Loading...
HomeMy WebLinkAboutOrd.5102.08-20-2018 BILL NO. 18-104 ORDINANCE NO. 5)0Q, AN ORDINANCE AUTHORIZING THE CITY MANAGER TO NEGOTIATE A DESIGN-BUILD CONTRACT FOR THE DESIGN AND IMPROVEMENTS TO CAPAHA FIELD, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT ORDAINED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1 . The City Manager is hereby authorized to negotiate a Design-Build contract with the first ranked team, Penzel Construction Company/Gray Design Group, for the design and construction of improvements to the Capaha Park Ball Field including perimeter fencing, new sports lighting and upgraded fan experience, in the City of Cape Girardeau, Missouri . If negotiations fail with the first selected team, the City Manager is hereby authorized to negotiate such design-build contract With the second ranked team, Dille Traxel Architecture/Sides Construction/Strickland Engineering. ARTICLE 2 . This Ordinance shall be in full force and effect ten days after its passage and appr.val. h/ �/� PASSED AND APPROVED THIS �j day o " ,L,, , 2018 . if Bob Fox, Mayor ATTEST: ii? -ter'' 0 th7A4Cid All t Gayle4 . Conrad, City Clerk C h 11- 101m- 414 THETEVIIas .,,''a 14. ,+.