o � 89'66£" o 0 0 f o o 0..-._ _ 0 0 0 ``- y 4,w o 0 0 0 Ln c M N O O O PROPERTY/LCAT i INES (TYP) .. . .............. UT I L I T IES ARE' -LOCATES) !GHT-OF-WAY OF ANE. SEE GENERAL SHEET TL-GOI. .. . ....... ..... ........... ..... hr -ct w, /4 in V;C-;,7 i tjv L4-8 err S TA. 14 + (T--8 S' within f Morar L.L E3 0" Ln N 541942.01•,, 4 -E 1083283.02 Is, L4-7 STA. 13+38.0 N 54 188 1.95 E 1083156.74 LA -15 S T A. 16 + 6 4. 2 20' N 541848.53 E 1083444.87 00 Z-4 - Lj; AN: i ''=50 1 L P 0 � i,Lc': I =50' HOR!Z. =10" VERT. r4 ATrAc (4 M IE N T' 41 c c NOTE: EXISTING UT|L|T|ES ARE LOCATED W|TH|N RIGHT-OF-WAY OF rAPmcT / xmF rcmco^/ 7_ /~«_`^��� ~ L ~ I LA -56 All of Lot 5 and the South 167 feet, of Lot 4 in Btock 1 of the Resubdivision of Lots 27, 30, 31, 32 and 35 in Twin Lakes Subdivision in the County and City of Cape Girardeau In the State of Missouri — 23.67' S 89'03'17' E S 07'55'22' E 10.12'15.18'25.30' i p 77.27' to 31.6 N 88'14'56' E 101.15' N 07.55'22' W S ea•1a'56� ww -101.73' o o a N � 44.27' R r*1 ..,' /S--88'14156 W <"*3 7 - 2 '12' Q v 3 32.22' 'U o I S °i � i. 54.18'32' W 32.05' O+ o y � 15' Wide 2lo Sewer Easement 7,369 'sq.ft. - 5.00' 3 QIN N 78'40'35' W o 15.00' N 78'40'35' W P T 0/4l H 5.00' S 78.40'35' E fC 3 I t ON o j ti Paul 13 .,I I and 5.00' to Helen Hawkins N 78'40'35' W l v 21.43' Book 697 /O1 N 11'19'38' E Page 590 3.s . l \w / c, 3 Temporary Easement 13,409 sq.ft. j O+ ti N 542386.3049 E 1081739.2631 to / rl A � a+ 36.11' A � / J (11 0 J GRAPHIC SCALE w 0 26 so 100 t � � ( IN FEET ) 1 Inch - 50 Z7 Drawing prepared by City of Cape Girardeau Engineering Division 2-26-96 PE/TE TEH a TTA HMEr�r T 1-23 O co - I O U-) 10 \-­--­­,­-,-. I CL ................... . ........ ......... ....... . .... to w 0 + C) V) I. - c 2� 0 F- pn cr [IT t.. Z z w idAl) k. U.- \-­--­­,­-,-. I CL IT to w 0 + C) V) I. - c 2� 0 F- pn cr [IT t.. Z z w idAl) k. U.- 0 C) J lf�b' T Doo'Zoo, I NI UJ LO + -j C) uo N 00 Ul CD 14; ri r (A '30 0 + Go + + :41 _j tn i-- 0 (A z La V) O. C J." C) ...1:•-..-... .... Ll Q \-­--­­,­-,-. I CL IT z w 0 + C) V) I. - c 2� 0 'o pn cr [IT t.. Z z w idAl) k. U.- 0 Q h 4 U - J lf�b' T Doo'Zoo, I V% UJ LO + -j U. uo N 00 Ul CD 14; ri r kn '30 0 + Go + + :41 _j tn i-- 0 (A z La to V + �,,t7 0 t < ........... . ... ........ . .... . T I ...... . ......... . .. . ..... CD CD cli �p )92 ZSO 13 Z " .14'.— ; .I -" � 3 CL IT z w 0 w — C) V) I. - c 2� 0 0 -1 ........................_-_`^r cr [IT t.. Z z w idAl) k. 0 0 Q h 4 U - z w 0 Doo'Zoo, I V% LO U. Ln j r en a; 0 + Go + _j 0 (A z La C) cg :+ 13.1M [IT 0 cn z ou 6.i n - Ln cg :+ 13.1M z ?Ll \1 NNr o vC Ln Ln Zo o V o j < a P N J nZw 3. Cv Z W = .. , r i w r . i ............ .. .... _ _ _... __ . _.._....._. f } li k RIGHT-OF -WAY LINE fTYPJ —J' a Jui J Z co to a W \ ;r t ra vii<'` T Vii► f� eZ- w t- w \J N Z W t U !Z Z Z o cn `C J 'p' rt l� 1p O z � o00 Ln mc. / 1 �i• o \ t f ( / .• - 1 L1„ :/ Z O+ O to ',- / .. OD Q'0 ° 1. J w v o o' ao v ' ( v t a to M O M 23: . i. .. I a J N Z W/ ./ TTA NM E N T "Z a a (n 1 (: �, - . r '; J N Z W {I.z ' C� o AMENDMENT 1 TO APPENDIX B ADDITIONAL OWNER SUPPLIED INFORMATION AND ACTIVITIES June 1996 WIN 11. Additional survey along Route K at the new location for Lift Station No. 1. New information to be located includes any new topographical changes, the new access road location, new power pole locations, and new church sign, etc. 12. Acquire any new easement documentation for the new power pole locations impacting the new location for Lift Station No. 1. 13. Coordination with utility company for approvals of revised lift station and sewers location as described in Attachment 1 to Appendix A. 14. Coordination with the Missouri Highway and Transportation Department (MHTD) to attain a permit for the new Lift Station No. 1 access road if required. 15. Coordination with property owners for approval of revisions described in Attachment 1 to Appendix A. AMENDMENT 1 TO APPENDIX C COST ESTIMATE SUMMARY JUNE 1996 Add: Labor Cost Estimate Estimated Manhours 252 Average Rate, $/hr 24.00 Salary Related Expense Factor 1.428 Salary Cost 8,640 G&A Overhead @ 92.5% 7,990 $16,630 Boring 300 Soil Tests ._$0 $380 Other Reimbursable Cost Summary Travel $80 Travel Meals 15 Duplicating 100 Miscellaneous 50 Package Shipment 50 CADD Design 2,600 CADD Plotting 175 Micro Computer 50 Other Cost Total $3,120 Fixed Fee $2,000 Totals 1 U _X Q W Z W Q IL Q � O� W r cc ZO W = 2Z p Q Z� W Q N 00 — 00 r� M N I- N 0 r- N O O O r- N M N t0 N •- r .- C) N — r O H N � U •L U C (O N CO CO 00 O O It N I�d. 00 to O N N .0 C �G � U CD d p F- L N (O N d• O CO N 't N N N N .-- G� d r- — N C C W y = O L CD O) 'N Q O t0 C� t CL G Cc) s y o U y CL > L N � 3 � O i LL a O aL � LL y O Y N N °� C 3 y = o r M cn O o O Cn W Uo m U O c— a c > CD 3 o 0 Q H LU ca J v cc a� J E 3 O rn C 3 C ,� E N -C _ CD Y c m O 4)0 tL E (D O Z o Z O CO U > p U "O d m t m 04 N cn co O p N d OL U.L CL 0) L N L (n O > 0 O E m � co � a� a� � °' � CD ` C O m C W -p U U U` cn L U r y' D O O Z + cofC N E O co =ca .i U O 0 0'= L d to C cp y N Z p (V W CC lf) CO U O _ ca v O p {L O _ ;4 U O U d Qa) U U Q LL +. cc 4, d a) H U O U s U U a s c O u o 0 (n_> U co 3 4, L .. co 70 p Z L a +, J 't E -- (n C V 0 O (n (M U C CL O Q. s V) Y CD U U +0 O ;+� 16 •+� C p N U C Q1 W Q ar Y O N �G cu Y C O Y C L O ty0 d d d d = N d O 7 N U 7 O p >• �: (0 E- cc C7 Q Cr p 0= 0 U w 2 w 2 (n D: O] N V X_ 70 W Z WCL Q CL ON F. W C C Z = U W Z �a Z W Q M (O It Lo N In •- N H R N N U �L U C N .- 127 .- (O N N .- O N O � U � C C � L �(n U a� d L N N '-1' (O co (O O C 0 C W N �+ U � d t0 O cp y a� a� `o 0 O CL c ON > cu ' O 0' O CD >. co Y 0�0 CD ? O W O N (n LO � cn C L .-- U o cn a)CL _ m � -� fC y -j ch a� +`, y d d d >. O Y4) m 4l ` L O Z (1)Q: C 3 (C) J (D y O Q) Y O m IS) r ` a (n H O O p d m O O. >O co D 0 CCL m + J in 0 N� OOO O 0 (n 2 Ln Ov O > cr. ) c O Z > -Z) Y �a > � 'O 'CO ± 0 4w 3 p > ': �aO �vO—�Y' C'.Z O `LLIO�- C14 OT L fn �. -C U N O U) O d W O O U �_ L U) U) U O U y J OL U U U U s N U ++ t U U } a) � 0 U C U r Un U) � (� Un � -C 0 MF- s a 3 L V U _ N O off (n c0 _ N c0 Y —1 NC O 0 C E CD y O L cn F- > U F- _ -j (n m -moi Y N Y (n N M AMENDMENT 1 TO APPENDIX D SCHEDULE June1996 The project schedule is updated to account for previous delays. Initiate Project Easement Aquisition Begun Preliminary Design Complete Originally Revised Bid Documents Submitted for Review January 31, 1994 March 28, 1994 May 2, 1994 July 14, 1995 The schedule on the items below reflect the cumulative number of weeks after Contract Amendment 1 is approved and Lift Station No. 1 third party issues are resolved. Amendment 1 Modifications Submitted for Review 5 Owner Review Complete 7 DNR/MHTD Approval (4 weeks allowed) 9 Begin Advertising for Bid 11 Bids Received 15 Award Contract* 20 Construction Complete 72 Project Closeout 85 * The Appendix C Cost Estimate for Resident Engineering Services assumes the Sverdrup Resident Engineer will be on the site for one continuous 6 month period during the construction.