HomeMy WebLinkAboutRes.2143.01-25-2006BILL NO. 06-15
RESOLUTION NO. Q14
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 9 TO THE GENERAL
AGREEMENT FOR ENGINEERING SERVICES BETWEEN
THE CITY OF CAPE GIRARDEAU AND S. H. SMITH &
COMPANY, INC., FOR IMPROVEMENTS TO WALNUT
STREET, IN THE CITY OF CAPE GIRARDEAU,
MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 9 to the Engineering Services Contract between the
City of Cape Girardeau and S. H. Smith & Company, Inc., for
improvements to Walnut Street, in the City of Cape Girardeau,
Missouri. A copy of said Amendment is attached to this
Resolution and made a part hereof.
PASSED AND ADOPTED THIS ti0` DAY OF , 20nLl .
Gayle L.!�onrad, City Clerk
ayKnud son, Mayor
w
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT NO. 9
This Amendment modifies and amends the General Agreement for Engineering Services dated March 4,
2004 between The City of Cape Girardeau, hereinafter referred to as the "City" and S.H. Smith& Co.,
Inc., hereinafter referred to as "Engineer".
This amendment shall be for the purpose of performing st
preliminary layout of Walnut Street from Beaudean Sti
consists of collection of existing field data, preparing a
stakeout of the proposed center line and right of way.
SECTION I: SCOPE OF WORK
d. The project generally
proposed center line, and
GENERAL: For all phases of survey and design, the Engineer shall submit detailed design progress
reports with each application for payment.
Engineer shall:
TASK A — Preliminary Layout:
1. Collect existing field data to assist in determining the most suitable alignment.
2. Prepare a proposed alignment and submit it to the city engineer's office for review and approval.
3. Appoint a licensed professional engineer to serve as Project Engineer.
4. After approval of the proposed alignment by the City, we will stakeout the new alignment and
sixty foot right of way line at 100 foot stationing along the centerline.
5. Attend City Council meetings and/or Public Hearings as required by CITY to provide project
information to City Council and answer questions relating to proposed improvements. The
estimated design cost includes attendance at one City Council/Public Hearing meetings.
SECTION II: SCHEDULE
The Engineer will commence work within 3 business days after receiving written Notice to Proceed.
The time to complete Task A — Collection of the field data and the preliminary layout shall be completed
within 21 days from Notice to Proceed. The proposed centerline layout shall be staked out within 14 days
from the approval of the proposed alignment by the city engineer's office.
SECTION III — COMPENSATION
The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in
Exhibit I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the
scope of services outlined in Section I of this Amendment, CITY shall pay ENGINEER as follows:
1. An amount equal to the actual hours charged to the Project by each class of Engineer's employees
times the standard hourly rates in Exhibit I for each applicable billing class for all services
performed on the Project.
2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable
expenses shall be limited to express mailing or courier services, special copying services, legal
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc
Page 1 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
documents or other charges requested by CITY. Reimbursable expenses are not expected to
exceed $620 on this project.
3. Mileage at a rate of $0.40 per mile.
4. The total compensation for services and reimbursable expenses for each Task is estimated to be
as summarized in the following table. ENGINEER shall not exceed the amounts shown for each
task without prior written by OWNER'S authorized representative.
Task A Preliminary Layout $5,500
Total Not To Exceed $5,500
5. ENGINEER shall not begin any work nor obligate CITY for any fee prior to the date of
WRITTEN NOTICE TO PROCEED by CITY.
6. ENGINEER shall issue monthly statements during the course of the work, based on the actual
hours charged to the Project during the month. CITY shall pay undisputed portions of the invoice
within 30 days after the date of the invoice.
SECTION IV: AUTHORIZATION
CITY and ENGINEER agree to the specific work scope, schedule, and compensation described in this
Amendment to the Agreement.
CITY: City of Cape Girardeau, MO ENGINEER: S.H. Smith&Company, Inc .
By:
oug K. Leslie
City Manager
Date: /-1Cu
Date: / k -- U
By.
aul W. Ridlen, P.E.
President
Date: 1 CL 200
ATTEST: �'�G�" t3 F c'7
(SEAL) ,
By:
os h M. Leahy, P
Assistant Secreta
Date:
S:\CONTRACTS\Archive\Agreement. Cape Girardeau Amendment 9 - Walnut Street.doc
Page 2 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 1
STANDARD HOURLY RATES
LABOR CATEGORY
PROPOSED STAFF
NAMES INITIALS
HOURLY RATE
Samuel Smith
SHS
$150
-Principal
Engineer IX
Paul Ridlen
PWR
$120
Engineer VII
Chris Layton
CAL
$105
Dan Kla roth
DEK
Engineer IV
Billy Cobb
WJC
$75
Shannon Todd
SMT
II
Rodger Williams
RGW
$65
-Engineer
Greg Bell
GCB
I
Jacob Buenin
JMB
$60
-Engineer
Tech V (Sr. Drafter)
Rodney Simpson
RDS
$55
Tech V (Drill Operator)
Dwayne Ormsby
LDO
Tech IV (Drafter)
Adam Burger
ARB
$50
Tech III
Derek Melton
DWM
$45
Land Surveyor
Randy Thurman
RKT
$80
-Registered
LSIT Surveyor
Joe Pulliam
JRP
$65
Survey Crew (2 Man)
$85
Admin
1:.I;.:
�t>d :
JM
$35
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street -doe Page 3 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 2
ESTIMATED HOURS AND COSTS
LABOR CATEGORY
HOURLY
RATE
PRELIMINARY DESIGN
Hours Cost
Principal
$150
0 $0
Engineer IX
$120
0 $0
Engineer VII
$105
12 $1,260
Engineer IV
$75
0 $0
Engineer II
$65
0 $0
Tech V
$55
0 $0
Tech IV
$50
8 $400
Registered Land
Surveyor
$80
2 $160
LSIT Surveyor
$65
0 $0
Admin
$35
0 $0
Survey Crew (2 Man)
$85
36 $3060
Reimbursable Expense
$620
TOTALS I
i
i 58 $5,500
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc
Page 4 of 4
Agreement bemeen S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AIMENDMENT NO. 9
This Amendment modifies and amends the General Agreement for Engineering Services dated March 4,
2004 between The City of Cape Girardeau, hereinafter referred to as the "City" and S.H. Smith& Co.,
Inc., hereinafter referred to as "Engineer".
This amendment shall be for the purpose of performing surveying and engineering design for the
preliminary layout of Walnut Street from Beaudean Street to West End Blvd. The project generally
consists of collection of existing field data, preparing a preliminary layout of the proposed center line, and
stakeout of the proposed center line and right of way.
SECTION I: SCOPE OF «'ORK
GENERAL: For all phases of survey and design, the Engineer shall submit detailed design progress
reports with each application for payment.
Engineer shall:
TASK A — Preliminary Layout:
1. Collect existing field data to assist in determining the most suitable alignment.
2. Prepare a proposed alignment and submit it to the city engineer's office for review and approval.
3. Appoint a licensed professional engineer to serve as Project Engineer.
4. After approval of the proposed alignment by the City, we will stakeout the new alignment and
sixty foot right of way line at 100 foot stationing along the centerline.
5. Attend City Council meetings and/or Public Hearings as required by CITY to provide project
information to City Council and answer questions relating to proposed improvements. The
estimated design cost includes attendance at one City Council/Public Hearing meetings.
SECTION II: SCHEDULE
The Engineer will commence work within 3 business days after receiving written Notice to Proceed.
The time to complete Task A — Collection of the field data and the preliminary layout shall be completed
within 21 days from Notice to Proceed. The proposed centerline layout shall be staked out within 14 days
from the approval of the proposed alignment by the city engineer's office.
SECTION III — COMPENSATION
The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in
Exhibit I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the
scope of services outlined in Section I of this Amendment, CITY shall pay ENGINEER as follows:
1. An amount equal to the actual hours charged to the Project by each class of Engineer's employees
times the standard hourly rates in Exhibit I for each applicable billing class for all services
performed on the Project.
2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable
expenses shall be limited to express mailing or courier services, special copying services, legal
S:\CON"I'RACT'S\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc Page I of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
documents or other charges requested by CITY. Reimbursable expenses are not expected to
exceed $620 on this project.
3. Mileage at a rate of $0.40 per mile.
4. The total compensation for services and reimbursable expenses for each Task is estimated to be
as summarized in the following table. ENGINEER shall not exceed the amounts shown for each
task without prior written by OWNER'S authorized representative.
Task A Preliminary Layout $5,500
Total Not To Exceed $5,500
5. ENGINEER shall not begin any work nor obligate CITY for any fee prior to the date of
WRITTEN NOTICE TO PROCEED by CITY.
6. ENGINEER shall issue monthly statements during the course of the work, based on the actual
hours charged to the Project during the month. CITY shall pay undisputed portions of the invoice
within 30 days after the date of the invoice.
SECTION IV: AUTHORIZATION
CITY and ENGINEER agree to the specific work scope, schedule, and compensation described in this
Amendment to the Agreement.
CITY: City of Cape Girardeau, MO
By: - ��eL4
Doug,ras K. Leslie
City Manager
Date: j _5'
c
Gayle Onrad
City Clerk
Date: 1
ENGINEER: S.H. Smith&Company, Inc.
B.
a W. Ridlen, P.E.
President
Date:
ATTEST: �..`' G�h�r�',
J
(SEAL)
By:
oseph M. LeahW.t.
Assistant Secre ry
Date:/2.Z U
S:\CONTRACTS\Archive\Agreement. Cape Girardeau Amendment 9 - Walnut Street.doc
Page 2 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 1
STANDARD HOURLY RATES
LABOR CATEGORY
PROPOSED STAFF
NAMES INITIALS
HOURLY RATE
Principal
Samuel Smith
SHS
$150
Engineer IX
Paul Ridlen
PWR
$120
Engineer VII
Chris Layton
CAL
$105
Dan Kla roth
DEK
Engineer IV
Billy Cobb
WJC
$75
Shannon Todd
SMT
Engineer II
Rodger Williams
RGW
$65
Greg Bell
GCB
Engineer I
Jacob Buening
JMB
$60
Tech V (Sr. Drafter)
Rodney Simpson
RDS
$55
Tech V (Drill Operator)
Dwayne Ormsby
LDO
Tech IV (Drafter)
Adam Burger
ARB
$50
Tech III
Derek Melton
DWM
$45
Registered Land Surveyor
Randy Thurman
RKT
$80
LSIT Surveyor
Joe Pulliam
JRP
$65
Survey Crew (2 Man)
I
I
$85
Admin
I Julie Elwood
' JME
$35
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc Page 3 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 2
ESTIMATED HOURS AND COSTS
LABOR CATEGORY
HOURLY
RATE
PRELIMINARY DESIGN
Hours Cost
Principal
$150
0 $0
Engineer IX
$120
0 $0
Engineer VII
$105
12 $1,260
Engineer IV
$75
0 $0
Engineer II
$65
0 $0
Tech V
$55
0 $0
Tech IV
$50
8 $400
Registered Land
Surveyor
$80
2 $160
LSIT Surveyor
$65
0 $0
Admin
$35
0 $0
Survey Crew (2 Man)
$85
36 $3060
Reimbursable Expense
$620
TOTALS
58 $5,500
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc Page 4 of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4. 2004
AMENDMENT NO. 9
This Amendment modifies and amends the General Agreement for Engineering Services dated March 4,
2004 between The City of Cape Girardeau, hereinafter referred to as the "City" and S.H. Smith& Co.,
Inc., hereinafter referred to as "Engineer".
This amendment shall be for the purpose of performing surveyinil and enj!ineerin2 design for the
preliminary layout of Walnut Street from Beaudean Street to West End Blvd. The project generally
consists of collection of existing field data, preparing a preliminary layout of the proposed center line, and
stakeout of the proposed center line and right of way.
SECTION I: SCOPE OF WORK
GENERAL: For all phases of survey and design, the Engineer shall submit detailed design progress
reports with each application for payment.
Engineer shall:
TASK A — Preliminary Layout:
1. Collect existing field data to assist in determining the most suitable alignment.
2. Prepare a proposed alignment and submit it to the city engineer's office for review and approval.
3. Appoint a licensed professional engineer to serve as Project Engineer.
4. After approval of the proposed alignment by the City, we will stakeout the nevv alignment and
sixty foot right of way line at 100 foot stationing along the centerline.
5. Attend City Council meetings and/or Public Hearings as required by CITY to provide project
information to City Council and answer questions relating to proposed improvements. The
estimated design cost includes attendance at one City Council/Public Hearing meetings.
SECTION II: SCHEDULE
The Engineer will commence work within 3 business days after receiving written Notice to Proceed.
The time to complete Task A — Collection of the field data and the preliminary layout shall be completed
within 21 days from Notice to Proceed. The proposed centerline layout shall be staked out within 14 days
from the approval of the proposed alignment by the city engineer's office.
SECTION III — COMPENSATION
The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in
Exhibit I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the
scope of services outlined in Section I of this Amendment, CITY shall pay ENGINEER as follows:
1. An amount equal to the actual hours charged to the Project by each class of Engineer's employees
times the standard hourly rates in Exhibit I for each applicable billing class for all services
performed on the Project.
2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable
expenses shall be limited to express mailing or courier services, special copying services, legal
S:\CON"IIZACTS\Archivc\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc
Page I of 4
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
documents or other charges requested by CITY. Reimbursable expenses are not expected to
exceed $620 on this project.
3. Mileage at a rate of $0.40 per mile.
4. The total compensation for services and reimbursable expenses for each Task is estimated to be
as summarized in the following table. ENGINEER shall not exceed the amounts shown for each
task without prior written by OWNER'S authorized representative.
Task A Preliminary Layout $5,500
Total Not To Exceed $5,500
5. ENGINEER shall not begin any work nor obligate CITY for any fee prior to the date of
WRITTEN NOTICE TO PROCEED by CITY.
6. ENGINEER shall issue monthly statements during the course of the work, based on the actual
hours charged to the Project during the month. CITY shall pay undisputed portions of the invoice
within 30 days after the date of the invoice.
SECTION IV: AUTHORIZATION
CITY and ENGINEER agree to the specific work scope, schedule, and compensation described in this
Amendment to the Agreement.
CITY: City of Cape Girardeau, MO ENGINEER: S.H. Smith&Company, Inc.
By: !;
ougl Le lie
City Manager
Date: l -d 0(v
ii
Gayle Cd rad
City Cler
Date: `-4 -i Y,y,
B•
Paul W. Ridlen, P.E.
President
Date: 1 I—e-00
ATTEST: 1''' r 0 i
(SEAL) rt
�,,, ii ► yI `1
By>Joph M. Leahy, P
Assistant Secreta
Date:
T
S:\CONTRACTS\Archivc\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc
Page 2 of 4
Agreement between S.H. Smith&,Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 1
STANDARD HOURLY RATES
LABOR CATEGORY
PROPOSED STAFF
NAMES INITIALS
HOURLY RATE
Principal
Samuel Smith
SHS
$150
Engineer IX
Paul Ridlen
PWR
$120
Engineer VII
Chris Layton
CAL
$105
Dan Kla roth
DEK
Engineer IV
Billy Cobb
WJC
$75
Shannon Todd
SMT
Engineer II
Rodger Williams
RGW
$65
Greg Bell
GCB
Engineer I
Jacob Buening
JMB
$60
Tech V (Sr. Drafter)
Rodney Simpson
RDS
$55
Tech V (Drill Operator)
Dwayne Ormsby
LDO
Tech IV (Drafter)
Adam Burger
ARB
$50
Tech III
Derek Melton
DWM
$45
Registered Land Surveyor
Randy Thurman
RKT
$80
LSIT Surveyor
Joe Pulliam
JRP
$65
Survey Crew (2 Man)
1
1 $85
Admin
Julie Elwood
JIIE -
$35
S:\CONTRACTS\Archive\Agreement.Cape Girardeau Amendment 9 - Walnut Street.doc Page 3 of
Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri
Master Agreement executed on March 4, 2004
AMENDMENT No. 9
EXHIBIT 2
ESTIMATED HOURS AND COSTS
LABOR CATEGORY
HOURLY
RATE
PRELIMINARY DESIGN
Hours Cost
Principal
$150
0 $0
Engineer IX
$120
0 $0
Engineer VII
$105
12 $1,260
Engineer IV
$75
0 $0
Engineer II
$65
0 $0
Tech V
$55
0 $0
Tech IV
$50
8 $400
Registered Land
Surveyor
$80
2 $160
LSIT Surveyor
$65
0 $0
Admin
$35
0 $0
Survey Crew (2 Man)
$85
36 $3060
Reimbursable Expense
$620
TOTALS
i 58 $5,500