HomeMy WebLinkAboutRes.2777.09-09-2013BILL NO. 13-120
RESOLUTION NO.( E,
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT WITH R.L. PERSONS
CONSTRUCTION, INC., FOR THE BROADWAY STORM
WATER RELIEF SEWER
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF CAPE
GIRARDEAU, MISSOURI, AS FOLLOWS:
ARTICLE 1. The City Manager, for and on behalf of the
City of Cape Girardeau, Missouri, is hereby authorized to
execute an Agreement with R.L. Persons Construction, Inc., for
the Broadway Storm Water Relief Sewer, in the City of Cape
Girardeau. The Agreement shall be in substantially the form
attached hereto as Exhibit A, which document is hereby approved
by the City Council, with such changes therein as shall be
approved by the officers of the City executing the same.
PASSED AND ADOPTED THIS DAY OEC`, 2013.
ATTEST:
Gayl�)L. Conrad, City Clerk
Harry E." Rediger, Mayor
uy \
�
CITY OF CAPE GIRARDEAU
BROADWAY STORMWA TER RELIEF SEWER
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the day of in the year
2013 by and between the City of Cape Girardeau, Missouri (hereinafter called OWNER)
and R. L. Persons Construction, Inc. (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
Work shall consist of constructing new stormwater sewer infrastructure from existing
stub locations at the intersections of Broadway and Ellis, Broadway and Frederick, and
Broadway and Middle to a new junction chamber that shall be constructed at the entrance
to the Merriwether Storm Tunnel. New sanitary sewer infrastructure will be installed along
Merriwetherto accommodate sanitary sewer lateral lines. Deep trenching will be required
throughout the project. All other work to be performed as specified in the bid documents
for the Broadway Stormwater Relief Sewer.
Article 2. ENGINEER.
The City Engineer or his designee is to act as OWNER'S representative, assume all duties
and responsibilities and have the rights and authority assigned to ENGINEER in the
Contract Documents in connection with completion of the Work in accordance with the
Contract Documents.
Article 3. CONTRACT TIMES.
3.1 The work will be substantially completed within One Hundred Eighty (180) calendar
days after the date when the Contract Times commence to run as provided in paragraph
2.3 of the General Conditions, and completed and ready for final payment in accordance
with paragraph 14.13 of the General Conditions within Two Hundred Ten (210) days
after the date when the Contract Times commence to run.
3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
A-1
completed within the times specified in paragraph 3.1 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expense and difficulties involved in proving the actual loss suffered by OWNER if
the Work is not competed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a
penalty) CONTRACTOR shall pay OWNER One thousand two hundred dollars $1200.00
for each day that expires after the time specified in paragraph 3.1 for Substantial
Completion until the Work is substantially complete. After Substantial Completion, if
CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time
specified in paragraph 3.1 for completion and readiness for final payment or any proper
extension thereof granted by OWNER, CONTRACTOR shall pay OWNER One thousand
five hundred dollars $1500.00 for each day that expires after the time specified in
paragraph 3.1 for completion and readiness for final payment.
Article 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts
determined pursuant to paragraphs 4.1 and 4.2 below:
4.2 For all Unit Price Work, an amount equal to the sum of the established unit price for
each separately identified item of Unit Price Work times the estimated quantity of that item
as indicated in the bidding documents.
TOTAL OF ALL UNIT PRICES: Two million two hundred fifty-one thousand six
hundred eighty-seven dollars and no cents ($ 2,251,687.00)
As provided in paragraph 11.9 of the General Conditions estimated quantities are not
guaranteed, and determinations of actual quantities and classification are to be made by
ENGINEER as provided in paragraph 9.10 of the General Conditions. Unit prices have
been computed as provided in paragraph 11.9.2 of the General Conditions.
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1 Progress payments, Retainage. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR'S Application for Payment as
recommended by ENGINEER, on or about the 10th day of each month during construction
as provided in paragraphs 5. 1.1 and 5.1.2 below. All such payments will be measured by
the schedule of values established in paragraph 2.9 of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is
no schedule of values, as provided in the General Requirements.
OVA
5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as ENGINEER shall determine, or OWNER may
withhold, in accordance with paragraph 14.7 of the General Conditions.
90% of Work completed (with the balance being retainage). If Work has
been 50% completed as determined by ENGINEER, and if the character and
progress of the Work have been satisfactory to OWNER and ENGINEER,
OWNER, on recommendation of ENGINEER, may determine that as long as
the character and progress of the Work remain satisfactory to them, there
will be no additional retainage on account of Work completed, in which case,
the remaining progress payments prior to Substantial Completion will be an
amount equal to 100% of the Work completed.
90% (with the balance being retainage) of materials and equipment not
incorporated in the Work (but delivered, suitably stored and accompanied by
documentations satisfactory to OWNER as provided in paragraph 14.2 of the
General Conditions).
5.1.2 Upon Substantial Completion, in an amount sufficient to increase total payments to
CONTRACTOR to 95% of the Contract Price (with the balance being retainage), less such
amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions.
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with
paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the
Contract Price as recommended by ENGINEER as provided in said paragraph 14.13.
Article 6. INTEREST.
All moneys not paid when due as provided in Article 14 of the General Conditions shall
bear interest at the maximum rate allowed by law at the place of the Project.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into the Agreement, CONTRACTOR makes the
following representations:
7.1 CONTRACTOR has examined and carefully studied the Contract Documents
(including the Addenda listed in paragraph 8) and the other related data identified in the
Bidding Documents, including "technical data".
7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance and
furnishing of the Work.
A-3
7,3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws
and Regulations that may affect cost, progress, performance and furnishing of the Work.
7.4 CONTRACTOR has carefully studied all reports of explorations and tests of
subsurface conditions at or contiguous to the site and all drawings of physical conditions in
or relating to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified. CONTRACTOR acknowledges that
such reports and drawings are not Contract Documents and may not be complete for
CONTRACTOR'S purposes. CONTRACTOR acknowledges that OWNER and ENGINEER
do not assume responsibility for the accuracy or completeness of information and data
shown or indicated in the Contract Documents with respect to Underground Facilities at or
contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for having done so) all such additional supplementary examinations,
investigations, explorations, tests, studies and data concerning conditions (surface,
subsurface and Underground Facilities) at or contiguous to the site or otherwise which may
affect cost, progress, performance or furnishing of the Work or which relate to any aspect
of the means, methods, techniques, sequences and procedures of construction to be
employed by CONTRACTOR and safety precautions and programs incident thereto.
CONTRACTOR does not consider that any additional examinations, investigations,
explorations, tests, studies or data are necessary for the performance and furnishing of the
Work at the Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents.
7.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the site that relates to the Work as indicated in the Contract Documents.
7.6 CONTRACTOR has correlated the information known to CONTRACTOR, information
and observation obtained from visits to the site, reports and drawings identified in the
Contract documents and all additional examinations, investigations, explorations, tests,
studies and data with the Contract Documents,
7.7 CONTRACTOR has given ENGINEERwritten notice of all conflicts, errors, ambiguities
or discrepancies that CONTRACTOR has discovered in the Contract Documents and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract
Documents are generally sufficient to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.
A-4
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8,1 This Agreement (pages 1 to 7 inclusive).
8.2 Exhibits to this Agreement (pages BF- 1 to BF- 9 , inclusive).
8.3 Performance, Payment, and other Bonds, identified as exhibits and consisting of
pages.
8.4 Notice to Proceed.
8.5 General Conditions (pages 1 to 55, inclusive). (EJCDC No. 1910-8 1990 Edition)
8.6 Supplementary Conditions (pages SC -1 to SC -5 , inclusive).
8.7 Specifications bearing the title Broadway Stormwater Relief Sewer.
8.8 Drawings,
8.9 Addenda numbers 1 to 1 , inclusive,
8.10 CONTRACTOR'S Bid (pages BF -1 to BF- 9, inclusive) marked exhibit "A"
8.11 Pursuant to 285.530 R.S. Mo, the contractor must affirm its enrollment and
participation in a federal work authorization program with respect to the employees
proposed to work in connection with the services requested herein by 1) submitting a
completed, notarized copy of AFFIDAVIT OF WORK AUTHORIZATION and 2) providing
documentation affirming the bidder's enrollment and participation in a federal work
authorization program with respect to the employees proposed to work in connection with
the services requested herein.
8,12 Documentation submitted by CONTRACTOR prior to Notice of Award (pages ^to
_, inclusive).
8.13 The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto: All Written Amendments and other documents
amending, modifying or supplementing the Contract Documents pursuant to paragraphs
3.5 and 3.6 of the General Conditions,
The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(except as expressly noted otherwise above).
A-5
There are no Contract Documents other than those listed above in the Article 8. The
Contract Documents may only be amended, modified or supplemented as provided in
paragraphs 3.5 and 3.6 of the General Conditions.
Article 9. MISCELLANEOUS.
9.1 Terms used in this Agreement which are defined in Article 1 of the General Conditions
will have the meanings indicated in the General Conditions,
9,2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and, specifically but without limitation, moneys that may become due
and moneys that are due may not be assigned without such consent (except to the extent
that the effect of this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or discharge
the assignor from any duty or responsibility under the Contract Documents,
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the
Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall
continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the
Contract Documents shall be reformed to replace such stricken provision or part thereof
with a valid and enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
9.5 Pursuant to 292.675, R.S. Mo, the contractor is informed that all contractors or
subcontractors doing work on this project to provide, and require its on-site employees to
complete, a ten (10) hour course in construction safety and health approved by the
Occupational Safety and Health Administration ("OSHA") or similar program approved by
the Missouri Department of Labor and Industrial Relations which is at least as stringent as
an approved OSHA program. The training must be completed within sixty (60) days of the
date work on the project commences. On-site employees found on the worksite without
documentation of the required training shall have twenty (20) days to produce such
documentation.
9.6 The General Contractor shall provide to the City of Cape Girardeau City Engineer's
Office weekly certified payrolls from the General Contractor and all Subcontractors during
the course of the project. These must be provided on a weekly basis; if no work was done,
then a payroll stating "No Work Done" must be submitted.
A-6
,
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed the Agreement in
multiple copies, One counterpart each has been delivered to CONTRACTOR and
ENGINEER and finro counterparts to the OWNER. All portions of the Contract Documents
have been signed, initialed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
This Agreement will be effective on �Cr'%�� 9 , 2013 (which is the
Effective Date of the Agreement).
OWNER City of Cape Girardeau CONTRACTOR R. L. Persons Construction
_.
Inc.
Scott Me r Cit Mana er
��v K/ii � �'V�'f
By. /�III���
Y'
[COR SEAL] [CORPORATE SEA
;
Attest � ,�� Attes
Gayle . Conrad, City Clerk
Address for giving notices Address for giving notices
401 Independence Street 3025 Cravens Road — P. O. Box 3938
Cape Girardeau, MO 63703 Poplar Bluff, Missouri 63902-3938
(If OWNER is a public body, attach License No.
evidence of authority to sign and
resolution or other documents Agent for service of process:
authorizing execution of Agreement.
�
'�'��-'�'�� (If CONTRACTOR is corporation,
l�� ,, ' ��a���;; attach evidence of authority to sign.)
�,, .�
•G;, .� t,.
��� ;� �;,.�
;
. I _.i w=
�i ;�; `�
�
�t, i ;. 2
��-' � , �
�;
,/ '
�\�M - - ` �%
��' V 'r' /
a:�C.`.S�''�J'/•
A-7
"EXHIBIT A"
CITY OF CAPE GIRARDEAU
BROADWAY STORMWATER RELIEF SEWER
BID FORM
(EJCDC 1910-18) (1990)
PROJECT IDENTIFICATION: Work shall consist ofconsiructingnew stormwatersewer
infrastructure from existing stub locations at the intersections of Broadway and Ellis,
Broadway and Frederick, and Broadway and Middle to a new junction chamber that shall
be constructed at the entrance to the Mem`wether Storm Tunnel New sanitary sewer
infrastructure will be installed along Merriwether to accommodate sanitary sewer lateral
lines. Deep trenching will be required throughout the project. All other worm to be
performed as specified in the bid documents for the Broadway Stonrrwater Relief Sewer.
THIS BID IS SUBMITTED TO: CITY OF CAPE GIRARDEAU, MO
409 INDEPENDENCE STREET
CAPE GIRARDEAU, MO 63703
1. The undersigned BIDDER proposes and agrees, if the Bid is accepted, to enter into an
agreement with OWNER in the form included in the Contract Documents to perform and
furnish all Work as specified or indicated in the Contract Documents for the Bid Price and
within the Bid Times indicated in this Bid and in accordance with the other ten -ns and
conditions of the Contract Documents.
2. BIDDER accepts all of the ten -ns and conditions of the Advertisement orinvitation to Bid
and Instructions to Bidders, including without limitation those dealing with the disposition of
Bid security. This Bid will remain subject to acceptance for sixty days after the day of Bid
opening. BIDDER will sign and deliver the required number of counterparts of the
Agreement with the Bonds and other documents required by the Bidding Requirements
within fifteen days atter the date of OWNER'S notice of Award_
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement,
i that:
(a) BIDDER has examined and carefully studied the Bidding Documents and the,
following:
receipt of all which is hereby acknowledged: (UstAddenda by Addendum Number and Date)
.73 13
(b) BIDDER has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance and
furnishing of the Work,
US J=
(c) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress, performance and furnishing of the Work.
i
(d) BIDDER has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physical conditions in or relating
to existing surface or subsurface structures at or contiguous to the site (except
Underground Facilities) which have been identified BIDDER acknowledges that such
reports and drawings are not Contract Documents and may not be complete forB1DDER's
j
purposes. BIDDER acknowledges that OWNER and Engineer do not assume
responsibility foraccuracyorcompleteness of information and data shown orindicated in
the Bidding Documents with respect to Underground Facilities at orcontiguous to the site.
BIDDER has obtained and carefully studied (orassumes responsibility forhaving done so)
j
all such additional or supplementary examinations, investigations, explorations, tests,
studies and data concerning conditions (surface, subsurface and Underground Facilities) at
or contiguous to the site or otherwise which may affect cost progress, performance or
furnishing of the Work or which relate to any aspect of the means, methods, techniques,
sequences and procedures of construction to be employed by BIDDER and safety
precautions and programs incident thereto. BIDDER does not consider that any additional
examinations, investigations, explorations, tests, studies or data are necessary for the
determination of this Bid forperformance and furnishing of the Work in accordance with the
times, price and other terms and conditions of the Contract Documents.
(e) BIDDER is aware of the general nature of Work to be performed by Owner and
others at the site that relates to Work for which this Bid is submitted as indicated in the
Contract Documents.
(t) BIDDER has correlated the information known to BIDDER, information and
observations obtained from visits to the site, reports and drawings identified in the Contract
Documents and all additional examinations, investigations, explorations, tests, studies and
data with the Contract Documents.
(g) BIDDER has given Engineer written notice of all conflicts, errors, ambiguities or
discrepancies that BIDDER has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract
Documents are generally sufficient to indicate and convey understanding of all terms
and conditions for performing and furnishing the Work for which this Bid is submitted.
Any questions, comments, or concems regarding the design of this project should be
addressed to Jake Garrard, E.l , City of Cape Girardeau at 573-339-6327.
(h) This Bid is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or rules
ofany group association, organization orcorporation, BIDDER has not directly orindirectly
induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not
BF -2 P
a4
solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER
has not sought by collusion to obtain for itself any advantage over any other Bidder or over
OWNER.
(i) Pursuant to 285.530 RSMo, the bidder must affirm its enrollment and participation in
a federal work authorization program with respect to the employees proposed to work in
connection with the services requested herein by
• submitting a completed, notarized copy of AFFIDAVIT OF WORK
AUTHORIZATION and
• providing documentation affirming the bidder's enrollment and participation in a
federal work authorization program with respect to the employees proposed to work
in connection with the services requested herein,
• htto.//www.uscis.gov/portaUsite/uscis
(j) Bidders are informed that the Project is subject to the requirements of Section
292.675, R.S. Mo, which requires all contractors or subcontractors doing work on the
Project to provide, and require its on-site employees to complete, a ten (10) hourcourse in
construction safety and health approved by the Occupational Safety and Health
Administration ("OSHA') or similar program approved by the Missouri Department of Labor
and Industrial Relations which is at least as stringent as an approved OSHA program. The
training must be completed within sixty (60) days of the date work on the Project
commences. On-site employees found on the worksite without documentation of the
required training Shall have twenty (20) days to produce such documentation.
4. BIDDER will complete the Work in accordance with the Contract Documents for the
following price(s): L
UNIT PRICE BID
M
5274000
ITEM
Contractor Furnished
Surveying and Staking
1SP01-1 Traft Control
201-1
Erosion Control -
202 -1
Clearing and Grubbing
203-1
Removal of lmprbvements
203-2
Pavement Removal
UNIT
LS
LS
LS
Acre
LS
SY
EST.
QTY.
1
1
1
0.1
1
7063
BF -3
UNIT PRICE
TOTAL EST.
PRICE
$;�•c�
$ lr'�
$ ,�,SoO•oo
$ mos �soo
Addendum One
3
q
204-1
Rock Excavation
205-1
Embankment
209-1
Seed and Mulch
600-1
Flexible Pavement Repair
600-2
Portland Cement Concrete
$
Pavement Repair
JSP02-1
Remove and Replace
0.2
Existing Sidewalk
JSP03-1
Remove and Replace
6855
Sidewalk Ramps
JSP04-1
Remove and Replace
SY
Existing Driveway
$
Remove and Replace
JSP05-1
Existing Upright Curb and
40
Gutter
Manholes, Type A, 5'-
60221100
Diameter, Type 1 Frame,
$
Closed Lid
$ /Z 9M.00
Manholes, Type A, 7-
60224459
Diameter, Type 1 Frame,
Closed Lid
Manholes, Type A, 8'-
60224459
Diameter, Type 1 Frame,
Closed Lid
60235700
Inlets, Type A, Type 3
Frame and Grate
1
Manholes to be Adjusted
60255800
with New Type i Frame,
Closed Lid
JSP06-1
Storm Sewer Junction Box
JSP07-1
Junction Chamber 5-2
901-1
12 in. Class 111 RCP
901-2
24 in. Class 111 RCP
901-3
36 in. Class 111 'RCP
901-4
42 in. Class Ill RCP
t
901-5
48 in. Class N RCP
3
2
$ &, 40
$ 2 4W
LS
CY
100
$
''Dm •RGr$
�4fGi�0 -'Op
CY
557
$
if•DO
$ �1'6•pp
Acre
0.2
$ /r9, AM •40
$
SY
6855
$
2•+fb
$Z$?, 9/O.ve
SY
209
$
X •aq
$ /f G:�O•uy
SY
40
$ 6eAW-#,o
SF
162
$
7 DA
$ /Z 9M.00
SY
38
$
$ (o�6.a?J•OD
LF
504
$ tip 200 -
Each
1
$3
?ey -ow
$ 3 7D0 w _
Each
2
$
O."Otf
$ /�dG�•o0
Each 8 $ %rW-049 $4�W.0'0
Each 1 $ Zj-571m'DD_
Each 2 $ �-W'4b $ 3"-m
Each
2
$ &, 40
$ 2 4W
LS
1
$ 63S -O'g
00
LF
36
$ liO.oO
$ ��8�if0,OD
LF
24
$ Z•Q%'p0
$ GAJ •O!7
LF
343
$
$j
LF
680
$ /44.x
$ 99, ZpBO
LF
879
$ ZZD 00
$,49 %Z •QD
RIM
Addendum One
m
901-6
60 in. Class HVRCP (Top of
Trench to Flowline < 10)
901-7
60 in. Class 111 RCP (Top of
Trench to Flowline >,10)
8000-1
4' Diameter Standard
Manhole
3000-2
8" Polyvinyl Chloride Pipe
3000-3
12" Polyvinyl Chloride Pipe
3000-4
12" Ductile Iron Pipe
3000-5
18" Polyvinyl Chloride Pipe
3000-6
BYPASS PUMPING
Sanitary Lateral
JSP08-1
Replacement (4" or 6"
Diameter)
Reconnection of Existing
JSP09-1
Lateral (6"on 8"
Connection)
Reconnection of Existing'
JSP09 2
Lateral (6" on 12"
Connection)
J$P10-1
Storm Sewer Plug, 24"
JSPio-2
Storm Sewer Plug, 30"
JSP10-3
Storm Sewer Plug, 36"
6181000
Mobilization
t
LF 675
LF 1974
Each 5
LF
LF
LF
LF
LS
378
211
22
55
1
LF 359
Each 4
Each 2
Each
Each
Each
LS
TOTAL BID FOR ALL UNIT PRICES
2
1
1
1
$ /*e00 -P&O
$ / M,0o
$ lSod •L�
$ /dra0•ao
$ 623, 7041
$ A -W #A0
3r$�,00
$
$
$ 3S,`�•oo
$ 23,33S,co
687. oy
l o �f���✓7�is�o�vyol+�°o��`r7'`�Y 6WE' �iBdn+,�o'J'iX/jt�aalr+Pc�
01
(Written figure)
(Total bid amount is to be shown in both words and figures. In case of discrepancy, the
amount shown in words will govern. In case of error in extension, the unit and lump sum
prices under each Pty Item will be considered correct, and these sums when properly
extended, shall constitute the Bid.)
Unit Prices have beets computed in accordance with paragraph 11.9.2 of the General
Conditions.
J
BF -5
Addendum One
5. BIDDER agrees that the Work will be substantially complete within One Hundred
Eighty (180) calendar days after the date when the Contract Times commences to run as
provided in paragraph 2.3 of the General Conditions, and completed and ready for final
payment in accordance with paragraph 14.13 of the General Conditions within Two
Hundred Ten (210) calendar days after the date when the Contract Times commences to
run.
BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of
failure to complete the Work within the times specified in the Agreement.
6. The following documents are attached to and made a condition of this Bid:
(a) Required Bid Security in the form of bid bond or cashiers check '
(b) Acknowledgement of any addenda issued.
(c) Exhibit Affidavit of Work Authorization
(d) Exhibit Affidavit of Excessive Unemployment (if applicable)
(e) The E Verify Program for Unemployment Verification Memorandum of
Understanding http.lAvww. uscis.govlfifes/nativedocumentsl?WOU. pdf
(t) Exhibit Affidavit of OSHA Training
(g) Certification Regarding Debarment, Suspension and Other Responsibility Matters
7. Bidder agrees to submit the following documents within three (3) business days after
the opening of Bids if requested:
(a) BIDDER'S Qualification Statement with supporting data.
8. Communications concerning this Bid shall be addressed to:
Address
CONSTRUCTION
p'.lJ. Oun
Poplar Bluff, Missouri 63902-3938
(a) Performance and Payment Bonding Company
Name osr 2f-S�0Y-(—'
Address P -LJ • CxP-Cu+we-WN LLS &-L rnm (+ .M'D
AgentlPower of Attorney Name (if used)
MW
�. Address
I�
w
w
t
9. Terms used in the Bid which are defined in the General conditions or Instructions will
have the meanings indicated in the General Conditions or Instructions_
SUBMITTED on N�� , 201
State Contractor License No.
IF BIDDER is.
An Individual
By
doing business as
Business address:
Phone No.:
(Individual's Name)
A Partnership
By
(Firm Name)
(General Partner)
Business address:
Phone No.:
(SEAL)
Corporation
By `R� pig r•��n
S CO t err, C- (SEAL)
_ �v,s�r �
(Corporation Name)
(State of Incorporation)
Byi1i� •O i r (SEAL)
(Name of Person Authorized to Sign)
(Title)
(Corporate Seal}
BF -7
Lerida Bimel
L / (Secretary)
Business address. R.L_ PERSONS CONSTRUCTION 30175 CC UA) -P -ns RJ
P.O. Box 3938 i ar !� ( / r � O
Poplar
BlWY, Mfssoud 63902-3938 �° �7 t 310 t
PhoneNo.:
Date of Qualification to do business is -7/2-3 1 Igo
A Joint Venture
By (SEAL)
(Name)
(Address)
By (SEAL)
(Name)
(Address)
Phone Number and Address for receipt of official communications:
(Each joint venturermust sign. The manner of signing for each individual, partnership and
corporation that is a party to the joint venture should be in the manner indicated above.)
RIM
lk'� BREAKDOWN OF WORK FORGE (Required):
The Contractor shall be registered with the Missouri Secretary of State in order to work on
this project.
BIDDER hereby states that he W11 perform the following items of work directly without
employment of subcontractors:
All ar c exeedS •�Q%m�
y - -
I. .
I .
It is anticipated that the following subcontractors will be employed for work on this project_
0
a
*SUBCONTRACTORS:
(/Name of Company) (Type of Work)
MA t /'
* Afl subcontractors shall be registered with the Missouri Secretary of State in orderto wont
on this project
•