HomeMy WebLinkAboutRes.899.02-25-1994c BILL NO. 94-42 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 2 TO AN AGREEMENT WITH SVERDRUP CORPORATION FOR LIME TREATMENT AND SLUDGE STORAGE AT THE CITY'S WASTEWATER TREATMENT PLANT BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is here by authorized to execute Amendment No. 2 to an Agreement with Sverdrup Corporation for lime treatment and sludge storage at the City's wastewater treatment plant. A copy of said Amendment is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS DAY OF ^ , 19. Francis E. Rhodes, Mayor ATTEST: Gayle L Conrad Deputy City Clerk b*4 AMENDMENT NO. 2 ` to AGREEMENT BETWEEN THE CITY OF CAPE GIRARDEAU, MISSOURI and SVERDRUP CORPORATION Dated February 21, 1992 Note: All other terms of the original contract and Amendment No. 1 remain unchanged with the exception of the following: Article 3 - Compensation and Payment On page 3 under A. Cost - Replace the second paragraph with: The total cost (exclusive of fixed fee) is estimated to be $266,660. The fixed fee shall be $28,380. The total amount to be paid for design and construction services under this Agreement shall not exceed $295,040 including cost and fixed fee, without approval of the Owner. Sverdrup shall notify the Owner when costs incurred and obligated amount to 95% of the total estimated cost and shall not incur costs beyond the estimated cost without prior approval of the Owner. Article 11 - Contract Documents On page 9 amend Article 11 to read: This Agreement consists of: 1. This Document - Agreement for Professional Services 2. APPENDIX A - Scope of Services 3. APPENDIX B - As amended by Amendments 1 and 2 4. APPENDIX C - Additional Owner Supplied Information and Activities 5. APPENDIX D - As amended by Amendments 1 and 2 6. APPENDIX E - As amended by Amendment 2 SAENVIRONV08\1MAAMEND 2 1 Proposed by Sverdrup Corporation: Date: G. R. Pennington Vice President Accepted by City of Cape Girardeau: BY: ATTEST: J. Ronald Fischer City Manager Attachments: Amendment 2 to Appendix B Amendment 2 to Appendix D Amendment 2 to Appendix E SAENVIRONVOB\11T74UMEND_2 2 City Clerk Add: !kr) Page 1 of 3 AMENDMENT NO. 2 41 ;41 4 APPENDIX B PHASE I - FACILITY PLAN ADDITIONAL SCOPE OF WORK A. Modification of the Facility Plan to add a sludge storage tank and mixing system and negotiations with the Missouri Department of Natural Resources (DNR) to incorporate modifications to the project: 1. Eliminate 36 -inch outfall sewer from the Facility Plan. 2. Negotiate with DNR and provide written documentation that the 21 -inch Henderson Interceptor project will not be designed and constructed at this time. 3. Negotiate with DNR to determine required additional information needed to charge the Facility Plan recommendation from rehabilitation to replacement. 4. Develop preliminary design and cost information for a sludge storage tank and mixing system to be added at the wastewater treatment plant site as presented at the November 16, 1992 public hearing. 5. Negotiate with DNR and prepare a letter amendment to the Facility Plan to define the Lime Treatment System (Sludge Process to Significantly Reduce Pathogens) and Sludge Storage tank system as the systems that are to be designed and constructed. B. Geotechnical engineering services are required to determine foundation requirements for the lime treatment system and sludge storage tank to be designed under this Agreement: 1. Observe boring at three locations and prepare boring logs. Boring and geotechnical testing to be contracted directly by Owner. 2. Analyze data and test results for foundation requirements, lateral pressure, settlement and liquefaction. 3. Prepare a report, in memorandum form, summarizing the results of the geotechnical study and recommending foundation design parameters. SAENVIRONVOMI1T74UPP B l.! Page 2 of 3 AMENDMENT NO. 2 ® "' APPENDIX B (continued) 4e PHASE II - FINAL DESIGN PHASE ADDITIONAL SCOPE OF WORK ALTERNATE POWER CONCEPTUAL STUDY The DNR requires a source of emergency power for the wastewater treatment plant should the normal power supply be interrupted. Union Electric has recently disconnected the stand-by line feeding the Owner's plant. A conceptual study of alterative emergency power sources will be performed: A. Visit Wastewater Treatment Plant 1. Inspect existing power distribution system. 2. Review and collect copies of appropriate electrical drawings. 3. Review historical power usage (historical bills). 4. Take appropriate reference photographs. 5. Establish contact with Union Electric personnel. 6. Meet with Cape Girardeau personnel to get additional input on Owners objectives relative to emergency power and management of power costs. B. Develop conceptual designs for four basic alternatives. 1. Second Union Electric supplied emergency power line continuing secondary service. 2. Second Union Electric supplied emergency power line but changing to primary service. 3. Generator for emergency power with continued secondary service. 4. Generator for emergency power but changing to primary service. The conceptual designs will be based on the current control systems and loads, including the new lime treatment and sludge storage systems. Distribution of power to the various systems will be considered, assuming no changes in existing control systems or loads. S:\ENVIRONVOB\l1774\APP B 0% r 40qx AMENDMENT NO. 2 APPENDIX B (continued) nm Page 3 of 3 C. Development of the conceptual designs for emergency power will address these related issues: 1. Necessary modifications to the existing distribution to allow switching between the regular and emergency source. Automatic switching versus the current manual switching will also be evaluated. 2. Operating costs for continuing secondary service versus converting to primary service. 3. Potential for operating cost savings, based on currently available rate structure, for peak shaving or voluntary curtailment of power usage by switching to the generator on peak days. D. Budget cost estimate for implementing the conceptual designs developed under 2 above. Both construction and operating costs will be considered. E. Prepare a draft report summarizing the four alternative conceptual designs, the costs associated with each alternative and a recommendation on which alternative to pursue. Four copies of the draft report will be provided for review. F. Meet with the Owner to review the results of the draft report. G. Prepare a final report incorporating comments received during the review meeting with the Owner. SAENVIRONVOB\117/4UPP B Add: Page 1 of 3 t AMENDMENT NO. 2 4 APPENDIX D COST ESTIMATE SUMMARY S:\ENVIRONVOB\(1T74WPP D Phase I Phase I Phase A B II Labor Cost Estimate Estimated Manhours 100 78 188 Average Rate, $/hr $ 25 $ 23.80 $ 27.50 Salary Related Expense Factor 1.405 1.405 1.428 Salary Cost $ 3,524 $ 2,610 $ 7,380 G&A Overhead % 85 85 93 Overhead Cost 2,996 2,220 6,860 $ 14,240 Labor Cost Total $ 6,520 $ 4,830 Other Reimbursables Cost Summary Auto Mileage $ 125 $ 160 Lodging 60 Travel Meals 75 40 Duplicating 50 Telephone 40 Miscellaneous 150 50 Word Processing 50 CADD Design 120 CADD Plotting 30 Micro Computer 50 50 $ 0 $ 400 $ 650 Other Cost Total Fixed Fee $ 780 $ 570 $ 1,710 1992 Overhead Adjustment 1 700 $ $ - Total $ 9,000 $ 5,800 $ 16,600 S:\ENVIRONVOB\(1T74WPP D w A4 Page 2 of 3 o� a n. g 0 0 H VI OO 00 I'D N O c H U rr U on 00 Acj F 00 00 00 w v � C N N 00 �r� A W � w C� 00 00 4. ME.>::::: Zcz 14 w0 bA Omill cl 0 .� cz v ami ao W ' w .--� 0 Dpi 1-4 ccz a>_< o t` Q v cz o� a n. g 0 0 H x z W a N z z w �I w x a O N N N N 00 �c 00 cz V U Ct •� �O N Acj H a W U y W 0 00 It 00 00 �+ C W 00 N %O o0 'zt %O jr r W o ; o0 ` O cz C7 ).0 C �• o U .� 'A U w w" t.. O `< r'. a�ai GA G�q a R7 U a+ a) IM, M C14 C�4 .� v O v a� O t, O U U CO) Q a w a Page 3 of 3 0 a s 0 0 N Add: 4w AMENDMENT NO. 2 41 It V APPENDIX E PHASES II, III, IV SCHEDULE City approves design/construction phase July 19, 1993 contract and authorizes design DNR gives verbal approval of Facility Plan by July 7, 1993 pending response to FONSI Sverdrup presents preliminary flow diagram August 9, 1993 and site plan to DNR Construction permit application submitted to September 10, 1993 DNR Sverdrup and City present other documents As needed required for loan approval to DNR Sverdrup submits complete design documents December 22, 1993 DNR approves design February 11, 1994 Advertise for bids February 25, 1994 Open bids March 25, 1994 Award contract April 8, 1994 Begin construction April 22, 1994 Complete construction October 7, 1994 SAENVIRONVOMIIT74WPP E Page 1of1 February 25, 1994 Sverdrup Civil, Inc. 314 436-7600 13723 Riverport Drive Maryland Heights. Missouri 63043 City of Cape Girardeau P. O. Box 617 Cape Girardeau, Missouri 63702-0617 Attention: Mr. J. Kensey Russell, P.E. City Engineer Subject: Proposal for Engineering Services Ramsey Branch Water Treatment Plant Primary Power Conversion Dear Kensey: We are pleased to propose engineering services to assist the City in preparing technical specifications for converting the Ramsey Branch Water Treatment Plant from secondary metering to a primary metered supply. The scope of work is to prepare the technical portions of the specifications to convert to primary power. The City will use the technical specifications in conjunction with other bid documents developed by the City to bid and install the modifications. A detailed scope of work is enclosed. We anticipate the work can be completed within four weeks of notice to proceed. Sverdrup proposes to perform these services for the lump sum price of $6,430. The basis for the cost is enclosed. A payment of $6,430 will be due when the final specification is received by the City as described in Item 6 of the Scope of Work, or 30 days after submission of the draft specifications if City comments are not received within that period. City of Cape Girardeau February 21, 1994 Page 2 If the City accepts this proposal and wishes to proceed, this letter can serve as the agreement between us. Please have Mr. Fischer sign and return one copy for our records. Sincerely, SVERDRUP CIVIL, Inc. Robert E. Crawley, P.E. Vice President Enclosures ACCEPTED: t J. Ronald Fischer City Manager Richard C. Vedder, P.E. Program Manager CITY OF CAPE GIRARDEAU RAMSEY BRANCH WATER TREATMENT PLANT TECHNICAL SPECIFICATION PRIMARY POWER CONVERSION SCOPE OF WORK FEBRUARY 1994 As described in Sverdrup's February 21, 1994 proposal letter, Sverdrup will prepare the technical portion of specifications (including sketches) for the purchase and installation of the main transformer and metering transformers to convert the Ramsey Branch Water Treatment Plant from secondary power supply to a primary power supply. The city will combine the technical specifications prepared by Sverdrup with any general or special conditions, bidding forms, general requirements or other documents desired by the city for bidding the project. The city will handle advertisement, bidding, and all construction phase activities. Sverdrup's scope of work is as follows: 1. One -day visit to the site to observe the current power pole and transformer location for the new city -owned transformer. A pole mounted transformer is anticipated if flooding is an issue. 2. Coordinate with Union Electric to determine metering requirements and the interface between UE and the city. 3. Prepare technical specification for supplying and installing main transformer and metering transformers to convert from secondary to primary metering. 4. Prepare sketch type drawings to define plan, elevation and installation requirements for the above transformers. Anticipated 8-1/2" x 11" sketches: • 1 - Plan • 1 - Pole metering details • 1 - Elevation • 2 - Installation details EPCY-195s1404M W.430 1 5. Transmit one copy of the draft technical specifications and sketches to the city for review. 6. Incorporate city comments and transmit one copy of final technical specifications and sketches to the city for use in bid documents. EPCY-19s1400WWW.420 2 CITY OF CAPE GIRARDEAU RAMSEY BRANCH WATER TREATMENT PLANT TECHNICAL SPECIFICATION PRIMARY POWER CONVERSION FEBRUARY 1994 LABOR Site Visit 12 Coordinate with Union Electric 4 Prepare technical specification 24 Prepare sketches 20 Typing and project administration 12 72 x $85/hr. _ $ 6,120 DIRECT COST Travel (1 trip) 95 Phone 20 Word Processing 150 Reproductions 45 $ 310 LUMP SUM $ 6,430 EPCY-10\1404WWWAM 3