HomeMy WebLinkAboutRes.2173.05-05-2006f
BILL NO. 06-98
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AMENDMENT NO. 1 TO THE GENERAL
SERVICES AGREEMENT WITH S. H. SMITH &
COMPANY, INC., FOR THE DESIGN OF THE SILVER
SPRINGS ROAD AND THEMIS STREET INTERSECTION
AND OTHER STORMWATER IMPROVEMENTS, IN THE
CITY OF CAPE GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute
Amendment No. 1 to the General Services Agreement with S. H.
Smith & Company, Inc., for the design of the Silver Springs Road
and Themis Street Intersection and other stormwater
improvements, in the City of Cape Girardeau, Missouri. A copy
of said Agreement is attached to this Resolution and made a part
hereof.
PASSED AND ADOPTED THIS JE�-- DAY OF 20_.
Gayle L)Conrad, City Clerk
4��00'PO4"'a
v 've�p -
Ja Knudtson, Mayor
Amendment to Agreement between S.H. Smith&Co. and the City of Cape Girardeau, Missouri
Agreement effective as of March 22, 2006
AMENDMENT NO. 1
The following detailed scope of services is for the design of Silver Springs Stormwater Improvements.
SECTION I: SCOPE OF WORK
The work shall general consist of preliminary and final engineering design, surveying, construction document
preparation and inspection for portions of the stormwater improvements as described in the engineering report
entitled, "Stormwater Feasibility Study Silver Springs/Whitener and Silver Springs/Themis Watershed", dated
"February 2006". The improvements to be included in this work shall consist of designing replacement culverts
for two existing culverts located on driveways off of Whitener Road near the intersection of Whitener and Silver
Springs Roads; and design of drainage and grading improvements at the intersection of Silver Springs Road and
Themis Road to adequately remove and transport stormwater from this intersection to the ditch near the existing
culverts on Themis Road.
TASK A — Report and Preliminary Design Phase
1. Prepare a Preliminary Engineering Report based on the proposed project portions of the existing report,
conforming to the guidelines of the Missouri Department of Natural Resources including an engineer's
preliminary cost estimate containing appropriate contingencies as to establish a project budget, according
to the criteria and limitations set forth by the OWNER.
TASK B — Final Design Phase
1. Develop a work plan and schedule for implementation of the project, including surveying, analysis and
design efforts, investigations, permitting and other required tasks.
2. Appoint a licensed professional engineer to serve as Project Engineer, who will be responsible for all
technical aspects of the work and who will sign and seal the final design drawings.
3. Prepare final Contract Documents for permitting and construction consisting of. 1) Final engineering
drawings (plans); 2) Specifications; 3) Contract Provision. These Contract Documents shall accurately
describe the character and scope of the work to be performed by contactors on the PROJECT. Contact
Provisions shall include bid forms and schedules, notice to bidders, instructions to bidders, general
conditions and supplementary conditions, bonding and insurance requirements, and other related
documents.
4. Furnish two (2) copies of preliminary Contract Documents to OWNER for review and approval.
Make necessary correction and/or revisions to preliminary versions of Contact Documents as maybe
requested by OWNER. If substantive revisions are requested, submit two (2) copies of revised
documents to OWNER for final review.
6. Advise the OWNER of any adjustments to his latest opinion of probably PROJECT cost caused by
changes in scope, design requirements or Construction Costs and furnish a revised opinion of probable
PROJECT cost based on the final Drawings and Specifications.
7. Upon authorization by OWNER, assist OWNER in obtaining bids or negotiating proposals for the contact
for construction. It is anticipated that the Engineer will provide a set of reproducible contact documents
to the OWNER for bidder purposes.
8. Upon receipt of bids for construction, tabulate and certify all bid results, consult with and advise OWNER
as to the acceptability of bidders and submitted bids, and make recommendations of award.
9. Upon award of the Construction Contact by OWNER, assist OWNER in assembling and executing
contracts.
TASK C — Construction Inspection Phase
1. Once the OWNER has fully executed the Contract(s) for the proposed work, the Engineer shall conduct a
pre -construction meeting with the Contractor and the OWNER and assist the OWNER with the notice to
proceed.
C:\Documents and Settings\paulr\Local Settings\Temporary Internet Files\OLK733\Amendment Blank Amendment Cape Silver Springs Stormwater (2).docPage 1 of 3
Amendment to Agreement between S.H. Smith&Co. and Sanborn, Inc.
Agreement effective as of December 21, 2005
AMENDMENT No. 1
2. Conduct periodic on site inspections of the Work performed by the Contractor. Inspection shall be
performed on all major milestones of the work and at intermittent time intervals during general Work
tasks. This does not include full time resident project inspection.
3. Periodic payment requests from the Contractor shall be reviewed by the inspector. The Engineer shall
make recommendations to the OWNER of full or partial payment of Contractor requests based on actual
Work complete.
4. Final inspection and close out procedures shall be performed upon completion of the Word by the
Contractor. The Engineer shall perform a final inspection of the work with the Inspector, Contractor and
OWNER.
SECTION II: SCHEDULE
The time of completion of this work shall be 120 days from Notice to Proceed to delivery of Final plans and
specifications to the OWNER for review.
SECTION III — COMPENSATION
The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in Exhibit
I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the scope of services
outlined in Section I of this Amendment, OWNER shall pay ENGINEER as follows:
An amount equal to the actual hours charged to the Project by each class of ENGINEER's employees
times the standard hourly rates in Exhibit I for each applicable billing class for all services performed on
the Project.
2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable expenses
shall be limited to express mailing or courier services, special copying services, legal documents or other
charges requested by OWNER. Reimbursable expenses are not expected to exceed $500 on this project.
3. Mileage at a rate of $0.35 per mile.
4. The total compensation for services and reimbursable expenses for each Task is estimated to be as
summarized in the following table. ENGINEER shall not exceed this amount for each Task without prior
written authorization by OWNER's authorized representative.
Task A Report and Preliminary Design Phase Not to Exceed $2,475
Task B Final Design Phase Not to Exceed $17,810
Task C Inspection Phase Not to Exceed $13,295
Total Not to Exceed $33,580
5. ENGINEER shall not begin any work nor obligate OWNER for any fee prior to the date of WRITTEN
NOTICE TO PROCEED by OWNER.
6. ENGINEER shall issue monthly statements during the course of the work, based on the actual hours
charged to the Project during the month. ONWER shall pay undisputed portions of the invoice within 30
days after the date of the invoice.
C:\Documents and Settings\paulr\Local Settings\Temporary Internet Files\OLK733\Amendment Blank Amendment Cape Silver Springs Stormwater (2).docPage 2 of 3
Amendment to Agreement between S.H. Smith&Co. and Sanborn, Inc.
Agreement effective as of December 21, 2005
C:\Documents and Settings\paulr\Local Settings\Temporary Internet Files\OLK733\Amendment Blank Amendment Cape Silver Springs Stormwater (2).docPage 3 of 3
AMENDMENT No. 1
SECTION V: AUTHORIZATION
OWNER and ENGINEER agree to the specific work scope, schedule, compensation described in this Amendment
to the Agreement.
OWNER: City of C4pe Girardeau, MO
ENGINEER: S
ith&Company nc
("SMITH&C ")
By:
By:
tgnat of Authorized Representative
Si ature of Autliorized Representative
Douglas K. Leslie
Paul W. Ridlen, P.E.
Name (please print or type)
Name (please print or type)
City Manager
President and CEO
Title
Title
Date:
Date:
S
ATTEST:
ATTEST:
' `;
(SEAL)
(SEAL)
� %
: V
AJ
By: P
By:
Gayle Co d, City Clerk
Robert P. MacDonald, Secretary
Date:
Date:
,�-- Z —O or.
C:\Documents and Settings\paulr\Local Settings\Temporary Internet Files\OLK733\Amendment Blank Amendment Cape Silver Springs Stormwater (2).docPage 3 of 3
EXHIBIT I
STANDARD HOURLY RATES
LABOR CATEGORY
PROPOSED STAFF
HOURLY RATE
NAMES INITIALS
PrincipalSamuel
...................................................................................................
Smith
SHS
$150.00
IX
Paul Ridlen
PWR
$120.00
..&eer
7 .... ---
Kg aenr Viif-------------
-----Molloy...........................
9�;
... ----------
D'MM
- ----------- - - - - - '"1"2"""0'0"
$0
....................
Engineer VII
---------.C..h
.....................
-r.i.s.L..m.t�q
. -----------f----------
.........................
............................KKj
C--A--L-
.........................
$
i "---------
aenrVi................Joe
leahy...............
Engineer
-7"---'-'-'V---.-----------------
-----------------•.........................
-.Steve Hicks -----
-K�
----------
SDH
-1-0-5-.-0-0
-----------------4�66
------------------$95-
..................$..8.5..0.0
.
Kumeer IV.................
Greg Currington........
.''"'.
..........GAC ..........
$75.00
........................
----------•--------------
Engmeerii
Engineer
Rodger
RGW
$65.00
Greg Bell
GCB
...................
...&eer I
-------------------------
..................
Jacob B �M,R� ------------------------------------
.........................
JMB
.........................
$60.00
--------------------------
TeX'V"(Sr. Rqttn�)* ____.__Rodney
S son
...... ..tp ...........
........... RDS ..........
$55.00
.........................
Tech IV
Adam Burger
Ki�
$50.00
Mark Wilson
MDW
Yjjwiff (Inspector)*-.--"''- .........
---------- -------------
"B"e"r,e"k ... Melton ............ :
* ................ ...............
......... i5w�i .........
-----------------------------
................... $-4-5- -0- -0,
-0-
ij Land Surveyor
Randy. Thurman
$-8-0-
0-
...uistered
-- --------------- ------------
SurvTy. man;
.........
--------------
----------
--------------- ------------------------------
---------- .
................_-$85 .00
.
Secretary - Tech
Julie Elwood
JM E
$35. 00
Miranda Inman
MAI