Loading...
HomeMy WebLinkAboutRes.2440.03-17-2009BILL NO. 09-51 RESOLUTION NO. A RESOLUTION AUTHORIZING THE INTERIM CITY MANAGER TO EXECUTE AMENDMENT NO. 8 TO THE GENERAL AGREEMENT FOR ENGINEERING SERVICES WITH S. H. SMITH & CO., INC., FOR THEMIS STREET DRAINAGE IMPROVEMENTS, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The Interim City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment No. 8 to the General Agreement for Engineering Services with S. H. Smith & Co., Inc., for Themis Street Drainage Improvements, in the City of Cape Girardeau, Missouri. A copy of said Amendment is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS DAY OF B. Knudtson, Mayor ATTEST: City Clerk Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri Master Agreement executed on March 22, 2006 AMENDMENT NO. 8 — Whitner and Themis Street Drainage Improvements This Amendment references the General Agreement for Engineering Services dated March 22, 2006 between The City of Cape Girardeau, hereinafter referred to as the "OWNER" and S.H. Smith& Co., Inc., hereinafter referred to as "ENGINEER". This amendment shall be for the purpose of designing drainage improvements in the storm water collection system at Whitener Street and Themis Street near Silver Springs Road The design of this project is consistent with improvements recommended in a Stormwater Feasibility Study completed by the City of Cape in February of 2006, which recommends a number of improvements that could be made to reduce localized flooding. Specifically this project will add two improvements to the system. First, the 2 pipe culverts under Themis Street will be replaced with a Box culvert to increase the stormwater carrying capacity. The second feature is the addition of a stormwater collection system on Whitener Street that removes stormwater from the street and into the ditch before it reaches the area which is most susceptible to flooding. SECTION I: SCOPE OF WORK GENERAL: The Engineer shall submit detailed design progress reports with each application for payment. Engineer shall: Appoint a licensed professional engineer to serve as Project Engineer, who will be responsible for all technical aspects of the project 2. Conduct a survey of the site to establish lines and grades needed for design improvements. Locate and identify potential utility conflicts. Gather boundary information needed for easements. 3. Utilize the existing design of the Themis Street box culvert and make necessary modifications as required by utility conflicts. 4. Submit letters and maps to regulatory agencies for environmental clearances. Agencies to be contacted include Army Corp of Engineers (404 Permit) and Department of Natural Resources (401 permit). Any additional work requested by a regulatory agency, such as an archeological study or environmental impact study, is not included in this amendment. 5. Conduct field visit with the OWNER to identify the location and limits of construction. 6. Provide owner with a Final Draft of Plans Specification and Estimate for review and make revisions as necessary. 7. Provide a One set of Plans and Specifications sealed by the Project Engineer for reproduction and bidding purposes. 8. Prepare legal description and exhibit for any Right of Way acquisition that would be required. SECTION II: SCHEDULE The Engineer will commence work within 3 business days after receiving written Notice to Proceed. The time to complete the design shall not be more than 45 dans from the Notice to Proceed. Permit clearances and requests by the regulatory agencies could extend past the 45 days required to complete design of the improvements. Amend 8- Whitner-Themis Drainage Improvments FINAL.doc Page 1 of 5 Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri Master Agreement executed on March 22, 2006 AMENDMENT No. 8 SECTION III — COMPENSATION The Basis of Payment of this Amendment shall be TIME AND MATERIALS at the rates established in Exhibit I to this Amendment. Using the procedures set forth in Section E of the Agreement, and for the scope of services outlined in Section I of this Amendment, OWNER shall pay ENGINEER as follows: 1. An amount equal to the actual hours charged to the Project by each class of Engineer's employees times the standard hourly rates in Exhibit I for each applicable billing class for all services performed on the Project. 2. Actual direct reimbursable expenses incurred plus 15% of the actual expense. Reimbursable expenses shall be limited to express mailing or courier services, special copying services, legal documents or other charges requested by OWNER. Reimbursable expenses are not expected to exceed $250 on this project. 3. Mileage at a rate of $0.585 per mile. 4. The total compensation for services and reimbursable expenses for this task is estimated to be broken down as follows: a. Design of Whitener and Themis Street Drainage Improvement $10,040 The ENGINEER shall not exceed the amounts shown without prior written approval by OWNER's authorized representative. 5. ENGINEER shall not begin any work nor obligate OWNER for any fee prior to the date of WRITTEN NOTICE TO PROCEED by OWNER. 6. ENGINEER shall issue monthly statements during the course of the work, based on the actual hours charged to the Project during the month. OWNER shall pay undisputed portions of the invoice within 30 days after the date of the invoice. Amend 8- Whitner-Themis Drainage Improvments FINAL.doc Page 2 of 5 Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri Master Agreement executed on March 22, 2006 AMENDMENT No. 8 SECTION IV: AUTHORIZATION OWNER and ENGINEER agree to the specific work scope, schedule, and compensation described in this Amendment to the Agreement. OWNER: City of Cape Girardeau, MO By: lc L) Ken J. Eftink Interim City Manager ENGINEER: S.H. Smith&Company, Inc. By: —_ Robert P. MacDonald President Date: —0> Z e, -e 9 ATTEST: (SEAL) By: �el"'X �J Stephen4licks Secretary Date: 2 -,? � "67 L7 Amend 8- Whitner-Themis Drainage Improvments FINAL.doc Page 3 of 5 Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri Master Agreement executed on March 22, 2006 AMENDMENT No. 8 EXHIBIT 1 STANDARD HOURLY RATES LABOR CATEGORY PROPOSED STAFF HOURLY RATE NAMES INITIALS Principal Bob MacDonald SHS $150 Engineer XIII Dan Molloy DMM $125 Engineer VII Chris Layton Steve Hicks CAL SDH $115 Engineer VI Dennis Cox Shannon Todd LDC SMT $95 Engineer II Matt Neal MJN $70 Tech VII (Sr. Drafter) Rodney Simpson RDS $60 Tech V (Drafter) Adam Sadler AFS $55 Tech III Derek Melton DWM $45 PLS 4 - Chief Surveyor Randy Thurman RKT $105 PLS 1 - Surveyor Joe Pulliam_ JRP $75 Tech VI — Surveyor Miranda Inman Julie Elwood MAI JME $60 Admin $40 Amend 8- Whinier -Themis Drainage Improvments FINAL.doc Page 4 of 5 Agreement between S.H. Smith&Co. and The City of Cape Girardeau, Missouri Master Agreement executed on March 22, 2006 AMENDMENT No. 8 EXHIBIT 2 ESTIMATED HOURS AND COSTS LABOR CATEGORY HOURLY RATE PRELIMINARY DESIGN Hours Cost Principal $150 0 $0 -Engineer XIII $125 0 $0 Engineer VII $115 28 $3,220 Engineer V $ 95 0 $0 Engineer III $75 0 $0 -Engineer II $70 52 $3,640 Tech V (Drafter) $55 40 $2,200 Tech III $45 0 $0 Tech II $40 0 $0 PLS 4 - Chief Surveyor $105 2 $210 PLS 1 - Surveyor $75 0 $0 Tech VI (Surveyor) $60 6 $360 Admin $40 4 $160 Survey Crew (2 Man) $85 0 $0 Reimbursable Expense TOTALS 132 $250 $10,040 Amend 8- Whitner-Themis Drainage Improvments FINAL.doc Page 5 of 5