HomeMy WebLinkAboutRes.3374.01-04-2021 BILL NO. 21-01 RESOLUTION NO. s3-7q
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH NIP KELLEY
EQUIPMENT COMPANY, INC. , FOR THE WATER PLANT
NO. 1 FILTER AND SECONDARY BASIN
REHABILITATION PROJECT, IN THE CITY OF CAPE
GIRARDEAU, MISSOURI
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1 . The City Manager, for and on behalf of the City
of Cape Girardeau, Missouri, is hereby authorized to execute an
Agreement with Nip Kelley Equipment Company, Inc. , for the Water
Plant No. 1 Filter and Secondary Basin Rehabilitation Project,
in the City of Cape Girardeau, Missouri. The Agreement shall be
in substantially the form attached hereto, which document is
hereby approved by the City Council, and incorporated herein by
reference, with such changes therein as shall be approved by the
officers of the City executing
Jtthhe same.
PASSED AND ADOPTED THIS — \In DAY OF "J`W, J21 .
/41,A
-1////
Bob "•x, Mayor
ATTEST:
117-
0317!-4� 1E:7 €4`�
-uce Tayl , Deputy City Clerk ;)); ;,,
CITY OF CAPE GIRARDEAU
WATER PLANT NO.1
FILTER AND SECONDARY
BASIN REHABILITATION
Project No. 6206
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the day of in the year
2021 by and between the City of Cape Girardeau, Missouri (hereinafter called OWNER)
and Nip Kelley Equipment Company, Incorporated (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
Rehabilitation work at the City of Cape Girardeau's Water Treatment Plant No. 1 located at
20 East Cape Rock Drive including: concrete repair for the secondary sedimentation and
floc basins; the replacement of handrails, stairs, walkways, metal plates and hatches for
various process units at the plant site; removal of process equipment and fixtures in the
chemical feed building with structural infill and concrete flat work to raise the floor in
specified areas; and other associated items and requirements as indicated in the Project
Plans and Specifications prepared by Horner& Shifrin, Inc. and dated November 2020 for
the City of Cape Girardeau, Missouri.
Article 2. ENGINEER.
The City Engineer or his designee is to act as OWNER'S representative, assume all duties
and responsibilities and have the rights and authority assigned to ENGINEER in the
Contract Documents in connection with completion of the Work in accordance with the
Contract Documents.
A-1
Article 3. CONTRACT TIMES.
3.1 The work will be substantially completed within 180 calendar days after the date when
the Contract Times commence to run as provided in paragraph 2.3 of the General
Conditions, and completed and ready for final payment in accordance with paragraph 14.13
of the General Conditions within 210 days after the date when the Contract Times
commence to run.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
completed within the times specified in paragraph 3.1 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expense and difficulties involved in proving the actual loss suffered by OWNER if
the Work is not competed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a
penalty) CONTRACTOR shall pay OWNER Nine Hundred fifty dollars$950.00 for each day
that expires after the time specified in paragraph 3.1 for Substantial Completion until the
Work is substantially complete. After Substantial Completion, if CONTRACTOR shall
neglect, refuse or fail to complete the remaining Work within the time specified in paragraph
3.1 for completion and readiness for final payment or any proper extension thereof granted
by OWNER, CONTRACTOR shall pay OWNER Nine Hundred fifty dollars$950.00 for each
day that expires after the time specified in paragraph 3.1 for completion and readiness for
final payment.
Article 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amount
determined pursuant to paragraph 4.1, 4.2 and 4.3 below:
4.1 For Lump Sum Amount.
LUMP SUM CONTRACT BASE BID AMOUNT:
One million, thirty-two thousand five hundred dollars and zero cents
($1,032,500.00 )
4.2 The Contractor agrees that the Lump Sum Contract Base Bid Amount will be adjusted
according to field measured quantities needed for concrete repair on the secondary
sedimentation and floc basins. If field measured quantities vary from the consultant's
estimated quantities, the Contract Base Bid Amount will be increased or decreased by the
following unit prices times the difference between the plan quantity and the actual field
measured quantity for each of the following two items:
Topside Concrete Repair (price per square foot) $ 171.00
A-2
Vertical Concrete Repair (price per square foot) $ 343.00
4.3 The Contractor agrees to include the Add Alternate(s) described below in addition to
the Work included in the above Contract Base Bid Price if requested by the Owner, and
only upon prior authorization by Owner, for the Total of Add Alternate Amounts stated
below:
Add Alternate Add Alternate Amount (enter N/A if not accepted by Owner)
Alternate Al: Five thousand, one hundred ten dollars and zero cents
($ 5,110.00)
Alternate A2: Twenty-two thousand, three hundred and zero cents
($ 22, 300.00)
Alternate A3: Ninety-three thousand, six hundred ninety dollars and zero
cents ($ 93,690.00 )
TOTAL OF ACCEPTED ADD ALTERNATES (Additional Amount of upgrade):
One hundred twenty-one thousand, one hundred dollars and zero cents
($121,100.00 )
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1 Progress payments;Retainage. OWNER shall make progress payments on account of
the Contract Price on the basis of CONTRACTOR'S Application for Payment as
recommended by ENGINEER, on or about the 10th day of each month during construction
as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be measured by
the schedule of values established in paragraph 2.9 of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is
no schedule of values, as provided in the General Requirements.
5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as ENGINEER shall determine, or OWNER may
withhold, in accordance with paragraph 14.7 of the General Conditions.
95% of Work completed (with the balance being retainage). If Work has
been 50% completed as determined by ENGINEER, and if the character and
progress of the Work have been satisfactory to OWNER and ENGINEER,
A-3
OWNER, on recommendation of ENGINEER, may determine that as long as
the character and progress of the Work remain satisfactory to them,there will
be no additional retainage on account of Work completed, in which case,the
remaining progress payments prior to Substantial Completion will be an
amount equal to 100% of the Work completed.
95% (with the balance being retainage) of materials and equipment not
incorporated in the Work(but delivered, suitably stored and accompanied by
documentations satisfactory to OWNER as provided in paragraph 14.2 of the
General Conditions).
5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to
CONTRACTOR to 98% of the Contract Price (with the balance being retainage), less such
amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with
paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the
Contract Price as recommended by ENGINEER as provided in said paragraph 14.13.
Article 6. INTEREST.
All moneys not paid when due as provided in Article 14 of the General Conditions shall bear
interest at the maximum rate allowed by law at the place of the Project.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the
following representations:
7.1 CONTRACTOR has examined and carefully studied the Contract Documents
(including the Addenda listed in paragraph 8) and the other related data identified in the
Bidding Documents, including "technical data".
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance and
furnishing of the Work.
7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance and furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physical conditions in or relating
to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified. CONTRACTOR acknowledges that
such reports and drawings are not Contract Documents and may not be complete for
A-4
CONTRACTOR'S purposes. CONTRACTOR acknowledges that OWNER and ENGINEER
do not assume responsibility for the accuracy or completeness of information and data
shown or indicated in the Contract Documents with respect to Underground Facilities at or
contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for having done so) all such additional supplementary examinations,
investigations, explorations, tests, studies and data concerning conditions (surface,
subsurface and Underground Facilities)at or contiguous to the site or otherwise which may
affect cost, progress, performance or furnishing of the Work or which relate to any aspect
of the means, methods, techniques, sequences and procedures of construction to be
employed by CONTRACTOR and safety precautions and programs incident thereto.
CONTRACTOR does not consider that any additional examinations, investigations,
explorations, tests, studies or data are necessary for the performance and furnishing of the
Work at the Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents.
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract Documents.
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information
and observation obtained from visits to the site, reports and drawings identified in the
Contract documents and all additional examinations, investigations, explorations, tests,
studies and data with the Contract Documents.
7.7 CONTRACTOR has given ENGINEER written notice of all conflicts,errors,ambiguities
or discrepancies that CONTRACTOR has discovered in the Contract Documents and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR,and the Contract
Documents are generally sufficient to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement (pages A-1 to A-8 inclusive).
8.2 Exhibits to this Agreement (pages to , inclusive).
8.3 Performance, Payment, and other Bonds, identified as exhibits and consisting of
pages.
8.4 Notice to Proceed.
8.5 General Conditions (pages j to 55 , inclusive). (EJCDC No. 1910-8 1990 Edition)
8.6 Supplementary Conditions (pages SC-1 to SC- 5 , inclusive).
A-5
8.7 Specifications bearing the title Water Plant No.1 Filter And Secondary Basin
Rehabilitation
8.8 Drawings.
8.9 Addenda numbers 1 to 2 , inclusive.
8.10 CONTRACTOR'S Bid (pages BF-1 to BF-8 , inclusive) marked exhibit A .
8.11 Pursuant to 285.530 R.S. Mo, the contractor must affirm its enrollment and
participation in a federal work authorization program with respect to the employees
proposed to work in connection with the services requested herein by 1) submitting a
completed, notarized copy of AFFIDAVIT OF WORK AUTHORIZATION and 2) providing
documentation affirming the bidder's enrollment and participation in a federal work
authorization program with respect to the employees proposed to work in connection with
the services requested herein.
8.12 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _to
, inclusive).
8.13 The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto: All Written Amendments and other documents
amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5
and 3.6 of the General Conditions.
The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(except as expressly noted otherwise above).
There are no Contract Documents other than those listed above in the Article 8. The
Contract Documents may only be amended, modified or supplemented as provided in
paragraphs 3.5 and 3.6 of the General Conditions.
Article 9. MISCELLANEOUS.
9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions
will have the meanings indicated in the General Conditions.
9.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and, specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent (except to the extent
that the effect of this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or discharge
the assignor from any duty or responsibility under the Contract Documents.
A-6
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the
Contract Documents shall be reformed to replace such stricken provision or part thereof
with a valid and enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
9.5 Pursuant to 292.675, R.S. Mo, the contractor is informed that all contractors or
subcontractors doing work on this project to provide, and require its on-site employees to
complete, a ten (10) hour course in construction safety and health approved by the
Occupational Safety and Health Administration ("OSHA") or similar program approved by
the Missouri Department of Labor and Industrial Relations which is at least as stringent as
an approved OSHA program. The training must be completed within sixty(60) days of the
date work on the project commences. On-site employees found on the worksite without
documentation of the required training shall have twenty (20) days to produce such
documentation.
9.6 The General Contractor shall provide to the City of Cape Girardeau City Engineer's
Office weekly certified payrolls from the General Contractor and all Subcontractors during
the course of the project. These must be provided on a weekly basis; if no work was done,
then a payroll stating "No Work Done" must be submitted.
A-7
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in
multiple copies, One counterpart each has been delivered to CONTRACTOR and
ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents
have been signed, initialed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
This Agreement will be effective on , 2021 (which is the
Effective Date of the Agreement).
OWNER City of Cape Girardeau CONTRACTOR Nip Kelley Equipment Co., Inc.
Scott Me er C._ Mana•er s 19: ,,s/. /
y: 401"
lr By: /� k`;,',�
CORPO' ' ` SEAL] [CO'PORATE S ii 4] `•. *� % , 1
Attest, t7S 67/4„44f,44(C Attest
71&fie /
Address for giving notices Address for giving notices
401 Independence Street 41 N. Spriqq Street
Cape Girardeau, MO 63703 Cape Girardeau, GM ,Oq 63701
(If OWNER is a public body, attach License No. /S 0 U o
evidence of authority to sign and
resolution or other documents Agent for service of process:
authorizing execution of Agreement.
-- (If CONTRACTOR is corporation,
attach evidence of authority to sign.)
;tel
-„,,-; -'''''./)i. d" a
7)V
'''- , +rirl `a�/�
A-8