Loading...
HomeMy WebLinkAboutRes.3101.08-07-2017 BILL NO. 17-128 RESOLUTION NO. 3/0/ A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A DEMOLITION CONTRACT WITH RONALD KUCERA, JR. , FOR THE DEMOLITION OF BUILDINGS LOCATED AT 615 REAR GOOD HOPE STREET, 811 SOUTH RANNEY STREET, AND 725 INDEPENDENCE STREET, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute a Demolition Contract with Ronald Kucera, Jr. , for the demolition of buildings located at 615 Rear Good Hope Street, 811 South Ranney Street, and 725 Independence Street, in the City of Cape Girardeau, Missouri. The Demolition Contract shall be in substantially the form attached hereto as Exhibit A, which document is hereby approved by the City Council, and incorporated herein by reference, with such changes therein as shall be approved by the officers of the City executing the same. 112 PASSED AND ADOPTED THIS DAY OF lila�,/,a 2017 . / . . . Ha ry E. ' •edige ' .:',-OlkialliiN • ATTEST: O4 9G,, 4y -. • yy M: M ruse Taylo Deputy City Clerk icr1t4 H Ii �'Y DEMOLITION CONTRACT This agreement, entered into this day of ,2017,byand between the City of Cape Girardeau, Missouri, a Municipal Corporation, hereinafter referred to as "City", and Ronald Kucera,Jr., 160 Tolbert Drive Jackson, MO 63755, hereinafter referred to as "Contractor." In consideration of the mutual covenants contained herein and other good and valuable consideration, City and Contractor agree as follows: 1. Contractor shall totally demolish the following buildings: a. 725 Independence Street Remove one and one-half(1%)story wood frame residence.Remove footing and foundations, all concrete steps, slabs, and sidewalks, on the site. Check for possible cistern at the rear of property and fill with concrete. Haul off all rubbish, debris and concrete to an approved land fill. Fill and terrace grade as per Mark Hasheider,Assistant Fire Chief;instructions. Gravel parking lot with 6 inches of Type 5 aggregate. b. 615 Rear Good Hope(Tract No.970) Remove one and one-half(1%)brick residence. Remove footing and foundation front concrete steps, all concrete slabs, all rubbish and debris. Remove storage shed and fence on all four sides of the site. All nrbbish and debris to be hauled to an approved landfill.Bury concrete on the site with a minimum of 2 ft.of fill. Fill,grade,seed and straw. Camper trailer is the property of the homeowner.Police department will remove derelict vehicles. c. 811 South Ranney Street(Tract No.968) Remove one and one-half(PA) wood frame residence with basement.. Remove footing and foundation,all concrete slabs,all rubbish and debris. Driveway to remain. Haul all rubbish and debris to an approved landfill. Bury concrete on the site with a minimum of 2 ft of fill Fill,grade,seed and straw. 2. All debris and rubbish shall be removed from the demolition site and deposited at a site satisfactory to the City. All holes left by removal of the foundations shall be filled with good dirt,free of debris, and compacted to a density equal to the surrounding ground. Dirt required for filling any holes shall be obtained at a site satisfactory to the City Engineer. Contractor will be responsible for any damage done to the sidewalks, alleys or streets adjoining the property. All utilities shall be disconnected prior to demolition. Contractor shall take all necessary care to protect nearby buildings, drives, motor vehicles, and all adjoining property,and the Contractor is to leave same in condition equal to that which now exists. 3. Contractor shall provide all labor and materials, and furnish and direct at its own expense, whatever equipment or work may be necessary for the expeditious and proper execution of its duties under this contract. 4. Contractor shall secure, at its own expense, all permits, licenses and consents required by law or necessary to perform this work and will give all notices and pay all fees and otherwise comply with applicable city, county and state laws,ordinances, rules and regulations. 5. Should Contractor at any time refuse or neglect to supply adequate materials or equipment or a sufficient number of property skilled workmen, or fail in any respect to prosecute the work with promptness and diligence,or fail to perform any of the agreements of this contract, City may, at its election, immediately terminate this agreement, giving notice to Contractor in writing of such election, and enter on the premises and take possession for the purpose of completing the work included under this agreement, and may employ any other person or persons to finish the work and to provide the materials therefor at the expense of Contractor. 6. Contractor shall indemnify City from ail claims,demands,suits and actions of every name and description brought against the City for or on account of any injuries or damages received or sustained by any parties by or as a result of the acts or omission of Contractor, his servants or agents, in doing the work herein described, or by or as a result of any negligence in guarding the same, or on account of any improper equipment or materials utilized in performing the work. 7. Contractor shall prior to commencing work furnish to City a certified check or a surety bond,the form of the bond and surety company to be approved by the City, in the amount of Twenty-six Thousand Six Hundred Dollars ($26,600.00), conditioned on the performance by Contractor of all its duties hereunder. 8. Contractor agrees to file with the City prior to commencement of work, a certificate of insurance naming the City as coinsured and showing that the Contractor has in force for a period equal to the period of the contract a policy of general liability insurance insuring Contractor against liability for personal injuries and property damage arising out of the contract in a minimum amount of$100,000.00 for injury or damage to any one person and $2,000,000.00 for injuries or damages received in any one accident. Contractor agrees to provide and maintain during the entire term of the contract and until final acceptance of the work by the City, workers compensation insurance for all of its employees at the site of the work. 9. Upon satisfactory performance by Contractor of its duties under this contract, and acceptance of said work by the City Engineer or his or her designee, City will pay Contractor the sum of Twenty-six Thousand Six Hundred Dollars ($26,600.00). 10. Time is of the essence of this agreement and Contractor agrees to begin working within ten(10)days after the date of this contract and to complete the work within Sixty (60) days, and in case the contract is not completed within this length of time, excepting extensions granted to the Contractor for delays caused by conditions beyond his - 2 - control, Contractor will pay the City for damages the sum of Fifty Dollars ($50.00) per day for each day over Sixty (60) days it is required to complete the work covered under this contract. 11. Contractor shall not assign or sublet this contract or any portion thereof without the prior written consent of the City. 12. Failure of the City to insist in any one or more instance on a strict performance of all of the terms or conditions of this contract, or to exercise any right herein contained, shall not be construed as a future waiver or a relinquishment of the provisions or rights,but the same shall continue and remain in full force and effect. None of the terms or conditions of this contract shall be altered,waived, modified or abandoned in any manner except by written instrument executed by both parties. IN WITNESS WHEREOF, the parties have executed this agreement at Cape Girardeau, Missouri, the day and year first above written. CITY OF C• ' - • RDEAU, MISSOURI ......t� / - ',id A. Meyer, . - , ager ATTEST: I Gayle L •onrad, City Clerk —GI:-:� Ronald Kucera, Jr I. � GI I' s • t0k' I 4-t • { �'Ji. r• i Ronald Kucera, Jr_ H ' ''� '' `'! [Typed Name of Signer] S --. ..:..,,i .,,..11 0 Ai I/ ; x` E 13741 , N , [Typed Name of Secretary] - 3