Loading...
HomeMy WebLinkAboutRes.2913.08-17-2015BILL NO 15-149 RESOLUTION NO (A A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NUMBER 6 TO THE GENERAL SERVICES AGREEMENT WITH JACOBS ENGINEERING GROUP, INC , FOR THE WASTEWATER TREATMENT PLANT PROJECT, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS ARTICLE 1 The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment Number 6 to the General Services Agreement with Jacobs Engineering Group, Inc , for the Wastewater Treatment Plant Project, in the City of Cape Girardeau The Amendment shall be in substantially the form attached hereto as Exhibit A, which document is hereby approved by the City Council, and incorporated herein by reference, with such changes therein as shall be approved by the officers of the City executing the same PASSED AND ADOPTED THIS ATTEST Gayle Conrad, City Clerk DAY 0 y E fediger, Mayor , 2015 Amendment Number 6 Effective Date A L)�1��� /� �/� Amendment No. 6 This Amendment is entered into on the effective date noted above pursuant to the "General Servcies Agreement" between CITY OF CAPE GIRARDEAU, MISSOURI ("ClienY') and JACOBS ENGINEERING GROUP INC. ("Consultant"), dated July 21, 2009, ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Amendment. However, in case of conflict,the terms of the Amendment shall control. Services Authorized Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Amendment No. 6 and consists of one(1)page. Compensation To the extent and amount invoiced, Consultant will be compensated for this Amendment on the following basis of reimbursement: 1. For the salary costs of its professional, technical and supporting personnel for the time during which they are directly employed in services covered by this Task,multiplied by a factor of 2.1 for office labor and 1.9 for field labor to cover overhead and profit. a. Salary costs are defined as the salaries paid for regular time and overtime (including any premium overtime)worked. b. Included in overhead are: i. Provision for applicable annual salary related expenses, including sick leave, vacation pay, holiday pay and other ordinary and customary paid time off, bonuses, the employer's portion of social security, unemployment and other payroll taxes, Employee's Retirement and Benefit Plan contributions, employer's portion of group hospitalization and medical insurance, and the cost of worker's compensation insurance. ii. T'he salaries of officers, except for technical or advisory services directly applicable to the project. iu. Rent and costs of light, heat and water; equipment depreciation and maintenance cost; costs of office supplies and reproduction of data for our internal use; general communications expense, including local telephone calls and postage; taxes, insurance premiums and license fees; automotive expense and other transportation and travel expense not chargeable to specific contracts; and other miscellaneous costs. Page 1 of 2 City of Cape Girardeau Amendment No.6 z 2. For the following direct costs: a. Travel, subsistence, and incidental expenses of personnel while traveling in connection with this Task. b. Transportation by passenger automobiles that Jacobs supplies intermittently in connection with this Amendment, at the prevailing federal mileage reimbursement rate. All costs of owned, leased or rented passenger vehicles assigned to this Amendment and car allowances granted to management and supervisory personnel are reimbursable. Reimbursement for the cost of special types of vehicles will be at rates to be mutually agreed upon when such vehicles are required. c. Reproduction of drawings, photographs, maps, charts and reports which are prepared for the Owner's periodic or interim review and also the cost of the reproduction which constitute the delivery of services. d. Insurance required by Owner in addition to the coverage or in excess of thc limits normally carried. e. Subcontracted services such as, but not limited to, borings, surveys, testing and computing services, if required in the performance of this Amendment. 3. Estimate of Cost of Consultant's Services a. Consultant estimates that the total cost of the services for Amendment No. 6 will be $43,100. Jacobs will consult with the Owner and obtain the Owner's consent before its costs exceed this estimate. Jacobs does not guarantee,however, that the cost of thc scrvices required by this Agreement will not exceed the estimated amount. CITY OF CAPE,�IRARpEAU�MISSOURI JACOBS ENGINEERING GROUP INC. r, /-/ /% .—� � BY. BY: `" �i-_�1 NAME: ,�i NAME:�iEJ�/� ,!'Z�j,.fl TITLE: ��� _ TITLE:cST�JlS ��e�'�J2Dh/,( ,�C�j _ DATE: �'��"/� DATE: � — 29� ��S Page 2 of 2 City of Cape Girardeau Amendment No.6 , .. .' EXHIBIT A—SCOPE OF SERVICES AMENDMENT NO. 6 Between City of Cape Girardeau(City) and Jacobs En ing eering Group Inc. (Jac�bs) The scope of services under this Amendment includes additional construction phase services including resident project representative services and project management services for the new wastewater treatment facility. The tasks are outlined below. Jacobs is currently working towards completion of the construction phase of the new wastewater treatment facility as described in Amendment No. 3, dated September 8,201 l. Task 1 —Additional Design and Resident Project Representative Services A. The additional design and resident project representative(RPR)services include: 1. There are three areas that require additional effort in completing the construction phase of the new wastewater treatment facility. The first area is rclated to the handling of the belt dryer condenser unit and the associated odor control unit. The testing and startup of the dryer system had to be delayed until the condensate and particulate matter in the condenser exhaust could be removed before passing through the odor control unit. We have also been working with MDNR for the last several months to resolve the conditions in the draft air permit issued by MDNR. Sampling and analysis of the exhausts from the condenser, wet scrubber and dust collector are required before a final air permit is issued by MDNR. The work on the condenser/odor control unit will continue for an additional 2—3 months. 2. The second area is regarding the turbo blowers supplied by Atlas Copco. It has taken a lot of effort on our part to deal with Atlas Copco in their finally agreeing to remove and modify the three blowers in the factory and reinstall them, and the warranty issues associated with it. The modified blowers have been installed and they will go throuf;h one to two months of testing and trouble-free operation before final acceptance by the City. 3. The third area is the unusual deposits in the strainers of both the automatic and manual filters of the service water system that caused the filters to fail and become inoperable. Sampling and testing of the service water to identify the agents of deposits and for the recommendation of the proper chemical addition to alleviate the problem have been proposed by an expert in this field. This work and engineering the chemical addition system will continue for 2—3 months. 4. The additional work on the three items described above is estimated to be 320 hours,which correlates to $43,100. This includes 80 hours of construction inspection and 100 hours of project management. The basic construction phase services including preparation of the hard copy and electronic operations guide, construction closeout services including preparation of the record drawings, and post construction follow-up activities remain as described in Amendment No. 3. Page 1 of 1 City of Cape Girardeau Amendment No.6—Exhibit A