HomeMy WebLinkAboutRes.3437.11-01-2021 BILL NO. 21-160 RESOLUTION NO. 3I/37 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT FOR PROFESSIONAL SERVICES WITH OLSSON, INC. , FOR THE DEVELOPMENT OF AN ELECTRIC VEHICLE READINESS PLAN, ON BEHALF OF THE SOUTHEAST METROPOLITAN PLANNING ORGANIZATION BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS : ARTICLE 1 . The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute a Contract for Professional Services with Olsson, Inc. , on behalf of the Southeast Metropolitan Planning Organization, for the development of an Electric Vehicle Readiness Plan. The Agreement shall be in substantially the form attached hereto, which document is hereby approved by the City Council, and incorporated herein by reference, with such changes therein as shall be approved by the officers of the City executing the same. t PASSED AND ADOPTED THIS / DAY OF A ii,„4er , 2021. Yg427,--------- Bob Fox, Mayor ATTEST: („ :. -24l-ell2_ ,,.-- .ai Bruce Tayl j>, Deputy City Clerk 0 eta % Iiii. F-% ISi-+"=--.+44:-11 i• THE a 1 $g; Z,AL *_. oissons LETTER AGREEMENT FOR PROFESSIONAL SERVICES October 26, 2021 Southeast Metropolitan Planning Organization (SEM PO) Attn: Alex McElroy, SEMPO Executive Director City of Cape Girardeau 401 Independence St. Cape Girardeau, MO 63703 Re. LETTER AGREEMENT FOR PROFESSIONAL SERVICES Electric Vehicle Readiness Plan (the"Project") Southeast Metropolitan Planning Organization Dear Mr. McElroy: It is our understanding that SEMPO ("Client") requests Olsson, Inc. ("Olsson") to perform the services described herein pursuant to the terms of this Letter Agreement for Professional Services, Olsson's General Provisions and any exhibits attached hereto(all documents constitute and are referred to herein as the "Agreement")for the Project. Olsson has acquainted itself with the information provided by Client relative to the Project and based upon such information offers to provide the services described below for the Project. Client warrants that it is either the legal owner of the property to be improved by this Project or that Client is acting as the duly authorized agent of the legal owner of such property. Client acknowledges that it has reviewed the General Provisions and any exhibits attached hereto,which are expressly made a part of and incorporated into the Agreement by this reference. In the event of any conflict or inconsistency between this Letter Agreement, and the General Provisions regarding the services to be performed by Olsson, the terms of the General Provisions shall take precedence. Olsson shall provide the following services ("Scope of Services") to Client for the Project. See Project Approach on page 20-26 of attached Proposal for detailed description. Should Client request work in addition to the Scope of Services, Olsson shall invoice Client for such additional services (Optional Additional Services) at the standard hourly billing labor rate charged for those employees actually performing the work, plus reimbursable expenses if any. Olsson shall not commence work on Optional Additional Services without Client's prior written approval. Olsson agrees to provide all of its services in a timely, competent and professional manner, in accordance with applicable standards of care, for projects of similar geographic location, quality and scope. SCHEDULE FOR OLSSON'S SERVICES Unless otherwise agreed, Olsson expects to perform its services under the Agreement as follows: Page 1 of 3 Anticipated Start Date: November 2021 Anticipated Completion Date: September 2022 These dates have been modified from the original proposal due to approval dates. Olsson will endeavor to start its services on the Anticipated Start Date and to complete its services on the Anticipated Completion Date. However, the Anticipated Start Date, the Anticipated Completion Date, and any milestone dates are approximate only, and Olsson reserves the right to adjust its schedule and any or all of those dates at its sole discretion, for any reason, including, but not limited to, delays caused by Client or delays caused by third parties. COMPENSATION Client shall pay to Olsson for the performance of the Scope of Services, the actual time of personnel performing such services in accordance with the Cost Estimate, page 32 of attached Proposal. Olsson shall submit invoices on a monthly basis, and payment is due within 30 calendar days of invoice date. Olsson's Scope of Services will be provided on a time-and-expense basis not to exceed $94,435.31. TERMS AND CONDITIONS OF SERVICE We have discussed with you the risks, rewards and benefits of the Project,the Scope of Services, and our fees for such services and the Agreement represents the entire understanding between Client and Olsson with respect to the Project. The Agreement may only be modified in writing signed by both parties. Client's designated Project Representative shall be If this Agreement satisfactorily sets forth your understanding of our agreement, please sign in the space provided below. Retain one original for your files and return an executed original to Olsson. This proposal will be open for acceptance for a period of 30 days from the date set forth above, unless changed by us in writing. OLSSON, INC. fl/_/_ Blake Hansen �Kurt Rotering YNf+'�K 2021.10.27 10:43:47-05'00' 2021 10.27 By By 11:34 46-0600' Blake Hansen, PE, PTOE, PMP Kurt Rotering, PE, PTOE Page 2 of 3 By signing below, you acknowledge that you have full authority to bind Client to the terms of the Agreement. If you accept the terms set forth herein, please sign: SEMPO By efS2nature Print Name Title �� Dated ///24/ Attachments Proposal General Provisions Page 3 of 3 for the trop olita r'= pan Or nation <' '=' .29.2021 September 29, 2021 Southeast Metropolitan Planning Organization C/O Alex McElroy, SEMPO Executive Director City of Cape Girardeau 401 Independence St. Cape Girardeau, MO 63703 RE: Electric Vehicle Readiness Plan Dear Mr. McElroy and selection committee members: Recently, we are being bombarded with news about Electric Vehicles (EV) every day. With all the noise generated by news, opinions, and announcements, it can be difficult not only to separate the fact from fiction, but to determine what actions should be taken. In proactive fashion, the Southeast Metropolitan Planning Organization (SEMPO) has determined to carry out the first planning effort within the region to sort out the facts and take steps to prepare for the quickly approaching impacts. When it comes to leading regional planning efforts accurately and expertly, there is no better choice than our team. Here's why: FOCUSED EXPERIENCE DEVELOPING INFRASTRUCTURE PLANS We have developed many types of plans, including transportation system master plans, communications system master plans, centralized fiber plans, Intelligent Transportation Systems (ITS) plans, and power distribution system plans. We are experienced in gathering data from stakeholders, industry trends, existing plans, and regulatory sources; then synthesizing this information into actionable intelligence. Our skillful team integrates years of experience planning, designing, and implementing infrastructure needs for our clients. We will study the immediate and ultimate goals, concerns, and challenges of each stakeholder so we can approach the project with the right perspective. ASSISTING REGIONAL COALITIONS WITH THEIR GROWTH GOALS Stakeholder participation is essential to the effective development and deployment of this EV plan for SEMPO. We will work with the steering committee to develop a full list of stakeholder groups. Our team has a long resume of experience working successfully with multi -stakeholder coalitions. One coalition in particular is the Mid-America Regional Council's Operation Greenlight Initiative in the Kansas City metropolitan area, which involves Olsson working closely with 25 cities across two states over the past 15 years. When working on coalition projects, communication is key. We take the time and make the effort to understand the needs of individual partners - learning the nuances that make each stakeholder unique. At the same time, we keep the goals of the partnership in sight, allowing us to provide seamless coordination and progression across jurisdictional boundaries. A COMPREHENSIVE PLANNING TEAM Several of the steps, such as the assessment of the capacity of local power delivery systems, will require the specialized knowledge and expertise that Olsson can provide. Olsson has a unique blend of planning, transportation, power delivery, and vehicle electrification experience that will establish SEMPO as a trailblazer for EV readiness planning and allow you to serve your community's EV needs, now and into the future. We have selected a team of professionals that the SEMPO can rely on to develop the best practical and comprehensive solutions to prepare for the increase in EVs. Adaptability to the changing technology landscape will be a key to ensuring that the SEMPO region meets the demand and expectations of those who live and work here. Olsson will provide you with an accountable readiness planning document to direct strategic projects and foster growth for a welcoming community. We have prepared the following proposal for you. If you have any questions, you may contact me at 913.381.1170 or bghansen@olsson.com. Sincerely, vok Blake Hansen, PE, PTO E, PMP Project Manager 7301 W 133rd Street, Overland Park KS 66213 / olsson.com CONTENTS Project Understanding........................................4 Project Team and Qualifications.................................6 Firm Information..............................................................7 ProjectTeam................................................................... 8 Representative Projects..............................................12 Project Approach................................................19 Project Management.........................................27 Schedule ►z; Cost Proposal....................................................... 31 Appendix: Resumes PROJECT UNDERSTANDING vo PROJECT UNDERSTANDING Why all the recent hype about Plug-in Electric Vehicles (PEV / EV)? There are three primary contributors: recent advancements in technology have made EVs both practical and affordable; there is a growing concern to preserve our environment; and vehicle manufacturers are racing to design the vehicles of tomorrow. This perfect storm has generated a frenzy of electrification activity that will impact every government, industry, and individual in some way. While most government planning organizations are still waiting to see what happens, Southeast Metropolitan Planning Organization's (SEMPO's) forward -thinking leadership has determined to actively plan, prepare, and benefit from the impacts of EVs. This focus will help maintain your service levels as a gateway to the region, and as a destination point because you are a partner in supplying the answer to their needs. Trip planning around charging needs will become the de facto standard practice for all EV users. This includes all anticipated EV vehicle types; personal, commercial, local, fleet, transit, farm, industry and general. Various EV vehicles require various types of chargers to ensure that the SEMPO region is both a support of services region and a gateway to you're the region. There is no standard process for developing an EV readiness plan because the full breadth of impacts is just beginning to be understood and few local government organizations have contemplated the development of such a plan. Olsson has a unique blend of planning, transportation, power delivery, and vehicle electrification experience that will establish SEMPO as a trailblazer for EV readiness planning and allow you to serve your community's EV needs now and into the future. Electric Vehicle Readiness Plan / 5 PROJECT TEAM QUALIFICATIONS vo We're Olsson, a nationally recognized, employee - owned engineering and design firm with a rich, successful history. Founded in 1956 on the same mindset that drives us today, we exist to improve communities, like yours, making it more sustainable, better connected, and more efficient. Simply put, we exist to leave the world better than we found it. Though our philosophy hasn't changed since John E. Olsson opened our doors many years ago, we have certainly evolved, adding dozens of offices across nine states and developing a comprehensive list of services to best serve a comprehensive list of markets. We achieved Top 100 engineering firm status (No. 76 on Engineering News -Record's Top 500 Design Firms national list), proving that tenacity, teamwork, and a philanthropic mindset is indeed a winning combination. FIRM SIZE 1,585 LOCATION Olsson 1170 W 133rd Street Overland Park, KS 66213 PRIMARY SERVICES Planning and Design Engineering Field Services Environmental Technology Electric Vehicle Readiness Plan / 2 PROJECT TEAM Our team is set for your success. We have carefully selected our in-house team of outstanding professionals that are passionate about their craft and bring the quality, knowledge, and experience necessary to ensure a successful project. Olsson will act as the prime consultant, led by Blake Hansen, providing project management and planning coordination. Blake Hansen and Rusty Hartman (power distribution planning) are familiar with SEMPO staff members by partnering on conference presentations on the subject. Every member of our team has extensive, cross -disciplinary experience, enabling us to provide you with core services that will address all aspects of this project. Olsson has made vehicle electrification planning a priority within our company, and we have several recent key hires to support this initiative. The chart below outlines our team's responsibilities, followed by each member's short biography. We have performed both transportation planning and power distribution services throughout the nation. Several of these projects have resulted in successfully negotiated multi -agency and public/private partnerships that have added value to all parties. We have strong working relationships with both public agencies and private partners. We understand the benefit of having the stakeholders collaborate more closely so that needs are met at a potentially lower cost. PROJECT MANAGER BLAKE HANSEN, PE, PTOE, PMP TECHNICAL LEADER EV PLANNING DISTRIBUTION PLANNING John Hansen Kyle McLaughlin Rusty Hartman, PE Devon Brazeal, IE Jeff Buttermore, PE EV CHARGING STATIONS STAKEHOLDER COORDINATION Kurt Rotering, PE, PTOE Stacey Roach Eldon Jensen, PE Electric Vehicle Readiness Plan / 8 -- BLAKE HANSEN, PE, PTOE, PMP a S Project Manager Blake is a transportation professional with experience in transportation technology. Blake has both experience and a keen interest in all types of transportation technology, especially in the anticipated benefits and impacts of connectivity, automation, and electrification. He is a transportation technology subject matter expert with experience in design, planning, construction, maintenance, operations, integration, and software deployment. Blake's responsibilities include identifying cost-effective strategies for technology operations and other alternative transportation technology efforts. JOHN HANSEN Technical Leader For the past four decades, John has been involved with hundreds of transportation technology -related projects throughout the nation. His particular expertise is related to technology applications, including agency - wide data collection, agency -wide Road Weather Information Systems, dynamic message signs, camera systems, traffic management systems, geographic information systems for transportation, weigh in motion systems, and traffic management center integration. In addition, John has been actively involved in a number of organizations, including NCUTCD (22 years), ITE (35 years), ITSA (39 years), National Rural ITS/Steering Group (18 years), IMSA (eight years), ATSSA (five years), and APWA (three years). He has served on the National Committee for MUTCD-FHWA since 1997, the National Rural ITS Steering Committee since 2003, and the National NCUTCD/FHWA Task Force on Connected and Autonomous Vehicles. KYLE MCLAUGHLIN EV Planning Kyle is a highly motivated, solution -oriented asset to our team here at Olsson. He has developed a skill of curating plans that have an attention for detail concerning the improvement of the efficiency of traffic for cities. Kyle has vast knowledge and understanding of civil practices, community and regional planning, and how each must go hand-in-hand. While completing his Masters degree, Kyle has presented on important topics when it comes to different aspects of city planning. Kyle will lead the planning process to develop relevant, strategies that address the immediate needs, as well as long-term planning objectives and identify opportunities, and provide strategies to reduce hurdles for the infrastructure deployment. Electric Vehicle Readiness Plan / 9 DEVON BRAZEAL, EI EV Planning Devon has garnered significant experience in the transportation and construction industry. His experience in transportation and traffic operations includes planning, analysis, design, implementation, and construction engineering inspection (CEI). Prior design experience includes ITS deployments for managed freeway systems, including CCTV cameras, Dynamic Message Signs (DMS), vehicle detection systems, roadway weather information systems (RWIS), connected vehicle deployments and more, as well as traffic signalization, lighting, advanced transportation management systems (ATMS) installations, traffic operation and safety studies, and signing and pavement marking projects. Devon will work with the planning team to assist with assessing the needs of the and create a plan with a vision, goals, and action -based strategies and recommendations. RUSTY HARTMAN, PE Distribution Planning As a team leader for Olsson, Rusty uses his knowledge and years of experience in mechanical/electrical design to guide the power transmission and distribution team. He is seasoned in electrical substation, transmission, and distribution projects, both in the public and private sector. Rusty's involvement in engineering for municipalities and renewable energy projects positions him as a thought leader for Olsson, and a great resource for client coordination and business development. Rusty will evaluate existing conditions and identify existing infrastructure needs and available technologies, best practices, and other items for grid forecasting. JEFF BUTTERMORE, PE Distribution Planning Jeff has experience in several areas of electric utility engineering and medium voltage industrial system engineering. He has served as the project manager responsible for design and construction administration for a wide range of project types, covering substations, transmission, subtransmission, distribution lines and systems, and generation. Jeff will work with Rusty and assist with identifying electric rate structures and potential initiatives. Electric Vehicle Readiness Plan / 10 ELDON JENSEN, II, PE EV Charging Station Planning Eldon has experience in engineering management, design, and field support on both new construction and brownfield project sites. He has extensive experience on a wide variety of projects that include the food and beverage, pet food, biofuels, ag processing, power generation, wastewater, and commercial building industries. Specifically, his experience includes: EV charging station design, power system studies, power system design, specification of electrical equipment, design of electrical equipment enclosures, electrical area classification, grounding and lightning protection design, instrumentation, control schematics, and control panel design. Eldon is a licensed Professional Engineer in 24 states. KURT ROTERING, PE, PTOE EV Charging Station Design Utilizing his broad breadth of experience, Kurt brings expertise to a wide variety of projects in traffic and transportation engineering including signal and roundabout design, large-scale campus planning and design, access management, traffic studies, and event traffic management. Kurt has worked on a variety of projects for various state DOT's and has extensive experience working with municipalities throughout the Midwest. Kurt is currently leading the charge on positioning and designing EV charging stations throughout the City of Overland Park, Kansas. STACEY ROACH Stakeholder Coordination Stacey leads public engagement services at Olsson. She is a public involvement and communications professional trained through the International Association for Public Participation (IAP2). She manages Olsson's NDOT Public Involvement and Strategic Communications On -Call contract, including public involvement and communications efforts at both the state and local municipal levels. Stacey's experience includes planning and facilitating multi -stakeholder meetings, gathering stakeholder input, and building consensus. She has experience coordinating project meetings and meeting materials; creating and executing programmatic and project - related strategic communication plans using websites; managing social media and media relations; and developing and coordinating printed and digital communications. Electric Vehicle Readiness Plan / 11 REPRESENTATIVE PROJECTS & REFERENCES ELECTRICAL VEHICLE CHARGING STATIONS Overland Park, Kansas ELECi Ri-Y'iN(j KAitiSPOK HTION IN THE KANSAS CITY METRO Under our City of Overland Park On-call Traffic Engineering contract, the Kansas City Traffic/Technology Team was awarded a task order to provide engineering services for new electric vehicle (EV) charging stations. The project scope includes planning, design, and construction management. The first locations for station installations will be placed at Deanna Rose Children's Farmstead and Scheels Overland Park Soccer Complex, then more will follow in suitable locations to allow widespread accessibility to the community. BATES 2021 SERVICES • Planning & Design • Civil Engineering • Technology MARKETS • Transportation • Technology PROJECT REFERENCE Brian Geiger City of Overland Park 8500 Santa Fe Drive Overland Park, KS 66212 913.895.6140 Brian.Geiger@opkansas.org Electric Vehicle Readiness Plan / 12 ELECTRIC VEHICLE CHARGING STATIONS Brighton, Colorado PARTNERING WITH THE LARGEST NETWORK OF CHARGING STATIONS IN THE COUNTRY As electric cars become more and more prevalent and accessible, fuel providers are expanding their service offerings to match. Olsson is the premiere engineering firm for Kum & Go in Colorado, we were tasked with upgrading a Brighton location with charging stations in partnership with Charge Point, the largest network of electric vehicle charging stations in the country. Our team performed civil design, electrical engineering, geotechnical, and surveying services for this location, designing two stations to serve electric vehicles. We delivered this project successfully and to the satisfaction of our client. At a later date, Tesla approached the location and expressed an interest in expanding the two charging stations to ten. Tesla brought in their preferred civil design firm, and took the advice of the client to hire Olsson so we could continue our support. Our field services team provided geotechnical recommendations and construction phase materials testing services for this expansion. Since this project, Olsson has been brought to several other Colorado locations to retrofit them with ChargePoint stations, ensuring that electric vehicles can keep moving. DATES 2016 SERVICES • Civil Engineering Electrical Engineering • Surveying Geotechnical MARKETS • Transportation • Technology PROJECT REFERENCE Ryan Halder Kum & Go 1459 Grand Ave Des Moines, IA 50309 515.457.6232 RJH@kumandgo.com Engineering Electric Vehicle Readiness Plan / 13 MARC OPERATION GREEN LIGHT Multiple Jurisdictions in the Kansas City Metro OPERATION GREEN LIGHT: ONE NAME FOR MULTIPLE PROJECTS Engineering and Planning Support Under this on-call project, Olsson is responsible for leading many regional planning and engineering tasks. These have included the original communications design for the project, signal timing development and the completion of a strategic plan (along with 2 subsequent revisions at 3-4 year intervals), development of a performance management plan, a business and financial planning for the program, and research and recommendation for the upgrade of the communications technology. The communications technology task targeted licensed and unlicensed wireless equipment that provides distribution to more than 700 of its connected traffic signals. DATES 2009 - present SERVICES • Traffic Management Intelligent Systems Transportation Systems MARKETS • Transportation • Technology PROJECT REFERENCE Ray Webb Mid America Regional Council Manager of Traffic Operations 600 NE Colbern Road Lee's Summit, M064086 816.622.0731 rwebb@marc.org PERHTION GREENLIGHT ANNUAL BENEFITS MILLION FEWER VEHICLE STOPS WHAT WE DO Q OGL works with federal, state, and local 1.9 MILLION agencies to develop and implement a regional network of signals. This system HOURS SAVED provides uniform traffic management across jurisdictional boundaries in Kansas City allowing for better 1.8 MILLION collaboration among all agencies. GALLONS SAVED The system coordinates traffic signal timing plans and communication between 9 traffic signal equipment, improving the Flow of traffic in the region. Y. 3,000 TONS CGL tracks signal -related malfunctions OF POLLUTANTS AVOIDED in the field and provides improved maintenance and infrastructure to partner jurisdictions. U 0 CGL is paving the way in the traffic $35.2 MILLION sector within the Kansas City region DOLLARS SAVED through innovation and collaboration. Electric Vehicle Readiness Plan / 14 SIDEWALK LABS TRANSPORTATION MODELING Kansas City metropolitan area The sources and availability of data, the increases in computing power, and the ubiquity of communications have all converged to enable infinite possibilities to do things smarter and better than we have before. Sidewalk Labs is one of very few companies who is doing more than thinking about it. Olsson is helping them to combine and convert data into actionable information that will help transportation planners make better plans and decisions for the management and improvement of regional transportation systems. It can also provide private companies with a much more comprehensive ability to complete a market study - providing insights into transportation methods, purposes, and patterns along with detailed characteristics of those using the transportation systems. Olsson is calibrating a model, and helping to facilitate its adoption into the wider public and private communities. We collected data from transportation agencies and private development companies. Then, we will do a general "gut check' of the entire model. Based on our experience throughout the area, we will identify anomalies or irregularities in the model output. In addition, we will identify a number of location points as an "indicator sample" throughout the metro representing various facility and data types. We will do a more in-depth check of these points on every iteration of the model, which will assist to provide structure and consistency to the validation process. We will summarize our review findings in a short memorandum, or in a specific format as requested by Sidewalk Labs. *i DATES 2018 SERVICES Traffic Management Intelligent Systems Transportation Systems MARKETS • Transportation • Technology PROJECT REFERENCE Nick Bowden Replica 10 Hudson Yards 26th Floor New York, NY 10001 212.373.0800 bowden@sidewalklabs.com Electric Vehicle Readiness Plan / 15 METROPOLITAN TRANSPORTATION PLAN Joplin, Missouri PROJECT COORDINATION WITH A VAST COALITION. Economic development is thriving in Joplin and the growth justified an analysis of the metropolitan area's transportation needs. The Joplin Area Transportation Study Organization (JATSO) turned to Olsson to complete an update of the Metropolitan Transportation Plan (MTP). Our transportation planners dove into studying all modes of transportation - auto, truck, bicycle, pedestrian, transit, etc. - in and around the City of Joplin. With the onset of the pandemic in the spring of 2020, Olsson quickly pivoted our outreach and public engagement to online and virtual meetings. The plan was built with the input of numerous stakeholder groups, and hundreds attended the virtual online "open houses" to review materials and provide input. Through this process, and fueled in part by the pandemic, two trends became clear: the desire for increased active transportation connectivity and facilities for pedestrian and bicyclists; and, the lack of widespread broadband options to facility work from home and remote learning. These desires surfaced not only from the general public, but also from chambers of commerce, visitor's bureaus, developers, business owners, and school districts. The stakeholders saw not only the benefit for existing residents and businesses, but the need for these expanded services to attract and retain new employees and residents. We are continuing to work with JATSO on a solid plan to address the community's needs, and the plan is anticipated to be adopted in 2021. DATES 2020-2021 SERVICES • Transportation Planning MARKETS • Transportation PROJECT REFERENCE Keegan Stanton JATSO 602 S. Main Street Joplin, MO 64801 417.624.0820 ext. 511 kstanton@joplinmo.org Electric Vehicle Readiness Plan / 16 MOBILITY NEEDS The Association of Central Oklahoma Governments (ACOG) chose Olsson to develop a performance based Congestion Management Process (CMP) for the Oklahoma City Area. As a part of the CMP, Olsson conducted a review of the previous CMP; updated the CMP with current data and conditions; assessed the CMP's relationship to the Transportation Improvement Program (TIP) and Encompass 2040; identified system deficiencies, evaluated existing strategies, and identified new strategies to alleviate congestion and enhance mobility; developed techniques and relationships needed for responding to recurring and non recurring traffic congestion and incidents; analyzed regional freight transportation volumes and related congestion impacts; and identified a new CMP focus network for use in future planning. Olsson's delivery refined congestion management corridors and provided congestion management toolbox. The toolbox directly links ACOG's regional goals and objectives to regionally tailored congestion management strategies to both achieve the region's livability goals and address congestion issues. DATES 2015-2016 PROJECT REFERENCE John Sharp Acting Executive Director 4205 N Lincoln Boulevard Oklahoma City, OK 73105 405.234.2264 Following the conclusion of this project, ACOG reached out to Olsson to help simplify their existing Surface Transportation Block Grant (STBG) project selection methodology. Olsson developed a new system that leaned upon existing data to directly link the Long Range Plan, CMP, and TIP. Electric Vehicle Readiness Plan / 17 TRANSPORTATION SYSTEMS MANAGEMENT AND OPERATIONS (TSM&O) Statewide STING AS k... EXTENSION FOR DOT STAFF Olsson served as the prime consultant for the development of Missouri's Statewide Transportation Systems Management and Operations (TSM&O) program plan. The project developed a plan to integrate consideration of TSM&O more fully into MoDOT's organization and culture. The end goal of these efforts is that MoDOT as a whole understands and considers TSM&O strategies in all planning, project development, operations, and maintenance efforts and initiatives. The plan provides the background, establish the mission, vision and goals, and define the process and tasks that will help mainstream operations strategies into MoDOT's general toolbox for transportation improvement. The areas of focus for the plan included Traffic Incident Management, Work Zone Management, Intelligent Transportation Systems, and integration into the overall planning process. The plan also addressed workforce development, performance measures, and looking ahead to future development and expansion of the TSM&O program. DATES 2015-2018 SERVICES • Traffic Management Systems • Planning & Design MARKETS • Transportation • Technology PROJECT REFERENCE Ashley Buechter Traffic Liaison Engineer MoDOT Central Office 830 MoDOT Drive, Jefferson City, MO 65102 573.751.0982 ashIey.buechter@modot.mo.gov Electric Vehicle Readiness Plan / 18 PROJECT APPROACH .I PROJECT APPROACH Twelve tasks are included in the RFP that outline a solid process for the development of an EV readiness plan. The following sections describe our specific approach to completing each of the tasks. Within several subsections, we have included various added -value activities that can be discussed during scoping and included if desired. EV Readiness Plan Development The development of the EV plan will follow a traditional strategic planning process. Several of the steps, such as the assessment of the capacity of local power delivery systems, will require the specialized knowledge and expertise that Olsson can provide. To develop the plan, we propose to establish a small steering committee comprised of representatives from various stakeholder groups and chaired by the agency project manager. This steering committee should provide direction to Olsson and counsel to the agency project manager throughout the process. Stakeholder Outreach Stakeholder participation is essential to the effective development and deployment of this EV Plan for SEMPO. Because the anticipated growth in the number of EVs will impact all of us in some form, everyone is a stakeholder. From a practical standpoint, however, we need to identify key stakeholders and group representatives in your region. We will work with the steering committee to develop a full list of stakeholder groups. At a minimum, stakeholders will include transportation, transit, local power providers, local businesses that benefit directly from an EV business model, local and regional government agencies, chambers of commerce, fleet and delivery service companies, special interest groups such as Electrify Missouri, and interested members of the traveling public. With an understanding who the stakeholders are, we will develop a stakeholder engagement and management plan. This plan will subdivide each stakeholder by their levels of influence and interest and manage or inform them accordingly. The table below illustrates how various stakeholders will be engaged: Quadrant I: We will plan to hold one-on-one or small group interviews to gather into the plan. We will present a project fact sheet and a list of discussion/ questions topics which will assess each group's assets, needs, and concerns. We will use these interview meetings in part to educate the stakeholders, then listen to them on their specific issues and thoughts. Because of the uncertainties of COVID-19, we will plan to conduct these interviews virtually. This stakeholder group will also be provided the opportunity to review and comment on the draft plan. Quadrant II: We will communicate individually with these stakeholders about what level of engagement they would like and will accommodate accordingly. Quadrant III: We will develop an online survey form where members of these groups can answer questions related to the study and submit comments. Members of this group may be referred to a project information website, discussed below. Quadrant IV: We will stay in contact with these groups, but due to low interest and weak influence, won't specifically engage with them. Olsson will work with you and the steering committee to determine the best methods of reaching out to each stakeholder group. This may include directly contacting some stakeholders and working through other organizations to reach others. For example, we may work with the local Economic Development Council to reach local businesses, and through SEMPO's existing communication channels to reach members of the public. To keep all project stakeholders informed, we will work with you to determine if it is possible to include project information on the SEMPO website. If this Electric Vehicle Readiness Plan / 20 High Interest Low Interest Strong 1 II Influence Manage Closely Keep Satisfied Weak III IV Influence Keep Informed Monitor Quadrant I: We will plan to hold one-on-one or small group interviews to gather into the plan. We will present a project fact sheet and a list of discussion/ questions topics which will assess each group's assets, needs, and concerns. We will use these interview meetings in part to educate the stakeholders, then listen to them on their specific issues and thoughts. Because of the uncertainties of COVID-19, we will plan to conduct these interviews virtually. This stakeholder group will also be provided the opportunity to review and comment on the draft plan. Quadrant II: We will communicate individually with these stakeholders about what level of engagement they would like and will accommodate accordingly. Quadrant III: We will develop an online survey form where members of these groups can answer questions related to the study and submit comments. Members of this group may be referred to a project information website, discussed below. Quadrant IV: We will stay in contact with these groups, but due to low interest and weak influence, won't specifically engage with them. Olsson will work with you and the steering committee to determine the best methods of reaching out to each stakeholder group. This may include directly contacting some stakeholders and working through other organizations to reach others. For example, we may work with the local Economic Development Council to reach local businesses, and through SEMPO's existing communication channels to reach members of the public. To keep all project stakeholders informed, we will work with you to determine if it is possible to include project information on the SEMPO website. If this Electric Vehicle Readiness Plan / 20 is feasible, we will work with you and the steering committee to develop some descriptive content that will be updated periodically. Information can be updated periodically based on the project's progress and can serve as an up-to-date source of information for this stakeholder group. Note that we have not included any telephone, mail, or in-person surveys, or public meetings to obtain input from the general public in our plan and estimate. If this is an important element for SEMPO, however, we are happy to explore options for a broader public outreach effort as an added -value item. Assessment A full assessment of existing conditions is foundational to the development of any plan. Olsson will provide this assessment which includes local conditions and external research. The context provided by this information will serve as the basis to identify the opportunities to be leveraged and obstacles to be overcome to achieve EV readiness in the SEMPO region LOCAL CONDITIONS Assessment of the existing local conditions covers a broad spectrum of government and regional information, including an assessment of the local power grid. Olsson will research and synthesize information from these areas, which will inform the study recommendations. Local Government Olsson will review existing relevant policies, building codes, zoning ordinances, and planning and other relevant documents available from SEMPO and its member agencies for elements that may affect the adoption or implementation of EVs. We will work with SEMPO and the steering committee to obtain access to the needed documentation which may not already be available via public website. Such documentation may include plans, maps, GIS -based and other files, and other resources. Some specific items that will support the development of the plan include the following: • The existing regional plans will provide the regional vision and goals serving as a touch -point to ensure that the outcome and recommendations of the EV readiness plan are in alignment with these existing efforts. Some local building codes, permitting regulations, and inspection practices may also have an influence on EV adoption. For example, building codes for van - accessible parking spaces also applies to designated EV charging spaces and needs to be accounted for in deployment plans. Some agencies have also included mandatory percentage of EV parking spaces for all new or modified public parking lots. • A combination of both local and census - level data along with economic development plans will help identify underserved public and residential areas and will support recommendations to address equity concerns. Regional Various regional factors will also impact rollout of electric vehicles in the area. Olsson will gather and synthesize this information to gain an understanding of these factors to identify gaps and opportunities. The following paragraphs describe a few of the sources that will be contact used. • We will discuss with local transit and business fleets to assess their willingness to share plans to move any of their fleets to EV or other zero- or low -emissions technology. We will also take a sampling of local businesses, including fueling stations and truck stops, to understand their current plans or reservations regarding electrification. • We will contact local auto dealers to understand the availability of vehicles, service options, and EV sales statistics. We will review existing transportation plans to understand the levels of regional vs. pass-through traffic. This will provide insight into the publicly available charging needs of pass-through vehicles and the residential charging needs of local residents. We will assess existing regionally available charging stations and contact a sample of national charging station providers to determine upcoming plans for expansion into the region and study area. A simple search of available charging stations shows only three in Cape Girardeau itself, with others throughout the region. From user comments on plugshare.com, some of these in the area itself have limited access, are remote, or are in need of repair. Electric Vehicle Readiness Plan / 21 • Regional geographic and demographic information may provide additional insights into the potential future adoption rate. For example, we anticipate that rural residents and those in the agricultural industry may be slower to adopt because of the extended distances they need to travel and the associated "range anxiety" related to the availability of regional charging stations. Power Grid In addition to the governmental and regional needs, Olsson will also provide a high-level assessment of the capacity of the local power infrastructure. We have an existing working relationship with Ameren and will also determine if there are other Rural Electric Cooperatives or municipal power providers that may also need to be engaged. Most electricity providers will require a confidentiality agreement prior to providing any details about their infrastructure. There are various types of grid documentation and modeling tools that each organization may be using, and Olsson has the experience to be able to read and assess each common type. We will assess and summarize this information into a high-level form that each power company is comfortable with including in the plan and meets their needs for confidentiality and security. In addition to the infrastructure, we will also assess the current rate structure for both residents and businesses to determine in place rate structure issues that could impact EV use. Examples may be incentives related to charging times, surcharges related to solar power, etc. External Conditions A primary input to the study will be an overarching summary of the external elements that impact vehicle electrification, and how these elements will impact EV adoption and utilization at the local level. Our summary will include a review of the industry from the standpoint of manufacturing, federal and state government, national power grid, and from an environmental perspective. It will include an unbiased and honest assessment of the risks involved and obstacles that need to be overcome at a national and industry level. We feel that this is important to help SEMPO and its member agencies maintain the fiscal responsibility demanded of you by your constituents. Existing EV Stations in the Cape Girardeau and surrounding areas. • -A. .J Yee v .. - �u. t... r . . iety, . t• !Y. Electric Vehicle Readiness Plan / 22 Federal and State Government At this time, the federal government is looking for ways to advance the adoption of EVs and other low -emissions technology in order to reduce the negative impact that transportation currently has on the environment. These impacts are primarily the emission of greenhouse gases and the depletion of non-renewable natural resources. EVs are known to have a lower environmental impact and have become more affordable and feasible through recent developments in battery and other technology. Avenues being explored include funding and incentive programs ranging from grants awarded to municipal governments, incentives for consumers, incentives and penalties for manufacturers, and funding for the upgrade of power grids. We will provide a summary of these incentives and programs, including identifying funding and programs that may be available for SEMPO, its member agencies, and local power providers. In addition to these federal programs, we will also summarize any state -level policies, laws, or programs in place or anticipated at the state level. Industry Status There is a significant amount of research being done both to advance the EV industry, to assess the current state of adoption, and to predict its impacts. This assessment will also include a summary of the technology, which will include challenges introduced by the lack of a standard for charging connectors, as shown in the following diagram. We will look at the current manufacturer goals, EV production rates, and availability in the region. We will summarize this information in order to inform the study recommendations. Best Practices A third component for the external research includes a brief assessment of best practices at the regional and municipal levels for EV planning. Specifically, we will research the various actions taken at the municipal level by local agencies, which include changes at the policy level, the program level, and the partnership level. Most of these will be from agencies within states such as California and Colorado who are currently seeing a higher adoption rate than most other parts of the country. Synthesis From the information gathered at the local and external levels to draw conclusions about critical barriers, gaps, and opportunities that will help the SEMPO area be prepared for the anticipated changes related to EVs. The outcome of this effort will become the plan's recommended actions and strategies. They will include recommended modification to existing governmental codes and policies, participating in or creating new programs, engaging in partnerships with public and private organizations, outreach activities, and other appropriate actions. Equity Analysis Electric Vehicles are commonly considered a luxury for the affluent. This is due in part by the higher initial cost, and in part by limitations in available charging infrastructure. Currently 80% of EV owners charge at home, yet only 37% of renters have access to a garage or carport. Addressing equitable access to charging infrastructure is an important component to this EV plan. In the plan, we will summarize various strategies and incentive programs that help to offset EV purchase and operational costs and provide charging infrastructure to underserved communities. With these programs and strategies in mind, we will work with SEMPO to identify underserved areas and potential infrastructure gaps within the planning area that will need specific focus during the implementation of the EV readiness plan. We anticipate that much of the needed data can be obtained from the most recent Federal Census; however, we will supplement this information with Electric Vehicle Readiness Plan / 23 AC JI772 Mennekes GB/T (AC) (Type 1) (Type 2) ONBOARD CHARGER Various Types of EV Chargers and Connectors DC • • ' • X Tesla CHAdeMO GB/T (AC) CCs1 CCs2 other data, such as land use and other parcel data, that may be available through SEMPO or its partners Identification of Needed Infrastructure For this plan, we anticipate that this information will be presented at a high level. However, Olsson can also provide a more detailed assessment and recommendations as an added -value service. An evaluation of existing power infrastructure Identification of Needed Services is critical to any EV readiness plan. The aging national and local power infrastructure is not likely equipped to handle the added increase in power consumed by EVs. Recommendations to upgrade the infrastructure for the installation of charging stations will be included as part of this Plan. High use areas, equality location identification and prioritization by neighborhood and region, existing high-capacity power locations ready for charging stations and high usage areas will be identified. Olsson will take existing land use maps and estimate how the power needs for those areas may increase over time based on anticipated EV adoption rates. We anticipate that these needs will be different for residential, commercial, industrial, and rural areas. We will overlay these future needs onto the existing power generation, transmission, and delivery infrastructure to determine gaps and priorities. With an understanding of the existing power generation and distribution system, we develop high-level recommendations for actions that can be addressed in partnership with SEMPO and local power providers, along with budgetary cost estimate for both the power delivery system and the charging infrastructure. Residents and local businesses will be hesitant to purchase EVs for themselves or their fleets without being able to purchase or service them locally. As part of the stakeholder engagement task, we will communicate with local dealerships and auto service providers to determine their current and planned capabilities to provide these services. If needed, we will also interview dealers in more urban areas to gage the actual level of service that is needed based on the number of EVs in their areas. While this may be a classic "chicken and egg' scenario, we will also provide any available recommendations on how to attract or incentivize the needed services to the area. Identification of Needed Programs and Policies The information gathered during the Existing Conditions task will provide needed intelligence to recommend policies and programs that will encourage the adoption of EVs by both residents and organizations. Some examples may include: Electric Vehicle Readiness Plan / 24 • Including the installation of EV charging stations for new buildings or public parking locations. • Requiring developers to assist with power infrastructure upgrades needed to power newly installed charging stations. • Requiring local dealerships to report individual EV sales (with addresses) to the power providers so that the power company can accommodate increased load in residential areas. • Participating in subsidy programs for the deployment of EV charging stations (both public and private) • Participation in local or national organizations that may provide further insights into best practices and incentive programs related to EVs. • Require residents to notify power companies? • Provide for ADA requirements at public charging locations • Mapping of charging sites and providing location information to 3rd party charging location providers • Local phone app with charging locations Strategy and Recommendations Throughout this approach, we have identified specific areas for strategies and recommendations. In this task we will summarize these recommendations and rank them by effort level, impact, cost, along with roles and responsibilities of each stakeholder. This ranked list will provide the foundation for the scheduled implementation plan. Funding guidance For this task, we will identify specific funding sources and opportunities that may be used by SEMPO and its partners to support its EV readiness efforts. These sources may include federal, state, and private funding, as well as opportunities through private and economic development. For example, in April 2021 the Federal Highways Administration produced a report identifying federal transportation funding sources that can be used by state and local agencies in support of vehicle electrification. The table below is summarized from that report. We will also identify and describe examples of the additional rate structuring and incentive programs implemented by municipalities across the country. This includes identification of how local power companies have modified their rates to both incentivize EV usage and to fund improvements to the power infrastructure. The analysis will also address programs that target fleets and businesses as well as those targeted toward individual consumers. Olsson will also provide an overview of how the utilization of distributed power generation also impacts the future power generation and transmission needs. We have extensive experience in this area and have helped power companies address renewable power on their grids. This includes overcoming several challenges, such as the fact that existing power infrastructure is designed to be one-way and must be modified to allow a "back - feed" from solar power sources during the day. Implementation Plan Once the strategies are prioritized and potential funding sources identified, we will work with SEMPO and the project steering committee to develop a scheduled implementation plan. Because of the rapid evolution in all aspects of vehicle electrification, we will build in necessary flexibility to accommodate new programs, funding, initiatives, and partners - as well as allowances for the potential formation of partnerships and contingencies for any that may not materialize. Performance measures will also be identified that will Electric Vehicle Readiness Plan / 25 allow SEMPO and its partners to track its progress. Some example measures that could be considered include the number of public charging stations in the area, number of EVs sold to individuals, number of EVs deployed into fleets, funding received, incentives distributed, partnerships formed, outreach activities performed, power infrastructure capacity added, etc. Complete Draft of EV Readiness Plan At each step of this process, we will submit preliminary findings to the SEMPO Technical Planning Committee and the project steering committee for review and comment. The draft plan will be the compilation and formalization of the previously reviewed findings and will be submitted to both committees for their review and comments. We will plan to hold a meeting to review the draft plan with one or both committees as desired in order to provide a plan overview and to facilitate any discussion among the committee members. Once committee member comments are addressed, the draft can be made available on a website to all stakeholder groups for general comment, and to the public if desired. We will work with SEMPO to determine if the organization's website can be used for this purpose and to determine the best way to receive public comment. If needed, Olsson has access to several tools which can be used to receive this public and general stakeholder comment. Once all comments are received, we will provide any changes back to the steering and planning committee members for final approval. Final EV Readiness Plan Once all final comments are received and incorporated, a final readiness plan will be provided. Our experience in producing many publicly visible planning documents along with a best -in -class publishing and graphic arts team means that the document will be concise, readable, graphical, and have a professionally attractive appearance consistent either with SEMPO's organization branding or with an approved project branding as you prefer. FHWA Funding sources eligible for EV projects National Highway Performance $23.1 B Program (NHPP Surface Transportation Block $10.2 B Grant Program (STBG) Congestion Mitigation & Air Quality $2.4 B Improvement Program (CMAQ) National Highway Freight $1.5 B Program (NHFP) State Planning & Research (SPR) $641.5 M Metropolitan Planning (PL) 1 $357.9 M Rebuilding American Infrastructure with Sustainability and Equity $1.0 B (RAISE) (formerly known as BUILD) Infrastructure for Rebuilding $889.0 M America (INFRA) Grant Program Advanced Transportation and Congestion Management Technologies $53.3 M Deployment (ATCMTD) Federal Lands and Tribal $1.0 B Transportation Program (FLTTP) Highway Infrastructure Program (HIP) $644.0 M Puerto Rico Highway Program (PRHP) $74.9 M Territorial Highway Program (THP) $37.3 M State Infrastructure Banks (SIBs) Varies Transportation Infrastructure Financing & Innovation Act (TIFIA) Varies Electric Vehicle Readiness Plan / 26 PROJECT MANAGEMENT vo PROJECT MANAGEMENT At Olsson, we provide you with outstanding projects by making sure each project task is on track and clearly communicated to you - from start to finish. Our approach follows the industry standards laid out by the Project Management Institute (PMI), and we manage the key elements of a project purposefully throughout the project's life cycle (shown below). Initiating: Defining expectations at the start of a new project. At project initiation, Olsson prepares a mutually agreed upon scope of work and budget, which are incorporated into the contract documents. These documents establish clear project goals, deliverables, and important schedule milestones. We know clearly defined expectations are the key to successful project delivery and client satisfaction. Planning: Figuring out what will be done, how, and in what order. After the contract documents are signed, we develop an overall project management plan (PMP) that defines how the project will be carried out. The PMP will address the following items: Leadership and Communication The PMP identifies the project manager (PM), the client points of contact, and a list of the key stakeholders involved in the project. Making sure everyone is in the loop is critical. To do this effectively, we must know what communication is valuable to you - this includes things like progress meetings, status reports, and project dashboards. Knowing what is valuable to you helps us manage expectations and eliminate confusion about what will get communicated and when. As part of our communication within the PMP, our team will schedule regular check-in or progress meetings. On past projects, we have found that the frequency of meetings is better determined by tasks and deliverables (project demands) than by a set recurrence. The PM will work with your team to determine the timing of review and coordination meetings. 10 Agendas will be provided for each meeting, followed by meeting minutes and action items to keep track of assigned tasks. Status reports will be sent to the client and project team to keep everyone informed of progress and next steps. We will communicate all changes or modifications to the project as quickly as possible. Scope, Schedule, Budget The PMP outlines the project goals, scope, schedule, budget, and deliverables of a project, and it's essential for keeping a project on track. The PMP is the playbook for executing the project and maintaining clear expectations for the whole project team. Resource Management Identifying the right people with the right skills and clearly articulating their roles and responsibilities is key to success. Based on the specific requirements of the project, Olsson's PM assigns the appropriate staff as task managers. The PM may adjust personnel assignments to meet project deadlines or to overcome project challenges. This assures that your project has a team with the right skills, expertise, and capacity for successful project execution. Electric Vehicle Readiness Plan / 28 SCHEDULE vo SCHEDULE Our team is wired for the success in delivering this project on time while exceeding the motoring public and city's expectations. Our deep resource pool of team members has extensive, cross -disciplinary experience, enabling us to provide you with core services that will address all aspects of the project. With nearly 250 traffic and transportation and power distribution professionals firmwide, we have the resources and capacity in-house to deliver this project on time for the MPO. Our team has a passion for and knowledge of providing mobility and safety to users. Our senior level expertise, backed by our assistant engineers and technicians, allows us to develop quality, tailored solutions for you and efficiently respond to any needs that arise. We are ready and want to assist in delivering this project to the lead you into the future of transportation. TASK NAME J OCT UEPrJAN FEB MAR'SAPR MAY JUN AUG SEP Notice to Proceed Form Steering Committee Stakeholder Engagement Assessment, Analysis, and Research Recommendation, Funding, and Implementation Plan Draft Report Comment Period Final Report Traffic Signal Timing Updates Phase 2 / 19 COST PROPOSAL vo COST ESTIMATE The following is an estimated fee. The actual fee will be finalized with SEMPO during final negotiation of scope and fee. Hourly rates are provided by category. Role Hours Rate Total Project Manager 37 $ 80.00 $ 2,960.00 SME 105 $ 70.00 $ 7,350.00 Power Engr 54 $ 60.00 $ 3,240.00 Public Engagement 22 $ 50.00 $ 1,100.00 Planner 96 $ 50.00 $ 4,800.00 GIS 16 $ 35.00 $ 560.00 EIT 228 $ 35.00 $ 7,980.00 Graphics 35 $ 30.00 $ 1,050.00 Total Direct Labor 593 3 Assessment, Analysis, and Research $ 29,040.00 Overhead 187.52%% $ 54,455.81 Subtotal 43 $ 83,495.81 Fee 12.00% $ 10,019.50 Subtotal Labor Costs 45 $ 93,515.31 Direct Expenses 2.1 Stakeholder List Total Airfare $ 500.00 Hotel $ 90.00 Car Rental & Fuel $ 110.00 PerDiem $ 220.00 Subtotal Direct Expenses $ 920.00 Project Total $ 94,435.31 Project Public Task Description Role: Manager SME I Power Engr Engagement Planner GIS EIT I Graphics Total 1 Project Management 1.1 Project Management 1161 1 1 1 1 1161 1 32 Task Subtotal 16 0 0 0 0 0 16 0 32 2 Stakeholder Engagement 2.1 Stakeholder List 1 2 2 2 4 11 2.2 Primary SH Outreach 2 12 2 12 6 1 35 2.3 Secondary SH Outreach 1 3 8 3 15 2.4 Feedback Assessment 1 2 2 2 4 11 Task Subtotal 5 19 0 14 19 0 14 1 72 3 Assessment, Analysis, and Research 3.1 Government Docs 1 4 8 30 43 3.2 Regional Assessment 1 4 8 8 24 45 3.3 Federal/National Assessment 2 24 8 40 74 3.4 Power Grid 1 2 32 1 36 Task Subtotal 5 34 32 0 25 8 94 0 178- 4 Recommendation, Funding, and Implementation 4.1 Policies, policies, funding 4 16 16 16 32 84 4.2 Implementation Plan 2 8 8 16 34 Task Subtotal 6 24 16 0 24 0 48 0 118 5 Draft Plan 5.1 Draft Plan 4 20 4 20 8 40 32 128 5.2 Comment Period 4 8 4 8 24 Task Subtotal 4 24 4 8 24 8 48 32 152 6 Final Plan 6.1 Revisions & Final Plan 11 41 21 141 181 21 21 Task Subtotal 1 4 2 0 4 0 8 2 21 Project Total 1 371 1051 541 221 961 161 2281 35 593 Electric Vehicle Readiness Plan / 32 APPENDIX: RESUMES .I BLAKE HANSEN, PE, PTOE, PMP Project Manager EXPERIENCE SUMMARY Blake is a transportation professional who has experience in transportation technology. Blake has both experience and a keen interest in all types of transportation technology, especially in the anticipated benefits and impacts of connectivity, automation, and electrification. He is a transportation technology subject matter expert who has experience in design, planning, construction, maintenance, operations, integration, and software deployment. Blake is a registered Project Management Professional (PMP), Professional Traffic Operations Engineer (PTOE), and Professional Engineer (PE) in multiple states. PROJECT EXPERIENCE • Mid-America Regional Council (MARC), Operation Greenlight Traffic On-call, Including Strategic Plan; Kansas City Metropolitan • MoDOT, SM&O Plan Development; MO • MoDOT, ITS Heartland MCOMP Grant Administrator; KS, NE, IA, MO • MoDOT, KC Scout Weather Memorandum of Understanding; MO • Oklahoma Department of Transportation (ODOT), ITS Inspection Guidelines; OK • City of Omaha, Traffic Signal System On -Call; Omaha, NE • City of Leawood, 2016 On-call Traffic Services; Leawood, KS • IowaDOT, Cedar Rapids ITS; Cedar Rapids, IA • IowaDOT, ITS On-call and Fiber Design; IA • Nebraska Link, Engineering On-call; Lincoln, NE • Kansas Department of Transportation (KDOT), ITS Central Software Evaluation; KS • City of Lee's Summit, Communications Master Plan; Lee's Summit, MO • Kansas Field Expansion; Kansas City metropolitan area • Sidewalk Labs, Transportation Modeling; Kansas City Metropolitan Area • Nebraska Department of Transportation (NDOT), ATCMTD Grant Support, NE • Minnesota Department of Transportation (MnDOT), North/ West Passage Corridor Freight Planning; various states • City of Olathe, Transportation Master Plan; Olathe, KS • City of Kansas City, Noland Road Corridor; Kansas City, MO EDUCATION • B.S., Civil Engineering, University of Utah • M.S., Civil Engineering University of Utah PROFESSIONAL REGISTRATIONS • Professional Engineer: KS, NE, MO, UT, IA • Professional Traffic Operations Engineer • Project Management Professional OLSSON EXPERIENCE • 2014 to Present OVERALL EXPERIENCE • 1997 to Present Electric Vehicle Readiness Plan / 34 JOHN HANSEN Technical Leader EXPERIENCE SUMMARY For the past four decades, John has been involved with hundreds of ITS -related projects throughout the United States and Canada. His particular expertise is related to infrastructure applications, including agency -wide data collection, agency -wide Road Weather Information Systems, dynamic message signs, camera systems, traffic management systems, geographic information systems for transportation, weigh in motion systems, and traffic management PROJECT EXPERIENCE • Oregon DOT, Operation Green Light; OR* • Various Clients, Multi -state (11) Coalitions to Share Data; Nationwide* • Nebraska DOT, Statewide Road Weather Information System Deployment; NE* • New Mexico DOT, Statewide Dynamic Message System; NM*Nebraska DOT, Statewide Road Weather Information System Deployment; NE* • New Mexico DOT, Statewide Camera Deployment and Management; NM* • New Mexico DOT, Statewide Dynamic Message System; NM* • Federal Highway Administration, Weigh in Motion; Nationwide* • Wyoming DOT, Transportation Management Center Deployment; WY* • Various Clients, Advanced Data Collection -Permanent Systems in 15 States; Nationwide* • Various Clients, Deployment of Statewide RWISs in 14 States; Nationwide* • Various Clients, Statewide Portable Weigh in Motion Systems in 18 States; Nationwide* • Various Clients, Statewide deployment of 511 Systems in Eight States; Nationwide* • Various Clients, Multi -state (11) Coalitions to Share Data; Nationwide* • City and County of Denver, Transit Priority System; Denver, CO* • City of Phoenix, Transit Priority System; Phoenix, AZ* • City of Kansas City, Transit Priority System; Kansas City, MO* • City of Salt Lake City, Transit Priority System; Salt Lake City, UT* • City of San Diego, Transit Priority System; San Diego, CA* • City of Sacramento, Transit Priority System; Sacramento, CA* • City of Seattle, Transit Priority System; Seattle, WA* *Previous Experience I OLSSON EXPERIENCE • 2021 to Present OVERALL EXPERIENCE • 1980 to Present Electric Vehicle Readiness Plan / 35 KYLE MCLAUGHLIN EV Planning Kyle is a highly motivated, solution -oriented asset to our team here at Olsson. He has developed a skill of curating plans that have an attention for detail concerning the improvement of the efficiency of traffic for cities. Kyle has vast knowledge and understanding of civil practices, community and regional planning, and how each must go hand-in-hand. While completing his Masters degree, Kyle has presented on important topics when it comes to different aspects of city planning. PROJECT EXPERIENCE • City of Colorado Springs, Complete Streets Policy EDUCATION Guidelines; Colorado Springs, CO • M.S., Community and Regional Planning, University • Nebraska Department of Transportation, NDOT Mobility of Nebraska Lincoln Management -Phase 3 PK1901; Lincoln, NE • M.S., Civil Engineering • Ruxton Avenue Functionality Study; Manitou Springs, CO* (Transportation • Manitou Springs Transportation & Mobility Specialization), University of Master Plan; Manitou Springs, CO* Nebraska Lincoln • Flaming Gorge Way Corridor Study; Green River, WY* • B.S., Civil Engineering, University of Nebraska • City of Golden, Transportation Master Plan; Golden, CO* Lincoln *Previous Experience CERTIFICATIONS/ TRAINING • Engineer in Training, NCEES • Envision Sustainability Professional, Institute for Sustainable Infrastructure • Mitigation Planning for Local and Tribal Communities, FEMA PROFESSIONAL PRESENTATIONS • "Taming the Urban Arterial", American Planning Association, 2019 • "Hazard Mitigation Planning 101", Nebraska Planning and Zoning Association Conference, 2017 OLSSON EXPERIENCE • 2021 to Present Electric Vehicle Readiness Plan / 36 DEVON BRAZEAL, EI EV Planning EXPERIENCE SUMMARY Devon's experience in transportation and traffic operations includes planning, analysis, design, implementation, and construction engineering inspection. Prior design experience includes ITS deployments for managed freeway systems, as well as traffic signalization, lighting, advanced transportation management systems installations, traffic operation and safety studies, and signing and pavement marking projects. PROJECT EXPERIENCE • GVP Windier, Windier Master Community Multimodal Design and Traffic Study; Aurora, CO • Orange County, Oak Ridge Pedestrian and Bicycle Study; Orlando, FL* • CDOT Region 1, Wrong Way Driving Evaluation and Prioritization Study; CO* • City of Oviedo, Mitchell Hammock Road Adaptive Traffic Signals; FL* • Volusia County, ATMS; Volusia, FL* • FDOT District 5, SR 50/SR 33 Realignment; Lake County, FL* • FDOT District 4, Florida Turnpike ERCAR; St. Lucie County, FL* • Central Florida Expressway (CFX), Miscellaneous Engineering Design Services; Orange County, FL* • FDOT, Park and Ride Facility Evaluations; FL* • GVP Windier, Windier Master Community Multimodal Design and Traffic Study; Aurora, CO • CDOT Region 3, General Engineering Contract; CO* • Sarasota County, ATMS Phase V; Sarasota, FL* • Volusia County, ATMS; Volusia, FL* • FDOT District 5,1-75 Frame; Sumter and Marion County, FL* • FDOT, FEMA Hurricane Irma Emergency Response; FL* *Previous Experience EDUCATION • B.S., Civil Engineering, University of Central Florida PROFESSIONAL REGISTRATIONS • Engineer -Intern: FL OLSSON EXPERIENCE • 2021 to Present OVERALL EXPERIENCE • 2015 to Present Electric Vehicle Readiness Plan / 37 RUSTY HARTMAN, PE Distribution Planning EXPERIENCE SUMMARY As a team leader for Olsson, Rusty uses his knowledge and years of experience in mechanical/electrical design to guide the power transmission and distribution team. He is seasoned in electrical substation, transmission, and distribution projects, both in the public and private sector. Rusty's involvement in engineering for municipalities and renewable energy projects positions him as a thought leader for Olsson, and a great resource for client coordination and business development. PROJECT EXPERIENCE • Empire District, Liberty Utilities, Electrical Transmission EDUCATION Distribution On -Call Engineering; Joplin, MO • B.S., Mechanical Engineering, • Evergy, Electrical Transmission Distribution On- University of Missouri Call Engineering; Kansas City, MO • Carthage Water Electrical Plant (CWEP), Industrial REGISTRATIONS Site Readiness; Carthage, MO Professional Engineer: • Omaha Public Power District (OPPD), Electrical Transmission KS, MO, NE, NM, OK Distribution On -Call Engineering; Omaha, NE CERT IFICAT ION SITRAINING • Mid America Precision Products (MAPP), Joplin Electrical One Line and Rework; Joplin, MO OSHA 10 Hour Training • MAPP, New Primary Installation WO #1; Joplin, MO OLSSON EXPERIENCE • City of Miami, General Engineering 2018; Miami, OK • 2018 to Present • Missouri American water, Joplin WTP Plant 2 Ventilation Modification; OVERALL EXPERIENCE Joplin, MO • 2006 to Present • USACE, Electrical Distribution System Upgrade; USA* • Evergy, Substation Design Consulting; Kansas City, MO* • Rio Grande Electric Coop at Ft. Bliss, Texas, 4,500 -Acre Site Development Underground Distribution, Substation Design, Procurement, Construction, Energization; EI Paso, TX* • Evergy System -Wide Circuit Switcher Replacements, Circuit Switcher Replacements Throughout the Service Territory, Including the Encompassed Line Panels in the Substations; Kansas City, MO* • Cole Camp Substation, 69/34 Greenfield Switching Station Complete Design, Procurement, Construction Coordination, Pre-Energization Testing and Energization; Cole Camp, MO* *Previous Experience Electric Vehicle Readiness Plan / 38 JEFF BUTTERMORE, PE Distribution Planning EXPERIENCE SUMMARY Jeff has experience in several areas of electric utility engineering and medium voltage industrial system engineering. He has served as the project manager responsible for design and construction administration for a wide range of project types, covering substations, transmission, subtransmission, distribution lines and systems, and generation. PROJECT EXPERIENCE • Empire District, Liberty Utilities, Electrical Transmission Distribution On -Call Engineering; Joplin, MO • Evergy, Electrical Transmission Distribution On - Call Engineering; Kansas City, MO • Carthage Water Electrical Plant (CWEP), Industrial Site Readiness; Carthage, MO • Omaha Public Power District (OPPD), Electrical Transmission Distribution On -Call Engineering; Omaha, NE • Mid America Precision Products (MAPP), Joplin Electrical One Line and Rework; Joplin, MO • Carroll Electric Cooperative Corporation, Incident Review; Bentonville, AR • City of Alliance, 12.47 kV Distribution Rebuilds (2018); Alliance, NE • Auburn Board of Public Works, Substation and Electric System Upgrades; Auburn, NE • Carroll Electric Cooperative Corporation, Incident Review; Bentonville, AR • City of Alliance, 12.47 kV Distribution Rebuilds (2018); Alliance, NE • City of Cambridge, Electric CUR 2010 (OA 008-1167); Cambridge, NE • City of Chappell, Electrical Distribution System Evaluation; Chappell, NE • City of Claremore, 2019-6 Electrical Distribution; Claremore, OK • City of Claremore, Capacitor Bank Study; Claremore, OK • City of Claremore, ODOT Frederick Road; Claremore, OK • City of Hickman, Consulting Services (2018-2020); Hickman, NE • City of Miami, General Electrical Services (2019); Miami, OK • City of Miami, Birnamwood URD Rebuild; Miami, OK • City of Miami, Feeder 23 Rebuild; Miami, OK • City of Seward, Electrical CUR 2010 (OA 005-0187); Seward, NE • City of Seward, Consulting Services (2017-2019); Seward, NE EDUCATION • B.S., Electrical Engineering, University of Nebraska - Lincoln • Graduate Studies, Electrical Engineering, Gonzaga University PROFESSIONAL REGISTRATIONS • Professional Engineer: CO, NE, TX, WA CERTIFICATIONS/TRAINING • SKM - 101: Intro 1 to SKM - 102: Intro 2 to SKM • Schweitzer - PROT 401: Protecting Power systems for Engineers OLSSON EXPERIENCE • 2019 to Present OVERALL EXPERIENCE • 2008 to Present Electric Vehicle Readiness Plan / 39 ELDON JENSEN, II, PE EV Charging Station Planning EXPERIENCE SUMMARY Eldon has experience in engineering management, design, and field support on both new construction and brownfield project sites. He has extensive experience on a wide variety of projects that include the food and beverage, pet food, biofuels, ag processing, power generation, wastewater, and commercial building industries. Specifically, his experience includes: power system studies, power system design, specification of electrical equipment, design of electrical equipment enclosures, electrical area classification, grounding and lightning protection design, instrumentation, control schematics, and control panel design. Eldon is a licensed Professional Engineer in 24 states. He has worked on many projects for Cargill Corn Milling at the Blair and Eddyville facilities. PROJECT EXPERIENCE • City of Overland Park, Electric Vehicle Station Design; Overland Park, KS • City of Auburn, Substation and Electric System Upgrades; Auburn, NE • Evergy, PISA Design Contract; KS & MO • Google, Electrical System Critical Spare Parts Evaluation; Lithia Springs, GA • Google, Substation and Associated Electrical Power Systems Analysis; Pryor, OK • Google, Short Circuit, Coordination, and Arc Flash (SCCAF) Engineering Services 2021 Contract; Council Bluffs, IA • City of Miami, On -Call Substation Construction Services; Miami, OK • Freeport LNG; Power Distribution Center Design; Freeport, TX • ADM; Combined Heat and Power Project; Cedar Rapids, IA* • Calpine Washington Parish; RTU Panels; Washington Parish, LA* • Consumers Energy; Campbell Unit 1 and 2 Control Upgrade; Holland, MI* • Exelon; Wolf Hollow PDCs; Granbury, TX* • Exelon; Colorado Bend PDCs; Colorado Bend, TX* • Reliant Energy; Hunterstown Combined Cycle Project; Hunterstown, PA* • Reliant Energy; Choctaw County Combined Cycle Project; French Camp, MS* • Sacramento Municipal Utilities District; Auxiliary Boiler Relocation; Sacramento, CA* *Previous Experience EDUCATION • M.A., New Testament, Johnson University • B.S., Electrical Engineering, University of Missouri - Columbia PROFESSIONAL REGISTRATIONS • Professional Engineer: AL, AR, CA, CO, FL, GA, IL, IN, IA, KS, MI, MN, MS, MO NE, NV, NJ, OH, OR, SC, SD, TX, VI, WY CERTIFICATIONS/TRAINING • OSHA 10 -Hour Construction Safety and Health • OSHA 10 -Hour General Industry Safety and Health • HACCP Level 1 OLSSON EXPERIENCE • 2021 to Present OVERALL EXPERIENCE • 2000 to Present Electric Vehicle Readiness Plan / 40 KURT ROTERING, PE, PTOE EV Charging Station Planning EXPERIENCE SUMMARY Utilizing his broad breadth of experience, Kurt brings expertise to a wide variety of projects in traffic and transportation engineering including signal and roundabout design, large- scale campus planning and design, access management, traffic studies, and event traffic management. Kurt has worked on a variety of projects for various state DOT's and has extensive experience working with municipalities throughout the Kansas City metropolitan area, Midwest, and Texas. PROJECT EXPERIENCE • City of Overland Park, Electric Vehicle Station Design; Overland Park, KS EDUCATION • Mid-America Regional Council, Operation Green • B.S., Civil Engineering, Kansas Light; Kansas City Metropolitan area State University • MoDOT, Route 152 & Platte Purchase DDI Conversion Kansas City, MO • M.S., Transportation • City Kansas City, On -Call Traffic; Kansas City, MO Engineering, Kansas State • KCATA IDIQ Transit Customer Information Systems; Kansas City, MO University • City of Pittsburg, Kansas Highway 126 Traffic Study; Pittsburg, KS PROFESSIONAL REGISTRATIONS • MoDOT, Route 152 & Platte Purchase DDI Conversion Kansas City, MO • Professional Engineer: TX, KS, MO, AR, OK, MI, ND, ID, • City of Owasso, 116th Street Widening from 129th Street to US -169; Owasso, OK* •Professional Traffic Operations Engineer • City of Overland Park, 2017 Neighborhood Street Reconstruction Program; Overland Park, KS* OLSSON EXPERIENCE • City of Overland Park, 2019 Neighborhood Street Reconstruction • 2020 to Present Program; Overland Park, KS* OVERALL EXPERIENCE • City of Overland Park, 2021 Neighborhood Street Reconstruction Program; Overland Park, KS* • 2007 to Present • City of Tulsa, 31 st Street Improvements from Riverside Drive to Peoria Avenue; Tulsa, OK* • City of Houston, Allen Parkway Improvements; Houston, TX* • City of Houston, CenterPoint Safety Study; Houston, TX* • City of Kansas City, Chouteau Parkway and Trail Connection Study and Improvements; Kansas City, MO* • City of Olathe, Church Street Improvements Project; Olathe, KS* • Grand Parkway Design Build Toll Road Segments F1, F2 and G; Harris and Montgomery Counties, TX* *Previous Experience Electric Vehicle Readiness Plan / 41 STACEY ROACH Stakeholder Coordination EXPERIENCE SUMMARY Stacey leads public engagement services at Olsson. She is a public involvement and communications professional trained through the International Association for Public Participation (IAP2). She manages Olsson's NDOT Public Involvement and Strategic Communications On -Call contract, including public involvement and communications efforts at both the state and local municipal levels. Stacey has worked closely with NDOT's public involvement and communications teams to determine the appropriate level and strategy for public participation and communication for multiple projects and programs. Stacey's experience includes planning and facilitating multi -stakeholder meetings, gathering stakeholder input, and building consensus. She has experience coordinating project meetings and meeting materials; creating and executing programmatic and project -related strategic communication plans using websites; managing social media and media relations; and developing and coordinating printed and digital communications. Stacey is known for her keen attention to detail, her ability to create and follow a plan of action and is energized by building and maintaining relationships with communities and their stakeholders while seeking to listen and share information. PROJECT EXPERIENCE • City of Harrison, Goblin Drive Phase I Improvements; Harrison, AR • City of Omaha, 13th Street Walkability Study; Omaha, NE • Metropolitan Area Planning Agency 24th Street Multimodal Transportation Study; Omaha, NE • City of Lincoln, RTSD 33rd Street and Cornhusker Highway Improvements; Lincoln, NE • City of Loveland, Highway 402 Master Corridor Plan, Loveland, CO • NDOT, On-call Public Involvement Services (2020-2023); Statewide, NE • NDOT, New 11 -Mile South Beltway East-West Freeway Construction Public Relations (sub to Hawkins Construction); Lincoln, NE • NDOT, Mobility Management Phase 3 Public Involvement; Statewide, NE • NDOT, In Valentine Public Involvement; Valentine, NE • NDOT, West 4th Street In Valentine Public Involvement; Valentine, NE • NDOT, U.S. 77 to U.S. 75 Public Involvement; Burt County, NE EDUCATION • Graduate Certificate, Public Management, University of Nebraska -Omaha • B.S., Education & Human Sciences, University of Nebraska -Lincoln CERTI FICATIONSITRAINING • International Association for Public Participation (IAP2), Planning and Techniques for Effective Public Participation Certificate OLSSON EXPERIENCE • 2017 to Present OVERALL EXPERIENCE • 2002 to Present Electric Vehicle Readiness Plan / 42 GENERAL PROVISIONS These General Provisions are attached to and made a part of the respective Letter Agreement or Master Agreement, dated October 26, 2021 between SEMPO ("Client") and Olsson, Inc. ("Olsson") for professional services in connection with the project or projects arising under such Letter Agreement or Master Agreement (the "Project(s)"). As used herein, the term "this Agreement" refers to these General Provisions, the applicable Letter Agreement or Master Agreement, and any other exhibits or attachments thereto as if they were part of one and the same document. SECTION 1—OLSSON'S SCOPE OF SERVICES Olsson's scope of services for the Project(s) is set forth in the applicable Letter Agreement or Master Agreement ("Scope of Services"). SECTION 2—ADDITIONAL SERVICES 2.1 Unless otherwise expressly included, Scope of Services does not include the categories of additional services set forth in Sections 2.2 and 2.3. 2.2 If Client and Olsson mutually agree for Olsson to perform any optional additional services as set forth in this Section 2.2 ("Optional Additional Services"), Client will provide written approval of the agreed-upon Optional Additional Services, and Olsson shall perform or obtain from others such services and will be entitled to an increase in compensation at rates provided in this Agreement. Olsson may elect not to perform all or any of the Optional Additional Services without cause or explanation: 2.2.1 Preparation of applications and supporting documents for governmental financial support of the Project(s); preparation or review of environmental studies and related services; and assistance in obtaining environmental approvals. 2.2.2 Services to make measured drawings of or to investigate existing conditions of facilities. 2.2.3 Services resulting from changes in the general scope, extent or character of the Project(s) or major changes in documentation previously accepted by Client where changes are due to causes beyond Olsson's control. 2.2.4 Services resulting from the discovery of conditions or circumstances which were not contemplated by Olsson at the commencement of this Agreement. Olsson shall notify Client of the newly discovered conditions or circumstances and Client and Olsson shall renegotiate, in good faith, the compensation for this Agreement, if amended terms cannot be agreed upon, Olsson may terminate this Agreement and Olsson shall be paid for its services through the date of termination. 2.2.5 Providing renderings or models. 2.2.6 Preparing documents for alternate bids requested by Client. 2.2.7 Analysis of operations, maintenance or overhead expenses; value engineering; the preparation of rate schedules; earnings or expense statements; cash flow or economic evaluations or; feasibility studies, appraisals or valuations. 2.2.8 Furnishing the services of independent professional associates or consultants for work beyond the Scope of Services. 2.2.9 Services necessary due to the Client's award of more than one prime contract for the Project(s); services necessary due to the construction contract containing cost plus or incentive -savings provisions; services necessary in order to arrange for performance by persons other than the prime contractor; or those services necessary to administer Client's contract(s). 2.2.10 Services in connection with staking out the work of contractor(s). 2.2.11 Services during out-of-town travel or visits to the site beyond those specifically identified in this Agreement. 2.2.12 Preparation of operating and maintenance manuals. 2.2.13 Services to redesign some or all of the Project(s). 2.2.14 Preparing to serve or serving as a consultant or witness or assisting Client with any litigation, arbitration or other legal or administrative proceeding. 2.2.15 Services relating to Construction Observation, Certification, Inspection, Construction Cost Estimating, project observation, construction management, construction scheduling, construction phasing or review of Contractor's performance means or methods. 2.3 Whenever, in its sole discretion, Olsson determines additional services as set forth in this Section 2.3 are necessary to avoid a delay in the completion of the Project(s) ("Necessary Additional Services"), Olsson shall perform or obtain from others such services without waiting for specific instructions from Client, and Olsson will be entitled to an increase in compensation for such services at the standard hourly billing rate charged for those employees performing the services, plus reimbursable expenses, if any: 2.3.1 Services in connection with work directive changes and/or change orders directed by the Client to any contractors. 2.3.2 Services in making revisions to drawings and specifications occasioned by the acceptance of substitutions proposed by contractor(s); services after the award of each contract in evaluating and determining the acceptability of an unreasonable or excessive number of substitutions proposed by contractor(s); or evaluating an unreasonable or extensive number of claims submitted by contractor(s) or others in connection with the Project(s). 2.3.3 Services resulting from significant delays, changes or price increases occurring as a direct or indirect result of material, equipment or energy shortages. 2.3.4 Additional or extended services during construction made necessary by (1) work damaged during construction, (2) a defective, inefficient or neglected work by any contractor, (3) acceleration of the progress schedule involving services beyond normal working hours, or (4) default by any contractor. Page 1 of 8 19-3868.01 SECTION 3—CLIENT'S RESPONSIBILITIES 3.1. Client shall provide all criteria and full information as to Client's requirements for the Project(s); designate and identify in writing a person to act with authority on Client's behalf in respect of all aspects of the Project(s); examine and respond promptly to Olsson's submissions; and give prompt written notice to Olsson whenever Client observes or otherwise becomes aware of any defect in the Olsson's services. 3.2 Client agrees to pay Olsson the amounts due for services rendered and expenses within thirty (30) days after Olsson has provided its invoice for such services. In the event Client disputes any invoice item, Client shall give Olsson written notice of such disputed item within fifteen (15) days after receipt of such invoice and shall pay to Olsson the undisputed portion of the invoice according to the provisions hereof. If Client fails to pay any invoiced amounts when due, interest will accrue on each unpaid amount at the rate of thirteen percent (13%) per annum from the date due until paid according to the provisions of this Agreement. Interest shall not be charged on any disputed invoice item which is finally resolved in Client's favor. Payment of interest shall not excuse or cure any default or delay in payment of amounts due. 3.2.1 If Client fails to make any payment due Olsson for services and expenses within thirty (30) days after receipt of Olsson's statement therefore, Olsson may, after giving seven (7) days written notice to Client, suspend services to Client under this Agreement until Olsson has been paid in full all amounts due for services, expenses and charges and Client will not obtain any license to any Work Product or be entitled to retain or use any Work Product pursuant to Section 7.1 unless and until Olsson has been paid in full and Client has fully satisfied all of its obligations under this Agreement. 3.3 Payments to Olsson shall not be withheld, postponed or made contingent on the construction, completion or success of the Project(s) or upon receipt by the Client of offsetting reimbursements or credit from other parties who may have caused the need for additional services. No withholdings, deductions or offsets shall be made from Olsson's compensation for any reason unless and until Olsson has been found to be legally liable for such amounts. 3.4 Client shall also do the following and pay all costs incident thereto: 3.4.1 Furnish to Olsson any existing and/or required borings, probings or subsurface explorations; hydrographic surveys; laboratory tests or inspections of samples, materials or equipment; appropriate professional interpretations of any of the foregoing; environmental assessment and impact statements; property, boundary, easement, right-of-way, topographic or utility surveys; property descriptions; and/or zoning or deed restrictions; all of which Olsson may rely upon in performing services hereunder. 3.4.2 Guarantee access to and make all provisions for Olsson to enter upon public and private property reasonably necessary to perform its services on the Project(s). 3.4.3 Provide such legal, accounting, independent cost estimating or insurance counseling services as may be required for the Project(s); any auditing service required in respect of contractor(s)' applications for payment; and/or any inspection services to determine if contractor(s) are performing the work legally. 3.4.4 Provide engineering surveys to establish reference points for construction unless specifically included in Olsson's Scope of Services. 3.4.5 Furnish approvals and permits from all governmental authorities having jurisdiction over the Project(s). 3.4.6 If more than one prime contractor is to be awarded the contract for construction, designate a party to have responsibility and authority for coordinating and interfacing the activities of the various prime contractors. 3.4.7 All fees and other amounts payable by Client under this Agreement are exclusive of taxes and similar assessments. Without limiting the foregoing, Client is responsible and liable for all sales, service, use, and excise taxes, and any other similar taxes, duties, and charges of any kind imposed by any federal, state, county or local governmental authority on any amounts payable by Client under this Agreement, other than any taxes imposed on Olsson's income. In the event any governmental authority assesses Olsson for taxes, duties, or charges of any kind in connection with Scope of Services provided by Olsson to Client, Olsson shall be entitled to submit an invoice to Client, its successors or assigns, for the amount of said assessment and related interest and penalties. Client shall pay such invoice in accordance with Olsson's standard payment terms. 3.5 Client shall pay all costs incident to obtaining bids or proposals from contractor(s). 3.6 Client shall pay all permit application review costs for government authorities having jurisdiction over the Project(s). 3.7 Contemporaneously with the execution of this Agreement, Client shall designate in writing an individual to act as its duly authorized Project(s) representative. 3.8 Client shall bear sole responsibility for: 3.8.1 Jobsite safety. Neither the professional activities of Olsson, nor the presence of Olsson or its employees or sub - consultants at the Project shall impose any duty on Olsson relating to any health or safety laws, regulations, rules, programs or procedures. 3.8.2 Notifying third parties including any governmental agency or prospective purchaser, of the existence of any hazardous or dangerous materials located in or around the Project(s) site. 3.8.3 Providing and updating Olsson with accurate information regarding existing conditions, including the existence of hazardous or dangerous materials, proposed Project(s) site uses, any change in Project(s) plans, and all subsurface installations, such as pipes, tanks, cables and utilities within the Project(s) site. 3.8.4 Providing and assuming all responsibility for: interpretation of contract documents; Construction Observations; Certifications; Inspections; Construction Cost Estimating; project observations; construction management; construction scheduling; construction phasing; and review of Contractor's performance, means and methods. Client waives any claims against Olsson and releases Olsson from liability relating to or arising out of such services and agrees, to the fullest extent permitted by law, to indemnify and hold Olsson Page 2 of 8 19-3868.01 harmless from any and all damages, liabilities or costs, including reasonable attorneys' fees and defense costs, relating to such actions and services. 3.9 Client releases Olsson from liability for any incorrect advice, judgment or decision based on inaccurate information furnished by Client or others. 3.10 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including hazardous materials, encountered on the site, Olsson may immediately stop work in the affected area and report the condition to Client. Client shall be solely responsible for retaining independent consultant(s) to determine the nature of the material and to abate or remove the material. Olsson shall not be required to perform any services or work relating to or in the area of such material until the material has been removed or rendered harmless and only after approval, if necessary of the government agency with jurisdiction. SECTION 4—MEANING OF TERMS 4.1 The "Cost of Construction" of the entire Project(s) (herein referred to as "Cost of Construction") means the total cost to Client of those portions of the entire Project(s) designed and specified by Olsson, but it will not include Olsson's compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include Client's legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project(s) or the cost of other services to be provided by others to Client pursuant to Section 3. 4.2 The "Salary Costs": Used as a basis for payment mean salaries and wages (base and incentive) paid to all Olsson's personnel engaged directly on the Project(s), including, but not limited to, engineers, architects, surveyors, designers, draftsmen, specification writers, estimators, other technical and business personnel; plus the cost of customary and statutory benefits, including, but not limited to, social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay and other group benefits. 4.3 "Certify" or "a Certification": If included in the Scope of Services, such services shall be limited to a statement of Olsson's opinion, to the best of Olsson's professional knowledge, information and belief, based upon its periodic observations and reasonable review of reports and tests created by Olsson or provided to Olsson. Olsson shall not be responsible for constant or exhaustive observation of the work. Client understands and agrees that any certifications based upon discrete sampling observations and that such observations indicate conditions that exist only at the locations and times the observations were performed. Performance of such observation services and certification does not constitute a warranty or guarantee of any type, since even with diligent observation, some construction defects, deficiencies or omissions in the work may occur. Olsson shall have no responsibility for the means, methods, techniques, sequences or procedures selected by the contractor(s) or for the contractor's safety precautions and programs nor for failure by the contractor(s) to comply with any laws or regulations relating to the performance or furnishing of any work by the contractor(s). Client shall hold its contractor(s) solely responsible for the quality and completion of the Project(s), including construction in accordance with the construction documents. Any duty under this Agreement is for the sole benefit of the Client and not for any third party, including the contractor(s) or any subcontractor(s). Olsson shall sign pre- printed form certifications only if (a) Olsson approves the form of such certification prior to the commencement of its services, (b) such certification is expressly included in the Scope of Services, (c) the certification is limited to a statement of professional opinion and does not constitute a warranty or guarantee, express or implied. It is understood that any certification by Olsson shall not relieve the Client or the Client's contractors of any responsibility or obligation they may have by industry custom or under any contract. 4.4 "Opinion of Probable Cost": An opinion of probable construction cost made by Olsson. In providing opinions of probable construction cost, it is recognized that neither the Client nor Olsson has control over the costs of labor, equipment or materials, or over the contractor's methods of determining prices or bidding. The opinion of probable construction costs is based on Olsson's reasonable professional judgment and experience and does not constitute a warranty, express or implied, that the contractor's bids or the negotiated price of the work on the Project(s) will not vary from the Client's budget or from any opinion of probable cost prepared by Olsson. 4.5 "Day": A calendar day of 24 hours. The term "days" shall mean consecutive calendar days of 24 hours each, or fraction thereof. 4.6 "Construction Observation": If included in the Scope of Services, such services during construction shall be limited to periodic visual observation and testing of the work to determine that the observed work generally conforms to the contract documents. Olsson shall not be responsible for constant or exhaustive observation of the work. Client understands and agrees that such visual observations are discrete sampling procedures and that such procedures indicate conditions that exist only at the locations and times the observations were performed. Performance of Construction Observation services does not constitute a warranty or guarantee of any type, since even with diligent observation, some construction defects, deficiencies or omissions in the work may occur. Olsson shall have no responsibility for the means, methods, techniques, sequences or procedures selected by the contractor or for the contractor's safety precautions and programs nor for failure by the contractor to comply with any laws or regulations relating to the performance or furnishing of any work by the contractor. Client shall hold its contractor(s) solely responsible for the quality and completion of the Project(s), including construction in accordance with the construction documents. Any duty under this Agreement is for the sole benefit of the Client and not for any third party, including the contractor or any subcontractor. Client, or its designees shall notify Olsson at least twenty-four (24) hours in advance of any field tests and observations required by the construction documents. 4.7 "Inspect" or "Inspection": If included in the Scope of Services, such services shall be limited to the periodic visual observation of the contractor's completed work to permit Olsson, as an experienced and qualified professional, to determine that the observed work, generally conforms to the contract documents. Olsson shall not be responsible for constant or exhaustive observation of the work. Client understands and agrees that such visual observations are discrete sampling procedures and that such procedures indicate conditions that exist only at the locations and times the observations were performed. Performance of such observation services does not constitute a warranty or guarantee of any type, since even with Page 3 of 8 19-3868.01 diligent observation, some construction defects, deficiencies or omissions in the work may occur. Olsson shall have no responsibility for the means, methods, techniques, sequences or procedures selected by the contractor(s) or for the contractor's safety precautions and programs nor for failure by the contractor(s) to comply with any laws or regulations relating to the performance or furnishing of any work by the contractor(s). Client shall hold its contractor(s) solely responsible for the quality and completion of the Project(s), including construction in accordance with the construction documents. Any duty under this Agreement is for the sole benefit of the Client and not for any third party, including the contractor(s) or any subcontractor(s). Client, or its designees, shall notify Olsson at least twenty-four (24) hours in advance of any inspections required by the construction documents. 4.8 "Record Documents": Drawings prepared by Olsson upon the completion of construction based upon the drawings and other data furnished to Olsson by the Contractor and others showing significant changes in the work on the Project(s) made during construction. Because Record Documents are prepared based on unverified information provided by others, Olsson makes no warranty of the accuracy or completeness of the Record Documents. SECTION 5—TERMINATION 5.1 Either party may terminate this Agreement, for cause upon giving the other party not less than seven (7) calendar days written notice of default for any of the following reasons; provided, however, that the notified party shall have the same seven (7) calendar day period in which to cure the default: 5.1.1 Substantial failure by the other party to perform in accordance with the terms of this Agreement and through no fault of the terminating party; 5.1.2 Assignment of this Agreement or transfer of the Project(s) by either party to any other entity without the prior written consent of the other party; 5.1.3 Suspension of the Project(s) or Olsson's services by the Client for more than ninety (90) calendar days, consecutive or in the aggregate. 5.2 In the event of a "for cause" termination of this Agreement by either party, the Client shall, within fifteen (15) calendar days after receiving Olsson's final invoice, pay Olsson for all services rendered and all reimbursable costs incurred by Olsson up to the date of termination, in accordance with the payment provisions of this Agreement. 5.2.1 In the event of a "for cause" termination of this Agreement by Client and (a) a final determination of default is entered against Olsson under Section 6.2 and (b) Client has fully satisfied all of its obligations under this Agreement, Olsson shall grant Client a limited license to use the Work Product pursuant to Section 7.1. 5.3 The Client may terminate this Agreement for the Client's convenience and without cause upon giving Olsson not less than seven (7) calendar days written notice. In the event of any termination that is not the fault of Olsson, the Client shall pay Olsson, in addition to payment for services rendered and reimbursable costs incurred, for all expenses reasonably incurred by Olsson in connection with the orderly termination of this Agreement, including but not limited to demobilization, reassignment of personnel, associated overhead costs, any fees, costs or expenses incurred by Olsson in preparing or negotiating any proposals submitted to Client for Olsson's Scope of Services or Optional Additional Services under this Agreement and all other expenses directly resulting from the termination and a reasonable profit of ten percent (10%) of Olsson's actual costs (including overhead) incurred. SECTION 6—DISPUTE RESOLUTION 6.1. Mediation 6.1.1 All questions in dispute under this Agreement shall be submitted to mediation. On the written notice of either party to the other of the election to submit any dispute under this Agreement to mediation, each party shall designate their representatives and shall meet within ten (10) days after the service of the notice. The parties themselves shall then attempt to resolve the dispute within ten (10) days of meeting. 6.1.2 Should the parties themselves be unable to agree on a resolution of the dispute, and then the parties shall appoint a third party who shall be a competent and impartial party and who shall be acceptable to each party, to mediate the dispute. Any third party mediator shall be qualified to evaluate the performance of both of the parties, and shall be familiar with the design and construction progress. The third party shall meet to hear the dispute within ten (10) days of their selection and shall attempt to resolve the dispute within fifteen (15) days of first meeting. 6.1.3 Each party shall pay the fees and expenses of the third party mediator and such costs shall be borne equally by both parties. 6.2 Arbitration or Litigation 6.2.1 Olsson and Client agree that from time to time, there may be conflicts, disputes and/or disagreements between them, arising out of or relating to the services of Olsson, the Project(s), or this Agreement (hereinafter collectively referred to as "Disputes") which may not be resolved through mediation. Therefore, Olsson and Client agree that all Disputes shall be resolved by binding arbitration or litigation at the sole discretion and choice of Olsson. If Olsson chooses arbitration, the arbitration proceeding shall proceed in accordance with the Construction Industry Arbitration Rules of the AAA. 6.2.2 Client hereby agrees that Olsson shall have the right to include Client, by consolidation, joinder or other manner, in any arbitration or litigation involving Olsson and a subconsultant or subcontractor of Olsson or Olsson and any other person or entity, regardless of who originally initiated such proceedings. 6.2.3 If Olsson chooses arbitration or litigation, either may be commenced at any time prior to or after completion of the Project(s), provided that if arbitration or litigation is commenced prior to the completion of the Project(s), the obligations of the parties under the terms of this Agreement shall not be altered by reason of the arbitration or litigation being conducted. Any arbitration hearings or litigation shall take place in Lincoln, Nebraska, the location of Olsson's home office. 6.2.4 The prevailing party in any arbitration or litigation relating to any Dispute shall be entitled to recover from the other party those reasonable attorney fees, costs and expenses incurred by the prevailing party in connection with the Dispute. Page 4 of 8 19-3868.01 6.3 Certification of Merit Client agrees that it will not assert any claim, including but not limited to, professional negligence, negligence, breach of contract, misconduct, error, omission, fraud, or misrepresentation ("Claim") against Olsson, or any Olsson subconsultant, unless Client has first provided Olsson with a sworn certificate of merit affidavit setting forth the factual and legal basis for such Claim (the "Certificate"). The Certificate shall be executed by an independent engineer ("Certifying Engineer") currently licensed and practicing in the jurisdiction of the Project site. The Certificate must contain: (a) the name and license number of the Certifying Engineer; (b the qualifications of the Certifying Engineer, including a list of all publications authored in the previous 10 years and a list of all cases in which the Certifying Engineer testified within the previous 4 years ; (c) a statement by the Certifying Engineer setting forth the factual basis for the Claim; (d) a statement by the Certifying Engineer of each and every act, error, or omission that the Certifying Engineer contends supports the Claim or any alleged violation of any applicable standard of care; (e) a statement by the Certifying Engineer of all opinions the Certifying Engineer holds regarding the Claim or any alleged violation of any applicable standard of care; (f) a list of every document related to the Project reviewed by the Certifying Engineer; and (g) a list of every individual who provided Certifying Engineer with any information regarding the Project. The Certificate shall be provided to Olsson not less than thirty (30) days prior to any arbitration or litigation commenced by Client or not less than ten (10) days prior to the initial response submitted by Client in any arbitration or litigation commenced by someone other than Client. The Certificate is a condition precedent to the right of Client to assert any Claim in any litigation or arbitration and Client's failure to timely provide a Certificate to Olsson will be grounds for automatic dismissal of the Claim with prejudice. SECTION 7—MISCELLANEOUS 7.1 Reuse of Documents All documents, including drawings, specifications, reports, boring logs, maps, field data, data, test results, information, recommendations, or opinions prepared or furnished by Olsson (and Olsson's independent professional associates and consultants) pursuant to this Agreement ("Work Product"), are all Olsson's instruments of service, do not constitute goods or products, and are copyrighted works of Olsson. Olsson shall retain an ownership and property interest in such Work Product whether or not the Project(s) is completed. If Client has fully satisfied all of its obligations under this Agreement, Olsson shall grant Client a limited license to use the Work Product and Client may make and retain copies of Work Product for use in connection with the Project(s); however, such Work Product is for the exclusive use and benefit of Client or its agents in connection with the Project(s), are not intended to inform, guide or otherwise influence any other entities or persons with respect to any particular business transactions, and should not be relied upon by any entities or persons other than Client or its agents for any purpose other than the Project(s). Such Work Product is not intended or represented to be suitable for reuse by Client or others on extensions of the Project(s) or on any other Project(s). Client will not distribute or convey such Work Product to any other persons or entities without Olsson's prior written consent which shall include a release of Olsson from liability and indemnification by the third party. Any reuse of Work Product without written verification or adaptation by Olsson for the specific purpose intended will be at Client's sole risk and without liability or legal exposure to Olsson, or to Olsson's independent professional associates or consultants, and Client shall indemnify and hold harmless Olsson and Olsson's independent professional associates and consultants from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation of Work Product will entitle Olsson to further compensation at rates to be agreed upon by Client and Olsson. 7.2 Electronic Files By accepting and utilizing any electronic file of any Work Product or other data transmitted by Olsson, the Client agrees for itself, its successors, assigns, insurers and all those claiming under or through it, that by using any of the information contained in the attached electronic file, all users agree to be bound by the following terms. All of the information contained in any electronic file is the work product and instrument of service of Olsson, who shall be deemed the author, and shall retain all common law, statutory law and other rights, including copyrights, unless the same have previously been transferred in writing to the Client. The information contained in any electronic file is provided for the convenience to the Client and is provided in "as is" condition. The Client is aware that differences may exist between the electronic files transferred and the printed hard -copy original signed and stamped drawings or reports. In the event of a conflict between the signed original documents prepared by Olsson and the electronic files, which may be transferred, the signed and sealed original documents shall govern. Olsson specifically disclaims all warranties, expressed or implied, including without limitation, and any warranty of merchantability or fitness for a particular purpose with respect to any electronic files. It shall be Client's responsibility to confirm the accuracy of the information contained in the electronic file and that it accurately reflects the information needed by the Client. Client shall not retransmit any electronic files, or any portion thereof, without including this disclaimer as part of any such transmissions. In addition, Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless Olsson, its officers, directors, employees and sub consultants against any and all damages, liabilities, claims or costs, including reasonable attorney's and expert witness fees and defense costs, arising from any changes made by anyone other than Olsson or from any reuse of the electronic files without the prior written consent of Olsson. 7.3 Opinion of Probable Cost Since Olsson has no control over the cost of labor, materials, equipment or services furnished by others, or over the contractor(s)' methods of determining prices, or over competitive bidding or market conditions, Olsson's Opinion of Probable Cost provided for herein is made on the basis of Olsson's experience and qualifications and represent Olsson's best judgment as an experienced and qualified professional engineer, familiar with the construction industry. Client acknowledges and agrees that Olsson cannot and does not guarantee proposals or bids and that actual total Project(s) or construction costs may reasonably vary from Olsson's Opinion of Probable Cost. If prior to the bidding or negotiating phase Client wishes greater assurance as to total Project(s) or construction costs, Client shall employ an independent cost estimator as provided in paragraph 3.4.3. If Olsson's Opinion of Probable Cost was performed in accordance with its standard of care and was reasonable under the total circumstances, any services performed by Olsson to modify the contract documents to bring the construction cost within any limitation established by Client will be considered Optional Additional Services and paid for as such by Client. If, however, Olsson's Opinion of Probable Cost was not performed Page 5 of 8 19-3868.01 in accordance with its standard of care and was unreasonable under the total circumstances and the lowest negotiated bid for construction of the Project(s) unreasonably exceeds Olsson's Opinion of Probable Cost, Olsson shall modify its work as necessary to adjust the Project(s)' size, and/or quality to reasonably comply with the Client's budget at no additional cost to Client. Under such circumstances, Olsson's modification of its work at no cost shall be the limit of Olsson's responsibility with regard to any unreasonable Opinion of Probable Cost. 7.4 Prevailing Wages It is Client's responsibility to determine whether the Project(s) is covered under any prevailing wage regulations. Unless Client specifically informs Olsson in writing that the Project(s) is a prevailing wage project and is identified as such in the Scope of Services, Client agrees to reimburse Olsson and to defend, indemnify and hold harmless Olsson from and against any liability, including costs, fines and attorneys' fees, resulting from a subsequent determination that the Project(s) was covered under any prevailing wage regulations. 7.5 Samples All material testing samples shall remain the property of the Client. If appropriate, Olsson shall preserve samples obtained no longer than forty-five (45) days after the issuance of any document that includes the data obtained from those samples. After that date, Olsson may dispose of the samples or return them to Client at Client's cost. 7.6 Standard of Care Olsson will strive to perform its services in a manner consistent with that level of care and skill ordinarily exercised by members of Olsson's profession providing similar services in the same locality under similar circumstances at the time Olsson's services are performed. This Agreement creates no other representation, warranty or guarantee, express or implied. 7.7 Force Majeure Any delay in the performance of any of the duties or obligations of either party hereto (except the payment of money) shall not be considered a breach of this Agreement and the time required for performance shall be extended for a period equal to the period of such delay, provided that such delay has been caused by or is the result of any acts of God, acts of the public enemy, insurrections, riots, embargoes, labor disputes, including strikes, lockouts, job actions, boycotts, fires, explosions, floods, shortages of material or energy, or other unforeseeable causes beyond the control and without the fault or negligence of the party so affected. The affected party shall give prompt notice to the other party of such cause, and shall take promptly whatever reasonable steps are necessary to relieve the effect of such cause. 7.8 Equal Employment Opportunity Olsson and any sub -consultant or subcontractor shall abide by the requirements of 41 CFR 60-1.4(a), 60-300.5(a) and 60- 741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities, and prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity or national origin. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability or veteran status. 7.9 Confidentiality In performing this Agreement, the parties may disclose to each other written, oral, electronic, graphic, machine-readable, tangible or intangible, non-public, confidential or proprietary data or information in any form or medium, including but not limited to: (1) information of a business, planning, marketing, conceptual, design, or technical nature; (2) models, tools, hardware, software or source code; and (3) any documents, videos, photographs, audio files, data, studies, reports, flowcharts, works in progress, memoranda, notes, files or analyses that contain, summarize or are based upon any non- public, proprietary or confidential information (hereafter referred to as the "Information"). The Information is not required to be marked as confidential. 7.9.1 Therefore, Olsson and Client agree that the party receiving Information from the other party to this Agreement (the "Receiving Party") shall keep Information confidential and not use the Information in any manner other than in the performance of this Agreement without prior written approval of the party disclosing Information (the "Disclosing Party") unless Client is a public entity and the release of Information is required by law or legal process. 7.9.2 Prior to the start of construction on the Project, the existence of discussions between the parties, the purpose of this Agreement, and this Agreement shall be considered Information subject to the confidentiality provisions of this Agreement. 7.9.3 Notwithstanding anything to the contrary herein, the Receiving Party shall have no obligation to preserve the confidentiality of any Information which: 7.9.3.1 was previously known to the Receiving Party free of any obligation to keep it confidential; or 7.9.3.2 is or becomes publicly available by other than unauthorized disclosures; or 7.9.3.3 is independently developed by the Receiving Party without a breach of this Agreement; or 7.9.3.4 is disclosed to third parties by the Disclosing Party without restrictions; or 7.9.3.5 is received from a third party not subject to any confidentiality obligations. 7.9.4 In the event that the Receiving Party is required by law or legal process to disclose any of Information of the Disclosing Party, the Receiving Party required to disclose such Information shall provide the Disclosing Party with prompt oral and written notice, unless notice is prohibited by law (in which case such notice shall be provided as early as may be legally permissible), of any such requirement so that the Disclosing Party may seek a protective order or other appropriate remedy. 7.9.5 Notwithstanding anything to the contrary herein (or to the contrary of any existing or future nondisclosure, confidentiality or similar agreement between the parties), Olsson is authorized, to use, display, reproduce, publish, transmit, and distribute Information (including, but not limited to, videos and Page 6 of 8 19-3868.01 photographs of the Project) on and in any and all formats and media (including, but not limited to, Olsson's internet website) throughout the world and in all languages in connection with or in any manner relating to the marketing, advertising, selling, qualifying, proposing, commercializing, and promotion of Olsson and/or its services and business and in connection with any other lawful purpose of Olsson. In the event of any conflict or inconsistency between the provisions of this section and any other prior or future nondisclosure, confidentiality or similar agreement between the parties, the terms of this section shall take precedence. 7.9.6 Nothing contained in this Agreement shall be construed as altering any rights that the Disclosing Party has in the Information exchanged with or disclosed to the Receiving Party, and upon request, the Receiving Party will return all Information received in tangible form to the Disclosing Party, or at the Receiving Party's option, destroy all such Information. If the Receiving Party exercises its option to destroy the Information, the Receiving Party shall certify such destruction to the Disclosing Party. 7.9.7 The parties acknowledge that disclosure or use of Information in violation of this Agreement could cause irreparable harm for which monetary damages may be difficult to ascertain or constitute an inadequate remedy. Each party therefore agrees that the Disclosing Party shall be entitled in addition to its other rights to seek injunctive relief for any violation of this Agreement. 7.9.8 The obligations of confidentiality set forth herein shall survive termination of this Agreement but shall only remain in effect for a period of one (1) year from the date the Information is first disclosed. 7.10 Damage or Injury to Subterranean Structures or Utilities, Hazardous Materials, Pollution and Contamination 7.10.1 To the extent that work pursuant to this Agreement requires any sampling, boring, excavation, ditching or other disruption of the soil or subsurface at the Site, Olsson shall confer with Client prior to such activity and Client will be responsible for identifying, locating and marking, as necessary, any private subterranean structures or utilities and Olsson shall be responsible for arranging investigation of public subterranean structures or utilities through an appropriate utility one -call provider. Thereafter, Olsson shall take all reasonable precautions to avoid damage or injury to subterranean structures or utilities which were identified by Client or the one - call provider. Olsson shall not be responsible for any damage, liability or costs, for any property damage, injury or economic loss arising or allegedly arising from damages to subterranean structures or utilities caused by subsurface penetrations in locations approved by Client and/or the one call provider or not correctly shown on any plans, drawings or utility clearance provided to Olsson, except for damages caused by the negligence of Olsson in the use of such information. 7.10.2 It is understood and agreed that any assistance Olsson may provide Client in the disposal of waste materials shall not result in Olsson being deemed as a generator, arranger, transporter or disposer of hazardous materials or hazardous waste as defined under any law or regulation. Title to all samples and waste materials remains with Client, and at no time shall Olsson take title to the above material. Client may authorize Olsson to execute Hazardous Waste Manifest, Bill of Lading or other forms as agent of Client. If Client requests Olsson to execute such documents as its agent, the Hazardous Waste Manifest, Bill of Lading or other similar documents shall be completed in the name of the Client. Client agrees to indemnify and hold Olsson harmless from any and all claims that Olsson is a generator, arranger, transporter, or disposer of hazardous waste as a result of any actions of Olsson, including, but not limited to, Olsson signing a Hazardous Waste Manifest, Bill of Lading or other form on behalf of Client. 7.10.3 At any time, Olsson can request in writing that Client remove samples, cuttings and hazardous substances generated by the Project(s) from the project site or other location. Client shall promptly comply with such request, and pay and be responsible for the removal and lawful disposal of samples, cuttings and hazardous substances, unless other arrangements are mutually agreed upon in writing. 7.10.4 Client shall release Olsson of any liability for, and shall defend and indemnify Olsson against any and all claims, liability and expense resulting from operations under this Agreement on account of injury to, destruction of, or loss or impairment of any property right in or to oil, gas, or other mineral substance or water, if at the time of the act or omission causing such injury, destruction, loss or impairment, said substance had not been reduced to physical possession above the surface of the earth, and for any loss or damage to any formation, strata, reservoir beneath the surface of the earth. 7.10.5 Notwithstanding anything to the contrary contained herein, it is understood and agreed by and between Olsson and Client that the responsibility for pollution and contamination shall be as follows: 7.10.5.1 Unless otherwise provided herein, Client shall assume all responsibility for, including control and removal of, and protect, defend and save harmless Olsson from and against all claims, demands and causes of action of every kind and character arising from pollution or contamination (including naturally occurring radioactive material) which originates above the surface of the land or water from spills of fuels, lubricants, motor oils, pipe dope, paints, solvents, ballast, bilge and garbage, except unavoidable pollution from reserve pits, wholly in Olsson's possession and control and directly associated with Olsson's equipment. 7.10.5.2 In the event a third party commits an act or omission which results in pollution or contamination for which either Olsson or Client, for whom such party is performing work, is held to be legally liable, the responsibility therefore shall be considered as between Olsson and Client, to be the same as if the party for whom the work was performed had performed the same and all of the obligations regarding defense, indemnity, holding harmless and limitation of responsibility and liability, as set forth herein, shall be specifically applied. 7.11 Controlling Law and Venue The parties agree that this Agreement and any legal actions concerning its validity, interpretation or performance shall be governed by the laws of the State of Nebraska. It is further agreed that any legal action between the parties arising out of this Agreement or the performance of services shall be brought in a court of competent jurisdiction in Nebraska. Page 7 of 8 19-3868.01 7.12 Subconsultants Olsson may utilize as necessary in its discretion subconsultants and other subcontractors. Olsson will be paid for all services rendered by its subconsultants and other subconsultants as set forth in this Agreement. 7.13 Assignment 7.13.1 Client and Olsson each are hereby bound and the partners, successors, executors, administrators and legal representatives of Client and Olsson (and to the extent permitted by paragraph 7.13.2 the assigns of Client and Olsson) are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. 7.13.2 Neither Client nor Olsson shall assign, sublet or transfer any rights under or interest in (including, but without limitation, moneys that may become due or moneys that are due) this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent Olsson from employing such subconsultants and other subcontractors as Olsson may deem appropriate to assist in the performance of services under this Agreement. 7.13.3 Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Client and Olsson, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Client and Olsson and not for the benefit of any other party. There are no third -party beneficiaries of this Agreement. 7.14 Indemnity Olsson and Client mutually agree, to the fullest extent permitted by law, to indemnify and hold each other harmless from any and all damages, liabilities or costs, including reasonable attorneys' fees and defense costs, relating to third party personal injury or third party property damage and arising from their own negligent acts, errors or omissions in the performance of their services under this Agreement, but only to the extent that each party is responsible for such damages, liabilities or costs on a comparative basis of fault. 7.15 Limitation on Damages 7.15.1 Notwithstanding any other provision of this Agreement, and to the fullest extent permitted by law, neither party's individual employees, principals, officers or directors shall be subject to personal liability or damages arising out of or connected in any way to the Project(s) or to this Agreement. 7.15.2 Notwithstanding any other provision of this Agreement, and to the fullest extent permitted by law, neither Client nor Olsson, their respective officers, directors, partners, employees, contractors or subconsultants shall be liable to the other or shall make any claim for any delay damages, any punitive damages or any incidental, indirect or consequential damages arising out of or connected in any way to the Project(s) or to this Agreement. This mutual waiver of delay damages and consequential damages shall include, but is not limited to, disruptions, accelerations, inefficiencies, increased construction costs, increased home office overhead, loss of use, loss of profit, loss of business, loss of income, loss of reputation or any other delay or consequential damages that either party may have incurred from any cause of action including, but not limited to, negligence, statutory violations, misrepresentation, fraud, deceptive trade practices, breach of fiduciary duties, strict liability, breach of contract and/or breach of strict or implied warranty. Both the Client and Olsson shall require similar waivers of consequential damages protecting all the entities or persons named herein in all contracts and subcontracts with others involved in the Project(s). 7.15.3 Notwithstanding any other provision of this Agreement, Client agrees that, to the fullest extent permitted by law, Olsson's total liability to the Client for any and all injuries, claims, losses, expenses, damages, or claims expenses of any kind arising from any services provided by or through Olsson under this Agreement, shall not exceed the amount of Olsson's fee earned under this Agreement. Client acknowledges that such causes include, but are not limited to, negligence, statutory violations, misrepresentation, fraud, deceptive trade practices, breach of fiduciary duties, strict liability, breach of contract and/or breach of strict or implied warranty. This limitation of liability shall apply to all phases of Olsson's services performed in connection with the Project(s), whether subsequent to or prior to the execution of this Agreement. 7.16 Entire Agreement This Agreement supersedes all prior communications, understandings and agreements, whether oral or written. Amendments to this Agreement must be in writing and signed by the Client and Olsson. Page 8 of 8 19-3868.01