Loading...
HomeMy WebLinkAboutCIP2021-2026_2021_ CITYOfCAPE G 1 R A R D E A U CAPITAL IMPROVEMENTS PROGRAM ADOPTED FISCAL 2021-2026 rA ti THE UINION ~ � OREVg4' VEAL Adopted by the Cape Girardeau City Council in the State of Missouri on March 1, 2021. The program serves as a guideline for major one-time expenditures by the City. For standard, recurring expenses, please see the 2021-2022 Annual Budget. BILL NO. 21-28 RESOLUTION NO. � j� A RESOLUTION ADOPTING THE 2021-20126 CAPITAL IMPROVEMENTS PROGRAM, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Council, for and on behalf of the City of Cape Girardeau, Missouri, hereby adopts the 2021-2026 Capital Improvements Program, in the City of Cape Girardeau. A copy of said Program is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THIS �_ DAY OF' 2021. Bob Fox, Mayor ATTEST: G1 "7 ruse TaylT , Deputy City C1 1,11110 y� { The Honorable Mayor and Members of the City Council City of Cape Girardeau, Missouri Dear Mayor and Council Members: INTRODUCTION City staff herewith presents a draft of the proposed Five -Year Capital Improvements Program. This program, for the period July 1, 2021, through June 30, 2026, is submitted in accordance with Article VI, Section 6.04 of the City Charter. A public hearing will be held on March 1, 2021 for the Capital Improvements Program. Following public input, the City Council may adopt the program by resolution at the same Council meeting. In accordance with the City Charter, the Capital Improvement Program must be adopted on or before April 1, 2021. The Capital Improvements Program is a planning instrument that drives the evaluation and identification of capital infrastructure projects in need of renovation, repair and/or construction. The document contains two categories: Recurring/Grant Revenue Projects and Tax Initiative Projects. The Recurring/Grant Revenue Projects category consists of area specific projects requiring funding sources from the respective funds, recurring revenue sources and grant opportunities. The Tax Initiative category consists of projects designated specifically within the voter -approved tax initiatives currently active. The CIP relates these projected capital needs to the financial sources that will support their realization and the timeframe in which both the financing and work will take place. Capital improvements programming is the process by which capital projects are identified, prioritized, and selected and thus incorporated into the long-range fiscal and strategic plans of the City. The CIP document is designed to report to the City Council, the public, City staff and other interested parties the capital management and strategies of the City. Each of the City's departments was given the opportunity to provide input in planning and implementation of the Capital Improvement Program. BACKGROUND The City Council, in 1983, formally considered and adopted a long-range Capital Improvements Program for the first time under the current Charter requirement. The CIP could then be referenced for fiscal decisions relative to the City annual operating budget developed separately from the CIP. This budget process should provide a relevant approach to identifying and implementing important community -wide and neighborhood level projects. The Capital Improvements Program should be considered as an investment in the future of the community. Some of the projects are financed over long periods of time, in effect spreading the cost of the projects across generations of users. The selection and evaluation of capital projects is a difficult task involving some speculation and the ability to make estimations, which to some extent, are based on historical perspectives. Perhaps the greatest benefit of having a capital improvement program is focusing attention on improving or constructing the capital assets necessary for providing the services and facilities expected by the residents and businesses. This process over time, with the informed and involved citizens, has allowed our community to offer a sustainable enhanced quality of life with the financial resources available and those new resources approved by the voters. FINANCING DESCRIPTIONS The City employs a combination of approaches to fund its capital projects. Capital projects are funded through a variety of methods, including long-term financing, user fees, grants, assessments, tax levies, and reserve balances. Some projects are budgeted with multiple revenue streams. The Capital Improvements Program will not list all revenue sources of the City but only sources used for the projects included. The following is a brief description of the various revenue sources: Capital Improvement Sale Tax — Water: A '/4% %%, or '/z% Sales Tax can be issued by the City for various types of public improvements. Such a tax requires approval by the electorate with a simple majority. For example, in November 1996, the voters adopted an additional '/4% sales tax effective January 1, 1997 for expansion of the water treatment plant and various other water improvements. The current '/4% sales tax for water improvements was set to expire in 2017. In 2011, this tax was extended to the end of 2037 to fund the newly constructed Wastewater Treatment Plant. Capital Improvement Sales Tax — Sewer: A '/4% %%, or '/z% Sales Tax can also be issued for sewer improvements. Such a tax requires approval by the electorate with a simple majority. In November 1996, the voters adopted an additional '/4% sales tax effective January 1, 2000 for elimination of combined sewer and various other improvements. This tax was renewed by voters on August 6, 2019 and will sunset December 31, 2034. A dedicated portion of these funds will be invested in the City's water distribution system by replacing old galvanized pipes with stronger PVC piping. Doing so reduces leaks, breaks and boil water advisories and increases the systems resiliency. The remainder of the funds will go toward the Common Pleas Courthouse and Annex renovation into a new City Hall, City Airport Terminal and Tower replacement, and additional funding for street maintenance. Local, State and Federal Grants and Loans: The City has partnered with local agencies for them to participate in certain projects where there is mutual benefit K to both parties. The partners and participation vary but are detailed in the funding reports and project descriptions. The City is eligible to submit grant applications to the State of Missouri for funds they may have available either from their own State revenue sources or, in some cases, from revenue sources they administer for various federal agencies. The City is also eligible to receive various Federal grants on a competitive basis from appropriate Federal agencies. This could include the Environmental Protection Agency as it relates to wastewater improvements; the Federal Highway Administration that administers and distributes funds from the Federal Gasoline Tax through the Surface Transportation Program — Urban; or the Federal Aviation Administration for airport improvements. Federal funds may include special appropriations related to specific projects or events. Most of these funds, however, are now administered by the State through related State agencies. Transportation Trust Fund (TTF): Pursuant to Sections 94.700-94.755 of the State Statues, the voters of the City of Cape Girardeau may approve a '/2% sales tax for transportation purposes for a period of five (5) years five. Voters of the City of Cape Girardeau approved a '/2% sales tax on June 2, 2020 marking the sixth TTF initiative passed by voters to fund vital transportation projects. The tax went into effect January 1, 2021 and will expire December 31, 2025. The revenues from this source are placed into a separate Transportation Trust Fund and are used for the specific projects approved by voters. Motor Fuel Tax (MFT): The Motor Fuel Tax fund provides for the receipt and disbursement of revenues the City receives as its portion of the State Gasoline Tax, State Motor Vehicle Licensing Fees, and State Motor Vehicle Sales Tax. The revenues from this source can be used for capital improvements, as well as annual operating and maintenance expenses as they relate to improvements on the City's streets. Parks and Stormwater Sales Tax (PRS): Pursuant to Section 144.032 of the State Statutes, the voters approved a '/2¢ tax for parks and stormwater projects. The tax was approved on April 8, 2008 and went into effect October 1, 2008. This '/2¢ sales tax is made up of a 3/%¢ sales tax which sunset December 31, 2018. On April 3, 2018 voters approved renewing the %0 sales tax which became effective January 1, 2019. The remaining '/s¢ sales tax is for operations and has no sunset. The project improvements supported by these funds will be spread out over a fifteen year window with the tax scheduled to expire in 2033. Enterprise Funds — Water: The City operates several businesses, or enterprises, that generate revenues for services provided to the citizens and to businesses. One important enterprise the City acquired from Ameren in 1992 was the potable water system. Operation of the system, maintenance, construction and improvement of the water system has most of its funding coming from monthly fees charged for water used by the end customers. The 3 City has taken advantage of low interest loan programs available through the Department of Natural Resources and the sale of bonds to fund large capital projects paid off over time. Like any business, water rates have to be carefully evaluated each year to make sure the income from water sales cover the operating costs and debt service and accounts for depreciation and the growth needs of the system. Enterprise Funds — Sewer: Another business, or enterprise, the City operates that generates revenue for services provided to the citizens and to businesses is the sanitary sewer system. Operation of the system, maintenance, construction and improvement of the sanitary sewer system has most of its funding coming from monthly fees charged for sewer usage based on the customer's water usage. The City also charges connection fees for new customer's connection to the system. The City has taken advantage of low interest loan programs available through the Department of Natural Resources and the sale of bonds to fund large capital projects that are paid off over time. Like any business, sewer rates have to be carefully evaluated each year to make sure the income from sewer service cover the operating costs and debt service and accounts for depreciation and the growth needs of the system. Enterprise Funds - Solid Waste: Another business, or enterprise, the City operates that generates revenue for services provided to the citizens and to businesses is the solid water service or trash service. This service includes weekly curbside trash pick-up, weekly recycling pickup, the transfer station, the recycling drop off center, special collections, recycling drop off points around the City, the annual leaf pick up program and a leaf drop off site. Numerous one-time special programs are included such as tire recycling, household hazardous waste and others. Maintenance of the equipment needed to provide all these services, repair and maintenance of all the facilities, and the construction of new facilities has most of its funding coming from monthly fees charged for solid waste service. The City has taken advantage of the sale of bonds to fund large capital equipment purchases and projects that are paid off over time. Like any business, trash rates have to be carefully evaluated each year to ensure the income from solid waste service cover the operating costs and debt service and accounts for depreciation and the growth needs of the system. Casino Revenue: The gaming revenue from the Century Casino Cape Girardeau began to be paid to the City in November of 2012. These revenues have been projected to generate approximately $3,000,000 per year. The City Council's plan is to use 40% - 60% of this yearly revenue for Capital Improvement projects. The Riverfront Development Fund (RDF) is also generated by the gaming revenue. Fire Sales Tax: Pursuant to Section 321.242 of the State Statutes, the voters of the City of Cape Girardeau approved a '/4% sales tax for operation of the Municipal Fire Department, Police Department and for capital improvements 4 related thereto on June 8, 2004. The tax went into effect October 1, 2005 with half of the tax ('/8%) expiring on December 31, 2014 and the other '/8% with no sunset. In November 2014, the voters of Cape Girardeau voted to continue the '/8% tax for another 21 years until the new expiration date in 2035. Undetermined: This category denotes needed funds not yet available. The projects with this designation cannot be completed until an existing revenue source can be made available or a new revenue source created. PROGRAM DESCRIPTIONS The major program areas include Recurring Revenue Projects and Tax Initiative Projects. These major categories contain the following types of projects: Recurring/Grant Revenue: The projects in this category provide for a variety of projects related to necessary improvements within the City, including IT related projects, being funded by fund specific sources, recurring non -tax initiative revenue and grant funding sources. Tax Initiative: The projects under this area provide for the necessary maintenance and upgrades and/or replacement to city -owned facilities, infrastructure and equipment with funding being provided by voter -approved tax initiatives. PROGRESS ON IMPROVEMENTS IN 2020-2021 The City Council set a course of action for staff in March 2020 with the adoption of the 2020-2025 Capital Improvements Program. The following projects have either been completed or will be substantially completed by the adoption of this plan and therefore will not be included in this plan for 2021-2026. 2020-2021 Completed Projects Assets - Facilities City -Wide - Gateway Features New Park Restrooms Fort D Complete Assets — IT Fiber Infrastructure Gigabyte Network Switches New Aerials for GIS Radio Interoperability Phase 2A Radio Interoperability Phase 2B Environmental Good Hope Drainage Project Phase 2 Penny Street Drainage 5 Transportation Osage Centre Parking Lot Overlay - Section #1 Street, Curb and Gutter Repair Airfield Master Drainage Study Airport Terminal Area Master Plan PROPOSEDIMPROVEMENTS The total Capital Improvements Program included herein includes a total of $139,472,021 for projects slated for FY 2021-2026, which have identified funding from various revenue sources. Revenue Sources for Projects This year the Transportation Sales Tax 5, Parks Recreation and Stormwater Tax (PRS) 2, FAA Supplemental Appropriations, MoDOT, and Capital Improvement Sales Tax - Water proceeds provide the highest revenue sources for projects. Unfunded Projects The Contingent Program is a program of currently unfunded projects. The unfunded projects have been prioritized. This will be helpful if additional funding or grants become available. The Contingent Program shows there is approximately $65,174,206 of unfunded projects in this CIP. The data shows the importance of the continuation of existing sales tax revenues including the Transportation Trust Fund and Parks/Stormwater Sales Tax. CONCLUSION The Capital Improvement Program reveals there are many needed projects within the City of Cape Girardeau; however, only a portion of the projects have an identified funding source. Previous Capital Improvement Programs have positioned the City favorably in terms of water and sewer infrastructure and have also resulted in many transportation improvements such as Veterans Memorial Drive and the Lexington and Route W Roundabout. These improvements help the community by providing opportunities for both new and existing businesses - including the creation of new jobs, increased tax revenues, and an enhanced quality of life for those in and around the City of Cape Girardeau. The City's previous Capital Improvement Programs have successfully addressed many systemic issues through new improvements such as the new Police Station, Fire Station #4, Wastewater Treatment Plant and a new Transfer Station. Attention has now turned to the City's existing capital assets and what may be needed to extend their useful life and maximize public benefit. The program contained herein and subsequent programs should transition from a majority of new improvement projects to more projects that address the needs of the City's existing assets. The Capital Improvement Program should include projects that repair existing roadways and facilities with long-term remedies instead of quick "Band-Aid" fixes that are not sustainable. A perfect example is repairing a potholed street with new concrete rather than filling it with cold patch. The cold patch works in the short term but may allow the existing pothole to grow in size leading to an even bigger problem down the road. This is reflected in the approved TTF- 6 projects. In 2014, the Capital Improvement Program identified numerous City facilities in urgent need of investment in the near future including the Police Station, Transfer Station, Public Safety Radio Interoperability, Fire Stations (#4, #2, and #1), City Hall, and the Airport. The good news is, in 2014, the voters of the City of Cape Girardeau voted to extend the Fire Tax, the Settlement Agreement was resolved, and a new public/private partnership was formed to address a number of these needs. For the most part these facilities, which were previously contingent items, now have identified funding sources and are complete. One big exception was funding for City Hall and the Airport. Fortunately, on August 6, 2019, Cape Girardeau voters approved the renewal of a '/4¢ Capital Improvement Sales Tax for infrastructure improvement and maintenance. The funds will be used to strengthen the resiliency of the City's water distribution system, replace the antiquated airport terminal and tower, preserve the Common Pleas Courthouse and Annex by repurposing the buildings as a new City Hall, and dedicating an additional $7.5 million toward street maintenance. The City Charter requires an annual review and revision of the Capital Improvements Program which assures the Program remains responsive to changing demands, priorities, and available revenues. This Program has successfully identified projects, positioned them through a public process, and helped locate and secure funding sources to allow the successful completion of projects thus bettering our community. The final plan should be regarded as a sound, fiscally responsible working document that can and will be implemented via the City Council's annual budget appropriation process, with Cape Girardeau citizens' support for appropriate revenue sources, and with City staff's diligent action. Respectfully submitted, Scott A. Meyer Dustin Ziebold City Manager Finance Director F CIT`'r''' -CAPE G, I R A R a E A U CIP SUMMARY FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) FY21-26 CIP Summary 8 Recurring / Grant Revenue Projects FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-31 CNT Total ADMINISTRATIVE SERVICES $ 1,089,208 $ 202,000 $ 137,000 $ 137,000 $ 218,000 $ 736,000 $ 50,000 $ 2,569,208 CAPE GIRARDEAU REGIONAL AIRPORT $ 3,904,000 $ 10,890,000 $ 2,110,000 $ 4,350,000 $ 170,000 $ 500,000 $ 6,388,000 $ 28,312,000 COMMUNITY DEVELOPMENT $ 2,240,000 $ - $ - $ - $ - $ - $ 37,232,000 $ 39,472,000 FIRE DEPARTMENT $ 20,000 $ 107,000 $ - $ - $ - $ - $ 11,489,000 $ 11,616,000 FLEET $ 4,389,053 $ 3,271,629 $ 2,760,449 $ 1,878,695 $ 3,376,437 $ 12,887,762 $ 3,797,206 $ 32,361,231 PARKS & RECREATION $ - $ - $ - $ - $ - $ - $ 3,497,000 $ 3,497,000 POLICE DEPARTMENT $ - $ - $ - $ - $ - $ - $ - $ - PUBLIC WORKS $ 1,677,500 $ 3,330,500 $ 1,445,000 $ 1,379,200 $ 1,900,000 $ 24,500,000 $ 945,000 $ 35,177,200 Department Total by Fiscal Year $ 13,319,761 $ 17,801,129 $ 6,452,449 $ 7,744,895 $ 5,664,437 $ 38,623,762 $ 63,398,206 $ 153,004,639 Tax Initiative Projects FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-31 CNT Total CAPITAL IMPROVEMENT SALES TAX $ 14,837,000 $ 1,030,000 $ 6,120,000 $ 5,530,000 $ 1,030,000 $ 5,030,000 $ - $ 33,577,000 INNOVATION FUND $ - $ - $ - $ - $ - $ - $ 306,000 $ 306,000 PARKS & STORMWATER TAX $ 3,464,000 $ 7,752,000 $ 5,353,000 $ 4,514,000 $ 2,218,250 $ 3,239,250 $ - $ 26,540,500 FIRE SALES TAX $ - $ - $ - $ - $ - $ - $ 160,000 $ 160,000 PUBLIC SAFETY TRUST FUND $ 119,100 $ 18,000 $ 125,000 $ 1,400,000 $ 230,000 $ 1,375,000 $ 310,000 $ 3,577,100 TRANSPORTATION TRUST FUND $ 9,397,000 $ 11,352,000 $ 6,355,000 $ 3,530,000 $ 4,115,000 $ - $ 1,000,000 $ 35,749,000 Tax Initiative Total by Fiscal Year $ 27,817,100 $ 20,152,000 $ 17,953,000 $ 14,974,000 $ 7,593,250 $ 9,644,250 $ 1,776,000 $ 99,909,600 CIP Project Total by Fiscal Year $ 41,136,861 1 $ 37,953,129 1 $ 24,405,449 1 $ 22,718,895 1 $ 13,257,687 1 $ 48,268,012 1 $ 65,174,206 1 $ 252,914,239 FY21-26 CIP Summary 8 CITY CAPE G1 R A R D E A, U ADMINISTRATIVE SERVICES FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID p Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total City Hall Council Audio/Video Production Fixtures, and Equipment) (Furniture, General Fund Casino Audio/video/technology equipment/setup and furniture, fixtures and equipment for in-house audio and video productions, video conferencing, and live broadcast of City Council meetings $ 952,208 $ $ 952,208 Capital Assets - Facilities Projects Totals by Fiscal Year $ 952,208 $ - $ - $ - $ - $ - $ - $ 952,208 Map ID N Capital Assets - IT Projects Funding Source 1 Funding Source 2 1 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Exchanger Server Upgrade General Fund 5 -year upgrade $ 100,000 $ 100,000 $ 200,000 Network Switch Replacement General Fund Upgrade network infrastructure $ 37,000 $ 37,000 $ 74,000 CISCO Phone Upgrade General Fund 5 -year upgrade $ 97,000 $ 97,000 $ 194,000 Network Storage General Fund File storage / Nimble NAS (5 -yr upgrade schedule) $ 40,000 $ 95,000 $ 40,000 $ 175,000 Nimble Storage Upgrade General Fund Replace storage array $ 97,000 $ 97,000 $ 194,000 Upgrade Offsite VM server General Fund Disaster recovery $ 40,000 $ 40,000 $ 80,000 Data backup storage General Fund Backup for server data $ 70,000 $ 70,000 $ 140,000 Storage Upgrade General Fund File serverstorage I $ 67,000 $ 67,000 $ 134,000 Fiber Infrastructure General Fund Moving/ running fiber to City facilities $ 100,000 $ 100,000 $ 200,000 Data Archiving General Fund Data backup $ 23,000 $ 23,000 $ 46,000 Capital Assets- IT Projects' Totals by Fiscal Year $ 137,000 $ 137,000 $ 137,000 $ 137,000 $ 218,000 $ 671,000 $ - $ 1,437,000 Map ID q Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total City -Wide Rebranding Initiative EDA Grant lGeneral Fund Final Comprehensive Plan includes a complete rebranding/redesign to conform with Strategic Plan $ - $ 50,000 $ 50,000 City Web Site Re -Design EDA Grant General Fund 5 -year upgrade - Redesign of web site to improve customer service and citizen engagement $ 65,000 1 1 1 $ 65,000 $ 130,000 $ $ - Capital Assets - Non -fleet Projects Totals by Fiscal Year $ - $ 65,000 $ - $ - $ - $ 65,000 $ 50,000 $ 180,000 Map ID p Environmental Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Environmental Projects' Totals by Fiscal Year $ $ $ $ $ $ $ $ Map ID q Transportation Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Transportation Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ $ 1,089,208 $ 202,000 $ 137,000 $ 137,000 $ 218,000 $ 736,000 $ 50,000 1 $ 2,569,208 ADMINISTRATIVE SERVICES f,, 0 �� �� qt—ITYAPE G� 1 R A R D E A U 'A-.,, ;t i CIP FY 2021-2026 J11 1-11-��-��-�•- -��� - Cape Girardeau � 3 � 10 Regional Airport Tek/way F .R N i; • � w?i •'r f 2 EE 9 s ■ N f - 4 (U+ 6 _0 OL Ai 4 �.. 8 ' Taxiwa C ---1R 3 ! — -..�---- +m A LEGEND7 jr - ! 3 Numbers correspond to Map ID # on the ? CIP spreadsheet. Transportation Projects ..� 0 N Transportation Projects - �••►�1'„•„' `.,,.��1 1 1 Capital Assets Ili lr Capital Assets - - -11-11� Cape City Limits �1-Il�lti Ward 1 Ward 2 Ward 3 0 1,0002,000 Feet Ward 4 11 1 11:12,855 Created by: Development Services _____________________________ Ward 5 Teresa Hefner, AY ante Water Res ou ces prov tled by the City ofCAe Gverdrm are to be usd fm usual vd osty mt goes nted t b; aaurat<. Date: 2/26/2021 aeiay<raar<"artn<aa<draraay Data Source(s): mgmeaisg order gs purpose. Ward 6 City of Cape Giardeau Government, MO Coordnate System: NAD 1983 Slate Pune Missouri EastFIPS 2401 Feet 10 CITY CAPE G1 R A R D E A D FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total Cape Girardeau Regional Airport -10 Additional T- 1 Hangars Public -Private Partnership Design and construct set of 10 additional t -hangars and adjoining pavement $ 1,400,000 $ $ 1,400,000 Cape Girardeau Regional Airport -18 Replace Pale 2 Barn T -Hangars Airport Improvement Program (AIP) (90%) General Fund (10%) 18 new pole barn -style t -hangars to replace the existing Air -Evac t- hangars $ 506,000 $ $ 506,000 3 Cape Girardeau Regional Airport -Perimeter Fence MoDOT ($1,270,000) General Fund ($130,000) Fencing around the entire perimeter $ 1,300,000 $ $ 1,300,000 Cape Girardeau Regional Airport- Replace Airport 4 Corporate Hangar General Fund Replace airport corporate hangar $ 500,000 $ $ 500,000 5 Cape Girardeau Regional Airport - Fuel Farm AIP General Fund 2x 20,000 gallon tanks for airport/Cape Aviation would increase capacity ofbothjet and 1001 -1 -fuel $ 990,000 $ $ 990,000 Cape Girardeau Regional Airport - ARFF Access Road MoDOT Access road to airport ARFF facility $ 750,000 $ $ 750,000 Cape Girardeau Regional Airport - ARFF/SRE Storage Facility AIP General Fund New maintenance facility and building to store airport ARFF and snow removal equipment $ 2,500,000 $ $ 2,500,000 $ $ Capital Assets - Facilities Projects' Totals by Fiscal Year $ 3,706,000 $ 990,000 $ - $ 3,250,000 $ - $ - $ - $ 7,946,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Capital Assets - IT Projects' Totals by Fiscal Year $ -I$ - $ - $ -I$=-26F1 $ - $ Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24ZFY24-25 FY CNT Total Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ - $ - $ - $ $ - $ Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY CNT Total Environmental Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Air Service Marketing MoDOT (90%) General Fund (10%) Air service marketing $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $ 1,000,000 Environmental Assessment for Airport Layout Plan Update MoDOT Environmental Assessment for Airport Layout Plan Update $ 98,000 $ $ 98,000 6 Taxiway Alpha Rehabilitation FAA Supplemental Appropriation Taxiway Alpha Rehabilitation $ 7,700,000 $ $ 7,700,000 7 Taxiway Delta Rehabilitation MoDOT (90%) General Fund (10%) Taxiway Delta Rehabilitation $ 2,100,000 $ $ 2,100,000 8 Airfield Pavement Maintenance AIP General Fund Crack seal 75,000LF of airfield surfaces and general aviation ramp $ 510,000 $ $ 510,000 9 Taxiway Echo Rehabilitation AIP General Fund Reconstruction of Taxiway Echo $ 1,500,000 $ $ 1,500,000 10 Taxiway Access to NW Quadrant MoDOT(90%) General Fund (10%) Taxiway Access to NW Quadrant $ 1,000,000 $ $ 1,000,000 11 Helicopter and Light Sport Aircraft Operations Area MoDOT Helicopter and Light Sport Aircraft Operations Area $ 70,000 $ $ 70,000 Access Road and Taxilane for NW State Funding General Fund Landside access road and airside taxilane for NW quad, parcels $ - $ 1,323,000 $ 1,323,000 Airport Road Extension to Rte M '2 T Airport Road Extension to Rte M $ - $ 4,629,000 $ 4,629,000 Land Acquisition for Runway 10 Extension M.DOT Land Acquisition for Runway 10 Extension $ - $ 436,000 $ 436,000 $ $ Transportation Projects'Totals by Fiscal Year $ 198,000 $ 3,904,000 $ 9,900,000 1 $ 10,890,000 $ 2,110,000 $ 2,110,000 5 1,100,0001 $ 4,350,000 170,000 $ 170,000 500,000 1 $ 6,388,000 1 $ 500 ,000 $ 6,388,000 $ 20,366,000 28,312,000 CAPE GIRARDEAU REGIONAL AIRPORT 11 dl 4i.lmlr i,,-)y�r, illi ■_ r x:;L �e * "CITY OfCAPE x. srr�x C, 1 R A R D E A U C I P FY 2021-2026 Community Development -NT S Illinois Y` LEGEND i .AMC ■ Numbers correspond to Map ID # on the CIP spreadsheet. i = Transportation Project 11�114F Ell 111111R. A- , ■ Cape City Limits Ward 1 Ward 4 -MNNMJ or Ward 2 Ward 5 Ward 3 Ward 6 0 1 2 Miles I I I I I I I 1 I 1:72,300 Created by: Development Services _ Teresa Heifner,Alliance Water Resources �r ihec Date: 2/26/2021 ye..e... m 1 —d lr,,,, Data So,rc:,s,: 2 City of Cape Girardeau Government, MO 1 1 Coordinate System: NAD 1983 StatePlane Missouri East FIPS 2401 Feet CITY CAPE G 1 R A R ❑ E A U FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID# Capital Assets- Facilities Projects Funding Source) Funding Source2 Description FY 21-22 FY 22-23 FY 25-26 FY23-244FY24-25 FY 26-31 CNT Total Red Star Boat Dock Feasibility Study TBD $ - $ 50,000 $ 50,000 Non -Transportation Street Lights TBD $ - $ 50,000 $ 50,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ - $ $ - 4FY23-24 - $ - $ 100,000 $ 100,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY 25-26 FY 26-31 CNT Total $ $ Capital Assets - IT Projects' Totals by Fiscal Year $ - $ - Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 =FY23-24FY24-25 =25-26FY =CNTTotal Capital Assets - Non -fleet Projects'Totals by Fiscal Year $ - $ - Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 Electric Vehicle Charging Stations TBD $ $ Environmental Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ 50,000 $ 50,000 Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total 1 Spanish Street - Broadway to Independence RDF New pavement, sidewlks, streetlights, streetscaping $ 1,770,000 $ $ 1,770,000 2 Lorimier Street and Sanitary Sewer Replacement Sewer Fund $ 470,000 $ $ 470,000 Bloomfield Road Overpass @ 1-55 TBD Widening Bloomfield Road Overpass @ 1-55 $ - $ 5,750,000 $ 5,750,000 Bloomfield Road - White Oaks to MO -74 TBD Road Reconstruction - Bloomfield Road improvements from White Oaks to MO -74 I $ -1$ 3,450,000 $ 3,450,000 Parking Structure or Surface Lots - Lower Broadway TBD Parking Structure or Surface Lots - Lower Broadway $ - $ 5,233,000 $ 5,233,000 Parking Structure - Riverfront TBD Parking Structure - Riverfront $ - $ 2,990,000 $ 2,990,000 Parking Surface Lots -Spanish Street TBD Parking Surface Lots- Spanish Street parking lot $ - $ 386,000 $ 386,000 Traffic Signal Upgrade TBD Traffic Signal Upgrade - Upgrades to 22 intersections $ - $ 273,000 $ 273,000 Bloomfield Road - Kingshighway to Albert Street TBD Road Reconstruction - Bloomfield Road improvements from Kingshighway to Albert Street $ - $ 1,000,000 $ 1,000,000 Bloomfield Road -Albert Street to West End Boulevard TBD Road Reconstruction - Bloomfield Road improvements from Albert Street to West End Boulevard $ - $ 1,000,000 $ 1,000,000 Emerald St -Sprigg St to Big Bend Rd TBD Road Reconstruction - New 36' concrete (2 travel lanes, 1 parking), curb & gutter, 2 - 6' sidewalks, streetlights, bridge/box I at Sloan Creek $ - $ 2,500,000 $ 2,500,000 Hopper Rd - Mount Auburn Rd to Kingshighway TBD Road & Sidewalk Upgrades - Mill and overlay, sidewalks $ - $ 1,500,000 $ 1,500,000 Sprigg Street - Shawnee Parkway / Route 74 to William Street TBD Road Reconstruction - Sprigg Street from Shawnee Parkway / Route 74 to William Street $ - $ 2,100,000 $ 2,100,000 Veterans Memorial Drive Phase 2 TBD County Road 306 to Mid America Hotels Property $ - $ 4,600,000 $ 4,600,000 Veterans Memorial Drive Phase 6 TBD Road Extension - Veterans Memorial Drive from Hopper Road to Vantage Drive - Construction of project. Design and Acquisition was completed with TTF6 $ - $ 3,700,000 $ 3,700,000 West End Boulevard - Southern Expressway to Linden Street TBD Road Reconstruction - West End Boulevard from Southern Expressway to Linden Street $ - $ 2,000,000 $ 2,000,000 West End Boulevard -Jefferson Avenue to Bloomfield Street TBD Road Reconstruction - West End Boulevard from Jefferson Avenue to Bloomfield Street 600,000 600,000 $ $ Transportation Projects' Totals by Fiscal Year $ $ 2,240,000 $ 2,240,000 $ - $ $ - $ - $ - $ 37,082,000 $ 37,232,000 $ 39,322,000 39,472,000 COMMUNITY DEVELOPMENT 13 .i 41■11■Ir �+���y�r, ■ illi ■ r - .r,f�� 71� 2 1 �e * "CITY OfCAPE x. srr�x � 1 F2 A Ft D E A D C I P FY 2021-2026 Fire Dept. & Public Safety Trust Fund yyyQQ �` e Q'N w 147 S Illinois LEGEND 1 Numbers correspond to Map ID # on the ■ ,V CIP spreadsheet. O Capital Assets ® PSTF �It■111 11■11� �I■11■11■ �� Cape City Limits x.11 ��� � ■ I I ■ f Ward 1 Ward 4 ' Ward 2 Ward 5 Ward 3 Ward 6 ■ J11■Ir 0 1 2 Miles I I I I I I 1 1I 1:72,300 !f� Created by: Development Services Teresa Heifner,Alliance Water Resources sr ihec ofcrpe #If#� uure o eusN fa vuuel uid Doty Date: 2/26/2021 r,e, ,e r y ■ _ ■ Ir r *It Data So,rc:,s,: a e. City of Ca pe Girardeau Government, MO ■ r Coordin a to System: NAD 1983 StatePlane Missouri East FIPS 2401 Feet CITY CAPE 0 1 R A R 6 E A U FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total 1 Fire Station#2 Annex Backup Generator Installation General Fund Relocate standby generator from the old Police Station to the Fire Station #2 Annex. This project would include pouring a concrete pad, installing a transfer switch, and running wiring from the generator to the building. $ 20,000 $ $ 20,000 Fire Station #5 Future Fire Sales Taxi New Fire Station #5 in north or south Cape, dependent upon future growth trends $ - $ 4,000,000 $ 4,000,000 Regional Training Center Future Fire Sales Tax Training tower and burn building $ - $ 1,339,000 $ 1,339,000 Fire Station #1 -Relocation TBD Building has reached the end of its 50 -year life span and relocate for service delivery I $ - $ 6,000,000 $ 6,000,000 $ $ Capital Assets- Facilities Projects'Totals by Fiscal Year $ 20,000 $ - $ $ - $ - 1 $ - $ 11,339,000 $ 11,359,000 Capital Assets - Fleet Funding Source Funding Source Description FY 21-22 FV 22-23 FY23-24 FY24-25 FV 25-26 FY 26-31 CNT Total Capital Assets - Fleet Requests'Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Map ID # Capital Assets -IT Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total AVL (Automatic Vehicle Location) Dispatching Software/Equipment Future PSTF Purchase AVL dispatching software that integrates with our new computer aided dispatch (CAD) system implemented in March 2020. The project also included laptops for all front line apparatus land staffcars assigned to chiefofficers. $ 107,000 $ $ 107,000 $ $ Capital Assets - IT Projects' Totals by Fiscal Year $ - $ 107,000 $ - $ - $ - $ - $ - $ 107,000 Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total Outdoor Warning Sirens TBD Hopper Road /JC Golf Course / Whispering Oaks / Notre Dame High School / Bloomfield Road / Airport $ - $ 150,000 $ 150,000 $ $ Capital Assets - Non -fleet Projects'Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ 150,000 $ 150,000 Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Environmental Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FV 21-22 FV 22-23 FY23-24 FY24-25 FV 25-26 FY 26-31 CNT Total Transportation Projects' Totals by Fiscal Vear $ $ $ $ $ $ $ - $ $ 11,489,000 $ 11,616,000 FIRE DEPARTMENT 15 CITY CAPE FY 2021-2026 Capital Improvement Program Q1 R A R D E A U 10 Year Projection LEET Y 2021-20 Project Cost (Solit for Multi -Year Proiectsl Administrative Services' Fleet Requests Description I Fleet # I Last 4 VIN I Transfer I FY 21-22 1 FV 22-23 1 FY23-24 I FY24-25 FY 25-26 1 FY 26-31 CNT Total 2000 FORD CROWN VIC 1 82 1 20411 X 1 1 $ -1 1$ - Administrative Services' Fleet Request Totals by Fiscal Year 1 1$ - $ - $ - $ - $ - 1 $ Cape Regional Airport's Fleet Requests Description Fleet # Last 4 VIN FY 21-22 FY 22-23 FY23-24 FV24-2S FY 25-26 FY 26-31 CNT Total FBO-2007 FORD TAURAS 5 5598 $ 16,080 $ 21,547 $ 37,627 FBO-1999 SKYBUS TUG 720 $ 22,113 $ 25,076 $ 47,189 FBO-2001 HARLAN TUG 887 508 USED $ 31,506 $ 25,727 $ 57,233 FBO-2015 FORD FUSION 343 6122 $ 21,226 $ - $ 21,226 FBO-2013 JOHN DEERE GATOR 855D 199 6071 $ 16,355 $ 18,366 $ 34,721 OPS -2004 IHC 7400 DUMP TRUCK -SPREADER AND PLOW 208 8283 $ 341,000 1 $ - $ 490,857 $ 831,857 OPS -2007 SWEEPER ATTACHES TO 208 334 2294 $ 33,000 $ 37,422 $ 70,422 OPS-L&D TRAILER 5X8 TILT 346 6142 $ 800 $ - $ 800 OPS -2016 TOYOTA 50000LBS FORKLIFT 374 $ 40,576 $ 40,576 OPS -2011 GRACO PAINT LINE STRIPER 436 6995 $ 4,500 $ 4,500 OPS -2018 JOHN DEERE Z970R MOWER 449 944 $ 13,089 $ 13,089 OPS -2015 NEW HOLLAND T4.100 95HP TRACTOR 184 227 $ 68,055 $ 68,055 OPS -2012 JOHN DEERE HX15 ROTARY CUTTER 497 4510 1 $ 19,935 $ - 1 $ 22,606 $ 42,541 OPS -2015 JOHN DEERE Z970R Z MOWER 550 159 $ 13,536 $ 15,200 $ 28,736 OPS -2016 JOHN DEERE HX15 ROTARY CUTTER 1185 3248 $ 20,670 $ 23,439 $ 44,109 OPS -2011 CHEVROLET SILVERADO 3500 - PLOW AND SPREASER 145 671 X $ 43,115 $ - $ 48,892 $ 92,007 OPS -2011 CHEVROLET SILVERADO 3500 - PLOW AND SPREASER 148 965 X $ 43,115 $ - $ 48,892 $ 92,007 Cape Regional Airport's Fleet Request Totals by Fiscal Year Development'sCommunity $ 132,590 $ 468,391 $ - $ 800 $ - $ )90,228 $ 634,686 $ 1,526,695 Description Fleet # Last 4 VIN Transfer FY 21-22 FY 22-23 FY23-24 FY24-25 FV 25-26 FY 26-31 CNT Total 2008 Chevrolet Silverado 3/4 ton 44 Pickup (ENGINEERING) 105 164 X $ 28,511 $ 32,331 $ 60,842 2009 FORD EXPLORER (ENGINEERING) 109 7459 $ 26,745 $ 30,328 $ 57,073 2009 FPRD EXPLORER (ENGINEERING) 127 7461 $ 26,745 $ 30,328 $ 57,073 2008 Chevrolet Silverado 3/4 ton 44 Pickup (ENGINEERING) 156 9978 X $ 28,511 $ 32,331 $ 60,842 2017 CHEVROLET SILVERADO 1500 4X4 W/KNAPHIDE WORK BED (ENGINEERING) 220 7966 $ 36,532 $ - $ 36,532 2016 FORD EXPLORER 4X4 (ENGINEERING) 221 1697 $ 32,320 $ - $ 32,320 2016 FORD EXPLORER 4X4 (ENGINEERING) 241 1698 $ 32,320 $ - $ 32,320 2007 CHEVROLETTRAIL BLAZER (PLANNING) 225 110 $ 27,426 $ 31,101 $ 58,527 2009 FORD EXPLORER (INSPECTIONS) 99 7460 $ 26,745 $ 30,228 $ 56,973 2014 FORD ESCAPE 4X4 (INSPECTIONS) 137 9620 $ 36,553 $ - $ 36,553 2017 FORD ESCAPE (INSPECTIONS) 180 5279 $ 26,377 $ 26,377 2015 FORD ESCAPE (INSPECTIONS) 1 247 1 9620$ 26,553 $ - $ 26,553 Community Development's Fleet Request Totals by Fiscal Year Fire Department $ 164,683 $ - $ 64,640 $ 73,085 $ 26,553 $ 213,024 $ - $ 541,985 Description Fleet # Last 4 VIN Transfer FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total 2003 CHEVROLET SUBURAN F250 95 8495 X $ 54,658 $ 61,982 $ 116,640 2018 FORD EXPLORER PPV INTERCEPTOR 113 6128 $ 32,595 $ 32,595 2010 CHEVROLET SUBURBAN F250 131 702 $ 44,803 $ 50,806 $ 95,609 2020 DODGE RAM 2500 CREW CAB PICKUP 4X4 153 3317 $ 33,016 $ 33,016 2008 CHEVROLET TRAIL BLAZER (ENG) 154 8876 $ 29,676 $ 33,652 $ 63,328 2019 CHEVROLET 250OHD 4X4 PICKUP W/ UTILTY BED 156 4558 $ 47,582 $ 47,582 2020 DODGE RAM 25004X4 PICKUP 1 252 1 3318 $ 38,259 1 1 $ 38,259 2008 CHEVROLET SUBURBAN 139 8740 $ - $ 368,500 $ 368,500 2019 CHEVROLET SILVERADO 4X4 PICKUP 155 4558 $ 28,500 $ 28,500 1993 FORD F350 4X4 PICKUP 158 2191 $ 38,259 $ - $ 38,259 2009 FORD F550 4X4 PICKUP 166 2978 $ 67,750 $ - $ 67,750 FLEET 16 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection 1988 FORD F350 4X4 PICKUP 167 4813 $ 31,000 $ - $ 31,000 2017 ROSENBAUR HEAVY RESCUE 233 1603 $ 808,500 $ 808,500 2005 El CYCLONE II 240 0405 $ 545,500 $ - $ 545,500 2017 ROSENBAUER AERIAL LADDER 243 1601 $ 942,568 $ 942,568 2005 EI CYCLONE II 254 0630 $ 581,500 $ - $ 581,500 2017 ROSENBAUER FIRE PUMPER 257 1610 $ 681,950 $ 681,950 2017 ROSENBAUER FIRE PUMPER 260 1609 $ 681,950 $ 681,950 2017 ROSENBAUER FIRE PUMPER 262 1611 $ 684,950 $ 684,950 2017 ROSENBAUER FIRE PUMPER 266 1608 $ 715,880 $ 715,880 2006 SPARTAN SMEAL/SPARTAN LADDER TRUCK 268 2774 $ 705,000 $ - $ 705,000 2000 WELLS EW2024 ENCLOSED CARGO TRAILER 332 8150 $ - $ 18,500 $ 18,500 2012 TAILWIND ENCLOSED TRAILER 415 7800 $ - $ 18,500 $ 18,500 2006 HOMESTEAD ENCLOSED TRAILER 487 5185 $ - $ 18,500 $ 18,500 2011 FORD EXPLORER 91 2688 $ 27,299 $ - $ 27,299 2017 CHEVROLET SUBURBAN 4X4 141 9341 $ 58,997 $ - $ 58,997 2014 FORD EXPLORER 4X4 261 8499 $ 34,950 $ - $ 34,950 2014 FORD EXPLORER 4X4 270 1650 $ 34,950 $ 2002 WELLS ENCLOSED CARGO TRAILER 332 8150 $ Fire Department Fleet Request Totals by Fiscal Year $ 1,287,137 $ 135,458 $ 763,997 $ 67,750 $ - $ 4,842,190 $ 442,500 $ 7,539,032 Parks and Recreation Fleet Requests Description Fleet # Last 4 VIN Transfer FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total ARENA -2015 CHEVROLET 25004X4 PICKUP 234 3403 $ 32,450 $ - $ 32,450 ARENA -2016 JOHN DEERE X920M ZTR 48" MOWER 1186 0826 $ 9,298 $ - $ 9,298 CEMETERY -2005 DODGE 2500 PICKUP 118 0100 $ 32,500 $ - $ 32,500 CEMETERY -2019 JOHN DEERE XUV865M GATOR 1139 0268 $ 19,262 $ 19,262 CEMETERY -2010 CHEVROLET 3500 PICKUP 185 6815 $ 32,500 $ - $ 32,500 CEMETERY- 2005 JOHN DEERE 11OTLB BACK HOE 481 1218 $ - $ 55,500 $ 55,500 CEMETERY -2010 BOSS 8FT PLOW 714 01011 $ 6,050 1 $ - $ 6,050 CEMETERY -2010 SWENSON POLYHAWK SPREADER 717 1108 $ 6,855 $ - $ 6,855 CEMETERY -2016 JOHN DEERE Z997R DIESEL MOWER 981 1281 $ 24,805 $ - $ 24,805 CEMETERY -2017 JOHN DEERE Z997R DIESEL MOWER 1194 2551 $ 24,805 $ 24,805 CEMETERY -2017 JOHN DEERE Z960M MOWER 1198 2519 $ 13,458 $ 13,458 CEMETERY -2009 JOHN DEERE 3320 TRACTOR 1218 2268 $ 31,200 $ - $ 31,200 CEMETERY -U -DUMP 5/8 DUMP TRAILER 1250 3835 $ - $ 9,850 $ 9,850 FACILITY MAINT-2012 CHEVROLET K2500 4X4 PICKUP 171 0318 $ 43,146 $ 1 $ 43,146 COLF-2012 CHEVROLET C2500 4X4 PICKUP 112 8359 $ 32,560 $ - $ 32,560 GOLF -2013 FORD F3500 4X4 W/ GOOSE NECK HITCH 160 6563 $ 42,500 $ - $ 42,500 GOLF -2010 KUBOTA L5740HSTC-3 4X4 TRACTOR 186 0935 $ 47,351 $ - $ 47,351 GOLF -2004 MASSY FERGERSON 1440 TRACTOR 306 2806 $ 23,500 $ - $ 23,500 GOLF -2017 KUBOTA L35 TRACTOR 308 1130 $ - $ 71,845 $ 71,845 GOLF -2019 NORSTAR DECK -OVER TILT TRAILER 361 7979 $ 10,022 $ 10,022 GOLF -2008 JOHN DEERE PROGATOR 2030 394 0135 $ 22,082 $ - $ 22,082 GOLF -2013 TORO 5010 REELMASTER FAIRWAY MOWER 406 0204 $ 70,350 $ - $ 70,350 GOLF -2016 JOHN DEERE Z970R 60" MOWER 414 0069 $ 11,115 $ - $ 11,115 GOLF -2017 VENTRAC 4500P SLOPE MOWER 500 5576 $ 35,935 $ 35,935 GOLF -2013 RED RHINO 30FT GOOSENECK TRAILER 522 7194 $ 23,500 $ 23,500 GOLF -2017 TORO SAND PRO 5040 528 4451 $ 34,128 $ - $ 34,128 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 594 2798 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 599 2827 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 600 2848 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 611 2849 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 616 2850 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 618 2851 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 629 2852 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 630 2853 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 637 2854 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 655 2855 $ 9,555 $ 9,555 FLEET 17 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 680 2856 $ 9,555 $ 9,555 GOLF -2008 PEQUEA TOP SEEDER 701 2000 $ 23,050 $ - $ 23,050 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 709 2801 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 727 2859 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 728 2803 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 773 2805 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 833 2809 $ 9,555 $ 9,555 GOLF -2013 CLUB CAR DSPLAYER GOLF CAR 834 46661 $ 5,145 $ - $ 5,145 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 835 2821 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 853 2822 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 855 2824 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 856 2825 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 859 2864 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 860 2865 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 863 2867 $ 9,555 $ 9,555 GOLF -2013 CLUB CAR DSPLAYER GOLF CAR 875 46681 $ 5,145 $ - $ 5,145 GOLF -2007 CLUB CAR CAFE EXPRESS DRINK CAR 905 7580 $ 10,750 $ - $ 10,750 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 912 2868 $ 9,555 $ 9,555 GOLF -2016 TURF PRIDE 5400 AERATOR 919 1063 $ 29,250 $ - $ 29,250 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1022 2869 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1023 2870 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1024 2871 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1025 2873 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1026 28741 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1027 2875 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1028 2876 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1029 2877 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1030 2878 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1031 2879 $ 9,555 $ 9,555 GOLF -2019 YAMAHA DR2ARIBE GOLF CAR 1100 2658 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1101 3604 $ 5,950 $ 5,950 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1102 2880 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1103 2660 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1104 2881 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1105 2882 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1106 3922 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1107 3606 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1108 2664 $ 6,100 $ 6,100 GOLF -2008 CLUB CAR DSPLAYER GOLF CAR 1110 78551 $ 5,500 $ - $ 5,500 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1111 3939 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1112 3605 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1113 2857 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1114 2659 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1115 3612 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1116 2657 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1117 2858 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1118 26651 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1119 2662 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1120 2668 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1121 2860 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1122 2861 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1123 2661 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1124 2338 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1125 2862 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1126 2863$ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1127 2330 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1128 26671 $ 6,100 $ 6,100 FLEET 18 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1129 2866 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1130 2334 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1131 3613 $ 6,100 $ 6,100 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1132 2337 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1133 2873 $ 9,555 $ 9,555 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1134 3945 $ 6,100 $ 6,100 GOLF -2018 YAMAHA DR2ARIBE GOLF CAR 1136 3609 $ 6,100 $ 6,100 GOLF -2008 CLUB CAR DSPLAYER GOLF CAR 1137 65621 $ 5,500 $ - $ 5,500 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1138 2333 $ 9,555 $ 9,555 GOLF -2020 CLUB CAR TEMPO ELECTRIC GOLF CAR 1140 2368 $ 9,555 $ 9,555 GOLF -2008 YAMAHA DR2ARIBE 1141 3931 $ 5,500 $ - $ 5,500 GOLF -2010 CLUB CAR DSPLAYER GOLF CAR 1142 8419 $ 5,500 $ - $ 5,500 GOLF -2010 CLUB CAR DSPLAYER GOLF CAR 1143 8422 $ 5,500 $ - $ 5,500 GOLF -2015 TORO WORKMAN SPRAYER 1190 0508 $ 65,796 $ 65,796 GOLF -2012 TORO 44906 GREENS ROLLER 1192 1457 $ 13,195 $ - $ 13,195 GOLF -2015 FELLING FT-10DT-DUMP TRAILER 1193 0851 $ 10,645 $ 10,645 GOLF -2017 TORO 4700D MOWER 1199 0571 $ 86,750 $ - $ 86,750 GOLF -2009 TORO 4700D MOWER 1201 0243 $ 70,750 $ - $ 70,750 GOLF -2017 CLUB CAR 1500 CARRYALL 1207 2671 $ 14,155 $ - $ 14,155 GOLF -2017 CLUB CAR 1500 CARRYALL 1208 2618 $ 14,155 $ - $ 14,155 GOLF -2017 CLUB CAR 1500 CARRYALL 1209 2640 $ 14,155 $ - $ 14,155 GOLF -2015 TORO WORKMAN MDX 1210 7273 $ 13,667 $ - $ 13,667 GOLF -2009 TORO PROCORE 1298 1213 0107 $ 35,100 $ - $ 35,100 GOLF -2009 TORO 3250D GREEN MASTER MOWER 1215 0500 $ 50,975 $ - $ 50,975 GOLF -2009 JOHN DEERE 21OU TRACTOR 1227 0185 $ 66,885 $ - $ 66,885 GOLF -2010 TORO 6700D MOWER 1239 0166 $ 79,700 $ - $ 79,700 GOLF -2010 JOHN DEERE 2030A PROGATOR 1240 5046 $ 30,025 $ - $ 30,025 GOLF -2016 TORO 3400 REEL MOWER 1242 0600 $ 52,175 $ - $ 52,175 GOLF -2010 TORO 3100D REEL MOWER 1245 0426 $ 35,500 $ - $ 35,500 GOLF -2010 TORO 648 PROCORE 1246 0832 $ 28,085 $ - $ 28,085 GOLF -2010 FOLEY 652 KNIFE GRINDER 5515 1200 $ 42,000 $ 42,000 MAINT-2009 CHEVROLET 25004X4 DUMP TRUCK 125 1364 $ 56,250 $ - $ 56,250 MAINT-2013 CHEVROLET 3500 4X4 PICKUP W/ PLOW & SPREADER 129 4605 $ 42,500 $ - $ 42,500 MAINT-2008 CHEVROLET 3500 4X4 PICKUP W- PLOW & SPREADER 149 1467 $ 42,500 $ - $ 42,500 MAINT-2008 CHEVROLET 1500 PICKUP 217 7926 $ 19,200 $ - $ 19,200 MAINT-2012 CHEVROLET 1500 PICKUP 98 9824 $ 25,750 $ - $ 25,750 MAINT-2009 CHEVROLET 1500 PICKUP 102 6672 $ 25,750 $ - $ 25,750 MAINT-2009 CHEVROLET 2500 PICKUP 114 1482 $ 27,500 $ - $ 27,500 MAINT-2009 CHEVROLET 1500 PICKUP 116 9575 $ 21,500 $ - $ 21,500 MAINT-2009 SUZUKI SUPER STALKER 117 5857 $ 22,500 $ - $ 22,500 MAINT- CHEVROLET 3500 HD CREW CAB DUMP TRUCK 128 2489 $ 62,500 $ 62,500 MAINT-2012 CHEVROLET 1500 PICKUP 135 1924 $ 23,200 $ - $ 23,200 MAINT-2012 CHEVROLET C2500 PICKUP 143 7408 $ 35,500 $ - $ 35,500 MAINT-20191SUZUC45009YD TRASH TRUCK 150 0344 $ 134,117 $ 134,117 MAINT-20101HC 7400 DUMP TRUCK 209 4933 $ 132,100 $ - $ 132,100 MAINT-2012 CHEVROLET 3500 DUMP TRUCK 212 0482 $ 44,675 $ - $ 44,675 MAINT-2013 FORD E35015 PASSENGER VAN 213 1965 $ 32,100 $ - $ 32,100 MAINT-2020 FORD F-350 PASSENGER VAN 277 4998 $ 42,828 $ 42,828 MAINT-2015 JOHN DEERE 333E SKID STEER 302 5960 $ 93,490 $ 93,490 MAINT-2015 JOHN DEERE 50G MINI EXCAVATOR 311 3655 $ 89,646 $ 89,646 MAINT-2013 GENIE TZ -50 BOOM LIFT 318 590 $ 70,200 $ 70,200 MAINT-2018 CASE IH 120C TRACTOR W/ LOADER 325 0373 $ 80,400 $ 80,400 MAINT-2015 TRAIL KING TKT 14U TRAILER 345 9279 $ 14,715 $ 14,715 MAINT-2012 FELLING FT15IT-I TRAILER 381 1556 $ 10,565 $ 10,565 MAINT-2016 JOHN DEERE 1570 FRONT DECK MOWER 395 0103 $ 32,407 $ - $ 32,407 MAINT-2011 FRONTIER PR1184F POWER RAKE 682 0093 $ 18,585 $ - $ 18,585 MAINT-2009 HOMESTEAD 818AB ENCLOSED TRAILER 764 4854 $ 10,500 $ - $ 10,500 FLEET 19 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection MAINT-2019 FRONTIER FLEX MOWER 990 0618 $ 22,975 $ 22,975 MAINT-2017 JOHN DEERE 1570 FRONT DECK MOWER 1182 1175 $ 33,154 $ - $ 33,154 MAINT-2015 JOHN DEERE 1570 FRONT DECK MOWER 1188 0356 $ 33,600 $ - $ 33,600 MAINT-2012 JOHN DEERE 1445 FRONT DECK MOWER 1195 0356 $ 25,850 $ - $ 25,850 MAINT-2016 JOHN DEERE 1570 FRONT DECK MOWER 1217 0211 $ 31,625 $ - $ 31,625 MAINT-2009 JOHN DEERE 4320 TRACTOR W/ BELLY MOWER 1223 0351 $ 51,500 $ - $ 51,500 MAINT-2017 JOHN DEERE 5100E TRACTOR 1224 2024 $ 69,288 $ 69,288 MAINT-2017 FRONTIER FM1015R FLEX WING MOWER 1225 0508 $ 21,125 $ - $ 21,125 MAINT-2009 JOHN DEERE 4320 TRACTOR W/ BELLY MOWER 1226 0350 $ 51,266 $ - $ 51,266 MAINT-2009 JOHN DEERE 21OU LOADER 1228 0184 $ 101,405 $ - $ 101,405 MAINT-2010 TORO WALK BEHIND MOWER 1244 0111 $ 5,950 $ - $ 5,950 OSAGE-2007 CHEVROLET 2500 4X4 W/ UTLITY BODY 267 9225 $ 32,500 $ - $ 32,500 OSAGE- 2012 CHEVROLET 2500 4X4 W/ SERVICE BODY 176 1938 $ 34,525 $ - $ 34,525 OSAGE-2012 CLUB CAR UTILITY CART 391 1278 $ 6,935 $ - $ 6,935 OSAGE-2009 CHEVROLET C1500 PICKUP 104 9478 $ 19,413 $ - $ 19,413 OSAGE-2012 GENIE GS4069DC SCISSOR LIFT 393 1561 $ - $ 64,000 $ 64,000 OSAGE-2016 JOHN DEERE XUV 855D GATOR 1184 1176 $ 16,840 $ - $ 16,840 OSAGE-2016 JOHN DEERE X390 RIDING MOWER 1211 2051 $ 5,875 $ - $ 5,875 OSAGE-2009 JOHN DEERE X360 RIDING MOWER 1237 2977 $ 5,900 $ - $ 5,900 OSAGE-2010 TORO Z400 MOWER 1243 1305 $ 7,050 $ - $ 7,050 SOFTBALL -2007 JOHN DEERE GATOR 79 0107 $ 5,250 $ - $ 5,250 SOFTBALL -2002 CUSHM TRUCKSTER/SPRAYER 92/93 2278 $ - $ 21,600 $ 21,600 SOFTBALL-2007KUBOTA TRACTOR 339 7609 $ - $ 40,215 $ 40,215 SOFTBALL-2012CHEVRLOET 35004X4 PICKUP 130 8274 $ 31,290 $ - $ 31,290 SOFTBALL -2012 CHEVROLET 1500 PICKUP 157 1555 $ 22,900 $ - $ 22,900 SOFTBALL -2012 CHEVROLET 35004X4 DUMP TRUCK 170 5157 $ 44,676 $ - $ 44,676 SOFTBALL -2010 CHEVROLET 3500 DUMP TRUCK 178 3087 $ 38,352 $ - $ 38,352 SOFTBALL -2012 CHEVROLET 1500 PICKUP 237 0212 $ 22,900 $ - $ 22,900 SOFTBALL -2016 ABI FORCE S360 INFIELD GROOMER 352 2034 $ 21,927 $ 21,927 SOFTBALL -2016 ABI FORCE S360 INFIELD GROOMER 354 2033 $ 21,927 $ 21,927 SOFTBALL -2013 TORO 5040 SAND PRO 408 0376 $ 36,645 $ - $ 36,645 SOFTBALL -2012 JOHN DEERE 4720 TRACTOR 421 5086 $ 55,790 $ - $ 55,790 SOFTBALL -2014 LEVEL BEST TD48 LASER GRADER 474 2609 $ 29,985 $ 29,985 SOFTBALL -2008 JOHN DEERE GATOR 489 1550 $ 11,657 $ - $ 11,657 SOFTBALL -2013 JOHN DEERE 855D GATOR 490 1724 $ 14,025 $ - $ 14,025 SOFTBALL -2013 JOHN DEERE 855D GATOR 493 1850 $ 14,025 $ - $ 14,025 SOFTBALL -2019 JOHN DEERE Z955M MOWER 797 0029 $ 13,855 $ - $ 13,855 SOFTBALL -2017 KUBOTA MX5800HST TRACTOR 826 3276 $ - $ 40,215 $ 40,215 SOFTBALL -2015 JOHN DEERE Z970R MOWER 991 0003 $ 11,475 $ - $ 11,475 SOFTBALL -2017 FELLING FT15ITI TRAILER 1009 3380 $ - $ 17,250 $ 17,250 SOFTBALL -2017 TORO 3500D MOWER 1183 0649 $ 38,397 $ - $ 38,397 SOFTBALL -2015 TORO 44507 TOP DRESSER 1189 0134 $ 14,478 $ 14,478 SOFTBALL -2015 JOHN DEERE 855D GATOR 1191 1051 $ 15,430 $ - $ 15,430 SOFTBALL -2012 JOHN DEERE Z970A MOWER 1196 0229 $ 15,128 $ - $ 15,128 SOFTBALL -2012 JOHN DEERE Z960A MOWER 1197 0005 $ 13,827 $ - $ 13,827 SOFTBALL -2016 TORO 4700D MOWER 1202 0275 $ 90,423 $ - $ 90,423 SOFTBALL -2016 TORO 4500D MOWER 1203 0565 $ 76,495 $ - $ 76,495 SOFTBALL -2014 JOHN DEERE 855D GATOR 1204 1016 $ 15,075 $ - $ 15,075 SOFTBALL -2014 JOHN DEERE 855D GATOR 1214 1018 $ 15,075 $ - $ 15,075 SOFTBALL -2009 JOHN DEERE 855D GATOR 1219 0750 $ 11,929 $ - $ 11,929 SOFTBALL -2017 TORO PROCORE 1298 1222 8638 $ 39,129 $ 39,129 SOFTBALL -2009 JOHN DEERE 21OU LOADER 1229 0183 $ 109,975 $ 109,975 SOFTBALL -2016 JOHN DEERE Z970R MOWER 1236 1281 $ 14,175 $ - $ 14,175 SPORTSPLEX-2010 CHEVROLET 1500 PICKUP 121 0735 $ 22,891 $ - $ 22,891 SPORTSPLEX-2020 JOHN DEERE Z920M MOWER 1 482 0085 1.$9,524 $ 9,524 Parks and Recreation Fleet Request Totals by Fiscal Year Police Department Fleet Requests $ 562,003 $ 1,053,817 $ 536,370 $ 508,812 $ 296,215 $ 1,786,147 $ 320,47S $ 5,063,839 FLEET 20 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection Description Fleet p Last 4 VIN Transfer FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total HEALTH -2006 CHEVROLET 1500 PICKUP 126 2408 X $ - $ - HEALTH -2016 CHEVROLET 15004X4 119 $ 32,000 $ - $ 32,000 HEALTH -2014 CHEVROLET C1500 4X4 133 9433 $ 32,500 $ - $ 32,500 HEALTH -2014 CHEVROLET C1500 4X4 134 3164 $ 32,500 $ - $ 32,500 2016 DODGE CHARGER 1 5634 $ 21,889 $ - $ 21,889 2016 DODGE CHARGER 2 8232 $ 23,944 $ - $ 23,944 2017 DODGE CHARGER 3 6239 $ 25,500 $ 1 $ 25,500 2018 DODGE CHARGER 4 $ 23,422 $ - $ 23,422 2009 FORD CROWN VIC 6 2552 $ 23,500 $ - $ 23,500 2014 FORD EXPLORER 7 7724 $ 31,500 $ - $ 31,500 2016 DODGE CHARGER 8 8528 $ 29,000 $ - $ 29,000 2005 CHEVROLET IMPALA 9 5393 $ - $ 32,000 $ 32,000 2014 DODGE CHARGER 10 1321 $ 22,400 $ - $ 22,400 2014 DODGE DURANGO 11 3574 $ 31,190 $ - $ 31,190 2016 DODGE CHARGER 12 8526 $ 24,860 $ - $ 24,860 2014 DODGE CHARGER 13 6797 $ 31,500 $ - $ 31,500 2014 DODGE CHARGER 14 1297 $ 31,500 $ - $ 31,500 2011 FORD CROWN VIC 16 5325 $ 29,000 $ - $ 29,000 2016 DODGE CHARGER 17 5634 $ 29,899 $ - $ 29,899 2011 FORD CROWN VIC 18 7204 $ 23,422 $ - $ 23,422 2014 DODGE CHARGER 19 1300 $ 31,190 $ - $ 31,190 2005 FORD CROWN VIC 21 8216 $ 25,899 $ - $ 25,899 2013 FORD EXPLORER 22 6199 $ 31,845 $ - $ 31,845 2011 FORD CROWN VIC 23 9205 $ 25,899 $ - $ 25,899 2011 CHEVROLET IMPALA 24 3071 $ 22,400 $ - $ 22,400 2013 FORD TAURUS 25 0941 $ 32,455 $ - $ 32,455 2010 FORD CROWN VIC 26 5328 $ 21,375 $ - $ 21,375 2017 DODGE CHARGER 27 6231 $ - $ - 2014 FORD EXPLORER 28 7720 $ 31,500 $ - $ 31,500 2007 FORD CROWN VIC 29 2337 $ 25,500 $ - $ 25,500 2015 FORD EXPLORER 30 1857 $ - $ - 2016 DODGE CHARGER 31 8527 $ 25,500 $ - $ 25,500 2010 FORD CROWN VIC 32 5329 $ 25,500 $ - $ 25,500 2017 DODGE CHARGER 33 6240 $ - $ - 2015 FORD EXPLORER 34 1858 $ 32,500 $ 1 $ 32,500 2017 FORD EXPLORER 35 5351 $ - $ - 2013 FORD TAURUS 36 0940 $ 32,455 $ - $ 32,455 2009 FORD CROWN VIC 38 2553 $ 25,500 $ - $ 25,500 2017 DODGE CHARGER 39 6247 $ 25,500 $ - $ 25,500 2009 FORD CROWN VIC 40 2550 $ 21,075 $ - $ 21,075 2018 DODGE CHARGER 41 1288 $ 29,500 $ - $ 29,500 2009 FORD CROWN VIC 44 2547 $ 25,500 $ - $ 25,500 2016 DODGE CHARGER 45 1368 $ 25,550 $ - $ 25,550 2009 CHEVROLET IMPALA 47 6227 $ 22,500 $ - $ 22,500 2016 DODGE CHARGER 48 5203 $ 25,500 $ - $ 25,500 2011 FORD CROWN VIC 49 7205 $ 21,075 $ - $ 21,075 2010 FORD CROWN VIC 50 5324 $ 21,075 $ - $ 21,075 2014 DODGE CHARGER 51 1307 $ 25,500 $ - $ 25,500 2013 FORD TAURUS 52 0939 $ 32,455 $ - $ 32,455 2016 DODGE CHARGER 53 5197 $ 25,500 $ - $ 25,500 2011 FORD CROWN VIC 54 9207 $ 25,000 $ - $ 25,000 2014 DODGE CHARGER 55 1299 $ 27,500 $ - $ 27,500 2011 FORD CROWN VIC 56 7206 $ 28,000 $ - $ 28,000 2016 DODGE CHARGER 57 8237 $ - $ - 2014 DODGE CHARGER 58 1306 $ 25,550 $ - $ 25,550 2013 CHEVROLET TAHOE 59 5879 $ 31,500 $ - $ 31,500 FLEET 21 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection 2005 FORD CROWN VIC 60 8229 $ 25,000 $ - $ 25,000 2008 FORD CROWN VIC 61 4409 $ 25,000 $ - $ 25,000 2011 CHEVROLET TAHOE 62 1938 $ 32,150 $ - $ 32,150 1999 IHC 340 BUS VAN 63 5177 $ - $ 65,000 $ 65,000 2016 DODGE CHARGER 64 1368 $ 25,550 $ - $ 25,550 2017 CHEVROLET VAN 65 2294 $ 50,465 $ 50,465 2017 FORD EXPLORER 66 9608 $ 36,535 $ 36,535 2014 DODGE CHARGER 67 1303 $ 29,000 $ - $ 29,000 2016 DODGE CHARGER 68 5634 $ 21,889 $ - $ 21,889 2017 DODGE CHARGER 69 6896 $ 22,245 $ - $ 22,245 2009 CHEVROLET IMPALA 70 7571 $ - $ 20,678 $ 20,678 2011 CHEVERLOT IMPALA 72 5961 $ - $ 20,678 $ 20,678 2006 BRISTERS CHUCK WAGON 73 0131A $ - $ 6,000 $ 6,000 2014 FORD EXPLORER 74 7723 $ 31,500 $ - $ 31,500 2014 DODGE CHARGER 75 1317 $ 25,500 $ $ 25,500 2011 CHEVROLET TAHOE 76 9579 $ 32,150 $ - $ 32,150 2017 FORD EXPLORER 77 8337 $ 32,500 $ - $ 32,500 2006 NISSAN PATHFINDER 78 0066 $ - $ 3,969 $ 3,969 2014 FORD EXPLORER 81 7722 $ 31,500 $ - $ 31,500 2017 FORD EXPLORER 83 1832 $ 33,615 $ 33,615 2013 CHEVROLET TAHOE 84 8137 $ 32,150 $ - $ 32,150 2011 FORD CROWN VIC 85 7207 $ 25,000 $ - $ 25,000 2014 DODGE CHARGER 86 1298 $ 25,550 $ - $ 25,550 2018 DODGE CHARGER 87 9082 $ 27,500 $ 27,500 2016 DODGE CHARGER 88 8525 $ 25,550 $ - $ 25,550 2007 FORD CROWN VIC 89 2336 $ 21,500 $ - $ 21,500 2013 FORD EXPLORER 90 6201 $ 30,245 $ - $ 30,245 2010 DODGE CHARGER 94 3260 $ 25,550 $ - $ 25,550 1992 FORD E350 SWAT VAN 123 0511 $ - $ 8,000 $ 8,000 2016 DODGE RAM 1500 SSP 136 7285 $ 35,500 $ - $ 35,500 2017 DODGE RAM 2500 195 0609 $ 38,100 $ 38,100 2003 FORS F250 4X4 PICKUP 224 9260 $ 32,875 $ - $ 32,875 2016 ARISING CARGO TRAILER 344 4800 $ - $ 5,550 $ 5,550 2014 POLARIS ATC 400 CC 4X4 1255 8107 $ 6,500 $ 6,500 2014 POLARIS ATC 400 CC 4X4 1260 8103 $ 6,500 $ 6,500 2016 DODGE CHARGER 1401 5204 $ 21,550 $ - $ 21,550 2017 DODGE CHARGER 1402 1370 $ 21,550 $ - $ 21,550 2020 FORD F150 RESPONDER 4X4 1 1405 1 50681 1 $42,000 $ 42,000 Police Department Fleet Request Totals by Fiscal Year $ 273,474 $ 528,318 $ 447,159 $ 374,777 $ 334,600 $ 241,215 $ 161,875 $ 2,361,418 Public Works Fleet Requests Description Fleet # Last 4 VIN Transfer FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total FLEET -2001 DODGE 2500 4X4 FUEL TRUCK 122 8974 X $ - $ 35,800 $ 35,800 FLEET -2004 CHEVROLET SILVERADO PICKUP 132 8431 X $ - $ 32,500 $ 32,500 FLEET -2009 CHEVROLET SILVERADO 3500 4X4 W/ SERVICE BODY 140 2978 X $ - $ 40,604 $ 40,604 FLEET -2005 FORD F250 W/ SERVICE BODY 164 6357 X $ - $ 29,500 $ 29,500 FLEET -2008 CHEVROLET TRAIL BLAZER 174 3744 X $ - $ 19,504 $ 19,504 FLEET -2012 CHEVROLET SILVERADO 4X4 216 8512 $ - $ 32,450 $ 32,450 FLEET -2006 JOHN DEERE 3320 TRACTOR W/ 72 INCH DECK MOWER 246 2069 X $ - $ 22,106 $ 22,106 FLEET -2005 TENNANT 6200E FLOOR SWEEPER 758 3015 $ - $ 16,893 $ 16,893 SEWER -2007 CHEVROLET 3500 W/ UTILITY BODY 263 9376 $ 32,850 $ 37,251 $ 70,101 SEWER -2006 444/TRAILER MOUNT SEWER RODDER 852 1028 X $ - $ 40,295 $ 40,295 SEWER -2016 FORD F350 SUPERDUTY 4X4, PLOW & SPREADER 101 8191 $ 44,913 $ - $ 44,913 SEWER -2016 FORD F350 SUPERDUTY 4X4 115 8190 $ 44,913 $ - $ 44,913 SEWER -2013 FORD F350 DUMP TRUCK 168 4931 $ 44,680 $ - $ 44,680 SEWER -2020 CHEVROLET 3500 EXT CAB 4X4 169 2354 $ 42,855 $ 42,855 SEWER -2016 FORD TRANSIT VAN 172 0980 $ 109,585 $ 109,585 SEWER CAMERA 172A 0359 $ 98,113 $ - $ 98,113 FLEET 22 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection SEWER -JOHN DEERE 410K BACKHOE 181 4707 $ 105,247 $ 119,350 $ 224,597 SEWER -2018 CHEVROLET SILVERADO 3500 4X4, PLOW & SPREADER 223 8227 $ 41,740 $ 41,740 SEWER -2006 IHC 7500 DUMP TRUCK, PLOW & SPREADER 230 4106 $ 166,003 $ 168,227 $ 334,230 SEWER 2015 FREIGHTLINER 114SD6X4 VACTOR TRUCK 236 4521 $ 498,827 $ - $ 498,827 SEWER -2020 JOHN DEERE 135G EXCAVATOR 50% 244 3018 $ - $ 106,278 $ 106,278 SEWER -2015 STRONG SL1000 MANHOLE REHAB MACHINE 341 4763 $ 95,580 $ - $ 95,580 SEWER -2017 FELLING TILT TRAILER 355 3859 $ 16,110 $ 16,110 SEWER -2018 PIPEHUNTER SIDE-TRAC EASMENT MACHINE 434 6990 $ 57,569 $ 57,569 SEWER -2013 PIPEHUNTER 7834 JET RODDER 838 1890 $ 86,295 $ - $ 86,295 SLUDGE -2015 CHEVROLET 2500 PICKUP 4X4 106 0699 $ 32,500 $ - $ 32,500 SLUDGE -2015 CHEVROLET 2500 PICKUP 4X4 108 1198 $ 32,500 $ - $ 32,500 SLUDGE -IHC 7600 TRACTOR TRAILER 281 4352 $ - $ 91,467 $ 91,467 SLUDGE -WALKER TANKER TRAILER 735 0136 $ - $ 58,705 $ 58,705 STORM -2007 CHEVROLET PICKUP W/ SERVICE BODY 205 0627 X $ 53,274 $ 60,412 $ 113,686 STORM -2006 KAWASKI MULE 3010 498 1052 X $ 9,995 $ - $ 11,334 $ 21,329 STORM -2019 ALTOZ 7661 TRAC MOWER 864 3599 $ 20,684 $ 20,684 STORM -2013 FORD F350 DUMP TRUCK, PLOW & SPREADER 161 4932 $ 61,867 $ 70,157 $ 132,024 STORM -2015 CHEVROLET 3500 PICKUP 4X4 W/ PLOW & SPREADER 162 3921 $ 46,002 $ - $ 46,002 STORM -2011 CATAPILLER 430E BACKHOE 182 0213 $ - $ 101,170 $ 101,170 STORM -2013 JOHN DEERE 3320 TRACTOR 190 0190 $ 35,550 $ - $ 35,550 STORM -FORD F350 SUPERDUTY,PLOW & SPREADER 191 8189 $ 45,995 $ - $ 45,995 STORM- 2008 TAKEUCHI TB145C EXCAVATOR 198 7673 $ 75,468 $ 75,468 STORM -2019 ISUZU ELGIN BROOMBADGER 50% 249 1958 $ 233,471 $ - $ 233,471 STORM -2021 INT. HV507 DUMP TRUCK W/PLOW & SPREADER 258 8461 $ 183,892 $ 183,892 STORM -2013 JOHN DEERE 3320 TRACTOR 604 0204 $ 36,211 $ - $ 36,211 STORM -2015 JOHN DEERE CX -15 FLEX WING MOWER 383 6292 $ 20,500 $ - $ 20,500 STREET -2012 CHEVROLET 3500 PICKUP 4X4 W/ PLOW & SPREADER 97 8041 X $ 55,720 $ - $ 55,720 STREET -2006 CHEVROLET 3500 DUMP TRUCK W/ PLOW & SPREADER 110 7215 $ 54,045 $ - $ 54,045 STREET -2013 CHEVROLET 3500 EXT. CAB 146 1148 $ 32,955 $ - $ 32,955 STREET -2000 CHEVROLET 3500 151 2636 X $ 36,575 $ - $ 36,575 STREET -2008 CHEVROLET SILVERADO 3500 4X4 W/ PLOW & SPREADER 159 0154 X $ 51,735 $ 58,667 $ 110,402 STREET -2008 CHEVROLET SILVERADO 2500 4X4 169 3671 X $ 41,511 $ 47,075 $ 88,586 STREET -2007 JOHN DEERE 31051 BACKHOE 183 8872 X $ 89,616 $ - $ 89,616 STREET -2007 JOHN DEERE 31051 BACKHOE 188 6646 X $ 89,616 $ - $ 89,616 STREET -2009 JOHN DEERE 5083E TRACTOR 194 1069 X $ 75,000 $ - $ 75,000 STREET -2021 IHC HV507 DUMP TRUCK W/ PLOW & SPREADER 214 5764 $ 158,503 $ 158,503 STREET -2008 CHEVROLET SILVERADO 1500 PICKUP 218 4318 X $ 34,980 $ 202,370 $ 39,667 $ 277,017 STREET -2011 JOHN DEERE 544K LOADER 303 9351 $ - $ STREET -2008 RHINO FR15 FLEX WING MOWER 765 3458 $ 15,649 $ - $ 15,649 STREET -2000 BOMAG BW120AC ROLLER 319 1031 $ - $ 45,265 $ 45,265 STREET NKP GHR4 HAMMER ATTACHMENT 320 6533 $ - $ 18,145 $ 18,145 STREET-2010CHEVERLOT 2500 PICKUP 4X4 173 2241 $ 32,850 $ 37,251 $ 70,101 STREET -2018 JOHN DEERE 3105L -HL BACKHOE 189 1699 $ 121,250 $ 121,250 STREET -2017 NAVISTAR 7400 6X4 DUMP TRUCK PLOW & SPREADER 201 2432 $ 198,259 $ 198,259 STREET -2010 IHC 7400 DUMP TRUCK W/ PLOW & SPREADER 202 1534 $ 151,623 $ 171,940 $ 323,563 STREET -2011 IHC 7400 DUMP TRUCK W/ PLOW & SPREADER 204 6262 $ 181,896 $ 206,270 $ 388,166 STREET -2010 IHC 7400 DUMP TRUCK W/ PLOW & SPREADER 211 4940 $ 151,623 $ - $ 171,940 $ 323,563 STREET -2010 IHC 7400 DUMP TRUCK W/ PLOW & SPREADER 215 4939 $ 151,623 $ - $ 171,940 $ 323,563 STREET- 2018 CHEVROLET 2500 HD 4X4 W/ PLOW & SPREADER 219 8610 $ 45,964 $ 45,964 STREET -2010 IHC 7400 DUMP TRUCK W/ PLOW & SPREADER 232 4941 $ 151,623 $ - $ 171,940 $ 323,563 STREET -2012 IHC 7300 DUMP TRUCK W/ PLOW & SPREADER 238 0427 $ 168,606 $ - $ 191,199 $ 359,805 STREET-20191SUZU ELGIN BROOM BADGER 251 5467 $ 241,400 $ - $ 241,400 STREET-PETERBUILT BERGKAMP SP5 POTHOLE PATCHER 265 2664 $ 29,592 $ 29,592 STREET -2013 FORD F550 BUCKET TRUCK 271 4268 $ 113,500 $ 113,500 STREET -2007 FREIGHTLINER M2/ALTECAM55-MH BUCKET TRUCK 272 3733 $ 102,200 $ - $ 102,200 STREET -2014 DURAPATCH 100077 DURATANK 309 0838 $ - $ 35,500 $ 35,500 STREET -2016 -JOHN DEERE 544K LOADER 350 7959 $ 187,366 $ - $ 187,366 FLEET 23 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection STREET -2017 JOHN DEERE 5085E TRACTOR W/DIAMOND BOOM 1187 1167 $ 112,325 $ - $ 112,325 S -W RECYCLE 2001 NISSAN FORKLIFT 252 0424 $ - $ 29,457 $ 29,457 S -W RECYCLE -2015 CHEVROLET 3500 W/ KNAPHEIDE BED 179 9841 $ 48,750 $ - $ 48,750 S -W RECYCLE -2012 JOHN DEERE 318D SKID STEER 250 9270 $ 45,158 $ - $ 45,158 S -W RECYCLE -2020 AUTOCAR ACX64 TRASH TRUCK 286 0735 $ 315,500 $ 315,500 S -W RECYCLE -2019 AUTOCAR ACX64 TRASH TRUCK 288 2380 $ 305,776 $ - $ 305,776 S -W RECYCLE -2019 AUTOCAR ACX64 TRASH TRUCK 289 8416 $ 305,776 $ - $ 305,776 S -W -RESIDENTIAL 2019 RAM 15004X4 124 00451 27,692 $ 27,692 S -W RESIDENTIAL FRIEGHT LINER TRASH TRUCK 287 9469 $ 173,502 $ 173,502 S -W RESIDENTIAL ODBD LCT60C LEAF MACHINE 293 8120 $ - $ 21,337 $ 21,337 S -W RESIDENTIAL ODBD LCT60C LEAF MACHINE 296 8120 $ - $ 21,337 $ 21,337 S -W RESIDENTIAL ODBD LCT60C LEAF MACHINE 301 8119 $ - $ 21,337 $ 21,337 S -W -RESIDENTIAL 2019 AUTOCAR ACX64 TRASH TRUCK 280 1851 $ 289,294 $ - $ 289,294 S -W RESIDENTIAL FREIGHTLINER M2 W/ HEIL BED 278 8134 $ 199,500 $ 199,500 S -W RESIDENTIAL 2019 AUTOCAR ACX64 283 8417 $ 282,685 $ 282,685 S -W RESIDENTIAL 2019 AUTOCAR ACX64 284 2375 $ 282,685 $ 282,685 S -W RESIDENTIAL 2019 AUTOCAR ACX64 285 2376 $ 282,685 $ 282,685 S -W RESIDENTIAL 2012 FRIEGHTLINER M2 LEAF VACUUM TRUCK 290 0676 $ 174,310 $ - $ 174,310 S -W TRANSFER 2016 CHEVROLET 3500 DUMP TRUCK 210 9689 $ - $ 40,275 $ 40,275 S -W TRANSFER 2015 JOHN DEERE644K LOADER 203 9184 $ 339,290 $ 339,290 S -W TRANSFER 2011 KALMAR OTTOWA 0121G YARD TRUCK 279 0039 $ 125,650 $ - $ 125,650 S -W TRANSFER 2006 IHC 7400 ROLL OFF TRUCK 800 2679 $ 127,156 $ 144,194 $ 271,350 TRAFFIC -2007 CHEVROLET 2500 W/ UTILITY BODY 165 9341 $ 32,900 $ - $ 32,900 TRAFFIC- 2015 GRACO LINELAZER 5900 323 4079 $ 9,805 $ - $ 9,805 TRAFFIC -2011 GRACO LINELAZER 5900 470 2686 $ 9,805 $ - $ 91805 TRAFFIC-GOLDSTAR16FT TRAILER 705 0314 $ - $ 3,855 $ 3,855 W -WATER -2009 IHC 4300 W/ UTILITY BODY W/ CRANE 138 4927 $ 163,451 $ - $ 163,451 W -WATER -2009 TORO WORKMAN 715 0267 $ 15,050 $ - $ 15,050 W -WATER 2011 JOHN DEERE GATOR L15907 885 0656 $ 10,550 $ - $ 10,550 W -WATER -2016 RETCO 6X12 TRAILER 362 1815 $ - $ 1,876 $ 1,876 W -WATER 2019 US JETTING CARTJETTER 3012-150 445 4145 $ 39,000 $ 39,000 W -WATER -2015 RETCO 18FT TRAILER 555 0907 $ - $ 3,555 $ 3,555 W -WATER -2017 GENIE Z30/20 BOOM LIFT 771 9145 $ - $ 69,698 $ 69,698 W -WATER -2019 JOHN DEERE Z955M MOWER 795 0091 $ 13,833 $ - $ 13,833 W -WATER -2012 CHEVROLET K2500 4X4 144 0458 $ 35,950 $ - $ 35,950 W -WATER -2015 GENIE GS2632 SCISSOR LIFT 314 1317 $ - $ 23,730 $ 23,730 W -WATER -2007 NISSAN CF30LP FORKLIFT 315 0606 $ - $ 30,584 $ 30,584 W -WATER -2015 VENTRAC 4500P SLOP MOWER 519 3442 $ 32,125 $ 32,125 WATER -2021 FORD F750 W KNAPHEID BED W/CRANE 207 0656 $ - $ 193,987 $ 193,987 WATER-2019CHEVRLOT 25004X4 PICKUP 275 2454 $ 42,691 $ 42,691 WATER -2005 FORD STEP VAN 294 1668 $ - $ 105,500 $ 105,500 WATER -1998 TOYOTA 6F6425 FORK LIFT 373 6590 $ 30,125 $ - $ 30,125 WATER -2016 BARLOW 6.5X12 TRAILER 337 2819 $ 2,065 $ - $ 2,065 WATER -2005 KOHLER 100REOZJC 10OKW GENERATOR 2005 0127 $ - $ 33,981 $ 33,981 WATER -2019 VIRNIG SKID STEER SWEEPER 761 5202 $ - $ 6,164 $ 6,164 WATER -2017 CHEVROLET 1500 4X4 W/ SERVICE BODY 96 0150 $ 38,537 $ 38,537 WATER -2017 CHEVROLET 1500 4X4 W/ SERVICE BODY 100 83641 28,537 $ 28,537 WATER -2012 CHEVROLET C1500 PICKUP 107 2118 $ 17,144 $ - $ 17,144 WATER -2012 CHEVROLET 25004X4 PICKUP 120 3691 $ 32,500 $ - $ 32,500 WATER -2015 FORD F550 CREWCAB W/VMAC&SERVICE BODY 142 1208 $ 169,050 $ - $ 169,050 WATER -2009 CHEVROLET 4500 MED DUTY 163 1805 $ 63,942 $ - $ 63,942 WATER -2012 JOHN DEERE 50D MINI EXCAVATOR 175 7477 $ 78,336 $ - $ 78,336 WATER -2011 JOHN DEERE 4320 TRACTOR 177 0663 $ 42,575 $ - $ 42,575 WATER -2015 JOHN DEERE 35G MINI EXCAVATOR 192 2363 $ 62,595 $ - $ 62,595 WATER -2012 JOHN DEERE 310SK BACKHOE 193 772$ 102,000 $ - $ 102,000 WATER -2015 JOHN DEERE 50G MINI EXCAVATOR 196 2191 $ 107,450 $ - $ 107,450 WATER -2015 JOHN DEERE 333ESKID STEER 197 87661 95,725 $ - $ 95,725 FLEET 24 CITY CAPE Q1 R A R D E A U FY 2021-2026 Capital Improvement Program 10 Year Projection WATER -2004 IHC 4300 LANDSCAPE DUMP TRUCK 206 1500 $ 69,645 $ - $ 69,645 WATER -2021 FORD F750 CREW CAB KNAPHEIDE BED W/CRANE 207 0656 $ 245,055 $ 245,055 WATER -2008 IHC 4300 CREW CAB 222 8382 $ 146,035 $ - $ 146,035 WATER -2019 PETERBILT 348 DUMP TRUCK 226 0407 $ 168,342 $ 168,342 WATER -2015 FORD ESCAPE/ REPLACE W/PICKUP W/ UTILIY BODY 227 2314 $ 26,650 $ 37,850 $ - $ 64,500 WATER -2015 CHEVROLET 2500 W/ SERVICE BODY 228 7502 $ 42,567 $ - $ 42,567 WATER -2015 FORD ESCAPE 4X4 229 2315 $ 26,650 $ - $ 26,650 WATER -2005 IHC 7400 DUMP TRUCK 231 3712 $ 105,620 $ - $ 105,620 WATER -2013 CHEVROLET 1500 PICKUP 235 5158 $ 32,500 $ - $ 32,500 WATER- 2015 CHEVROLET 2500 W/ UTITLITY BODY 239 7361 $ 37,125 $ - $ 37,125 WATER -JOHN DEERE 135G EXCAVATOR 50% 244 3018 $ - $ 106,278 $ 106,278 WATER -2015 CHEVROLET 2500 4X4 W/ UTILITY BODY 256 5915 $ 41,750 $ - $ 41,750 WATER -2018 CHEVROLET 2500 PICKUP 264 3520 $ 30,539 $ - $ 30,539 WATER -2019 CHEVROLET 25004X4 PICKUP 275 2454 $ 46,305 $ - $ 46,305 WATER -2019 IHC 7400SBA CREW CAB W/ CRANE 295 0891 $ 206,451 $ 206,451 WATER -2016 EH-WACHS LX VALVE MAINT. TRAILER 297 7090 $ 82,387 $ 82,387 WATER-2010NISSAN PF50LP FORK LIFT 305 3321 $ - $ 32,500 $ 32,500 WATER -2020 DITCHWITCH JT24 DIRECTIONAL DRILL 310 0131 $ 304,532 $ 304,532 WATER -2015 FELLING FT -15-1 TILT TRAILER 333 2618 $ 16,110 $ 16,110 WATER -2016 FELLING FT -15 -IT -1 TILT TRAILER 347 3161 $ 16,110 $ 16,110 WATER -2016 FELLING FT -15 -IT -1 TILT TRAILER 349 3087 $ 16,110 $ 16,110 WATER -2005 SULLIVAN COMPRESSOR 380 5268 $ 31,950 $ - $ 31,950 WATER -2005 TOYOTA FORKLIFT 412 4536 $ 32,450 $ - $ 32,450 WATER -2008 BALDOR TS60T GENERATOR 466 1497 $ - $ 35,500 $ 35,500 WATER -2012 FELLING FT -15 -IT -1 TILT TRAILER 506 X $ 16,110 $ - $ 16,110 WATER -2012 MCELROYAT1816501 FUSSION 618 PIPE MACHINE 525 9928 $ 73,984 $ - $ 73,984 WATER -2007 EAGR-BEAV 35FT GOOSENECK TRAILER 707 1139 USED $ - ? $ - WATER -2010 VERMEER V80OLE-250 VACTOR 725 4858 $ - $ - WATER -2012 HOMESTEAD CARGO TRRAILER 818 1251 $ - $ 12,184 $ 12,184 WATER -2004 TRAIL-EZE TE40R26LP TRAILER 819 6798 $ - $ - WATER -2009 TORO 74925 Z -MOWER 601N 1230 1455 $ 10,630 $ - $ 10,630 WATER -2009 JOHN DEERE XUV6201 GATOR 1 1233 1 3749 $ 12,360 1 1 1 1 1 $ - 1 1 $ 12,360 Public Works Fleet Request Totals by Fiscal Yearl 1 $ 1,969,166 $ 1,085,645 $ 948,283 $ 853,471 $ 2,719,069 $ 5,514,958 $ 2,237,670 $ 15,328,262 FLEET 25 CITY CAPE G I R A R C3 E A UFY 2021-2026 Capital Improvement Program 10 Year Projection PARKS AND RECREATION FY 2021-2026 Project Cost (Split for Multi -Year Projects) Map ID# Capital Assets- Facilities Projects Funding Source Funding Source Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Kiwanis Park Improvements PRS Excess Grant Internal park trail system $ - $ 50,000 $ 50,000 Osage Centre Drivit Repair/ Paint Exterior PR52 Excess PRS Equipment Drivit Repair / Paint Exterior $ - $ 84,000 $ 84,000 Missouri Park- Phased Improvements PRS Excess Grant Phased improvements to Missouri Park (Concept Plan is Complete) $ - $ 105,000 $ 105,000 Osage Centre -Commercial Tile PRS Excess or Equipment Replace the original tile floor in the gym $ - $ 124,000 $ 124,000 Osage Centre - Gym Curtain/Divider PRSExcess or Equipment Replace the two (2) original 50'curtains/dividers in the gym $ - $ 51,000 $ 51,000 Osage Centre - Upgrade Sound System PRS Equipment Foundation Update sound system on main floor and meeting rooms $ - $ 62,000 $ 62,000 Osage Park Improvements PR52 Excess Move sand volleyball courts from Arena Park to Osage Park and add a shelter due to the widening of the Cape La Croix Trail at Arena Park (Also add Restroom in Parks Portion) $ - $ 50,000 $ 50,000 Shawnee Park Center Generator TBD Grant Addition of a generator to the facility will provide access to City services during times of power outages and disaster $ - $ 350,000 $ 350,000 Shawnee Park Sports Complex - Soccer Fields Awards Area P & R Foundation Landscape/Hardscape Area for Pictures, Awards and Ceremonies $ - $ 50,000 $ 50,000 Shawnee Park Sports Complex - Concession / Restroom Facility Upgrade P & R Foundation Improve storage, concession and restroom facilities at football / soccer fields #13 & #14 $ - $ 215,000 $ 215,000 Shawnee Park Sports Complex- Extend Concession Patio TBD 40' Extension off of West side of Concession Building A $ - $ 192,000 $ 192,000 Shawnee Park Sports Complex- Fencing Behind Fields #13 & #14 TBD Install fencing to the East of football fields #13 & #14 by hillside $ - $ 100,000 $ 100,000 Shawnee Park Sports Complex -(x4) New Shelters TBD Shelter built in-house for softball fields $ - $ 200,000 $ 200,000 Shawnee Park Sports Complex- New Soccer Concessions and Restrooms P & R Foundation To provide permanent concessions and restrooms for participants on soccer fields #10, #11, and #12 (West End) $ - $ 150,000 $ 150,000 Shawnee Park Sports Complex -P.A. System PRS Equipment P.A. system located at the Shawnee Park Sports Complex for making announcements $ - $ 120,000 $ 120,000 Washington Park- Phased Improvements PRS Excess Grant Phased improvements to Washington Park including ADA accessible shelter, walkways and playground (Concept Plan is Complete) $ - $ 200,000 $ 200,000 $ $ Capital Assets - Facilities Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ 2,103,000 1$ 2,103,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Capital Assets - IT Projects' Totals by Fiscal Year Non-fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total =Environmental Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ - $ $ - $ $ - $ - $ - $ rojects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY 25-26 FY 26-31 CNT Total $ $ $ $ - Environmental Projects' Totals by Fiscal Year $ - $ $ $ - $ - $ - $ Map ID # Transportation Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY2;;4 FY 25-26 FY 26-31 CNT Total Arena Park Fields #9 - #10 Parking Lot and Maintenance Buildings TBD Pave Arena Park Fields #9 -#10 gravel parking lot, Parks Maintenance Building gravel parking lot, and Arena Park Sports Complex Maintenance Building gravel parking lot $ - $ 450,000 $ 450,000 Arena Park Fields #11- #14 Parking Lot TBD Fields #11- #14 new parking lot $ - $ 180,000 $ 180,000 Bloomfield Trail Parking Lot TBD Parking Lot for Bloomfield Trail -Acquire Land $ - $ 173,000 $ 173,000 Dennis Scivally Park and Kiwanis Park Paving TBD Pave gravel road to Shelter #4 in Kiwanis Park and overlay parking lot and road in Dennis Scivally Park $ - $ 200,000 $ 200,000 Jaycee Municipal Golf Course Overlay TBD Repair and overlay approx. 65,000 SF of parking areas and road $ - $ 230,000 $ 230,000 Lorimier and Fairmount Cemeteries TBD Resurface approx. 6,000 SF of driveways $ - $ 80,000 $ 80,000 PARKS AND RECREATION 26 CITY I CAPE GI R A R 0 E A U FY 2021-2026 Capital Improvement Program 10 Year Projection Red House Parking Area TBD Improvement to parking area north of Red House $ - $ 81,000 $ 81,000 $ $ Transportation Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ 3,497,000 $ 3,497,000 PARKS AND RECREATION 27 CITY I CAPE GI R A R 0 E A U FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID # Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total Capital Assets - Facilities Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Map ID# Capital Assets - IT Projects Funding Source Funding Source Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ Capital Assets - IT Projects' Totals by Fiscal Year=21-22FY Map ID # Capital Assets -Non-fleet Projects Funding Source 1 Funding Source 2 Description FY23-24 FY24-25 CNT Total =25-26FY Capital Assets - Non -fleet Projects'Totals by Fiscal Year $ - $ - $Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY23-24 FY24-25 CNT Total Environmental Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total tMaplDTransportation $ $ Transportation Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ POLICE DEPARTMENT 28 ■x 4 4 l I 3 +■ 5 mill ■ M WE 5 1 �e * "CITY OfCAPE x. srr�x C, 1 F2 A Ft D E A U C I P FY 2021-2026 Public Works Dept LEGEND Numbers correspond to Map ID # on the CIP spreadsheet. i 1 O Capital Assets 2 i Environmental Projects AEC■ - Environmental Projects r ■� = Transportation Projects r��f■11�11■�14F !I11■11OL 1 ■ Cape City Limits y Ward 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 ■ J11■ir 0 1 2 Miles I I I I I I 1 1I 1:72,300 !f� Created by: Development Services Teresa Heifner,Alliance Water Resources �# T�Te or�soyco� af« ual aid o�p. Date: 2/26/2021 ,',tee �y�s „,e��,o,m ,e o, ■ ■ Ir Data So,rc:,s,: City of Ca pe Girardeau Government, MO ■ r Coordinate System: NAD 1983 StatePlane Missouri East FIPS 2401 Feet CITY CAPE G 1 R A R D E A U PUBLIC WORKS FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID# Capital Assets- Facilities Projects Funding Source Funding Source2Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total 1 Recycling Center/ Solid Waste Shed Paving Solid Waste User Fees Pave area between the City Recycling Center and Solid Waste truck garage on Public Works site $ 165,000 $ $ 165,000 Public Works Facility- Equipment Pole Barn TBD 150'x40' metal building with open front for equipment storage $ - $ 210,000 $ 210,000 Capital Assets - Facilities Projects' Totals by Fiscal Year $ 165,000 $ - $ - $ - $ - $ - $ 210,000 $ 375,000 Map ID # Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total $ $ $ $ Capital Assets - IT Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ - $ - $ Map ID # Capital Assets - Non -fleet Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Sewer Line Camera Sewer Fund Replace aging camera system with a new one $ 110,000 $ $ 110,000 Capital Assets - Non -fleet Projects' Totals by Fiscal Year $ 110,000 $ - $ - $ - $ - $ - $ - $ 110,000 Map ID # Environmental Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Sewer System I&I Program Phase 4 Sewer Fund Repair sewer system elements such as manholes and pipes with defects $ 270,000 $ $ 270,000 Sewer Manhole Rehab Sewer Fund Repair sanitary sewer manhole defects $ 400,000 $ 400,000 $ 400,000 $ 300,000 $ 300,000 $ $ 1,800,000 2 W WiP IPS Automatic Course Screen - Phase 2 Sewer Fund Design and construction of W WTP Influent Pump Station automatic course bar screening equipment and replace mixers $ 178,500 $ 1,321,500 $ $ 1,500,000 County Park/LaSalle Pressure Zone - Water 3 Distribution Main * CIST 1,600 feet extension of 8 inch water main from Franks Lane to County Road 620 $ 45,000 $ 255,000 $ $ 300,000 4 Cypress Road PRV * CIST Pressure Reducing Valve Installation $ 120,000 $ $ 120,000 LaSalle Pressure Zone - Perryville Road Water 5 Distribution Main * CIST Construct 1,160 feet of 14 inch main along Perryville Road from Sue Armes to Monterey and EI Rio to Lakeshore $ 150,000 $ $ 150,000 LaSalle Pressure Zone - Distribution Main Interstate 6 55 Crossing at Scenic Drive * CIST 1,800 feet of 12 inch water main from Scenic Drive, across Interstate 55, connecting to Deerfield Estates Subdivision $ 75,000 $ 425,000 $ $ 500,000 Plant Pressure Zone - Distribution Main and LaSalle 7 Pressure Zone - Perryville Road Distribution Main * CIST Line 2-14 inch mains between Fitzgerald & Green Acres from Rand to Big Bend. $ 650,000 $ $ 650,000 Sewer System Master Plan Sewer Fund Professional services for a complete Master Plan for the City's wastewater system $ 250,000 $ 250,000 $ $ 500,000 8 Old Sprigg St. Water Distribution Main * CIST 2,900 feet of 12 inch main along Old Sprigg St. from Lexington to east of Hidden Valley Dr. $ 105,000 $ 595,000 $ $ 700,000 Well Field Interconnect to Distribution System * CIST Need more information and cost from Facility Plan update. $ 35,000 $ 370,000 $ $ 405,000 Security Upgrades: Fencing, Lighting * CIST Fencing, Lighting $ 114,200 $ $ 114,200 9 County Road 206 Water Distribution Main * CIST 11,700 feet of 12 inch distribution main along County Road 206 from Rt. K to Benton Hill Road $ 1,600,000 $ $ 1,600,000 W Program - Pipe Repairs SRF Loan Sewer Fund Repair sewer system elements such as manholes and pipe defects by contract $ 10,000,000 $ 10,000,000 LaSalle Pressure Zone - Water Distribution Main Veterans Memorial Drive * CIST 5,600 feet of 12 inch main along future Veterans Memorial Drive north of Indoor Sports Complex, connecting to County Road 620 $ 1,000,000 $ 1,000,000 Veterans Memorial Drive Water Main Extension - Phase 1 * CIST 9,500 feet of 12 inch main along Veterans Memorial Drive from Hopper to Kingshighway $ 1,200,000 $ 1,200,000 West Cape Rock Distribution Main * CIST 3,300 feet of 12 inch main along West Cape Rock Drive from Shadow Ridge to Big Bend Road $ 750,000 $ 750,000 Bloomfield Road/County Road 205 Distribution Main * CIST 11,600 feet extension of 12 inch distribution main along County Rd 205, Highway 74, to Plant 2 $ 1,500,000 $ 1,500,000 Plant 1 Residuals * CIST On hold Solids handling improvements at Plant 1 $ 1,000,000 $ 1,000,000 Misc. Scada system upgrades * CIST Scada system upgrades $ 500,000 $ $ 500,000 Water Plant 2 Demolition * CIST Demolition of Water Plant 2 $ 100,000 $ 100,000 Percy Distribution Main/Interstate 55 Crossing *CIST 1,500 feet of 16 inch water main along Percy, to the west side of Interstate 55, connecting at SE corner of Kirchdoerfer Dairy Farm $ - $ 600,000 $ 600,000 (Themis Alley Sewer Project ITBD I $ - $ 35,000 I $ 35,000 PUBLIC WORKS 30 CITY CAPE G 1 R A R ❑ E A U FY 2021-2026 Capital Improvement Program 10 Year Projection - PRIORITIZATION TO BE DETERMINED AFTER WATER FACILITY MASTER PLAN IS COMPLETE IN SPRING 2021 PUBLIC WORKS 31 Environmental Projects'Totals by Fiscal Year $ 1,238,500 $ 3,301,500 $ 1,290,000 $ 1,379,200 $ 1,900,000 $ 735,000 $ 25,294,200 Map ID# Transportation Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 CNT Total Traffic Signal Upgrades Motor Fuel Tax GeneralFund Upgrade communication infrastructure and safety features on the City's 22 traffic signals $ 89,000 $ 29,000 $ 155,000 t26-31 $ 273,000 Streetlight replacement related to the MoDOT DDI 10 at 1-55 and Hwy 61 Motor Fuel Tax (85%) General Fund (15%) Streetlight replacement related to the MoDOT DDI at 1-55 and Hwy61 $ 75,000 $ 75,000 Asphalt Overlay Program (TTF7?) TBD Annual asphalt overlay program $ 3,000,000 1 3,000,000 Concrete Street Repair (TTF7?) TBD Annual concrete street repair program $ 5,000,000 $ 5,000,000 Sidewalk Repair Program (TTF7?) TBD Sidewalk point repair program $ 1,050,000 $ 1,050,000 Transportation Projects' Totals by Fiscal Year $ 164,000 $ 29,000 $ 155,000 $ - $ - $ 9,050,000 $ - $ 9,398,000 $ 1,677,500 $ 3,330,500 $ 1,445,000 $ 1,379,200 $ 1,900,000 $ 24,500,000 $ 945,000 $ 35,177,200 - PRIORITIZATION TO BE DETERMINED AFTER WATER FACILITY MASTER PLAN IS COMPLETE IN SPRING 2021 PUBLIC WORKS 31 ■i wimimir if) 2 ally ■ M e * "CITY OfCAPE x. srr�x 17,11 F2 A Ft D E A D C I P FY 2021-2026 Capital Improvement Sales Tax 3 eyee F�,e y5 5 t` n r� 'A r F y .T .` S y 1 Illinois LEGEND '} Numbers correspond to Map ID # on the 0v CIP spreadsheet. AV i 0 CIST CIST i A- , - - Cape City Limits r' 5 `x{x Ward 1 Ward 4 ' Ward 2 Ward 5 Ward 3 Ward 6 -M N N M J M _ 6 0 1 I I 2 Miles I 1:72,300 Created by: Development Services Teresa Heffner, A 11 once Water Resources bYihe C., ofc �� eo�i`Euar`n�tlfa vuuel uidonty Date: 2/26/2021 r,��nye.��,e��,o,m� ,e o, ■ _ . �r *Jt #+'#�� Data So,rc:,s,: City of Cape Girardeau Government, MO 3 ■ r Coordinate System: NAD 1983 Stat Plane Missouri East FIPS 2401 Feet CITY CAPE G II R A R ❑ E A U CAPITAL IMPROVEMENT SALES TAX (CIST) FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID# CIST Projects Funding Source Funding Source Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total 1 City Hall CIST (50%) Casino (50%) Renovation of Common Pleas Courthouse and annex for City Hall facilities to house Administrative and Development Services $ 12,507,000 $ $ 12,507,000 2 LaSalle Pressure Zone - Cypress, Perryville, & Route W CIST Partnership w/Nip Kelley 3,800 feet of 8 inch main - Cypress from Perryville to Kelley Court, Perryville from Cypress to Route W & Route W from Perryville to Boutin $ 100,000 $ $ 100,000 3 Water Plant 1 Upgrades Old CIST Railing, concrete repair, chemical feed building improvements, rehab piping $ 800,000 $ $ 800,000 Water Master Plan Update and Plant 2 Eval CIST Update of 2011 Master Plan $ 400,000 $ $ 400,000 2" Line Replacement CIST Replace 2" lines with G" water lines City-wide $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 130,000 $ 650,000 $ 1,300,000 Water Tank Asset Management Program CIST Annual SUEZ water tank asset management program $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 1,880,000 $ 3,880,000 Annual CIST Street Repair CIST Annual CIST street maintenance and repair program $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 2,500,000 $ 5,000,000 4 Cape Girardeau Regional Airport - Replace Airport Terminal CIST AIP/CARES Airport Terminal Replacement $ 5,000,000 $ $ 5,000,000 5 Motor Control Center A/C Unit Replacement CIST Replace the A/C units forthe MCC at Plant #1, Water Wells #1, #2, #3, & #4 $ 90,000 $ $ 90,000 6 Cape Girardeau Regional Airport - Replace Air Traffic lControl Tower CIST AIP lAirTraffic Control Tower Replacement $ 4,500,000 $ $ 4,500,000 $ $ CIST Projects' Totals by Fiscal Year $ 14,837,000 $ 1,030,000 $ 6,120,000 $ 5,530,000 $ 1,030,000 $ 5,030,000 $ - $ 33,577,000 $ 14,837,000 $ 1,030,000 $ 6,120,000 $ 5,530,000 $ 1,030,000 $ 5,030,000 $ - $ 33,577,000 CAPITAL IMPROVEMENT SALES TAX 33 CITY CAPE GI R A R D E A U INNOVATION FUND FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects( Map ID # Innovation Fund Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT I Total City -Wide - Facility Access Card Readers Innovation Fund Install key -card readers at City farilities $ - $ 306,000 $ 306,000 $ $ Innovation Fund Projects' Totals by Fiscal Year306,000 $ 306,000 306,000 $ 306,000 INNOVATION FUND 34 1.1r e eL M �l lieu 1 f� illi ■ '-� ITIf�4PE C, 1 R A Ft D E A U C I P FY 2021-2026 Parks & Stormwater Tax 2 16 11 14. 1�lM 2 s I ' 7 k 15 15 10 e`e 12 10 ■ t� 3 13, _ y M fti Jll.lr M 1 �#Its ■r #flAii f ? N 18 11 ' 1* w r 5 4 18 4 ,ti 1 � - a - I Illinois 9 9 81 r e LEGEND Numbers correspond to Map ID # on the CIP spreadsheet. • PRS2 Projects ��f.11 11 11.11� RI.II.II.L ■ Cape City Limits �I1.11.11■ Ward 1 Ward 4 5 -Y ,y Ward 2 Ward 5 Ward 3 Ward 6 0 1 2 Miles I I I I I I 1 1I 1:72,300 Created by: Development Services Teresa Heifner,Alliance Water Resources Sayer: pro.iaed by the O lynfcape Gvardeau ue to be usal t'u veua I aid Doty and vre ioi quare ore ed m k vccorme Date: 2/26/2021 ye;�uyar, are nn,m �n,.a rn.any DataSource(s,: ene- ane d e ..... e. City of Cape Girardeau Government, MO 3 Coordinate System: NAD 1H3 StatePlane Missouri lastHl. 2401 Feet CITY CAPE G 1 R A R D E A D PARKS & STORMWATER TAX (PRS) FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID # PRS2 Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total 1 Airport Stormwater Drainage Improvements PRS2 Improvements to the stormwater drainage system $ 100,000 $ $ 100,000 Improvements along Cape LaCroix Trail Creek Bank at Lexington 2 Trail Creek Bank Improvements - Phase 1 PRS2 and Lynwood Hills $ 40,000 $ $ 40,000 2020-2021 Improvements to Offices and Customer Service Area 3 Osage Centre Enhancements PRS2 due to the new City Hall Project $ 300,000 $ $ 300,000 Customer Service Move Enterprise Funds PRS2 Renovate City facilities for Utility Customer Service $ 500,000 $ $ 500,000 Renovations to Central Municipal Pool Phase 1 will procure a design/build consultant with construction occuring in FY 22-23 / FY 23-24; City Council/Cape Public School District Partnership 4 Central Municipal Pool PRS2 Project $ 80,000 $ 4,000,000 $ 1,861,000 $ $ 5,941,000 Acquire approximately 25 acres of undeveloped land to design and build a new 5 - 8 field ballfield complex to replace fields at New Youth Ballfield Complex (25 Acres) PRS2 Arena Park (Design/ Build solicitation Spring of 2021) $ 100,000 $ 1,950,000 $ 2,450,000 $ $ 4,500,000 Capaha Park Phase 3+design/renovation including Capaha Pond excavation, Cherry Hill and the Rose Garden renovations and improvements with ADA accessible walkways, seating, lighting, 5 Capaha Park Master Plan PRS2 Grant new shelter, restrooms and playground (2019 - 2021) $ 750,000 $ 750,000 $ $ 1,500,000 Asphalt Overlay Overlay of parking lot at Osage Centre broken into 6 sections. The 6 Osage Centre Parking Lot Overlay PR52 Program project total will be $521,310 (Prioritized) $ 139,000 $ 119,000 $ 52,000 $ 30,000 $ $ 340,000 The Arena Park Phased Master Plan will include an updated survey, ADA accessible event space, tennis court renovation (Pickleball addition) upgrades in electric, lighting, trails, a new SEMO Fair Barn/Offices and other park amentities and 7 Arena Park MasterPlan PRS2 renovations. $ 60,000 $ 750,000,$ 690,000 $ $ 1,500,000 (2018-2022) $375,000 in this CIP - $1,500,000 total / Replace fencing fields#1-#5, upgrade field lights to LED, install bleacher canopies on fields #2 - #8, maintenance building addition Shawnee Park Sports Complex Facility and Field and parking renovation, entryway landscaping, and digital signage 8 Improvements - Phased Construction PRS2 (total project cost: $1,500,000) $ 375,000 $ 360,000 $ 765,000 $ $ 1,500,000 (2019-2023) One new park area will be built connected to Jefferson School to take advantage of the new Aquatic Facility and Indoor Spaces being added to the school. The second Neighborhood park will be constructed on the southside of Hwy 9 2 New Southside Neighborhood Parks PRS2 74. $ 400,000 $ 400,000 $ $ 800,000 Asphalt Overlay of City Parks/Facilities Parking Asphalt Overlay Asphalt overlay of park roads/drives/parking in conjunction with Lots/Drives PR52 Program the City's asphalt overlay program (total of $110 through 2033) $ 100,000 $ 300,000 $ 100,000 $ 100,000 $ 500,000 $ 1,100,000 Asphalt Overlay Complete widening of Cape LaCroix Trail from 8'to 12', and new City -Wide Trail Improvements PRS2 Program trail connections/signage/etc. (total of $1.5M through 2033) $ 320,000 $ 150,000 $ 150,000 $ 150,000 $ 750,000 $ 1,520,000 Lisa Branch Watershed Drainage Improvements - Upgrade street crossings at Brookwood at Masters and at 10 Phase 1 PRS2 Sherwood near Westwood $ 553,000 $ $ 553,000 (2021-2024) The "new" Red Star Neighborhood Park will be a phased new park adjacent and part of flood buyout property on the north side of the City adjacent to the Red Star Boat Ramp with connections to the River Flood Wall Trail. Improvements include walking trails, picnic/pavilion areas and playgrounds with 11 Red Star PRS2 Casino the potential for an RV Campground adjacent to the Casino. $ 20,000 $ 240,000 $ 240,000 $ $ 500,000 Lisa Branch Watershed Drainage Improvements - 12 Phase 2 PRS2 Upgrade street crossing at Westwood near Sherwood $ 220,000 $ $ 220,000 Phase 3 of Cape Splash includes "Splash Reef' a new themed shallow water area, deck space, restroom/concession building 13 Cape Splash - Phase 3 PRS2 and small stage area for parties/events movies (2023-2024) $ 80,000 $ 1,920,000 $ $ 2,000,000 Scivally Branch Watershed Drainage Improvements - 14 Phase 1 PRS2 Upgrade street crossing a[Lexington near Steven $ 159,000 $ $ 159,000 PARKS STORMWATER TAX 36 CITY( CAPE G 1 R A R 0 E A U FY 2021-2026 Capital Improvement Program 10 Year Projection PARKS STORMWATER TAX 37 Lisa Branch Watershed Drainage Improvements - 15 Phase 3 PRS2 Upgrade street crossings on Glenridge and Melrose near Randol $ 707,000 $ $ 707,000 16 Trail Creek Bank Improvements - Phase 2 PRS2 Stabilize Cape LaCroix Trail Creek Bank at Walden Park $ 120,000 $ $ 120,000 The Cape Jaycee Golf Course scheduled replacement/renovation 17 Golf Course Enhancements PRS2 of the cart and maintenance shop. $ 350,000 $ $ 350,000 (2018-2033) $210,000 in this CIP - $350,000 total / new restroom facilities at Indian Park, Red House area (completed) and as funding allows Osage Volleyball Courts/Arena New Park Restrooms PRS2 Tennis Courts $ 70,000 $ 70,000 $ 140,000 Improvements to Old Lorimier, New Lorimier and Fairmount Cemeteries include improved ADA access, signage, information 18 City Cemeteries PRS2 kioks and renovation to existing facilities $ 31,250 $ 156,250 $ 187,500 Lisa Branch Watershed Drainage Improvements - Phase 4 PRS2 Upgrade street crossing on Lisa near Randol $ 311,000 $ 311,000 P & R Foundation / Improve ADA accessibility to the park, improved parking, lighting Historic Preservation and historic representation of the park property (for FY2026-27) Cape Rock Park Improvements PR52 Grant Design (for FY 2028-29) Build $ 500,000 $ 500,000 Expand Shawnee Park Center on the North East side of the facility Shawnee Park Center Addition PRS2 (for FY2027-28) $ 650,000 $ 650,000 Scivally Branch Watershed Drainage Improvements - Phase 2 PRS2 Upgrade street crossing at Perryville near Sherwood $ 302,000 $ 302,000 Complete renovations to building exterior (Old Fire Station #T) River Heritage Museum Improvements PRS2 which houses the City Museum $ 200,000 $ $ 200,000 $ $ PRS2 Projects' Totals by Fiscal Year, $ 3,464,000 $ 7,752,000 $ 5,353,000 $ 4,514,000 $ 2,218,250 $ 3,239,250 $ - $ 26,540,500 $ 3,464,000 $ 7,752,000 $ 5,353,000 $ 4,514,000 $ 2,218,250 $ 3,239,250 1 $ - $ 26,540,500 PARKS STORMWATER TAX 37 CITY CAPE G 1 R A R ❑ E A U FIRE SALES TAX FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map ID # Fire Sales Tax Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total Security fencing, water, electric, lighting, drainage, and doors, Training Site Fire Sales Tax windows, and steps $ $ 160,000 $ 160,000 Fire Sales Tax Projects' Totals by Fiscal Year $ - $ - $ - $ - $ - $ $ 160,000 $ 160,000 $: - $ - $ - $ - $ - $ - $ 160,000 $ 160,000 FIRE SALES TAX 38 di 41■11■Ir �+���y�r, ■ illi ■ r - .r,f�� 71� 2 1 �e * "CITY OfCAPE x. srr�x � 1 F2 A Ft D E A D C I P FY 2021-2026 Fire Dept. & Public Safety Trust Fund yyyQQ �` e Q'N w 147 S Illinois LEGEND 1 Numbers correspond to Map ID # on the ■ ,V CIP spreadsheet. O Capital Assets ® PSTF �It■111 11■11� �I■11■11■ �� Cape City Limits x.11 ��� � ■ I I ■ f Ward 1 Ward 4 ' Ward 2 Ward 5 Ward 3 Ward 6 ■ J11■Ir 0 1 2 Miles I I I I I I 1 1I 1:72,300 !f� Created by: Development Services Teresa Heffner, All lance Water Resources �# T�Te or�soyco� af« ual aid o�p. Date: 2/26/2021 ,',teem� ,e o, ■ _ ■ Ir f j+ #tl#�� Data S ,,rc:,s, a City of Cape Girardeau Government, MO ■ r Coordinate System: NAD 1983 StatePlane Missouri Eas(F IPS 2401 Feet CITY CAPE G 1 R A R ❑ E A U PUBLIC SAFETY TRUST FUND (PSTF) FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost j5pllt for Multi -Year Projects) Map ID# PSTF Projects Funding Source Funding Source Description FY 21-22 FY 22-23 FY23-24 FY24-25 FY 25-26 FY 26-31 CNT Total Replace the roof at Fire Station #3. This included removing old shingles and replacing win new and addressing any concerns with 2 Fire Station #3 Roof Replacement PSTF vent pipes or decking. $ 125,000 $ $ 125,000 3 Fire Station #1 Apparatus Bay Heat PSTF Replace the current Floor heat with hanging forced air heaters. $ 16,100 $ $ 16,100 Preplace 4 thermal imaging cameras on 4 of the 5 front line apparatus. The existing thermal imaging cameras are reaching the end of their life span (over 10 yrs old) and are unable to be repaired/replaced due to the company (I5G) no longer Replace Thermal Imaging Cameras PSTF manufacturing that specific camera. $ 18,000 $ 18,000 $ $ 36,000 Replace the 1987 Ford F-350 brush truck with a new 1 ton crew cab diesel truck and assiciated removable pump, tank, and hose Replace Brush 3 PSTF reel (skid unit). $ 85,000 $ $ 85,000 Replace Platform Ladder Truck PSTF Replace the 2005 Smeal platform arial truck $ 1,400,000 $ $ 1,400,000 Replace existing Police Department tablets (x 58) (5 -yr Replace Tablets and Mobile Data Terminals PSTF replacement schedule) $ 230,000 $ $ 230,000 Fire Station #1- Renovations PSTF TBD South addition / HVAC / rear parking lot / foundation repair $ 1,375,000 $ 1,375,000 To build a firearms range suitable for pistols and rifles. The range will be used for ongoing training, as well as required annual certification. The range can also be used by other regional law Firearms Range Grants / Donations Phase II of the PSTF enforcement agencies. $ - $ 310,000 $ 310,000 $ $ PSTF Projects' Totals by Fiscal Year $ 119,100 $ 18,000 $ 125,000 $ 1,400,000 $ 230,000 $ 1,375,000 $ 310,000 $ 3,577,100 $ 119,100 $ 18,000 $ 125,000 $ 1,400,000 $ 230,000 $ 1,375,000 $ 310,000 $ 3,577,100 PUBLIC SAFETY TRUST FUND 40 CITY OfCAPE ra all I RA R DE A U C I P FY 2021-2026 Transportation Trust Fund milli E; 7tl 7 Is" 8 14, t 0 6 3 N E 13 i 9 4 cls 12 0 2 5 Illinois i 4, .-10 LEGEND Le Numbers correspond to Map ID # on the I i CIP spreadsheet. TTF-5 Tax TTF-6 Tax Cape City Limits Ward 1 Ward 4 Ward 2 Ward 5 Ward 3 Ward 6 ■ 0 1 2 Miles I I I I I I 1 1 1:72,300 ft Created by: Development Services Teresa Helfner,Allance Water Resourcesofcrpe Date: 2126/2021 —r N- J!"if go ON Data S ,rc:,s, City of C. Girardeau Government, MO ■ r iffigil, Coordinate System: NAD 1983 StatePIcn, Missouri East11PS 2401 last CITY CAPE G 1 R A R D E A D TRANSPORTATION TRUST FUND (TTF) FY 2021-2026 FY 2021-2026 Capital Improvement Program 10 Year Projection Project Cost (Split for Multi -Year Projects) Map IDN TTFS Projects Funding Source Funding Source Description FY 21-22 FY 22-23 FY23-24 FY24-2S FY 25-26 FY 26-31 CNT Total 1 West End - Rose to Battling TTFS Widen from Rose to New Madrid, reconstruction from New Madrid to Bertling, add curb and gutter, sidewalks, and streetlights $ 1,519,500 $ 1,519,500 $ $ 3,039,000 2 Independence- Gordonville to Sunset TTFS Construct recommendations from traffic study to address congestion and traffic safety $ 2,364,000 $ 2,364,000 $ $ 4,728,000 3 Main - Roberts to East Cape Rock TTFS Reconstruction, curb and gutter, sidewalks, and streetlights $ 670,500 $ 670,500 $ $ 1,341,000 4 Fountain - William to Independence TTFS New concrete street, curb and gutter, sidewalk, and streetlights $ - $ 1,000,000 $ 1,000,000 5 Sprigg- William to Broadway TTFS Mill and overlay, sidewalks, streetscape, intersection improvements at William/Sprigg $ 823,000 $ 823,000 $ $ 1,646,000 Street Lights TTFS Maintenance, repair, and replacement of traditional bulbs to LEDs $ 232,000 $ $ 232,000 Sidewalk Gap and Repair TTFS Sidewalk repair $ 63,000 $ $ 63,000 Safety Projects TTFS $ 350,000 5 350,000 $ $ 700,000 $ $ TTFS Projects'Totals by Fiscal Year $ 6,022,000 $ 5,727,000 $ - $ - $ - $ - $ 1,000,000 $ 12,749,000 Map ID p TTF6 Projects Funding Source 1 Funding Source 2 Description FY 21-22 FY 22-23 FY23-24 F124-25 FY 25-26 FY 26-31 CNT Total 6 Bertling- Perryville to Big Bend TTF6 Concrete repair $ 100,000 $ 900,000 $ $ 1,000,000 7 Lexington- Carolina to Sherwood TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 120,000 $ 1,080,00011 $ 1,200,000 8 Lexington- West Cape Rock to Sprigg TTF6 Remove and replace concrete pavement sections, curb and gutter, and sidewalks; overlay $ 120,000 $ 1,080,000 $ 5 1,200,000 9 Maria Louise Lane/Kiwanis Drive/Broadview Street Intersection Improvements TTF6 Design/Study intersection improvements $ 50,000 $ $ 50,000 10 Sprigg - Shawnee Parkway/Route 74 to Southern Expressway TTF6 Remove and replace curb and gutter and sidewalks; mill and overlay $ 295,000 $ 2,655,000 $ $ 2,950,000 Asphalt Overlay Program TTF6 Annual asphalt overlay program $ 660,000 $ 600,000 $ 600,000 $ 600,000 $ 540,000 $ $ 3,000,000 Concrete Street Repair TTF6 Annual concrete street repair program $ 1,980,000 $ 1,800,000 $ 1,800,000 $ 1,800,000 $ 1,620,000 $ $ 9,000,000 Sidewalk Repair Program TTF6 Sidewalk point repair program $ 50,000 $ 450,000 $ 50,000 $ 450,000 $ $ 1,000,000 11 College - Minnesota to West End TTF6 New concrete street, curb and gutter, and sidewalks $ 120,000 $ 680,000 $ - $ 800,000 12 Route K School Corridor Safety Improvements TTF6 Intersection improvements, in cooperation with others, contribution toward total project cost $ 500,000 $ $ 500,000 13 Veterans Memorial Drive Phase 6 - Hopper to Vantage (Design, Acquisition, & Grading) TTF6 Design, acquisition, and grading only $ 345,000 $ 1,955,000 $ $ 2,300,000 TTF6 Projects'Totals by Fiscal Yearl $ 3,375,000 1 $ 5,625,000 $ 6,355,000 $ 3,530,000 $ 4,115,000 $ - $ - $ 23,000,000 $ 9,397,000 $ 11,352,000 $ 6,355,000 $ 3,530,000 $ 4,115,000 $ - $ 1,000,000 $ 35,749,000 TRANSPORTATION TRUST FUND 42 CITY CAPE FY 2021-2026 Capital Improvement Program G f R A R D E A U 10 Year Projection COMPLETED PROJECTS FY 2020-2021 Project Cost COMPLETED PROJECTS 43 Capital Assets - Facilities Projects Funding Source 1 Funding Source 2 Description FY 20-21 City -Wide - Gateway Features PRS2 Placemaking signs $ 200,000 New Park Restrooms PRS2 (2018-2033) $210,000 in this CIP - $350,000 total / new restroom facilities at Indian Park and Red House area $ 140,000 Fort D Complete $ 200,000 Capital Assets - Facilities Projects Completed $ 340,000 Capital Assets - IT Projects Funding Source 1 Funding Source 2 Description FY 20-21 Fiber Infrastructure General Fund Moving /running fiber to Common Pleas City Hall, etc. $ 100,000 Gigabyte Network Switches General Fund Upgrade 100 Mb to 1 Gb $ 20,000 New Aerials for GIS Innovation Fund Updated imagery of structures and infrastructure would reduce field verification (divided into 3 payments) - 3 of 3 $ 10,000 Radio Interoperability Phase 2A Fire Sales Tax Casino Communication system providing seamless communication among City departments and other agencies in the state and region - Phase 2A, portables and plugins $ 600,000 Radio Interoperability Phase 2B Fire Sales Tax Casino Communication system providing seamless communication among City departments and other agencies in the state and region - Phase 213, mobiles and plugins $ 600,000 Capital Assets - IT Projects Completed $ 1,330,000 Environmental Projects Funding Source 1 Funding Source 2 Description FY 20-21 Good Hope Drainage Project Phase 2 PRS2 Install 60" pipe from Spring Street to Walker Branch $ 3,500,000 Penny Street Drainage PRS2 Upgrade existing storm drain at Penny & Sunset Streets $ 629,000 Environmental Projects Completed $ 4,129,000 Transportation Projects Funding Source 1 Funding Source 2 Description FY 20-21 Osage Centre Parking Lot Overlay - Section #1 PRS2 Overlay of parking lot at Osage Centre broken into 6 sections. The project total will be $521,310. $ 121,000 Street, Curb and Gutter Repair TTF5 Complete removal and replacement of deteriorated sections of existing street, curb and gutter $ 1,700,000 Airfield Master Drainage Study General Fund Master drainage study- analyse current drainage conditions at airport $ 50,000 Airport Terminal Area Master Plan MoDOT (95%) General Fund (5%) Master Plan update for terminal and facilities $ 423,000 Transportation Projects Completed $ 2,294,000 $ 8,093,000 COMPLETED PROJECTS 43