Loading...
HomeMy WebLinkAboutRes.2832.08-04-2014BILL NO. 14-117 RESOLUTION NO A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NUMBER 5 TO THE GENERAL SERVICES AGREEMENT WITH JACOBS ENGINEERING GROUP, INC., FOR THE WASTEWATER TREATMENT PLANT PROJECT, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute Amendment Number 5 to the General Services Agreement with Jacobs Engineering Group, Inc., for the Wastewater Treatment Plant Project, in the City of Cape Girardeau. The Amendment shall be in substantially the form attached hereto as Exhibit A, which document is hereby approved by the City Council, with such changes therein as shall be approved by the officers of the City executing the same. PASSED AND ADOPTED THIS � DAY OF 2014. Harry EJ Re iger, Mayor ATTEST: Gayle . Conrad, City Clerk Y Amendment Number 5 Effective Date I I Amendment No. 5 This Amendment is a red into on the effective date noted above pursuant to the "General Servcies Agreement" ehveen CITY OF CAPE GIRARDEAU, MISSOURI ("Client') and JACOBS ENGINEERING GROUP INC. ("Consultant'), dated July 21, 2009, ("Agreement'). The Agreement is incorporated herein and forms an integral part of this Amendment. However, in case of conflict, the terms of the Amendment shall control. Services Authorized Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Amendment No. 5 and consists of one (1) page. Compensation To the extent and amount invoiced, Consultant will be compensated for this Amendment on the following basis of reimbursement: 1. For the salary costs of its professional, technical and supporting personnel for the time during which they are directly employed in services covered by this Task, multiplied by a factor of 2.1 for office labor and 1.9 for field labor to cover overhead and profit. a. Salary costs are defined as the salaries paid for regular time and overtime (including any premium overtime) worked. b. Included in overhead are: Ow of Cape Girardeau .4mendm t No. 5 L Provision for applicable annual salary related expenses, including sick leave, vacation pay, holiday pay and other ordinary and customary paid time off, bonuses, the employers portion of social security, unemployment and other payroll taxes, Employee's Retirement and Benefit Plan contributions, employer's portion of group hospitalization and medical insurance, and the cost of worker's compensation insurance. ii. The salaries of officers, except for technical or advisory services directly applicable to the project. iii. Rent and costs of light, heat and water; equipment depreciation and maintenance cost; costs of office supplies and reproduction of data for our internal use; general communications expense, including local telephone calls and postage; taxes, insurance premiums and license fees; automotive expense and other transportation and travel expense not chargeable to specific contracts; and other miscellaneous costs. Page 1 oft 2 2. For the following direct costs: a. Travel, subsistence, and incidental expenses of personnel while traveling in connection with this Task. b. Transportation by passenger automobiles that Jacobs supplies intermittently in connection with this Amendment, at the prevailing federal mileage reimbursement rate. All costs of owned, leased or rented passenger vehicles assigned to this Amendment and car allowances granted to management and supervisary personnel are reimbursable. Reimbursement for the cost of special types of vehicles will be at rates to be mutually agreed upon when such vehicles are required. c. Reproduction of drawings, photographs, maps, charts and reports which are prepared for the Owner's periodic or interim review and also the cost of the reproduction which constitute the delivery of services. d. Insurance required by Owner in addition to the coverage or in excess of the limits normally carried. e. Subcontracted services such as, but not limited to, borings, surveys, testing and computing services, if required in the performance of this Amendment. 3. Estimate of Cost of Consultant's Services a. Consultant estimates that the total cost of the services for Amendment No. 5 will be $212,200. Jacobs will consult with the Owner and obtain the Owner's consent before its costs exceed this estimate. Jacobs does not guarantee, however, that the cost of the services required by this Agreement will not exceed the estimated amount. CITY OF CAPE GI EAU,MISSOURI JACOBS ENGINEERING GROUP INC. BY BY: �S� Q- � � NAME: S� r.r NAME: n^'°" n a ' p��-�s'�u'M n TITLE: �!.��--�� TITLE: s i. �ovc s vPe��'co�t �ir'*'C- DATE: �-.� �%'� DATE: o�I Z'-� �1� Page 2 of 2 City of Cape Ginrdeau Amendment No.5 EXHIBIT A — SCOPE OF SERVICES AA'IENTWN ENT NO. 5 Between City of Cape Girardeau (City) and Jacobs Engineering Group Inc. (Jacobs) The scope of services under this Amendment includes additional construction phase services including resident project representative services and project management services for the new wastewater treatment facility. The tasks are outlined below. Jacobs is currently working towards completion of the construction phase of the new wastewater treatment facility as described in Amendment No. 3, dated September 8; 2011. Task 1 — Additional Resident Project Representative Services A. The additional resident project representative (RPR) services include: 1. KCI Concoction Company, the City's construction contractor for the wastewater treatment facility (WWTF) has requested to extend the final completion date of construction from August 19, 2014 to March 27, 2015. The reason for the request is the significant delays experienced by the contractor due to a number of issues including the unforeseen groundwater encountered at the bottom of sequencing batch reactor excavation; the changed condition at the influent pump station that necessitated an elaborate shoring system, and the weather delays experienced that have been in excess of the anticipated lost work days in the Special Conditions of the specifications. Per Amendment No. 3 to the contract for construction phase services, the duration of RPR services coincides with construction duration of two years, which ends in August 2014. Therefore the RPR services need to be extended to match the revised construction schedule plus an additional month for project closeout work such as inspecting final punch list work, processing final pay application, and reviewing contractor's as -built marked -up drawings. It is anticipated that the contractor will work on Fridays (in addition to their normal 10 -hour Monday through Thursday work week) through the end of November 2014 to meet the new schedule. RPR services will be provided during those days also. The additional RPR work is about 1,500 hours, which correlates to a fee of $153,400, and the fee for direct costs for RPR's travel and lodging is 54,900. The total fee is S 158.300. 2. Because of the time extension; additional project management services are also required. The additional services include assistance in the longer -duration plant startup, troubleshooting treatment processes, coordination with equipment vendors and MDNTt, and general project management tasks. This additional work is about 300 hours, which correlates to a fee of 553,900. In summary, the fee for the additional work described above is S212,200. Page 1 of 1 City of Cape GimMd u Amendment No. 5 - Exhibit A