Loading...
HomeMy WebLinkAboutRes.2801.03-03-2014BILL NO. 14-32 RESOLUTION NO. e:2601 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH LAPPE CEMENT FINISHING, INC., FOR THE SAFE ROUTES TO SCHOOL 2008 PROJECT, IN THE CITY OF CAPE GIRARDEAU, MISSOURI BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE GIRARDEAU, MISSOURI, AS FOLLOWS: ARTICLE 1. The City Manager, for and on behalf of the City of Cape Girardeau, Missouri, is hereby authorized to execute an Agreement with Lappe Cement Finishing, Inc., for the Safe Routes to School 2008 Project, in the City of Cape Girardeau, Missouri. A copy of said Agreement is attached to this Resolution and made a part hereof. PASSED AND ADOPTED THISDAY OF 2014. Harry E. Rediger, Mayor ATTEST: Gaylk)L. Conrad, City Clerk CITY OF CAPE GIRARDEAU SAFE ROUTES TO SCHOOL VARIOUS LOCATIONS SRTS-INF-H280(106) STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the day q?t�' of in the year 2011 by and between the City of Cape Girardeau, Missouri (hereinafter called OWNER)and LAPPE CEMENT FINISHING, INC. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The Improvement consists of the construction of sidewalk in 8 locations as stipulated in the plans and bid documents. Article 2. ENGINEER. The Project Engineer or his designee is to act as OWNER'S representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIMES. 3.1 The work shall be diligently prosecuted at such rate and in such manner as, in the judgment of the engineer, is necessary for the completion of the work within the time specified as follows in accordance with Sec 108 of the Missouri Standard Specifications for Highway Construction, 2011 Edition: Calendar Days: 210 calendar days 3.2 liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not competed on time. 845-2662 A_1 Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Seven Hundred dollars $700.00 for each day that expires after the time specified in paragraph 3.1 for Completion until the Work is complete and ready for final inspection. Article 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 4.1 below: 4.1 for all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in the bidding documents. TOTAL OF ALL UNIT PRICES: Three hundred sixteen thousand seven hundred ten dollars and fifty cents ($ 316,710,50) As provided in paragraph 11.9 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have been computed as provided in paragraph 11.9.2 of the General Conditions. Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress payments, OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Application for Payment as recommended by ENGINEER, on or about the 10th day of each month during construction. All such payments will be measured by the schedule of values established in paragraph 2.9 of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. Retainage may be initiated during contract performance in accordance with Sec 109.9 of the Missouri Standard Specifications for Highway Construction, 2011 Edition. 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. Article 6. INTEREST. 845-2662 A-2 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the following representations: 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents, including "technical data". 7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect -cost, progress, performance and furnishing of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work- 7.4 ork 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR'S purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observation obtained from visits to the site, reports and drawings 845-2662 A-3 identified in the Contract documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 7.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1 This Agreement (pages A-1 to A-7 inclusive). 8.2 Exhibits to this Agreement (pages to, inclusive). 8.3 Performance, Payment, and other Bonds, identified as exhibits _ and consisting Of _ pages. 8.4 Notice to Proceed_ 8.5 General Conditions (pages GC -1 to GC -55, inclusive). (EJCDC No. 1910-8 1990 Edition) 8.6 Supplementary Conditions (pages SC -1 to SC- 5, inclusive). 8.7 Specifications bearing the title Cape Girardeau Safe Routes to School Various Locations. 8.8 Drawings. 8.9 Addenda numbers 1- to 1, inclusive. 8.10 CONTRACTOR'S Bid (pages P-1 to P-11, inclusive) marked exhibit. 8.11 Pursuant to 285.530 R.S. Mo, the contractor must affirm its enrollment and participation in a federal work authorization program with respect to the employees proposed to work in connection with the services requested herein by 1) submitting a completed, notarized copy of AFFIDAVIT OF WORK AUTHORIZATION and 2) providing documentation affirming the bidder's enrollment and participation in a federal work authorization program with respect to the employees proposed to work in connection with the services requested herein. 845-2662 A-4 8.12 Documentation submitted by CONTRACTOR prior to Notice of Award (pages to inclusive). 8.13 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in the Article B. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions_ Article 9. MISCELLANEOUS. 9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 92 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 9.5 Pursuant to 292.675, R.S. Mo, the contractor is informed that all contractors or subcontractors doing work on this project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the 545-2662 A-5 Occupational Safety and Health Administration COSHAJ or similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. The training must be completed within sbcty (60) days of the date work on the project commences. On-site employees found on the worksite without documentation of the required training shall have twenty (20) days to produce such documentation. 9.6 The General Contractor shall provide to the City of Cape Girardeau City Engineer's Office weekly certified payrolls from the General Contractor and all Subcontractors during the course of the project These must be provided on a weeldy basis; if no work was done, then a payroll stating 'No Work Done' must be submitted. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in multiple copies, One counterpart each has been delivered to CONTRACTOR and ENGINEER and two counterparts to the OWNER. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf. This Agreement will be effective on M arc 6) aG 20 I`1 (which is the Effective Date of the Agreement). OWNER Attest Address for giving notices 401 Independence Street Cape Girardeau, MO 63703 (If OWNER is a public body, attach evidence of authority to sign and resolution or other documents Attest Address for giving notices Friedheim MO 63747 License Agent for service of process: (if CONTRACTOR is corporation, attach evidence of authority to sign. A-6 EXHIBIT A NOTICE TO CONTRACTORS Sealed bids, addressed to the City of Cape Girardeau, Engineering Department, 401 Independence Street, Cape Girardeau, MO 63703 for the proposed work will be received by the City of Cape Girardeau until LOAM (prevailing local time) on February 21, 2014, at the office of the City Engineer, 401 Independence Street, Cape Girardeau, MO 63703, and at that time will be publicly opened. Bids should be delivered to: City of Cape Girardeau, Engineering Department, 401 Independence Street, Cape Girardeau, MO 63703. A pre-bid conference will be held at 9AM, local time, February 12, 2014, in the Osage Center at 1625 N Kingshighway St, Cape Girardeau, MO 63701. Representatives of the Owner and Engineer will be present to discuss the project. Bidders are required to attend and participate in the pre-bid conference. The Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. (1) PROPOSED WORK: The proposed work, hereinafter called the work, includes: Federal Aid Project No. SRTS-INF-H280(106) consisting of the construction of approximately 6000 linear feet of Safe Route to School sidewalks along various routes, including all grading, concrete sidewalks, driveways, retaining walls, and miscellaneous work to complete the project in accordance with die plans and specifications prepared by Hurst- Rosche Engineers, Inc. and Dated: January 24, 2014. (2) COMPLIANCE WITH CONTRACT PROVISIONS: The bidder, having examined and being familiar with the local conditions affecting the work, and with the contract, contract documents, including the Missouri Highways and Transportation Commission's "Missouri Standard Specifications for Highway Construction, 2011," and "Missouri Standard Plans for Highway Construction, 2009", their revisions, and the request for bid, including appendices, the special provisions and plans, hereby proposes to furnish all labor, materials, equipment, services, etc„ required for the performance and completion of the work. All references are to the Missouri Standard Specifications for Highway Construction, as revised, unless otherwise noted- The oted The following documents are available on the Missouri Department of Transportation web page at www.modot.mo.gov under 'Business with MODOT" "Standards and Specifications". General Provisions & Supplemental Specifications Supplemental Plans to October 2009 Missouri Std. Plans For Ii-ighway Construction These supplemental bidding documents contain all current revisions to the bound printed versions and have important legal consequences. It shall be conclusively presumed that they are in the bidders possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project The effective version shall be determined by the letting date of the project. In addition, City of Cape Girardeau Specifications and Drawings are available at www.cityofeapggimWeau-org/uploads/Main/C4yt aWDevelopment/Enginecting�Eneineeting-Specifications- Standard s-Drawinps.pdf. City of Cape Girardeau Standard Specifications, dated May 27, 2010 City of Cape Girardeau Standard Drawings, dated May 27, 2010 Please note that within the above -listed documents, the term "Commission" shall be replaced with the term, "City of Cape Girardeau", and the tern "Engineer" is a reference to the City Engineer. (3) PERIOD OF PERFORMANCE: If the bid is accepted, the bidder agrees that work shall be diligently prosecuted at such rate and in such manner as, in the judgment of the engineer, is necessary for the completion of the work within the time specified as follows in accordance with Sec 108: Calendar Days: 210 days Completion Date: 845-2662 P-1 (4) LIOLIDATED DAMAGES: The bidder agrees that, should the bidder fail to complete the work in the time specified or such additional time as may be allowed by the engineer under the contract, the amount of liquidated damages to be recovered in accordance with Sec 108 shall be as follows: Liquidated damages per day $700.00 (5) BID GUARANTY: 'Ile bidder shall submit a Bid Guaranty <meeting the requirements of Section 102 of the Missouri Standard Specifications for Highway Construction . The project bid bond form is included in the bid book The bidder shall marc the box below to identify the type of Bid Guaranty. Paper Bid Bond Cashier's Check (6) CERTIFICATIONS FOR FEDERAL JOBS: By signing and submitting this bid, the bidder makes the certifications appearing in Sec. 102.18.1 (regarding affirmative action and equal opportunity), Sec. 102.182 (regarding disbarment, eligibility, indictments, convictions, or civil judgments), Sec. 102.18.3 (reganling anti -collusion), and See. 102.18.4 (regarding lobbying activities). Any necessary documentation is to accompany the bid submission, as required by these sections. As provided in Sec. 108.13, the contracting authority may terminate the contract for acts of misconduct, which includes but is not limited to fraud, dishonesty, and material misrepresentation or omission of fad within the bid submission. (7) ANTD)ISCRMUNATION: The Contracting Authority hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. (8) FEDERAL AND STATE INSPECTION: The Federal Government is participating in the cost of construction of this project All applicable Federal laws, and the regulations made pursuant to such laws, shall be observed by the contractor, and the work will be subject to the inspection of the appropriate State or Federal Agency in the same manner as provided in Sec 105.10 of the Missouri Standard Specifications for Iiighway Construction with all revisions applicable to this bid and contract (9) PREVAILING WAGE (FEDERAL AND STATE): This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and requires adherence to a schedule of minimrnn wages as determined by the United States Department of Labor. For work performed anywhere on this project, the contractor and the contractor's subcontractors shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract are detailed in "Annual Wage Order No. 20", which is attached to this bidding document The applicable federal wage rates for this contract are the effective Davis -Bacon federal wage rates posted the tenth day before the bid opening date and are attached herein_ These supplemental bidding documents have important legal consequences. It shall be conclusively presumed that they are in the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project. (10) WORKER ELIGIBILrff REQUIREMENTS: Execution of the construction contract for this project is dependent upon the awarded bidder providing an Affidavit of Compliance AND E -Verify Memorandum -of - Understanding (MOU) between the bidder and Department of Homeland Security to the Contracting Authority as required by section 285.530 RSMo. The cover page and signature page of the &Verify MOU and the Affidavit must be submitted prior to award of this contract. A sample Affidavit of Compliance can be found at the Missouri Affnmey General's website at the following link: http://ago.mo.gav/forms/Affidavit of Compliance.ndf 945-2662 P-2 All bidders must also be enrolled in the E Verify Program, and include their MOU prior to contract execution Bidders who are not enrolled will need to go to the following website link and select "Enroll in the Program' to get started. After completing the program, they will receive their E -Verify MOU with Department of Homeland Security. This document will need to be printed out and kept on file so that a copy can be attacked to the Affidavit of Compliance. hnp://www.dhs.gov/fiLes/pLoMrns/Lrc 1185221678150.shtm This requirement also applies to subcontractors and contract labor, but this contract only requires submittal of the verification documents for the prime contractor. It is the prime contractor's responsibility to verify the worker eligibility of their subcontractors in order to protect their own company from liability as required by section 285.530 RSMo. (11) OSHA TEN HOUR TRAINING REOUIREMENTS: Missouri Law, 292.675 RSMO, requires any awarded contractor and its subcontractor(s) to provide a ten-hour Occupational Safety and Health Administration (OSHA) Construction Safety Program (or a similar program approved by the Missouri Deparhnent of Labor and Industrial Relations as a qualified substitute) for their on-site employees (laborers, workmen, drivers, equipment operators, and craftsmen) who have not previously completed such a program and are directly engaged in actual construction of the improvement (or working at a nearby or adjacent facility used for construction of the improvement). The awarded contractor and its subcontractor(s) shall require all such employees to complete this ten-hour program, pursuant to 292.675 RSMO, unless they hold documentation on their prior completion of said program. Penalties, for Non -Compliance include contractor forfeiture to the Contracting Authority in the amount of $2,500, phis $100 per contractor and subcontractor employee for each calendar day such employee is employed beyond the elapsed time period for required program completion under 292.675 RSMO. (12) BUY AMERICA REOUDZEMENTS_ Construction contracts shall assure compliance with Section I65 of the Surface Transportation Assistance Act of 1982, Section 337 of the Surface Transportation and Uniform Relocation Assistance Act of 1987, and 23 CFR 635.410 regarding Buy America provisions on the procurement of foreign products and materials. On all contracts involving Federal -aid, all products of iron, steel, or a coating of steel which are incorporated into the work must have been manufactured in the United States. The Contracting Authority may allow minimal amounts of these materials from foreign sources, provided the cost does not exceed 0.1 percent of the contract sum or $2,500, whichever is greater. The Contractor certifies that these materials are of domestic origin. Additional information regarding the `Buy America" tegnirenrents can be found at: hoJ/www.fhwa.dotgov/programadmin/conracelb-amqucLefin (13) ADDENDUM ACKNOWLEDGEMENT: The undersigned states that the all addenda (if applicable) have been received, acknowledged and incorporated into their hid, prior to submittal. For paper bids, staple addenda to the bid in the appropriate part of the bid. (14) SIGNATURE AND IDENTITY OF BIDDER: The undersigned states that the following provided information is correct and that (if not signing with the intention to bind themselves to become the responsible and sole bidder) they ars the agent of and they are signing and executing this, as the bid of which is the as stated on the contractor questionnaire (if a) The organization submitting this bid is a(u) (1) individual bidder, (2) partnership, (3) joint ventrner (whether individuals or corporations, and whether doing business under a fictitious name), or (4) corporation. Indicate by marking the appropriate box below. ❑ sole individual ❑ partnership. [--]joint ventre Xcorporation, incorporated under laws of state of /A i 'a5t) u r /b) If the bidder is doing business under a fictitious name, indicate below by filling in the fictitious name 845-2662 P-3 Executed by bidder this - [T" day of 2014. THE BIDDER CERTIFIES THAT THE BIDDER AND ITS OFFICIALS, AGENTS, AND EMPLOYEES HAVE NEITHER DIRECTLY NOR INDIRECTLY ENTERED INTO ANY AGREEMENT, PARTICIPATED IN ANY COLLUSION, OR OTHERWISE TAKEN ANY ACTION IN RESTRAINT OF FREE COMPETITIVE BIDDING IN CONNECTION WITH THIS BID, AND THAT THE BIDDER INTENDS TO PERFORM THE WORK WITH ITS OWN BONAFIDE EMPLOYEES AND SUBCONTRACTORS, AND DID NOT BID FOR THE BENEFIT OF ANOTHER CONTRACTOR THE BIDDER ACKNOWLEDGES THAT THIS IS AN UNSWORN DECLARATION. EXECUTED UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE UNITED STATES AND/OR FALSE DECLARATION UNDER THE LAWS OF MISSOURI, AND ANY OTHER APPTdCABLE STATE OR FEDERAL LAWS. THE FAILURE TO PROVIDE THIS CERTIFICATION IN THIS BID MAY MAKE THIS BID NON-RESPONSIVE, AND CAUSE IT TO BE REJECTED. TEE BIDDER CERTIFIES THAT THE BIDDER'S COMPANY KNOWINGLY EMPLOYS ONLY INDIVIDUALS WHO ARE AUTHORIZED TO WORK IN THE UNITED STATES IN ACCORDANCE WITH APPLICABLE FEDERAL AND STATE LAWS AND ALL PROVISIONS OF MISSOURI EXECUTIVE ORDER NO. 07-13 FOR CONTRACTS WITH THE CONTRACTING AUTHORITY. ❑ Check this box ONLY if the bidder REFUSES to make any or all of these certifications. The bidder may provide an elplanation for the refusal(s) with this submittal - Signature oCBidder'y6a RayNa Please print or type name Attest gK_�rd or -,. 3 rider is a Corporation) $AE^ f i IdiWAS riding business under a fictitious Hanle, the bid shall be executed in the legal Warne of the individual, partners, joint ventures, or corporation, and registration of fictitious name filed with the secretary of state, as required by sections 417.200 to 417230 RSMo. If the bidder is a corporation not organized under the laws of Missouri, it shall procure a certificate of authority to do business in Missouri, as required by section 351.572 or seq RSMo. A certified copy of such registration of fictitious name or certificate of authority to do business in Missouri shall be filed with the Missouri Highways and Transportation Commission, as required by the standard specifications. (15) TRAINEES: By submitting this bid, the bidder certifies that the bidder is familiar with the Training Provision in the Missouri Highways and Transportation Commission's "General Provisions and Supplement Specifications" which are available on the Missouri Department of Transportation web page at www.modot-mo.gov under 'Business with MoDOT" "Standards and Specifications". The number of trainee hours provided under this contract will be 0 slots at 1000 hours per slot or 0 hours. (16) SUBCONTRACTOR DISCLOSURE: Requirements contained within Sec 102.7.12 of the Missouri Standard Specification for Highway Construction shall be waived for this contract. (17) PROJECT AWARD: This project will be awarded to the lowest, responsive, responsible bidder. (18) MATERTAi S INSPECTIONS: All technicians who perform, or are required by the FHWA to witness, such sampling and testing shall be deemed as qualified by virtue of successfully completing the requirements of EPG 106.18 Technician Certification Program, for that specific technical area 845-2662 - PA (19) PRUKE CONTRACTOR REOUIREMENTS: The limitation in Sec 108.1.1 of the Mdissomi Standard Specifications for Highway Construction that "the contractor's organization shall perform work amounting to not less than 40 percent of the total contract cost' is waived for this contract. Instead, the less restrictive terms of the Federal Highway Administration's rule at Title 23 Code of Federal Regulations (CFR) § 635.116(a) shall apply, so that the contractor must perform project work with its own organization equal to and not less than 30 percent of the total original contract price. Second -de subcontracting will not be permitted on this contact All other provisions in Sec 108. 1.1 at seq. of the Missouri Standard Specifications for Highway Construction shall remain in fall force and effect, and shall continue to govern the contractor and its subcontractors, in accordance with the provisions of True 23 CFR § 635.116. (20) SALES AND USE TAR EXEMPTION: The City of Cape Girardeau, a tax exempt entity, will furnish a Missomi Project Exemption Certificate as described in Section 144.062 RSMo to the awarded contractor who in tum may use the certificate to purchase materials for a specific project performed for the tax exempt entity. Only the materials and supplies incorporated or consumed during the construction of the project are exempt. 'Ire certificate will be issued to the contractor for a specific project for a defined period of time. (21) DIFFERING SITE CONDITIONS: If differing site conditions are encountered during the progress of the work, the work shall proceed in accordance with Sec 104.2 of the Missouri Standard Specifications for Highway Construction. (22) SUSPENSION OF THE WORK DIRECTED BY THE ENGINEER: All suspensions of work directed by the Engineer which delay the work for an unreasonable period of time shall be addressed in accordance with Sec 108.15 of the Missouri Standard Specifications for Highway Construction (23) CHANGES IN THE WORK: All changes in work shall be addressed in accordance with Sec 104.3 of the Missouri Standard Specifications for Highway Construction (24) RETAINAGE: Retainage may be initiated during connactperformance in accordance with Sec 109.9 of the Missouri Standard Specifications for Highway Construction. (25) HIERARCHY OF DOCUMEN 15: The documents inchrded in the contract are intended to be complementary and to describe a complete work If the Engineer determines a conflict exists between the contract documents, the following hierarchy will be applied and the Contractor shall then complete the work according to the interpretation made by the Engineer. Hierarchy of the Contract Documents Hienuchy of me Contract Documents Job Special Provisions (JSP) Hold over: Project Plans, Supplementary Conditions, Genesial Conditions, Standard Specifications Standard Drawings / Plans *ProjectPlans Hold over Supplementary Conditions, General Conditions, Standard Specifications Standard Drawings / Plans Supplementary Conditions Hold over. General Conditions, Standard Specifications Standard Drawings / Plans General Conditions Hold over. Standard Specifications Standard Drawings / Plans **Standard Specifications Hold over. ***Standard Drawings / Plans * Calculated dimensions hold over scaled dimensions. ** City of Cape Girardeau Standard Specifications hold over the Missouri Standard Specificad®s for Highway Construction *** City of Cape Girardeau Stimdard Drawings hold over the Missouri Standard Plans for Highway Construction 845-2662 P-5 This page left intentionally blank. (26) ITEMI7.RD BUD: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the performance and completim nfthn anrlr ne fnllnac- INo. Description QUftd« Unit unit Cost Total Cost 1 Mobilization/Demobilization 1 LS $3190 °' $ 2 Clearing and Grubbing 1 LS $ S rjj0QP° 3 4" Concrete Sidewalk 3150 Sy $17-10 S p 4Replacement) 6" Concrete Driveway (Removal and 740 SY S 4190 s 55,311' 5 8" Concrete oval and Replacement 73 Sy S .OD $ Jr117J M 6 Removal of Existing Concrete Sidewalk 260 Sy $ IaA6 $ 3 .0O 7 BOX Removal of Concrete Pad at Traffic Control B 1 Sy S oto?D $ 00 8 Case 1 Each $ I=FD $ IDOC>PD 9 Case 10 Each. $ 700,90 $ 60.00 10 Case 19 Each $ Pb $ 13,36D.00 11 Case 17 Each S °D $ M I 17.6"M 12 (Compound 3 Each I $ INOPO S a 6510 °D 13 Ram arallel Changing Directions 4 Each $ TOWD $ $3OD (7D 14 Ramps (Perpendicular 1 Each $ /000" 1 $ =. go 15 Driveway Flares 39 Each $ 1 toSes $ lo, 4 3 S.'" 16 ADA Matts 185 LF S S ,70.0D 17 Vertical Curh✓Ret rn Curb or Retain' Curb 125 LF S SO S S- 18 Curb and Gutter kcemant 568 IY S S (o 412P 19 Wall e 6 8 Cy S I OD W S 00 20 Re ' ' Wall 7 100 LF $ C0 S OD . n 21 Concrete S C-119 1 LS $ 000 $ MOO 22 Inlet T lacemerrt :5 k4 12 Each $ (OLIOPO $ 0. DD 23 Inlet T R lacmment >5'x4 2 Each $ ev 24 Wall 11 Cy $ 25 Guardrail 89 LF S On 26 Relocate Si 11 Each S 100.00 27 Furnish and Inslall New S' Pole 6 Each $ do•°0 28 Relocate Mailboxes 2 Fach S 00•aD29 A just Water Valve Box 7 Each S i4ao . 30 Relocate Fire Hydrant 1 Each S Zi2CVPD $ (a MOO 31 Adjust Water Meter 1 Ear]t $ 0D- $ 0D.tl0 32 Adjust Water Service Lines 4 Each $V00. $ OO OD 33 Cross Walk S in 826 LF $ D d 34 Bar S ' in 126 LF $ 3 .100 35 lace Timber a C-114 15 LF $ 00 .OD 36 Relocate Tree Border C-114 1 LS $$ 00 37 Removal of in Ties 6119 1 LS $ 38 Siltafion Fencing 500 LF $ a.40 $ jal DO. CO 39 Ditch Check 30 LF S SQ. DD $ 0.00 40 Triangular Filter Dike 100 LF $ 00 S .00 41 l Inlet Dam 4 Each S O0 S 0.°0 42 Type 2Inlet Dam 4 Each $ 1 WAD S 43 Inlet Sediment Bag 1 4 Each S z" S 845-2662 P-6 IM Y3�5Vf1i/.7,».ns!�:►.rrr.,rir�Ia,�i___T'.1���'tt.'�v'!r�.�!�'�//il/�7dfR� (Amount in Words) (Total bid amount is to be shown in both words and figures In cast of discrepancy, the amount shown in words will govern. Incase of error in exhmmou, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly extended, shall constitute the Bid) (27) MCIDENI'AIS: The following work shall be completed by the Contractor in accordance with the plans and specifications and shall be incidental to the construction with costs allocated to the appropriate pay item in the list of Unit Prices: a) Rock Excavation. b) Full -Height Granular Backfill, Bedding, and Aggregate Base. c) Construction and Expansion Joints in Concrete Sidewalk including filler material. (28) BASIS OF BIDS: The following work shall be completed by the Contractor in accordance with the plans and specifications and shall be incidental to the construction with costs allocated to the appropriate pay item in the hst,af Unit Prices: The basis of bids is a general description of the work and materials which shall be included in the bid items listed on the bid proposal. Bid item prices shall generally reflect the scope of work described below. It shall be understood by the bidder that the total bid price listed on the bid proposal shall represent total compensation for the entire project based on the estimated quantities given_ Due to the complex nature of this project, some overlap of work items is inevitable and some minor items may not be included below. It is the contractor's responsibility to be sure that all work items are included in his/her bid prices. Payment atter the award of the contract will be based on the number of units completed for unit price items or on the percentage of each lump sum item for the work that has been completed or as outlined in the specifications. Payment will not be made for items that have not been completed. LIST OF BID MMS: 1. Mobilization/Demobilization This item shall consist of all preparatory work and operation necessary to start work on this project, including hauling of equipment onsite and removal of said equipment on completion as necessary for completion of projec Method of Payment Lump Sum 2. Clearing and Grubbing This item shall consist of all labor, equipment and materials necessary for removal and disposal of the top layer of soil and removal of all grass and plant material as well as excavation to the required subgrade depth. Section 202. Method of Payment Lump Sum 3. 4" Concrete Sidewalk This item shall consist of all labor, equipment and materials necessary for installation of a 4" thick concrete sidewalk including the 4" aggregate base, form work, finishing, joints, and joint materials and all necessary components as requited by the drawings and specifications. Section 702. Method of Payment Square Yard - 4. 6" Concrete Driveway (Removal and Replacement) This item shall consist of all labor, equipment and materials necessary for removal and disposal of the existing driveway and replacement of the existing driveway to provide ADA access across said driveway. This item shall include 4" of aggregate base, 6" concrete driveway, form work, finishing, joints, and joint materials, 845-2662 P-7 Temporary Traffic Control TT, --_A (TA -10) Y3�5Vf1i/.7,».ns!�:►.rrr.,rir�Ia,�i___T'.1���'tt.'�v'!r�.�!�'�//il/�7dfR� (Amount in Words) (Total bid amount is to be shown in both words and figures In cast of discrepancy, the amount shown in words will govern. Incase of error in exhmmou, the unit and lump sum prices under each Pay Item will be considered correct, and these sums when properly extended, shall constitute the Bid) (27) MCIDENI'AIS: The following work shall be completed by the Contractor in accordance with the plans and specifications and shall be incidental to the construction with costs allocated to the appropriate pay item in the list of Unit Prices: a) Rock Excavation. b) Full -Height Granular Backfill, Bedding, and Aggregate Base. c) Construction and Expansion Joints in Concrete Sidewalk including filler material. (28) BASIS OF BIDS: The following work shall be completed by the Contractor in accordance with the plans and specifications and shall be incidental to the construction with costs allocated to the appropriate pay item in the hst,af Unit Prices: The basis of bids is a general description of the work and materials which shall be included in the bid items listed on the bid proposal. Bid item prices shall generally reflect the scope of work described below. It shall be understood by the bidder that the total bid price listed on the bid proposal shall represent total compensation for the entire project based on the estimated quantities given_ Due to the complex nature of this project, some overlap of work items is inevitable and some minor items may not be included below. It is the contractor's responsibility to be sure that all work items are included in his/her bid prices. Payment atter the award of the contract will be based on the number of units completed for unit price items or on the percentage of each lump sum item for the work that has been completed or as outlined in the specifications. Payment will not be made for items that have not been completed. LIST OF BID MMS: 1. Mobilization/Demobilization This item shall consist of all preparatory work and operation necessary to start work on this project, including hauling of equipment onsite and removal of said equipment on completion as necessary for completion of projec Method of Payment Lump Sum 2. Clearing and Grubbing This item shall consist of all labor, equipment and materials necessary for removal and disposal of the top layer of soil and removal of all grass and plant material as well as excavation to the required subgrade depth. Section 202. Method of Payment Lump Sum 3. 4" Concrete Sidewalk This item shall consist of all labor, equipment and materials necessary for installation of a 4" thick concrete sidewalk including the 4" aggregate base, form work, finishing, joints, and joint materials and all necessary components as requited by the drawings and specifications. Section 702. Method of Payment Square Yard - 4. 6" Concrete Driveway (Removal and Replacement) This item shall consist of all labor, equipment and materials necessary for removal and disposal of the existing driveway and replacement of the existing driveway to provide ADA access across said driveway. This item shall include 4" of aggregate base, 6" concrete driveway, form work, finishing, joints, and joint materials, 845-2662 P-7 sawcutting pavement as necessary, and all necessary components as required by drawings and specifications. Section 701. Method of Payment Square Yard- 5. ard5. 8" Concrete Roadway (Removal and Replacement) This item shall consist of all labor, equipment and materials necessary for removal and disposal of the existing roadway and replacement of same. This item shall include aggregate base and trench backfill, 8" concrete roadway, form work, finishing, joints, and joint materials, and traffic control devices as necessary for protection of workers and in accordance with Manual of Uniform Traffic Control Devices latest revision and all necessary components as required by drawings and specifications. Method of Payment Square Yard_ Section 504. 6. Removal of Existing Concrete Sidewalk This item shall consist of all labor, equipment and materials necessary for removal and disposal of the existing concrete sidewalk including sawcutting the sidewalk as necessary. Section 203. Method of Payment Square Yard 7. Removal of Concrete Pad at Traffic Control Box This item shall consist of all labor, equipment and materials necessary for removal and disposal of the existing concrete control box including sawcutting as necessary. Section 203. Method of Payment: Square Yard. 8. Ramps (Case E) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, rearm or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Method of Payment Each. Section 702. - 9. Ramps (Case F) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Method of Payment Each. Section 702. 10. Ramps (Case H) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Method of Payment Each. Section 702. 11. Ramps (Case LC) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Section 702. Method of Payment Each. 12. Ramps (Compound Diagonal) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Section 702. Method of Payment Each_ 13. Ramps (Parallel Changing Directions) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Section 702. Method of Payment Each. 14. Ramps (Perpendicular) This item shall consist of all labor, equipment and materials necessary for construction of 6" thick concrete Ramps per detail as well as 4" Aggregate base, joints, return or retaining curb, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Section 702. Method of Payment: Each. 845-2662 P-8 15. Driveway Flares This item shall consist of all labor, equipment and materiaLs necessary for construction of 6" thick concrete Flares per detail as well as 4" Aggregate base, joints, return or retaining rub, curb and gutter replacement per detail, and sawcut of existing pavement or curbing. Section 702. Method of Payment Each. 16. ADA Maas This item shall consist of all labor, equipment and materials necessary for installation of 2' wide ADA Malts per details. When ADA Matts are installed along a curve, the longest side of the curve will be used in determining pay length. Section 702. Method of Payment Linear Feet. 17. Vertical Curb/Retum Curb or Retaining Curb This item shall consist of construction of new vertical curbing/retum curbing or retaining curbing that is not included as part of another pay item. Section 504. Method of Payment Linear Feet 18. Curb and Gutter Replacement This item shall consist of all labor, equipment and materials necessary for curb and gutter replacement that is not included as part of another pay item including removal and disposal of existing curbing. Section 504. Method of Payment Linear Feet. 19. Retaining Wall Type 6 This item shall consist of all labor, equipment and materials necessary for construction of a Type 6 retaining wall per plans and details including reinforcing, forming, finishing, granular base, backfill, weephoies and drain piping and all appurtenances as required to complete the wall and sidewalk surface concrete. Pay limits will be 6" thickness and as built measurement of exposed wall and sidewalk surface areas. Section 504 and JSP par. M. Method of Payment Cubic Yard. 20. Retaining Wall Type 7 This item shall consist of all labor, equipment and materials necessary for a Type 7 Retaining Wall including forming, finishing granular backfA and all appurtenances required by details and plans. Method of Payment Linear Feet 21. Concrete Steps (C-119) This item shall consist of all labor, equipment and materials occessary for construction of concrete steps including excavation, 6" granular bedding, forming, finishing, and all necessary work to complete the concrete steps in accordance with the Plans and Specifications. Section 504. Method of Pavement Lump Sum. 22. Inlet Top Replacement (:55'x4') This item shall consist of all labor, equipment and materials necessary for replacement of existing inlet tops that are smaller than 5 feet x 4 feet or 20 square feet Construction shall include precast concrete tops and cast iron manhole covers to match City Details and Specifications and all necessary adjustments to match sidewalk grade and ADA code. Section 902. Method of Payment Each. 23. Inlet Top Replacement (>5'x4') This item shall consist of all labor, equipment and materials necessary for replacement of existing inlet tops that are larger than 5 feet x 4 feet or 20 square feet Construction shall include precast concrete tops and cast iron manhole covers to match City Details and Specifications and all necessary adjustments to match sidewalk grade and ADA code. Section 902. Method of Payment Each. 24. Retainnna Wall This Item shall consist of all labor, equipment and materials necessary for construction of Retaining Wall 1 and 2 along Clark Street on Plan Sheet C-102 and C-103 and referenced details including all concrete foundation and wall work, excavation and compaction, base material and granular backfll, reinforcement, forming, finishing, and all appurtenances necessary for the completion of the Retaining Wall 1 and 2. Section 504. Method of Payment Cubic Yards of Concrete. 25. Guardrail This Item shall consist of all labor, equipment and materials necessary for construction of alsrminrmr black powder coated OSHA compliant guardrrail__nw and mounting for Retaining Walls 1 and 2 and all appurtenances necessary including concrete anchors, posts, top and bottom rails, and intermediate tails, for the completion of the Guardrail. Method of Payment Linear Foot 845-2662 P-9 26. Relocate Signs This Item shall consist of all labor, equipment and materials necessary for relocating of existing signs including new posts and bolts as necessary to complete sign installation- (See Item 27) Section 804. Method of Payment Each. 27. Furnish and Install New Sign Pole This Item shall consist of all labor, equipment and materials necessary for installation of new 2 -inch square perforated galvanized steel sign poles where the new locations require existing signs to be higher than the existing poles allow to meet ADA criteria This will occur where signs extend more than 4 inches into sidewalk space at less than 78 inches height This installation includes new hardware for mounting the existing sign to the new pole as necessary to complete sign installation. Section 804. Method of Payment Each. 28. Relocate Mailboxes ibis Item shall consist of all labor, equipment and materials necessary for relocating of existing mail boxes and pouring of concrete within post hole. Method of Payment Each. 29. Adjust Water Valve Box This Item shall consist of all labor, equipment and materials necessary for adjustment of existing valve boxes to match grade of proposed sidewalk, curbing, or final grade. Section 2000. Method of Payment Each_ 30. Relocate Fire Hydrant This Item shall consist of all labor, equipment and materials necessary for relocating of an existing fire hydrant including removal of existing thrust blocking, replacement of piping between valve and hydrant, and all appurtenances necessary to complete the requirements including restrains, thrust blocking per City Requirements. Section 2000. Method of Payment Each. 31. Adjust Water Meter This Item shall consist of all labor, equipment and materials necessary for adjustment of existing water meter to match grade of proposed sidewalk, curbing, or final grade. Section 2000. Method of Payment Each. 32. Adjust Water Service Lines This Item shall consist of all labor, equipment and materials necessary for adjustment of existing water service lines to clear of new construction. Section 2000. Method of Payment Each 33. Cross Walk Striping This Item shall consist of all labor, equipment and materials necessary for for painting of 6" wide cross -walk striping. Section 2000. Method of Payment Linear Feet 34. Stop Bar Striping This Item shall consist of all labor, equipment and materials necessary to remove existing stop bar and for painting of new 24" wide Stop Bar striping. Section 804 Method of Payment Linear Feet. 35. Replace Timber Edge (C-114) This Item shall consist of all labor, equipment and materials necessary for replacement of Timber Edge Located On Sheet C-114 per notes including new timbers to match existing as well as bedding and restoration as necessary to match existing. Method of Payment Linear Feet. 36. Relocate Tree Border (C-114) This Item shall consist of all labor, equipment and materials necessary for Relocating Tree Border on Sheet C- 114 using existing tree border and adjusting as necessary to clear new sidewalk. Method of Payment Lump Sum, 37. Removal of Existing Landscaping Ties (C-119) This Item shall consist of all labor, equipment and materials necessary for removal of existing landscaping ties on sheet C-119, including removal of landscaping as required for construction of retaining wall per bid item 19. Method of Payment Lump Sum 845-2662 P-10 38. Siltation Fencing This Item shall consist of all labor, equipment and materials necessary for installation of Fabric Silt Fencing as required by Storz Water Pollution Prevention Plan and per details and City Requirements. Straw Bales are not permitted. Section 201. Method of Payment Linear Feet 39. Ditch Check This Item shall consist of all labor, equipment and materials necessary for construction of Ditch Check per Storm Water Pollution Prevention Plan and City Requirements. Section 201. Method of Payment Linear Feet. 40. Triangular Filter Dike This item shall consist of all labor, equipment and materials associated with the placement, maintenance and replacement as necessary for triangular filter dike for erosion control per Storm Water Pollution Prevention Plan and City Requirements. Filter dike shall be set and maintained to be effective in removal of silt from runoff entering into the storm drainage system or otherwise from leaving the site. Section 201. Method of Payment. Linear Foot 41. Type 1 Inlet Dam This item shall consist of all labor, equipment and materials associated with the placement, maintenance and replacement as necessary for Type I inlet dam for erosion control per Storm Water Pollution Prevention Plan and City Requirements. Inlet dams shall be installed and maintained to be effective in removal of silt from runoff entering into the storm drainage system or otherwise from leaving the site. Section 201. Method of Payment Each. 42. Type 2 inlet Dam This item shall consist of all labor, equipment and materials associated with the placement, maintenance and replacement as necessary for Type 2 inlet dam for erosion control as part of the Contrador's approved Erosion Control Plan and the S WP3. Inlet dams shall be installed and maintained to be effective in removal of silt from runoff entering into the storm drainage system or otherwise from leaving the site. Section 201. Method of Payment Each 43. Inlet Sediment Bag This item shall consist of all labor, equipment and materials associated with the placement, maintenance and replacement as necessary for inlet sediment bags for erosion control per Storm Water Pollution Prevention Plan and City Requirements. Sediment bags shall be installed and maintained to be effective in removal of silt from nmoff entering into the storm drainage system or otherwise from leaving the site, Section 201. Method of Payment Each_ 44. Seeding, Strawing and Final Cleanup This Item shall consist of all labor, equipment and materials necessary for final seeding, mulching, strawing and general clean-up of project site. Section 209. - Method of Payment Lump Sum. 45. Temporary Traffic Control Type A (TA -10) This item shall consist of all labor, equipment and materials associated with the set up and operation of temporary traffic controls for TA -10 setup according to the Manual on Uniform Traffic Control Devices and the MoDOT Quality Standards for Temporary Traffic Control Devices. Measurement will be by hourly periods each day and paid as either fall day or partial days (nearest one quarter day) of setup time. Method of Payment Day. 46. Temporary Traffic Control Type B ('TA -13) This item shall consist of all labor, equipment and materials associated with the set up and operation of temporary traffic controls for TA -13 setup according to the Manual on Uniform Traffic Control Devices and the MoDOT Quality Standards for Temporary Traffic Control Devices. Measurement will be by hourly periods each day and paid as either full day or partial days (nearest one quarter day) of setup time. Method of Payment Day. 845-2662 P-11 ADDENDUM #1 1.1 PROJECT INFORMATION A. _ Project Name: Safe Routes to Schools; Federal Aid No, SRTS-INF-H280(106). B. Owner The City of Cape Girardeau, Missouri. C. Owner Project Number. 2095 D. Engineer. Hurst Rosche Engineers, Inc. E. Date of Addendum: February 11, 2014 1.2 NOTICE TO BIDDERS A. This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract This Addendum updates the State wages effective for this project This Addendum shall be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement B. The Bidder shall acknowledge receipt of this Addendum as nwuin2d on Daae --= C. The date for receipt of bids is unchanged by this Addendum, at same time and location. 1.3 GENERAL A. This Addendum provides Generak Decision Number. M0140001, 0113112014, MO1. 1.4 ATTACHMENTS A. M0140001. 1.5 REVISIONS TO PREVIOUS ADDENDA A. None. 1.6 REVISIONS TO PROJECT MANUAL A None. Page 1 of 2 ADDENDUM #1: nE: February 21, 2014 2095 SRTS4A1F-H260(106) 1.7 REVISIONS TO DRAWING SHEETS A. None. 1.6 PRE BID MEETING COMMENTS A. None. 1.9 PRE BID MEETING QUESTIONS AND ANSWERS A. None_ 1.10 QUESTIONS RECEIVED AFTER THE PRE BID MEETING A. None. — There are no other changes to the contract documents in this addendum. — END OFADDENDUM #1 Page 2 of 2 ADDENDUM #1: rTB: February 21, 2014 2095 SRTS-INF-H2801106) SUBCONTRACTOR CER'IMCATION REGARDING AFFIRMATWE ACTION Project: S4fe &teo-/v 5c tDDI Job No. 9--Y-A) F— ol 9 O Oto) Route: Q [' 1 e� u 5 County: d a a u Certification Regarding Affirmative Action and Equal Opportunity: The bidder (prospective prime contractor) or proposed subcontractor certifies: 1� Affirmative Action Program: That it has developed and has on file at each of its / establishments affirmative action programs pursuant to 41 CFR Part 60-2. Y! Equal Opporhmity Clause: That it has participated in a previous contract or subcontract subject to the equal opportunity clause set forth in 41 CFR Part 69-1.4 and executive order / no. 11246. "3./ Compliance Reports: That it has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance Programs and his designate, or the Equal Employment Opportunity Commission, all reports due under the applicable filing requirements contained in 41 CFR Part 60-1. If the text of the certification above is incorrect, the bidder or subcontractor making the certification shall correct it below: NOTE: This certification applies to and must be executed by each bidder (prospective prime contractor) or proposed subcontractor if its proposed contract or subcontract on this project will equal or exceed $10,000 or that contractor or subcontractor has contracts or subcontracts on federally assisted projects in any 12 -month period which have or can reasonably be expected to have, an aggregate total value exceeding $I0,000 41 CFR Part 60-1.5(a)(1). It is a duty and contract obligation of the prime contractor to insure that each of its subcontractors, which meet this criterion, executes and submits to the commission this certification also. Lp�e CkL" E 7/n5�1ltq I 845-2662 AA -I SUBCONTRACTOR CI RTITICATION REGARDING AFFIRMATNE ACITON Project: JCCI ej 5Chtro/ Job No. SAIF • Z 4n (L) Route: County: r Certification Regarding Affirmative Action and Equal Oppotfunity The bidder (prospective prime contractor) or proposed subcontractor certifies: Affirmative Action Program. That it has developed and has on file at each of its establishments affirmative action programs pursuant to 41 CFR Part 60-2. 2. BMW Opportunity Clause; That it has participated in a previous contract or subcontract subjeot to the equal opportunity clause set forth in 41 CFR Part 69-I.4 and executive order no. 11246. 3. ComPliance Reports: That it has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance Programs and his designate, or the Equal Employment Opportunity Commission, all reports due under the applicable filing requirements contained in 41 CFR Part 60-1. If the text of the certificatiau above is incorrect, the bidder or subcontractor making the eettmcatioz shall correct it below: NOTE: This certification applies to and must be executed by each bidder (prospective prime contractor) or proposed subcontractor if its proposed contract or subcontract on this project will equal or oxeced $10,000 or that contractor or subcontractor has contracts or subcontracts on federally assisted projects in any 12-monthperiod which have or can reasonably be expected to have, an aggregate total -value exceeding $I0,000 41 CFR Part 60-1.5(x)(1), ft is a duty and contract obligation of the prime contractor to insure that each of its subcontractors, which meet this criterion, executes and submits to tho commission this certification also. Company ' By: � Date: �2 2012 0 n- CreCre-AAtr,:J, Title 845-2662 AA -I SUBCONTRACTOR CERTIFICATION REGARDING AFFIRMATIVE ACHON / l Project 5iz .� s Chao( Job Na ARTS -SAI F - �Fi7 �Ob Bowe: CovirtYe 7XneY rl 4 Certification Regarding.a $nmative Action and Fqual Opportunity. The bidder (pmspective pdme contractor) or proposed subcontractor certifies- 1 ertihes: 1 2. Affamative Action Program That it has developed atm has oa file at each of its establishments sff tnative action programs pursuant to 41 CFR Part 6o-2- Egnal QwgMmity Clansec That it has participated in a previous contract or subcoutract subject to the equal opportunity clause set forth in 41 CFR Part 69 -IA and=cutive order no. 11246. 3. CQpliance Reports: That it has filed with the Joint Reportmg Committee, Bre Director of the Office ofFederal Contract Compliance programs and his designate, or the Equal Employment Opportunity Commission, all reports dire under the applicable filing requirements contained in 41 CFRPart 60-1. If the tett of the certification: above is incorrect, the bidder or snbcontrac zr maktiig the certificatioq shall corrcet it below: NOTE: Thu ca'tif cation applies to and must be executed by each bidder (prospective prime contractor) or proposed subcontractor if its proposed contract or subcontract on tins prc jectwW equal or exceed $10,000 or that contractor or subcontreator has contracts or sabcouhacts an fedaaily assisted projects in any 12 -month period which bave or can reasonably be expected to.have, an aggregate total value exceeding $10,000 41 CFR Part 60-1.5(a)(1). ft is a duty and contract obligation of the prime contractor to insure that each of its subcontractors, which meet this criterion, executes and submits to the commission this certification. also. Date: . Company? � �C Title 845-2662 AA -1 EXHIBIT AFFIDAVIT OF WORK AUTHORIZATION COMES NOW (Name) I) -k- as (Office Held) of (Company Name/Contractor) Lanoe `eY.eV-I; r�sk�� and first being duly swom, on my oath, affirm as follows: 1. (Company NamelContractor) �— m 15 C is enrolled and will continue to participate in a federal work authorization program in respect to employees that will work in connection with the contracted services related to (Project Name) Ra -u" t� —fo SChor) I for the duration of the contract in accordance with RSMo Chapter 285.536(2). 2. 1 also affirm that (Company Name/confractor) Cewsu4 t '5 does not and will not knowingly empkoy a persor{wh`o isrran unauthorized alien in connection with the contract services related to (Project Name) JA-Ff RouTeS To 57-kcrp) for the duration of the contract. 3. . Attached hereto is documentation affirming Contractor's enrollment and participation in a federal work authorization program with respect to the employees working in connection with the contracted services. FURTHER AFFIANT SAITH NOT. IN AFFIRMATION THEREOF, the facts stated above are true and correct (the undersigned -understands that false statements made in this filing are subject to the penalties provided in Section 575.040, RSMo.) n A ATTEST: (name of corporation and title) --- w./t�.�5I 945-2662 .. . WA -1 C. STATE OF MISSOURI ) ) ss - COUNTY OF CAPE GIRARDEAU ) On this ltday of Zb1La 1-, 200 before me appeared a a e- to me personall known who being by me duly sworn, did say tha&she is the of n 9 a I fissouri Corporation, and that the seal affixed to the foregoing instr6wat is the seal of said Corporation, and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors, and acknowledged said instrument to be the free act and deed of said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my official seal, at my office in Cape Girardeau, Missouri, the day and year fust above Notary PAlic My Comm ion Expires: MELISSAL YDEN 2 OFM RI COLIrdy con assim # 12642541 My 4Q3M6 845-2662 WA -2 E -Verify. COPY Ir L�„wlm c-.zem n � scrioa ou: Company ID Number. 189854 THE E -VERIFY PROGRAM FOR EMPLOYMENT VERIFICATION MEMORANDUM OF UNDERSTANDING ARTICLE I PURPOSE AND AUTHORITY This Memorandum of Understanding (MOU) sets forth the points of agreement between the Department of Homeland Security (DHS) and Laaoe Cement Finishing, Inc. (Employer) regarding the Employer's participation in the Employment Eligibility Verification Program (E - Verify). This MOU explains certain features of the E -Verify program and enumerates specific responsibilities of DHS, the Social Security Administration (SSA), and the Employer. E -Verify is a program that electronically confirms an employee's eligibility to work in the United States after completion of the Employment Eligibility Verification Form (Form 1-9). For covered government contractors, E -Verify is used to verify the employment eligibility of all newly hired employees and all existing employees assigned to Federal contracts. Authority for the E -Verify program is found in Title IV, Subtitle A, of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA), Pub. L. 104208, 110 Stat. 3009, as amended (8 U_S.C. § 1324a note). Authority for use of the E -Verify program by Federal contractors and subcontractors covered by the terms of Subpart 22.18, °Employment Eligibility Verification', of the Federal Acquisition Regulation (FAR) (hereinafter referred to in this MOU as a "Federal contractor) to verify the employment eligibility of certain employees working on Federal contracts is also found in Subpart 22.18 and in Executive Order 12989, as amended. ARTICLE it FUNCTIONS TO BE PERFORMED A. RESPONSIBILITIES OF SSA 1. SSA agrees to provide the Employer with available information that allows the Employer to confirm the accuracy of Social Security Numbers provided by all employees verified under this MOU and the employment authorization of U.S. citizens. 2. SSA agrees to provide to the Employer appropriate assistance with operational problems that may arise during the Employers participation in the E -Verify program. SSA agrees to provide the Employer with names, titles, addresses, and telephone numbers of SSA representatives to be contacted during the E -Verify process. 3. SSA agrees to safeguard the information provided by the Employer through the E -Verify program procedures, and to limit access to such information, as is appropriate by law, to individuals responsible for the verification of Social Security Numbers and for evaluation of the E -Verify program or such other persons or entities who may be authorized by SSA as governed by the Privacy Act (5 U.S.C. § 552a), the Social Security Act (42 U.S.C. 1306(a)), and SSA regulations (20 CFR Part 401). Page 7 of 131E-Vedh MOU for EnVoye.lRe'sson Date 1029105 .e 4.j: c.;: Company ID Number. 189854 Tobe_ accepted -as_a.participant inEYerify, you shouid_oniy sign.the Employers Section of the signature page. If you have any questions, contact E -Verify at 888-4844218. Employer Lappe Cement Finishing, Inc. Randy Lappe Name (Please Type or Print) E1aYTnica& Signed 0211212009 Signature Date Department of Homeland Security — Verification Division USCIS Verification Division Name (Please Type or Print) _ Elecrranicalry Signed Signature 02/12/2009 Date Page 11 of 131E -Verity MOU for EmptoyeQRe%isia, Date to2grosi;':..: �i:_: :' iyHW4�t� Everify Company ID Number. 189854 Tobe_ accepted -as_a.participant inEYerify, you shouid_oniy sign.the Employers Section of the signature page. If you have any questions, contact E -Verify at 888-4844218. Employer Lappe Cement Finishing, Inc. Randy Lappe Name (Please Type or Print) E1aYTnica& Signed 0211212009 Signature Date Department of Homeland Security — Verification Division USCIS Verification Division Name (Please Type or Print) _ Elecrranicalry Signed Signature 02/12/2009 Date Page 11 of 131E -Verity MOU for EmptoyeQRe%isia, Date to2grosi;':..: �i:_: Company ID Number 189854 Information gr .1 a to your Company. .."y Name: Lappac*rent7TTr�shO)o,'t Company Facility Addresq,,444 Company Alternate Address: Rerryville, MO 63 Employer Identification Number. 4-31,168974:,. North American Indus Classification Syste fdfpc Ins=. Pap 12 of 13jE.Verffy MOU for EmplDyerjRevislon Dale iQQ&M www.dhs.SovJB-VerifY v Y Company ID Number 189854 Information gr .1 a to your Company. .."y Name: Lappac*rent7TTr�shO)o,'t Company Facility Addresq,,444 Company Alternate Address: Rerryville, MO 63 Employer Identification Number. 4-31,168974:,. North American Indus Classification Syste fdfpc Ins=. Pap 12 of 13jE.Verffy MOU for EmplDyerjRevislon Dale iQQ&M www.dhs.SovJB-VerifY E -Verity NaFl*-* Me is�: L Hayden T, eNumbeF � - Fax Number 73) 7 - 513_f (573) 547'-7822 S, lapcem@pownq, nz. .. . RanoyjL Tellepfi6ne Number. 7f­ (573 Kf=Fax Number.- �(573) 547 - 7822, E-mail Address: lapcem@powrup.net t Page 13 o[13lE-Veqfy MOU (or Employe�Revision Date 1000 viny w. d h s. S ov] E Nen ly DCII' COMES NOW (Name) PaVIL a- Q. as (Office Held) 1 reS I d eil1 of (Company Name)Contractor) n and first being duly swum, on my oath, affirm ' connection with the contracted services related to (Project Name) for the duration of the contract, as follows: 1. Contactor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) coustuction safety program for all employees who will be on-site at the Project. The construction safety program shall include a course in construction safety and health that is approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program as required by Section 292.675, RSMo_ 2. Contractor shall require its on-site employees to complete a constmctioa safety program within sixty (60) days after the date work on the Project commences, as required by Section 292.675, RSMo. Contactor acknowledges and agrees that any of Contractor's employees found on the Project site without documentation of the successful completion of a construction safety program shall be required to produce such documentation wifbin twenty (20) days, or will be subject to removal from the Project 4. Contractrr'shall require all of its Subcontractors to comply with the requirements of Section 292.675, RSMo. 5_ Contractor acknowledges that pursuant to Section 292.675, RSMo., Contractor shall forfeit to City as a penalty two thousand five hundred dollars ($2,500.000), plus one hundred dollars ($100.00) for each on-site employee employed by Contractor or its Subcontractor, for each calendar day, or portion thereof, such on-site employee is employed without the construction safety training required in Section 292.675, RSMo_ 6. Contractor acknowledges that violations of Section 292.675, RSMo, and imposition of the penalties described therein shall be investigated and determined by the N ssouri Department of Labor and Industrial Relations..' 7. Contractor acknowledges that in the event that the Mrssouri Department of Labor and Industrial Relations has determined that a violation of Section 292.675, RSMo., has occurred and that a penalty shall be assessed, the City shall withhold and retain all sums and amounts due and owing when making payments to Contractor under this Contract. 845-2662 OSHA - 1 FURTHER AFFIANT SAITH NOT. IN AFFIRMATION THEREOF, the facts stated above are true and correct (the undersigned understands that false statements made in this Sling are subject to the penalties provided in Section 575.040, RSMo.) 0 ATTEST: becreuuyomex omcerl-„ ; 1•_, s (S#W iOF'CQRP()RATION) Y ) ss. Co Y OF CAPE GIRARDEAU ) On this ��day of J-="�� , 201, before me appeared Q ,tome Personally known, who, being by me duly sworn, did say th4 he is the - of 1 n �'S�. ���r a Missouri Corporation, and that the seal affixed to the foregoing Lirumeut is the seal of said Corporation, and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors, and acknowledged said instrument to be the free act and deed of said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my official seal, at office in Cape Girardeau, Missouri, the day and year first above written. /\ My Commission 845-2662 OSHA -2 DBE Submittal Forms (6) DBE Submittal Fortes: This form must be submitted by 4 p.m. three (3) business days after bid opening. (A) DBE Contrail Goal: By submitting this bid, the bidder certifies that the bidder is familiar with the DBE Program Requirements in this omftact The contract DBE goal for the amount of work to be awarded is 10% of the total federal project price. The bidder shall also complete the DBE Submittal Form in accordance with the program requirements. (B) DBE Participation: The bidder certifies that A will utilize DBE's as follows: ,ID_% OF TOTAL FEDERAL CONTRACT NOTE: Bidder must fill in the above blank. If no percentage is specified, the bidder certifies that it agrees to, and will comply with the contract goal. If a percentage below the contract goal is specified, then the bidder must submit complete documentation of good faith efforts to meet the DBE contrail goal, immediately below. I (C) Cerfflcafion of Good Faith Efforts to Obtain DBE Participation: By submitting its signed bid, the bidder certifies under penalty of perjury and other provisions of law, that the bidder took each of the following steps to try to obtain sufficient DBE participation to achieve the Commission's proposed DBE Contract Goal: (Attach additional sheets if necessary). 845-2662 DBE - 1 DBE Submittal Forms Identification of participating DBEs: The information shown on this page must be completed. If this page Is submitted but not signed, ft wfl not be cause for rejection. The apparent low and second low bidder must file this form with the by 4:00 p.m. on the third working day after the bid opening. Fax or email transmittal Is permitted. The fax number is and the email address for submittal is . The original copy must be mailed by ovemight mail to the Local Public Agency the day of the FAX or email transmittal. Contact External Civil Rights at (573) 751-7801 for questions or assistance in completion. (Note: Submittal of this form is not required If the Contract DBE Goal Is 0%) The undersigned submits the following list of DBFs to be used in accomplishingthe work of this contract. The work, supplies or services, applicable value and percent of total federal contract each DBE is to perform or famish is as follows: (AI DBE Name & (B) Bid Item numbers (C) $ Value of DBE of Work " (D) % Of $ Value I (E) $ Amourd Applicable to (F) % Of Total Contract Address (Or Line numbers) (Una Price x Quantity of each Applicable to DBE Goal " DBE Goal for each ,lam Amount for each Item Item In B, or Lump Sum) (1110%, et1%) (ElTotal Contract C x D) Amount DO °jb .tr 1.(,21-3-30 -c'b L) to tpD3Dot Total 0k3 Total Total 5 7M 2- R0 1Zr.MRra 54TL P.o.RA55� #d5-fikl�0 rl aar�� I��p V�fIJvPID �% YgCk6 n,(AO 63.765 1 Tote) Total vc Total 3 S;l�rE�lc t� Nvo s. c mm I Sfi+ PA "ill -319i a •l+a, brr0lItem, IN, D c�3 Twat150Tow Total 4. Total Total Total Total DBE Participation a'j,333..'`� no t" Cannot ezwad contact amount for given item of work 845-2662 DBE - 2 DBE Submittal (A) (B) (C) (D) (E) (F) DBE Name 8 Address Bid den $ Value of DBE of Work " % Of $ Value $ Amount % Of Total Contract numbers Applicable to DBE Goal Appricable to DBE Amount for each item (Unit Price x Quantity of Goal for each dem each dem In B, or Lump Sum) (100%.60%) (C x D) (Errotal Contract Amount Truddn Services 6A X= P.O. 130% ►A?d the4DBE s+ #:/r (>7 560 po I 100% �j J� [� L On yr �edfU `r b owns the trucks or Is y� leasing from a DBE firm Trucking Services I Only Include Fees forTructdng Trucks ere leased Services from non-0BE source Brokered Services Only Include Fees for Brokered Services Totals (Page 1) a7 333• Totals (Page 2) XT VV Totals (additional pages If needed) Total DBE Participation 3 3 833. `5D 3v, AR -' l o 67D "" Cannot exceed oonfract amount for given Poem of work. 845-2662 DBE -3 U1 UNITED FIRE & CASUALTY COMPANY 118 Second Avenue SE, PO Box 73909 Cedar Rapids, Iowa 52407-3909 319-399-5700 (A Stock Company) BID BOND KNOW ALL BY THESE PRESENTS, that we Lappe Cement Finishing, Inc. 2710 County Road 413, Friedheim, MO 63747 as Principal, hereinafter called the Principal, and the UNITED FIRE & CASUALTY COMPANY, a corporation duly organized under the laws of the State of IOWA, as Surety, hereinafter called the Surety, are held and finely bound unto City of Cape Girardeau 401 Independence St., Cape Girardeau, MO 63701 as Obligee, hereinafter called the Obligee, in the sum of Five percent of bid amount Dollars ($ 5% of bid amount ), for the payment of which sum well and truly to be made, the said principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, finely by these presents. WHEREAS, the Principal has submitted a bid for Safe Routes to School NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performance of such contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such contract and give such --bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with, another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 21 day of February 20 14 I As 1 017 N CONT 0001 OB99 Lappe Cement Finishing, Inc. �d ATTOR oma, the laws :of"the State at lows; 11i.Ytltll.rlHC.¢•tiw�nmrvu z wrvuxn r, a wiyuaauuu ,a,.r v+�; urs.. w+..:��w�s ............. -�^a -- W- w -- Texas; and FINANCfAL PACIFIC II3SUItANC13,C01vIPANY a :corporation �9 organupd aUd erdssting under the laws of the State of CaTrforna •(beets col&ciively calledtlre Comp ernes and hsv'mgDieacotlptpte an Calot State of does amaka, constdrte�d appeint "TDDI3 A WARD, OR NANCY $TRAU OR PRISCLiLA H NUNT. ALL INDTV�UALLY,OFE GL;RARDEAU MO OR Ct1ARLFS'.iQ DECKER ;OR:ALAN R;RAi15ENBERGER, liR._BEULANM YOUNG OR..�ASON.RI1llSENBERGER"i OR RATTY `z 'i REYNOLDS, ALL INDIVIDUALLY of CARBONOAl.1= IL ' '" '- ' their true sadI&M Atiomey(s}m-Fad with power and authority hereby conferred to sign seal and execute in its behalf all lawfhLbo»dc, . 1'and other obligatory instruments ofsirrrharnature provided that no single obligation shall exceed_ :-550.000, 000.00 and to bind the Companies thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Compeaues .. . andallQf the acts of said Attorney, Ptuavag W the authority. y given and hetsbyratified and confirmed `hIaAu* .oritY�=:bygrantedshellexpimthelSt day of September, 2015 unless sooner.'revnked byUNfIEQFIRE& " CASUALTY COMPANY UNITED TARE & INDEMNITY 06Iv1PANIr, AND FINANCIAL PACIFIC"INSURANCE CONIPANY, Th sTasirr of Attorney is made and x6cuted pursuant to and by authority of the following bylaw duly adopted onMay:— J 5 2(313, hY the Boards of Directors of UNITED FIRIi & CASUALTY COMPANY, UNITED FIRE & BMUE41TY COMPANY,'and FINANCIAL 4ACIFIC INSURANCE COMPANY -Article VI - Surety Bonds and UndertakW Sedtws 2 Appoivhuent of Attorney -in -Fact "The President or any Vice President, or any other officer the Companies' may', fivm time W . • tune, 'Appoint by Written •ce rates attorneys -in -fad to act in behalf of the Companies in the execution of poHeies of uuucence„bonds, s jiudaWCmgh and -other ollhgatory instruments of tike nature. The signature of any officer authorized hereby, and She Corporate seal, may be,., affixed by facsimile to angpower.of attorney or special power of attorney or certification of either amhodzed hereby, sock signature and seal, whor: soused, being adopted by the Companies as the original. signature of such offices and the original seal of the Coon _ es, to be valid and bidding Upon tile'Companies with the same force and effect as though manually affixed- Such attorneys-in-&ct, subject to the RMItShMS set forth in their respective certificates of anthonty shall have full power to bind the Companies by their signature and execution of any such ibshuoucros-:and to attach the sealof the Companies thereto. The President or any Vice President, the Board.dDirecmrsor.any other of>Iar of the Companies may at anytime revoke all power and authority previously given to any afYomey-inMAG3- „wau•yy ,,,wraa•y, IN WITNESS WHEREOF, the COMPANIES have each CaliSCd these presorts t0 be signed by its 7*\�iviccpresidrotanditscorporatesealtobeheretoaffixedtitinlst daY:of September. 2073 UN= FIRE & CASUALTY CO mRroc�i# o .� MPANY . —• __ = wry 010 UN=FIRE &imIDEmNP1yCOMPANY �'rra., �� SEAL Y� s 1989 FINANCIAL PACIFIC INSURANCE COMPANY By: x . V lnv..ti_4 I State of Iowa, CountyLain, ss. ' rce President fln;ls� daY:ofy epteaber. 29.a3, before me persdvRtty came Dennis J. Rtchmann .: to me knoiva;.who being by me dufysvmra, did depose and any; that he resides in Cedar Rapids, State of Iowa; that ]reds a Vra President of Uiv'TII� FIRE & CASUALTY COMPANY, a Vice President of UNITED FIRE & INDIA galY COMPANY, and a Vice President of FINANCIAL PACIFIC INSURANCE COMPANY the corporations described m and which. executed the above iustnrmeal; that he knows the seal of said corporations: that the seat affixed to the said instrument is such corporate seal; that itwas so aflued pdr want to authority given by the Board of Directm of said corporations: and thathei signedhis name thereto pursuant to like aitthonty. and acknowledges stone to be the ad and deed m said corporstionQr E JUdah A. times a Notary Public tows NWaliei Seal . ' Commission mimber 773041 .My commission ires: 4/23/2015 w my Commission Exptres ¢Q3r1015 `., FIRE of Attorney and a ORIGINALS ON said originals am `-lniesth this dayof�-c-V7r, ,ma o„onnyyr .=L�bst �•Q��$��yar� of -�-co4law 5 -ci°$ -s •— r 'v a.. tCs BPQA0045 0913... OF subscribed my name nd Assistant Secretary of CJNIfED FIRE & do hereby certify that I have compared the i ions of said Corporations as set forth in said and that the same are correct ttansc6pts the ow. in fill force and effect. g0forporate seal of the said Corporations )ENINITY.COhTANY, ;omg copy of the Power , ver of Attorney, with the and of the -whole ofthe STATE OF ILLINOIS ) ) ss COUNTY OF JACKSON ) On jp� r L� & rr if a ( '10 1 _ before me, a Notary Public in and for said County and State, residing therein, duly commissioned and sworn, personally appeared Jason A. Rausenberger known to me to be Attorney -in -Fact of United Fire 5 Casualty Co. the corporation described in and that executed the within and foregoing instrument, and known to me to be the person who executed the said instrument on behalf of the said corporation, and (s)he duly acknowledged to me that such corporation executed the same. IN WITNESS WHERFOF, I have hereunto set my hand and affixed my official seal, the day and year stated in this certificate above. Notary Public. State of lNrtols Commission E>j*w fill= MAR 17 29% RY- DST