HomeMy WebLinkAboutRes.2921.10-05-2015BILL NO 15-183
RESOLUTION NO
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE A SUPPLEMENTAL AGREEMENT NO 2 WITH
KOEHLER ENGINEERING AND LAND SURVEYING,
INC , FOR THE INDEPENDENCE AND GORDONVILLE
INTERSECTION DESIGN
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS
ARTICLE 1 The City Manager, for and on behalf of the
City of Cape Girardeau, Missouri, is hereby authorized to
execute a Supplemental Agreement No 2 with Koehler Engineering
and Land Surveying, Inc , for the Independence and Gordonville
intersection design, in the City of Cape Girardeau The
Agreement shall be in substantially the form attached hereto as
Exhibit A, which document is hereby approved by the City
Council, and incorporated herein by reference, with such changes
therein as shall be approved by the officers of the City
executing the same
PASSED AND ADOPTED THIS ' DAY OF
ATTEST
Gayle U Conrad, City Clerk
al -I
Harry E edig-er, Mayor
SUPPLEMENTAL AGREEMENT NO. 1
TO
ENGINEERING SERVICES CONTRACT
This Supplemental Agreement is made part of an agreement dated October 10, 2014
between the City of Cape Girardeau and Koehler Engineering and Land Surveying, Inc.
for traffic study and conceptual report of project STP-1500(022). The purpose of this
Supplemental Agreement is to include engineering services for design and construction and
prepare PS&E plans for the intersection improvement concept (a single-lane roundabout)
identified per the study performed under the original ESC. The overall services provided for
this project shall be in an amount not to exceed (Fifty Seven Thousand, Eight Hundred Fifty-Five
Dollars and 44 Cents) ($57,855.44) without further authorization. The total design phase
services shall be in an amount not to exceed (Forty Thousand, Seven Hundred Eighty-One
Dollars and 83 Cents) ($40,781.83). The total construction phase services shall be in an amount
not to exceed (Eight Thousand Three Hundred Thirty Four Dollars and 41 Cents) ($8,334.41).
Attachment A outlines the cost breakdown for this Supplemental Agreement.
Anticipated Dates for Milestones shall be established as follows:
NTP with Preliminary Engineering: March 2,2015
Submission for Environmental/Historical Clearances: March 16, 2015
Completed Preliminary Design Tasks as noted in Attachment'A': April 30,2015
Right of Way Plan Submission May 7, 2015
Completed Final Design Tasks as noted in Attachment 'A': June 19, 2015
Receipt of City/MoDot Comments: July 3, 2015
Address Comments and Final Submittal of PS&E: July 17, 2015
Advertise for Bidding: August 2,2015
Supplement Agreement No. I accepted as defined herein:
FIG. VI-4
Revised 02-14-00
OWNER: City Of Cape Girardeau ENGINEER: Koehler Engineering and Land
S)urveying, IInnc.
B . LISA BY• ( -
4111. Chris Koehler, PE, PLS
TITLE:
ill. _ , TITLE: President
DATE: . . 6.; : DATE: February 26, 2015
ATTEST:
BY. Ao'_c_-L(�c,te,- ,t�IB.fit BY: 4,,,,,470„,.., £LI1 Dul/
l/UJB Stephnie Koehler
TITLE: (1 jj (Omjc , TITLE: Corporate Secretary
DATE: 3 - (Q -15 DATE: February 26, 2015
44 In
Executed by the City on the day of fkikafi h 2015.
(/'---'� 12GQinR�tt
---
' ms
a �l. iI. 1 CA
3, T:E QNI ON
t'*x'tjt?R•v
"QcySEAL
FIG. VI - 4
Revised 02-14-00
ATTACHMENT A
SUPPLEMENTAL AGREEMENT NO. 1
(October 10,2014)
DESIGN Phase Services:
1) Survey and research existing right of way, easements and property lines
2) Survey and research existing and proposed utilities
3) Perform 3D and topographic survey of the intersection site including trees, signs,
buildings and other adjacent features
4) Prepare historic/heritage/environmental submittals
5) Prepare exhibit for presentation purposes
6) Attend meetings with property owners as needed
7) Prepare preliminary design of a single-lane, offset-left roundabout including:
a. horizontal geometric design elements including curb and gutter/lane edge lines,
truck apron(s), splitter islands, pedestrian crossing(s)
b. profiles of circulation lane and approaches
c. existing and proposed entrances/driveways which fall within the limits of
improvement.
d. existing and proposed utility locations
e. storm water drainage features(if necessary)
f. interim and presumed future accommodations for pedestrians
g. typical sections
h. exhibits and descriptions for easements
i. documentation of performance checks including: fastest path analysis, AutoTum
for WB-65, sight distance, level of service and v/c ratio for design year traffic
j. opinion of construction cost
8) Prepare final design of the intersection including the following:
a. horizontal and vertical alignment of the street approaches with coordinates
b. storm water drainage design (if necessary)
c. design of interim accommodations for pedestrians
d. water main relocation design
e. street lighting design
f. typical sections of street and roundabout
g. pavement elevation detail sheet with spot elevations 10' to 20' apart along inside
and outside edges of all lanes
h. job special provisions
i. traffic control plan with proposed staging
j. permanent striping/signing plan
k. retaining wall design (if necessary)
I. SWPPP (if necessary)
m. opinion of construction cost
9) Revisions per City and MoDOT review comments
10)Environmental clearances
11)Deliverables for final design shall include:
FIG.VI-4
Revised 02-14-00
•
,4
a. copies of historic/heritage/environmental permits and clearances
b. design report with detailed calculations for:
i. pavement runoff for inlets
ii. hydraulics for entrance pipes
c. electronic and hard copy of survey information
d. electronic and hard copy of drawings for construction plans and specifications
e. opinion of construction costs.
CONSTRUCTION Phase Services
1) Perform compaction/moisture testing for earthwork and aggregate base and provide
documentation of test results
FIG. VI -4
Revised 02-14-00
ATTACHMENT B1
ENGINEERING SERVICES FEE SCHEDULE(PRELIMINARY DESIGN PHASE)
COST&PRICE SUMMARY FORMAT
Date: 24-Feb-15 Supplemental Agreement#1
PROJECT NAME. Intersection Improvements for Gordonville Road and Independence Street
PROJECT LOCATION: Cape Girardeau,Missouri
PROJECT NUMBER: STP-1500(022)
ESTIMATED HOURLY ESTIMATED
DIRECT LABOR HOURS RATE COST TOTALS
Principal Engineer/Senior PE 144 $ 37.50 $ 5,400.00
Senior Geotechnical Engineer 0 $ 37.50 $ -
Engineer I 158 $ 27.88 $ 4,405.04
Engineer II 24 $ 25.00 $ 600.00
Draftsman I 24 $ 16.50 $ 396.00
Secretarial 16 $ 15.00 $ 240.00
Registered Land Surveyor 1 16 $ 27.50 $ 440.00
Registered Land Surveyor 2 24 $ 25.00 $ 600.00
Survey Rodman 24 $ 13.00 $ 312.00
Drilling Technician#1 0 $ 18.00 $ -
Drilling Technician#2 0 $ 15.00 $
Direct Labor Total: I $ 12,393.04
'INDIRECT COST(OVERHEAD)
DIRECT LABOR DISTRIBUTION BASE
1.8113(.4005 Fringe,1.4108 General OH)x Direct Labor Total
INDIRECT COST. I $ 22,447.51
SUBTOTAL EXCLUSIVE OF FIXED FEE: $ 34,840.55
FIXED FEE(13%'SUBTOTAL) I $ 4,529.27
OTHER DIRECT COST
Postage&Telephone: 0 $ -
Mileage 200 0.560 $ 112.00
Copies and Reproduction(Excluding Bid Sets) $ 100.00
Informational Title Commitmemnts 6 $ 200.00 $ 1,200.00
$
OTHER DIRECT COST TOTAL. I $ 1,412.00
ICuttural/Historical Resources Survey: I$
Pass Through Costs to DBE Subconsuhant-
NOTAL ENGINEERING FEE FOR DESIGN PHASE SERVICES: $ 40,781.83
Item Hours
Projected Distribution of PE Time for Prelim Engineering Tasks/Programming 4
Major Work Elements Utility Relocations 8
Historical/Env.Submittals 4
Preliminary Design Plans 104
Final Design Plans 120
Revisions for City/MoDot Comments 32
JSPs 8
Estimates 8
Meetings 8
Project Management 6
Total: 302
res.as P
ATTACHMENT B2
ENGINEERING SERVICES FEE SCHEDULE(CONSTRUCTION)
COST 8 PRICE SUMMARY FORMAT
Date. 24-Feb-15
PROJECT NAME: Intersection Improvements for Gordonville Road and Independence Street
PROJECT LOCATION: Cape Girardeau,Missouri
PROJECT NUMBER: STP-5100(0221
ESTIMATED HOURLY ESTIMATED
DIRECT LABOR HOURS RATE COST TOTALS
Principal Engineer 8 $ 37.50 $ 300.00
Engineer I 4 $ 28.84 $ 115.36
Inspector 1 40 $ 21.63 $ 865.20
Inspector 2 60 $ 18.00 $ 1,080.00
Laboratory Technician 12 $ 15.00 $ 180 00
Draftsman 0 $ 14.50 $ -
Secretarial 4 $ 14.50 $ 58.00
Registered Land Surveyor 0 $ 27.50 $ -
Survey Party Chief 0 $ 26.25 $ -
Survey Rodman 0 $ 12 00 $ -
Direct Labor Total: ' $ 2,598.56
INDIRECT COST(OVERHEAD)
DIRECT LABOR DISTRIBUTION BASE
1.6936 x Direct Labor Total
INDIRECT COST. I $ 4,400.92
SUBTOTAL EXCLUSIVE OF FIXED FEE. $ 6,999.48
FIXED FEE(13%'SUBTOTAL) 1 $ 909.93
OTHER DIRECT COST
Postage 8 Telephone: $ 50.00
Mileage 500 0.550 $ 275.00
Materials $ 100.00
OTHER DIRECT COST TOTAL ' $ 425.00
Subcontract Pass Through Costs-
�$
(TOTAL ENGINEERING FEE FOR LIMITED CONSTRUCTION PHASE SERVICES: $ 8,334.41